Loading...
HomeMy WebLinkAboutLot Certifications - 01/12/2021 (7)2/14/17 Page 1 CERTIFICATION OF LOT GRADING Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e) Date: Address: Lot: Block: Subdivision: Permit Application #: Larimer County Parcel #: Larimer County Reception #: (on development agreement) I, (print) , a Colorado registered professional engineer, verify that construction of all stormwater facilities and grading is complete and hereby submit this certification. Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots. 1.Certification includes attached Stormwater-approved grading plan. (NOTE: City’s Building Department does not approve grading plans). 2.Certification includes the attached as-built survey dated (must be within 60 days of the date the certification is submitted) accurately and truthfully depicting elevations for: Top of foundation/finished floor Finished grade on each side of the structure Quarter points along each lot line (not more than 50 feet apart) Break points/high points Swales Berms Retaining walls Air conditioning pads Window wells Any other appurtenance(s) within an easement 3.All elevations are within a 0.2 foot tolerance of the approved grading plan. 4.The top of foundation is at least 6 inches above the highest grade surrounding the structure. 5.There is a minimum grade of 5% away from the structure within the first 5 to 10 feet adjacent to the residence. 6.All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than 33% (3:1). 7.All flow lines of stormwater drainage swales are a minimum of 6 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Stormwater-approved grading plan. 8.All downspout locations and discharge directions are shown on the as-built survey. Runoff is directed into an appropriate drainage system or lot line swale, and it is not directed onto neighboring properties. No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes 01/12/2021 Mountain's Edge 2432 Ridge Top Drive B2000048, B2000050, B2000051, B2000052, B2000053 Fort Collins, CO 80526 9721350001, 9721350002, 9721350003, 9721350004, 9721350005 1-5 4 20180053810 Stephanie Thomas 12/09/2020 ST ST ST ST ST ST ST ST A localized area near the front door of Lot 5 is only 4" of exposed foundation. There are no downspouts to this location and this location has sufficient grade away from the building. This does not cause engineering concern. 2/14/17 Page 2 9.A smooth transition with no vertical offset (step) in grade is provided at the lot line to all adjacent properties. 10.The grading of this lot does not adversely affect neighboring properties or City infrastructure. 11.Landscaping has been completed prior to survey. If not, please indicate who will be responsible for completing landscaping: 12.Final site cleanup has been completed. 13.I personally visited the site as part of the certification process, and in my professional opinion, the as-built survey is an accurate representation of the site conditions.. No Yes No Yes No Yes No Yes No Yes 14.Based on this information, I certify that (check one): □The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). □The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. Name: Email: Phone: Company: Address: NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) WaterUtilitiesEng@fcgov.com Mailing Address Fort Collins Utilities ATTN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 Questions? 970-221-6700 PE Stamp Sign and date TNT Landscaping 4 Stephanie Thomas stephanie@northernengineering.com 970-568-5412 Northern Engineering 301 N. Howes Street Unit 100 Fort Collins, CO 80521 ST ST ST ST ST 01/12/2021 January 12, 2021 Mr. Dan Mogen City of Fort Collins Utilities 281 N. College Avenue Fort Collins, CO 80521 RE: Mountain’s Edge – Block 4 - Certification of Lot Grading Dear Mr. Mogen, Please find the attached Certification of Lot Grading for Block 4, Mountain’s Edge (Address: 2432 Ridge Top Drive). This letter is provided to document the deviations from the approved grading plans. The following items are deviations from the approved grading plans: 1. The top of foundation was poured 0.20’ higher than the design. The finished floor was expected to be the same as the top of foundation due to the hung joists. Instead the finished floor was laid 0.31’ higher than the top of foundation. Due to these changes during construction the finished floor is 0.51’ higher than designed. 2. The garage pads were designed to be 8” below the top of foundation. It was expected that there would be a step from the garage into the units. At construction, these pads were poured to be ADA accessible into the unit. As such, these pads were poured higher than planned. The driveway was adjusted to match the garage pad and the flowline. The installed driveways have a minimum slope of 8.7% and 14%. FHA recommends a maximum driveway gradient of 14%. 3. A localized landscape areas adjacent to the front door of Lot 5 is only 4” below the top of foundation. No downspouts are directed to the area and these areas have a sufficient slope away from the building. As no drainage is directed to this area and this area has sufficient fall away from the building, we have no concern for the function of drainage in this area. 4. The sidewalk at the southeast corner of the building was built 0.5’ higher than the design. A sidewalk chase was installed to allow for drainage under this walk. The grading and drainage improvements around the building meet the intention of the original plans and design. Please do not hesitate to contact me at 970.568.5412 or stephanie@northernengineering.com. Sincerely, Northern Engineering Services, Inc. Stephanie Thomas Project Manager Page 2 Attachments: As-Built Elevations for Drainage Certificate – Lots 1-5, Block 4, Mountain’s Edge Approved Mountains Edge Grading Plans