CERTIFICATION OF LOT GRADING
Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e)
Date:
Address:
Lot: Block:
Subdivision:
Permit Application #:
Larimer County Parcel #:
Larimer County Reception #:
(on development agreement)
I, (print) , a Colorado registered professional engineer, verify that construction
of all stormwater facilities and grading is complete and hereby submit this certification.
Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an
explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots.
1. Certification includes attached Stormwater-approved grading plan. (NOTE: City’s
Building Department does not approve grading plans).
2. Certification includes the attached as-built survey dated (must be within 60
days of the date the certification is submitted) accurately and truthfully depicting
elevations for:
z Top of foundation/finished floor
z Finished grade on each side of the structure
z Quarter points along each lot line (not more than 50 feet apart)
z Break points/high points
z Swales
z Berms
z Retaining walls
z Air conditioning pads
z Window wells
z Any other appurtenance(s) within an easement
ϯ͘All elevations are within a 0.2 foot tolerance of the approved grading plan.
ϰ͘The top of foundation is at least 6 inches above the highest grade surrounding the
structure.
ϱ͘There is a minimum grade of 5% away from the structure within the first 5 to 10 feet
adjacent to the residence.
ϲ͘All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single
family lots when the swale is draining the runoff from only two adjoining properties)
and are not steeper than ϯϯ% (ϯ:1).
ϳ͘All flow lines of stormwater drainage swales are a minimum of 6 inches below the
elevation of ground adjacent to the structure and will direct drainage as shown on the
Stormwater-approved grading plan.
ϴ͘All downspout locations and discharge directions are shown on the as-built survey.
Runoff is directed into an appropriate drainage system or lot line swale, and it is not
directed onto neighboring properties.
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
HY
HY
HY
HY
HY
HY
HY
HY
July 13, 2021 Mountain's Edge
2450 Crown View B2100688
Fort Collins, CO 80528 9721368003
3 22 20180053810
Hayley Young
7/09/21
//1 Page 2
9. A smooth transition with no vertical offset (step) in grade is provided at the lot line to all
adjacent properties.
10. The grading of this lot does not adversely affect neighboring properties or City
infrastructure.
11. Landscaping has been completed prior to survey. If not, please indicate who will be
responsible for completing landscaping:
12. Final site cleanup has been completed.
13. I personally visited the site as part of the certification process, and in my professional
opinion, the as-built survey is an accurate representation of the site conditions..
No Yes
No Yes
No Yes
No Yes
No Yes
14. Based on this information, I certify that (check one):
Ƒ The elevations and drainage patterns of the lot/site are in substantial conformance with the City
approved drainage and grading plan for the property (information attached).
Ƒ The elevations and drainage patterns of the lot/site as measured are in general conformance with the
City approved drainage plan with exceptions (information attached). In my professional judgment the
elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the
specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a
manner consistent with the approved drainage plan.
Name:
Email:
Phone:
Company:
Address:
NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy
for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed
elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other
information necessary to confirm the above certification to:
Email (preferred)
WaterUtilitiesEng@fcgov.com
Mailing Address
Fort Collins Utilities
ATTN: Water Utilities Engineering
281 North College Avenue
Fort Collins, CO 80521
Questions?
970-221-6700
PE Stamp
Sign and date
HY
HY
HY
HY
HY
7/13/21
Blue Mountain Landscaping
✔
Hayley Young
hyoung@bjsurvey.net
303-850-0559
B&J Surveying, Inc.
6841 South Yosemite Street
Suite 100, Centennial, CO 80112
Hayley Young, PE
B&J Surveying, Inc.
6841 S. Yosemite Street; Suite 100
Centennial, CO 80112
Phone: 303.850.0559
hyoung@bjsurvey.net
7/16/2021
Matt Simpson, PE, CFM
Development Review Engineer
City of Fort Collins Utilities
970.416.2754
700 Wood Street
Fort Collins, Colorado. 80521
RE: Lot 3 Block 22, Mountains Edge Certification of Lot Grading
This letter serves to certify the deviations from grading plan on this lot. While the corner elevations for
Lot 3 Block 22, Mountain’s Edge are in substantial conformance with the elevations shown on the City
approved Final Grading Plan for the subdivision, the proposed “garden level” condition shown the
grading plan is not functional or necessary. As a ground level lot /foundation as opposed to a walkout,
the grades are not dropped in the rear as in the area grading plan. The 3’ drop shown on the grading
plan is generally not considered a functional garden level lot. B&J Surveying has only recently taken
over this project for others and did not complete the plot plan or finished grade staking. We are aware
that 3:1 slopes are not desired and for all homes in the subdivision, we will use 4:1 as a typical design
preference. For the sake of a home already designed, we did not want to recommend lowering the
grade as this was not proposed at plot plan stage and therefore the foundation may not have frost
protection if grades are lowered. The elevations and slopes for this lot are in conformance with Fort
Collins grading criteria and the drainage patterns of the City approved Final Grading Plan for
Mountain's Edge. Therefore, it is my professional opinion to approve the certification for this lot.
Sincerely,
Hayley Young, PE
B&J Surveying, Inc.
E
35,000 SQFT
CROWN VIEW DRIVE
58' R.O.W.
TRACT B
CRO
TO
TOF=5148.62
#2450
COV'D
PORCH
D D
D
D
&
T:\Projects\MOUNTAINS EDGE\MOUNTAINS EDGE.dwg, 7/13/2021 4:37:11 PM, kpollack
approved construction documents by Northern
Engineering, dated 08.22.18