HomeMy WebLinkAboutSite Certifications - 04/19/2019Page 1 OVERALL SITE and DRAINAGE CERTIFICATION Commercial, Multi-Family and Subdivision Certification Form and Checklist Project Name: Date: Building Permit Numbers: (Commercial or multi-family) Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Volume 1, Section 6.11, please fill in all applicable items in this Certification Form for Commercial, Multi-Family and Overall Single Family sites. NOTE: several items must be verified during construction. A copy of the approved grading plan must be submitted with the as-built grading plan. (As-built elevations must be written in red next to the approved elevations.) x Use “Yes” for items completed as described. x Use “N/A” for items that are not applicable to the site being certified. x If any blanks are “No,” attach an explanation referencing the item number below. Attach an explanation or description of the as-built condition for any items listed or for anything not listed but shown on the approved construction plans. Provide an as-built redline or Mylar drawing with the following: I. Water Quality and Quantity Detention Basin Certification - FCSCM Vol.2, Ch.10 For multiple detention basins on a site, provide the following for each basin separately: A.Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and volume verification calculations for the water quality capture volume and the 100-year detention storage volume. 1. Detention basin topography was prepared by a professional land surveyor registered in the state of Colorado. 2. Both proposed and as-built contours are shown on the same plan sheet (dashed lines for proposed and solid lines for as-built). 3. All critical spot elevations as shown on the approved construction plans have been verified and the as-built elevations are shown on the plan sheet. 4. Stage-storage-discharge tables are provided on a separate document. 5. Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92- 602(8) is attached and has been uploaded to the Statewide Compliance Portal (tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include: a. The cover sheet from the approved drainage report b. The stamped certification page from the approved drainage report c. As-built topographic survey d. Stamped certification page from the Overall Site & Drainage Certification e. PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet Maverik Subdivision Filing 1, Lot 1 03/22/2019 B1607221 Yes Yes Yes Yes Yes Yes Page 2 B.Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2% grade requirement. 1.Low Flow: Choose one of the following detention basin low flow options as applicable: a. Turf swale for low flow path in detention basin. There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade is . b. Concrete pan for low flow in detention basin. There is a concrete pan installed that meets the grades as shown on the approved construction plans. (Show as-built spot elevations.) c. Soft pan for low flow in detention basin. x Verify and document the soft pan material gradation, trench width and depth - to be verified during construction by engineer. Picture documentation is preferred or engineer’s statement of visual inspection and compliance. (Choose one below.) o There is a soft pan with an underdrain installed that meets the design on the approved construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations, bends, cleanouts, etc.) o There is soft pan installed without an underdrain but there is a type A or B soil. The soil type must be documented by supplying verification from a registered professional geotechnical engineer. NOTE: Spot elevations are to be within 0.2 ft. +/-. 2.Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown. Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re- graded. Provide documentation if a variance was granted for steeper slopes during the design process. 3.Spillway Certification: The following items must be field verified: a. The location of the spillway is indicated on the as-built plan. b. The width of the spillway is indicated on the as-built plan. c. The elevation(s) of the spillway is shown on the as-built plan. d. A concrete ribbon defines the location and grade of the spillway. e. There is downstream scour protection in the spillway as per the construction plans. Indicate type: (riprap size “D50” gradation and bedding type, geotextile, buried riprap with inches of bury, etc.). f. There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape features, rocks, etc. Yes Yes N/A N/A N/A N/A Yes Yes Yes Yes Yes Yes Yes 0.1% Riprap D50=6" 6 Page 3 4.Outlet Structure Certification a. The orifice plate for the approved release rate is installed with the correct size and location of the orifice. b. The orifice plate for the water quality outlet is installed with the correct hole size, number of rows and columns of holes. c. The bottom hole on both the water quality and quantity outlets are at the bottom of the plate so no water ponds in front of the plate. d. The well screen is the correct material and is installed as shown on the construction plans. e. 100-year overflow grate elevation is . (Elev. A on detail D-46) f. The top elevation of the water quality capture volume is . (Elev. B on detail D-46) g. Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the top and bolted at the bottom. h. The bottom of the outlet box has no obstructions or misalignments that will cause it to retain runoff water and is sloped at 2% towards outlet. II. Channels/Swales - FCSCM Vol.1, Ch.7, Sect.3&4 A.Capacity: The as-built capacity of all the major channels and swales has been verified. They meet or exceed capacity requirements shown in the approved drainage study for this project. 1. All swales are located within the drainage easements as shown on the construction plans. 2. Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these criteria are not met, the certification engineer will write a justification and propose mitigation for each instance or have the issues corrected. If variances to these criteria have previously been approved and are shown on the construction plans, no justification is needed. 3. As-built spot elevations on channels/swales are shown that correspond to spot elevations shown on the approved construction plans. 4. All permanent erosion control measures are installed as shown on the approved construction plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used as part of this verification.) 5. All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the system. (Pictures at tie-in points suggested.) 6. The minimum freeboard is provided for all channels and swales as shown on the approved construction plans or as identified in the approved drainage study. (Show the freeboard provided on the cross-sections as on the construction plan set or attached as separate documentation.) 7. The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees, shrubs, sod, etc. infringe on the low flow portion of channels or swales.) Yes 4930.10-4930.89 4929.10 Yes Yes Yes Yes Yes N/A Yes Yes Yes Yes Yes Yes Yes Yes Yes Page 4 III. Storm Pipes (aka storm drains) - FCSCM Vol.1, Ch.6, Sec. 4 A.Storm Drain Pipe Capacity: The as-built capacity of all pipes installed on this project has been verified and meets or exceeds the capacity requirements shown in the approved drainage study for this project. 1. All storm drain pipe sizes and materials have been verified and are in conformance with the approved construction plans. (Indicate on the plan and profile sheets that they have been verified.) Material and size substitutions must be approved prior to installation. If a pipe size or material was changed during construction, the certification engineer must attach the approval documents or supply them with this certification. Approval documents must include a calculation documenting the capacity equivalency (equal or greater) of the substituted size. 2. The longitudinal slope of the pipe is as shown on the approved construction plans. The acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans must be justified with capacity calculations on an attached sheet. 3. The as-built invert elevations have been verified and are shown on the plan and profile sheets of the approved construction plans. B.Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the approved construction plans. 1. The minimum cover requirements for all pipes have been met as shown on the approved construction plans. These will be called out in critical locations. 2. All encasements and clearances as specified on the approved construction plans have been met. 3. Any specific joint types or construction methods specified on the approved construction plans have been met. (List on a separate sheet and attach to this certification.) IV. Concrete Pans - FCSCM Vol.1, Ch.7, Sec.4.1.3.4 A.Construction/Installation: All concrete pans have been constructed in accordance with the approved construction plans. 1. The concrete pans are the correct size/width as shown on the approved construction plans. 2. The longitudinal slopes of the pans are as shown on the approved construction plans. The certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or justification by separate document. 3. The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross- section is “V” shaped and meets the side slope shown on the detail.) 4. The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4 inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide documentation of the reinforcement used if different than shown on the details or on the approved construction plans.) 5. The spot elevations shown on the concrete pan(s) have been verified and are shown on the as- built drawings. Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes /1Page 5 V.Storm Drain Inlets - FCSCM Vol.1, Ch.6, Sec. 3 A.Construction/Installation: All storm drain inlets have been constructed in accordance with the approved construction plans. ϭ͘The size and type of inlets are consistent with the inlets shown on the approved construction plan. Indicate by writing “Verified” on each inlet on the plan sheet or list on a separate document the inlet number(s), type and size (length). If the inlet installed is other than the one on the approved construction plan detail sheet, provide the name and source of the detail with justification for equal or better capacity. Ϯ͘The size of the inlet opening is consistent with the approved detail. (Check height and width.) ϯ͘The elevation of the grate (if applicable) is at the elevation shown on the street profile or as indicated by a spot elevation on the construction plans. ϰ͘The as-built invert elevations of all pipes entering and leaving the inlet are shown on the plan and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide justification and capacity calculations to show the capacity is not affected or propose mitigation. ϱ͘The as-built size of the inlet box is as shown on the construction plans or an explanation or justification is attached. ϲ͘All dLJƉĞ͕Z͕ϭϯĂŶĚϭϲinlet covers are stenciled or stamped with the following;ŽƌĂŶ ĞƋƵŝǀĂůĞŶƚͿĚĞƐŝŐŶĂƚŝŽŶ͗ NO DUMPING – DRAINSTO POUDRE RIVER. VI. Culverts - FCSCM Vol.2, Ch.9 A.Construction/Installation: All culverts have been constructed and/or installed in accordance with the approved construction plans. 1. All culvert sizes have been verified as indicated on the as-built construction plans as correct. 2. The culvert material type for all culverts installed is as on the approved construction plans and is indicated on the as-built plans. 3. The as-built invert “in and out” elevations have been verified and are indicated on the as-built construction plans. 4. The culvert headwalls or wing walls have been installed as shown on the approved construction plans. Headwalls or wing walls may be needed in the as-built conditions onsite if the slopes adjacent to the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative. An alternative to consider is a turf reinforcement mat (TRM). VII. Sub-Drains A.Construction/Installation: All sub-drains shown on the construction plans have been installed in accordance with those plans. Sub-drains installed with the sanitary sewer are to be verified on the sanitary sewer plan and profile sheets of the construction plans. (NOTE: Indicate any sub-drains installed after the plans were approved on the as-built plans.) 1. The size of the sub-drains are as approved on the construction plans and are indicated on the as- built plans. 2. The type of sub-drain, in particular the perforated and non-perforated sections of the drain, are as indicated on the approved construction plans. Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Page 6 3. The cover requirements per the construction plans are provided. 4. The cleanouts have been installed at the locations shown on the construction plans and are accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations marked.) 5. The backfill materials for sub-drains are as shown on the approved construction plans. (This includes the type, depth and width.) 6. The geo-textile liner completely wraps the sub-drain and the permeable backfill material unless shown otherwise on the approved construction plans. (Sub-drain pipe wrapped in a sock filter material is accepted only if approved prior to installation.) VIII. Curb Cuts A.Construction: All curb cut openings are constructed in accordance with the approved construction plans. 1. The size (width) of the curb cut opening is as shown on the approved construction plans. 2. The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb cut. IX. Sidewalk Culverts & Chases A.Construction/Installation: All sidewalk culverts have been installed at the locations shown on the approved construction plans. 1. The size (width and length) of the culverts are as shown on the approved construction plans. 2. The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the detail shown on the approved construction plans or per the City’s detail. 3. The sidewalk culvert invert “in and out” elevations have been verified and are indicated on the as-built plans. 4. The sidewalk culvert opening is as shown on the approved construction plans or per the City’s detail. 5. There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert. X.Site Grading A.Construction: All common open spaces have been graded in accordance with the approved construction plans. 1. The grading on all common open spaces bordering private lots has been verified as correct and the as-built rear lot corner elevations have been shown on the as-built plans. Yes Yes Yes Yes N/A N/A N/A Yes Yes Yes Yes Yes Yes Yes Yes Page 7 2. The as-built contours for “overlot grading” are shown on the as-built construction plans for all common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the situation for noncompliance and when it may be corrected. An escrow for overlot grading may be required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site Certification. It is understood that residential lots will be brought to final grade once the foundation is backfilled so they may be lower than the plan shows at this Overall Site Certification stage.) 3. All turf reinforcement mats (TRMs) have been installed as shown on the approved construction plans and the slopes are stabilized. XI. Riprap - FCSCM Vol.1, Ch.7, Sec.4.4.4.3 A.Construction: All riprap has been installed in the locations and sizes indicated on the approved construction plans. XII. Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7 A.Construction: All fabric has been installed in the locations and sizes indicated on the approved construction plans. 1. All fabric was installed per the details on the approved construction plans. XIII. Post-Construction Site Cleanup - FCSCM Vol.3, Ch.7 A.Construction: All construction debris and obstructions of any kind have been removed from drainage paths. 1. All construction debris has been removed except in staging area(s). 2. All ruts have been smoothed out in all construction areas. 3. All areas needing reseeding have been identified and future stabilization goals have been coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note the area needing stabilization in the narrative. XIV. Certification of Other Permanent BMPs - FCSCM Vol.2, Ch.8, Sec.2 & FCSCM Vol.2, Ch.12 A. The construction of channel drop structures is in accordance with the approved plan both in location, horizontal dimensions and cross-section. XV. Certification of LID and Water Quality Facilities - FCSCM Vol.3, Ch.4 A. Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and other items to be verified during construction, along with pictures and other required documentation. N/A Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Page 8 XVI. Certification and Erosion Control Measures A.All temporary erosion control measures shall be removed upon stabilization. If at the time of preparing this certification there are any erosion control measures still remaining on the site, please note them in the narrative and verify that they need to remain at this time. If in doubt as to the need for any control measure, please consult with the Erosion Control Inspector at 970-221-6700. XVII. Statement of Compliance A.This certification is signed and stamped. By signing this form, the engineer(s) attests that he/she has visited and observed the site, and to the best of his/her knowledge, the as-built conditions of the drainage facilities are as described in the above form and in the enclosed as-built plans. B. Failure to properly disclose all known information could result in the rejection of this certification and prevent the release of any and all Stormwater Utility permit holds on Building Permits and/or Certificates of Occupancy within this development. XVIII. Signature and Stamp by a Colorado-Registered Professional Engineer Engineer’s contact information: Name: Email: Phone: Company: Address: PE Stamp Sign and date 03/22/19 Jeffrey, M. Killingsworth, PE jkillingsworth@atwell-group.com 303-462-1100 Atwell, LLC 143 Union Blvd, Suite 700 Lakewood, CO 80228 March 22, 2019 Dan Mogen Development Review Engineer City of Fort Collins 281 N College Fort Collins, CO 80524 Re: Maverik Fort Collins – Overall Site and Pond Certification Letter (As-Built) Dear Mr. Mogen, I, Jeffrey M. Killingsworth, a registered Professional Engineer in the State of Colorado, PE No. 41217, in accordance with Sections 5.3 of the Bylaws and Rules of the State Board of Registration for Professional Engineers and Professional Land Surveyors, do hereby certify that the proposed drainage facility at the above subdivision has been constructed in accordance with the design intent of the approved drainage report and construction drawings based upon the as- built field survey completed on February 6, 2019 by Professional Land Surveyors at Atwell, Inc. Based on the initial field inspection/observations/survey, it was previously found that re-work would be required to bring the previously existing and recently modified pond within compliance of the Fort Collins Stormwater Criteria Manual, in coordination with Fort Collins Utilities (FCU), due to the as-built top of the outlet structure grate being 0.88 feet higher than the approved design and the as-built volume within the pond being 0.05 ac·ft short of the approved design. It was decided in coordination with FCU that the following field modifications were required to bring this pond closer to compliance with current standards: 1. The previously as-built top of the outlet structure at 4930.88 was to be modified with a 4:1 weir slope, bringing the effective front weir elevation down to 4930.13 while the back weir elevation remains the same at 4930.88. This allows for stormwater to enter the outlet structure at lower elevations, effectively lowering the corresponding water surface elevations (WSELs). While this does increase the pressure head in the pond as the pond fills up, effectively increasing the release rate, a variance was obtained for the release rate of this existing pond upon original approval of these construction documents and corresponding drainage report. A slight increase in the approved 100- year release rate of 14.2 CFS to the proposed 100-year release rate of 16.3 CFS was approved for this re-work to occur, still less than the pre-development release rate of 21 CFS. The as-built release rate is 16.55 CFS, as calculated in the current as-built condition, and a modified variance form is being submitted with this letter. 2. The previous as-built emergency spillway elevation of 4930.93 was to be raised to 4931.40, bringing the spillway above the previous 100-year WSEL of 4931.23 and allowing the pond to store the 100-year runoff safely. The as-built emergency spillway elevation is 4931.35, as shown throughout the as-built pond calculations. 3. The previous 15’ as-built emergency spillway width was to be increased to 34’, lowering the design depth of the emergency 100-year inflow (29.0 CFS) to 0.40’. This allows the emergency spillway to safely convey/release the 100-year inflow in the event of catastrophic failure of design outlet structure conveyances. The proposed design had a design depth of 0.45’ from the proposed spillway elevation of 4931.40 to the proposed top of berm at 4931.85. The as-built depth is 0.50’ from the as-built spillway elevation of 4931.35 to the as-built top of berm at 4931.85. A second field inspection/observations/survey was completed on 02/06/2019. After review of the current, as-built detention facility, it is my professional opinion that all work has been installed and is in substantial compliance with City of Fort Collins Technical Criteria, the approved Construction Drawings, and the original design intent of the Grading Plan. The As-Built drawings and calculations included accurately depict the final installation of the drainage facility. The as-built extended detention basin meets general design requirements for detention and water quality facilities as required by the City of Fort Collins, Larimer County and the Urban Drainage and Flood Control District, and the release rates as required by CRS 37-92-602(8). However, two (2) variances have been approved as follows: 1. Less than one (1) foot of freeboard above the 100-year emergency water surface elevation while the emergency spillway is conveying full flow as outlined in the Freeboard variance request. 2. More than the allowable 100-year release rate prescribed by Fort Collins Stormwater Criteria Manual of 6.9 CFS as outlined in the Release Rate variance request. Please find the As-Built Pond Certification (survey) exhibit, as-built calculations, variance requests, and the CRS 37-92-602(8) Compliance Design Data Workbook attached. If you have any questions regarding this stormwater pond certification, please do not hesitate to contact me at 303.825.7110. Sincerely, Jeffrey M. Killingsworth, P.E. Atwell, LLC 03/22/19 Project Name:Maverik Job No.15001770 Title:Updated Pond (AS-BUILT)Date:3/22/2019 By:DIF Drainage Basin:Basin A Tributary Area (ac.):4.35 V = Volume in cubic feet (cu-ft) h = Contour Interval in feet (ft.) Volume Equation:Modified FAA A1,A2 = Area enclosed by successive Contours in square feet (sq-ft) Required Volume: Allowable Release Rate: Minor Required Volume = 0.07 ac-ft 3,049 cubic feet Q100R = 14.2 cfs *as-built increases to 16.55 CFS 100 Year Required Volume = 0.38 ac-ft 16,553 cubic feet Contour Area A1+A2 (A1xA2)^1/2 (A1+A2) + h h/3 Volume Accumul. Accumul. Elev.(A1+A2)^1/2 Volume Volume (ft.) (sf) (sf) (sf) (sf) (ft) (ft) (cu-ft) (cu-ft) (ac-ft) 4926.00 1 0 0.00 95 10 105 1.00 0.33 35 4927.00 94 35 0.00 469 188 657 1.00 0.33 219 4928.00 375 254 0.01 5265 1354 6619 1.00 0.33 2206 4929.00 4890 2460 0.06 10903 5423 16326 1.00 0.33 5442 4930.00 6013 7902 0.18 13030 6496 19526 1.00 0.33 6509 4930.88 6685 14411 0.33 14146 7062 21208 0.47 0.16 3323 4931.00 7017 14411 0.33 14478 7236 21714 0.35 0.12 2533 4931.35 7461 16944 0.39 as-built E.S. elevation 15690 7836 23526 0.50 0.17 3921 4931.85 8229 20865 0.48 4929.11 depth = 3.11 4931.30 depth = 5.30 4931.85 0.55 6.6 inchesAs-built Freeboard = Top of Berm/Storage = Minor Water Surface Elevation = 100 Year Water Surface Elevation (Incl WQCV) = 03/22/19 Stormwater Facility Name: Facility Location & Jurisdiction: User Input: Watershed Characteristics User Defined User Defined User Defined User Defined Watershed Slope = 0.020 ft/ft Stage [ft] Area [ft^2] Stage [ft] Discharge [cfs] Watershed Length = 500 ft 0.00 1 0.00 0.00 Watershed Area = 4.35 acres 1.00 94 1.00 0.00 Watershed Imperviousness = 81.1% percent 2.00 375 2.00 0.00 Percentage Hydrologic Soil Group A = percent 3.00 4,890 3.00 0.07 Percentage Hydrologic Soil Group B = 100.0% percent 4.00 6,013 4.00 0.19 Percentage Hydrologic Soil Groups C/D = percent 4.10 6,113 4.10 0.20 4.20 6,212 4.20 0.70 User Input 17 4.30 6,310 4.30 2.06 4.40 6,409 4.40 3.91 4.50 6,507 4.50 6.14 4.60 6,606 4.60 8.71 WQCV Treatment Method = 40.00 hours 4.70 6,705 4.70 11.56 4.80 6,802 4.80 14.66 4.90 6,913 4.90 15.12 5.00 7,017 5.00 15.45 5.35 7,461 5.35 16.55 5.85 8,229 5.85 18.00 After completing and printing this worksheet to a pdf, go to: https://maperture.digitaldataservices.com/gvh/?viewer=cswdif create a new stormwater facility, and attach the pdf of this worksheet to that record. Routed Hydrograph Results Design Storm Return Period =WQCV 2 Year 5 Year 10 Year 50 Year 100 Year One-Hour Rainfall Depth =0.53 0.98 1.36 1.71 2.31 3.67 in Calculated Runoff Volume =0.122 0.280 0.411 0.535 0.781 1.275 acre-ft OPTIONAL Override Runoff Volume =acre-ft Inflow Hydrograph Volume =0.121 0.279 0.410 0.535 0.781 1.275 acre-ft Time to Drain 97% of Inflow Volume =>107 34.1 30.7 28.6 25.7 21.5 hours Time to Drain 99% of Inflow Volume =>107 0.0 0.0 0.0 35.2 30.6 hours Maximum Ponding Depth =3.36 4.25 4.43 4.57 4.79 5.75 ft Maximum Ponded Area =0.12 0.14 0.15 0.15 0.16 0.19 acres Maximum Volume Stored =0.109 0.226 0.253 0.273 0.308 0.471 acre-ft Location for 1-hr Rainfall Depths (use dropdown): Workbook Protected Worksheet Protected Stormwater Detention and Infiltration Design Data Sheet Maverik Detention Pond (AS-BUILT) Fort Collins, CO 15001770 SDI_Design_Data_v1.07_AS_BUILT - 2019.03.22, Design Data 3/22/2019, 7:16 AM WQCV_Trigger = 1 RunOnce= 1 CountA=1 Draintime Coeff=1.0 0 1 2 3 #N/A #N/A 0 1 2 3 #N/A #N/A Check Data Set 1 Check Data Set 1 Area Discharge Stormwater Detention and Infiltration Design Data Sheet 0 5 10 15 20 25 30 35 0.1 1 10 FL O W [ c f s ] TIME [hr] 100YR IN 100YR OUT 50YR IN 50YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT WQCV IN WQCV OUT 0 1 2 3 4 5 6 7 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 100YR 50YR 10YR 5YR 2YR WQCV 15001770 SDI_Design_Data_v1.07_AS_BUILT - 2019.03.22, Design Data 3/22/2019, 7:16 AM Project: Basin ID: Design Information (Input): Width of Basin Bottom, W = ft Right Triangle OR Length of Basin Bottom, L = ft Isosceles Triangle OR Dam Side-slope (H:V), Zd =ft/ft Rectangle OR Circle / Ellipse OR Irregular (Use Overide values in cells G32:G52) MINOR MAJOR Storage Requirement from Sheet 'Modified FAA': 0.35 0.48 acre-ft. Stage-Storage Relationship:Storage Requirement from Sheet 'Hydrograph': acre-ft. Storage Requirement from Sheet 'Full-Spectrum': 0.40 0.75 acre-ft. Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes for WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor, & Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage Stages ft ft/ft ft ft ft2 ft2 User ft3 acres acre-ft Volumes (input) (input)Below El.(output) (output) (output)Overide (output) (output) (output) (for goal seek) 4926.00 (input)1 0.000 0.000 4927.00 0.00 0.00 94 48 0.002 0.001 4928.00 0.00 0.00 375 282 0.009 0.006 4929.00 0.00 0.00 4,890 2,915 0.112 0.067 4930.00 0.00 0.00 6,013 8,366 0.138 0.192 4930.10 0.00 0.00 6,113 8,972 0.140 0.206 4930.20 0.00 0.00 6,212 9,589 0.143 0.220 4930.30 0.00 0.00 6,310 10,215 0.145 0.234 4930.40 0.00 0.00 6,409 10,851 0.147 0.249 4930.50 0.00 0.00 6,507 11,496 0.149 0.264 4930.60 0.00 0.00 6,606 12,152 0.152 0.279 4930.70 0.00 0.00 6,705 12,818 0.154 0.294 4930.80 0.00 0.00 6,802 13,493 0.156 0.310 4930.90 0.00 0.00 6,913 14,179 0.159 0.325 4931.00 0.00 0.00 7,017 14,875 0.161 0.341 4931.35 0.00 0.00 7,461 17,409 0.171 0.400 4931.85 0.00 0.00 8,229 21,331 0.189 0.490 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A STAGE-STORAGE SIZING FOR DETENTION BASINS Maverik Fort Collins Check Basin Shape AS-BUILT 15001770 UDFCD Outlet Structure_AS-BUILT - 2019.03.22, Basin 3/22/2019, 7:06 AM Project: Basin ID: STAGE-STORAGE SIZING FOR DETENTION BASINS 0.00 1000.00 2000.00 3000.00 4000.00 5000.00 6000.00 0.00 0.10 0.20 0.30 0.40 0.50 0.60 St a g e ( f t . e l e v . ) Storage (acre-feet) STAGE-STORAGE CURVE FOR THE POND 15001770 UDFCD Outlet Structure_AS-BUILT - 2019.03.22, Basin 3/22/2019, 7:06 AM Project: Basin ID: WQCV Design Volume (Input): Catchment Imperviousness, Ia = 81.1 percent Catchment Area, A = 4.35 acres Diameter of holes, D = 1.125 inches Depth at WQCV outlet above lowest perforation, H = 1.00 feet Number of holes per row, N = 1 Vertical distance between rows, h = 4.00 inches OR Number of rows, NL =5.00 Orifice discharge coefficient, Co =0.65 Height of slot, H = inches Slope of Basin Trickle Channel, S = 0.005 ft / ft Width of slot, W = inches Time to Drain the Pond = 40 hours Watershed Design Information (Input):1 Percent Soil Type A = % Percent Soil Type B = 100 % Percent Soil Type C/D = % Outlet Design Information (Output): Excess Urban Runoff Volume (From 'Full-Spectrum Sheet') 1.095 watershed inches X N/A 0.00 Excess Urban Runoff Volume (From 'Full-Spectrum Sheet') 0.397 acre-feet Outlet area per row, Ao = 1.47 square inches Total opening area at each row based on user-input above, Ao =0.99 square inches Total opening area at each row based on user-input above, Ao =0.007 square feet 3 Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 23 S 4928.15 4928.48 4928.82 4929.15 4929.48 Flow 4928.00 0.0000 0.0000 0.0000 0.0000 0.0000 0.00 4928.10 0.0000 0.0000 0.0000 0.0000 0.0000 0.00 4928.20 0.0081 0.0000 0.0000 0.0000 0.0000 0.01 4928.30 0.0139 0.0000 0.0000 0.0000 0.0000 0.01 4928.40 0.0180 0.0000 0.0000 0.0000 0.0000 0.02 4928.50 0.0213 0.0051 0.0000 0.0000 0.0000 0.03 4928.60 0.0242 0.0125 0.0000 0.0000 0.0000 0.04 4928.70 0.0267 0.0169 0.0000 0.0000 0.0000 0.04 4928.80 0.0290 0.0204 0.0000 0.0000 0.0000 0.05 4928.90 0.0312 0.0233 0.0102 0.0000 0.0000 0.06 4929.00 0.0332 0.0260 0.0153 0.0000 0.0000 0.07 4929.10 0.0351 0.0284 0.0191 0.0000 0.0000 0.08 4929.20 0.0369 0.0306 0.0222 0.0081 0.0000 0.10 4929.30 0.0386 0.0326 0.0249 0.0139 0.0000 0.11 4929.40 0.0403 0.0345 0.0274 0.0180 0.0000 0.12 4929.50 0.0418 0.0364 0.0297 0.0213 0.0051 0.13 4929.60 0.0434 0.0381 0.0318 0.0242 0.0125 0.15 4929.70 0.0448 0.0398 0.0338 0.0267 0.0169 0.16 4929.80 0.0463 0.0414 0.0356 0.0290 0.0204 0.17 4929.90 0.0476 0.0429 0.0374 0.0312 0.0233 0.18 4930.00 0.0490 0.0444 0.0391 0.0332 0.0260 0.19 4930.10 0.0503 0.0458 0.0407 0.0351 0.0284 0.20 4930.20 0.0516 0.0472 0.0423 0.0369 0.0306 0.21 4930.30 0.0528 0.0486 0.0438 0.0386 0.0326 0.22 4930.40 0.0540 0.0499 0.0453 0.0403 0.0345 0.22 4930.50 0.0552 0.0512 0.0467 0.0418 0.0364 0.23 4930.60 0.0564 0.0524 0.0480 0.0434 0.0381 0.24 4930.70 0.0575 0.0536 0.0494 0.0448 0.0398 0.25 4930.80 0.0586 0.0548 0.0507 0.0463 0.0414 0.25 4930.90 0.0597 0.0560 0.0519 0.0476 0.0429 0.26 4931.00 0.0608 0.0572 0.0532 0.0490 0.0444 0.26 4931.10 0.0618 0.0583 0.0544 0.0503 0.0458 0.27 4931.20 0.0629 0.0594 0.0555 0.0516 0.0472 0.28 4931.30 0.0639 0.0605 0.0567 0.0528 0.0486 0.28 4931.40 0.0649 0.0615 0.0578 0.0540 0.0499 0.29 4931.50 0.0659 0.0626 0.0589 0.0552 0.0512 0.29 4931.60 0.0669 0.0636 0.0600 0.0564 0.0524 0.30 4931.70 0.0678 0.0646 0.0611 0.0575 0.0536 0.30 4931.80 0.0688 0.0656 0.0622 0.0586 0.0548 0.31 4931.90 0.0697 0.0666 0.0632 0.0597 0.0560 0.32 4932.00 0.0707 0.0676 0.0642 0.0608 0.0572 0.32 4932.10 0.0716 0.0685 0.0652 0.0618 0.0583 0.33 4932.20 0.0725 0.0694 0.0662 0.0629 0.0594 0.33 4932.30 0.0734 0.0704 0.0672 0.0639 0.0605 0.34 Override Area Row 1 Override Area Row 2 Override Area Row 3 Override Area Row 4 Override Area Row 5 Override Area Row 6 Override Area Row 7 Override Area Row 8 Override Area Row 9 Override Area Row 10 Override Area Row 11 Override Area Row 12 Override Area Row 13 Override Area Row 14 Override Area Row 15 Override Area Row 16 Override Area Row 17 Override Area Row 18 Override Area Row 19 Override Area Row 20 Override Area Row 21 Override Area Row 22 Override Area Row 23 Override Area Row 24 Central Elevations of Rows of Holes in feet Collection Capacity for Each Row of Holes in cfs STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET Maverik Detention Pond AS-BUILT 15001770 UDFCD Outlet Structure_AS-BUILT - 2019.03.22, WQCV 3/22/2019, 7:06 AM Worksheet Protected Project: Basin ID: STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET Maverik Detention Pond AS-BUILT 0.00 1000.00 2000.00 3000.00 4000.00 5000.00 6000.00 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 St a g e ( f e e t , e l e v . ) Discharge (cfs) STAGE-DISCHARGE CURVE FOR THE WQCV OUTLET STRUCTURE 15001770 UDFCD Outlet Structure_AS-BUILT - 2019.03.22, WQCV 3/22/2019, 7:06 AM Project: Basin ID: X 1 #1 Vertical #2 Vertical Sizing the Restrictor Plate for Circular Vertical Orifices or Pipes (Input)Orifice Orifice Water Surface Elevation at Design Depth Elev: WS = 4,931.30 feet Pipe/Vertical Orifice Entrance Invert Elevation Elev: Invert = 4,928.03 feet Required Peak Flow through Orifice at Design Depth Q = 16.40 cfs Pipe/Vertical Orifice Diameter (inches)Dia = 24.0 inches Orifice Coefficient Co =0.65 Full-flow Capacity (Calculated) Full-flow area Af = 3.14 sq ft Half Central Angle in Radians Theta = 3.14 rad Full-flow capacity Qf = 24.7 cfs Percent of Design Flow = 151% Calculation of Orifice Flow Condition Half Central Angle (0<Theta<3.1416)Theta = 1.75 rad Flow area Ao =1.92 sq ft Top width of Orifice (inches)To =23.62 inches Height from Invert of Orifice to Bottom of Plate (feet)Yo =1.18 feet Elevation of Bottom of Plate Elev Plate Bottom Edge = 4,929.21 feet Resultant Peak Flow Through Orifice at Design Depth Qo =16.4 cfs Width of Equivalent Rectangular Vertical Orifice Equivalent Width = 1.63 feet Centroid Elevation of Equivalent Rectangular Vertical Orifice Equiv. Centroid El. = 4,928.62 feet RESTRICTOR PLATE SIZING FOR CIRCULAR VERTICAL ORIFICES Maverik Detention Pond AS-BUILT 15001770 UDFCD Outlet Structure_AS-BUILT - 2019.03.22, Restrictor Plate 3/22/2019, 7:11 AM 15001770 UDFCD Outlet Structure_AS-BUILT - 2019.03.22, Restrictor Plate 3/22/2019, 7:11 AM 15001770 UDFCD Outlet Structure_AS-BUILT - 2019.03.22, Restrictor Plate 3/22/2019, 7:11 AM Project: Basin ID: Design Information (Input):#1 Horiz. #2 Horiz. #1 Vert. #2 Vert. Circular Opening: Diameter in Inches Dia. =inches OR Rectangular Opening: Width in Feet W =2.92 1.63 ft. Length (Height for Vertical)L or H =2.92 1.18 ft. Percentage of Open Area After Trash Rack Reduction % open =50 100 % Orifice Coefficient Co =0.65 0.65 Weir Coefficient Cw =3.00 Orifice Elevation (Bottom for Vertical)Eo =4930.13 4,928.03 ft. Calculation of Collection Capacity: Net Opening Area (after Trash Rack Reduction)Ao =4.26 1.92 sq. ft. OPTIONAL: User-Overide Net Opening Area Ao =sq. ft. Perimeter as Weir Length Lw =8.76 ft. OPTIONAL: User-Overide Weir Length Lw =ft. Top Elevation of Vertical Orifice Opening, Top =4929.21 ft. Center Elevation of Vertical Orifice Opening, Cen =4928.62 ft. Horizontal Orifices Vertical Orifices Labels Water WQCV #1 Horiz. #1 Horiz. #2 Horiz. #2 Horiz. #1 Vert. #2 Vert.Total Target Volumes for WQCV, Minor,Surface Plate/Riser Weir Orifice Weir Orifice Collection Collection Collection for WQCV, Minor, & Major Storage Elevation Flow Flow Flow Flow Flow Capacity Capacity Capacity & Major Storage W.S. Elevations ft cfs cfs cfs cfs cfs cfs cfs cfs Volumes (input)(linked) (User-linked) (output) (output) (output) (output) (output) (output)(output)(link for goal seek) 4926.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4927.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4928.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4929.00 0.07 0.00 0.00 0.00 0.00 5.73 0.00 0.07 4930.00 0.19 0.00 0.00 0.00 0.00 11.77 0.00 0.19 4930.10 0.20 0.00 0.00 0.00 0.00 12.18 0.00 0.20 4930.20 0.21 0.49 5.88 0.00 0.00 12.59 0.00 0.70 4930.30 0.22 1.84 9.17 0.00 0.00 12.98 0.00 2.06 4930.40 0.22 3.69 11.56 0.00 0.00 13.36 0.00 3.91 4930.50 0.23 5.91 13.53 0.00 0.00 13.73 0.00 6.14 4930.60 0.24 8.47 15.25 0.00 0.00 14.09 0.00 8.71 4930.70 0.25 11.31 16.79 0.00 0.00 14.44 0.00 11.56 4930.80 0.25 14.41 18.20 0.00 0.00 14.79 0.00 14.66 4930.90 0.26 17.76 19.51 0.00 0.00 15.12 0.00 15.12 4931.00 0.26 21.33 20.74 0.00 0.00 15.45 0.00 15.45 4931.35 0.30 35.41 24.56 0.00 0.00 16.55 0.00 16.55 4931.85 0.32 59.28 29.16 0.00 0.00 18.00 0.00 18.00 #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A Routing 3: Single Stage - Water flows through WQCV plate and #1 horizontal opening into #1 vertical opening. This flow will be applied to culvert sheet (#2 vertical & horizontal openings is not used). STAGE-DISCHARGE SIZING OF THE WEIRS AND ORIFICES (INLET CONTROL) Current Routing Order is #3 Maverik Detention Pond AS-BUILT W.S. EL. WQ W.S. EL. Minor W.S. EL. Major WQ H1 H2 V1 V2 Routing Order #1 (Standard) V1 W.S. EL. WQ W.S. EL. Design Storm WQ H1 Routing Order #3 (Single Stage)Routing Order #4 V2 V1 H1 WQ W.S. EL. Major W.S. EL. Minor W.S. EL. WQ W.S. EL. Emergency Spillway Emergency Overflow into Pipe- H2 V2 H1 WQ W.S. EL. Major W.S. EL. Minor W.S. EL. WQ V1 Routing Order #2 15001770 UDFCD Outlet Structure_AS-BUILT - 2019.03.22, Outlet 3/22/2019, 7:11 AM STAGE-DISCHARGE SIZING OF THE WEIRS AND ORIFICES (INLET CONTROL) 4926 4927 4928 4929 4930 4931 4932 4933 0 2 4 6 8 10 12 14 16 18 20 St a g e ( f e e t , e l e v . ) Discharge (cfs) STAGE-DISCHARGE CURVE FOR THE OUTLET STRUCTURE 15001770 UDFCD Outlet Structure_AS-BUILT - 2019.03.22, Outlet 3/22/2019, 7:11 AM Project: Basin ID: 75.96 4.00000 Design Information (input): Bottom Length of Weir L = 34.00 feet Angle of Side Slope Weir Angle = 75.96 degrees Elev. for Weir Crest EL. Crest = 4,931.35 feet Coef. for Rectangular Weir Cw = 2.68 Coef. for Trapezoidal Weir Ct = 2.68 Calculation of Spillway Capacity (output): Water Rect. Triangle Total Total Surface Weir Weir Spillway Pond Elevation Flowrate Flowrate Release Release ft. cfs cfs cfs cfs (linked) (output) (output) (output) (output) 4926.00 0.00 0.00 0.00 0.00 4927.00 0.00 0.00 0.00 0.00 4928.00 0.00 0.00 0.00 0.00 4929.00 0.00 0.00 0.00 0.00 4930.00 0.00 0.00 0.00 0.00 4930.10 0.00 0.00 0.00 0.00 4930.20 0.00 0.00 0.00 0.00 4930.30 0.00 0.00 0.00 0.00 4930.40 0.00 0.00 0.00 0.00 4930.50 0.00 0.00 0.00 0.00 4930.60 0.00 0.00 0.00 0.00 4930.70 0.00 0.00 0.00 0.00 4930.80 0.00 0.00 0.00 0.00 4930.90 0.00 0.00 0.00 0.00 4931.00 0.00 0.00 0.00 0.00 4931.35 0.00 0.00 0.00 0.00 4931.85 32.22 1.89 34.11 34.11 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A STAGE-DISCHARGE SIZING OF THE SPILLWAY Maverik Detention Pond AS-BUILT 15001770 UDFCD Outlet Structure_AS-BUILT - 2019.03.22, Spillway 3/22/2019, 7:08 AM Project: Basin ID: STAGE-DISCHARGE SIZING OF THE SPILLWAY Maverik Detention Pond AS-BUILT 0 0.1 0.2 0.3 0.4 0.5 0.6 4926 4927 4928 4929 4930 4931 4932 4933 0 5 10 15 20 25 30 35 40 Storage (Acre-Feet) St a g e ( f e e t , e l e v . ) Pond Discharge (cfs) STAGE-STORAGE-DISCHARGE CURVES FOR THE POND TOTAL DISCHARGE SPILLWAY DISCHARGE POND STORAGE 15001770 UDFCD Outlet Structure_AS-BUILT - 2019.03.22, Spillway 3/22/2019, 7:08 AM RE: Maverik Ft Collins Pond Good aernoon Dan, I hope this finds you well. I believe we now have all these outstanding items nailed down for your files. Please find our final cerficaon documents for the Maverik Fort Collins site and detenon facility at the following link: hps://atwell-group.sharefile.com/d-sf1080a274a94f92a We would like to respond to comment #6 and comment #8 as follows to ensure your understanding of these two (2) specific items. Atwell Response to #6: While the dry well depth is slightly less than the design depth in its as-built condion, the volume within the dry well does not affect how this redundant/secondary ouall operates. The dry well diameter of 4’ and corresponding 12.57 SF of infiltraon area are what control the averaged infiltraon rate of 2.1 minutes per inch of infiltraon and are the guiding factors in this redundant ouall design. The dry well volume itself does not affect the infiltraon area provided of 12.57 SF, and of course, the dry well is not intended to store 1,888 CF provided within the underground system itself. It is provided in the event of failure of the underground storage’s primary ouall, allowing the 1,888 CF of runoff to infiltrate through the dry well’s boom over a period of 4.4 hours, with the underground chambers sll storing this volume of water during those approximate 4.4 hours. Completely redundant and only meant for an extreme failure of the underground system’s primary ouall. We do not believe a variance is necessary for this as this as-built condion does not affect the secondary ouall or average infiltraon rate of the dry well in any way. Atwell Response to #8: The ‘low tailwater basin’ with buried Type M rip rap under 6” of soil for revegetaon purposes was installed per plan. The as-built length, width, and depth of this buried rip rap are now shown on record drawing sheet #14 for clarity. Thank you for your help geng this wrapped up. Once confirmaon of acceptance of these documents is received, we will upload ALL of the required documents to the state portal per page 1 of the site cerficaon checklist. Again, thank you for sending the signed, approved ‘REV1’ drainage report. That gave us the remaining required pieces for the state upload upon your confirmaon/acceptance/approval. Let me know if you have any quesons sir. I’m sure we are both ready to put this one to ‘bed’! Cheers, David I. Fralick, E.I., LEED Green Associate Engineer II ATWELL, LLC 303.462.1100 Tel 303.928.6776 Direct 303.825.7110 Fax 143 Union Boulevard | Suite 700 | Lakewood, CO 80228 www.atwell-group.com From: Dan Mogen [mailto:dmogen@fcgov.com] Sent: Tuesday, March 05, 2019 4:12 PM To: David Fralick Cc: Jeff Killingsworth Subject: RE: Maverik Ft Collins Pond David, Please see aached the scanned approved copy of the revised drainage report. I typically receive the PLS-stamp on what is essenally the raw survey, and then the record drawings show elevaons on the plan sheets and those are PE-stamped (no PLS needed on those). So, the record drawing sheets should include statement and PE-stamp. On Friday, I was having trouble tracking down my notes from the cerficaon submial last fall, but I’ve tracked those down now. You may have already referenced this list and addressed, but I’d like to reiterate to be sure and as a reminder to myself. Aached are the redlines I emailed over on 9/28/2018 and this is the list that was included in that email: 1. Address outlet structure/spillway per email below. 2. Please see aached redlines on the site cerficaon form. I have quesons on several items and am looking for some pieces of informaon including some crical informaon like detenon volume. 3. Please inial the yes/no responses on the lot grading cerficaon form. 4. Please show the elevaon of the outlet orifice on the record drawings (sheet 14). David Fralick <dfralick@atwell-group.com> Tue 4/2/2019 3:24 PM To:Dan Mogen <dmogen@fcgov.com>; Cc:Jeff Killingsworth <jmkillingsworth@atwell-group.com>; Know what's below. before you dig.Call RUTILITY PLANS FOR LOT 1, MAVERIK SUBDIVISION FILING NO. 1 ” ”” ” ” ” ” ” RECORD DRAWINGS Know what's below. before you dig.Call R ‘’ ‘’ ’ “” “” “” ’ ’ RECORD DRAWINGS Know what's below. before you dig.Call R RECORD DRAWINGS Know what's below. before you dig.Call RRECORD DRAWINGS Know what's below. before you dig.Call R RECORD DRAWINGS Know what's below. before you dig.Call R RECORD DRAWINGS Know what's below. before you dig.Call R RECORD DRAWINGS Know what's below. before you dig.Call R RECORD DRAWINGS Know what's below. before you dig.Call R RECORD DRAWINGS Know what's below. before you dig.Call R RECORD DRAWINGS Know what's below. before you dig.Call R RECORD DRAWINGS Know what's below. before you dig.Call R RECORD DRAWINGS Know what's below. before you dig.Call R RECORD DRAWINGS Know what's below. before you dig.Call R RECORD DRAWINGS Scale: 1:5 ACCESS RAMP1 Scale: 1:5 ACCESS RAMP2 Scale: 1:5 ACCESS RAMP3 Scale: 1:5 ACCESS RAMP4 Scale: 1:5 ACCESS RAMP5 Scale: 1:5 ACCESS RAMP6 Scale: 1:5 ACCESS RAMP7 Scale: 1:5 ACCESS RAMP9Scale: 1:5 ACCESS RAMP8 Know what's below. before you dig.Call R RECORD DRAWINGS Know what's below. before you dig.Call R RECORD DRAWINGS Know what's below. before you dig.Call R RECORD DRAWINGS