Loading...
HomeMy WebLinkAboutLot Certifications - 01/08/2018//1 Page 1 CERTIFICATION OF LOT GRADING Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e) Date: Address: Lot: Block: Subdivision: Permit Application #: Larimer County Parcel #: Larimer County Reception #: (on development agreement) I, (print) , a Colorado registered professional engineer, verify that construction of all stormwater facilities and grading is complete and hereby submit this certification. Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots. 1. Certification includes attached Stormwater-approved grading plan. (NOTE: City’s Building Department does not approve grading plans). 2. Certification includes the attached as-built survey dated (must be within 60 days of the date the certification is submitted) accurately and truthfully depicting elevations for: z Top of foundation/finished floor z Finished grade on each side of the structure z Quarter points along each lot line (not more than 50 feet apart) z Break points/high points z Swales z Berms z Retaining walls z Air conditioning pads z Window wells z Any other appurtenance(s) within an easement ϯ͘All elevations are within a 0.2 foot tolerance of the approved grading plan. ϰ͘The top of foundation is at least 6 inches above the highest grade surrounding the structure. ϱ͘There is a minimum grade of 5% away from the structure within the first 5 to 10 feet adjacent to the residence. ϲ͘All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than ϯϯ% (ϯ:1). ϳ͘All flow lines of stormwater drainage swales are a minimum of 6 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Stormwater-approved grading plan. ϴ͘All downspout locations and discharge directions are shown on the as-built survey. Runoff is directed into an appropriate drainage system or lot line swale, and it is not directed onto neighboring properties. No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes HY HY HY HY HY HY HY HY Lot Specific R# from Superintendent R 1655542 January 4th, 2017 Mail Creek 2539 Spruce Creek Dr B1606774 Fort Collins, CO 80528 8608266007 7 13 20140002632 Hayley Young 12/13/2017 //1 Page 2 9. A smooth transition with no vertical offset (step) in grade is provided at the lot line to all adjacent properties. 10. The grading of this lot does not adversely affect neighboring properties or City infrastructure. 11. Landscaping has been completed prior to survey. If not, please indicate who will be responsible for completing landscaping: 12. Final site cleanup has been completed. 13. I personally visited the site as part of the certification process, and in my professional opinion, the as-built survey is an accurate representation of the site conditions.. No Yes No Yes No Yes No Yes No Yes 14. Based on this information, I certify that (check one): Ƒ The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). Ƒ The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. Name: Email: Phone: Company: Address: NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) WaterUtilitiesEng@fcgov.com Mailing Address Fort Collins Utilities ATTN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 Questions? 970-221-6700 PE Stamp Sign and date HY HY HY HY HY 1/4/2018 B & M Turf ✔ Hayley Young hyoung@bjsurvey.net 303-850-0559 B&J Surveying, Inc. 6841 South Yosemite Street Suite 100, Centennial, CO 80112 Hayley Young, PE B&J Surveying, Inc. 6841 S. Yosemite Street; Suite 100 Centennial, CO 80112 Phone: 303.850.0559 hyoung@bjsurvey.net January 4th, 2018 FORT COLLINS UTILITIES 700 Wood Street Fort Collins, Colorado. 80521 RE: Lot 7 Block 13, Mail Creek Crossing Planned Land Division Certification of Lot Grading In general, this lot has substantial conformance to the grading plan, varying only a few tenths and matching grading patterns perfectly. The rear of the lot has been raised slightly more here simply to provide adequate drainage (considered 2% minimum). The fence was not completed, which supports the landscape not being complete in this area, as there will still be minor disturbance putting the fence in place. The landscape was partially complete, gravel was placed along the drive. There was no trash or construction fence left onside. It is my professional opinion to approve the certification for this lot. Sincerely, Hayley Young, PE B&J Surveying, Inc. & TOF=4952.11 #2539 T:\Projects\MAIL CREEK\BLOCK 13.dwg, 12/19/2017 12:31:12 PM, mmeredith