HomeMy WebLinkAboutLot Certifications - 11/09/2017//1 Page 1
CERTIFICATION OF LOT GRADING
Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e)
Date:
Address:
Lot: Block:
Subdivision:
Permit Application #:
Larimer County Parcel #:
Larimer County Reception #:
(on development agreement)
I, (print) , a Colorado registered professional engineer, verify that construction
of all stormwater facilities and grading is complete and hereby submit this certification.
Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an
explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots.
1. Certification includes attached Stormwater-approved grading plan. (NOTE: City’s
Building Department does not approve grading plans).
2. Certification includes the attached as-built survey dated (must be within 60
days of the date the certification is submitted) accurately and truthfully depicting
elevations for:
z Top of foundation/finished floor
z Finished grade on each side of the structure
z Quarter points along each lot line (not more than 50 feet apart)
z Break points/high points
z Swales
z Berms
z Retaining walls
z Air conditioning pads
z Window wells
z Any other appurtenance(s) within an easement
ϯ͘All elevations are within a 0.2 foot tolerance of the approved grading plan.
ϰ͘The top of foundation is at least 6 inches above the highest grade surrounding the
structure.
ϱ͘There is a minimum grade of 5% away from the structure within the first 5 to 10 feet
adjacent to the residence.
ϲ͘All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single
family lots when the swale is draining the runoff from only two adjoining properties)
and are not steeper than ϯϯ% (ϯ:1).
ϳ͘All flow lines of stormwater drainage swales are a minimum of 6 inches below the
elevation of ground adjacent to the structure and will direct drainage as shown on the
Stormwater-approved grading plan.
ϴ͘All downspout locations and discharge directions are shown on the as-built survey.
Runoff is directed into an appropriate drainage system or lot line swale, and it is not
directed onto neighboring properties.
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
HY
HY
HY
HY
HY
HY
HY
HY
lot specific: R1655556
November 2nd, 2017 Mail Creek
2269 Spruce Creek Dr B 1702707
Fort Collins, CO 80528 8608268001
1 15 20140002632
Hayley Young
10/23/2017
//1 Page 2
9. A smooth transition with no vertical offset (step) in grade is provided at the lot line to all
adjacent properties.
10. The grading of this lot does not adversely affect neighboring properties or City
infrastructure.
11. Landscaping has been completed prior to survey. If not, please indicate who will be
responsible for completing landscaping:
12. Final site cleanup has been completed.
13. I personally visited the site as part of the certification process, and in my professional
opinion, the as-built survey is an accurate representation of the site conditions..
No Yes
No Yes
No Yes
No Yes
No Yes
14. Based on this information, I certify that (check one):
Ƒ The elevations and drainage patterns of the lot/site are in substantial conformance with the City
approved drainage and grading plan for the property (information attached).
Ƒ The elevations and drainage patterns of the lot/site as measured are in general conformance with the
City approved drainage plan with exceptions (information attached). In my professional judgment the
elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the
specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a
manner consistent with the approved drainage plan.
Name:
Email:
Phone:
Company:
Address:
NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy
for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed
elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other
information necessary to confirm the above certification to:
Email (preferred)
WaterUtilitiesEng@fcgov.com
Mailing Address
Fort Collins Utilities
ATTN: Water Utilities Engineering
281 North College Avenue
Fort Collins, CO 80521
Questions?
970-221-6700
PE Stamp
Sign and date
HY
HY
HY
HY
HY
11/2/17
HY
B&M Turf (completed in front)
✔
Hayley Young
hyoung@bjsurvey.net
303-850-0559
B&J Surveying, Inc.
6841 South Yosemite Street
Suite 100, Centennial, CO 80112
Hayley Young, PE
B&J Surveying, Inc.
6841 S. Yosemite Street; Suite 100
Centennial, CO 80112
Phone: 303.850.0559
hyoung@bjsurvey.net
November ϴƚŚ, 2017
FORT COLLINS UTILITIES
700 Wood Street
Fort Collins, Colorado. 80521
RE: Lot 1 Block 15, Mail Creek Crossing Planned Land Division Certification of Lot Grading
In general, the entire lot has raised a few tenths from the grading plan, however, the drainage basin
matches and the site still drains as planned. The downspout along the front of the house at the drive is
an underdrain in perfect condition. The landscape was partially complete, as the front of the house had
final landscaping. There was no trash or construction fence left onside. Further, I am noting the error on
the grading plan of record of lot numbering. A snip of the plat is attached as record for the legal
numbering of the lot. I do not perceive that the changes from the grading plan will make any difference
in the drainage and the site has very clear and well graded swale, and therefore, it is my professional
opinion to approve the certification for this lot.
Sincerely,
Hayley Young, PE
B&J Surveying, Inc.
11/8/2017
&
TOF=4955.24
#2269
T:\Projects\MAIL CREEK\BLOCK 15.dwg, 11/6/2017 11:14:36 AM, hyoung