HomeMy WebLinkAboutLot Certifications - 06/29/2020 (3)P:\111066 Ward Addition 1 Engineering Analytics, Inc. June 18, 2020 Rev 1.0 – June 22, 2020 Project No. 111066 Dan Mogen, EI, CFM Development Review Engineer Water Utilities Engineering City of Fort Collins 700 Wood Street Fort Collins, CO 80522 RE: Drainage Completion Memo – 825 Laporte Ave, Fort Collins, CO Dear Mr. Mogen, Engineering Analytics, Inc. (EA) issued revision 3.0 (dated March 16, 2020) of the drainage memo dated January 29, 2020 for the home addition at 825 Laporte Ave., Fort Collins, CO. I visited the site on June 12, 2020 to confirm that the drainage improvements were installed in agreement with the January 29, 2020 drainage memo. At the time of my site visit all the drainage improvements were completed. Photographs of the drainage improvements are included in Appendix A. The following drainage improvements were recommended in the January 29, 2020 memo to mitigate the additional runoff impacts due to the increase in impervious area in the central area of the lot: •Second story roof drainage and addition to the north east will be directed into a drain pipe which will discharge toward Laporte ave. The drain pipe will discharge to a drain pan or other means of conveyance at the northeast corner of the garage. The drain pan will maintain a minimum slope of 1%. To maintain grade the roof runoff will be conveyed in a solid pipe along the fence rail to the northeast corner of the garage. The drain pan will discharge to Laport ave. This adjustment to the gutter removes all water flow from the addition and the second story roof that was discharging toward the lot on the east side. This results in a reduction of 468 square feet (48’x9.75’, half of the second story roof) + 200 square feet (addition) to the central area of the lot. o This was completed in general agreement with the plans. A drain pipe was used to convey the runoff water to Laporte Ave. This is an acceptable alternative and is in keeping with the intent of the plan. •A portion of the second story roof drainage to the northwest, which was discharging directly on the west property line will be directed toward the back of the house to reduce concentrated flow to the west. Prior to the remodel the roof downspout on the west side ATTACHMENT A JUNE 12, 2020 SITE VISIT PHOTOGRAPHS Drain pipe to carry roof gutter water to Laporte Ave. Slope of drain pipe to Laporte Ave. Connection of garage and house gutters to the drain that flows to Laporte Ave. Downspout at north west corner of the garage that discharges to the front lawn. Concrete patio at front of house. Drains to the font lawn. Slope of front patio area toward the front lawn. Downspouts on west side of the house split into three discharge areas per the plan. Drainage at back of house unchanged. Drainage from east side of the house it captured in downspout and carried to Laporte Ave. East side roof gutter that carries water to Laporte Ave. East side roof gutter that carries water to Laporte Ave.