Loading...
HomeMy WebLinkAboutLot Certifications - 11/17/20242/14/17 Page 1 CERTIFICATION OF LOT GRADING Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e) Date: Address: Lot: Block: Subdivision: Permit Application #: Larimer County Parcel #: Larimer County Reception #: (on development agreement) I, (print) , a Colorado registered professional engineer, verify that construction of all stormwater facilities and grading is complete and hereby submit this certification. Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots. 1.Certification includes attached Stormwater-approved grading plan. (NOTE: City’s Building Department does not approve grading plans). 2.Certification includes the attached as-built survey dated (must be within 60 days of the date the certification is submitted) accurately and truthfully depicting elevations for: Top of foundation/finished floor Finished grade on each side of the structure Quarter points along each lot line (not more than 50 feet apart) Break points/high points Swales Berms Retaining walls Air conditioning pads Window wells Any other appurtenance(s) within an easement 3.All elevations are within a 0.2 foot tolerance of the approved grading plan. 4.The top of foundation is at least 6 inches above the highest grade surrounding the structure. 5.There is a minimum grade of 5% away from the structure within the first 5 to 10 feet adjacent to the residence. 6.All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than 33% (3:1). 7.All flow lines of stormwater drainage swales are a minimum of 6 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Stormwater-approved grading plan. 8.All downspout locations and discharge directions are shown on the as-built survey. Runoff is directed into an appropriate drainage system or lot line swale, and it is not directed onto neighboring properties. No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes 11/13/24 323 S. Loomis Ave B2208980 Fort Collins, CO 80521 9711328002 Jason T. Claeys 11/12/24 South 20 ft of Lot 12 & North 30 ft of Lot 13, Block 278 A concrete pan is constructed along the north side of the lot with portions of the pan at 0.6% slope Survey did not include downspout locations. Arrows added based on my on site observation. Side yard swales direct downspout runoff either east or west and not to neighboring properties. Grading/Stormwater Certification Accepted (Certificate of Occupancy Released) Accepted by: Date: ☐ Escrow was held for CO and is now released we Derek Lutz 11/17/2024 & B2208981 2/14/17 Page 2 9.A smooth transition with no vertical offset (step) in grade is provided at the lot line to all adjacent properties. 10.The grading of this lot does not adversely affect neighboring properties or City infrastructure. 11.Landscaping has been completed prior to survey. If not, please indicate who will be responsible for completing landscaping: 12.Final site cleanup has been completed. 13.I personally visited the site as part of the certification process, and in my professional opinion, the as-built survey is an accurate representation of the site conditions.. No Yes No Yes No Yes No Yes No Yes 14.Based on this information, I certify that (check one): □The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). □The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. Name: Email: Phone: Company: Address: NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) WaterUtilitiesEng@fcgov.com Mailing Address Fort Collins Utilities ATTN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 Questions? 970-221-6700 PE Stamp Sign and date High Country Landscape 4 Jason T. Claeys, P.E. jclaeys@highland-ds.com 970.674.7550 Highland Development Services 6355 Fairgrounds Ave, Suite 200 Windsor, CO 80550 Downspout locations per HDS site visit on 10/22/24 10 0 - Y R C O F C F L O O D P L A I N PROPOSED GARAGE TF = 5011.41 FG = 5010.91 323 S. LOOMIS AVENUE FFE = 5012.15 TF = 5010.85 FG = 5010.35 32 3 S . L O O M I S A V E N U E PU B L I C A L L E Y 10 0 - Y R C O F C F L O O D P L A I N 32 3 S . L O O M I S A V E N U E PU B L I C A L L E Y EXISTING HOUSE FFE = 5011.56 EXISTING CAR PORT 32 3 S . L O O M I S A V E N U E PU B L I C A L L E Y PROPOSED GARAGE 323 S. LOOMIS AVENUE RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 1 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) 32 3 S . L O O M I S A V E N U E GR A D I N G , D R A I N A G E & U T I L I T Y P L A N 10/24/22 1" = 10' N/A JTC JTC 22-1062-00 GR/DR/UT 1 1 1 AD D E D F L O O D P L A I N I N F O R M A T I O N JT C 7/ 1 0 / 2 3 2 AD J U S T G R A D I N G F O R A S B F O U N D A T I O N ZM W 6/ 1 0 / 2 4 PROPOSED GRADING & DRAINAGE EXISTING GRADING & DRAINAGE SCALE: 1" = 20' BASIN % IMPERVIOUS BASIN DESIGNATION BASIN AREA DRAINAGE FLOW ARROW DRAINAGE BASIN BOUNDARY LEGEND EX MAJOR CONTOUR EX MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR N W E S ABBREVIATIONS ARCH ARCHITECT CAS CAST IRON PIPE COFC CITY OF FORT COLLINS CONC CONCRETE BOS BOTTOM OF STEP EC EROSION CONTROL EX EXISTING FFE FINISHED FLOOR ELEVATION FG FINISHED GRADE FL FLOW LINE FO FIBER OPTIC GFF GARAGE FINISHED FLOOR ELEVATION GB GRADE BREAK HP HIGH POINT LOD LIMITS OF DISTURBANCE MEP MECHANICAL/ELECTRICAL/PLUMBING OHE OVERHEAD ELECTRIC PVC POLYVINYL CHLORIDE PIPE RE REFERENCE RS ROCK SOCK (EC) SCL SEDIMENT CONTROL LOG (EC) SQFT SQUARE FOOT SSWR SANITARY SEWER STRUCT STRUCTURAL ENGINEER TOS TOP OF STEP TF TOP OF FOUNDATION TYP TYPICAL CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R NOTES: 1.ALL EXISTING UTILITY LOCATIONS SHOWN HAVE BEEN PROVIDED BY OTHERS AND DETERMINED FROM A COMBINATION OF RECORD DRAWINGS, SURVEYED FIELD MARK-OUTS AND PHYSICAL OBSERVATIONS. THERE MAY BE UTILITIES NOT SHOWN ON THE DRAWINGS WHICH PRESENTLY EXIST IN THE AREA OF CONSTRUCTION. THEREFORE, THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES IN THE PROJECT VICINITY PRIOR TO BEGINNING WORK. THE CONTRACTOR SHALL BE FULLY AND SOLELY RESPONSIBLE FOR ANY AND ALL DAMAGES AND COSTS WHICH MIGHT OCCUR BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES. THE CONTRACTOR SHALL NOTIFY ALL PUBLIC AND PRIVATE UTILITY COMPANIES AND DETERMINE THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO PROCEEDING WITH GRADING AND CONSTRUCTION. ALL WORK PERFORMED IN THE AREA OF UTILITIES SHALL BE PERFORMED AND INSPECTED ACCORDING TO THE REQUIREMENTS OF THE UTILITY OWNER. LIKEWISE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND MAPPING ANY EXISTING UTILITY (INCLUDING DEPTH) WHICH MAY CONFLICT WITH THE PROPOSED CONSTRUCTION, AND FOR RELOCATING ENCOUNTERED UTILITIES AS DIRECTED BY THE ENGINEER. CONTRACTOR SHALL CONTACT AND RECEIVE APPROVAL FROM OWNER/UTILITY OWNER BEFORE RELOCATING ANY ENCOUNTERED UTILITIES. CONTRACTOR RESPONSIBLE FOR SERVICE CONNECTIONS, AND RELOCATING AND RECONNECTING AFFECTED UTILITIES AS COORDINATED WITH UTILITY OWNER AND/OR ENGINEER, INCLUDING NON-MUNICIPAL UTILITIES (TELEPHONE, GAS, CABLE, ETC.) WHICH SHALL BE COORDINATED WITH THE UTILITY OWNER. THE CONTRACTOR SHALL IMMEDIATELY CONTACT ENGINEER UPON DISCOVERY OF A UTILITY DISCREPANCY OR CONFLICT. AT LEAST 48 HOURS PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE UTILITY NOTIFICATION CENTER OF COLORADO (1-800-922-1987, WWW.UNCC.ORG). 2.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH OWNER'S APPROVAL FOR REMOVAL. 3.THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND MINIMIZE DOWNSTREAM WATERWAY POLLUTION. 4.NO DEBRIS OR SEDIMENT SHALL BE TRACKED ONTO ALLEY OR PUBLIC STREET. IN CASE ANY TRACKING DOES OCCUR, CONTRACTOR SHALL SWEEP AND CLEAN IMMEDIATELY. 5.LIMITS OF REMOVAL TO BE DETERMINED IN THE FIELD TO ADEQUATELY COMPLETE THE PROPOSED IMPROVEMENTS, WHILE MAINTAINING, IF NOT IMPROVING, EXISTING CONDITIONS. ADDITIONAL REMOVAL IDENTIFIED IN THE FIELD SHALL BE COMPLETED AT CONTRACTOR EXPENSE. ALL REPAIRS TO BE COMPLETED IN ACCORDANCE WITH CITY STREET REPAIRS STANDARDS. 6.EXISTING CONCRETE AND ASPHALT PAVING SHALL BE SAWCUT AND REMOVED PRIOR TO EXCAVATION. REMOVE CONCRETE TO THE NEAREST JOINT. 7.CONTRACTOR RESPONSIBLE FOR ALL SURFACE REPAIR/REPLACEMENT TO RESTORE SIDEWALKS, PAVEMENT, CURB/GUTTER, AND SOD AREAS DISTURBED BY NEW WORK. REPAIR/REPLACEMENTS SHALL BE COMPLETED PER CITY STANDARDS AT CONTRACTOR EXPENSE. 8.ALL PAVEMENTS AND EARTHWORK SHALL CONFORM TO THE GEOTECHNICAL REPORT FOR THE SITE. ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER RECOMMENDATIONS. 9.REFERENCE ARCHITECTURAL AND STRUCTURAL PLANS FOR ADDITIONAL INFORMATION AND BUILDING DETAILS AND DIMENSIONS. VERIFY ALL BUILDING DIMENSIONS PRIOR TO SITE WORK. 10.SIDEWALKS ADJACENT TO STREETS, DRIVES, PARKING LOTS, AND ACCESS SLOPE 2% TOWARDS THE CURB LINE. 11.PROVIDE A MINIMUM OF 5% SLOPE AWAY FROM FOUNDATIONS FOR THE FIRST 5 TO 10 FT. 12.THE FINISHED GRADE (FG) ADJACENT TO BUILDING FOUNDATIONS IS A MINIMUM 6 INCHES BELOW THE TOP OF FOUNDATION (TF). 13.A FLOODPLAIN USE PERMIT IS REQUIRED PRIOR TO ANY CONSTRUCTION ACTIVITY, SUCH AS DRIVEWAYS, SIDEWALKS, UTILITY INSTALLATION, ETC., IN THE FLOODPLAIN / FLOOD FRINGE. 14.ANY UTILITY WORK IN THE FLOODWAY MUST BE PRECEDED BY A FLOODPLAIN USE PERMIT AND NO-RISE CERTIFICATION. 15.IN ADDITION TO MEETING APPLICABLE LCUASS, STATE OR FEDERAL STANDARDS, ALL MATERIALS, WORKMANSHIP AND CONSTRUCTION OF PUBLIC WATER AND WASTEWATER SYSTEM IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS SET FORTH IN THE CITY OF FORT COLLINS WATER AND WASTEWATER DESIGN CRITERIA MANUAL. 16.IN CASES OF CONFLICT BETWEEN THESE SIGNED PLANS AND APPLICABLE STANDARDS, THE MOST RESTRICTIVE STANDARD SHALL APPLY. 17.ALL WATER SERVICES SHALL BE TYPE K SOFT COPPER. 18.ALL SANITARY SEWER SERVICES SHALL BE SDR 35 PVC. VERIFY BUILDING CONNECTION ELEVATION (RE: MEP). 19.SITE CONTRACTOR SHALL COORDINATE UTILITY CONNECTIONS AT THE BUILDING WITH BUILDING CONTRACTOR. 20.COORDINATE ELECTRIC SERVICE ROUTING, DEMOLISHING, RELOCATING, AND MODIFICATIONS WITH THE ELECTRICAL ENGINEER, ARCHITECT, AND OWNER. COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES 1.THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. 2.ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4.ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5.ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY. 6.CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. SUMMARY OF IMPERVIOUS AREAS CONCRETE PAN DETAIL 0 SCALE: 1" = 10' 2010510 UTILITY PLAN NOTE: 1.CONTRACTOR TO VERIFY SERVICE LOCATIONS DURING CONSTRUCTION. CONTACT DESIGN ENGINEER IF LOCATION IS SIGNIFICANTLY DIFFERENT. 2.CONTRACTOR TO PROVIDE ASBUILT LOCATIONS OF EXISTING WATER & SEWER SERVICES AND TO BE INCLUDE IN RECORD DRAWINGS. FLOODPLAIN INFORMATION BASE FLOODPLAIN ELEVATION (BFE) = 5009.80 FT (NAVD88) REGULATORY FLOODPLAIN ELEVATION (RFPE = BFE + 1.5 FT) = 5011.30 FT (NAVD88) BUILDING FINISHED FLOOR ELEVATION = 5011.75 FT (NAVD88) (REFERENCE ARCHITECTURAL SITE PLAN FOR VENTING REQUIREMENTS & DETAILS)