Loading...
HomeMy WebLinkAboutSite Certifications - 06/23/2016/15 Page 1 Wes Lamarque6/23/2016 /15 Page 2 o o /15 Page 3 /15 Page 4 /15 Page 5 /15 Page 6 /15 Page 7 /15 Page 8 C.O.0.00 7337 CLEANOUT C.O.0.00 7338 CLEANOUT 72.0 ' 72. 0 ' 117 . 3 ' 42. 1 ' 14.0' 35.4 ' 20. 0 ' ST ST G 1 STORY BLOCK, VAULTED 1 STORY BLOCK DS DS DS DS DS DS DS DS 1 ƒ      (         6 ƒ      (         6 ƒ      :         FL=4895.92 FL=4895.76 FL=4896.78 FL=4896.64 18.90 LF 8" PVC @ 0.74% FF=4898.88 FF=4898.66 FF=4898.66 10.5' 10.4' 49.4' 83.3' 67.5' 10. 0 7 % 14. 1 4 % 9.81 % 11. 1 1 % 9.68% 2.2 4 % 16.0' 0.5 0 % 54. 6 1 L F 1 2 " R C P @ 0 . 2 9 % 1 ƒ      :         6" P V C UND E R D R A I N 6" P V C UN D E R D R A I N LI G H T F I E L D E N T E R P R I S E S , I N C 26 0 0 M I D P O I N T D R I V E FO R T C O L L I N S , C O AS - B U I L T E X H I B I T 00 20'40'10' 1"=20' EL E V A T I O N EL E V A T I O N STATION STATION STORM "A" STA: 0+05.00 THRU 0+65.00 4894 4900 4894 4900 0+05 0+65 0+05 0+65 Pipe - (1) 49 LF OF 12" RCP @ 0.24% GRADE. 00 20' 40'10' 1"=20' FOR BURIED UTILITY INFORMATION (OR 1-800-922-1987) UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) WWW.UNCC.ORG R CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL IE = 4895.76IE = 4895.92 54.61 LF 12" RCP @ 0.29% Project: Basin ID: Design Information (Input): Width of Basin Bottom, W =ft Right Triangle OR… Length of Basin Bottom, L =ft Isosceles Triangle OR… Dam Side-slope (H:V), Zd =ft/ft Rectangle OR… Circle / Ellipse OR… Irregular (Use Overide values in cells G32:G52) MINOR MAJOR Storage Requirement from Sheet 'Modified FAA': 0.02 0.12 acre-ft. Stage-Storage Relationship:Storage Requirement from Sheet 'Hydrograph': acre-ft. Storage Requirement from Sheet 'Full-Spectrum': acre-ft. Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes for WQCV, Minor,Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor, & Major Storage Elevation (H:V)Stage Stage Stage Stage Stage Stage Stage & Major Storage Stages ft ft/ft ft ft ft2 ft2 User ft3 acres acre-ft Volumes (input)(input)Below El.(output)(output)(output)Overide (output)(output)(output)(for goal seek) 95.78 (input)0 0 0.000 0.000 96.00 0.00 0.00 1,711 188 0.039 0.004 96.17 0.00 0.00 2,445 544 0.056 0.012 WQCV = 96.17 96.25 0.00 0.00 2,784 750 0.064 0.017 96.50 0.00 0.00 4,078 1,608 0.094 0.037 96.75 0.00 0.00 4,909 2,731 0.113 0.0627 97.00 0.00 0.00 5,560 4,040 0.128 0.093 97.25 0.00 0.00 6,305 5,523 0.145 0.127 100-YR 97.26 0.00 0.00 6,337 5,586 0.145 0.128 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A STAGE-STORAGE SIZING FOR DETENTION BASINS Urban Box-Storage Check Basin Shape LID Reduced Developed 100-Year 100-Year Developed UD-Detention_v2.33_USEME.xls, Basin 3/29/2016, 12:58 PM Project: Basin ID: STAGE-STORAGE SIZING FOR DETENTION BASINS 10.28 20.28 30.28 40.28 50.28 60.28 70.28 80.28 90.28 100.28 110.28 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 St a g e ( f t . e l e v . ) Storage (acre-feet) STAGE-STORAGE CURVE FOR THE POND 100-Year Developed UD-Detention_v2.33_USEME.xls, Basin 3/29/2016, 12:58 PM Project: Basin ID: Design Information (Input): Width of Basin Bottom, W =ft Right Triangle OR… Length of Basin Bottom, L =ft Isosceles Triangle OR… Dam Side-slope (H:V), Zd =ft/ft Rectangle OR… Circle / Ellipse OR… Irregular (Use Overide values in cells G32:G52) MINOR MAJOR Storage Requirement from Sheet 'Modified FAA': 0.02 0.12 acre-ft. Stage-Storage Relationship:Storage Requirement from Sheet 'Hydrograph': acre-ft. Storage Requirement from Sheet 'Full-Spectrum': acre-ft. Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes for WQCV, Minor,Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor, & Major Storage Elevation (H:V)Stage Stage Stage Stage Stage Stage Stage & Major Storage Stages ft ft/ft ft ft ft2 ft2 User ft3 acres acre-ft Volumes (input)(input)Below El.(output)(output)(output)Overide (output)(output)(output)(for goal seek) 95.65 (input)0 0 0.000 0.000 95.75 0.00 0.00 1,105 55 0.025 0.001 96.00 0.00 0.00 2,097 455 0.048 0.010 WQCV = 96.17 96.25 0.00 0.00 2,864 1,076 0.066 0.025 96.50 0.00 0.00 3,735 1,901 0.086 0.044 96.75 0.00 0.00 4,404 2,918 0.101 0.0670 97.00 0.00 0.00 5,079 4,103 0.117 0.094 97.25 0.00 0.00 5,866 5,471 0.135 0.126 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A STAGE-STORAGE SIZING FOR DETENTION BASINS Urban Box-Storage Check Basin Shape LID Reduced Developed 100-Year 100-Year As-Built UD-Detention_v2..xls, Basin 3/29/2016, 12:57 PM Project: Basin ID: STAGE-STORAGE SIZING FOR DETENTION BASINS 10.28 20.28 30.28 40.28 50.28 60.28 70.28 80.28 90.28 100.28 110.28 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 St a g e ( f t . e l e v . ) Storage (acre-feet) STAGE-STORAGE CURVE FOR THE POND 100-Year As-Built UD-Detention_v2..xls, Basin 3/29/2016, 12:57 PM 12/15 Page 1 DURING CONSTRUCTION INSPECTION CHECKLIST To be completed by Construction Superintendent This checklist is to be completed during construction and included with the Overall Site and Drainage Certification. •Use “Yes” for items completed as described. •Use “N/A” for items that are not applicable to the site being certified. •If any blanks are “No,” attach an explanation referencing the item number below. I.Compaction A.All berms and embankments meet the compaction requirements as specified in the project geotechnical report or comply with the City’s standard, which is “soils should be compacted within a moisture content range of 2% below to 2% above optimum moisture content and compacted to 95% of the Maximum Standard Proctor Density (ASTM D698).” Compaction requires verification during construction. Provide testing log from contractor/engineer. II.Storm Drain Pipe Installation Requirements A.The pipe trenches have been compacted in accordance with Section 02225-3.07.A.1. of the Fort Collins Development Construction Standards (e.g., the trenches in the roadways are to be 95% of maximum density and all other areas are to be at 90%, both in accordance with ASTM D698). III. Riprap - FCSCM Vol.1, Ch.7, Sec.4.4.4.3 A.The riprap bedding is a granular bedding of the gradation and thickness indicated on the approved construction plans. B.A filter fabric was installed instead of granular bedding and is the material shown on the approved construction plans or was an approved equal. Provide documentation for an approved equal. C.The riprap is the gradation shown on the approved construction plans with a D50 of . D.The riprap thickness is as shown on the approved construction plans and extends to the horizontal limits shown. E.The riprap is buried to the depth indicated on the approved construction plans. (A minimum of 6 inches of soil is required.) IV. Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7 A.All fabric was installed per manufacturer’s specifications. V. Certification of Other Permanent BMPs - FCSCM Vol.2, Ch.8, Sec.2 & FCSCM Vol.2, Ch.12 A.All cut-off walls have been installed in accordance with the approved construction plans. (Cut-off walls are required for irrigation ditch crossings of storm drain pipes and at the end of flared end sections.) N/A Yes N/A N/A N/A N/A N/A N/A N/A 12/15 Page 2 Permeable Interlocking Concrete Pavers Post-excavation infiltration rates are consistent with design infiltration capacity (for “full or partial infiltration” designs) Impermeable liner meets design specifications Impermeable liner attached to concrete perimeter wall Impermeable liner is not exposed Any penetrations of the impermeable liner have been sealed and checked for water-tightness. Meets specifications for: -Dimensions -Reinforcement -Footings Underdrain pipe is per design specifications At least one cleanout is provided per underdrain lateral Cleanout pipe is not perforated Cleanout covers are installed and watertight Underdrain is NOT wrapped in geotextile fabric Underdrain orifice plate installed at outlet structure Underdrain integrity tested after backfilling using TV and/or water test Base coarse (e.g., #2/4) has 90% fractured faces Bedding coarse (e.g., #89) is thoroughly washed Sub-base materials are installed and compacted according to manufacturer’s specifications PICP area is protected from construction site sediment, including runoff from the upstream catchment and Close Out 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 12/15 Page 3 Bioretention Cells Heavy equipment did not travel over bioretention cell during excavation Bottom of cell was “ripped” after excavation Photograph before/after “ripping” Bottom of cell is flat and level Photograph Excavated area is protected/surrounded by sediment/runoff control BMPs during construction Photograph Overflow inlet elevation is set above bioretention media per plan (typically 12 inches) Overflow inlet invert elevation is at least 3 inches below containment wall/berm (to direct overflow into inlet) Measure/record distance between inlet and top of containment wall/berm Upstream catchment drains to inlet Forebay is installed according to design specifications Forebay has flat, concrete bottom Outlet structure/overflow elevation is confirmed Measure/record distance from overflow to top of media filter Impermeable liner meets design specifications Impermeable liner attached to concrete perimeter wall Impermeable liner is not exposed Underdrain pipe is per design specifications At least one cleanout is provided per underdrain lateral Cleanout pipe is not perforated Cleanout covers are installed and watertight Underdrain is NOT wrapped in geotextile fabric Underdrain orifice plate installed at outlet structure Underdrain integrity tested after backfilling using TV and/or water test 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 All construction was completed, rain garden was installed last. Weir El - Top Media = 1.72' 12/15 Page 4 Filter Media Filter media composition is per design specifications Filter media was “machine mixed” by supplier prior to delivery Filter media installed flat and level Other Structural Components Containment wall/berm is continuous and level Landscaping Final landscaping does NOT include sod Final landscaping (wood/rock mulch) is flat and level Vegetation is planted according to landscape design specifications Verify that weed barrier is not installed Temporary irrigation installed If N/A, then verify that permanent irrigation is installed to establish/maintain vegetation Close Out Upstream catchment stabilized prior to diverting runoff into bioretention cell Signature: Name: Title: Email: Phone: Company: Address: 4 4 4 4 4 4 4 4 4 4 Michael Palizzi Civil Engineering Designer II michael@quality-engineering.com (970) 416-7891 Quality Engineering 2637 Midpoint Drive, Suite E Fort Collins, CO 80525 No irrigation designed for rain garden.