HomeMy WebLinkAboutLot Certifications - 09/29/2021 (6)2/14/17 Page 1
CERTIFICATION OF LOT GRADING
Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e)
Date:
Address:
Lot: Block:
Subdivision:
Permit Application #:
Larimer County Parcel #:
Larimer County Reception #:
(on development agreement)
I, (print) , a Colorado registered professional engineer, verify that construction
of all stormwater facilities and grading is complete and hereby submit this certification.
Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an
explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots.
1.Certification includes attached Stormwater-approved grading plan. (NOTE: City’s
Building Department does not approve grading plans).
2.Certification includes the attached as-built survey dated (must be within 60
days of the date the certification is submitted) accurately and truthfully depicting
elevations for:
Top of foundation/finished floor
Finished grade on each side of the structure
Quarter points along each lot line (not more than 50 feet apart)
Break points/high points
Swales
Berms
Retaining walls
Air conditioning pads
Window wells
Any other appurtenance(s) within an easement
3.All elevations are within a 0.2 foot tolerance of the approved grading plan.
4.The top of foundation is at least 6 inches above the highest grade surrounding the
structure.
5.There is a minimum grade of 5% away from the structure within the first 5 to 10 feet
adjacent to the residence.
6.All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single
family lots when the swale is draining the runoff from only two adjoining properties)
and are not steeper than 33% (3:1).
7.All flow lines of stormwater drainage swales are a minimum of 6 inches below the
elevation of ground adjacent to the structure and will direct drainage as shown on the
Stormwater-approved grading plan.
8.All downspout locations and discharge directions are shown on the as-built survey.
Runoff is directed into an appropriate drainage system or lot line swale, and it is not
directed onto neighboring properties.
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
PEH
PEH
PEH
PEH
PEH
PEH
PEH
PEH
9/27/21 Lemay Avenue Estates
7105 Diamond Tail Drive B2002879
8618312035
35 N/A 20170002128
Patrick High
9/24/2021
2/14/17 Page 2
9.A smooth transition with no vertical offset (step) in grade is provided at the lot line to all
adjacent properties.
10.The grading of this lot does not adversely affect neighboring properties or City
infrastructure.
11.Landscaping has been completed prior to survey. If not, please indicate who will be
responsible for completing landscaping:
12.Final site cleanup has been completed.
13.I personally visited the site as part of the certification process, and in my professional
opinion, the as-built survey is an accurate representation of the site conditions..
No Yes
No Yes
No Yes
No Yes
No Yes
14.Based on this information, I certify that (check one):
□The elevations and drainage patterns of the lot/site are in substantial conformance with the City
approved drainage and grading plan for the property (information attached).
□The elevations and drainage patterns of the lot/site as measured are in general conformance with the
City approved drainage plan with exceptions (information attached). In my professional judgment the
elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the
specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a
manner consistent with the approved drainage plan.
Name:
Email:
Phone:
Company:
Address:
NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy
for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed
elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other
information necessary to confirm the above certification to:
Email (preferred)
WaterUtilitiesEng@fcgov.com
Mailing Address
Fort Collins Utilities
ATTN: Water Utilities Engineering
281 North College Avenue
Fort Collins, CO 80521
Questions?
970-221-6700
PE Stamp
Sign and date
PEH
PEH
PEH
PEH
PEH
09/28/2021
Homeowner hired landscaping company - TBD
4
Patrick E. High
patrick.high@yorkengineering.com
720-990-5900
York Engineering
7208 S. Tucson Way #195
Centennial Co, 80112
09/27/2021
62'
15
.
3
3
'
18
'
12'
22
'
12'
16
'
39.33'20.67'4'
12'
20
'
6'16.67'10'
22
'
2
'
4'12.67'
18
.
6
7
'
18
.
6
7
'
110.63'
17
1
.
5
2
'
136.43'
14
5
.
9
7
'
C759' UE
9'
U
E
30' SETBACK
25' SETBACK
6'
U
E
25
'
S
E
T
B
A
C
K
20
'
S
E
T
B
A
C
K
COVERED
PATIO
N0
0
°
0
0
'
0
0
"
W
S0
0
°
0
6
'
0
7
"
E
N90°00'00"E
N86°46'05"E
N
COVERED
PATIO PROPOSED
HOUSE
4'
4'
CONCRETE
DRIVEWAY
30'-6"
44
'
-
4
14"
44
'
-
4
14"
43'-9"
71
'
-
4
18"
69
'
-
6
"
20'-6"
73
'
-
0
14"
43'-1014"
60.00'
57.83'
59.50'58.29'
62.03'63.03'
63.03'61.64'
59.34'
58.31'
58.59'59.02'
61.72'
14
%
4%
16%
9%
61.64'
60.34'
63.60'
H.P.
63.60'
LEGEND:
PROPERTY LINE:
SETBACK:
EASEMENT:
DRAINAGE DIRECTION:
1" = 30'-0"
63.70
63.03
6.0%
7955 E ARAPAHOE CT #3300
CENTENNIAL, CO 80112
720-990-5900
GJ GARDNER HOMES - FORT COLLINS
140 E BOARDWALK DR. UNIT M
FORT COLLINS, CO 80525
PROVIDED FOR:
GJ GARDNER HOMES
SITE & GRADING PLAN
SCALE:
TOP OF FOUNDATION
DRIVEWAY SLOPE
MAX FINISH GRADE ELEV @
FOUNDATION WALL
GARAGE FLOOR ELEV. @ ENTRY
SETBACK:
DIAMOND TAIL DR - 20'
WOODS LANDING DR - 30'
REAR - 25'
LOT 35 LEMAY AVENUE ESTATES
7105 DIAMOND TAIL DR
FORT COLLINS, COLORADO
23318 SQ FT
PUE:
NORTH, EAST- 9'
WEST - 6'
SOUTH - N/A
---
City of Fort Collins Approved Plans Approved by: Date: Grading/Stormwater Certification Accepted (Certificat e of Occupancy Released) Accepted by: Date : ☐ Escrow was held for CO and is now released Grading/Stormwater Plan Accepted
(Building Permit Released)
Accepted by:
Date :
Utility (Water/Sewer) Plan A pproved
(Building Permit Released)
Approved by:
Date :
Fort Collins Utilities R edlines
Please contact me to discuss revisions
or questions prior to resubmitting.
dmogen@fcgov.com or 970-305-7944
Reviewed by:
Date :
we
Wes Lamarque
07/02/2020