Loading...
HomeMy WebLinkAboutSite Certifications - 08/30/2018Page 1 Lot 1, Legacy Auto 07/10/2018 B1704822 Yes Yes Yes Yes Yes Yes Accepted 8/30/2018 WL Page 2 o o Yes Yes Yes Yes Yes Yes Yes Yes Yes Scour Stop Pad Page 3 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Page 4 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes /1 Page 5 N/A N/A N/A N/A Page 6 N/A N/A Yes Yes Page 7 N/A Yes N/A Yes Yes N/A Yes Yes Yes Yes /15 Page 1 DURING CONSTRUCTION INSPECTION CHECKLIST To be completed by Construction Superintendent This checklist is to be completed during construction and included with the Overall Site and Drainage Certification. x Use “Yes” for items completed as described.x Use “N/A” for items that are not applicable to the site being certified.x If any blanks are “No,” attach an explanation referencing the item number below. I. Compaction A. All berms and embankments meet the compaction requirements as specified in the project geotechnical report or comply with the City’s standard, which is “soils should be compacted within a moisture content range of 2% below to 2% above optimum moisture content and compacted to 95% of the Maximum Standard Proctor Density (ASTM D698).” Compaction requires verification during construction. Provide testing log from contractor/engineer. II. Storm Drain Pipe Installation Requirements A. The pipe trenches have been compacted in accordance with Section 02225-3.07.A.1. of the Fort Collins Development Construction Standards (e.g., the trenches in the roadways are to be 95% of maximum density and all other areas are to be at 90%, both in accordance with ASTM D698). III.Riprap - FCSCM Vol.1, Ch.7, Sec.4.4.4.3 A. The riprap bedding is a granular bedding of the gradation and thickness indicated on the approved construction plans. B. A filter fabric was installed instead of granular bedding and is the material shown on the approved construction plans or was an approved equal. Provide documentation for an approved equal. C. The riprap is the gradation shown on the approved construction plans with a D50 of . D. The riprap thickness is as shown on the approved construction plans and extends to the horizontal limits shown. E. The riprap is buried to the depth indicated on the approved construction plans. (A minimum of 6 inches of soil is required.) IV.Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7 A. All fabric was installed per manufacturer’s specifications. V.Certification of Other Permanent BMPs - FCSCM Vol.2, Ch.8, Sec.2 & FCSCM Vol.2, Ch.12 A. All cut-off walls have been installed in accordance with the approved construction plans. (Cut-off walls are required for irrigation ditch crossings of storm drain pipes and at the end of flared end sections.) Yes Yes N/A N/A N/A N/A N/A Yes N/A /15 Page 2 Permeable Interlocking Concrete Pavers Item/Activity Yes No N/A Documentation/Submittal Requirements Excavation Post-excavation infiltration rates are consistent with design infiltration capacity (for “full or partial infiltration” designs) Impermeable Liner Impermeable liner meets design specifications Impermeable liner attached to concrete perimeter wall Impermeable liner is not exposed Any penetrations of the impermeable liner have been sealed and checked for water-tightness. Concrete Cut-Off Wall Meets specifications for: - Dimensions - Reinforcement - Footings Underdrain System Underdrain pipe is per design specifications At least one cleanout is provided per underdrain lateral Cleanout pipe is not perforated Cleanout covers are installed and watertight Underdrain is NOT wrapped in geotextile fabric Underdrain orifice plate installed at outlet structure Underdrain integrity tested after backfilling using TV and/or water test Aggregate Base coarse (e.g., #2/4) has 90% fractured faces Bedding coarse (e.g., #89) is thoroughly washed Sub-base materials are installed and compacted according to manufacturer’s specifications Protection During Construction PICP area is protected from construction site sediment, including runoff from the upstream catchment and construction equipment traffic Close Out Upstream catchment is stabilized prior to diverting runoff into PICP system ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ /15 Page 3 Bioretention Cells Item/Activity Yes No N/A Documentation/Submittal Requirements Excavation Heavy equipment did not travel over bioretention cell during excavation Bottom of cell was “ripped” after excavation Photograph before/after “ripping” Bottom of cell is flat and level Photograph Excavated area is protected/surrounded by sediment/runoff control BMPs during construction Photograph Inlet Overflow inlet elevation is set above bioretention media per plan (typically 12 inches) Overflow inlet invert elevation is at least 3 inches below containment wall/berm (to direct overflow into inlet) Measure/record distance between inlet and top of containment wall/berm Upstream catchment drains to inlet Forebay Forebay is installed according to design specifications Forebay has flat, concrete bottom Outlet Structure/Overflow Outlet structure/overflow elevation is confirmed Measure/record distance from overflow to top of media filter Impermeable Liner Impermeable liner meets design specifications Impermeable liner attached to concrete perimeter wall Impermeable liner is not exposed Underdrain System Underdrain pipe is per design specifications At least one cleanout is provided per underdrain lateral Cleanout pipe is not perforated Cleanout covers are installed and watertight Underdrain is NOT wrapped in geotextile fabric Underdrain orifice plate installed at outlet structure Underdrain integrity tested after backfilling using TV and/or water test ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ /15 Page 4 Filter Media Filter media composition is per design specifications Filter media was “machine mixed” by supplier prior to delivery Filter media installed flat and level Other Structural Components Containment wall/berm is continuous and level Landscaping Final landscaping does NOT include sod Final landscaping (wood/rock mulch) is flat and level Vegetation is planted according to landscape design specifications Verify that weed barrier is not installed Temporary irrigation installed If N/A, then verify that permanent irrigation is installed to establish/maintain vegetation Close Out Upstream catchment stabilized prior to diverting runoff into bioretention cell Signature: Name: Title: Email: Phone: Company: Address: ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ Adam Yee Sr Project Manager ayee@evergreen-ind.com 208-869-8292 Evergreen Industrial, Ltd 206 E 4th Street Suite 210 Loveland, CO 80537 11582 Colony Row, Broomfield, Colorado 80021 Phone: 720-259-0965 Fax: 720-259-1519 “This report (plan) for the Phase III drainage and water quality design for Lot 1, Legacy Auto was prepared by me (or under my direct supervision) in accordance with the provisions of the City of Fort Collins Stormwater Criteria Manual and was designed to comply with the provisions thereof. I understand that the City of Fort Collins does not and will not assume liability for drainage facilities designed by others.” _______________________________________________ Registered Professional Engineer State of Colorado No. 30325 Date: July 12, 2018 Wohnrade Civil Engineers, Inc. Stormwater Facility Name: Facility Location & Jurisdiction: User Input: Watershed Characteristics User Defined User Defined User Defined User Defined Watershed Slope =0.028 ft/ft Stage [ft] Area [ft^2] Stage [ft] Discharge [cfs] Watershed Length =366 ft 0.00 6 0.00 0.05 Watershed Area = 3.28 acres 0.50 9,775 0.50 0.29 Watershed Imperviousness = 43.0%percent 1.00 14,536 1.00 0.41 Percentage Hydrologic Soil Group A = 0.0%percent 1.50 16,175 1.50 0.51 Percentage Hydrologic Soil Group B = 0.0%percent 2.00 17,503 2.00 1.08 Percentage Hydrologic Soil Groups C/D = 100.0%percent 2.50 19,041 2.50 7.93 User Input 17 WQCV Treatment Method = 40.00 hours After completing and printing this worksheet to a pdf, go to: https://maperture.digitaldataservices.com/gvh/?viewer=cswdif create a new stormwater facility, and attach the pdf of this worksheet to that record. Routed Hydrograph Results Design Storm Return Period =WQCV 2 Year 5 Year 10 Year 50 Year 100 Year One-Hour Rainfall Depth =0.74 0.87 1.16 1.47 2.47 3.02 in Calculated Runoff Volume =0.051 0.090 0.146 0.209 0.475 0.636 acre-ft OPTIONAL Override Runoff Volume =acre-ft Inflow Hydrograph Volume =0.050 0.090 0.145 0.209 0.475 0.635 acre-ft Time to Drain 97% of Inflow Volume =3.6 5.0 6.7 8.4 14.2 15.8 hours Time to Drain 99% of Inflow Volume =3.7 5.2 7.0 8.9 15.0 16.7 hours Maximum Ponding Depth =0.38 0.54 0.73 0.92 1.61 1.96 ft Maximum Ponded Area =0.17 0.23 0.27 0.32 0.38 0.40 acres Maximum Volume Stored =0.033 0.065 0.113 0.170 0.413 0.548 acre-ft Location for 1-hr Rainfall Depths (use dropdown): Workbook Protected Worksheet Protected Stormwater Detention and Infiltration Design Data Sheet Legacy Auto Detention Pond 1 1845 N. College Avenue, Fort Collins, Colorado SDI_Design_Data_v1.08.xlsm, Design Data 7/12/2018, 9:41 AM WQCV_Trigger = 1 RunOnce= 1 CountA=1 Draintime Coeff=1.0 0 1 2 3 #N/A #N/A 0 1 2 3 #N/A #N/A Check Data Set 1 Check Data Set 1 Area Discharge Stormwater Detention and Infiltration Design Data Sheet 0 2 4 6 8 10 12 14 16 0.1 1 10 FL O W [ c f s ] TIME [hr] 100YR IN 100YR OUT 50YR IN 50YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT WQCV IN WQCV OUT 0 0.5 1 1.5 2 2.5 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 100YR 50YR 10YR 5YR 2YR WQCV SDI_Design_Data_v1.08.xlsm, Design Data 7/12/2018, 9:41 AM Thursday,  July  12,  2018  at  10:16:09  AM  Mountain  Daylight  Time Page  1  of  1 Subject:Stormwater  Deten,on  and  Infiltra,on  Facility  -­‐  Legacy  Auto  Deten,on  Pond  1 Date:Thursday,  July  12,  2018  at  9:46:26  AM  Mountain  Daylight  Time From:mailer@digitaldataservices.com  <mailer@digitaldataservices.com> To:mary@wcecivil.com  <mary@wcecivil.com> Thank  you  for  submitting  to  the  Colorado  Stormwater  Detention  and  In:iltration  database.  Your  facility  has been  recorded  and  the  local  jurisdiction  has  been  noti:ied. Facility  ID:SWDF-­‐20180712084619 Name:Legacy  Auto  Detention  Pond  1 Division:South  Platte Jurisdiction:FortCollins Design  Storm:100-­‐Year Water  Surface  Acres:0.44 Edit  Key:33bb28df06408fc009965b33b98c7f1b If  you  wish  to  edit  the  facility  in  the  future,  you  will  need  the  Edit  Key  listed  above.  If  you  lose  the  key,  you  will not  be  able  to  edit  the  facility  information  in  the  future. Project: Date: Sheets 11 5 8 2 C o l o n y R o w Br o o m f i e l d , C o l o r a d o 8 0 0 2 1 Ph o n e : ( 7 2 0 ) 2 5 9 - 0 9 6 5 Fa x : ( 7 2 0 ) 2 5 9 - 1 5 1 9 No . Re v i s i o n s : By : Da t e : WO H N R A D E C I V I L E N G I N E E R S , I N C . LEG: 1707.00 8/30/17 14 Scale: Designed By: Reviewed By: Sheet 1"=20' MBW YSG 7 1 AD J U S T G R A D E S @ E X . C O L U M N MB W 5/2 / 1 8 Scale: Designed By: Reviewed By: Sheet 1"=20' MBW YSG 5 1 FIR E H Y D R A N T C O N N E C T I O N JD M 04 / 2 4 / 1 8 Project: Date: Sheets 11 5 8 2 C o l o n y R o w Br o o m f i e l d , C o l o r a d o 8 0 0 2 1 Ph o n e : ( 7 2 0 ) 2 5 9 - 0 9 6 5 Fa x : ( 7 2 0 ) 2 5 9 - 1 5 1 9 No . Re v i s i o n s : By : Da t e : WO H N R A D E C I V I L E N G I N E E R S , I N C . LEG: 1707.00 8/30/17 14 Project: Date: Sheets 11 5 8 2 C o l o n y R o w Br o o m f i e l d , C o l o r a d o 8 0 0 2 1 Ph o n e : ( 7 2 0 ) 2 5 9 - 0 9 6 5 Fa x : ( 7 2 0 ) 2 5 9 - 1 5 1 9 No . Re v i s i o n s : By : Da t e : WO H N R A D E C I V I L E N G I N E E R S , I N C . LEG: 1707.00 8/30/17 14 Scale: Designed By: Reviewed By: Sheet 1"=20'H, 1"=5'V MBW YSG 8 Project: Date: Sheets 11 5 8 2 C o l o n y R o w Br o o m f i e l d , C o l o r a d o 8 0 0 2 1 Ph o n e : ( 7 2 0 ) 2 5 9 - 0 9 6 5 Fa x : ( 7 2 0 ) 2 5 9 - 1 5 1 9 No . Re v i s i o n s : By : Da t e : WO H N R A D E C I V I L E N G I N E E R S , I N C . LEG: 1707.00 8/30/17 14 Scale: Designed By: Reviewed By: Sheet N.A. YSG MBW 12 VALLEY PAN DETAILSPOND OVERFLOW WEIR CURB TAPER DETAILCONCRETE CURB EDGE DETAIL 18" VERTICAL CURB AND GUTTER DETAIL Project: Date: Sheets 11 5 8 2 C o l o n y R o w Br o o m f i e l d , C o l o r a d o 8 0 0 2 1 Ph o n e : ( 7 2 0 ) 2 5 9 - 0 9 6 5 Fa x : ( 7 2 0 ) 2 5 9 - 1 5 1 9 No . Re v i s i o n s : By : Da t e : WO H N R A D E C I V I L E N G I N E E R S , I N C . LEG: 1707.00 8/30/17 14 Scale: Designed By: Reviewed By: Sheet N.A. YSG MBW 14 CC A A B B SECTION C-C SECTION A-A SECTION B-B WELL SCREEN FLOW CONTROL PLATE PLAN GENERAL NOTES SECTION D-D D D A A ABBREVIATIONS LEGEND