Loading...
HomeMy WebLinkAboutLot Certifications - 06/28/2021 (3)2/14/17 Page 1 CERTIFICATION OF LOT GRADING Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e) Date: Address: Lot: Block: Subdivision: Permit Application #: Larimer County Parcel #: Larimer County Reception #: (on development agreement) I, (print) , a Colorado registered professional engineer, verify that construction of all stormwater facilities and grading is complete and hereby submit this certification. Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots. 1.Certification includes attached Stormwater-approved grading plan. (NOTE: City’s Building Department does not approve grading plans). 2.Certification includes the attached as-built survey dated (must be within 60 days of the date the certification is submitted) accurately and truthfully depicting elevations for: Top of foundation/finished floor Finished grade on each side of the structure Quarter points along each lot line (not more than 50 feet apart) Break points/high points Swales Berms Retaining walls Air conditioning pads Window wells Any other appurtenance(s) within an easement 3.All elevations are within a 0.2 foot tolerance of the approved grading plan. 4.The top of foundation is at least 6 inches above the highest grade surrounding the structure. 5.There is a minimum grade of 5% away from the structure within the first 5 to 10 feet adjacent to the residence. 6.All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than 33% (3:1). 7.All flow lines of stormwater drainage swales are a minimum of 6 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Stormwater-approved grading plan. 8.All downspout locations and discharge directions are shown on the as-built survey. Runoff is directed into an appropriate drainage system or lot line swale, and it is not directed onto neighboring properties. No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes DW DW DW DW DW DW DW DW Minor differences exceeding 0.2' on cantilevers at north and south edges of building. Building has extended stem walls above FF elevation. Wes Lamarque 6/28/2021 2/14/17 Page 2 9.A smooth transition with no vertical offset (step) in grade is provided at the lot line to all adjacent properties. 10.The grading of this lot does not adversely affect neighboring properties or City infrastructure. 11.Landscaping has been completed prior to survey. If not, please indicate who will be responsible for completing landscaping: 12.Final site cleanup has been completed. 13.I personally visited the site as part of the certification process, and in my professional opinion, the as-built survey is an accurate representation of the site conditions.. No Yes No Yes No Yes No Yes No Yes 14.Based on this information, I certify that (check one): □The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). □The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. Name: Email: Phone: Company: Address: NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) WaterUtilitiesEng@fcgov.com Mailing Address Fort Collins Utilities ATTN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 Questions? 970-221-6700 PE Stamp Sign and date DW DW DW DW DW Site is substantially complete but not finalized 6/11/2021 5005 5010 5015 5020 5005 5010 5015 5020 -0+25 0+00 1+00 ELEV=5015.11 ELEV=5014.43 TOP OF DECK TO LOW STEEL = 11" CITY BFE ELEV=5012.50EXISTING GROUND PROPOSED GROUND BRIDGE ABUTMENT BRIDGE ABUTMENT LOW STEEL ELEV=5013.56 12.7" PEDESTRIAN BRIDGE X E E E E X X X X X X X X X X X X X X X X E E W W W WW WW WW FO FO FO FO FO 6" S S 6" S S 6" S S 6" S S 6" S S 6" S S 6" S S 6" S S 6" S S 6" S S 6" S S 6" S S 6" S S CC 8" W 8" W 8" W 8" W X X X X S S S D D UD UD UD UD UD UD UD UD UD UD UD UD UD UD E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E WA L L E N B E R G D R I V E ST U A R T S T R E E T 54 ' R I G H T O F W A Y LOT 3 ARTHUR C. SHEELY FIRST SUBDIVISION OWNER: DEVORE, JANICE S. LOT 3 ARTHUR C. SHEELY FIRST SUBDIVISION OWNER: HANSCH, EDWARD C & DEBRA J LOT 3 ARTHUR C. SHEELY FIRST SUBDIVISION OWNER: HUFBAURER, RUTH BUILDING C BUILDING D BUILDING E PE D E S T R I A N B R I D G E SE E P R O F I L E , T H I S S H E E T RAIN GARDEN 3 CITY OF FORT COLLINS 100-YR FLOODWAY CITY OF FORT COLLINS 100-YR FLOODPLAIN 8' CURB CUT 2' REVERSE SIDEWALK CHASE 4' CURB CUT RAIN GARDEN 2 RAIN GARDEN 4 5' SIDE W A L K HOBBIT STREET 54' RIGHT OF WAY EXISTING WETLANDS NATURAL HABITAT BUFFER ZONE FEMA 100-YR HIGH-RISK FLOOD FRINGE EX. 10' SEWER EASEMENT BOOK 1204, PAGE 344 EX. 90' STORM DRAINAGE EASEMENT REC. NO. 86072551 26' EAE 24' EAE 24' EAE 24' EMERGENCY ACCESS EASEMENT BY SEPARATE DOCUMENT UTILITY AND ACCESS EASEMENT BY SEPARATE DOCUMENT PEDESTRIAN ACCESS EASEMENT BY SEPARATE DOCUMENT DRAINAGE EASEMENT BY SEPARATE DOCUMENT OFF-SITE RIGHT OF WAY DEDICATION BY SEPARATE DOCUMENT OFF-SITE RIGHT OF WAY DEDICATION BY SEPARATE DOCUMENT RIGHT OF WAY DEDICATION OFF-SITE 9' UTILITY EASEMENT BY SEPARATE DOCUMENT OFF-SITE 9' UTILITY EASEMENT BY SEPARATE DOCUMENT 9' UTILITY EASEMENT 0.5% 2. 5 % 2.0 % 1. 0 % 1. 0 % 0.5% 2. 0 % 2' SIDEWALK CHASE 2' CURB CUT 1.0% 1.0% 1.0% 1.0% 1.0 % 1.0% 1.0% 1.0% 1.0% 2' SIDEWALK CHASE 2' SIDEWALK CHASE 2.0% SCOURSTOP MAT SCOURSTOP MATS SCOURSTOP MAT TRANSITION TO 6" CURB HEIGHT TRANSITION TO 6" CURB HEIGHT STA:720 EL E V : 5 0 1 1 . 1 5 STA:80 5 E L E V : 5 0 1 1 . 4 2 STA : 9 0 5 E L E V : 5 0 1 1 . 8 9 ST A : 9 8 3 E L E V : 5 0 1 2 . 0 8 ST A : 1 0 7 5 E L E V : 5 0 1 2 . 3 1 ST A : 1 1 3 6 E L E V : 5 0 1 2 . 5 3 PROVIDE MEMBRANE LINER ALONG EAST FACE OF RAIN GARDEN - SEE BIORETENTION DETAIL SCOURSTOP MAT SCOURSTOP MAT 2. 6 % 2. 4 %2. 5 % 2.3% 2.4% 2.9% 2.4% 2. 0 % 2. 6 % 6' CURB TRANSITION 6' CURB TRANSITION DIRECT ROOF DRAIN TO PAN TO WEST DIRECT ROOF DRAIN TO NORTHWEST TO DRAIN TO RAIN GARDEN DIRECT ROOF DRAIN TO DRAIN TO EAST 12" RIBBON CURB NO CURB HEAD HERE TO HERE 2.0% CONCRETE RUNDOWN - SEE DETAIL, SHEET D8 CONCRETE CHANNEL CONCRETE RUNDOWN - SEE DETAIL, SHEET D8 CONCRETE RUNDOWN - SEE DETAIL, SHEET D8 2.1 % 2.1 % 2. 1 % 16. 2 % 5.5 % 4.6 % 4.3% 3.6 % 5.8 % 3.4 % 2. 0 % 2.6 % 4:1 6:1 6:1 14:1 5:1 0.5% 4: 1 4: 1 4: 1 4: 1 14.1% 11 . 1 % 5.0% 7:1 5:1 5:1 9:1 5:1 5:1 TOE OF SLOPE TOE OF SLOPE TOE OF SLOPE 5.3% 3.0% 2.2% 5. 0 % 2.4% 4. 6 % 2. 2 % 2.0 % 2. 2 % 2.3% 2.4% 2.2% 2.4% 2.2% 5:1 8:1 11:1 17:1 10 : 1 13:1 2. 0 % 2.7 % 2.5% 2.0% 2. 9 % 2.0% 2.3% 2.0% 2.3% 13.2 7 12.5 3 13.1 5 12.6 2 12.8 9 12.8 9 13.0 3 12.6 4 12.6 1 12.03 12.4 713.0 2 12.4 6 13.0 0 13.1 8 15.36 13.1 5 13.9 3 13.2 9 12.7 9 13.7 5 14.8 3 14.9 1 15.7 3 14.7 0 15.4 1 14.86 13.6 8 14.1 9 14.20 15.0 8 15.7 0 FFE=15.67 FFE=14.50 FFE=15.20 FFE=15.70 15.5 3 15.1 7 15.0 0 16. 5 8 13 . 2 9 10.7 0 12.8 5 15.44 13.6 1 13.5 1 12.9 9 12.7 8 13.16 13 . 2 2 12 . 3 7 12 . 2 0 12 . 6 1 12.3 8 12.8 0 12.06 12.4 6 11 . 9 8 12.4 7 12.5 7 12.9 0 15.2 9 15.3 5 15.3 8 14.8 7 13.6 0 13.7 2 13.7 5 13.88 13 . 5 4 13.96 13 . 9 7 15.0 8 15.2 7 14.7 3 14.6 4 14.5 6 14.7 2 14.1 0 13.7 0 13. 7 8 14.0 1 12.8 4 12.7 2 13.34 13.45 13.3 9 14.5 8 14.54 14.6 6 15.4 5 15.4 5 15.5 6 15. 5 0 15.6 1 16.2 4 10 . 8 4 9.72 13.5 8 15 . 2 7 15.1 9 15.5 2 15.6 7 15.89 15 . 9 3 16.1 8 17.3 9 17.3 815.6 7 15.67 15.0714.83 14.8 6 14.8 6 14.8 0 14.7 8 14.7 5 15.20 15 . 2 0 15.20 15.20 16.19 16.28 16.7 0 14 . 7 8 14.76 14.75 14. 7 2 15.7 5 16.0 1 16. 7 0 16.7 0 16 . 7 0 16.70 16 . 7 0 16 . 7 0 16 . 7 0 16.70 16 . 7 0 15.70 15 . 2 0 15.20 14.5 014.50 14.5 0 14.5 0 14.50 15.20 15 . 2 1 14 . 9 2 15.03 15.03 15. 0 3 15.0 3 15.03 15.0 3 15.0 3 15. 0 3 15.0 3 15 . 0 3 15.03 15. 0 3 14 . 8 7 15.24 15. 7 0 15. 7 0 15.7 0 16 . 7 0 16.7016.7 0 16. 7 0 16 . 7 0 16.7 0 16 . 7 0 15.75 15 . 7 5 15.21 15.13 15.2 5 15.9 7 15.9 4 16.0 7 16.1 5 16. 1 6 16 . 0 3 16.0 0 15.1 6 14.3 8 14.6 6 14.7 5 14.7 8 14.8 6 15.24 15.4 6 15.81 16. 2 1 15.9 6 15.8 3 15. 4 6 14. 9 4 14.50 14.43 14. 4 3 14 . 3 9 14.00 14.5 0 14.5 0 13.8 3 14.5 0 13.8 3 13. 8 3 13.8 3 13.6 0 13.83 13.8 1 13.8 3 13.8 3 13.8 3 13.8 3 13 . 8 3 13.5 8 13.68 13.6 1 15.0 0 13. 8 3 13.83 13.2 6 15.3 6 15.08 15 . 1 6 15 . 0 3 13.3 0 13.46 15.00 13.36 13.4 7 13.2 0 13.02 12.9 1 12.7 8 12.7 6 12.7 8 12.93 12.5 3 12.66 12.15 12.0 2 11.7 9 11.93 11.3 5 11.48 11.0 0 11.13 11.0 1 11.14 10.6 0 10.4 7 9.80 9.60 9.56 9.6 3 9.70 11.48 13.20 14.00 14.1 0 14. 1 0 14.0 0 14. 1 2 14 . 0 0 14.2 3 14.6 3 14.6 3 14.23 14.3 8 14.53 15.4 7 15.27 15.11 13.85 13.83 13.5 8 13.5 8 13.58 12.0 6 11.9 7 15.08 13.62 13.45 9.77 10.7 5 14.0 8 14.33 14.90 14.4 4 14.8 3 15.4 3 12 . 9 9 13.00 13.36 13. 7 9 12.9 3 11.11 11 . 1 1 13.6 5 15.11 15 . 9 8 13.9 1 14.9214.6 3 16.69 11 . 8 5 FFE=14.50 15.6 7 15.67 13. 1 7 13.1 3 TOC 14.5 0 14.5 0 14.5 0 14.50 14.5 0 14.50 14.5 0 15.00 15.0 0 15.00 13. 8 3 13.8 3 13.83 12.5 1 13.5012.50 13.8 1 14 . 6 6 14. 7 8 14. 7 4 FFE=15.70 15 . 7 0 15 . 7 0 15 . 7 0 15.70 15.03 14 . 4 2 15.14 9.67 12.50 12.5 0 12.50 12.5 0 12.8 1 12.73 12.6 9 12.7 1 9.0 7 9.02 11.2 5 13. 5 0 13.50 13.5 0 10.2 7 11. 2 5 11.25 11.25 12 . 0 0 12.0 0 12 . 0 0 11.2 5 11. 2 5 12.00 12 . 0 0 12 . 6 7 12.2 5 11. 8 5 13.3 0 13.38 13.4 2 13.6 1 14.24 14.39 14.2 5 13 . 2 7 13.63 13.60 13.25 13.5 8 13.58 13.2 5 13 . 2 5 13.25 13.4 5 13.1 6 13.3 5 13.1 8 13.2 8 13.3 5 13.25 13.0 0 13.1 0 13.1 1 13.00 13.10 13 . 0 0 12.5 9 11 . 4 3 11.43 12.25 12.2 5 12. 2 5 12.2 5 12.25 12.25 12.2 5 11.2 5 11.25 11.2 6 11.2 5 11.25 11.25 11.2 5 11. 2 6 12 . 5 0 13. 5 0 12 . 5 0 12.50 13.50 12.5 0 12.2 5 12.25 14.43 14.2 7 GB 13. 5 0 13.24 13.50 13.7 8 12.9 3 13.72 11.98 12 . 5 0 13.50 9.00 13.3 3 13.3 3 13.3 3 13.3 3 13.3 3 14.51 14.1 5 14 . 5 6 13.8 9 14.1 4 14.94 14.6 3 BEGIN CURB CUT END CURB CUT CONCRETE SIDEWALK CULVERT SEE SITE DETAIL D-12 PRIVATE TEMPORARY CONSTRUCTION EASEMENT CONVEYED FROM LANDMARK APARTMENTS EXPANSION TO LANDMARK P.U.D. 15.2 0 15.6 8 15.8 2 15.6 5 15.8 1 15 . 6 5 15.56 15.71 14 . 4 3 14.55 TRACT B PULSE PUD FILING ONE OWNER: NORTH SPRING CREEK PROPERTIES LLC EDGE OF WATER EDGE OF WATER EDGE OF WATER 14.5 0 14.50 AREA DETAIL 1 - SEE SHEET G3 AREA DETAIL 2 - SEE SHEET G3 AREA DETAIL 3 - SEE SHEET G4 15.20 15. 2 0 15.50 13.50 1' SIDEWALK CHASE 1' SIDEWALK CHASE KEYMAP DCDC CC Sheet LA N D M A R K A P A R T M E N T S E X P A N S I O N 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 E N G I N E E R N G I E H T R O N R N PH O N E : 9 7 0 . 2 2 1 . 4 1 5 8 ww w . n o r t h e r n e n g i n e e r i n g . c o m of 34 7/19/19 LEGEND: PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB AND GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM; NAVD88. SEE COVER SHEET FOR BENCHMARK REFERENCES. 4.FLOOD ZONE DESIGNATION: ACCORDING TO FEMA MAP NUMBER 08069C0979H, DATED MAY 2, 2012, A PORTION OF THE TRACT ABUTTING THIS LAND IS WITHIN A FEMA DESIGNATED SPECIAL FLOOD HAZARD AREA (SFHA), AND IS SUBJECT TO INUNDATION BY THE 1% ANNUAL CHANCE (100-YEAR) FLOOD. THIS LAND IS ALSO SUBJECT TO THE CITY OF FORT COLLINS FLOODPLAIN AND FLOODWAY KNOWN AS THE "CANAL IMPORTATION CHANNEL". 5.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATORY 100-YR HIGH-RISK FLOOD FRINGE AND CITY OF FORT COLLINS FLOOD FRINGE AND FLOODWAY, AND MUST COMPLY WITH THE FLOODPLAIN REQUIREMENTS OF CHAPTER 10 OF THE CITY OF FORT COLLINS MUNICIPAL CODE. 6.STORAGE OF EQUIPMENT AND MATERIALS IS NOT ALLOWED IN THE FLOODWAY. 7.NONSTRUCTURAL DEVELOPMENT (FENCES, DETENTION PONDS, HARD SURFACE PATHS, FILL, DRIVEWAYS, PARKING AREAS, VEGETATION, ETC.) IS ALLOWED WITHIN THE 100-YEAR FLOODWAY AS LONG AS IT CAN BE PROVEN THAT THE DEVELOPMENT WILL NOT CAUSE A RISE IN THE BASE FLOOD ELEVATION (BFE) OR A CHANGE TO THE FLOODWAY OR FLOOD FRINGE BOUNDARIES. NONSTRUCTURAL DEVELOPMENT IS NOT RESTRICTED WITHIN THE FLOOD FRINGE. 8.ANY AND ALL CONSTRUCTION ACTIVITIES IN THE FLOODWAY OR FLOOD FRINGE MUST BE PRECEDED BY AN APPROVED FLOODPLAIN USE PERMIT. IF THE CONSTRUCTION IS IN THE FLOODWAY A NO-RISE CERTIFICATION MUST BE APPROVED PRIOR TO CONSTRUCTION. 9.PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. 10.A FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR STORM OUTFALL LOCATIONS, BRIDGE ABUTMENTS, AND PEDESTRIAN TRAIL LOCATED WITHIN THE FLOODPLAIN. THE TURF REINFORCEMENT MATS WITHIN THE FLOODWAY WILL REQUIRE A NO-RISE CERTIFICATION. 11.THE EXISTING WETLANDS SHALL NOT BE DISTURBED BY ANY CONSTRUCTION OR DEVELOPMENT ACTIVITIES, EXCEPT AS APPROVED BY THE CITY ENVIRONMENTAL PLANNER AND IN ACCORDANCE WITH SECTION 3.4.1 OF THE LAND USE CODE. 12.SEE DETAIL, SHEET EC3 FOR MORE INFORMATION ON SCOURSTOP MATS NOTES: PROPOSED STORM INLET EXISTING SPOT ELEVATION PROPOSED FIRE HYDRANT PROPOSED LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) EXISTING RIGHT OF WAY PROPOSED RIGHT OF WAY FLOODPLAIN AND FLOODWAY POROUS LANDSCAPE DETENTION MATCHLINE-SEE SHEET G1 G2 G2 GR A D I N G P L A N 10 DateCity Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner NORTH ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 PEDESTRIAN BRIDGE PROFILE CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. before you dig.Call R