HomeMy WebLinkAboutLot Certifications - 06/05/2018 (3)Date: 05/31/2018 Subdivision: Kechter Farm Filing 2
Address: 6303 Fall Harvest Way
Permit Application #: B1706245
Fort Collins, CO 80528
Larimer County Parcel #: 8608444001
Lot: 1 Block: 25
Larimer County Reception #: 20150069429
(on development agreement)
I, (print)17f p JAM..Es fl-AL Pf , a Colorado registered professional engineer, verify that construction
- of all stormwater fa ilities and grading is complete and hereby submit this certification.
Please answer the following questions by initialing the appropriate response. For each question initialed "No," attach an
explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots.
1.Certification includes attached Stormwater-approved grading plan. (NOTE: City's No Yes 1H
Building Department does not approve grading plans).
2.Certification includes the attached as-built survey dated 05/31/2018 (must be within 60 No Yes 77)4
days of the date the certification is submitted) accurately and truthfully depicting
elevations for:
• Top of foundation/finished floor
• Finished grade on each side of the structure
• Quarter points along each lot line (not more than 50 feet apart)
• Break points/high points
• Swales
• Berms
• Retaining walls
• Air conditioning pads
• Window wells
• Any other appurtenance(s) within an easement
3.All elevations are within a 0.2 foot tolerance of the approved grading plan. No TM Yes
4.The top of foundation is at least 6 inches above the highest grade surrounding the No 1)4 Yes
structure.
5.There is a minimum grade of 5% away from the structure within the first 5 to 10 feet No ______Yes 7l
adjacent to the residence.
6.All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single No _____ Yes 71
family lots when the swale is draining the runoff from only two adjoining properties)
and are not steeper than 25% (4:1).
7.All flow lines of stormwater drainage swales area minimum of 6 inches below the No -Yes T(
elevation of ground adjacent to the structure and will direct drainage as shown on the
Stormwater-approved grading plan.
8.All downspout locations and discharge directions are shown on the as-built survey. No ______Yes1)4
Runoff is directed into an appropriate drainage system or lot line swale, and it is not
directed onto neighboring properties.
5/26/16 Page 1
9.A smooth transition with no vertical offset (step) in grade is provided at the lot line to all No Yes TT(
adjacent properties.
10.The grading of this lot does not adversely affect neighboring properties or City No Yes
infrastructure.
11.Landscaping has been completed prior to survey. If not, please indicate who will be No TS)1 Yes
responsible for completing landscaping: TELL e.ei—
/
12.Final site cleanup has been completed. No _____ Yes
visited thesite as part of the certification process, and in my professional No _____ Yes
opinion, the as-built survey is an accurate representation of the site conditions.
14. Based on this information, I certify that (check one):
o The elevations and drainage patterns of the lot/site are in substantial conformance with the City
approved drainage and grading plan for the property (information attached).
The elevations and drainage patterns of the lot/site as measured are in general conformance with the
City approved drainage plan with exceptions (information attached). In my professional judgment the
elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the
specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a
manner consistent with the approved drainage plan.
Name: Ittlemb. J. - t - CM.
C.P
Phone:
Company: i R. Er.) & LL.(
Address: 20 r. Ca Lt_e_6.r_37D
t.-r LLI d S 60 &CJ4 -L.'y-
PE Stamp
Sign and date
NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy
for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed
elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other
information necessary to confirm the above certification to:
Email (preferred)
WaterUtilitiesEngfcgov.com
Mailing Address Questions?
Fort Collins Utilities 970-221-6700
ATTN: Water Utilities Engineering
281 North College Avenue
Fort Collins, CO 80521
FsPt°otLins
ties
5/26/16 Page 2
J -R ENGINEERING
A Subsidiary of Westrian
7200 S. Alton Way, Suite 0400. CentennI, CO 80112
303-740-9393 • Fax 303-721-9019 • www.jrengineering.com
DRAINAGE
JOB NUMBER 39713.01
CLIENTESE CONSULTANTS, INC.
SUBDIVISION KECHTER FARM
FILING _2 BLOCK 25 LOT _1
DATE _06/01/18 DRAWN BY KRW
CERTIFICATE
N 0033'31 - 124.28' - 1 0 _0 _0 T
FENCE—"
I BUILDING
ir-----------
I I -
17.7% 24.5 /
L DOWNSPOI/"
L I covo. 'rvp' I
r PATIO "-
'1 I 14.2 _Z7 DLCCK 25 6.5
BLOCK 25 2 STORY STONE AND STUCCO
LOT 2 63o3 'FALL HARWST WAY
LEC
I TOF
I I
E
,
I
I
I 47 5
I, GAS 57. L8.3 . .. ...
242% 14.8 . ;.. COVO. ' IPORCH UG °
UG1
'...., I
9 L__z_'4ui i
r
---1—_ —----
P
9U.
U.E. E 45.16' - - 1373 .
L=1462'
-S 00`18'42" 10539
9=521.56'
ZZ h'A 7i$Y7 I1X
?
DOWNSPOUT
RUNOUT 30 15 0 30
ORIGINAL SCALE: 1" = 30'
THE PROPERTY DESCRIBED AS: LOT 1, BLOCK 25, KECHTER FARM, CITY OF FORT COLLINS, COUNTY OF
LARIMER, STATE OF COLORADO; (PER CLIENT) ALSO KNOWN AS 6303 FALL HARVEST WAY.
DRAINAGECERTIFICATE
THE ELEVATIONS, SLOPES AND DRAINAGE PATTERNS DEPICTED ON THIS CERTIFICATE WERE DEVELOPED BY ESE
CONSULTANTS, INC., WHO PERFORMED A FIELD SURVEY OF THE PROPERTY ON MAY 31.2018. THE ELEVATIONS
MAY CHANGE SUBSEQUENT TO THE SURVEY DUE TO SUBSIDENCE, UPHEAVAL, EROSION, ACTS OF MAN, AND/OR
OTHER FACTORS. THEREFORE, THIS CERTIFICATE MAY NOT ACCURATELY DEPICT THE ELEVATIONS AND
DRAINAGE PATTERNS AFTER THE DATE OF SURVEY AND INSPECTION. THE UNDERSIGNED, A REGISTERED
PROFESSIONAL ENGINEER, CERTIFIES THAT THEY HAVE INSPECTED THE SITE TO VERIFY THAT IT IS IN GENERAL
ACCORDANCE WITH THE SURVEY DATA AND CONCLUDES THAT THE LOT WILL DRAIN ADEQUATELY IN
CONFORMANCE WITH THE OVERALL SUBDIVISION DRAINAGE PLAN AND INDIVIDUAL LOT GRADING PLAN.
ENGINEER 'S STATEMENT RF
PREPARED UNDER MY DIRECT
r
TIMOTHY JAMES HALOPOFF, F.E.
FOR AND ON BEHALF OF JR ENGINEERING,
LL
COLORADO LIC. PE NO. 37953
0 0
It,
7200 South Alton Way, Suite C400
Centennial, CO 80112
303-740-9393 x Fax 303-921-7320
3930 Sinton Road, Suite 219
Colorado Springs, CO 80907
719-593-2593 x Fax 303-921-7320
X 2900 South College Avenue, Suite 3D
Fort Collins, CO 80525
970-491-9888 x Fax 303-921-7320
MEMORANDUM
To:City of Fort Collins, Bldg Dept.
From:Tim Halopoff, PE, CFM
Date:06-04-2018
Subject:6303 Fall Harvest Way, Lot 1, Blk 25 – Drainage Certificate Supplement
Certification of Lot Grading - Supplement
Item:
3.Not all elevations are within 0.2’ of the approved grading plans, but the drainage intent has been met
without impacts to adjoining properties.
4.All grades surrounding structures are at least 6’’ (0.5’) below TOF, except at the air conditioner pads
where the grades are +/- 4’’ (.33’) below TOF.
11. It is industry standard to certify the grades prior to landscape installation. The landscaping was not
complete at time of survey. Landscaping or temporary seeding/erosion control should be installed as soon as
possible to prevent erosion of the bare soil.