HomeMy WebLinkAboutLot Certifications - 10/12/2017· CERTIFICATION OF LOT GRADING
Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e)
Date: 1 0/04 /20 17
Address: 2944 Zephyr Road
Subdivision: Kechter Farm Filing 1
Perm it Application #: _B _1_7_0_ 1_4_8_4 ________ _
Fort Collins, CO 80528 Larimer County Parcel#: _8_6_0_8_4 _2_1 _0 _3_2 ______ _
Lot: 32 Block: 1 6 -------------Larimer County Reception#: 2014 00 24 9 17 & 20 150008527
(on development agreement)
I, (print('JlMo� JAMc!� w .. yfqff I a Colorado registered professional engineer, verify that construction
of all stormwater facilities and grading is complete and hereby submit this certification.
Please answer the following questions by initialing the appropriate response. For each question initialed "No," attach an
explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots.
1. Certification includes attached Stormwater-approved grading plan. (NOTE: City's No Yes -r:nl Building Department does not approve grading plans).
2.Certification includes the attached as-built survey dated 1 0/04/2017 (must be within 60 No Yes T.n-1 days of the date the certification is submitted) accurately and truthfully depictingelevations for:
•Top of foundation/finished floor•Finished grade on each side of the structure•Quarter points along each lot line (not more than 50 feet apart)•Break points/high points•Swales•Berms
•Retaining walls
•Air conditioning pads
•Window wells•Any other appurtenance(s) within an easement
3.All elevations are within a 0.2 foot tolerance of the approved grading plan.
4.The top of foundation is at least 6 inches above the highest grade surrounding the
structure.
5.There is a minimum grade of 5% away from the structure within the first 5 to 10 feetadjacent to the residence.
6.All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on singlefamily lots when the swale is draining the runoff from only two adjoining properties)and are not steeper than 25% (4:1).
7.All flow lines of stormwater drainage swales are a minimum of 6 inches below the
elevation of ground adjacent to the structure and will direct drainage as shown on theStormwater-approved grading plan.
8.All downspout locations and discharge directions are shown on the as-built survey.
5/26/16
Runoff is directed into an appropriate drainage system or lot line swale, and it is notdirected onto neighboring properties.
No�Yes __
No __ Yes�
No __ Yes�
No Yes -r.nc
No __ Yes�
No __ Yes ___ID
Accepted 10/12/2017 W L
9.A smooth transition with no vertical offset (step) in grade is provided at the lot line to all No Yes 114
adjacent properties.
10.The grading of this lot does not adversely affect neighboring properties or City No Yes 75
infrastructure.
11.Landscaping has been completed prior to survey. If not, please indicate who will be No T3'4 Yes
responsible for completing landscaping: 'ru..: LEA-L
12.Final site cleanup has been completed. No _____ Yes TT4
13.I personally visited the site as part of the certification process, and in my professional No _____ Yes T3bj
opinion, the as-built survey is an accurate representation of the site conditions.
14.Based on this information, I certify that (check one):
o The elevations and drainage patterns of the lot/site are in substantial conformance with the City
approved drainage and grading plan for the property (information attached).
I The elevations and drainage patterns of the lot/site as measured are in general conformance with the
City approved drainage plan with exceptions (information attached). In my professional judgment the
elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the
specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a
manner consistent with the approved drainage plan.
Name: J. 4ALS.cF, P
Email: sj -P c _'Aè eo-rsI.
Phone:
Company: R_ EM i 4../(I _L1.-c
Address: Z 10 0 T. Av 3-re ?D
5A-r_LJAs ,co9 c)529—
PE Stamp
Sign and date
NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy
for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed
elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other
information necessary to confirm the above certification to:
Email (preferred)
WaterUtiIitiesEngcfcgov.com
Mailing Address
Fort Collins Utilities
ATIN: Water Utilities Engineering
281 North College Avenue
Fort Collins, CO 80521
Questions?
970-221-6700
City of
Fort Collins
es
5/26/16 Page
7200 South Alton Way, Suite C400
Centennial, CO 80112
303-740-9393 x Fax 303-921-7320
3930 Sinton Road, Suite 219
Colorado Springs, CO 80907
719-593-2593 x Fax 303-921-7320
X 2900 South College Avenue, Suite 3D
Fort Collins, CO 80525
970-491-9888 x Fax 303-921-7320
MEMORANDUM
To:City of Fort Collins, Bldg Dept.
From:Tim Halopoff, PE
Date:10-12-2017
Subject:2944 Zephyr Road, Lot 32, Blk 16 – Drainage Certificate Supplement
Certification of Lot Grading - Supplement
Item:
3.Not all elevations are within 0.2’ of the approved grading plans, but the drainage intent has been met
without impacts to adjoining properties.
11. It is industry standard to certify the grades prior to landscape installation. The landscaping was not
complete at time of survey. Landscaping or temporary seeding/erosion control should be installed as soon as
possible to prevent erosion of the bare soil.
JOB NUMBER 39713.01 J-R ENGINEERING CLIENTESE CONSULTANTS, INC.
A Subsidiary of Westrian SUBDIVISION KECHTER FARM
FILING _1 BLOCK 16 LOT _32
7200 S. Aton Way, Suite 0400. Centennial, CO 80112 DATE _10/09/17 DRAWN BY KRW
303-740-9393 • Fax 303-721-9019' wwwjrengineering.com
DRAINAGE CERTIFICATE
S 37.57 ,4;i,Nc E_E iii:,
UTLT
ill
N
rw r-
00
c,
4.5' ACCESS,
UTILITY, DRAINAGE
AND NO BUILD
EASEMENT FOR
THE BENEFIT OF
LOT 32 BLOCK 16
20 10 C 20
ORIGINAL SCALE: 1" = 20'
- •T-• -
•-=--- 6'E
- -
I27
.25.97 (
I"
1 0 1'
127.74
11.9'
cs—I
C0vD.
N.
PATIO N
13.5'
DOWNSPOUT
"TYP"
V.
LOT 32, BLOCK 16 R
2944 ZEPHYR RD
2 STORY WOOD AND STONE
TOF 28.1
G S
5.1
6 ,3
4
t4
9' U.E.
COVD
PORCH
r)
N
) 20.1'
2.72 25.7(
CONC
DRIVE*
.,
-
H SIDEWALK
V...
p.
YRRD
10
4.5' ACCESS,
UTILITY, DRAINAGE
AND NO BUILD
EASEMENT FOR
THE BENEFIT OF
LOT 33 BLOCK 16
8
0)
v-
9-
w
?
DOWNSPOUT
W/RU N OUT
II
r16 00
cn I!
I p
It)
g I Iz
I I
-oo..
THE PROPERTY DESCRIBED AS: LOT 32, BLOCK 16, KECHTER FARM, CITY OF FORT COLLINS, COUNTY OF
LARIMER, STATE OF COLORADO; (PER CLIENT) ALSO KNOWN AS 2944 ZEPHYR ROAD.
DRAINAGE CERTIFICATE
THE ELEVATIONS, SLOPES AND DRAINAGE PATTERNS DEPICTED ON THIS CERTIFICATE WERE DEVELOPED BY ESC
CONSULTING, INC., WHO PERFORMED A FIELD SURVEY OF THE PROPERTY ON OCT04, 2017. THE ELEVATIONS
MAY CHANGE SUBSEQUENT TO THE SURVEY DUE TO SUBSIDENCE, UPHEAVAL, EROSION, ACTS OF MAN, AND/OR
OTHER FACTORS. THEREFORE, THIS CERTIFICATE MAY NOT ACCURATELY DEPICT THE ELEVATIONS AND
DRAINAGE PATTERNS AFTER THE DATE OF SURVEY AND INSPECTION. THE UNDERSIGNED, A REGISTERED
PROFESSIONAL ENGINEER, CERTIFIES THAT THEY HAVE INSPECTED THE SITE TO VERIFY THAT IT IS IN GENERAL
ACCORDANCE WITH THE SURVEY DATA AND CONCLUDES THAT THE LOT WILL DRAIN ADEQUATELY IN
CONFORMANCE WITH THE OVERALL SUBDIVISION DRAINAGE PLAN AND INDIVIDUAL LOT GRADING PLAN.
ENGINEER'S STATEMENT 17
PREPARED UNDER MY DIRECT SUPERVISI kk
,
LIC. FE NO. 3753
ThAOTHYJAMES HALOPOFFPE
LLC.NA
COLORADO
This unofficial copy was downloaded on Dec-05-2014 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com
For additional information or an official copy, please contact Engineering Office 281 North College Fort Collins, CO 80521 USA