Loading...
HomeMy WebLinkAboutLot Certifications - 10/20/2017 (2)Fort Collins,CO 80528 9.A smooth transition with no vertical offset (step) in grade is provided at the lot line to all No ______ Yes TT4 adjacent properties. 10.The grading of this lot does not adversely affect neighboring properties or City No _____ Yes 1H infrastructure. 11.Landscaping has been completed prior to survey. If not, please indicate who will be NoT)4 Yes responsible for completing landscaping:TOL.. Ft_a,J.ri 12.Final site cleanup has been completed. No _____ Yes 1'-0 13.I personally visited the site as part of the certification process, and in my professional No - Yes T3 opinion, the as-built survey is an accurate representation of the site conditions. 14.Based on this information, I certify that (check one): o The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). Rr The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. [IJ 37953y ONAL PE Stamp Sign and date Name: 17to'fl4 J. _,PI PC Email: •1 Phone: Company: J Ei...) 4i J_.at./(, LLC... Address: 296t, S. eln tjG ,k"., iT .b Flowy­C.L.Lz./ Co NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) WaterUtilitiesEng@fcgov.com Mailing Address Fort Collins Utilities ATIN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 Questions? 970-221-6700 City of Fort Collins ltes 5/26/16 Pae2 z•:_i 72t 0) go 0 0 Ln _6' U. E. ZOX • _ jjj_ucj._ ---- -- I SETBACK I I • I 41.26+ I '\ I I _ A -- 18.1' 4Z481'q PATIO I 59% I 19.7' ' 11.2' LOT 1, BLOCK 9 FENCE 6102 FALL HARVEST WAY I d / I 2 STORY WOOD AND STONE - V I TOF 42.7 42.00 ° Ia 41.95 DOWNSPOUT I —"TYP" H I •ELEC 2 PORCH . I PORCH Iz 0) c-J LOT BLOCK 9 F_ p 39 JOB NUMBER 39713.01 J-R ENGINEERING CLIENT ESECONSULTANTS,INC. A Subsidiary of Westrian SUBDIVISION KECHTERFARM FILING 1 BLOCK 9 LOT 1 7200 S. Alton Way, Suite C400. Centennial, CO 80112 DATE 10/18/17 DRAWN BY AJH 303-740-9393 • Fax 303-721-9019 • www.jrengineering.com DRAINAGE CERTIFICATE 4. -----i* • •.••. 9'U.E. DOWNSPOUT RUNOUT INNI .N2553'25" 65.60 38.70- - 20 10 0 20 ORIGINAL SCALE: 1" = 20' THE PROPERTY DESCRIBED AS: LOT 1, BLOCK 9, KECHTER FARM, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO; (PER CLIENT) ALSO KNOWN AS 6102 FALL HARVEST WAY. DRAINAGECERTIFICATE THE ELEVATIONS, SLOPES AND DRAINAGE PATTERNS DEPICTED ON THIS CERTIFICATE WERE DEVELOPED BY ESE CONSULTANTS, INC., WHO PERFORMED A FIELD SURVEY OF THE PROPERTY ON OCT. 16.2017. THE ELEVATIONS MAY CHANCE SUBSEQUENT TO THE SURVEY DUE TO SUBSIDENCE, UPHEAVAL, EROSION, ACTS OF MAN, AND/OR OTHER FACTORS. THEREFORE, THIS CERTIFICATE MAY NOT ACCURATELY DEPICT THE ELEVATIONS AND DRAINAGE PATTERNS AFTER THE DATE OF SURVEY AND INSPECTION. THE UNDERSIGNED, A REGISTERED PROFESSIONAL ENGINEER, CERTIFIES THAT THEY HAVE INSPECTED THE SITE TO VERIFY THAT IT IS IN GENERAL ACCORDANCE WITH THE SURVEY DATA AND CONCLUDES THAT THE LOT WILL DRAIN ADEQUATELY IN CONFORMANCE WITH THE OVERALL SUBDIVISION DRAINAGE PLAN AND INDIVIDUAL LOT GRADING PLAN. I A IIII PREPARED UNDER MY DIRECT SUPERVISIOM..717. Sd q ½ - _2.-7 •' TIMOTHY JAMES HALOPOFF, P.E. COLORADO LIC. PE NO. 37953 S/oNA FOR AND ON BEHALF OF JR ENGINEERING, LLC. … 7200 South Alton Way, Suite C400 Centennial, CO 80112 303-740-9393 x Fax 303-921-7320 … 3930 Sinton Road, Suite 219 Colorado Springs, CO 80907 719-593-2593 x Fax 303-921-7320 X 2900 South College Avenue, Suite 3D Fort Collins, CO 80525 970-491-9888 x Fax 303-921-7320 MEMORANDUM To:City of Fort Collins, Bldg Dept. From:Tim Halopoff, PE Date:10-20-2017 Subject:6102 Fall Harvest Way, Lot 1, Blk 9 – Drainage Certificate Supplement Certification of Lot Grading - Supplement Item: 3.Not all elevations are within 0.2’ of the approved grading plans, but the drainage intent has been met without impacts to adjoining properties. 11. It is industry standard to certify the grades prior to landscape installation. The landscaping was not complete at time of survey. Landscaping or temporary seeding/erosion control should be installed as soon as possible to prevent erosion of the bare soil. This unofficial copy was downloaded on Dec-05-2014 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact Engineering Office 281 North College Fort Collins, CO 80521 USA