Loading...
HomeMy WebLinkAboutLot Certifications - 04/18/2022Stephen Agenbroad 4/18/2022 4/15/2022 G PR O P O S E D P O U D R E R I V E R CR O S S S E C T I O N 2 8 2 BFE 4 9 6 4 . 2 PR O P O S E D P O U D R E R I V E R CR O S S S E C T I O N 5 8 3 BFE 4 9 6 4 . 2 PR O P O S E D P O U D R E R I V E R CR O S S S E C T I O N 6 4 5 BF E 4 9 6 4 . 2 PR O P O S E D P O U D R E R I V E R CR O S S S E C T I O N 7 2 3 BF E 4 9 6 4 . 2 FFE=4966.20 64. 5 3 64. 7 8 65. 2 0 65. 7 0 65. 7 0 65. 7 0 66. 1 1 65. 5 2 63. 2 1 61.9 9 64.32 64.44 65. 9 1 64. 4 2 FFE=4965.90 64. 4 0 64. 4 0 64. 4 0 61 . 8 5 25.0% 24.0% 22.9% 23.4% 23.2% 22.4% 22.2% 10 . 8 % 16 . 8 % 15 . 1 % 17 . 8 % 19 . 0 % 21 . 4 % 15. 9 % 11.7% 3.0 % 2.3% 2.1 % 13. 0 % 13 . 6 % 13 . 6 % 12 . 8 % 13 . 6 % 13 . 5 % 11 . 1 % 11. 0 % 9.2% 11.0 % 2. 0 % EXPOSE 1' TO 1.8' OF FOUNDATION ON WEST PORTION OF BUILDING EXPOSE 6" TO 1' OF FOUNDATION ON NORTH SIDE OF BUILDING 63.47 63.99 EXISTING 100-YEAR FLOODPLAIN 61 . 7 6 61 . 7 3 4.8 % 1.8' OF FOUNDATION EXPOSED ON SOUTH SIDE OF BUILDING 16 . 4 % 17.8 % 64. 4 0 64. 4 0 66. 2 0 66. 1 1 66. 2 0 61.9 5 11 . 4 % 7. 4 % 65 . 6 8 65. 5 2 65. 8 4 65. 6 0 66. 0 5 66. 1 8 66. 2 0 66. 0 7 66. 2 0 66. 0 1 65. 9 7 65. 9 3 65. 7 1 64. 4 0 PROPOSED 100-YEAR FLOODPLAIN PER WHITEWATER PARK LOMR 65. 6 4 65. 7 1 7" STEP DOWN TO EXISTING CONCRETE 65. 3 4 65.6 5 65. 7 6 65.6 0 66. 0 1 65. 6 3 65 . 0 5 LANDSCAPED AREA 2.5% 3.9% 4.2% 2.0% 2.3 % 2.1% 2. 0 % LANDSCAPED AREA LANDSCAPED AREA MAX. 30" TALL RETAINING WALL 65. 7 8 7" STEP DOWN TO EXISTING GRAVEL PROPOSED BUILDING EXISTING BUILDING EXISTING BUILDING 4.5 % 63.27 8.9% 13.0 % 65. 9 7 64. 5 8 63.49 64.77 64.59 2.0% 2.1% 3. 3 % 2.8 % 2.1% 65.6 4 65 . 6 7 65. 4 4 1.3% 2.4 % 4.8% 65. 5 8 30.0% 8. 3 % 7. 6 % 7. 3 % 4. 4 % 7.6% 2. 0 % 0.9% 2. 0 % 0.7% 0.1% 2. 0 % 0.1% 0.9% 1.8% 4.8 % 0.0% 0.0% 2. 0 % 2.3% 1.9% 2.0%2.0% 2.1% 2. 9 % 65. 4 4 65. 5 6 65. 4 7 65. 4 4 65 . 4 1 63.60 65. 5 8 64. 6 2 64. 4 6 1. 0 % 6. 5 % 6. 4 % 7.4 % 10 . 3 % 3.5% 1. 4 % 65. 6 4 65.05 64. 4 5 LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE 65.55 65.03 THREE (3) STEPS EASTERN STEP RISER HEIGHT VARIES TWO (2) WESTERN RISERS 6" HEIGHT GRADE BREAK EXISTING STORM SEWER EXISTING STORM SEWER N0 ° 2 0 ' 3 5 . 6 7 " E 2 3 4 . 4 2 0 ' S89° 39' 24.33"E 128.910' N1 ° 3 3 ' 0 4 . 6 7 " E 2 1 8 . 3 1 6 ' C 0.44 0.72 0.90 D1 0.34 0.90 1.00 D2 0.42 0.75 0.93 PROPOSED RETAINING WALL (30" MAX HEIGHT -TO BE STRUCTURALLY INDEPENDENT OF BUILDING; SEE STRUCTURAL PLANS) 61.5 8 62.4 4 62.3 3 62.4 5 62.1 9 62.0 0 61.7 3 61.7 2 61.4 7 61.3 7 65. 4 2 64 . 9 0 65. 7 8 65. 7 5 65. 6 2 65. 8 7 65. 6 3 65. 7 0 24.8% 24.7% 24.1% 2.4% 0.0%64. 5 8 63. 6 0 8. 3 % 64. 4 2 8. 3 % GRA D E B R E A K 65. 4 7 65. 5 5 65. 3 3 2. 0 % 2.0% 65 . 6 4 65.5 5 2.2% GRADE BREAK 65 . 8 1 65 . 7 2 65 . 5 9 65.7 8 65.7 0 65.5 9 65. 5 8 65. 5 9 2. 0 % 2. 0 % 2. 2 % 2. 0 % 2. 0 % 4'4' MATCH EXISTING CONCRETE MATCH EXISTING CONCRETE MATCH EXISTING CONCRETE 64. 7 2 65. 4 4 63. 7 6 65. 3 6 18 . 6 % 18 . 5 % 18 . 8 % 20 . 0 % 24.8% 19 . 3 % 18 . 7 % 22.5% 32.3% 28.9% 4966.30 IN N O S P H E R E 5/ 3 / 2 0 2 1 U19008 1" = 10' 1" = N/A IN N O S P H E R E P H A S E I I NO R T H 4/ 1 5 / 2 0 2 2 12 : 2 9 : 2 3 P M C: \ U N I T E D C I V I L D R O P B O X \ P R O J E C T S \ U 1 9 0 0 8 - I N N O S P H E R E P H A S E 2 \ C A D D \ C P \ R E C O R D D R A W I N G S \ C 4 . 0 0 - G R A D I N G & E C . D W G C4 . 0 0 - G R A D I N G & E C SM E JR S C4.00 10 GR A D I N G , D R A I N A G E & E R O S I O N C O N T R O L P L A N 0 10'20' SCALE: 1" = 10' 5' PR E P A R E D F O R : JOB NUMBER SHEET NUMBER SHEETSOF DA T E S U B M I T T E D : VERTICAL: HORIZONTAL: SCALE PR O J . M G R : DR A W I N G N A M E : PA T H : DE S I G N E R : DA T E : TI M E : Th e e n g i n e e r p r e p a r i n g t h e s e p l a n s w i l l n o t b e r e s p o n s i b l e f o r , o r l i a b l e f o r , u n a u t h o r i z e d ch a n g e s t o o r u s e s o f t h e s e p l a n s . A l l c h a n g e s t o t h e p l a n s m u s t b e i n w r i t i n g a n d m u s t be a p p r o v e d b y t h e p r e p a r e r o f t h e s e p l a n s . NO . BY DA T E CAUTION RE V I S I O N S : CIVIL ENGINEERING & CONSULTING UNITED CIVIL Design Group 19 OLD TOWN SQUARE #238 FORT COLLINS, CO 80524 (970) 530-4044 www.unitedcivil.com 5/3/21 7 90. 3 0 PROPOSED SPOT ELEVATION FFE = FINISHED FLOOR ELEVATION FG = FINISHED GRADE AT EXTERIOR WALL EOP = EDGE OF PAVEMENT LP = LOW POINT HP = HIGH POINT TOW = TOP OF WALL BOW = BOTTOM OF WALL 3.1 3 EXISTING GRADE 10.0%4.0:1 (10.0%)(4.0:1) PROPOSED SLOPE EXISTING SLOPE GRADE BREAK 1.THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE FIELD CONDITIONS ARE AS SHOWN IN THE DRAWINGS. IF THE CONTRACTOR FINDS DISCREPANCIES THE CONTRACTOR SHALL CONTACT THE ENGINEER. 2.SEE SOILS REPORT FOR PAVEMENT AND FOUNDATION PREPARATION, DESIGN AND RECOMMENDATIONS. 3.ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS. EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 4.THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, PAVEMENT, PRIVATE FENCES, ABOVE GROUND OR UNDERGROUND UTILITIES, STRUCTURES, AND UNDERGROUND FOUNDATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 5.THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. THIS WILL INCLUDE COORDINATION OF THE CONSTRUCTION OF THE ELECTRIC SERVICE WITH THE LITTLE THOMPSON SCHOOL DISTRICT TO THE SOUTH. 6.THE CONTRACTOR SHALL REFER TO SHEET C3.00 FOR ROOF DRAIN INFORMATION. 7.EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 8.ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. 9.SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON SEEDING/PLANTING, REVEGETATION, EROSION FABRIC/BLANKETS, IRRIGATION, HARDSCAPE AND OTHER TEMPORARY AND PERMANENT SITE STABILIZATION METHODS. 10.STREET SWEEPING ON VINE DRIVE SHALL BE PERFORMED AS NEEDED AND/OR AT THE DIRECTION OF THE CITY ENGINEERING INSPECTOR. 11.REFER TO THE ARCHITECTURAL, MECHANICAL, AND STRUCTURAL PLANS FOR MORE INFORMATION ON THE ELECTRICAL EQUIPMENT. NOTES VEHICLE TRACKING CONTROL PAD CONCRETE WASHOUT AREA - FINAL LOCATION TO BE DETERMINED BY CONTRACTOR INLET PROTECTION ROCK SOCK LEGEND LIMITS OF DISTURBANCE BUILDING OUTLINE PROPERTY BOUNDARY RIGHT OF WAY EMERGENCY ACCESS EASEMENT UTILITY EASEMENT STORM PIPE AND MANHOLE DS DOWNSPOUT, ROOF DRAIN, AND ROOF OVERFLOW RD OVF WALL SWALE FLOWLINE X.XX X.XXXX.X X BASIN DESIGNATION BASIN AREA (ACRE) 5 - YR RUNOFF COEFF. 100 - YR RUNOFF COEFF. DRAINAGE BASIN BOUNDARY SILT FENCE (SEE ALSO EROSION CONTROL NOTE 8) FLOODPLAIN NOTES 1.PORTIONS OF THIS PROJECT ARE LOCATED WITHIN THE FEMA REGULATED 100-YEAR CACHE LA POUDRE FLOODPLAIN. THIS PROPERTY IS ALSO IN THE CACHE LA POUDRE 500-YEAR FLOODPLAIN AND IS SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE CITY CODE. 2.ALL DEVELOPMENT (CURB & GUTTER, PAVEMENT, GRADING, FILL, PARKING LOTS, UTILITIES, FENCES, LANDSCAPING, ETC.) WITHIN THE FEMA REGULATORY FLOODPLAIN MUST BE PRECEDED BY AN APPROVED FLOODPLAIN USE PERMIT AND APPLICABLE FEES. 3.ALL SPOT ELEVATIONS AND BASE FLOOD ELEVATIONS AS SHOWN ON THIS DRAWING ARE PER VERTICAL CONTROL DATUM NAVD 88. 4.WHITEWATER PARK LOMR 100-YEAR FLOODPLAIN BOUNDARY SHALL BE STAKED DURING CONSTRUCTION. POSITIONING OF BUILDING MUST BE CERTIFIED PRIOR TO VERTICAL CONSTRUCTION. 5.ESSENTIAL SERVICES AND AT-RISK POPULATION CRITICAL FACILITIES ARE PROHIBITED IN THE POUDRE 500-YEAR FLOODPLAIN. 6.FLOATABLE MATERIALS INCLUDING TRASH DUMPSTERS, VEHICLES, TRAILERS, EQUIPMENT, SUPPLIES, OUTDOOR FURNITURE (I.E. BENCHES, TABLES), ETC. RELATED TO NON-RESIDENTIAL USES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN. ALL FLOATABLE MATERIALS, MUST BE STORED INSIDE A BUILDING, BE ANCHORED PER AN APPROVED ENGINEERED DESIGN OR BE LOCATED OUTSIDE OF THE 100-YEAR FLOODPLAIN. PARKING OF VEHICLES DURING BUSINESS OPERATION TIMES WHEN VEHICLE OWNERS ARE ONSITE TO MOVE THEM IS ALLOWED, OVERNIGHT PARKING OF UNATTENDED VEHICLES IN THE POUDRE RIVER 100-YEAR FLOODPLAIN IS PROHIBITED. EROSION CONTROL NOTES 1.THE SITE WILL BE LANDSCAPED TO FINAL STABILIZATION. SEE FINAL LANDSCAPE PLAN FOR DETAILS. 2.REFER TO SHEET C0.01 FOR STANDARD EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES. 3.EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 4.ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. THE ITEMS MAY INCLUDE BUT ARE NOT LIMITED TO VEHICLE TRACKING CONTROL, SILT FENCE, CONSTRUCTION FENCE, CONCRETE WASHOUT, AND SEDIMENT TRAP. 5.SOIL AMENDMENTS SHALL BE INCORPORATED IN ALL LANDSCAPE AREAS TO A DEPTH OF 6" AT A RATE OF 3 CUBIC YARDS PER 1000 SQUARE FEET OF AREA -OR- 4" OF LOOSE TOPSOIL IMPORTED ONTO THE SITE OVER 4" OF LOOSENED SUBGRADE SOILS. REFER TO CITY OF FORT COLLINS CODE SECTIONS 12-130 THROUGH 12-132. 6.TEMPORARY SEEDING SHALL BE UTILIZED IN THE EVENT THAT A GRADED AREA IS EXPOSED LONGER THAN 30 DAYS. THE SITE SHALL BE SEEDED WITH THE APPROPRIATE SEED MIX AND INSTALLATION METHOD AS SPECIFIED ON THE APPROVED LANDSACPE PLANS. 7.SEDIMENT CONTROL LOGS MAY ALSO BE USED IN LIEU OF SILT FENCE ON THIS SITE. 8.NO MUD AND DEBRIS SHALL BE TRACKED ONTO NEIGHBORING STREETS OR PROPERTIES. IN THE EVENT THAT TRACK OUT DOES OCCUR, THE CONTRACTOR SHALL CLEAN MUD/DEBRIS IMMEDIATELY. 9.SEE EROSION CONTROL DETAILS ON SHEET C5.02. 10.A COMMERCIAL FERTILIZER WITH THE FOLLOWING SPECS SHALL BE USED: INGREDIENT % AVAILABLE BY WEIGHT APPLICATION RATE IN LBS/ACRE NITROGEN 13 65 POTASSIUM 16 80 POTASSIUM M 120 PROJECT:INNOSPHERE PHASE II BEST MANAGEMENT PRACTICE ITEM: PRESERVE EXISTING VEGETATION SILT FENCE VEHICLE TRACKING CONTROL STAGING AREAS (if applicable) CONSTRUCTION FENCE (if applicable) ROCK SOCKS CONCRETE WASHOUT AREA (if applicable) TEMPORARY SEEDING INLET PROTECTION (EXIST. & PROP.) SLOPE PROTECTION 1.COLUMNS SHOWN BELOW FOR TEMPORARY EROSION CONTROL ITEMS REPRESENT PHASE OF CONSTRUCTION INCREMENTS, NOT SPECIFIC TIME DURATIONS. 2.CONTRACTOR IS RESPONSIBLE FOR REGULAR MAINTENANCE OF ALL BMPs. MOBILIZATIONDEMOLITION UTILITY INSTALLATION BUILDING CONSTRUCTION SITE GRADING & PAVING FINAL LANDSCAPING & STABILIZATIONPHASE OF CONSTRUCTION EROSION CONTROL SEQUENCING EROSION CONTROL CALCULATIONS TOTAL AREA OF DISTURBANCE 0.35 ACRES TOTAL "ONSITE" AREA OF DISTURBANCE 0.29 ACRES TOTAL "OFFSITE" AREA OF DISTURBANCE 0.06 ACRES TOTAL STORAGE/STAGING AREA 0.10 ACRES TOTAL HAUL ROADS AREA N/A CONSTRUCTION VEHICLE TRAFFIC AREA N/A APPROX. % OF PROJECT DISTURBED AT ANY TIME 100% ESTIMATED PRE-EXISTING % VEGETATIVE COVER 95% EXISTING SOIL TYPE TYPE C/NUNN CLAY LOAM DEPTH TO GROUNDWATER 13 FEET NUMBER OF PROJECT PHASES N/A TOTAL VOLUME OF MATERIAL IMPORT/EXPORT -30 CY TOTAL AREA OF OFFSITE STOCKPILING OF FILL/BORROW 0 STEEPEST SLOPE (H:V)4:1 DISTANCE FROM A RIPARIAN OR SENSITIVE AREA 0 FEET - NATURAL HABITAT BUFFER ZONE SM E 1/ 5 / 2 0 2 2 GR A D I N G R E V I S I O N S 1 1 2 SM E 3/ 8 / 2 0 2 2 MI N O R E D I T S A T R A M P 2 RECORD DRAWING THESE RECORD DRAWINGS, PRODUCED BY UNITED CIVIL DESIGN GROUP LLC, ARE BASED ON FIELD INFORMATION GATHERED BY OTHERS. UNITED CIVIL DESIGN GROUP LLC, ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. 3 JR S 4/ 1 5 / 2 0 2 2 DR A I N A G E C E R T I F I C A T I O N 3 3 108 EA S T V I N E D R I V E KIN G SUR V E Y O R S 65 0 E . G a r d e n D r i v e | W i n d s o r , C o l o r a d o 8 0 5 5 0 ph o n e : ( 9 7 0 ) 6 8 6 - 5 0 1 1 | e m a i l : c o n t a c t @ k i n g s u r v e y o r s . c o m 1 FOR DOHN CONSTRUCTION UTILITY AS-BUILT SURVEYOF INNOSPHERE VENTURES LEGEND G PR O P O S E D P O U D R E R I V E R CR O S S S E C T I O N 2 8 2 BFE 4 9 6 4 . 2 PR O P O S E D P O U D R E R I V E R CR O S S S E C T I O N 5 8 3 BFE 4 9 6 4 . 2 PR O P O S E D P O U D R E R I V E R CR O S S S E C T I O N 6 4 5 BF E 4 9 6 4 . 2 PR O P O S E D P O U D R E R I V E R CR O S S S E C T I O N 7 2 3 BF E 4 9 6 4 . 2 FFE=4966.20 64. 5 3 64. 7 8 65. 2 0 65. 7 0 65. 7 0 65. 7 0 66. 1 1 65. 3 8 63. 2 1 61.9 9 64.32 64.44 65. 9 1 64. 3 8 FFE=4965.90 64. 4 0 64. 4 0 64. 4 0 61 . 8 5 25.0% 24.0% 22.9% 23.4% 23.2% 22.4% 22.2% 10 . 8 % 16 . 8 % 15 . 1 % 17 . 8 % 19 . 0 % 21 . 4 % 15. 9 % 11.7% 5.3% 3.1 % 2.3% 2.1 % 12. 9 % 13 . 6 % 13 . 6 % 12 . 8 % 13 . 6 % 13 . 5 % 11 . 1 % 10. 7 % 6.5 % 8.6% 5. 2 % EXPOSE 1' TO 1.8' OF FOUNDATION ON WEST PORTION OF BUILDING EXPOSE 6" TO 1' OF FOUNDATION ON NORTH SIDE OF BUILDING 63.51 63.99 EXISTING 100-YEAR FLOODPLAIN 61 . 7 6 61 . 7 3 5.0 % 1.8' OF FOUNDATION EXPOSED ON SOUTH SIDE OF BUILDING 16 . 4 % 17.8 % 64. 4 0 64. 4 0 66. 2 0 66. 1 1 66. 2 0 61.9 5 9.0 % 7.8 % 65 . 6 6 65. 3 8 65. 7 7 65. 6 0 66. 0 5 66. 1 8 66. 2 0 66. 0 7 66. 2 0 66. 0 1 65. 9 7 64. 4 6 65. 9 3 65. 7 1 64. 4 0 PROPOSED 100-YEAR FLOODPLAIN PER WHITEWATER PARK LOMR 65. 6 4 65. 7 1 7" STEP DOWN TO EXISTING CONCRETE 65. 3 4 65.6 7 65. 6 9 65.6 0 66. 0 1 65. 6 3 65 . 0 5 LANDSCAPED AREA 2.7% 3.9% 4.2% 2.0% 2.3 % 2.1% 5. 0 % 5. 0 % LANDSCAPED AREA LANDSCAPED AREA MAX. 30" TALL RETAINING WALL 65. 7 8 7" STEP DOWN TO EXISTING GRAVEL PROPOSED BUILDING EXISTING BUILDING EXISTING BUILDING 5.0 % 63.31 6.0 % 10.8 % 65. 9 7 64. 7 8 63.61 64.77 64.59 2.0% 2.1% 4. 5 % 2.1 % 2.0% 65.6 8 65.6 7 65. 4 4 1.9% 4.2 % 4.1% 65. 5 8 25.7% 5. 0 % 5. 5 % 6. 7 % 4. 7 % 8.1% 3. 7 % 1.8% 2. 2 % 2. 0 % 0.2% 2.8% 7. 9 % 0.5% 2.0% 2.0% 5.0 % 0.0% 0.0% 4. 9 % 2.3% 1.9% 2.0%2.0% 2.1% 2. 9 % 65. 3 0 65. 5 0 65. 3 3 65. 3 0 65 . 4 2 64.73 63.89 65.5 5 65. 5 8 64. 7 8 64. 4 2 1. 0 % 5. 4 % 5. 9 % 7.1 % 9. 3 % 2.1% 1.7 % 65. 6 4 64.96 64. 4 5 LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE 65.55 65.03 THREE (3) STEPS EASTERN STEP RISER HEIGHT VARIES TWO (2) WESTERN RISERS 6" HEIGHT GRADE BREAK EXISTING STORM SEWER EXISTING STORM SEWER N0 ° 2 0 ' 3 5 . 6 7 " E 2 3 4 . 4 2 0 ' S89° 39' 24.33"E 128.910' N1 ° 3 3 ' 0 4 . 6 7 " E 2 1 8 . 3 1 6 ' C 0.44 0.72 0.90 D1 0.34 0.90 1.00 D2 0.42 0.75 0.93 PROPOSED RETAINING WALL (30" MAX HEIGHT -TO BE STRUCTURALLY INDEPENDENT OF BUILDING; SEE STRUCTURAL PLANS) 61.5 8 62.4 4 62.3 3 62.4 5 62.1 9 62.0 0 61.7 3 61.7 2 61.4 7 61.3 7 65. 4 2 64 . 9 0 65. 7 8 65. 7 5 65. 6 2 65. 8 7 65. 6 3 65. 6 8 24.8% 24.7% 24.1% IN N O S P H E R E 5/ 3 / 2 0 2 1 U19008 1" = 10' 1" = N/A IN N O S P H E R E P H A S E I I NO R T H 5/ 4 / 2 0 2 1 7: 0 5 : 5 6 A M C: \ U N I T E D C I V I L D R O P B O X \ P R O J E C T S \ U 1 9 0 0 8 - I N N O S P H E R E P H A S E 2 \ C A D D \ C P \ C 4 . 0 0 - G R A D I N G & E C . D W G C4 . 0 0 - G R A D I N G & E C SM E JR S C4.00 10 GR A D I N G , D R A I N A G E & E R O S I O N C O N T R O L P L A N 0 10'20' SCALE: 1" = 10' 5' PR E P A R E D F O R : JOB NUMBER SHEET NUMBER SHEETSOF DA T E S U B M I T T E D : VERTICAL: HORIZONTAL: SCALE PR O J . M G R : DR A W I N G N A M E : PA T H : DE S I G N E R : DA T E : TI M E : Th e e n g i n e e r p r e p a r i n g t h e s e p l a n s w i l l n o t b e r e s p o n s i b l e f o r , o r l i a b l e f o r , u n a u t h o r i z e d ch a n g e s t o o r u s e s o f t h e s e p l a n s . A l l c h a n g e s t o t h e p l a n s m u s t b e i n w r i t i n g a n d m u s t be a p p r o v e d b y t h e p r e p a r e r o f t h e s e p l a n s . NO . BY DA T E CAUTION RE V I S I O N S : CIVIL ENGINEERING & CONSULTING UNITED CIVIL Design Group 19 OLD TOWN SQUARE #238 FORT COLLINS, CO 80524 (970) 530-4044 www.unitedcivil.com 5/3/21 7 90. 3 0 PROPOSED SPOT ELEVATION FFE = FINISHED FLOOR ELEVATION FG = FINISHED GRADE AT EXTERIOR WALL EOP = EDGE OF PAVEMENT LP = LOW POINT HP = HIGH POINT TOW = TOP OF WALL BOW = BOTTOM OF WALL 3.1 3 EXISTING GRADE 10.0%4.0:1 (10.0%)(4.0:1) PROPOSED SLOPE EXISTING SLOPE GRADE BREAK 1.THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE FIELD CONDITIONS ARE AS SHOWN IN THE DRAWINGS. IF THE CONTRACTOR FINDS DISCREPANCIES THE CONTRACTOR SHALL CONTACT THE ENGINEER. 2.SEE SOILS REPORT FOR PAVEMENT AND FOUNDATION PREPARATION, DESIGN AND RECOMMENDATIONS. 3.ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS. EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 4.THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, PAVEMENT, PRIVATE FENCES, ABOVE GROUND OR UNDERGROUND UTILITIES, STRUCTURES, AND UNDERGROUND FOUNDATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 5.THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. THIS WILL INCLUDE COORDINATION OF THE CONSTRUCTION OF THE ELECTRIC SERVICE WITH THE LITTLE THOMPSON SCHOOL DISTRICT TO THE SOUTH. 6.THE CONTRACTOR SHALL REFER TO SHEET C3.00 FOR ROOF DRAIN INFORMATION. 7.EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 8.ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. 9.SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON SEEDING/PLANTING, REVEGETATION, EROSION FABRIC/BLANKETS, IRRIGATION, HARDSCAPE AND OTHER TEMPORARY AND PERMANENT SITE STABILIZATION METHODS. 10.STREET SWEEPING ON VINE DRIVE SHALL BE PERFORMED AS NEEDED AND/OR AT THE DIRECTION OF THE CITY ENGINEERING INSPECTOR. 11.REFER TO THE ARCHITECTURAL, MECHANICAL, AND STRUCTURAL PLANS FOR MORE INFORMATION ON THE ELECTRICAL EQUIPMENT. NOTES VEHICLE TRACKING CONTROL PAD CONCRETE WASHOUT AREA - FINAL LOCATION TO BE DETERMINED BY CONTRACTOR INLET PROTECTION ROCK SOCK LEGEND LIMITS OF DISTURBANCE BUILDING OUTLINE PROPERTY BOUNDARY RIGHT OF WAY EMERGENCY ACCESS EASEMENT UTILITY EASEMENT STORM PIPE AND MANHOLE DS DOWNSPOUT, ROOF DRAIN, AND ROOF OVERFLOW RD OVF WALL SWALE FLOWLINE X.XX X.XXXX.X X BASIN DESIGNATION BASIN AREA (ACRE) 5 - YR RUNOFF COEFF. 100 - YR RUNOFF COEFF. DRAINAGE BASIN BOUNDARY SILT FENCE (SEE ALSO EROSION CONTROL NOTE 8) FLOODPLAIN NOTES 1.PORTIONS OF THIS PROJECT ARE LOCATED WITHIN THE FEMA REGULATED 100-YEAR CACHE LA POUDRE FLOODPLAIN. THIS PROPERTY IS ALSO IN THE CACHE LA POUDRE 500-YEAR FLOODPLAIN AND IS SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE CITY CODE. 2.ALL DEVELOPMENT (CURB & GUTTER, PAVEMENT, GRADING, FILL, PARKING LOTS, UTILITIES, FENCES, LANDSCAPING, ETC.) WITHIN THE FEMA REGULATORY FLOODPLAIN MUST BE PRECEDED BY AN APPROVED FLOODPLAIN USE PERMIT AND APPLICABLE FEES. 3.ALL SPOT ELEVATIONS AND BASE FLOOD ELEVATIONS AS SHOWN ON THIS DRAWING ARE PER VERTICAL CONTROL DATUM NAVD 88. 4.WHITEWATER PARK LOMR 100-YEAR FLOODPLAIN BOUNDARY SHALL BE STAKED DURING CONSTRUCTION. POSITIONING OF BUILDING MUST BE CERTIFIED PRIOR TO VERTICAL CONSTRUCTION. 5.ESSENTIAL SERVICES AND AT-RISK POPULATION CRITICAL FACILITIES ARE PROHIBITED IN THE POUDRE 500-YEAR FLOODPLAIN. 6.FLOATABLE MATERIALS INCLUDING TRASH DUMPSTERS, VEHICLES, TRAILERS, EQUIPMENT, SUPPLIES, OUTDOOR FURNITURE (I.E. BENCHES, TABLES), ETC. RELATED TO NON-RESIDENTIAL USES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN. ALL FLOATABLE MATERIALS, MUST BE STORED INSIDE A BUILDING, BE ANCHORED PER AN APPROVED ENGINEERED DESIGN OR BE LOCATED OUTSIDE OF THE 100-YEAR FLOODPLAIN. PARKING OF VEHICLES DURING BUSINESS OPERATION TIMES WHEN VEHICLE OWNERS ARE ONSITE TO MOVE THEM IS ALLOWED, OVERNIGHT PARKING OF UNATTENDED VEHICLES IN THE POUDRE RIVER 100-YEAR FLOODPLAIN IS PROHIBITED. EROSION CONTROL NOTES 1.THE SITE WILL BE LANDSCAPED TO FINAL STABILIZATION. SEE FINAL LANDSCAPE PLAN FOR DETAILS. 2.REFER TO SHEET C0.01 FOR STANDARD EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES. 3.EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 4.ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. THE ITEMS MAY INCLUDE BUT ARE NOT LIMITED TO VEHICLE TRACKING CONTROL, SILT FENCE, CONSTRUCTION FENCE, CONCRETE WASHOUT, AND SEDIMENT TRAP. 5.SOIL AMENDMENTS SHALL BE INCORPORATED IN ALL LANDSCAPE AREAS TO A DEPTH OF 6" AT A RATE OF 3 CUBIC YARDS PER 1000 SQUARE FEET OF AREA -OR- 4" OF LOOSE TOPSOIL IMPORTED ONTO THE SITE OVER 4" OF LOOSENED SUBGRADE SOILS. REFER TO CITY OF FORT COLLINS CODE SECTIONS 12-130 THROUGH 12-132. 6.TEMPORARY SEEDING SHALL BE UTILIZED IN THE EVENT THAT A GRADED AREA IS EXPOSED LONGER THAN 30 DAYS. THE SITE SHALL BE SEEDED WITH THE APPROPRIATE SEED MIX AND INSTALLATION METHOD AS SPECIFIED ON THE APPROVED LANDSACPE PLANS. 7.SEDIMENT CONTROL LOGS MAY ALSO BE USED IN LIEU OF SILT FENCE ON THIS SITE. 8.NO MUD AND DEBRIS SHALL BE TRACKED ONTO NEIGHBORING STREETS OR PROPERTIES. IN THE EVENT THAT TRACK OUT DOES OCCUR, THE CONTRACTOR SHALL CLEAN MUD/DEBRIS IMMEDIATELY. 9.SEE EROSION CONTROL DETAILS ON SHEET C5.02. 10.A COMMERCIAL FERTILIZER WITH THE FOLLOWING SPECS SHALL BE USED: INGREDIENT % AVAILABLE BY WEIGHT APPLICATION RATE IN LBS/ACRE NITROGEN 13 65 POTASSIUM 16 80 POTASSIUM M 120 PROJECT:INNOSPHERE PHASE II BEST MANAGEMENT PRACTICE ITEM: PRESERVE EXISTING VEGETATION SILT FENCE VEHICLE TRACKING CONTROL STAGING AREAS (if applicable) CONSTRUCTION FENCE (if applicable) ROCK SOCKS CONCRETE WASHOUT AREA (if applicable) TEMPORARY SEEDING INLET PROTECTION (EXIST. & PROP.) SLOPE PROTECTION 1.COLUMNS SHOWN BELOW FOR TEMPORARY EROSION CONTROL ITEMS REPRESENT PHASE OF CONSTRUCTION INCREMENTS, NOT SPECIFIC TIME DURATIONS. 2.CONTRACTOR IS RESPONSIBLE FOR REGULAR MAINTENANCE OF ALL BMPs. MOBILIZATIONDEMOLITION UTILITY INSTALLATION BUILDING CONSTRUCTION SITE GRADING & PAVING FINAL LANDSCAPING & STABILIZATIONPHASE OF CONSTRUCTION EROSION CONTROL SEQUENCING EROSION CONTROL CALCULATIONS TOTAL AREA OF DISTURBANCE 0.35 ACRES TOTAL "ONSITE" AREA OF DISTURBANCE 0.29 ACRES TOTAL "OFFSITE" AREA OF DISTURBANCE 0.06 ACRES TOTAL STORAGE/STAGING AREA 0.10 ACRES TOTAL HAUL ROADS AREA N/A CONSTRUCTION VEHICLE TRAFFIC AREA N/A APPROX. % OF PROJECT DISTURBED AT ANY TIME 100% ESTIMATED PRE-EXISTING % VEGETATIVE COVER 95% EXISTING SOIL TYPE TYPE C/NUNN CLAY LOAM DEPTH TO GROUNDWATER 13 FEET NUMBER OF PROJECT PHASES N/A TOTAL VOLUME OF MATERIAL IMPORT/EXPORT -30 CY TOTAL AREA OF OFFSITE STOCKPILING OF FILL/BORROW 0 STEEPEST SLOPE (H:V)4:1 DISTANCE FROM A RIPARIAN OR SENSITIVE AREA 0 FEET - NATURAL HABITAT BUFFER ZONE