Loading...
HomeMy WebLinkAboutSite Certifications - 07/09/20201218 W. ASH, STE. A, WINDSOR, COLORADO 80550 June 26, 2020 Mr. Shane Boyle City of Fort Collins Stormwater 700 Wood Street Fort Collins, CO 80522 Re: Hoffman Mill Fuel Station–Site Certification Dear Shane, Please accept this letter as the Site and Drainage Certification for the City of Fort Collins Hoffman Mill Fuel Station project. Survey of the site was completed on June 17, 2020 by King Surveyors. A site visit was conducted by Bob Almirall of Interwest Consulting Group on June 19, 2020. My assessment is that the items constructed are in general conformance with the approved design with the minor exception of the downstream outfall channel. This channel was designed and approved to be a long earthen bottom channel at 0.5%. The as-built survey grades indicate short segments of the channel being less than the design channel slope; however, these segments are short and the overall flow of the channel to the east is consistent with the design intent. Minor repairs to the westernmost channel embankment and enhanced erosion control measures are also being performed in conjunction with the adjacent Streets Department Scale Project. I have attached the as-built survey of the site super-imposed on the grading plan, as-built detention pond and sand filter calculations, the contractor’s During Construction Checklist, and the Overall Site and Drainage Certification Form and Checklist. The site grading is finished and seeding for the site is nearly complete. We appreciate your time and consideration in reviewing this certification. If you have any questions or need additional information, please feel free to call at any time (970) 460- 8487. Sincerely, Robert Almirall, P.E. Colorado Professional Engineer 33441 Page 1 OVERALL SITE and DRAINAGE CERTIFICATION Commercial, Multi-Family and Subdivision Certification Form and Checklist Project Name: Date: Building Permit Numbers: (Commercial or multi-family) Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Chapter 3, Section 3.0 to certify as- built construction to the approved drainage and grading plans, please fill in all applicable items in this Certification Form for Commercial, Multi-Family and Overall Single Family sites. NOTE: several items must be verified during construction. A copy of the approved grading plan must be submitted with the as-built grading plan. (As-built elevations must be written in red next to the approved elevations.) •Use “Yes” for items completed as described. •Use “N/A” for items that are not applicable to the site being certified. •If any blanks are “No,” attach an explanation referencing the item number below. Attach an explanation or description of the as-built condition for any items listed or for anything not listed but shown on the approved construction plans. Provide an as-built redline or Mylar drawing with the following: I.Water Quality and Quantity Detention Basin - FCSCM Ch. 6 and 7 For multiple detention basins on a site, provide the following for each basin separately: A. Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and volume verification calculations for the water quality capture volume and the 100-year detention storage volume. 1. Detention basin topography was prepared by a professional land surveyor registered in the state of Colorado. 2.Both proposed and as-built contours are shown on the same plan sheet (dashed lines for proposed and solid lines for as-built). 3.All critical spot elevations as shown on the approved construction plans have been verified and the as-built elevations are shown on the plan sheet. 4.Stage-storage-discharge tables are provided on a separate document. 5.Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92- 602(8) is attached and has been uploaded to the Statewide Compliance Portal (tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include: a.The cover sheet from the approved drainage report b.The stamped certification page from the approved drainage report c.As-built topographic survey d.Stamped certification page from the Overall Site & Drainage Certification e.PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet 11/19 SECTION 5 TO BE COMPLETED AFTER AN INITIAL REVIEW BY CITY STAFF AS REQUESTED Hoffman Mill Fuel Station June 26, 2020 Yes Yes Yes Yes Yes Page 2 B.Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2% grade requirement. 1.Low Flow: Choose one of the following detention basin low flow options as applicable: a. Turf swale for low flow path in detention basin. There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade is . b.Concrete pan for low flow in detention basin. There is a concrete pan installed that meets the grades as shown on the approved construction plans. (Show as-built spot elevations.) c.Soft pan for low flow in detention basin. •Verify and document the soft pan material gradation, trench width and depth - to be verified during construction by engineer. Picture documentation is preferred or engineer’s statement of visual inspection and compliance. (Choose one below.) o There is a soft pan with an underdrain installed that meets the design on the approved construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations, bends, cleanouts, etc.) o There is soft pan installed without an underdrain but there is a type A or B soil. The soil type must be documented by supplying verification from a registered professional geotechnical engineer. NOTE: Spot elevations are to be within 0.2 ft. +/-. 2. Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown. Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re- graded. Provide documentation if a variance was granted for steeper slopes during the design process. 3.Spillway: The following items must be field verified: a.The location of the spillway is indicated on the as-built plan. b.The width of the spillway is indicated on the as-built plan. c.The elevation(s) of the spillway is shown on the as-built plan. d.A concrete ribbon defines the location and grade of the spillway. e.There is downstream scour protection in the spillway as per the construction plans. Indicate type: (riprap size “D50” gradation and bedding type, geotextile, buried riprap with inches of bury, etc.). f.There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape features, rocks, etc. 11/19 Yes Yes Yes Yes Yes Yes N/A N/A Yes Page 3 4.Outlet Structure: a.The orifice plate for the approved release rate is installed with the correct size and location of the orifice. b.The orifice plate for the water quality outlet is installed with the correct hole size, number of rows and columns of holes. c.The bottom hole on both the water quality and quantity outlets are at the bottom of the plate so no water ponds in front of the plate. d.The well screen is the correct material and is installed as shown on the construction plans. e.100-year overflow grate elevation is . (Elev. A on detail D-46) f.The top elevation of the water quality capture volume is . (Elev. B on detail D-46) g.Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the top and bolted at the bottom. h.The bottom of the outlet box has no obstructions or misalignments that will cause it to retain runoff water and is sloped at 2% towards outlet. II.Channels/Swales - FCSCM Ch. 8, Sec. 2.0 and Ch. 9, Sec. 5.0 A. Capacity: The as-built capacity of all the major channels and swales has been verified. They meet or exceed capacity requirements shown in the approved drainage study for this project. 1.All swales are located within the drainage easements as shown on the construction plans. 2.Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these criteria are not met, the certification engineer will write a justification and propose mitigation for each instance or have the issues corrected. If variances to these criteria have previously been approved and are shown on the construction plans, no justification is needed. 3.As-built spot elevations on channels/swales are shown that correspond to spot elevations shown on the approved construction plans. 4.All permanent erosion control measures are installed as shown on the approved construction plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used as part of this verification.) 5.All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the system. (Pictures at tie-in points suggested.) 6.The minimum freeboard is provided for all channels and swales as shown on the approved construction plans or as identified in the approved drainage study. (Show the freeboard provided on the cross-sections as on the construction plan set or attached as separate documentation.) 7.The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees, shrubs, sod, etc. infringe on the low flow portion of channels or swales.) 11/19 Yes N/A Yes N/A N/A Yes 4947.70 N/A N/A N/A Yes No Yes Yes Yes N/A Yes Page 4 III.Storm Pipes (aka storm drains) - FCSCM Ch. 9, Sec. 4.0 A. Storm Drain Pipe Capacity: The as-built capacity of all pipes installed on this project has been verified and meets or exceeds the capacity requirements shown in the approved drainage study for this project. 1.All storm drain pipe sizes and materials have been verified and are in conformance with the approved construction plans. (Indicate on the plan and profile sheets that they have been verified.) Material and size substitutions must be approved prior to installation. If a pipe size or material was changed during construction, the certification engineer must attach the approval documents or supply them with this certification. Approval documents must include a calculation documenting the capacity equivalency (equal or greater) of the substituted size. 2.The longitudinal slope of the pipe is as shown on the approved construction plans. The acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans must be justified with capacity calculations on an attached sheet. 3.The as-built invert elevations have been verified and are shown on the plan and profile sheets of the approved construction plans. B.Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the approved construction plans and construction specifications. 1.The minimum cover requirements for all pipes have been met as shown on the approved construction plans. These will be called out in critical locations. 2.All encasements and clearances as specified on the approved construction plans have been met. 3.Any specific joint types or construction methods specified on the approved construction plans have been met. (List on a separate sheet and attach to this certification.) IV.Concrete Pans - FCSCM Ch. 8, Sec. 2.0 A. Construction/Installation: All concrete pans have been constructed in accordance with the approved construction plans. 1.The concrete pans are the correct size/width as shown on the approved construction plans. 2.The longitudinal slopes of the pans are as shown on the approved construction plans. The certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or justification by separate document. 3.The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross- section is “V” shaped and meets the side slope shown on the detail.) 4.The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4 inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide documentation of the reinforcement used if different than shown on the details or on the approved construction plans.) 5.The spot elevations shown on the concrete pan(s) have been verified and are shown on the as- built drawings. 11/19 N/A N/A Yes Yes Yes Yes Yes Yes Page 5 V. Storm Drain Inlets - FCSCM Ch. 9, Sec. 3.0 A. Construction/Installation: All storm drain inlets have been constructed in accordance with the approved construction plans and construction specifications. 1.The size and type of inlets are consistent with the inlets shown on the approved construction plan. Indicate by writing “Verified” on each inlet on the plan sheet or list on a separate document the inlet number(s), type and size (length). If the inlet installed is other than the one on the approved construction plan detail sheet, provide the name and source of the detail with justification for equal or better capacity. 2.The size of the inlet opening is consistent with the approved detail. (Check height and width.) 3.The elevation of the grate (if applicable) is at the elevation shown on the street profile or as indicated by a spot elevation on the construction plans. 4.The as-built invert elevations of all pipes entering and leaving the inlet are shown on the plan and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide justification and capacity calculations to show the capacity is not affected or propose mitigation. 5.The as-built size of the inlet box is as shown on the construction plans or an explanation or justification is attached. 6.All Type C, R, 13 and 16 inlet covers are stenciled or stamped with the following designation (or an equivalent): NO DUMPING – DRAINS TO POUDRE RIVER. VI.Culverts - FCSCM Ch. 9, Sec. 4.0 A. Construction/Installation: All culverts have been constructed and/or installed in accordance with the approved construction plans and construction specifications. 1.All culvert sizes have been verified as indicated on the as-built construction plans as correct. 2.The culvert material type for all culverts installed is as on the approved construction plans and is indicated on the as-built plans. 3.The as-built invert “in and out” elevations have been verified and are indicated on the as-built construction plans. 4.The culvert headwalls or wing walls have been installed as shown on the approved construction plans. Headwalls or wing walls may be needed in the as-built conditions onsite if the slopes adjacent to the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative. An alternative to consider is a turf reinforcement mat (TRM). VII.Sub-Drains A. Construction/Installation: All sub-drains shown on the construction plans have been installed in accordance with those plans and the construction specifications. Sub-drains installed with the sanitary sewer are to be verified on the sanitary sewer plan and profile sheets of the construction plans. (NOTE: Indicate any sub-drains installed after the plans were approved on the as-built plans.) 1.The size of the sub-drains are as approved on the construction plans and are indicated on the as- built plans. 2.The type of sub-drain, in particular the perforated and non-perforated sections of the drain, are as indicated on the approved construction plans. 11/19 UNDERDRAINS INSTALLED IN SAND FILTER SYSTEM. REFER TO DURING CONSTRUCTION INSPECTION CHECKLIST FOR UNDERDRAIN INFORMATION. Yes Yes Yes N/A Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Page 6 3.The cover requirements per the construction plans are provided. 4.The cleanouts have been installed at the locations shown on the construction plans and are accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations marked.) 5.The backfill materials for sub-drains are as shown on the approved construction plans. (This includes the type, depth and width.) 6.The geo-textile liner completely wraps the sub-drain and the permeable backfill material unless shown otherwise on the approved construction plans. (Sub-drain pipe wrapped in a sock filter material is accepted only if approved prior to installation.) VIII.Curb Cuts A. Construction: All curb cut openings are constructed in accordance with the approved construction plans and construction specifications. 1.The size (width) of the curb cut opening is as shown on the approved construction plans. 2.The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb cut. IX.Sidewalk Culverts & Chases A. Construction/Installation: All sidewalk culverts have been installed at the locations shown on the approved construction plans. 1.The size (width and length) of the culverts are as shown on the approved construction plans. 2.The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the detail shown on the approved construction plans or per the City’s detail. 3.The sidewalk culvert invert “in and out” elevations have been verified and are indicated on the as-built plans. 4.The sidewalk culvert opening is as shown on the approved construction plans or per the City’s detail. 5.There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert. X. Site Grading - FCSCM Ch. 8 A. Construction: All common open spaces have been graded in accordance with the approved construction plans. 1.The grading on all common open spaces bordering private lots has been verified as correct and the as-built rear lot corner elevations have been shown on the as-built plans. 11/19 Yes N/A Yes Yes N/A N/A Yes Yes Page 7 2.The as-built contours for “overlot grading” are shown on the as-built construction plans for all common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the situation for noncompliance and when it may be corrected. An escrow for overlot grading may be required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site Certification. It is understood that residential lots will be brought to final grade once the foundation is backfilled so they may be lower than the plan shows at this Overall Site Certification stage.) 3.All turf reinforcement mats (TRMs) have been installed as shown on the approved construction plans and the slopes are stabilized. XI.Permanent Erosion Control BMPs - FCSCM Ch. 9, Sec. 7.0 A. Construction: All permanent erosion control BMPs have been installed per the approved construction plans. 1.All riprap has been installed in the locations and sizes indicated on the approved construction plans. 2.All fabric has been installed in the locations and sizes indicated on the approved construction plans. a.All fabric was installed per the details on the approved construction plans. XII.Post-Construction Site Cleanup - FCSCM Ch. 3, Sec. 2.0 A. Construction: All construction debris and obstructions of any kind have been removed from drainage paths. 1.All construction debris has been removed except in staging area(s). 2.All ruts have been smoothed out in all construction areas. 3.All areas needing reseeding have been identified and future stabilization goals have been coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note the area needing stabilization in the narrative. XIII.Certification of LID and Water Quality Facilities - FCSCM Ch. 7 A.Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and other items to be verified during construction, along with pictures and other required documentation. B.Attached is verification of the rain garden and/or sand filter flat surface area(s) and ponding volume(s). This verification includes survey of critical elevations. C.Attached is verification of the underground infiltration required volume(s), weir elevations, orifices, inspection ports and filtering fabric. This verification includes survey of critical elevations. D.All visible LID design features were verified as part of the engineer's site visit. 11/19 N/A Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes N/A Yes 11/19 Page 8 XIV.Certification of Other Permanent BMPs A.The construction of other permanent BMPs not specifically addressed in this certification is in accordance with the approved plan. This may include grade control structures, rundowns, bridges, stream access/improvements, etc. Please specify other permanent BMPs included on this site: XV. Certification and Erosion Control Measures - FCSCM Ch. 3 A. All temporary erosion control measures shall be removed upon stabilization. If at the time of preparing this certification there are any erosion control measures still remaining on the site, please note them in the narrative and verify that they need to remain at this time. If in doubt as to the need for any control measure, please consult with the Erosion Control Inspector at erosion@fcgov.com. XVI.Statement of Compliance - FCSCM Ch. 3 A. This certification is signed and stamped. By signing this form, the engineer(s) attests that he/she has visited and observed the site, and to the best of his/her knowledge, the as-built conditions of the drainage facilities are as described in the above form and in the enclosed as-built plans. B.Failure to properly disclose all known information could result in the rejection of this certification and prevent the release of any and all Stormwater Utility permit holds on Building Permits and/or Certificates of Occupancy within this development. XVII. Signature and Stamp by a Colorado-Registered Professional Engineer Engineer’s contact information: Name: Email: Phone: Company: Address: PE Stamp 06-26-2020 Channel Check Dams and Stone on West Channel Berm N/A Robert Almirall ralmirall@interwestgrp.com 970-460-8487 Interwest Consulting Group 1218 W Ash Street, Suite A Windsor, CO 80550 HOFFMAN MILL ROAD SE E S H E E T 7 POND CROSS-SECTION PROFILE HORIZ. SCALE: 1"=10' VERT. SCALE: 1"=5' 4945 4950 4945 4950 10+00 10+50 10+70 12 1 8 W . A s h , S u i t e A Wi n d s o r , C o l o r a d o 8 0 5 5 0 Ph o n e : ( 9 7 0 ) 6 7 4 - 3 3 0 0 Fa x : ( 9 7 0 ) 6 7 4 - 3 3 0 3 C O N S U L T I N G G R O U P I N T E R W E S T PR E P A R E D F O R PROJ. NO. DA T E : SC A L E ( H ) : SC A L E ( V ) : CH E C K E D B Y : DE S I G N E D B Y : PR O J E C T N A M E HO F F M A N M I L L F U E L I N G S I T E GR A D I N G P L A N 11 / 1 6 / 1 8 1" = 1 0 ' 1" = 5 ' JT C JT C 1344-095-00 6 of 9 AR C H I T E C T U R E W E S T , L L C 16 0 P A L M E R D R I V E FO R T C O L L I N S , C O 8 0 5 2 5 PH O N E : 9 7 0 . 2 0 7 . 0 4 2 4 CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date 0 10' 2010510 SCALE: 1" = LEGEND EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR NOTES: 1.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. 2.ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER RECOMMENDATIONS. 3.LENGTH OF STORM PIPE LISTED INCLUDES FLARED END SECTIONS. 4.THE WEST END OF THE CONCRETE PAN SHALL HAVE A 12" TURNED-DOWN EDGE TO PREVENT PIPING/UNDERMINING OF THE DRAIN PAN. INSTALL COBBLE OR RIPRAP AT THE WEST END OF THE PAN AND ALONG THE ROOF DRAIN/SUMP PUMP DRAINAGE PATHWAY AS NEEDED TO PREVENT EROSION. WQCV SPILLWAY CROSS-SECTION Re v i s i o n s No . Da t e De s c r i p t i o n By RECORD DRAWING DATE: 6/18/20 ASBUILT CONTOUR 13.4 ft 113.8 sf HOFFMAN MILL ROAD MA T C H L I N E SE E T H I S S H E E T HOFFMAN M I L L R O A D MA T C H L I N E SE E T H I S S H E E T 12 1 8 W . A s h , S u i t e A Wi n d s o r , C o l o r a d o 8 0 5 5 0 Ph o n e : ( 9 7 0 ) 6 7 4 - 3 3 0 0 Fa x : ( 9 7 0 ) 6 7 4 - 3 3 0 3 C O N S U L T I N G G R O U P I N T E R W E S T PR E P A R E D F O R PROJ. NO. DA T E : SC A L E ( H ) : SC A L E ( V ) : CH E C K E D B Y : DE S I G N E D B Y : PR O J E C T N A M E HO F F M A N M I L L F U E L I N G S I T E GR A D I N G P L A N 11 / 1 6 / 1 8 1" = 3 0 ' N/ A JT C JT C 1344-095-00 7 of 9 AR C H I T E C T U R E W E S T , L L C 16 0 P A L M E R D R I V E FO R T C O L L I N S , C O 8 0 5 2 5 PH O N E : 9 7 0 . 2 0 7 . 0 4 2 4 CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date 0 30' 60301530 SCALE: 1" = LEGEND EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR NOTES: 1.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. 2.ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER RECOMMENDATIONS. RECORD DRAWING DATE: 5/29/20 ASBUILT CONTOUR Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA Detention Volume Calculation 0.60 1.25 0.75 ft3 acre-ft 0.59 acres 2,788 0.064 0.50 cfs Time (min) 100-yr Intensity (I , in/hr) Q100 (cfs) Accumulative Runoff Volume (ft3) Release Volume (ft3) Detained Volume (ft3) Detained Volume (acre-ft) 0 0.00 0.00 0.00 0.00 0.00 0.0000 5 9.95 4.40 1,320.86 150.00 1,170.86 0.0269 10 7.72 3.42 2,049.66 300.00 1,749.66 0.0402 15 6.52 2.89 2,596.59 450.00 2,146.59 0.0493 20 5.60 2.48 2,973.60 600.00 2,373.60 0.0545 25 4.98 2.20 3,305.48 750.00 2,555.48 0.0587 30 4.52 2.00 3,600.18 900.00 2,700.18 0.0620 35 4.08 1.81 3,791.34 1,050.00 2,741.34 0.0629 40 3.74 1.65 3,971.88 1,200.00 2,771.88 0.0636 45 3.46 1.53 4,133.84 1,350.00 2,783.84 0.0639 50 3.23 1.43 4,287.83 1,500.00 2,787.83 0.0640 55 3.03 1.34 4,424.56 1,650.00 2,774.56 0.0637 60 2.86 1.27 4,555.98 1,800.00 2,755.98 0.0633 65 2.72 1.20 4,694.04 1,950.00 2,744.04 0.0630 70 2.59 1.15 4,813.52 2,100.00 2,713.52 0.0623 75 2.48 1.10 4,938.30 2,250.00 2,688.30 0.0617 80 2.38 1.05 5,055.12 2,400.00 2,655.12 0.0610 85 2.29 1.01 5,167.96 2,550.00 2,617.96 0.0601 90 2.21 0.98 5,280.80 2,700.00 2,580.80 0.0592 95 2.13 0.94 5,372.39 2,850.00 2,522.39 0.0579 100 2.06 0.91 5,469.30 3,000.00 2,469.30 0.0567 105 2.00 0.89 5,575.50 3,150.00 2,425.50 0.0557 110 1.94 0.86 5,665.77 3,300.00 2,365.77 0.0543 115 1.89 0.84 5,770.64 3,450.00 2,320.64 0.0533 120 1.84 0.81 5,862.24 3,600.00 2,262.24 0.0519 125 1.79 0.79 5,940.56 3,750.00 2,190.56 0.0503 130 1.75 0.77 6,040.13 3,900.00 2,140.13 0.0491 135 1.71 0.76 6,129.07 4,050.00 2,079.07 0.0477 140 1.67 0.74 6,207.39 4,200.00 2,007.39 0.0461 145 1.63 0.72 6,275.09 4,350.00 1,925.09 0.0442 150 1.60 0.71 6,372.00 4,500.00 1,872.00 0.0430 155 1.57 0.69 6,460.94 4,650.00 1,810.94 0.0416 160 1.54 0.68 6,541.92 4,800.00 1,741.92 0.0400 165 1.51 0.67 6,614.93 4,950.00 1,664.93 0.0382 170 1.48 0.65 6,679.98 5,100.00 1,579.98 0.0363 175 1.45 0.64 6,737.06 5,250.00 1,487.06 0.0341 180 1.42 0.63 6,786.18 5,400.00 1,386.18 0.0318 185 1.40 0.62 6,876.45 5,550.00 1,326.45 0.0305 190 1.38 0.61 6,961.41 5,700.00 1,261.41 0.0290 195 1.36 0.60 7,041.06 5,850.00 1,191.06 0.0273 200 1.34 0.59 7,115.40 6,000.00 1,115.40 0.0256 205 1.32 0.58 7,184.43 6,150.00 1,034.43 0.0237 210 1.30 0.58 7,248.15 6,300.00 948.15 0.0218 215 1.28 0.57 7,306.56 6,450.00 856.56 0.0197 220 1.26 0.56 7,359.66 6,600.00 759.66 0.0174 225 1.24 0.55 7,407.45 6,750.00 657.45 0.0151 230 1.22 0.54 7,449.93 6,900.00 549.93 0.0126 235 1.21 0.54 7,549.49 7,050.00 499.49 0.0115 240 1.20 0.53 7,646.40 7,200.00 446.40 0.0102 Adjusted Runoff Coefficient (CC f ) Area (A ) Allowed Release Rate Required Detention Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, June 2001 (Revised April 2008) City of Fort Collins - Storm Water Criteria Manual June 6, 2018 Runoff Coefficient (C ) Frequency Factor (C f ) 100-yr Detention Volume - FAA Method Hoffman Mill Fuel Station J.Claeys Interwest Consulting 1344-095-00 As-Built Detention Pond - Stage/Storage LOCATION:Detention PROJECT NO: COMPUTATIONS BY: LAJ DATE: 6/18/2020 V = 1/3 d ( A + B + sqrt(A*B)) where V = volume between contours, ft3 d = depth between contours, ft A = surface area of contour Detention Pond Surface Incremental Total Stage Area Storage Storage (ft)(ft2)(ac-ft) (ac-ft) 44.4 0 44.7 150 0.00 0.00 45.0 450 0.00 0.00 45.5 940 0.01 0.01 47.2 4170 0.09 0.10 47.3 0 0.00 0.11 47.4 0 0.00 0.11 47.5 0 0.00 0.11 47.6 0 0.00 0.11 47.7 0 0.00 0.11 47.8 0 0.00 0.11 47.9 0 0.00 0.11 48.0 0 0.00 0.11 48.1 0 0.00 48.2 48.3 48.4 1344-095-00 As-Built Pond Vol Calc_LAJ 2020-06-18.xls 51907643.xlsm, SF 6/26/2020, 9:52 AM Design Procedure Form: Sand Filter (SF) UD-BMP (Version 3.06, November 2016)Sheet 1 of 2 Designer:B. Almirall Company:Interwest Consulting Group Date:June 26, 2020 Project:Hoffman Mill Fueling Site Location: 1.Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =100.0 % (100% if all paved and roofed areas upstream of sand filter) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =1.000 C) Water Quality Capture Volume (WQCV) Based on 12-hour Drain Time WQCV =0.40 watershed inches WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including sand filter area)Area =8,500 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =283 cu ft VWQCV = WQCV / 12 * Area F) For Watersheds Outside of the Denver Region, Depth of d6 =0.43 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =283 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft (Only if a different WQCV Design Volume is desired) 2.Basin Geometry A) WQCV Depth DWQCV =0.82 ft B) Sand Filter Side Slopes (Horizontal distance per unit vertical, Z =4.00 ft / ft 4:1 or flatter preferred). Use "0" if sand filter has vertical walls. C) Minimum Filter Area (Flat Surface Area)AMin =106 sq ft D) Actual Filter Area AActual =114 sq ft E) Volume Provided VT =303 cu ft 3.Filter Material 4.Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =N/A cu ft iii) Orifice Diameter, 3/8" Minimum DO = in Choose One Choose One 18" CDOT Class B or C Filter Material Other (Explain): YES NO As-Built Conditions 51907643.xlsm, SF 6/26/2020, 9:53 AM Design Procedure Form: Sand Filter (SF) Sheet 2 of 2 Designer:B. Almirall Company:Interwest Consulting Group Date:June 26, 2020 Project:Hoffman Mill Fueling Site Location: 5.Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6-7.Inlet / Outlet Works A) Describe the type of energy dissipation at inlet points and means of conveying flows in excess of the WQCV through the outlet Notes: Choose One YES NO