Loading...
HomeMy WebLinkAboutLot Certifications - 07/15/2020 (2)2/14/17 Page 1 CERTIFICATION OF LOT GRADING Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e) Date: Address: Lot: Block: Subdivision: Permit Application #: Larimer County Parcel #: Larimer County Reception #: (on development agreement) I, (print) , a Colorado registered professional engineer, verify that construction of all stormwater facilities and grading is complete and hereby submit this certification. Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots. 1.Certification includes attached Stormwater-approved grading plan. (NOTE: City’s Building Department does not approve grading plans). 2.Certification includes the attached as-built survey dated (must be within 60 days of the date the certification is submitted) accurately and truthfully depicting elevations for: Top of foundation/finished floor Finished grade on each side of the structure Quarter points along each lot line (not more than 50 feet apart) Break points/high points Swales Berms Retaining walls Air conditioning pads Window wells Any other appurtenance(s) within an easement 3.All elevations are within a 0.2 foot tolerance of the approved grading plan. 4.The top of foundation is at least 6 inches above the highest grade surrounding the structure. 5.There is a minimum grade of 5% away from the structure within the first 5 to 10 feet adjacent to the residence. 6.All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than 33% (3:1). 7.All flow lines of stormwater drainage swales are a minimum of 6 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Stormwater-approved grading plan. 8.All downspout locations and discharge directions are shown on the as-built survey. Runoff is directed into an appropriate drainage system or lot line swale, and it is not directed onto neighboring properties. No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes July 14, 2020 Harmony Cottages 2050 Phia Way B1903891 Fort Collins, CO 9734326901 1 20160043986 Skylar Brower 05/28/20 SB SB SB SB See attached explanation. See attached explanation. SB SB SB SB See attached explanation. 2/14/17 Page 2 9.A smooth transition with no vertical offset (step) in grade is provided at the lot line to all adjacent properties. 10.The grading of this lot does not adversely affect neighboring properties or City infrastructure. 11.Landscaping has been completed prior to survey. If not, please indicate who will be responsible for completing landscaping: 12.Final site cleanup has been completed. 13.I personally visited the site as part of the certification process, and in my professional opinion, the as-built survey is an accurate representation of the site conditions.. No Yes No Yes No Yes No Yes No Yes 14.Based on this information, I certify that (check one): □The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). □The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. Name: Email: Phone: Company: Address: NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) WaterUtilitiesEng@fcgov.com Mailing Address Fort Collins Utilities ATTN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 Questions? 970-221-6700 PE Stamp Sign and date 4 Skylar Brower sbrower@interwestgrp.com 970-460-1091 Interwest Consulting Group 1218 W Ash Street, Suite A Windsor, CO 80550 SB SB SB SB SB 07-14-20 Harmony Cottages Lot 1 (2050 Phia Way) Additional Notes: 3. All elevations are within a 0.2 foot tolerance of the approved grading plan. There are several as built elevations that exceed the 0.2 foot tolerance but the overall lot grading is considered to be in general conformance of the approved grading plan. 4. The top of foundation is at least 6 inches above the highest grade surrounding the structure. There is one location where the finish grade is only 4” below the top of foundation (northwest corner of the house). This is near the high point of the lot and the grade away from the foundation exceeds 5% so there is no concern for ponding water in this location. 6. All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than 33% (3:1). The western property boundary of this lot has portions where it is sloped at approx. 0.7% since the contractor had to match existing grade at the property line. Only half of the roof drains to this property line and there is good fall away from the foundation. This shared property line is with the FCLWD property that has no structures and very minimal impervious area. There is not a significant amount of runoff directed to this property line so the minimal slope of the swale is not a concern. Lot 1 2050 CD N # 3 0 1 6 A ­ 0 2 2 06 ­ 3 0 ­ 1 6 CD N # 3 0 1 6 A ­ 0 2 2 06 ­ 3 0 ­ 1 6