Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Site Certifications - 05/02/2021
1218 Ash Street | Suite A Windsor, CO 80550 970.674.3300 April 27, 2021 Mr. Wes Lamarque City of Fort Collins Stormwater 700 Wood Street Fort Collins, CO 80521 Re: Harmony Commons Second Filing, Lots 1 and 2–Overall site and Drainage Certification Dear Wes, Please accept this letter as the Site and Drainage Certification for Lots 1 and 2 of Harmony Commons, Second Filing subdivision projects. The site work has been completed and is in general conformance with the approved design. The final landscaping and clean up for the site have also been completed. Survey of the site was completed on October 13, 2020 and a site visit was conducted by Erika Schneider of Interwest Consulting Group on February 24, 2021. I have attached the stamped overall as-built survey and as-built drawings of the Storm System and Grading Plans. Also attached is the Overall Site and Drainage Certification with supporting documentation. We appreciate your time and consideration in reviewing this document. If you have any questions or need additional information, please feel free to call at any time (970) 460-8471. Sincerely, Michael Oberlander, P.E. Colorado Professional Engineer 34288 Wes Lamarque 5/2/2021 OVERALL SITE AND DRAINAGE CERTIFICATION Page 1 OVERALL SITE and DRAINAGE CERTIFICATION Commercial, Multi-Family and Subdivision Certification Form and Checklist Project Name: Date: Building Permit Numbers: (Commercial or multi-family) Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Chapter 3, Section 3.0 to certify as- built construction to the approved drainage and grading plans, please fill in all applicable items in this Certification Form for Commercial, Multi-Family and Overall Single Family sites. NOTE: several items must be verified during construction. A copy of the approved grading plan must be submitted with the as-built grading plan. (As-built elevations must be written in red next to the approved elevations.) •Use “Yes” for items completed as described. •Use “N/A” for items that are not applicable to the site being certified. •If any blanks are “No,” attach an explanation referencing the item number below. Attach an explanation or description of the as-built condition for any items listed or for anything not listed but shown on the approved construction plans. Provide an as-built redline or Mylar drawing with the following: I.Water Quality and Quantity Detention Basin - FCSCM Ch. 6 and 7 For multiple detention basins on a site, provide the following for each basin separately: A. Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and volume verification calculations for the water quality capture volume and the 100-year detention storage volume. 1. Detention basin topography was prepared by a professional land surveyor registered in the state of Colorado. 2.Both proposed and as-built contours are shown on the same plan sheet (dashed lines for proposed and solid lines for as-built). 3.All critical spot elevations as shown on the approved construction plans have been verified and the as-built elevations are shown on the plan sheet. 4.Stage-storage-discharge tables are provided on a separate document. 5.Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92- 602(8) is attached and has been uploaded to the Statewide Compliance Portal (tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include: a.The cover sheet from the approved drainage report b.The stamped certification page from the approved drainage report c.As-built topographic survey d.Stamped certification page from the Overall Site & Drainage Certification e.PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet 11/19 Page 2 B.Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2% grade requirement. 1.Low Flow: Choose one of the following detention basin low flow options as applicable: a. Turf swale for low flow path in detention basin. There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade is . b.Concrete pan for low flow in detention basin. There is a concrete pan installed that meets the grades as shown on the approved construction plans. (Show as-built spot elevations.) c.Soft pan for low flow in detention basin. •Verify and document the soft pan material gradation, trench width and depth - to be verified during construction by engineer. Picture documentation is preferred or engineer’s statement of visual inspection and compliance. (Choose one below.) o There is a soft pan with an underdrain installed that meets the design on the approved construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations, bends, cleanouts, etc.) o There is soft pan installed without an underdrain but there is a type A or B soil. The soil type must be documented by supplying verification from a registered professional geotechnical engineer. NOTE: Spot elevations are to be within 0.2 ft. +/-. 2. Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown. Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re- graded. Provide documentation if a variance was granted for steeper slopes during the design process. 3.Spillway: The following items must be field verified: a.The location of the spillway is indicated on the as-built plan. b.The width of the spillway is indicated on the as-built plan. c.The elevation(s) of the spillway is shown on the as-built plan. d.A concrete ribbon defines the location and grade of the spillway. e.There is downstream scour protection in the spillway as per the construction plans. Indicate type: (riprap size “D50” gradation and bedding type, geotextile, buried riprap with inches of bury, etc.). f.There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape features, rocks, etc. 11/19 Page 3 4.Outlet Structure: a.The orifice plate for the approved release rate is installed with the correct size and location of the orifice. b.The orifice plate for the water quality outlet is installed with the correct hole size, number of rows and columns of holes. c.The bottom hole on both the water quality and quantity outlets are at the bottom of the plate so no water ponds in front of the plate. d.The well screen is the correct material and is installed as shown on the construction plans. e.100-year overflow grate elevation is . (Elev. A on detail D-46) f.The top elevation of the water quality capture volume is . (Elev. B on detail D-46) g.Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the top and bolted at the bottom. h.The bottom of the outlet box has no obstructions or misalignments that will cause it to retain runoff water and is sloped at 2% towards outlet. II.Channels/Swales - FCSCM Ch. 8, Sec. 2.0 and Ch. 9, Sec. 5.0 A. Capacity: The as-built capacity of all the major channels and swales has been verified. They meet or exceed capacity requirements shown in the approved drainage study for this project. 1.All swales are located within the drainage easements as shown on the construction plans. 2.Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these criteria are not met, the certification engineer will write a justification and propose mitigation for each instance or have the issues corrected. If variances to these criteria have previously been approved and are shown on the construction plans, no justification is needed. 3.As-built spot elevations on channels/swales are shown that correspond to spot elevations shown on the approved construction plans. 4.All permanent erosion control measures are installed as shown on the approved construction plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used as part of this verification.) 5.All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the system. (Pictures at tie-in points suggested.) 6.The minimum freeboard is provided for all channels and swales as shown on the approved construction plans or as identified in the approved drainage study. (Show the freeboard provided on the cross-sections as on the construction plan set or attached as separate documentation.) 7.The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees, shrubs, sod, etc. infringe on the low flow portion of channels or swales.) 11/19 Page 4 III.Storm Pipes (aka storm drains) - FCSCM Ch. 9, Sec. 4.0 A. Storm Drain Pipe Capacity: The as-built capacity of all pipes installed on this project has been verified and meets or exceeds the capacity requirements shown in the approved drainage study for this project. 1.All storm drain pipe sizes and materials have been verified and are in conformance with the approved construction plans. (Indicate on the plan and profile sheets that they have been verified.) Material and size substitutions must be approved prior to installation. If a pipe size or material was changed during construction, the certification engineer must attach the approval documents or supply them with this certification. Approval documents must include a calculation documenting the capacity equivalency (equal or greater) of the substituted size. 2.The longitudinal slope of the pipe is as shown on the approved construction plans. The acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans must be justified with capacity calculations on an attached sheet. 3.The as-built invert elevations have been verified and are shown on the plan and profile sheets of the approved construction plans. B.Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the approved construction plans and construction specifications. 1.The minimum cover requirements for all pipes have been met as shown on the approved construction plans. These will be called out in critical locations. 2.All encasements and clearances as specified on the approved construction plans have been met. 3.Any specific joint types or construction methods specified on the approved construction plans have been met. (List on a separate sheet and attach to this certification.) IV.Concrete Pans - FCSCM Ch. 8, Sec. 2.0 A. Construction/Installation: All concrete pans have been constructed in accordance with the approved construction plans. 1.The concrete pans are the correct size/width as shown on the approved construction plans. 2.The longitudinal slopes of the pans are as shown on the approved construction plans. The certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or justification by separate document. 3.The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross- section is “V” shaped and meets the side slope shown on the detail.) 4.The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4 inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide documentation of the reinforcement used if different than shown on the details or on the approved construction plans.) 5.The spot elevations shown on the concrete pan(s) have been verified and are shown on the as- built drawings. 11/19 Page 5 V. Storm Drain Inlets - FCSCM Ch. 9, Sec. 3.0 A. Construction/Installation: All storm drain inlets have been constructed in accordance with the approved construction plans and construction specifications. 1.The size and type of inlets are consistent with the inlets shown on the approved construction plan. Indicate by writing “Verified” on each inlet on the plan sheet or list on a separate document the inlet number(s), type and size (length). If the inlet installed is other than the one on the approved construction plan detail sheet, provide the name and source of the detail with justification for equal or better capacity. 2.The size of the inlet opening is consistent with the approved detail. (Check height and width.) 3.The elevation of the grate (if applicable) is at the elevation shown on the street profile or as indicated by a spot elevation on the construction plans. 4.The as-built invert elevations of all pipes entering and leaving the inlet are shown on the plan and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide justification and capacity calculations to show the capacity is not affected or propose mitigation. 5.The as-built size of the inlet box is as shown on the construction plans or an explanation or justification is attached. 6.All Type C, R, 13 and 16 inlet covers are stenciled or stamped with the following designation (or an equivalent): NO DUMPING – DRAINS TO POUDRE RIVER. VI.Culverts - FCSCM Ch. 9, Sec. 4.0 A. Construction/Installation: All culverts have been constructed and/or installed in accordance with the approved construction plans and construction specifications. 1.All culvert sizes have been verified as indicated on the as-built construction plans as correct. 2.The culvert material type for all culverts installed is as on the approved construction plans and is indicated on the as-built plans. 3.The as-built invert “in and out” elevations have been verified and are indicated on the as-built construction plans. 4.The culvert headwalls or wing walls have been installed as shown on the approved construction plans. Headwalls or wing walls may be needed in the as-built conditions onsite if the slopes adjacent to the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative. An alternative to consider is a turf reinforcement mat (TRM). VII.Sub-Drains A. Construction/Installation: All sub-drains shown on the construction plans have been installed in accordance with those plans and the construction specifications. Sub-drains installed with the sanitary sewer are to be verified on the sanitary sewer plan and profile sheets of the construction plans. (NOTE: Indicate any sub-drains installed after the plans were approved on the as-built plans.) 1.The size of the sub-drains are as approved on the construction plans and are indicated on the as- built plans. 2.The type of sub-drain, in particular the perforated and non-perforated sections of the drain, are as indicated on the approved construction plans. 11/19 Page 6 3.The cover requirements per the construction plans are provided. 4.The cleanouts have been installed at the locations shown on the construction plans and are accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations marked.) 5.The backfill materials for sub-drains are as shown on the approved construction plans. (This includes the type, depth and width.) 6.The geo-textile liner completely wraps the sub-drain and the permeable backfill material unless shown otherwise on the approved construction plans. (Sub-drain pipe wrapped in a sock filter material is accepted only if approved prior to installation.) VIII.Curb Cuts A. Construction: All curb cut openings are constructed in accordance with the approved construction plans and construction specifications. 1.The size (width) of the curb cut opening is as shown on the approved construction plans. 2.The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb cut. IX.Sidewalk Culverts & Chases A. Construction/Installation: All sidewalk culverts have been installed at the locations shown on the approved construction plans. 1.The size (width and length) of the culverts are as shown on the approved construction plans. 2.The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the detail shown on the approved construction plans or per the City’s detail. 3.The sidewalk culvert invert “in and out” elevations have been verified and are indicated on the as-built plans. 4.The sidewalk culvert opening is as shown on the approved construction plans or per the City’s detail. 5.There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert. X. Site Grading - FCSCM Ch. 8 A. Construction: All common open spaces have been graded in accordance with the approved construction plans. 1.The grading on all common open spaces bordering private lots has been verified as correct and the as-built rear lot corner elevations have been shown on the as-built plans. 11/19 Page 7 2.The as-built contours for “overlot grading” are shown on the as-built construction plans for all common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the situation for noncompliance and when it may be corrected. An escrow for overlot grading may be required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site Certification. It is understood that residential lots will be brought to final grade once the foundation is backfilled so they may be lower than the plan shows at this Overall Site Certification stage.) 3.All turf reinforcement mats (TRMs) have been installed as shown on the approved construction plans and the slopes are stabilized. XI.Permanent Erosion Control BMPs - FCSCM Ch. 9, Sec. 7.0 A. Construction: All permanent erosion control BMPs have been installed per the approved construction plans. 1.All riprap has been installed in the locations and sizes indicated on the approved construction plans. 2.All fabric has been installed in the locations and sizes indicated on the approved construction plans. a.All fabric was installed per the details on the approved construction plans. XII.Post-Construction Site Cleanup - FCSCM Ch. 3, Sec. 2.0 A. Construction: All construction debris and obstructions of any kind have been removed from drainage paths. 1.All construction debris has been removed except in staging area(s). 2.All ruts have been smoothed out in all construction areas. 3.All areas needing reseeding have been identified and future stabilization goals have been coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note the area needing stabilization in the narrative. XIII.Certification of LID and Water Quality Facilities - FCSCM Ch. 7 A.Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and other items to be verified during construction, along with pictures and other required documentation. B.Attached is verification of the rain garden and/or sand filter flat surface area(s) and ponding volume(s). This verification includes survey of critical elevations. C.Attached is verification of the underground infiltration required volume(s), weir elevations, orifices, inspection ports and filtering fabric. This verification includes survey of critical elevations. D.All visible LID design features were verified as part of the engineer's site visit. 11/19 Scenario: 100-YR P-5 P-4 P- 3 Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 3/29/2021 Bentley StormCAD V8i (SELECTseries 3) [08.11.03.84]Bentley Systems, Inc. Haestad Methods Solution Center3-25-21 AB MAIN REDUCED (LOT 1 and 2).stsw Conduit FlexTable: Combined Pipe/Node Report Energy Grade Line (Out) (ft) Energy Grade Line (In) (ft) Hydraulic Grade Line (Out) (ft) Hydraulic Grade Line (In) (ft) Slope (Calculat ed) (ft/ft) Invert (Stop) (ft) Invert (Start) (ft) Velocity (ft/s) Flow (cfs) Diamet er (in) MaterialLength (Unifie d) (ft) Stop NodeStart NodeLabel 13.2113.3612.5012.650.0099.509.686.7623.8918.0PVC20.0UG STORAGEK1-5' TYPE RP-1 13.3313.4013.0813.140.0039.689.753.7420.14Concrete26.7K1-5' TYPE RMH-1P-2 13.4813.5713.3213.41-0.0029.879.752.9415.84Concrete56.4MH-2MH-1P-3 13.6413.6813.5713.61-0.00310.109.872.136.6924.0PVC88.024" GRATE-1MH-2P-4 13.7213.7513.6513.68-0.00210.2510.102.136.6924.0PVC68.324" GRATE-224" GRATE-1P-5 13.7313.8113.5713.64-0.0029.959.873.304.0515.0PVC32.4K2-AREA INLET 1MH-2P-6 13.7613.7913.7213.76-0.00510.6110.251.471.8015.0PVC75.9K3 24" GRATE -324" GRATE-2P-7 13.7813.7913.7813.78-0.00611.1310.650.730.9015.0PVC75.9K3 24" GRATE -4 K3 24" GRATE-3P-8 13.5113.5713.3213.380.0079.759.903.504.3015.0PVC22.0MH-1J1-AREA INLET-2P-9 13.8313.9113.5713.64-0.0039.929.874.165.1015.0PVC20.0J2-AREA INLET 3MH-2P-10 13.8913.9413.7213.78-0.00410.3510.253.253.9915.0PVC23.2J3 24" GRATE- 524" GRATE-2P-11 13.9514.0313.8813.96-0.00210.5210.352.172.6615.0PVC85.1J3 24" GRATE- 6 J3 24" GRATE-5P-12 14.0214.0414.0014.02-0.00410.8310.521.081.3315.0PVC85.1J3 24" GRATE- 7 J3 24" GRATE-6P-13 Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 3/29/2021 Bentley StormCAD V8i (SELECTseries 3) [08.11.03.84]Bentley Systems, Inc. Haestad Methods Solution Center3-25-21 AB MAIN REDUCED (LOT 1 and 2).stsw FlexTable: Catch Basin Table Energy Grade Line (Out) (ft) Energy Grade Line (In) (ft) Hydraulic Grade Line (Out) (ft) Hydraulic Grade Line (In) (ft) Flow (Additional Carryover) (cfs) Elevation (Invert) (ft) Elevation (Rim) (ft) Elevation (Ground) (ft) LabelID 13.3613.3312.6513.083.759.6813.0413.54K1-5' TYPE R195 13.8113.8113.6413.644.059.9512.9313.73K2-AREA INLET 1196 13.9113.9113.6413.645.109.9213.5914.09J2-AREA INLET 3197 13.7913.7913.7813.780.9011.1313.5814.50K3 24" GRATE-4198 14.0414.0414.0214.021.3310.8313.8614.50J3 24" GRATE-7199 13.7913.7813.7613.780.9010.6113.3114.50K3 24" GRATE-3209 13.7513.7613.6813.720.9010.2513.4514.5024" GRATE-2212 13.5713.5713.3813.384.309.9013.8614.36J1-AREA INLET-2213 13.6813.7213.6113.650.0010.1013.4514.3024" GRATE-1230 13.9413.9513.7813.881.3310.3513.7014.50J3 24" GRATE-5231 14.0314.0213.9614.001.3310.5213.6814.50J3 24" GRATE-6234 Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 3/29/2021 Bentley StormCAD V8i (SELECTseries 3) [08.11.03.84]Bentley Systems, Inc. Haestad Methods Solution Center3-25-21 AB MAIN REDUCED (LOT 1 and 2).stsw FlexTable: Manhole Table Energy Grade Line (Out) (ft) Energy Grade Line (In) (ft) Hydraulic Grade Line (In) (ft) Hydraulic Grade Line (Out) (ft) Flow (Total Out) (cfs) Elevation (Invert) (ft) Elevation (Rim) (ft) Elevation (Ground) (ft) Label 13.4013.4813.3213.1420.149.7514.1514.15MH-1 13.5713.6413.5713.4115.849.8714.0914.09MH-2 Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 3/29/2021 Bentley StormCAD V8i (SELECTseries 3) [08.11.03.84]Bentley Systems, Inc. Haestad Methods Solution Center3-25-21 AB MAIN REDUCED (LOT 1 and 2).stsw Profile Report Engineering Profile - ug storage to grate 5 (3-25-21 AB MAIN REDUCED (LOT 1 and 2).stsw) Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 3/29/2021 Bentley StormCAD V8i (SELECTseries 3) [08.11.03.84]Bentley Systems, Inc. Haestad Methods Solution Center3-25-21 AB MAIN REDUCED (LOT 1 and 2).stsw Profile Report Engineering Profile - Profile - 1 (3-25-21 AB MAIN REDUCED (LOT 1 and 2).stsw) 5.00 10.00 15.00 -0+50 0+00 0+50 1+00 Station (ft) El e v a t i o n ( f t ) MH-2 Rim: 14.09 ft Invert: 9.87 ft J2-AREA INLET 3 Rim: 13.59 ft Invert: 9.92 ft K2-AREA INLET 1 Rim: 12.93 ft Invert: 9.95 ft P-10: 20.0 ft @ -0.003 ft/ft Circle - 15.0 in PVC P-6: 32.4 ft @ -0.002 ft/ftCircle - 15.0 in PVC Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 3/29/2021 Bentley StormCAD V8i (SELECTseries 3) [08.11.03.84]Bentley Systems, Inc. Haestad Methods Solution Center3-25-21 AB MAIN REDUCED (LOT 1 and 2).stsw Profile Report Engineering Profile - Profile - 1 (3-25-21 AB MAIN REDUCED (LOT 1 and 2).stsw) 5.00 10.00 15.00 -0+50 0+00 0+50 1+00 Station (ft) MH-1 Rim: 14.15 ft Invert: 9.75 ftK1-5' TYPE R Rim: 13.04 ft Invert: 9.68 ft J1-AREA INLET-2 Rim: 13.86 ft Invert: 9.90 ft UG STORAGE Rim: 13.20 ft Invert: 9.50 ft P-2: 26.7 ft @ 0.003 ft/ft Ellipse - 3.2 x 2.0 in Concrete P-9: 22.0 ft @ 0.007 ft/ft Circle - 15.0 in PVC P-1: 20.0 ft @ 0.009 ft/ft Circle - 18.0 in PVC Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 3/29/2021 Bentley StormCAD V8i (SELECTseries 3) [08.11.03.84]Bentley Systems, Inc. Haestad Methods Solution Center3-25-21 AB MAIN REDUCED (LOT 1 and 2).stsw Profile Report Engineering Profile - Profile - 1 (3-25-21 AB MAIN REDUCED (LOT 1 and 2).stsw) Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 3/29/2021 Bentley StormCAD V8i (SELECTseries 3) [08.11.03.84]Bentley Systems, Inc. Haestad Methods Solution Center3-25-21 AB MAIN REDUCED (LOT 1 and 2).stsw DURING CONSTRUCTION INSPECTION CHECKLIST AND SUPPORTING DOCUMENTATION 1 Erika Schneider From:Evan Fischgrund <Evan.Fischgrund@ads-pipe.com> Sent:Monday, July 13, 2020 4:01 PM To:Ryan Martin; Erika Schneider Subject:RE: Stormtech - Harmony Commons - Gravel Submittal [The e-mail below is from an external source. Please do not open attachments or click links from an unknown or suspicious origin.] Ryan, Not a problem. This will work for ADS. Erika, let me know if you need anything else to approve. Evan Fischgrund, P.E. Engineered Product Manager, CO Advanced Drainage Systems, Inc. : 720-250-8047 : evan.fischgrund@ads-pipe.com From: Ryan Martin <Ryan@martinandsonsco.com> Sent: Monday, July 13, 2020 2:52 PM To: Erika Schneider <eschneider@interwestgrp.com> Cc: Evan Fischgrund <Evan.Fischgrund@ads-pipe.com> Subject: Stormtech - Harmony Commons - Gravel Submittal Erika/Evan, We are getting ready to start in on the Stormtech at Harmony Commons. I completely forgot to submit on the aggregate for this. Will the #67 material from Kehn work for this? See attached. Thank You Ryan Martin Estimator/Project Manager Martin & Sons Excavating, Inc. 970.635.0404 - Office 970.635.0413 - Fax NOTICE: This email message is intended only for the person or entity to which it is addressed. This email message, including any attachments, may contain confidential and/or privileged information and other materials, and is protected by copyright law. Any unauthorized review, use, disclosure, or distribution is strictly prohibited. If you are not the intended recipient, then please contact the sender by reply email and delete/destroy all copies of the original email message and any attachments. This email message, including any attachments, also may contain technical, or similar types of, information and materials. The sender does not make any express or implied representations or warranties with respect to such information and materials, including, without limitation, fitness for a particular purpose or STAMPED SURVEY AND RECORD DRAWINGS 14.52 STUB 14.32 WV RIM 9.64 WV NUT 14.14 CS 14.58 STUB 14.67 STUB 15.16 11.48 WV NUT 16.09 FL 19.06 LP TOB 15.73 FL 15.49 FL 15.10 FL 15.03 FL 15.15 FL15.14 EOC 15.28 EOC 15.43 EOC 15.52 EOC 15.65 EOC 15.44 EOC 15.49 RIM 15.30 RIM 11.49 INV 15.40 EOC 15.32 EOC 15.12 RIM 11.58 INV 11.40 INV 15.30 RIM 15.32 EOC 15.15 TOC 15.20 FG 11.34 INV 15.30 RIM 15.35 EOC 15.43 EOC 15.41 TOC 15.24 FL 15.22 TOC 15.17 METER RIM 15.41 TOC 15.42 EOC 15.36 EOC 15.25 FG 15.13 METER RIM 15.21 FL 14.93 FL 14.89 FL 14.80 FL 14.94 FL 15.24 EOC 15.15 EOC 15.16 TOC 15.30 EOC 15.17 RIM 11.04 INV 10.90 INV 15.26 RIM 15.21 FG 15.29 EOC 15.18 TOC 14.98 METER RIM 15.27 EOC 15.12 TOC 15.24 RIM 10.83 INV 15.11 RIM 10.89 INV 15.17 FG 15.22 EOC 15.22 EOC 15.10 EOC 15.08 EOC 15.65 CO 14.86 EOC 14.84 EOC 14.88 EOC 14.92 EOC 14.58 EOC 14.60 EOC 14.68 WV 14.74 WATER METER RIM 14.72 METER BOX 14.85 FL 14.48 FL 14.50 FL 14.38 FL 14.32 FL 14.16 FL 14.14 FL 14.41 FL 14.41 WV 14.56 RIM 14.51 RIM 14.42 FL 14.65 FL 14.41 FL 14.41 FL 14.33 FL 14.28 FL 14.27 FL 14.74 EOC14.17 FL 13.97 FL 13.88 FL 16.79 TOB 14.26 TOC 13.98 TOC 14.14 TOC 14.20 TOC 14.37 TOC 14.58 TOC 14.66 TOC 14.49 TOC 14.47 TOC 14.50 16.84 LP TOB 15.14 14.55 FL 14.56 FL 14.70 FL 14.85 FL 14.98 FL 15.26 WV 15.08 TOC 14.76 TOC 14.98 EOC 14.93 EOC 15.40 EOC 14.93 EOC 14.87 EOC 15.40 EOC 14.88 EOC 14.17 EOC 14.58 EOC 15.04 FG 13.70 RIM 10.35 INV 13.34 RIM 10.25 INV 14.20 UPED 14.44 CL VAULT 10.10 INV 11.04 SAN STUB 13.70 SAN STUB 14.46 SAN STUB 14.27 SAN STUB 14.44 GI RIM 14.13 GI RIM 14.22 RIM 13.98 MH RIM 14.49 EOC 14.50 EOC 14.46 EOC14.43 FL 13.89 FL 13.86 FL 14.22 FG 14.19 FG 13.98 FG 14.18 FG14.19 FG 14.55 FG 14.70 FG 14.24 FG 13.31 RIM 10.61 INV 10.65 INV 13.74 FG 13.96 TOC 13.47 FL 13.60 FL 13.47 FL 13.05 FL 12.88 FL 12.95 FL 13.11 FL 9.95 INV 12.98 FL 13.48 TBC 13.24 TOC 15.39 LP TOB 13.39 TOC 13.32 TOC 13.48 TOC 5.49 INV 14.15 RIM 11.74 INV 14.91 FG 14.73 FG 14.97 FG 15.19 FG 15.07 FG15.53 FG 15.36 FG 14.76 FG 15.20 FG 15.89 FG 13.86 FG 13.86 RIM 10.83 INV 15.77 INV 15.61 FG 14.56 FG 14.87 FG 15.16 FG 14.83 FG 15.04 FG 13.68 RIM 10.52 INV 15.38 FG 15.03 FG 14.51 FG 15.07 FG 15.11 FG 14.55 FG 14.43 FG 14.28 FG 9.92 INV 14.09 MH -4.22 INV 13.45 AI RIM 4025 Automation Way, Suite C4 Fort Collins, CO 80525 970-232-9645 www.WashburnSurveying.com Sheet 1 of 4 Project #: 2019-0124 Date: MARCH 3, 2021 Scale: 1"=10' Drawn: CDBSheet 1 of 4 Project #: 2019-0124 Date: Sc a l e : 1 " = 1 0 ' HARMONY COMMONS SITE AS-BUILT EXHIBIT LOT 1 HARMONY COMMONS, SECOND FILING , LOCATED IN THE NORTHWEST QUARTER OF SECTION 4, TOWNSHIP 6 NORTH, RANGE 68 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO ELEVATIONS SHOWN ARE FROM AN AS-BUILT SURVEY OF THE SITE PERFORMED ON OCTOBER 12, 2020 & MARCH 3, 2021 CHAD R. WASHBURN, PROFESSIONAL LAND SURVEYOR COLORADO PLS 37963 FOR AND ON BEHALF OF WASHBURN LAND SURVEYING, LLC. 14.59 CS 16.46 CL RISER 14.52 STUB 14.32 WV RIM 9.64 WV NUT 14.14 CS 14.58 STUB 14.67 STUB 10.90 INV 15.26 RIM 15.21 FG 15.29 EOC 15.18 TOC 14.98 METER RIM 15.27 EOC 15.12 TOC 15.24 RIM 10.83 INV 15.11 RIM 10.89 INV 15.17 FG 15.22 EOC 15.22 EOC 15.10 EOC 15.08 EOC 15.65 CO 14.86 EOC 14.84 EOC 14.88 EOC 14.92 EOC 14.58 EOC 14.60 EOC 14.68 WV 14.74 WATER METER RIM 14.72 METER BOX 14.85 FL 14.48 FL 14.50 FL 14.38 FL 14.32 FL 14.16 FL 14.14 FL 14.41 FL 14.41 WV 14.56 RIM 14.51 RIM 14.42 FL 14.65 FL 14.41 FL 14.41 FL 14.33 FL 14.28 FL 14.27 FL 14.31 FL 14.31 FL 14.27 FL 14.27 FL 14.22 FL 15.08 TRANS PAD 15.08 TRANS PAD 15.12 TRANS PAD 15.12 TRANS PAD 14.37 TOC 14.75 EOC 14.74 EOC14.17 FL 13.97 FL 13.88 FL 14.17 FL 16.79 TOB 14.26 TOC 13.98 TOC 14.25 TOC 14.14 TOC 13.98 TOC14.88 TOC 15.01 TOC 14.47 TOC 14.26 TOC 14.20 TOC 14.37 TOC 14.58 TOC 14.98 EOC 14.93 EOC 15.40 EOC 14.93 EOC 14.87 EOC 15.40 EOC 14.88 EOC 14.17 EOC 15.04 FG 10.25 INV 14.20 UPED 14.44 CL VAULT 10.10 INV 11.04 SAN STUB 13.70 SAN STUB 14.46 SAN STUB 14.27 SAN STUB 14.44 GI RIM 14.13 GI RIM 14.22 RIM 13.98 MH RIM 14.49 EOC 14.50 EOC 14.46 EOC14.43 FL 13.89 FL 13.86 FL 13.93 FL 13.97 FL 13.96 FL 14.15 FL 14.64 WATER METER RIM 14.60 METER BOX 16.49 RISER 13.58 RIM 11.13 INV 13.66 FG 13.32 FG 13.92 FG 13.97 FG 13.90 FG 14.15 FG 14.22 FG 14.19 FG 13.98 FG 14.18 FG14.19 FG 14.55 FG 14.70 FG 14.24 FG 13.31 RIM 10.61 INV 10.65 INV 13.74 FG 13.96 TOC 13.47 FL 13.60 FL 13.47 FL 13.42 FL 13.35 FL 13.26 FL 13.17 FL 13.05 FL 12.88 FL 12.95 FL 13.11 FL 9.95 INV 12.98 FL 13.48 TBC 13.68 TBC 13.22 FL 14.16 TRANS PAD 14.16 TRANS PAD 14.14 TRANS PAD 14.13 TRANS PAD 13.34 TOC 13.43 TOC 13.24 TOC 15.39 LP TOB 16.41 LP TOB 13.61 TOC 14.07 FL 14.19 FL 14.18 FL 14.19 FL 14.07 FL 13.99 FL 13.99 FL 13.83 FL 13.87 TOC 13.76 TOC 13.72 TOC 13.81 TOC 14.00 TOC 13.77 TOC 13.39 TOC 13.32 TOC 13.48 TOC 14.18 WV 14.12 WV 14.08 WV 14.19 WV 14.28 FH FG 5.49 INV 15.07 FG 15.11 FG FG 14.28 FG 9.92 INV 14.09 MH -4.22 INV 13.45 AI RIM 4025 Automation Way, Suite C4 Fort Collins, CO 80525 970-232-9645 www.WashburnSurveying.com Sheet 2 of 4 Project #: 2019-0124 Date: MARCH 3, 2021 Scale: 1"=10' Drawn: CDBSheet 2 of 4 Project #: 2019-0124 Dat Sc a l e : 1 " = 1 0 ' HARMONY COMMONS SITE AS-BUILT EXHIBIT LOT 1 HARMONY COMMONS, SECOND FILING , LOCATED IN THE NORTHWEST QUARTER OF SECTION 4, TOWNSHIP 6 NORTH, RANGE 68 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO ELEVATIONS SHOWN ARE FROM AN AS-BUILT SURVEY OF THE SITE PERFORMED ON OCTOBER 12, 2020 & MARCH 3, 2021 STUB 14.32 WV RIM 9.64 WV NUT 14.58 STUB 14.87 EOC 15.10 FL 15.05 FL 14.73 EOC 15.12 LP TOB 14.56 EOC 14.63 EOC 14.12 FL14.15 FL 14.85 EOC 14.74 EOC 14.86 FL 14.70 FL 14.71 FL 14.70 FL 14.55 FL 14.43 FL 14.40 FL 14.34 FL 14.10 FL 14.55 CL VAULT 14.57 TOC 14.76 TOC 15.05 TOC 14.48 FL 14.16 FL 14.41 WV 14.56 RIM 14.51 RIM 14.42 FL 14.65 FL 14.41 FL 14.41 FL 14.33 FL 14.28 FL 14.27 FL 14.31 FL 14.31 FL 14.27 FL 14.27 FL 14.22 FL 15.08 TRANS PAD 15.08 TRANS PAD 15.12 TRANS PAD 15.12 TRANS PAD 14.37 TOC 14.75 EOC 14.74 EOC14.17 FL 13.97 FL 13.88 FL 14.17 FL 16.79 TOB 14.26 TOC 13.98 TOC 14.25 TOC 14.14 TOC 13.98 TOC 14.23 MH RIM 14.27 FL 14.45 FL 14.53 FL 14.45 FL 14.47 FL 14.56 FL 14.55 FL 14.62 FL 14.61 FL 14.53 FL 14.18 FL 14.14 FL 14.12 FL 14.13 FL 16.87 LP TOB 14.88 TOC 15.01 TOC 14.44 TOC 14.38 TOC 14.40 TOC 14.47 TOC 14.26 TOC 14.20 TOC 14.37 TOC 14.58 TOC 13.98 MH RIM 13.96 TOC 13.47 FL 13.60 FL 13.47 FL 13.42 FL 13.35 FL 13.26 FL 13.17 FL 13.05 FL 12.88 FL 12.95 FL 13.11 FL 9.95 INV 12.98 FL 13.48 TBC 13.68 TBC 13.22 FL 14.16 TRANS PAD 14.16 TRANS PAD 14.14 TRANS PAD 14.13 TRANS PAD 13.34 TOC 13.43 TOC 13.24 TOC 15.39 LP TOB 16.41 LP TOB 15.46 LP TOB 15.52 LP TOB 13.33 FL 13.51 FL 13.53 FL 13.64 FL 13.61 TOC 13.67 FL 13.61 FL 13.51 FL 13.42 FL 13.42 FL 13.32 FL 13.09 FL 13.07 FL 14.02 FL 14.10 FL 14.43 EOC 14.47 EOC 14.16 FL 14.03 FL 13.97 FL 14.04 FL 14.38 FL 14.45 FL 14.60 FL 14.13 EOC 14.78 FL 14.81 FL 14.97 FL 13.92 EOC 15.09 FL 15.17 FL 15.06 RIM 13.74 EOC 14.82 FL 14.66 FL 14.51 FL 14.32 RIM 14.03 RIM 14.19 RIM 14.30 RIM 13.98 FL 14.11 FL 14.10 FL 14.07 FL 14.19 FL 14.18 FL 14.19 FL 14.07 FL 13.99 FL 13.99 FL 13.83 FL 13.87 TOC 13.76 TOC 13.72 TOC 13.81 TOC 14.00 TOC 13.97 TOC 13.87 TOC 13.92 TOC 14.21 TOC 13.99 TOC 13.66 TOC 13.54 TOC 13.59 TOC 13.39 TOC 13.24 TOC 13.25 TOC 13.97 TOC 13.84 TOC 13.77 TOC 13.39 TOC 13.32 TOC 13.48 TOC 13.25 RIM 13.22 RIM 13.40 RIM 13.53 RIM 13.53 RIM 14.44 FL 13.83 FL 13.59 FL 13.41 FL 13.21 FL13.29 FL 13.15 FL 13.12 FL 13.03 FL 13.00 FL 13.71 EOC 13.68 EOC 8.96 INV 5.49 INV 13.78 AI 24IN 5.0 W 4.9 E 12IN DIVIDE 5.0 14.03 AI 24IN 5.0 W 5.0 4.55 E 18IN 4.45 N 13.54 MH 18IN 3.95 S 3.95 E 24IN 3.15 N 13.41 MH 18IN 4.0 W 24IN 3.1 S 4.1 E 4.1 N 13.32 MH 18IN 3.9 N 24IN 3.95 E 3.9 S 13.68 MH 18IN X2 4.0 E 24IN 4.0 W 14.15 MH 4.4 INV14.10 4.2 INV 9.92 INV 14.09 MH -4.22 INV 4025 Automation Way, Suite C4 Fort Collins, CO 80525 970-232-9645 www.WashburnSurveying.com Sheet 3 of 4 Project #: 2019-0124 Date: MARCH 3, 2021 Scale: 1"=10' Drawn: CDBSheet 3 of 4 Project #: 2019-0124 Date: Sc a l e : 1 " = 1 0 ' HARMONY COMMONS SITE AS-BUILT EXHIBIT LOT 1 HARMONY COMMONS, SECOND FILING , LOCATED IN THE NORTHWEST QUARTER OF SECTION 4, TOWNSHIP 6 NORTH, RANGE 68 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO ELEVATIONS SHOWN ARE FROM AN AS-BUILT SURVEY OF THE SITE PERFORMED ON OCTOBER 12, 2020 & MARCH 3, 2021 14.52 STUB 14.32 WV RIM 9.64 WV NUT CS 14.58 STUB 14.67 STUB 15.16 WV RIM 11.48 WV NUT 15.00 WV RIM 10.86 WV NUT 15.52 TBC 15.10 FL 15.05 FL 15.03 FL 15.29 FL 15.33 FL 15.43 FL 15.49 FL 15.87 FL 16.10 FL 15.94 TBW 15.81 EOC 15.86 TBW 16.15 LP TOB 15.19 WV 14.96 FL 14.71 FL 14.91 FL 15.02 FL 15.11 FL 15.20 FL 15.31 FL 15.34 FL 15.37 FL 15.60 FL 15.31 EOC 15.23 EOC 15.16 EOC 15.40 FL 15.30 FL 15.00 EOC 15.56 LP TOB 14.87 EOC 15.10 FL 15.05 FL 14.73 EOC 15.12 LP TOB 14.56 EOC 14.63 EOC 14.12 FL14.15 FL 14.85 EOC 14.74 EOC 14.86 FL 14.70 FL 14.71 FL 14.70 FL 14.55 FL 14.43 FL 14.40 FL 14.34 FL 14.10 FL 14.55 CL VAULT 14.57 TOC 14.76 TOC 15.05 TOC 15.07 TOC 15.55 TOC 15.14 FL 14.97 FL 14.94 FL 14.75 FL 14.78 FL 14.91 FL 15.01 FL 15.17 FL 15.26 FL 16.08 FL 16.09 FL 18.97 LP TOB 16.06 FL 15.73 TOC 15.69 TOC 15.69 TOC 16.03 FL 16.09 FL 19.06 LP TOB 15.73 FL 15.49 FL 15.10 FL FL 14.89 FL 14.80 FL 14.48 FL 14.38 FL 14.32 FL 14.16 FL 14.41 WV 14.56 RIM 14.51 RIM 14.42 FL 14.65 FL 14.41 FL 14.41 FL 14.33 FL 14.28 FL 14.27 FL 14.31 FL 14.31 FL 14.27 FL 14.27 FL 14.22 FL 15.08 TRANS PAD 15.08 TRANS PAD 15.12 TRANS PAD 15.12 TRANS PAD 14.37 TOC 14.75 EOC 14.74 EOC14.17 FL 13.97 FL 13.88 FL 14.17 FL 16.79 TOB 14.26 TOC 13.98 TOC 14.25 TOC 14.14 TOC 13.98 TOC 14.23 MH RIM 14.27 FL 14.45 FL 14.53 FL 14.45 FL 14.47 FL 14.56 FL 14.55 FL 14.62 FL 14.61 FL 14.53 FL 14.18 FL 14.14 FL 14.12 FL 14.13 FL 16.87 LP TOB 14.88 TOC 15.01 TOC 14.44 TOC 14.38 TOC 14.40 TOC 14.47 TOC 14.26 TOC 14.20 TOC 14.37 TOC 14.58 TOC 14.66 TOC 14.49 TOC 14.47 TOC 14.50 TOC 14.69 TOC 15.12 TOC 14.64 TOC 14.59 TOC 14.58 TOC 17.05 LP TOB 15.29 TOC 16.84 LP TOB 15.14 FH FG 14.85 FL 14.70 FL 14.64 FL 14.55 FL 14.56 FL 14.70 FL 14.85 FL 14.98 FL 15.26 WV 15.08 TOC 14.76 TOC 13.96 TOC 13.47 FL 13.60 FL 13.47 FL 13.42 FL 13.35 FL 13.26 FL 13.17 FL 13.05 FL 12.88 FL 12.95 FL 13.11 FL 9.95 INV 12.98 FL 13.48 TBC 13.68 TBC 13.22 FL 14.16 TRANS PAD 14.16 TRANS PAD 14.14 TRANS PAD 14.13 TRANS PAD 13.34 TOC 13.33 FL 13.51 FL 13.53 FL 13.64 FL 13.61 TOC 13.67 FL 13.61 FL 13.51 FL 13.42 FL 13.42 FL 13.32 FL 13.09 FL 13.07 FL 14.02 FL 14.10 FL 14.43 EOC 14.47 EOC 14.16 FL 14.03 FL 13.97 FL 14.04 FL 14.38 FL 13.84 TOC 13.22 RIM 14.44 FL 13.83 FL 8.96 INV 13.78 AI 24IN 5.0 W 4.9 E 12IN DIVIDE 5.0 13.68 MH 18IN X2 4.0 E 24IN 4.0 W 14.15 MH 4.4 INV14.10 4.2 INV 9.92 INV 14.09 MH -4.22 INV 4025 Automation Way, Suite C4 Fort Collins, CO 80525 970-232-9645 www.WashburnSurveying.com Sheet 4 of 4 Project #: 2019-0124 Date: MARCH 3, 2021 Scale: 1"=10' Drawn: CDBSheet 4 of 4 Project #: 2019-0124 Dat Sc a l e : 1 " = 1 0 ' HARMONY COMMONS SITE AS-BUILT EXHIBIT LOT 1 HARMONY COMMONS, SECOND FILING , LOCATED IN THE NORTHWEST QUARTER OF SECTION 4, TOWNSHIP 6 NORTH, RANGE 68 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO ELEVATIONS SHOWN ARE FROM AN AS-BUILT SURVEY OF THE SITE PERFORMED ON OCTOBER 12, 2020 & MARCH 3, 2021 SITE VISIT PHOTOS STORMTECH CERTIFICATION SUPPORTING DOCUMENTS Project: Chamber Model - SC-740 Units -Imperial Number of chambers - 98 Voids in the stone (porosity) - 40 % Base of STONE Elevation - 8.90 ft Amount of Stone Above Chambers - 6 in Amount of Stone Below Chambers - 6 in Area of system - 3801 sf Min. Area - Height of System Incremental Single Chamber Incremental Total Chamber Incremental Stone Incremental Ch & St Cumulative Chamber Elevation (inches) (cubic feet) (cubic feet) (cubic feet) (cubic feet) (cubic feet) (feet) 42 0.00 0.00 126.70 126.70 8023.31 12.40 41 0.00 0.00 126.70 126.70 7896.61 12.32 40 0.00 0.00 126.70 126.70 7769.91 12.23 39 0.00 0.00 126.70 126.70 7643.21 12.15 38 0.00 0.00 126.70 126.70 7516.51 12.07 37 0.00 0.00 126.70 126.70 7389.81 11.98 36 0.05 5.39 124.54 129.93 7263.11 11.90 35 0.16 15.97 120.31 136.28 7133.18 11.82 34 0.28 27.63 115.65 143.28 6996.90 11.73 33 0.60 59.19 103.02 162.21 6853.62 11.65 32 0.80 78.57 95.27 173.84 6691.40 11.57 31 0.95 93.17 89.43 182.60 6517.56 11.48 30 1.07 105.30 84.58 189.88 6334.96 11.40 29 1.18 115.69 80.42 196.11 6145.08 11.32 28 1.27 124.03 77.09 201.12 5948.97 11.23 27 1.36 132.79 73.58 206.37 5747.85 11.15 26 1.45 142.50 69.70 212.20 5541.47 11.07 25 1.52 149.42 66.93 216.35 5329.27 10.98 24 1.58 155.07 64.67 219.74 5112.92 10.90 23 1.64 160.94 62.32 223.27 4893.18 10.82 22 1.70 166.55 60.08 226.63 4669.91 10.73 21 1.75 171.79 57.99 229.77 4443.28 10.65 20 1.80 176.68 56.03 232.71 4213.51 10.57 19 1.85 181.79 53.98 235.77 3980.80 10.48 18 1.89 185.52 52.49 238.01 3745.03 10.40 17 1.93 189.53 50.89 240.42 3507.02 10.32 16 1.97 193.55 49.28 242.83 3266.60 10.23 15 2.01 196.97 47.91 244.88 3023.77 10.15 14 2.04 200.41 46.54 246.95 2778.88 10.07 13 2.07 203.35 45.36 248.71 2531.94 9.98 12 2.10 206.28 44.19 250.47 2283.23 9.90 11 2.13 208.92 43.13 252.05 2032.76 9.82 10 2.15 211.08 42.27 253.35 1780.71 9.73 9 2.18 213.35 41.36 254.71 1527.37 9.65 8 2.20 215.44 40.52 255.96 1272.65 9.57 7 2.21 216.32 40.17 256.49 1016.69 9.48 6 0.00 0.00 126.70 126.70 760.20 9.40 5 0.00 0.00 126.70 126.70 633.50 9.32 4 0.00 0.00 126.70 126.70 506.80 9.23 3 0.00 0.00 126.70 126.70 380.10 9.15 2 0.00 0.00 126.70 126.70 253.40 9.07 1 0.00 0.00 126.70 126.70 126.70 8.98 StormTech SC-740 Cumulative Storage Volumes 3313 sf min. area ,QFOXGH3HULPHWHU6WRQHLQ&DOFXODWLRQV Click Here for Metric EVAN FISCHGRUND 720-250-8047 EVAN.FISCHGRUND@ADS-PIPE.COM ©2013 ADS, INC. PROJECT INFORMATION ADS SALES REP: ENGINEERED PRODUCT MANAGER: PROJECT NO: ADVANCED DRAINAGE SYSTEMS, INC. R HARMONY COMMONS - LOT 2 FORT COLLINS - CO MARK KAELBERER 720-256-8225 MARK.KAELBERER@ADS-PIPE.COM S151002 FOR STORMTECH INSTRUCTIONS, DOWNLOAD THE INSTALLATION APP IMPORTANT - NOTES FOR THE BIDDING AND INSTALLATION OF THE SC-740 SYSTEM 1.STORMTECH SC-740 CHAMBERS SHALL NOT BE INSTALLED UNTIL THE MANUFACTURER'S REPRESENTATIVE HAS COMPLETED A PRE-CONSTRUCTION MEETING WITH THE INSTALLERS. 2.STORMTECH SC-740 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". 3.CHAMBERS ARE NOT TO BE BACKFILLED WITH A DOZER OR AN EXCAVATOR SITUATED OVER THE CHAMBERS. STORMTECH RECOMMENDS 3 BACKFILL METHODS: ·STONESHOOTER LOCATED OFF THE CHAMBER BED. ·BACKFILL AS ROWS ARE BUILT USING AN EXCAVATOR ON THE FOUNDATION STONE OR SUBGRADE. ·BACKFILL FROM OUTSIDE THE EXCAVATION USING A LONG BOOM HOE OR EXCAVATOR. 4.THE FOUNDATION STONE SHALL BE LEVELED AND COMPACTED PRIOR TO PLACING CHAMBERS. 5.JOINTS BETWEEN CHAMBERS SHALL BE PROPERLY SEATED PRIOR TO PLACING STONE. 6.MAINTAIN MINIMUM - 6" (150 mm) SPACING BETWEEN THE CHAMBER ROWS. 7.EMBEDMENT STONE SURROUNDING CHAMBERS MUST BE A CLEAN, CRUSHED, ANGULAR STONE 3/4-2" (20-50 mm). 8.THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH CHAMBER FOUNDATION MATERIALS BEARING CAPACITIES TO THE SITE DESIGN ENGINEER. 9.ADS RECOMMENDS THE USE OF "FLEXSTORM CATCH IT" INSERTS DURING CONSTRUCTION FOR ALL INLETS TO PROTECT THE SUBSURFACE STORMWATER MANAGEMENT SYSTEM FROM CONSTRUCTION SITE RUNOFF. NOTES FOR CONSTRUCTION EQUIPMENT 1.STORMTECH SC-740 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". 2.THE USE OF CONSTRUCTION EQUIPMENT OVER SC-740 CHAMBERS IS LIMITED: ·NO EQUIPMENT IS ALLOWED ON BARE CHAMBERS. ·NO RUBBER TIRED LOADERS, DUMP TRUCKS, OR EXCAVATORS ARE ALLOWED UNTIL PROPER FILL DEPTHS ARE REACHED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". ·WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT CAN BE FOUND IN THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". 3.FULL 36" (900 mm) OF STABILIZED COVER MATERIALS OVER THE CHAMBERS IS REQUIRED FOR DUMP TRUCK TRAVEL OR DUMPING. USE OF A DOZER TO PUSH EMBEDMENT STONE BETWEEN THE ROWS OF CHAMBERS MAY CAUSE DAMAGE TO THE CHAMBERS AND IS NOT AN ACCEPTABLE BACKFILL METHOD. ANY CHAMBERS DAMAGED BY THE "DUMP AND PUSH" METHOD ARE NOT COVERED UNDER THE STORMTECH STANDARD WARRANTY. CONTACT STORMTECH AT 1-888-892-2694 WITH ANY QUESTIONS ON INSTALLATION REQUIREMENTS OR WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT. SC-740 STORMTECH CHAMBER SPECIFICATIONS 1.CHAMBERS SHALL BE STORMTECH SC-740. 2.CHAMBERS SHALL BE ARCH-SHAPED AND SHALL BE MANUFACTURED FROM VIRGIN, IMPACT-MODIFIED POLYPROPYLENE COPOLYMERS. 3.CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418-16a, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 4.CHAMBER ROWS SHALL PROVIDE CONTINUOUS, UNOBSTRUCTED INTERNAL SPACE WITH NO INTERNAL SUPPORTS THAT WOULD IMPEDE FLOW OR LIMIT ACCESS FOR INSPECTION. 5.THE STRUCTURAL DESIGN OF THE CHAMBERS, THE STRUCTURAL BACKFILL, AND THE INSTALLATION REQUIREMENTS SHALL ENSURE THAT THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 12.12, ARE MET FOR: 1) LONG-DURATION DEAD LOADS AND 2) SHORT-DURATION LIVE LOADS, BASED ON THE AASHTO DESIGN TRUCK WITH CONSIDERATION FOR IMPACT AND MULTIPLE VEHICLE PRESENCES. 6.CHAMBERS SHALL BE DESIGNED, TESTED AND ALLOWABLE LOAD CONFIGURATIONS DETERMINED IN ACCORDANCE WITH ASTM F2787, "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". LOAD CONFIGURATIONS SHALL INCLUDE: 1) INSTANTANEOUS (<1 MIN) AASHTO DESIGN TRUCK LIVE LOAD ON MINIMUM COVER 2) MAXIMUM PERMANENT (75-YR) COVER LOAD AND 3) ALLOWABLE COVER WITH PARKED (1-WEEK) AASHTO DESIGN TRUCK. 7.REQUIREMENTS FOR HANDLING AND INSTALLATION: ·TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS. ·TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 2”. ·TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2418 SHALL BE GREATER THAN OR EQUAL TO 550 LBS/IN/IN. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS. 8.ONLY CHAMBERS THAT ARE APPROVED BY THE SITE DESIGN ENGINEER WILL BE ALLOWED. UPON REQUEST BY THE SITE DESIGN ENGINEER OR OWNER, THE CHAMBER MANUFACTURER SHALL SUBMIT A STRUCTURAL EVALUATION FOR APPROVAL BEFORE DELIVERING CHAMBERS TO THE PROJECT SITE AS FOLLOWS: ·THE STRUCTURAL EVALUATION SHALL BE SEALED BY A REGISTERED PROFESSIONAL ENGINEER. ·THE STRUCTURAL EVALUATION SHALL DEMONSTRATE THAT THE SAFETY FACTORS ARE GREATER THAN OR EQUAL TO 1.95 FOR DEAD LOAD AND 1.75 FOR LIVE LOAD, THE MINIMUM REQUIRED BY ASTM F2787 AND BY SECTIONS 3 AND 12.12 OF THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS FOR THERMOPLASTIC PIPE. ·THE TEST DERIVED CREEP MODULUS AS SPECIFIED IN ASTM F2418 SHALL BE USED FOR PERMANENT DEAD LOAD DESIGN EXCEPT THAT IT SHALL BE THE 75-YEAR MODULUS USED FOR DESIGN. 9.CHAMBERS AND END CAPS SHALL BE PRODUCED AT AN ISO 9001 CERTIFIED MANUFACTURING FACILITY. 00 15 ' 30 ' SHEET OF DA T E : PR O J E C T # : DR A W N : CH E C K E D : TH I S D R A W I N G H A S B E E N P R E P A R E D B A S E D O N I N F O R M A T I O N P R O V I D E D T O A D S U N D E R T H E D I R E C T I O N O F T H E S I T E D E S I G N E N G I N E E R O R O T H E R P R O J E C T R E P R E S E N T A T I V E . T H E S I T E D E S I G N E N G I N E E R S H A L L R E V I E W T H I S D R A W I N G P R I O R T O C O N S T R U C T I O N . I T I S T H E U L T I M A T E RE S P O N S I B I L I T Y O F T H E S I T E D E S I G N E N G I N E E R T O E N S U R E T H A T T H E P R O D U C T ( S ) D E P I C T E D A N D A L L A S S O C I A T E D D E T A I L S M E E T A L L A P P L I C A B L E L A W S , R E G U L A T I O N S , A N D P R O J E C T R E Q U I R E M E N T S . 46 4 0 T R U E M A N B L V D HI L L I A R D , O H 4 3 0 2 6 AD V A N C E D D R A I N A G E S Y S T E M S , I N C . R 2 5 09 - 1 9 - 1 9 S1 5 1 0 0 2 RJ W JP R FO R T C O L L I N S - C O HA R M O N Y C O M M O N S - L O T 2 DA T E DR W N CH K D DE S C R I P T I O N 11 / 1 8 / 1 9 SD M CT S RE V I S E D P E R E N G I N E E R ' S M A R K U P S 12 / 0 3 / 1 9 SD M CT S U P D T E D C A L L O U T P E R M A R K U P 12 / 0 4 / 1 9 SD M CT S UP D A T E D P E R N E W P L A N S 70 IN W O O D R O A D , S U I T E 3 | RO C K Y H I L L | CT | 060 6 7 86 0 - 5 2 9 - 8 1 8 8 | 88 8 - 8 9 2 - 2 6 9 4 | WW W . S T O R M T E C H . C O M De t e n t i o n R e t e n t i o n W a t e r Q u a l i t y NOTES ·MANIFOLD SIZE TO BE DETERMINED BY SITE DESIGN ENGINEER. SEE TECH SHEET #7 FOR MANIFOLD SIZING GUIDANCE. ·DUE TO THE ADAPTATION OF THIS CHAMBER SYSTEM TO SPECIFIC SITE AND DESIGN CONSTRAINTS, IT MAY BE NECESSARY TO CUT AND COUPLE ADDITIONAL PIPE TO STANDARD MANIFOLD COMPONENTS IN THE FIELD. ·THE SITE DESIGN ENGINEER MUST REVIEW ELEVATIONS AND IF NECESSARY ADJUST GRADING TO ENSURE THE CHAMBER COVER REQUIREMENTS ARE MET. ·THIS CHAMBER SYSTEM WAS DESIGNED WITHOUT SITE-SPECIFIC INFORMATION ON SOIL CONDITIONS OR BEARING CAPACITY. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR DETERMINING THE SUITABILITY OF THE SOIL AND PROVIDING THE BEARING CAPACITY OF THE INSITU SOILS. THE BASE STONE DEPTH MAY BE INCREASED OR DECREASED ONCE THIS INFORMATION IS PROVIDED. 6" ADS N-12 DUAL WALL PERFORATED HDPE UNDERDRAIN (SIZE TBD BY ENGINEER) INSPECTION PORT (SEE DETAIL / TYP 6 PLACES) OUTLET CONTROL STRUCTURE PER PLAN SHOWN AS 30" NYLOPLAST MAXIMUM OUTLET FLOW 11.0 CFS (DESIGN BY ENGINEER / PROVIDED BY OTHERS) PLACE MINIMUM 12.5' OF ADS GEOSYNTHETICS 315WTK WOVEN GEOTEXTILE OVER BEDDING STONE AND UNDERNEATH CHAMBER FEET FOR SCOUR PROTECTION AT ALL CHAMBER INLET ROWS 24" PREFABRICATED END CAP, PART# SC740EPE24B TYP OF ALL SC-740 24" CONNECTIONS AND ISOLATOR ROWS PROPOSED LAYOUT 98 STORMTECH SC-740 CHAMBERS 14 STORMTECH SC-740 END CAPS 6 STONE ABOVE (in) 6 STONE BELOW (in) 40 % STONE VOID 8037 INSTALLED SYSTEM VOLUME (CF) (PERIMETER STONE INCLUDED) 3811 SYSTEM AREA (ft²) 286 SYSTEM PERIMETER (ft) PROPOSED ELEVATIONS 19.90 MAXIMUM ALLOWABLE GRADE (TOP OF PAVEMENT/UNPAVED) 13.90 MINIMUM ALLOWABLE GRADE (UNPAVED WITH TRAFFIC) 13.40 MINIMUM ALLOWABLE GRADE (UNPAVED NO TRAFFIC) 13.40 MINIMUM ALLOWABLE GRADE (BASE OF FLEXIBLE PAVEMENT) 13.40 MINIMUM ALLOWABLE GRADE (TOP OF RIGID PAVEMENT) 12.40 TOP OF STONE 11.90 TOP OF SC-740 CHAMBER 10.40 24" CUSTOM CONNECTION INVERT 9.53 18" BOTTOM MANIFOLD/CONNECTION INVERT 9.41 24" BOTTOM CONNECTION / MANIFOLD INVERT 9.41 24" ISOLATOR ROW CONNECTION INVERT 9.40 BOTTOM OF SC-740 CHAMBER 8.90 UNDERDRAIN INVERT 8.90 BOTTOM OF STONE 24" X 24" ADS N-12 BOTTOM MANIFOLD INVERT 0.1" ABOVE CHAMBER BASE STRUCTURE PER PLAN SHOWN AS 30" NYLOPLAST (24" SUMP MIN) 24" ADS N-12 BOTTOM CONNECTION MAXIMUM INLET FLOW 2.8 CFS INVERT 0.1" ABOVE CHAMBER BASE (SEE NOTES) ISOLATOR ROW (SEE DETAIL / TYP 3 PLACES) 18" X 18" ADS N-12 BOTTOM MANIFOLD MAXIMUM INLET 5.6 CFS INVERT 1.6" ABOVE CHAMBER BASE (SEE NOTES) STRUCTURE PER PLAN SHOWN AS 30" NYLOPLAST (24" SUMP MIN) PROPOSED 30" NYLOPLAST BASIN (24" SUMP MIN/ FOR ACCESS ONLY) 24" ADS N-12 CUSTOM CONNECTION INVERT 12" ABOVE CHAMBER BASE PROPOSED 30" NYLOPLAST BASIN (24" SUMP MIN) 101.24' 107.82' 32 . 7 5 ' 35 . 3 5 ' 18" ADS N-12 BOTTOM CONNECTION MAXIMUM INLET 2.8 CFS INVERT 1.6" ABOVE CHAMBER BASE (SEE NOTES) SHEET OF DA T E : PR O J E C T # : DR A W N : CH E C K E D : TH I S D R A W I N G H A S B E E N P R E P A R E D B A S E D O N I N F O R M A T I O N P R O V I D E D T O A D S U N D E R T H E D I R E C T I O N O F T H E S I T E D E S I G N E N G I N E E R O R O T H E R P R O J E C T R E P R E S E N T A T I V E . T H E S I T E D E S I G N E N G I N E E R S H A L L R E V I E W T H I S D R A W I N G P R I O R T O C O N S T R U C T I O N . I T I S T H E U L T I M A T E RE S P O N S I B I L I T Y O F T H E S I T E D E S I G N E N G I N E E R T O E N S U R E T H A T T H E P R O D U C T ( S ) D E P I C T E D A N D A L L A S S O C I A T E D D E T A I L S M E E T A L L A P P L I C A B L E L A W S , R E G U L A T I O N S , A N D P R O J E C T R E Q U I R E M E N T S . 46 4 0 T R U E M A N B L V D HI L L I A R D , O H 4 3 0 2 6 AD V A N C E D D R A I N A G E S Y S T E M S , I N C . R 3 5 09 - 1 9 - 1 9 S1 5 1 0 0 2 RJ W JP R FO R T C O L L I N S - C O HA R M O N Y C O M M O N S - L O T 2 DA T E DR W N CH K D DE S C R I P T I O N 11 / 1 8 / 1 9 SD M CT S RE V I S E D P E R E N G I N E E R ' S M A R K U P S 12 / 0 3 / 1 9 SD M CT S U P D T E D C A L L O U T P E R M A R K U P 12 / 0 4 / 1 9 SD M CT S UP D A T E D P E R N E W P L A N S ACCEPTABLE FILL MATERIALS: STORMTECH SC-740 CHAMBER SYSTEMS PLEASE NOTE: 1.THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE". 2.STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 6" (150 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR. 3.WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS. 4.ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION. NOTES: 1.CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418-16a, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 2.SC-740 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 3.THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. 4.PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS. 5.REQUIREMENTS FOR HANDLING AND INSTALLATION: ·TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS. ·TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 2”. ·TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2418 SHALL BE GREATER THAN OR EQUAL TO 550 LBS/IN/IN. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS. MATERIAL LOCATION DESCRIPTION AASHTO MATERIAL CLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT D FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE TOP OF THE 'C' LAYER TO THE BOTTOM OF FLEXIBLE PAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE THAT PAVEMENT SUBBASE MAY BE PART OF THE 'D' LAYER. ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S PLANS. CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS.N/A PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND PREPARATION REQUIREMENTS. C INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 18" (450 mm) ABOVE THE TOP OF THE CHAMBER. NOTE THAT PAVEMENT SUBBASE MAY BE A PART OF THE 'C' LAYER. GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35% FINES OR PROCESSED AGGREGATE. MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THIS LAYER. AASHTO M145¹ A-1, A-2-4, A-3 OR AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10 BEGIN COMPACTIONS AFTER 12" (300 mm) OF MATERIAL OVER THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN 6" (150 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FOR WELL GRADED MATERIAL AND 95% RELATIVE DENSITY FOR PROCESSED AGGREGATE MATERIALS. ROLLER GROSS VEHICLE WEIGHT NOT TO EXCEED 12,000 lbs (53 kN). DYNAMIC FORCE NOT TO EXCEED 20,000 lbs (89 kN). B EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS FROM THE FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER ABOVE. CLEAN, CRUSHED, ANGULAR STONE AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57 NO COMPACTION REQUIRED. A FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE SUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER.CLEAN, CRUSHED, ANGULAR STONE AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57 PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE.2,3 18" (450 mm) MIN* 8' (2.4 m) MAX 6" (150 mm) MIN D C B A 12" (300 mm) MIN ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL AROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS 12" (300 mm) MIN51" (1295 mm)6" (150 mm) MIN 30" (762 mm) DEPTH OF STONE TO BE DETERMINED BY SITE DESIGN ENGINEER 6" (150 mm) MIN *TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR, INCREASE COVER TO 24" (600 mm). EXCAVATION WALL (CAN BE SLOPED OR VERTICAL) PERIMETER STONE (SEE NOTE 4) SC-740 END CAP SUBGRADE SOILS (SEE NOTE 3) PAVEMENT LAYER (DESIGNED BY SITE DESIGN ENGINEER) 70 IN W O O D R O A D , S U I T E 3 | RO C K Y H I L L | CT | 060 6 7 86 0 - 5 2 9 - 8 1 8 8 | 88 8 - 8 9 2 - 2 6 9 4 | WW W . S T O R M T E C H . C O M De t e n t i o n R e t e n t i o n W a t e r Q u a l i t y SHEET OF DA T E : PR O J E C T # : DR A W N : CH E C K E D : TH I S D R A W I N G H A S B E E N P R E P A R E D B A S E D O N I N F O R M A T I O N P R O V I D E D T O A D S U N D E R T H E D I R E C T I O N O F T H E S I T E D E S I G N E N G I N E E R O R O T H E R P R O J E C T R E P R E S E N T A T I V E . T H E S I T E D E S I G N E N G I N E E R S H A L L R E V I E W T H I S D R A W I N G P R I O R T O C O N S T R U C T I O N . I T I S T H E U L T I M A T E RE S P O N S I B I L I T Y O F T H E S I T E D E S I G N E N G I N E E R T O E N S U R E T H A T T H E P R O D U C T ( S ) D E P I C T E D A N D A L L A S S O C I A T E D D E T A I L S M E E T A L L A P P L I C A B L E L A W S , R E G U L A T I O N S , A N D P R O J E C T R E Q U I R E M E N T S . 46 4 0 T R U E M A N B L V D HI L L I A R D , O H 4 3 0 2 6 AD V A N C E D D R A I N A G E S Y S T E M S , I N C . R 4 5 09 - 1 9 - 1 9 S1 5 1 0 0 2 RJ W JP R FO R T C O L L I N S - C O HA R M O N Y C O M M O N S - L O T 2 DA T E DR W N CH K D DE S C R I P T I O N 11 / 1 8 / 1 9 SD M CT S RE V I S E D P E R E N G I N E E R ' S M A R K U P S 12 / 0 3 / 1 9 SD M CT S U P D T E D C A L L O U T P E R M A R K U P 12 / 0 4 / 1 9 SD M CT S UP D A T E D P E R N E W P L A N S 70 IN W O O D R O A D , S U I T E 3 | RO C K Y H I L L | CT | 060 6 7 86 0 - 5 2 9 - 8 1 8 8 | 88 8 - 8 9 2 - 2 6 9 4 | WW W . S T O R M T E C H . C O M De t e n t i o n R e t e n t i o n W a t e r Q u a l i t y INSPECTION & MAINTENANCE STEP 1)INSPECT ISOLATOR ROW FOR SEDIMENT A.INSPECTION PORTS (IF PRESENT) A.1.REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN A.2.REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED A.3.USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG A.4.LOWER A CAMERA INTO ISOLATOR ROW FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL) A.5.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. B.ALL ISOLATOR ROWS B.1.REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW B.2.USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW THROUGH OUTLET PIPE i)MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRY ii)FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE B.3.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. STEP 2)CLEAN OUT ISOLATOR ROW USING THE JETVAC PROCESS A.A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERRED B.APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN C.VACUUM STRUCTURE SUMP AS REQUIRED STEP 3)REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS. STEP 4)INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM. NOTES 1.INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS. 2.CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY. SUMP DEPTH TBD BY SITE DESIGN ENGINEER (24" [600 mm] MIN RECOMMENDED) CATCH BASIN OR MANHOLE SC-740 ISOLATOR ROW DETAIL NTS SC-740 END CAP OPTIONAL INSPECTION PORT SC-740 CHAMBER COVER ENTIRE ISOLATOR ROW WITH ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE 8' (2.4 m) MIN WIDE STORMTECH HIGHLY RECOMMENDS FLEXSTORM PURE INSERTS IN ANY UPSTREAM STRUCTURES WITH OPEN GRATES 24" (600 mm) HDPE ACCESS PIPE REQUIRED USE FACTORY PRE-FABRICATED END CAP PART #: SC740EPE24B TWO LAYERS OF ADS GEOSYNTHETICS 315WTK WOVEN GEOTEXTILE BETWEEN FOUNDATION STONE AND CHAMBERS 5' (1.5 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS ELEVATED BYPASS MANIFOLD NOTES: 1.INSPECTION PORTS MAY BE CONNECTED THROUGH ANY CHAMBER CORRUGATION VALLEY. 2.ALL SCHEDULE 40 FITTINGS TO BE SOLVENT CEMENTED (4" PVC NOT PROVIDED BY ADS). CONNECTION DETAIL NTS 8" (200 mm) 4" (100 mm) SCHED 40 PVC COUPLING 4" (100 mm) SCHED 40 PVC 4" (100 mm) SCHED 40 PVC CORE 4.5" (114 mm) Ø HOLE IN CHAMBER (4.5" HOLE SAW REQ'D) ANY VALLEY LOCATION STORMTECH CHAMBER CONCRETE COLLAR PAVEMENT 12" (300 mm) MIN WIDTH CONCRETE SLAB 6" (150 mm) MIN THICKNESS 4" PVC INSPECTION PORT DETAIL NTS 8" NYLOPLAST INSPECTION PORT BODY (PART# 2708AG4IPKIT) OR TRAFFIC RATED BOX W/SOLID LOCKING COVER CONCRETE COLLAR NOT REQUIRED FOR UNPAVED APPLICATIONS 4" (100 mm) SCHED 40 PVC SHEET OF DA T E : PR O J E C T # : DR A W N : CH E C K E D : TH I S D R A W I N G H A S B E E N P R E P A R E D B A S E D O N I N F O R M A T I O N P R O V I D E D T O A D S U N D E R T H E D I R E C T I O N O F T H E S I T E D E S I G N E N G I N E E R O R O T H E R P R O J E C T R E P R E S E N T A T I V E . T H E S I T E D E S I G N E N G I N E E R S H A L L R E V I E W T H I S D R A W I N G P R I O R T O C O N S T R U C T I O N . I T I S T H E U L T I M A T E RE S P O N S I B I L I T Y O F T H E S I T E D E S I G N E N G I N E E R T O E N S U R E T H A T T H E P R O D U C T ( S ) D E P I C T E D A N D A L L A S S O C I A T E D D E T A I L S M E E T A L L A P P L I C A B L E L A W S , R E G U L A T I O N S , A N D P R O J E C T R E Q U I R E M E N T S . 46 4 0 T R U E M A N B L V D HI L L I A R D , O H 4 3 0 2 6 AD V A N C E D D R A I N A G E S Y S T E M S , I N C . R 5 5 09 - 1 9 - 1 9 S1 5 1 0 0 2 RJ W JP R FO R T C O L L I N S - C O HA R M O N Y C O M M O N S - L O T 2 DA T E DR W N CH K D DE S C R I P T I O N 11 / 1 8 / 1 9 SD M CT S RE V I S E D P E R E N G I N E E R ' S M A R K U P S 12 / 0 3 / 1 9 SD M CT S U P D T E D C A L L O U T P E R M A R K U P 12 / 0 4 / 1 9 SD M CT S UP D A T E D P E R N E W P L A N S 70 IN W O O D R O A D , S U I T E 3 | RO C K Y H I L L | CT | 060 6 7 86 0 - 5 2 9 - 8 1 8 8 | 88 8 - 8 9 2 - 2 6 9 4 | WW W . S T O R M T E C H . C O M De t e n t i o n R e t e n t i o n W a t e r Q u a l i t y PART #STUB A B C SC740EPE06T / SC740EPE06TPC 6" (150 mm)10.9" (277 mm)18.5" (470 mm)--- SC740EPE06B / SC740EPE06BPC ---0.5" (13 mm) SC740EPE08T /SC740EPE08TPC 8" (200 mm)12.2" (310 mm)16.5" (419 mm)--- SC740EPE08B / SC740EPE08BPC ---0.6" (15 mm) SC740EPE10T / SC740EPE10TPC 10" (250 mm)13.4" (340 mm)14.5" (368 mm)--- SC740EPE10B / SC740EPE10BPC ---0.7" (18 mm) SC740EPE12T / SC740EPE12TPC 12" (300 mm)14.7" (373 mm)12.5" (318 mm)--- SC740EPE12B / SC740EPE12BPC ---1.2" (30 mm) SC740EPE15T / SC740EPE15TPC 15" (375 mm)18.4" (467 mm)9.0" (229 mm)--- SC740EPE15B / SC740EPE15BPC ---1.3" (33 mm) SC740EPE18T / SC740EPE18TPC 18" (450 mm)19.7" (500 mm)5.0" (127 mm)--- SC740EPE18B / SC740EPE18BPC ---1.6" (41 mm) SC740EPE24B*24" (600 mm)18.5" (470 mm)---0.1" (3 mm) ALL STUBS, EXCEPT FOR THE SC740EPE24B ARE PLACED AT BOTTOM OF END CAP SUCH THAT THE OUTSIDE DIAMETER OF THE STUB IS FLUSH WITH THE BOTTOM OF THE END CAP. FOR ADDITIONAL INFORMATION CONTACT STORMTECH AT 1-888-892-2694. * FOR THE SC740EPE24B THE 24" (600 mm) STUB LIES BELOW THE BOTTOM OF THE END CAP APPROXIMATELY 1.75" (44 mm). BACKFILL MATERIAL SHOULD BE REMOVED FROM BELOW THE N-12 STUB SO THAT THE FITTING SITS LEVEL. NOTE: ALL DIMENSIONS ARE NOMINAL NOMINAL CHAMBER SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH)51.0" X 30.0" X 85.4" (1295 mm X 762 mm X 2169 mm) CHAMBER STORAGE 45.9 CUBIC FEET (1.30 m³) MINIMUM INSTALLED STORAGE*74.9 CUBIC FEET (2.12 m³) WEIGHT 75.0 lbs.(33.6 kg) *ASSUMES 6" (152 mm) STONE ABOVE, BELOW, AND BETWEEN CHAMBERS PRE-FAB STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B" PRE-FAB STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T" PRE-CORED END CAPS END WITH "PC" SC-740 TECHNICAL SPECIFICATION NTS 90.7" (2304 mm) ACTUAL LENGTH 85.4" (2169 mm) INSTALLED LENGTH BUILD ROW IN THIS DIRECTION A A C B 51.0" (1295 mm) 30.0" (762 mm) 45.9" (1166 mm)12.2" (310 mm) 29.3" (744 mm) OVERLAP NEXT CHAMBER HERE (OVER SMALL CORRUGATION) START END UNDERDRAIN DETAIL NTS A A B B SECTION A-A SECTION B-B NUMBER AND SIZE OF UNDERDRAINS PER SITE DESIGN ENGINEER 4" (100 mm) TYP FOR SC-310 & SC-160LP SYSTEMS 6" (150 mm) TYP FOR SC-740, DC-780, MC-3500 & MC-4500 SYSTEMS OUTLET MANIFOLD STORMTECH END CAP STORMTECH CHAMBERS STORMTECH CHAMBER STORMTECH END CAP DUAL WALL PERFORATED HDPE UNDERDRAIN ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE FOUNDATION STONE BENEATH CHAMBERS FOUNDATION STONE BENEATH CHAMBERS DRAIN BASIN SHOP DRAWING PO# Part Number 2824AG5 Customer approval Project Name Harmony Commons Lot 2 Review Drawings Prepared By Josh McDonald Nyloplast 720-252-2481 Joshua.McDonald@ads-pipe.com Dia.24 Structure No.NYLO 1 Qty.1 Grate 24; Solid; Accessories Rim Elev.13.24 ft. Basin Height 50.4 in. Sump Depth 6.00 in. Stub size Angle Pipe Type Invert Elev. ft. AMSL Production Depth inches Stub #1 18 in.0 °ADS HP 9.54 ft.44.40 in. Stub #2 18 in.90 °ADS HP 9.54 ft.44.40 in. Stub #3 Stub #4 Stub #5 Stub #6 CUSTOMER NOTES PART CODES 2499CGC; This product is made to order and non-Refundable Nyloplast, 3130 Verona Ave. Buford, GA 30518. (866) 888-8479 Nyloplast® is a registered trademark of Advanced Drainage Systems® Nyloplast® is not responsible for accuracy of shop drawings submitted by customer through Basin Configurator. Submission of shop drawings for purchase and fabrication constitute an approval for production as designed by customer. DRAIN BASIN SHOP DRAWING PO# Part Number 2824AG5 Customer approval Project Name Harmony Commons Lot 2 Review Drawings Prepared By Josh McDonald Nyloplast 720-252-2481 Joshua.McDonald@ads-pipe.com Dia.24 Structure No.NYLO 2 Qty.1 Grate 24; Solid; Accessories Rim Elev.13.21 ft. Basin Height 50.52 in. Sump Depth 6.00 in. Stub size Angle Pipe Type Invert Elev. ft. AMSL Production Depth inches Stub #1 18 in.0 °ADS HP 9.50 ft.44.52 in. Stub #2 18 in.90 °ADS HP 9.50 ft.44.52 in. Stub #3 Stub #4 Stub #5 Stub #6 CUSTOMER NOTES PART CODES 2499CGC; This product is made to order and non-Refundable Nyloplast, 3130 Verona Ave. Buford, GA 30518. (866) 888-8479 Nyloplast® is a registered trademark of Advanced Drainage Systems® Nyloplast® is not responsible for accuracy of shop drawings submitted by customer through Basin Configurator. Submission of shop drawings for purchase and fabrication constitute an approval for production as designed by customer. DRAIN BASIN SHOP DRAWING PO# Part Number 2830AG7 Customer approval Project Name Harmony Commons Lot 2 Review Drawings Prepared By Josh McDonald Nyloplast 720-252-2481 Joshua.McDonald@ads-pipe.com Dia.30 Structure No.ST MH 1 Qty.1 Grate 30; Solid; Accessories Rim Elev.13.80 ft. Basin Height 76.68 in. Sump Depth 24.00 in. Stub size Angle Pipe Type Invert Elev. ft. AMSL Production Depth inches Stub #1 24 in.0 °ADS N12 9.41 ft.52.68 in. Stub #2 24 in.90 °ADS N12 9.41 ft.52.68 in. Stub #3 18 in.270 °ADS HP 9.41 ft.52.68 in. Stub #4 Stub #5 Stub #6 CUSTOMER NOTES PART CODES RIM ELEVATION USED FROM OCS - BASIN MAY REQUIRE FIELD TRIM 3099CGC; This product is made to order and non-Refundable Nyloplast, 3130 Verona Ave. Buford, GA 30518. (866) 888-8479 Nyloplast® is a registered trademark of Advanced Drainage Systems® Nyloplast® is not responsible for accuracy of shop drawings submitted by customer through Basin Configurator. Submission of shop drawings for purchase and fabrication constitute an approval for production as designed by customer. DRAIN BASIN SHOP DRAWING PO# Part Number 2830AG7 Customer approval Project Name Harmony Commons Lot 2 Review Drawings Prepared By Josh McDonald Nyloplast 720-252-2481 Joshua.McDonald@ads-pipe.com Dia.30 Structure No.ST MH 2 Qty.1 Grate 30; Solid; Accessories Rim Elev.14.25 ft. Basin Height 82.08 in. Sump Depth 24.00 in. Stub size Angle Pipe Type Invert Elev. ft. AMSL Production Depth inches Stub #1 24 in.0 °ADS N12 9.41 ft.58.08 in. Stub #2 Stub #3 Stub #4 Stub #5 Stub #6 CUSTOMER NOTES PART CODES RIM ELEVATION USED FROM OCS - BASIN MAY REQUIRE FIELD TRIM 3099CGC; This product is made to order and non-Refundable Nyloplast, 3130 Verona Ave. Buford, GA 30518. (866) 888-8479 Nyloplast® is a registered trademark of Advanced Drainage Systems® Nyloplast® is not responsible for accuracy of shop drawings submitted by customer through Basin Configurator. Submission of shop drawings for purchase and fabrication constitute an approval for production as designed by customer. DRAIN BASIN SHOP DRAWING PO# Part Number 2830AG7 Customer approval Project Name Harmony Commons Lot 2 Review Drawings Prepared By Josh McDonald Nyloplast 720-252-2481 Joshua.McDonald@ads-pipe.com Dia.30 Structure No.ST MH 3 Qty.1 Grate 30; Solid; Accessories Rim Elev.13.80 ft. Basin Height 76.68 in. Sump Depth 24.00 in. Stub size Angle Pipe Type Invert Elev. ft. AMSL Production Depth inches Stub #1 24 in.0 °ADS N12 9.41 ft.52.68 in. Stub #2 24 in.90 °PLAIN END SDR 35 STUB OUT (STUB OUT TO BE 16" FROM BASIN WALL)10.40 ft.40.80 in. Stub #3 18 in.180 °ADS HP 9.41 ft.52.68 in. Stub #4 24 in.270 °ADS N12 9.41 ft.52.68 in. Stub #5 Stub #6 CUSTOMER NOTES PART CODES RIM ELEVATION USED FROM OCS - BASIN MAY REQUIRE FIELD TRIM; CUSTOMIZED PLAIN END STUB OUT CONNECTION (SEE ATTACHED DETAIL) 3099CGC; This product is made to order and non-Refundable Nyloplast, 3130 Verona Ave. Buford, GA 30518. (866) 888-8479 Nyloplast® is a registered trademark of Advanced Drainage Systems® Nyloplast® is not responsible for accuracy of shop drawings submitted by customer through Basin Configurator. DRAIN BASIN SHOP DRAWING PO# Part Number 2830AG7 Customer approval Project Name Harmony Commons Lot 2 Review Drawings Prepared By Josh McDonald Nyloplast 720-252-2481 Joshua.McDonald@ads-pipe.com Dia.30 Structure No.ST MH 4 Qty.1 Grate 30; Solid; Accessories Rim Elev.13.80 ft. Basin Height 75.24 in. Sump Depth 24.00 in. Stub size Angle Pipe Type Invert Elev. ft. AMSL Production Depth inches Stub #1 18 in.0 °ADS N12 9.53 ft.51.24 in. Stub #2 18 in.90 °ADS N12 9.53 ft.51.24 in. Stub #3 24 in.270 °PLAIN END SDR 35 STUB OUT (STUB OUT TO BE 16" FROM BASIN WALL)10.40 ft.40.80 in. Stub #4 Stub #5 Stub #6 CUSTOMER NOTES PART CODES RIM ELEVATION USED FROM OCS - BASIN MAY REQUIRE FIELD TRIM; CUSTOMIZED PLAIN END STUB OUT CONNECTION (SEE ATTACHED DETAIL) 3099CGC; This product is made to order and non-Refundable Nyloplast, 3130 Verona Ave. Buford, GA 30518. (866) 888-8479 Nyloplast® is a registered trademark of Advanced Drainage Systems® Nyloplast® is not responsible for accuracy of shop drawings submitted by customer through Basin Configurator. DRAIN BASIN SHOP DRAWING PO# Part Number 2830AG10 Customer approval Project Name Harmony Commons Lot 2 Review Drawings Prepared By Josh McDonald Nyloplast 720-252-2481 Joshua.McDonald@ads-pipe.com Dia.30 Structure No.ST MH 5 Qty.1 Grate 30; Standard; Accessories Rim Elev.14.00 ft. Basin Height 85.2 in. Sump Depth 24.00 in. Stub size Angle Pipe Type Invert Elev. ft. AMSL Production Depth inches Stub #1 24 in.0 °ADS HP 8.90 ft.61.20 in. Stub #2 18 in.90 °ADS N12 9.53 ft.53.64 in. Stub #3 24 in.180 °ADS N12 9.41 ft.55.08 in. Stub #4 6 in.270 °ADS N12 8.90 ft.61.20 in. Stub #5 Stub #6 CUSTOMER NOTES PART CODES RIM ELEVATION USED FROM OCS - BASIN MAY REQUIRE FIELD TRIM 3099CGS; This product is made to order and non-Refundable Nyloplast, 3130 Verona Ave. Buford, GA 30518. (866) 888-8479 Nyloplast® is a registered trademark of Advanced Drainage Systems® Nyloplast® is not responsible for accuracy of shop drawings submitted by customer through Basin Configurator. Submission of shop drawings for purchase and fabrication constitute an approval for production as designed by customer. WEIR BASIN SHOP DRAWING PO# Part Number 2836AG10WE Customer approval Project Name Harmony Commons Lot 2 Review Drawings Prepared By Josh McDonald Nyloplast 720-252-2481 Joshua.McDonald@ads-pipe.com Dia.36 Structure No.ST MH 6 Qty.1 Grate 30; Standard; Accessories Weir Plate - 1; Straight Plate; 36X30 CONE STYLE REDUCER; Rim Elev.13.80 ft. Basin Height 71.4 in. Sump Depth 12.00 in. Stub size Angle Pipe Type Invert Elev. ft. AMSL Production Depth inches Weir Elevation Stub(s) Covered Stub #1 24 in.0 °ADS HP 8.85 ft.59.40 in.12.40 ft. Stub #2 24 in.180 °ADS HP 8.85 ft.59.40 in. Stub #3 Stub #4 Stub #5 Stub #6 CUSTOMER NOTES PART CODES 3099CGS; 2936AG30RC; 5199AGWEIR; Stub Covered 1 Orifice Diameter 13.5 in. Weir Height 54.6 in. Orifice Invert 59.4 in. This product is made to order and non-Refundable Nyloplast, 3130 Verona Ave. Buford, GA 30518. (866) 888-8479 Nyloplast® is a registered trademark of Advanced Drainage Systems® Nyloplast® is not responsible for accuracy of shop drawings submitted by customer through Basin Configurator. Submission of shop drawings for purchase and fabrication constitute an approval for production as designed by customer. DRAIN BASIN SHOP DRAWING PO# Part Number 2824AG3 Customer approval Project Name Harmony Commons Lot 2 Review Drawings Prepared By Josh McDonald Nyloplast 720-252-2481 Joshua.McDonald@ads-pipe.com Dia.24 Structure No.INLET 4 Qty.1 Grate 24; Domed; Accessories Rim Elev.13.30 ft. Basin Height 36 in. Sump Depth 6.00 in. Stub size Angle Pipe Type Invert Elev. ft. AMSL Production Depth inches Stub #1 15 in.0 °ADS HP 10.80 ft.30.00 in. Stub #2 Stub #3 Stub #4 Stub #5 Stub #6 CUSTOMER NOTES PART CODES 2499CGD; This product is made to order and non-Refundable Nyloplast, 3130 Verona Ave. Buford, GA 30518. (866) 888-8479 Nyloplast® is a registered trademark of Advanced Drainage Systems® Nyloplast® is not responsible for accuracy of shop drawings submitted by customer through Basin Configurator. Submission of shop drawings for purchase and fabrication constitute an approval for production as designed by customer. DRAIN BASIN SHOP DRAWING PO# Part Number 2824AG5 Customer approval Project Name Harmony Commons Lot 2 Review Drawings Prepared By Josh McDonald Nyloplast 720-252-2481 Joshua.McDonald@ads-pipe.com Dia.24 Structure No.INLET 3 Qty.1 Grate 24; Domed; Accessories Rim Elev.13.30 ft. Basin Height 39 in. Sump Depth 6.00 in. Stub size Angle Pipe Type Invert Elev. ft. AMSL Production Depth inches Stub #1 15 in.0 °ADS HP 10.55 ft.33.00 in. Stub #2 15 in.180 °ADS HP 10.55 ft.33.00 in. Stub #3 Stub #4 Stub #5 Stub #6 CUSTOMER NOTES PART CODES 2499CGD; This product is made to order and non-Refundable Nyloplast, 3130 Verona Ave. Buford, GA 30518. (866) 888-8479 Nyloplast® is a registered trademark of Advanced Drainage Systems® Nyloplast® is not responsible for accuracy of shop drawings submitted by customer through Basin Configurator. Submission of shop drawings for purchase and fabrication constitute an approval for production as designed by customer. DRAIN BASIN SHOP DRAWING PO# Part Number 2830AG5 Customer approval Project Name Harmony Commons Lot 2 Review Drawings Prepared By Josh McDonald Nyloplast 720-252-2481 Joshua.McDonald@ads-pipe.com Dia.30 Structure No.INLET 2 Qty.1 Grate 30; Domed; Accessories Rim Elev.13.30 ft. Basin Height 46.12 in. Sump Depth 10.00 in. Stub size Angle Pipe Type Invert Elev. ft. AMSL Production Depth inches Stub #1 24 in.0 °ADS HP 10.29 ft.36.12 in. Stub #2 15 in.270 °ADS HP 10.29 ft.36.12 in. Stub #3 Stub #4 Stub #5 Stub #6 CUSTOMER NOTES PART CODES BASIN UPSIZED TO MEET MINIMUM ANGLE REQUIREMENTS 3099CGD; This product is made to order and non-Refundable Nyloplast, 3130 Verona Ave. Buford, GA 30518. (866) 888-8479 Nyloplast® is a registered trademark of Advanced Drainage Systems® Nyloplast® is not responsible for accuracy of shop drawings submitted by customer through Basin Configurator. Submission of shop drawings for purchase and fabrication constitute an approval for production as designed by customer. DRAIN BASIN SHOP DRAWING PO# Part Number 2824AG5 Customer approval Project Name Harmony Commons Lot 2 Review Drawings Prepared By Josh McDonald Nyloplast 720-252-2481 Joshua.McDonald@ads-pipe.com Dia.24 Structure No.INLET 1 Qty.1 Grate 24; Domed; Accessories Rim Elev.13.50 ft. Basin Height 46.56 in. Sump Depth 6.00 in. Stub size Angle Pipe Type Invert Elev. ft. AMSL Production Depth inches Stub #1 24 in.0 °ADS HP 10.12 ft.40.56 in. Stub #2 24 in.183 °ADS HP 10.12 ft.40.56 in. Stub #3 Stub #4 Stub #5 Stub #6 CUSTOMER NOTES PART CODES 2499CGD; This product is made to order and non-Refundable Nyloplast, 3130 Verona Ave. Buford, GA 30518. (866) 888-8479 Nyloplast® is a registered trademark of Advanced Drainage Systems® Nyloplast® is not responsible for accuracy of shop drawings submitted by customer through Basin Configurator. Submission of shop drawings for purchase and fabrication constitute an approval for production as designed by customer. DRAIN BASIN SHOP DRAWING PO# Part Number 3024AGR5 Customer approval Project Name Harmony Commons Lot 2 Review Drawings Prepared By Josh McDonald Nyloplast 720-252-2481 Joshua.McDonald@ads-pipe.com Dia.24 Structure No.2X3 CURB INLET 1 Qty.1 Grate 24; 2x3 Curb Frame and Hood H-20 High Flow; Accessories Rim Elev.13.43 ft. Basin Height 47.4 in. Sump Depth 6.00 in. Stub size Angle Pipe Type Invert Elev. ft. AMSL Production Depth inches Stub #1 15 in.0 °ADS HP 9.98 ft.41.40 in. Stub #2 Stub #3 Stub #4 Stub #5 Stub #6 CUSTOMER NOTES PART CODES 3099CGRHF; 3099CGRFH; 24BASER; This product is made to order and non-Refundable Nyloplast, 3130 Verona Ave. Buford, GA 30518. (866) 888-8479 Nyloplast® is a registered trademark of Advanced Drainage Systems® Nyloplast® is not responsible for accuracy of shop drawings submitted by customer through Basin Configurator. Submission of shop drawings for purchase and fabrication constitute an approval for production as designed by customer. SUBMITTAL DOCUMENTS (FOR INFORMATION ONLY) 8"5'-0"8" 6'-4" 8" 3'-0" 8" 4'-4" VIEW P SCALE: 5/16" = 1'-0" A 1 Ø24" R&C CAST IN TOP BROOM FINISH P 1 VIEW A SCALE: 5/16" = 1'-0" DESIGN NOTES 1)MIN. DESIGN CRITERIA IS AS NOTED UNLESS OTHERWISE SPECIFIED 2)DESIGN LOADINGS: A.AASHTO HS - 20 - 44, W/ IMPACT. B.SOIL WEIGHT = 120 PCF C.EQUIV. FLUID PRESSURE = 40 PCF. D.80 PSF LATERAL LIVE LOAD SURCHARGE 3)CONCRETE 28 DAY COMPRESSIVE STRENGTH SHALL BE 6000 PSI (MIN.) 4)STEEL REINFORCEMENT: BAR, ASTM A-775 GRADE 60 5)CEMENT: ASTM C-150 SPECIFICATIONS PRODUCT WEIGHTS SECTION WEIGHT (LBS)VOLUME (CY) TOP 8,081 2.00 SLAB 2,745 0.68 TOTAL 10,826 2.67 #5 REBAR DOWELS @ 512" O.C. EMBEDDED WITH EPOXY BEFORE MANUFACTURING BEGINS* APPROVED W/ NO EXCEPTIONS TAKEN: APPROVED AS NOTED: REVISE AND RESUBMIT: SIGNATURE DATE *THIS MUST BE FILLED OUT B 2 C 2 D 2 MH JJ MARTIN & SONS HARMONEY COMMONS LOT 2 FORT COLLINS, CO 5' TYPE R INLET 146974 1820 E. HWY. 402, LOVELAND, CO 80537 PHONE: (970) 669-0535 FAX: (970) 669-0674 12/10/19 CUSTOMER T H I S D O C U M E N T I S T H E P R O P E R T Y O F O L D C A S T L E P R E C A S T , I N C . IT IS CONFIDENTIAL, SUBMITTED FOR REFERENCE PURPOSES ONLY AND SHALL NOT BE USED IN ANY WAY INJURIOUS TO THE INTERESTS OF, OR WITHOUT THE WRITTEN PERMISSION OF OLDCASTLE PRECAST, INC. COPYRIGHT © 2019 OLDCASTLE PRECAST, INC. ALL RIGHTS RESERVED. SUBMITTAL DRAWING 8" SLAB - BILL OF MATERIALS #QTY U/M DESCRIPTION ITEM # 1 4 EA 43 4" MBV6671 V-ANCHOR ANCHU4 7 4 EA 4 TON 43 4" DB-52 LIFTPIN4475 2.67 CY #5 LOVELAND SCC MIX 8650175 TOP - BILL OF MATERIALS #QTY U/M DESCRIPTION ITEM # 1 4 EA 43 4" MBV6671 V-ANCHOR ANCHU4 2 1 EA CHANNEL W/TRASH BAR ASSY CHANNEL5 3 4 EA MH STEPS STEPDRILLRET 4 1 EA CASTING 24" RING-INVERTED CIB5306R 5 1 EA CASTING 24" COVER, XH FLAT CIA1161CSTAX 6 2 EA #6 EPOXY REBAR RINGS BBHOOPS 2.00 CY #5 LOVELAND SCC MIX 8650175 714" 4' -3 3 4" VIEW C SCALE: 5/16" = 1'-0" VIEW B SCALE: 5/16" = 1'-0" VIEW D SCALE: 5/16" = 1'-0" SEE NON-SKID DETAIL NON-SKID DETAIL N.T.S. 3 4" 714" 8" 83 4" 8" WALL 3 4" 8" 4' -3 3 4" 714" 3 4" 8" 4' -3 3 4" 714" 3'-11 " RIM:4913.54' INV:4909.64' 3'-11 " RIM:4913.54' INV:4909.64' 4' -3 3 4" 8" 714" Ø34" X 48" SKEWED HOLE FOR Ø24" X 38" HERCP Ø25" X 53" SKEWED HOLE FOR (2)Ø18" ADS 2'-10 " 10 " 4'-5" 3 4" 2'-1" 1'-7" 4'-0" 7" 7"