HomeMy WebLinkAboutLot Certifications - 07/21/2020 (3)//1 Page 1
CERTIFICATION OF LOT GRADING
Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e)
Date:
Address:
Lot: Block:
Subdivision:
Permit Application #:
Larimer County Parcel #:
Larimer County Reception #:
(on development agreement)
I, (print) , a Colorado registered professional engineer, verify that construction
of all stormwater facilities and grading is complete and hereby submit this certification.
Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an
explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots.
1. Certification includes attached Stormwater-approved grading plan. (NOTE: City’s
Building Department does not approve grading plans).
2. Certification includes the attached as-built survey dated (must be within 60
days of the date the certification is submitted) accurately and truthfully depicting
elevations for:
z Top of foundation/finished floor
z Finished grade on each side of the structure
z Quarter points along each lot line (not more than 50 feet apart)
z Break points/high points
z Swales
z Berms
z Retaining walls
z Air conditioning pads
z Window wells
z Any other appurtenance(s) within an easement
ϯ͘All elevations are within a 0.2 foot tolerance of the approved grading plan.
ϰ͘The top of foundation is at least 6 inches above the highest grade surrounding the
structure.
ϱ͘There is a minimum grade of 5% away from the structure within the first 5 to 10 feet
adjacent to the residence.
ϲ͘All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single
family lots when the swale is draining the runoff from only two adjoining properties)
and are not steeper than ϯϯ% (ϯ:1).
ϳ͘All flow lines of stormwater drainage swales are a minimum of 6 inches below the
elevation of ground adjacent to the structure and will direct drainage as shown on the
Stormwater-approved grading plan.
ϴ͘All downspout locations and discharge directions are shown on the as-built survey.
Runoff is directed into an appropriate drainage system or lot line swale, and it is not
directed onto neighboring properties.
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
JFS
JFS
JFS
JFS
JFS
JFS
JFS
JFS
November 6, 2019 Harmony 23
4701 Strauss Cabin Road (I)B1706465,(J)B1706467,(N)B1706471
Building "I", "J" and "N" 8604143001
1 1 20170069536
Jonathan F. Sweet
Oct 2019
Certification of Lot Grading
Harmony 23 – Building “I”, “J”, and “N”
Item #3 on the Certification of Lot Grading has been initialed “No” due to required
field changes. It was determined during construction that the AC units did not
have enough clearance between the building face and back of walk in several
areas and therefore the detached walk was shifted to 4’ off the building face
rather than the 3’ shown on the approved grading plan for Harmony 23. This
required some grading changes in excess of 0.2’, but is still in compliance with
general drainage patterns shown on the approved plan.
51.1
4
51
.
4
7
51.
4
9
51
.
4
4
51
.
3
9
52.0
5
52.09