Loading...
HomeMy WebLinkAboutLot Certifications - 12/01/2023 (2)Date . November 29,2023 Address' 1655 Greenstone Trail Subdivision: greenstone pud phase 3 Permit Application #: 82202243_________________ Larimer County Parcel #: 8b18405099 Lot:99 Block:Larimer County Reception #:_ (on development agreement) msmmgmmms I, (print) Megan L. Keefe a Colorado registered professional engineer, verify that construction of all stormwater facilities and grading is complete and hereby submit this certification. Please answer the following questions by initialing the appropriate response. For each question initialed No, attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots. 1. Certification includes attached Stormwater-approved grading plan. (NOTE: City's No_____Yes Building Department does not approve grading plans). 2. Certification includes the attached as-built survey dated 11/16/23 (must be within 60 No__________________Yes days of the date the certification is submitted) accurately and truthfully depicting elevations for: • Top of foundation/finished floor • Finished grade on each side of the structure • Quarter points along each lot line (not more than 50 feet apart) • Break points/high points • Swales • Berms • Retaining walls • Air conditioning pads • Window wells • Any other appurtenance(s) within an easement 3. All elevations are within a 0.2 foot tolerance of the approved grading plan. 4. The top of foundation is at least 6 inches above the highest grade surrounding the structure. 5. There is a minimum grade of 5% away from the structure within the first 5 to 10 feet adjacent to the residence. 6. All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than 33% (3:1). 7. All flow lines of stormwater drainage swales are a minimum of 6 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Stormwater-approved grading plan. 8. All downspout locations and discharge directions are shown on the as-built survey. Runoff is directed into an appropriate drainage system or lot line swale, and it is not directed onto neighboring properties. No Yes No Yes pj^L No Yes [C No YeS/^^l No YesJ^C No Page 12/14/17 9. A smooth transition with no vertical offset (step) in grade is provided at the lot line to all No adjacent properties. 10. The grading of this lot does not adversely affect neighboring properties or City No infrastructure. 11. Landscaping has been completed prior to survey. If not, please indicate who will be No responsible for completing landscaping:________________________________ 12. Final site cleanup has been completed. No 13. I personally visited the site as part of the certification process, and in my professional No opinion, the as-built survey is an accurate representation of the site conditions. Yes C Yes Yes ^ Yes.|J^L Yes 14. Based on this information, I certify that (check one): The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). □ The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. DU z O' O / Or !Al- PE Stamp Sign and date Name: Megan Keefe Email: meg@>keefecivi!.com Phone: 970~215-6808 Company: Keefe Civil, Inc._____________ Address* 5125 Crockett Street Fort Collins, Colorado 80526 NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) Mailing Address Questions? vVaterUtilitiesEng@fcgov.com Fort Collins Utilities 970-221-6700 ATTN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 —City of. Fort Collins 2/14/17 Page 2 This unofficial copy was downloaded on Jan-07-2021 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact Engineering Office 281 North College Fort Collins, CO 80521 USA PROPOSED FUTURE GARAGE FUTURE SHOP FUTURE PAVED DRIVEWAY LOT 99 FF = 4954.9' TF = 4950.7' FG = 4949.5' GRE E N S T O N E T R A I L BL U E W A T E R C O U R T GRE E N S T O N E T R A I L BL U E W A T E R C O U R T RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 1 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) 16 5 5 G R E E N S T O N E T R A I L ER O S I O N C O N T R O L P L A N 6/15/22 1" = 20' N/A JTC JTC 22-1053-00 01 EC 1 2 CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R LEGEND NOTES: 1.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH OWNER'S APPROVAL FOR REMOVAL. 2.THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND MINIMIZE DOWNSTREAM WATERWAY POLLUTION. 3.LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION. 4.SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS. 5.ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED AREAS. 6.AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE THE SOIL. 7.NO DEBRIS OR SEDIMENT SHALL BE TRACKED ONTO ALLEY OR PUBLIC STREET. IN CASE ANY TRACKING DOES OCCUR, CONTRACTOR SHALL SWEEP AND CLEAN IMMEDIATELY. 8.SEE SHEET 2 FOR SUPPORTING DETAILS AND CITY OF FORT COLLINS EROSION CONTROL NOTES. N W E S0 SCALE: 1" = 20' 40201020 ABBREVIATIONS CWA CONCRETE WASHOUT AREA FFE FINISHED FLOOR ELEVATION FG FINISHED GRADE IP INLET PROTECTION LOD LIMITS OF DISTURBANCE RS ROCK SOCK SCL SEDIMENT CONTROL LOG TF TOP OF FOUNDATION EX MAJOR CONTOUR EX MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR SEDIMENT CONTROL LOG ROCK SOCK INLET PROTECTION