HomeMy WebLinkAboutSite Certifications - 08/14/201812/15 Page 1
OVERALL SITE and DRAINAGE CERTIFICATION
Commercial, Multi-Family and Subdivision Certification Form and Checklist
Project Name:
Date:
Building Permit Numbers:
(Commercial or multi-family)
Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Volume 1, Section 6.11, please fill in
all applicable items in this Certification Form for Commercial, Multi-Family and Overall Single Family sites.
NOTE: several items must be verified during construction. A copy of the approved grading plan must be
submitted with the as-built grading plan. (As-built elevations must be written in red next to the approved
elevations.)
•Use “Yes” for items completed as described.
•Use “N/A” for items that are not applicable to the site being certified.
•If any blanks are “No,” attach an explanation referencing the item number below.
Attach an explanation or description of the as-built condition for any items listed or for anything not listed but
shown on the approved construction plans.
Provide an as-built redline or Mylar drawing with the following:
I.Water Quality and Quantity Detention Basin Certification - FCSCM Vol.2, Ch.10
For multiple detention basins on a site, provide the following for each basin separately:
A. Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and
volume verification calculations for the water quality capture volume and the 100-year detention storage
volume.
1. Detention basin topography was prepared by a professional land surveyor registered in the state
of Colorado.
2.Both proposed and as-built contours are shown on the same plan sheet (dashed lines for
proposed and solid lines for as-built).
3.All critical spot elevations as shown on the approved construction plans have been verified and
the as-built elevations are shown on the plan sheet.
4.Stage-storage-discharge tables are provided on a separate document.
5.Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92-
602(8) is attached and has been uploaded to the Statewide Compliance Portal
(tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include:
a.The cover sheet from the approved drainage report
b.The stamped certification page from the approved drainage report
c.As-built topographic survey
d.Stamped certification page from the Overall Site & Drainage Certification
e.PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet
Wes Lamarque
8/14/2018
12/15 Page 2
B.Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is
a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of
the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2%
grade requirement.
1.Low Flow: Choose one of the following detention basin low flow options as applicable:
a. Turf swale for low flow path in detention basin.
There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade
is .
b.Concrete pan for low flow in detention basin.
There is a concrete pan installed that meets the grades as shown on the approved construction
plans. (Show as-built spot elevations.)
c.Soft pan for low flow in detention basin.
•Verify and document the soft pan material gradation, trench width and depth - to be verified
during construction by engineer. Picture documentation is preferred or engineer’s statement of
visual inspection and compliance. (Choose one below.)
o There is a soft pan with an underdrain installed that meets the design on the approved
construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations,
bends, cleanouts, etc.)
o There is soft pan installed without an underdrain but there is a type A or B soil. The soil
type must be documented by supplying verification from a registered professional geotechnical
engineer.
NOTE: Spot elevations are to be within 0.2 ft. +/-.
2. Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown.
Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed
is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re-
graded. Provide documentation if a variance was granted for steeper slopes during the design process.
3.Spillway Certification: The following items must be field verified:
a.The location of the spillway is indicated on the as-built plan.
b.The width of the spillway is indicated on the as-built plan.
c.The elevation(s) of the spillway is shown on the as-built plan.
d.A concrete ribbon defines the location and grade of the spillway.
e.There is downstream scour protection in the spillway as per the construction plans. Indicate
type: (riprap size “D50” gradation and bedding type, geotextile, buried
riprap with inches of bury, etc.).
f.There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape
features, rocks, etc.
12/15 Page 3
4.Outlet Structure Certification
a.The orifice plate for the approved release rate is installed with the correct size and location of
the orifice.
b.The orifice plate for the water quality outlet is installed with the correct hole size, number of
rows and columns of holes.
c.The bottom hole on both the water quality and quantity outlets are at the bottom of the plate
so no water ponds in front of the plate.
d.The well screen is the correct material and is installed as shown on the construction plans.
e.100-year overflow grate elevation is . (Elev. A on detail D-46)
f.The top elevation of the water quality capture volume is . (Elev. B on detail
D-46)
g.Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the
top and bolted at the bottom.
h.The bottom of the outlet box has no obstructions or misalignments that will cause it to retain
runoff water and is sloped at 2% towards outlet.
II.Channels/Swales - FCSCM Vol.1, Ch.7, Sect.3&4
A. Capacity: The as-built capacity of all the major channels and swales has been verified. They meet
or exceed capacity requirements shown in the approved drainage study for this project.
1.All swales are located within the drainage easements as shown on the construction plans.
2.Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires
longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these
criteria are not met, the certification engineer will write a justification and propose mitigation for each
instance or have the issues corrected. If variances to these criteria have previously been approved and
are shown on the construction plans, no justification is needed.
3.As-built spot elevations on channels/swales are shown that correspond to spot elevations
shown on the approved construction plans.
4.All permanent erosion control measures are installed as shown on the approved construction
plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used
as part of this verification.)
5.All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the
system. (Pictures at tie-in points suggested.)
6.The minimum freeboard is provided for all channels and swales as shown on the approved
construction plans or as identified in the approved drainage study. (Show the freeboard provided on
the cross-sections as on the construction plan set or attached as separate documentation.)
7.The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees,
shrubs, sod, etc. infringe on the low flow portion of channels or swales.)
12/15 Page 4
III.Storm Pipes (aka storm drains) - FCSCM Vol.1, Ch.6, Sec. 4
A. Storm Drain Pipe Capacity: The as-built capacity of all pipes installed on this project has been
verified and meets or exceeds the capacity requirements shown in the approved drainage study for this
project.
1.All storm drain pipe sizes and materials have been verified and are in conformance with the
approved construction plans. (Indicate on the plan and profile sheets that they have been verified.)
Material and size substitutions must be approved prior to installation. If a pipe size or material was
changed during construction, the certification engineer must attach the approval documents or supply
them with this certification. Approval documents must include a calculation documenting the capacity
equivalency (equal or greater) of the substituted size.
2.The longitudinal slope of the pipe is as shown on the approved construction plans. The
acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans
must be justified with capacity calculations on an attached sheet.
3.The as-built invert elevations have been verified and are shown on the plan and profile sheets of
the approved construction plans.
B.Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the
approved construction plans.
1.The minimum cover requirements for all pipes have been met as shown on the approved
construction plans. These will be called out in critical locations.
2.All encasements and clearances as specified on the approved construction plans have been met.
3.Any specific joint types or construction methods specified on the approved construction plans
have been met. (List on a separate sheet and attach to this certification.)
IV.Concrete Pans - FCSCM Vol.1, Ch.7, Sec.4.1.3.4
A. Construction/Installation: All concrete pans have been constructed in accordance with the
approved construction plans.
1.The concrete pans are the correct size/width as shown on the approved construction plans.
2.The longitudinal slopes of the pans are as shown on the approved construction plans. The
certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless
a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or
justification by separate document.
3.The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross-
section is “V” shaped and meets the side slope shown on the detail.)
4.The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4
inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide
documentation of the reinforcement used if different than shown on the details or on the approved
construction plans.)
5.The spot elevations shown on the concrete pan(s) have been verified and are shown on the as-
built drawings.
12/15 Page 5
V. Storm Drain Inlets - FCSCM Vol.1, Ch.6, Sec. 3
A. Construction/Installation: All storm drain inlets have been constructed in accordance with the
approved construction plans.
1.The size and type of inlets are consistent with the inlets shown on the approved construction
plan. Indicate by writing “Verified” on each inlet on the plan sheet or list on a separate document the
inlet number(s), type and size (length). If the inlet installed is other than the one on the approved
construction plan detail sheet, provide the name and source of the detail with justification for equal or
better capacity.
2.The size of the inlet opening is consistent with the approved detail. (Check height and width.)
3.The elevation of the grate (if applicable) is at the elevation shown on the street profile or as
indicated by a spot elevation on the construction plans.
4.The as-built invert elevations of all pipes entering and leaving the inlet are shown on the plan
and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide
justification and capacity calculations to show the capacity is not affected or propose mitigation.
5.The as-built size of the inlet box is as shown on the construction plans or an explanation or
justification is attached.
6.All inlet covers are stenciled or stamped with the following designation: NO DUMPING – DRAINS
TO POUDRE RIVER.
VI.Culverts - FCSCM Vol.2, Ch.9
A. Construction/Installation: All culverts have been constructed and/or installed in accordance with
the approved construction plans.
1.All culvert sizes have been verified as indicated on the as-built construction plans as correct.
2.The culvert material type for all culverts installed is as on the approved construction plans and is
indicated on the as-built plans.
3.The as-built invert “in and out” elevations have been verified and are indicated on the as-built
construction plans.
4.The culvert headwalls or wing walls have been installed as shown on the approved construction
plans. Headwalls or wing walls may be needed in the as-built conditions onsite if the slopes adjacent to
the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative.
An alternative to consider is a turf reinforcement mat (TRM).
VII.Sub-Drains
A. Construction/Installation: All sub-drains shown on the construction plans have been installed in
accordance with those plans. Sub-drains installed with the sanitary sewer are to be verified on the
sanitary sewer plan and profile sheets of the construction plans. (NOTE: Indicate any sub-drains installed
after the plans were approved on the as-built plans.)
1.The size of the sub-drains are as approved on the construction plans and are indicated on the as-
built plans.
2.The type of sub-drain, in particular the perforated and non-perforated sections of the drain, are
as indicated on the approved construction plans.
12/15 Page 6
3.The cover requirements per the construction plans are provided.
4.The cleanouts have been installed at the locations shown on the construction plans and are
accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations
marked.)
5.The backfill materials for sub-drains are as shown on the approved construction plans. (This
includes the type, depth and width.)
6.The geo-textile liner completely wraps the sub-drain and the permeable backfill material unless
shown otherwise on the approved construction plans. (Sub-drain pipe wrapped in a sock filter material
is accepted only if approved prior to installation.)
VIII.Curb Cuts
A. Construction: All curb cut openings are constructed in accordance with the approved construction
plans.
1.The size (width) of the curb cut opening is as shown on the approved construction plans.
2.The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth
transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb
cut.
IX.Sidewalk Culverts & Chases
A. Construction/Installation: All sidewalk culverts have been installed at the locations shown on the
approved construction plans.
1.The size (width and length) of the culverts are as shown on the approved construction plans.
2.The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the
detail shown on the approved construction plans or per the City’s detail.
3.The sidewalk culvert invert “in and out” elevations have been verified and are indicated on the
as-built plans.
4.The sidewalk culvert opening is as shown on the approved construction plans or per the City’s
detail.
5.There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no
obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert.
X. Site Grading
A. Construction: All common open spaces have been graded in accordance with the approved
construction plans.
1.The grading on all common open spaces bordering private lots has been verified as correct and
the as-built rear lot corner elevations have been shown on the as-built plans.
12/15 Page 7
2.The as-built contours for “overlot grading” are shown on the as-built construction plans for all
common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the
situation for noncompliance and when it may be corrected. An escrow for overlot grading may be
required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site
Certification. It is understood that residential lots will be brought to final grade once the foundation is
backfilled so they may be lower than the plan shows at this Overall Site Certification stage.)
3.All turf reinforcement mats (TRMs) have been installed as shown on the approved construction
plans and the slopes are stabilized.
XI.Riprap - FCSCM Vol.1, Ch.7, Sec.4.4.4.3
A. Construction: All riprap has been installed in the locations and sizes indicated on the approved
construction plans.
XII.Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7
A. Construction: All fabric has been installed in the locations and sizes indicated on the approved
construction plans.
1.All fabric was installed per the details on the approved construction plans.
XIII.Post-Construction Site Cleanup - FCSCM Vol.3, Ch.7
A. Construction: All construction debris and obstructions of any kind have been removed from
drainage paths.
1.All construction debris has been removed except in staging area(s).
2.All ruts have been smoothed out in all construction areas.
3.All areas needing reseeding have been identified and future stabilization goals have been
coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note
the area needing stabilization in the narrative.
XIV.Certification of Other Permanent BMPs - FCSCM Vol.2, Ch.8, Sec.2 & FCSCM Vol.2, Ch.12
A.The construction of channel drop structures is in accordance with the approved plan both in
location, horizontal dimensions and cross-section.
XV.Certification of LID and Water Quality Facilities - FCSCM Vol.3, Ch.4
A.Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and
other items to be verified during construction, along with pictures and other required documentation.
12/15 Page 1
DURING CONSTRUCTION INSPECTION CHECKLIST
To be completed by Construction Superintendent
This checklist is to be completed during construction and included with the Overall Site and Drainage Certification.
•Use “Yes” for items completed as described.
•Use “N/A” for items that are not applicable to the site being certified.
•If any blanks are “No,” attach an explanation referencing the item number below.
I.Compaction
A.All berms and embankments meet the compaction requirements as specified in the project geotechnical report or comply with the
City’s standard, which is “soils should be compacted within a moisture content range of 2% below to 2% above optimum moisture content
and compacted to 95% of the Maximum Standard Proctor Density (ASTM D698).” Compaction requires verification during construction.
Provide testing log from contractor/engineer.
II.Storm Drain Pipe Installation Requirements
A.The pipe trenches have been compacted in accordance with Section 02225-3.07.A.1. of the Fort Collins Development Construction
Standards (e.g., the trenches in the roadways are to be 95% of maximum density and all other areas are to be at 90%, both in accordance
with ASTM D698).
III. Riprap - FCSCM Vol.1, Ch.7, Sec.4.4.4.3
A.The riprap bedding is a granular bedding of the gradation and thickness indicated on the approved construction plans.
B.A filter fabric was installed instead of granular bedding and is the material shown on the approved construction plans or was an
approved equal. Provide documentation for an approved equal.
C.The riprap is the gradation shown on the approved construction plans with a D50 of .
D.The riprap thickness is as shown on the approved construction plans and extends to the horizontal limits shown.
E.The riprap is buried to the depth indicated on the approved construction plans. (A minimum of 6 inches of soil is required.)
IV. Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7
A.All fabric was installed per manufacturer’s specifications.
V. Certification of Other Permanent BMPs - FCSCM Vol.2, Ch.8, Sec.2 & FCSCM Vol.2, Ch.12
A.All cut-off walls have been installed in accordance with the approved construction plans. (Cut-off walls are required for irrigation
ditch crossings of storm drain pipes and at the end of flared end sections.)
12/15 Page 2
Permeable Interlocking Concrete Pavers
Post-excavation infiltration rates are consistent with design
infiltration capacity (for “full or partial infiltration” designs)
Impermeable liner meets design specifications
Impermeable liner attached to concrete perimeter wall
Impermeable liner is not exposed
Any penetrations of the impermeable liner have been sealed
and checked for water-tightness.
Meets specifications for:
-Dimensions
-Reinforcement
-Footings
Underdrain pipe is per design specifications
At least one cleanout is provided per underdrain lateral
Cleanout pipe is not perforated
Cleanout covers are installed and watertight
Underdrain is NOT wrapped in geotextile fabric
Underdrain orifice plate installed at outlet structure
Underdrain integrity tested after backfilling using TV and/or
water test
Base coarse (e.g., #2/4) has 90% fractured faces
Bedding coarse (e.g., #89) is thoroughly washed
Sub-base materials are installed and compacted according to
manufacturer’s specifications
PICP area is protected from construction site sediment,
including runoff from the upstream catchment and
Close Out
12/15 Page 3
Bioretention Cells
Heavy equipment did not travel over bioretention cell during
excavation
Bottom of cell was “ripped” after excavation Photograph before/after “ripping”
Bottom of cell is flat and level Photograph
Excavated area is protected/surrounded by sediment/runoff
control BMPs during construction
Photograph
Overflow inlet elevation is set above bioretention media per
plan (typically 12 inches)
Overflow inlet invert elevation is at least 3 inches below
containment wall/berm (to direct overflow into inlet)
Measure/record distance between inlet and top of
containment wall/berm
Upstream catchment drains to inlet
Forebay is installed according to design specifications
Forebay has flat, concrete bottom
Outlet structure/overflow elevation is confirmed Measure/record distance from overflow to top of media
filter
Impermeable liner meets design specifications
Impermeable liner attached to concrete perimeter wall
Impermeable liner is not exposed
Underdrain pipe is per design specifications
At least one cleanout is provided per underdrain lateral
Cleanout pipe is not perforated
Cleanout covers are installed and watertight
Underdrain is NOT wrapped in geotextile fabric
Underdrain orifice plate installed at outlet structure
Underdrain integrity tested after backfilling using TV and/or
water test
12/15 Page 4
Filter Media
Filter media composition is per design specifications
Filter media was “machine mixed” by supplier prior to delivery
Filter media installed flat and level
Other Structural Components
Containment wall/berm is continuous and level
Landscaping
Final landscaping does NOT include sod
Final landscaping (wood/rock mulch) is flat and level
Vegetation is planted according to landscape design
specifications
Verify that weed barrier is not installed
Temporary irrigation installed If N/A, then verify that permanent irrigation is installed to
establish/maintain vegetation
Close Out
Upstream catchment stabilized prior to diverting runoff into
bioretention cell
Signature:
Name:
Title:
Email:
Phone:
Company:
Address:
4900
4905
4910
4915
4920
4925
4930
4935
4900
4905
4910
4915
4920
4925
4930
4935
9+50 10+00 11+00 12+00 13+00 14+00 15+00 16+00
ST
M
H
1
-
3
ST
A
1
2
+
2
3
.
4
8
RI
M
4
9
1
9
.
9
±
IN
V
.
I
N
4
9
1
3
.
9
7
(
N
E
)
IN
V
.
O
U
T
4
9
1
3
.
9
7
(
S
W
)
ST
M
H
1
-
2
ST
A
1
1
+
7
7
.
3
2
RI
M
4
9
1
9
.
6
±
IN
V
.
I
N
4
9
1
3
.
8
3
(
N
E
)
IN
V
.
O
U
T
4
9
1
3
.
8
3
(
S
E
)
8" WATER
STA.=13+80.77
TOP=0.00
STA.=13+70.68
INV.= 4909.54
8" SANITARYSTA.=10+15.21
INV.= 4906.90
12" SANITARY
EXISTING
GROUND
PROPOSED
GRADE
OU
T
L
E
T
1
-
5
ST
A
1
5
+
4
0
.
0
1
IN
V
.
I
N
4
9
1
5
.
0
3
(
E
)
IN
V
.
O
U
T
4
9
1
5
.
0
3
(
W
)
42.35 LF
15" RCP
@ 0.33%
ST
M
H
1
-
4
ST
A
1
4
+
9
7
.
6
6
RI
M
4
9
2
0
.
9
±
IN
V
.
I
N
4
9
1
4
.
8
9
(
E
)
IN
V
.
O
U
T
4
9
1
4
.
8
9
(
S
W
)
274.19 LF 15" RCP @ 0.34%
46.16 LF
15" RCP
@ 0.30%
138.89 LF 15" RCP @ 0.33%
ST
M
H
1
-
1
ST
A
1
0
+
3
8
.
4
3
RI
M
4
9
1
8
.
3
±
IN
V
.
I
N
4
9
1
3
.
3
8
(
N
W
)
IN
V
.
O
U
T
4
9
1
3
.
3
4
(
S
)
ST
M
H
1
ST
A
1
0
+
0
0
.
0
0
RI
M
4
9
1
7
.
4
±
IN
V
.
I
N
4
9
1
2
.
9
6
(
N
)
IN
V
.
I
N
4
9
1
2
.
8
2
(
E
)
IN
V
.
O
U
T
4
9
1
2
.
8
2
(
W
)
38.43 LF
15" RCP
@ 1.00%
18" MIN.
100-YR HGL
5.91 LF 20"
STEEL CASING
PUBLIC PRIVATEPRIVATE
S
S
S
S
S S
SS
SS
SS
SS SS SS SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
CS
S
CS
CS
S
CS
HYD
S CS
W
h2o
S
CS
S
CS
S
CS
S
CS
S
CS
CS
S
CS
S
CS
S
CS
S
S
CS
CS
S
CS
S
S
CS
util
util
util
util
util
utilutil
util
util
util
util
util
V.P
.
D
D
ST
ST
ST
ST
S
DD
D S S
S
S
S
C.O
.
C.O
.
ST ST ST ST ST
SS
SS
SS
SS
SS
SS
MH
STMH 1-4
STA 14+97.66
N: 126636.41
E: 217546.56
STMH 1-3
STA 12+23.48
N: 126442.53
E: 217352.68
STMH 1-2
STA 11+77.32
N: 126420.70
E: 217312.01
STMH 1-1
STA 10+38.43
N: 126294.58
E: 217370.17
STMH 1
STA 10+00.00
N: 126256.23
E: 217367.75
OUTLET 1-5
STA 15+40.01
N: 126631.11
E: 217588.57
38.43 LF
15" RCP
@ 1.00%
46.16 LF
15" RCP
@ 0.30%
274.19 LF 15" RCP @ 0.34%
42.35 LF
15" RCP
@ 0.33%
13
8
.
8
9
L
F
1
5
"
R
C
P
@
0
.
3
3
%
SANITARY SEWER A4s
SEE SHEET SS3
SANITARY SEWER A4n
SEE SHEET SS3
SANITARY SEWER A
SEE SHEET SS1
LOT
8
LOT
9
LOT
45LOT
44
LOT
43
LOT
42
LOT
28
LOT
27
LOT
26
LOT
25
OUTLOT D
OUTLOT CLOT
46
LOT
47
OUTLOT E
FOX GROVE DRIVE
FND 12" REBAR
w/ PLASTIC CAP
LS 7839
N:126224.08
E:217502.99
N7
6
°
3
7
'
5
0
"
W
13
9
.
0
1
'
S
S
SS
SS
SS
SS
SS
SS
CS
S
S
CS
S
CS
CS
HYD
S
CS
S
CS
S
W h2
o
FES
FES
FES
D
ST
S
S
C.
O
.
C.
O
.
C.
O
.
X
X
X
X
X
X
SAN
I
T
A
R
Y
S
E
W
E
R
A
4
s
LOT
11
LOT
13
LOT
14
LOT
15
LOT
16
LOT 12
OUTLOT C
DRYWELL 2-1
STA 10+21.00
N: 126669.26
E: 217744.93
INLET 2-3
STA 10+64.98
N: 126713.22
E: 217745.73
INLET 2-2
STA 10+34.98
N: 126683.22
E: 217745.57
FES 2
STA 10+00.00
N: 126650.12
E: 217736.29
30.00 LF
18" RCP
@ 0.30%
13.97 LF
24" RCP
@ 0.30%
21.00 LF
12" PVC
@ 1.00%
SANITARY SEWER A
SEE SHEET SS2
STORM DRAIN LINE 2-1
SEE SHEET ST2
STORM DRAIN LINE 2-1
SEE SHEET ST2
S18°42
'
4
7
"
W
127.93
'
FND 12" REBAR
NO CAP
N:126834.38
E:217786.78 FO
X
G
R
O
V
E
D
R
I
V
E
4900
4905
4910
4915
4920
4925
4930
4935
4900
4905
4910
4915
4920
4925
4930
4935
9+5010+0011+0011+50
FE
S
2
ST
A
1
0
+
0
0
.
0
0
IN
V
.
I
N
4
9
1
6
.
0
0
(
N
E
)
21.00 LF
12" PVC
@ 1.00%
DR
Y
W
E
L
L
2
-
1
ST
A
1
0
+
2
1
.
0
0
RI
M
4
9
2
0
.
2
±
IN
V
.
I
N
4
9
1
5
.
0
6
(
N
)
IN
V
.
O
U
T
4
9
1
6
.
2
1
(
S
W
)
IN
V
.
O
U
T
4
9
1
6
.
2
1
(
W
)
IN
V
.
O
U
T
4
9
1
6
.
2
1
(
E
)
13.97 LF
24" RCP
@ 0.30%
IN
L
E
T
2
-
2
ST
A
1
0
+
3
4
.
9
8
FL
.
E
L
4
9
1
9
.
5
±
IN
V
.
I
N
4
9
1
5
.
1
0
(
N
)
IN
V
.
O
U
T
4
9
1
5
.
1
0
(
S
)
30.00 LF
18" RCP
@ 0.30%
IN
L
E
T
2
-
3
ST
A
1
0
+
6
4
.
9
8
FL
.
E
L
4
9
1
9
.
5
±
IN
V
.
O
U
T
4
9
1
5
.
1
9
(
S
)
8" WATER
STA.=10+54.98
TOP=0.00
STA.=10+44.98
INV.= 4910.98
8" SANITARY
PROPOSED
GRADE
EXISTING
GROUND
18" MIN.
5.90 LF 20"
STEEL CASING
PUBLIC PRIVATE
RIPRAP SEE
BURIED RIPRAP
SCHEDULE
KEYMAP
PROPOSED RIGHT-OF-WAY
EXISTING WATER MAIN
PROPOSED WATER MAIN
PROPOSED STORM SEWER
LEGEND:
NOTES:
1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL
UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW
CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL
UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN
UNDERGROUND UTILITIES.
2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL
SANITARY SEWER MAINS, WATER MAINS, AND SERVICES.
3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX
STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF
FLARED END SECTIONS.
4.ALL RCP SHALL BE CLASS III OR GREATER. PIPE MATERIAL, BEDDING, AND
INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF
FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE
R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE
'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR
RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE).
5.ALL STORM MANHOLES LOCATED IN SIDEWALKS AND TRAILS SHALL HAVE
PEDESTRIAN RATED LIDS.
6.MANHOLE DIAMETERS SHOWN ARE THE MINIMUM SIZE PER CITY STANDARD DETAIL
D-3. CONTRACTOR SHALL SHALL CONFIRM THAT MANHOLE DIAMETERS ARE
SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN
PRE-CASTER'S TOLERANCES, ETC.).
7.SLOTTED MANHOLE COVERS SHALL BE NEENAH R-2559, TYPE G, OR APPROVED
EQUAL.
8.ALL RIPRAP PAD TO BE BURIED. SEE RIPRAP DETAIL.
9.A FLOODPLAIN USE PERMIT MUST BE SUBMITTED TO AND APPROVED BY THE CITY OF
FORT COLLINS FLOODPLAIN ADMINISTRATION PRIOR TO CONSTRUCTION OF THE
FOLLOWING ITEMS: STORM SEWER (STORM LINE 8), SEWER AND WATERLINE
CONSTRUCTION IN VIXEN DRIVE, WATERLINE IN TRACT A AND LOT 1 LEE MLD,
ROADWAY CONSTRUCTION OF VIXEN DRIVE, AND FORT COLLINS LIGHT AND POWER
PRIMARY INSTALLATION FROM THE FRONTAGE ROAD.
10.A NO-RISE CERTIFICATION MUST BE SUBMITTED TO AND APPROVED BY THE CITY OF
FORT COLLINS FLOODPLAIN ADMINISTRATION PRIOR TO CONSTRUCTION OF THE
FOLLOWING ITEMS: STORM SEWER (STORM LINE 8), WATERLINE IN LOT 1 LEE MLD,
AND FORT COLLINS LIGHT AND POWER PRIMARY INSTALLATION ACROSS THE
FLOODWAY.
W
G
T
EXISTING STORM SEWER
EXISTING TELEPHONE
EXISTING GAS
EXISTING SANITARY SEWER SS
PROPOSED CURB & GUTTER
PROPOSED SANITARY SEWER
PROPOSED LOTLINE
EASEMENT LINE
PROPERTY BOUNDARY
EEXISTING ELECTRIC
PROPOSED STORM INLET
Sheet
Of 45 Sheets
FO
X
G
R
O
V
E
30
1
N
.
H
o
w
e
s
S
t
r
e
e
t
,
S
u
i
t
e
1
0
0
Fo
r
t
C
o
l
l
i
n
s
,
C
o
l
o
r
a
d
o
8
0
5
2
1
E
N
G
I
N
E
E
R
N
G
I
E
H
T
R
O
N
R
N
PH
O
N
E
:
9
7
0
.
2
2
1
.
4
1
5
8
ww
w
.
n
o
r
t
h
e
r
n
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
before you dig.Call
R
STORM DRAIN LINE 1
NORTH
ST1
PL
A
N
A
N
D
P
R
O
F
I
L
E
ST
O
R
M
D
R
A
I
N
L
I
N
E
S
1
&
2
STORM
DRAIN 1
PROFILE SCALE:
VERT. 1"=5'
HORIZ. 1"=50'
NORTH
PROFILE SCALE:
VERT. 1"=5'
HORIZ. 1"=50'
STORM
DRAIN 2
STORM DRAIN LINE 2
RECO
R
D
D
R
A
W
I
N
G
4905
4910
4915
4920
4925
4930
4935
4940
4905
4910
4915
4920
4925
4930
4935
4940
9+5010+0011+0012+0013+0013+50
ST
R
M
H
E
A
D
W
A
L
L
3
ST
A
1
0
+
0
0
.
0
0
IN
V
.
I
N
4
9
1
5
.
9
0
(
E
)
61.40 LF
24" RCP
@ 0.43%
ST
M
H
3
-
1
ST
A
1
0
+
6
1
.
4
0
RI
M
4
9
2
2
.
2
±
IN
V
.
I
N
4
9
1
6
.
1
6
(
E
)
IN
V
.
I
N
4
9
1
6
.
1
4
(
N
)
IN
V
.
O
U
T
4
9
1
6
.
1
6
(
W
)
148.79 LF 15" RCP @ 0.30%
ST
M
H
3
-
2
ST
A
1
2
+
1
0
.
1
9
RI
M
4
9
2
3
.
0
±
IN
V
.
I
N
4
9
1
6
.
5
9
(
N
E
)
IN
V
.
O
U
T
4
9
1
6
.
5
9
(
S
)
85.90 LF
15" RCP
@ 0.31%
OU
T
L
E
T
3
-
3
ST
A
1
2
+
9
6
.
0
9
IN
V
.
I
N
4
9
1
6
.
8
5
(
N
E
)
IN
V
.
O
U
T
4
9
1
6
.
8
5
(
S
W
)
STA.=10+84.59
INV.= 4908.18
12" SANITARY
STA.=12+32.01
INV.= 4909.41
8" SANITARY
8" WATER
STA.=12+46.18
TOP=0.00
EXISTING
GROUND
PROPOSED
GRADE
12" WATER
STA.=10+41.40
TOP=4913.83
18" MIN.
18" MIN.
11.00 LF 20"
STEEL CASING
7.54 LF 20"
STEEL CASING
PUBLIC
RIPRAP SEE
BURIED RIPRAP
SCHEDULE
FND 12" REBAR
w/ PLASTIC CAP
LS 7839
N:126224.08
E:217502.99
4905
4910
4915
4920
4925
4930
4935
4940
4905
4910
4915
4920
4925
4930
4935
4940
9+50 10+00 11+00
32.60 LF
24" RCP
@ 0.43%
ST
R
M
H
E
A
D
W
A
L
L
3
-
1
.
1
ST
A
1
0
+
3
2
.
6
0
IN
V
.
O
U
T
4
9
1
6
.
3
0
(
W
)
ST
M
H
3
-
1
ST
A
1
0
+
6
1
.
4
0
RI
M
4
9
2
2
.
2
±
IN
V
.
I
N
4
9
1
6
.
1
6
(
E
)
IN
V
.
I
N
4
9
1
6
.
1
4
(
N
)
IN
V
.
O
U
T
4
9
1
6
.
1
6
(
W
)
PROPOSED
GRADE
EXISTING
GROUND
PUBLIC
STEOHE OHE
8"
W
CENTER 14 CORNER
SECTION 15-7-68
N:126217.91
E:218503.02
4905
4910
4915
4920
4925
4930
4935
4940
4905
4910
4915
4920
4925
4930
4935
4940
9+50 10+00 11+00
4905
4910
4915
4920
4925
4930
4935
4940
4905
4910
4915
4920
4925
4930
4935
4940
9+5010+0011+0011+50
49.68 LF
12" PVC
@ 0.30%
90
D
E
G
B
E
N
D
2
-
1
w
.
1
ST
A
1
0
+
4
9
.
6
8
IN
V
.
I
N
4
9
1
6
.
0
6
(
E
)
IN
V
.
O
U
T
4
9
1
6
.
0
7
(
S
)
21.78 LF
12" PVC
@ 0.30%
FE
S
2
-
1
w
.
2
ST
A
1
0
+
7
1
.
4
6
IN
V
.
I
N
4
9
1
6
.
0
0
(
N
)
DR
Y
W
E
L
L
2
-
1
ST
A
1
0
+
2
1
.
0
0
RI
M
4
9
2
0
.
2
±
IN
V
.
I
N
4
9
1
5
.
0
6
(
N
)
IN
V
.
O
U
T
4
9
1
6
.
2
1
(
S
W
)
IN
V
.
O
U
T
4
9
1
6
.
2
1
(
W
)
IN
V
.
O
U
T
4
9
1
6
.
2
1
(
E
)
32.62 LF
12" PVC
@ 0.45%
90
D
E
G
B
E
N
D
2
-
1
e
.
1
ST
A
1
0
+
3
2
.
6
2
IN
V
.
I
N
4
9
1
6
.
0
6
(
W
)
IN
V
.
O
U
T
4
9
1
6
.
0
6
(
S
)
20.95 LF
12" PVC
@ 0.30%
FE
S
2
-
1
e
.
2
ST
A
1
0
+
5
3
.
5
7
IN
V
.
I
N
4
9
1
6
.
0
0
(
N
)
DR
Y
W
E
L
L
2
-
1
ST
A
1
0
+
2
1
.
0
0
RI
M
4
9
2
0
.
2
±
IN
V
.
I
N
4
9
1
5
.
0
6
(
N
)
IN
V
.
O
U
T
4
9
1
6
.
2
1
(
S
W
)
IN
V
.
O
U
T
4
9
1
6
.
2
1
(
W
)
IN
V
.
O
U
T
4
9
1
6
.
2
1
(
E
)
EXISTING
GROUND
PROPOSED
GRADE
EXISTING
GROUND
PROPOSED
GRADE
PRIVATE
RIPRAP SEE
BURIED RIPRAP
SCHEDULE
RIPRAP SEE
BURIED RIPRAP
SCHEDULE
S
S
SS
SS SS SS SS SS SS
SS
SS
CS
S
CS
CS
W
h2o
S S CS S CS CS
HYD
S CS S CS S
W
h2o
S CS
CS
S
CS
S
CS
util
util
util
util
util
util
util
V.P.
FES FES FES
DST
S
S
C.O.
C.O.
C.O.
XXXXXXXX
90DEG BEND 2-1w.1
STA 10+49.68
N: 126669.50
E: 217695.25
90 DEG BEND 2-1e.1
STA 10+32.62
N: 126669.04
E: 217777.55
FES 2-1e.2
STA 10+53.57
N: 126648.09
E: 217777.44
FES 2-1w.2
STA 10+71.46
N: 126647.72
E: 217695.12
21.78 LF
12" PVC
@ 0.30%
49.68 LF
12" PVC
@ 0.30%
20.95 LF
12" PVC
@ 0.30%
32.62 LF
12" PVC
@ 0.45%
STORM DRAIN LINE 2
SEE SHEET ST1
DRYWELL 2-1
STA 10+00.00
N: 126669.26
E: 217744.93
LOT
11
LOT
13
LOT
14
LOT
15
LOT
16
LOT
12
OUTLOT C
LOT
10
LOT
16
FND 12" REBAR
NO CAP
N:126834.38
E:217786.78
S1
4
°
1
3
'
1
7
"
W
17
0
.
3
4
'
FOX GROVE DRIVE
SSSSSS
SS
SS
SS CS
S
CS
HYD
W
h2
o
W
S
S
D
V.
P
.
ut
i
l
ut
i
l
ut
i
l
ut
i
l
ut
i
l
ut
i
l
ut
i
l
ut
i
l
ut
i
l
ut
i
l
ut
i
l
ut
i
l
D
ST ST
ST
ST
S S
DD
D
D
STST
ST
SS
SS
SS
SS
SS
SS
SS
MH
STRM HEADWALL 3
STA 10+00.00
N: 126243.41
E: 218049.08
61.40 LF
24" RCP
@ 0.43%
STMH 3-1
STA 10+61.40
N: 126242.52
E: 218110.47
148.79 LF 15" RCP @ 0.30%
STMH 3-2
STA 12+10.19
N: 126391.29
E: 218112.28
85.
9
0
L
F
1
5
"
R
C
P
@
0
.
3
1
%
OUTLET 3-3
STA 12+96.09
N: 126451.54
E: 218173.51
LOT
66
LOT
67
OU
T
L
O
T
G
OU
T
L
O
T
E
LOT
54
LOT
55
LOT
56
OUTLOT H
LOT
53
KI
T
D
E
N
D
R
I
V
E
SANITARY LINE B
SEE SHEET SS4
STORM DRAIN LINE 4
SEE SHEET ST
94.01 LF
24" RCP
@ 0.43%
4.5' ℄-℄
S8
7
°
5
8
'
2
3
"
W
54
6
.
4
3
'
STORM DRAIN LINE 3s
SEE SHEET ST3
STORM DRAIN LINE 3-1
SEE THIS SHEET
CARRIAGE PARKWAY
S
SS
SS
CS
S
CS
HYD
Wh2o
util
util
util util
utilutil
util util
util
ST
ST
S
D
ST
ST
SS SS SS SS
MH
32.60 LF
24" RCP
@ 0.43%STRM HEADWALL 3-1.1
STA 10+32.60
N: 126242.04
E: 218143.07
CA
R
R
I
A
G
E
P
A
R
K
W
A
Y
STMH 3-1
STA 10+00.00
N: 126242.52
E: 218110.47
LOT
67
OUTLOT G
94.01 LF
24" RCP
@ 0.43%
4.5' ℄-℄
S86°09'51"E
360.76'
STORM DRAIN LINE 3
SEE THIS SHEET
STORM DRAIN LINE 3s
SEE SHEET ST3
KEYMAP
PROPOSED RIGHT-OF-WAY
EXISTING WATER MAIN
PROPOSED WATER MAIN
PROPOSED STORM SEWER
LEGEND:
NOTES:
1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL
UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW
CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL
UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN
UNDERGROUND UTILITIES.
2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL
SANITARY SEWER MAINS, WATER MAINS, AND SERVICES.
3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX
STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF
FLARED END SECTIONS.
4.ALL RCP SHALL BE CLASS III OR GREATER. PIPE MATERIAL, BEDDING, AND
INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF
FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE
R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE
'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR
RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE).
5.ALL STORM MANHOLES LOCATED IN SIDEWALKS AND TRAILS SHALL HAVE
PEDESTRIAN RATED LIDS.
6.MANHOLE DIAMETERS SHOWN ARE THE MINIMUM SIZE PER CITY STANDARD DETAIL
D-3. CONTRACTOR SHALL SHALL CONFIRM THAT MANHOLE DIAMETERS ARE
SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN
PRE-CASTER'S TOLERANCES, ETC.).
7.SLOTTED MANHOLE COVERS SHALL BE NEENAH R-2559, TYPE G, OR APPROVED
EQUAL.
8.ALL RIPRAP PAD TO BE BURIED. SEE RIPRAP DETAIL.
9.A FLOODPLAIN USE PERMIT MUST BE SUBMITTED TO AND APPROVED BY THE CITY OF
FORT COLLINS FLOODPLAIN ADMINISTRATION PRIOR TO CONSTRUCTION OF THE
FOLLOWING ITEMS: STORM SEWER (STORM LINE 8), SEWER AND WATERLINE
CONSTRUCTION IN VIXEN DRIVE, WATERLINE IN TRACT A AND LOT 1 LEE MLD,
ROADWAY CONSTRUCTION OF VIXEN DRIVE, AND FORT COLLINS LIGHT AND POWER
PRIMARY INSTALLATION FROM THE FRONTAGE ROAD.
10.A NO-RISE CERTIFICATION MUST BE SUBMITTED TO AND APPROVED BY THE CITY OF
FORT COLLINS FLOODPLAIN ADMINISTRATION PRIOR TO CONSTRUCTION OF THE
FOLLOWING ITEMS: STORM SEWER (STORM LINE 8), WATERLINE IN LOT 1 LEE MLD,
AND FORT COLLINS LIGHT AND POWER PRIMARY INSTALLATION ACROSS THE
FLOODWAY.
W
G
T
EXISTING STORM SEWER
EXISTING TELEPHONE
EXISTING GAS
EXISTING SANITARY SEWER SS
PROPOSED CURB & GUTTER
PROPOSED SANITARY SEWER
PROPOSED LOTLINE
EASEMENT LINE
PROPERTY BOUNDARY
EEXISTING ELECTRIC
PROPOSED STORM INLET
Sheet
Of 45 Sheets
FO
X
G
R
O
V
E
30
1
N
.
H
o
w
e
s
S
t
r
e
e
t
,
S
u
i
t
e
1
0
0
Fo
r
t
C
o
l
l
i
n
s
,
C
o
l
o
r
a
d
o
8
0
5
2
1
E
N
G
I
N
E
E
R
N
G
I
E
H
T
R
O
N
R
N
PH
O
N
E
:
9
7
0
.
2
2
1
.
4
1
5
8
ww
w
.
n
o
r
t
h
e
r
n
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
before you dig.Call
R
STORM DRAIN LINE 3
ST2
PL
A
N
A
N
D
P
R
O
F
I
L
E
ST
O
R
M
D
R
A
I
N
L
I
N
E
S
2
-
1
w
,
2
-
1
e
,
3
&
3
-
1
STORM
DRAIN 2-1w & 2-1e
PROFILE SCALE:
VERT. 1"=5'
HORIZ. 1"=50'
PROFILE SCALE:
VERT. 1"=5'
HORIZ. 1"=50'
NORTH NORTH
STORM DRAIN LINE 3.1STORM DRAIN LINE 2-1w & 2-1e
PROFILE SCALE:
VERT. 1"=5'
HORIZ. 1"=50'
PROFILE SCALE:
VERT. 1"=5'
HORIZ. 1"=50'
STORM
DRAIN 3-1
STORM
DRAIN 3
NORTH
RECO
R
D
D
R
A
W
I
N
G
4905
4910
4915
4920
4925
4930
4935
4940
4905
4910
4915
4920
4925
4930
4935
4940
9+50 10+00 11+00 12+00 13+00 13+50
IN
L
E
T
4
-
8
ST
A
1
2
+
7
1
.
7
5
FL
.
E
L
4
9
2
1
.
1
±
IN
V
.
O
U
T
4
9
1
6
.
6
8
(
N
)
30.00 LF
15" RCP
@ 0.30%
IN
L
E
T
4
-
7
ST
A
1
2
+
4
1
.
7
5
FL
.
E
L
4
9
2
1
.
1
±
IN
V
.
I
N
4
9
1
6
.
5
9
(
S
)
IN
V
.
O
U
T
4
9
1
6
.
5
9
(
N
)
16.50 LF
15" RCP
@ 0.30%
DR
Y
W
E
L
L
4
-
6
ST
A
1
2
+
2
5
.
2
5
RI
M
4
9
2
0
.
5
±
IN
V
.
I
N
4
9
1
6
.
5
4
(
S
)
IN
V
.
O
U
T
4
9
1
7
.
7
1
(
E
)
75.81 LF 12" PVC @ 0.30%
45
D
E
G
B
E
N
D
4
-
5
ST
A
1
1
+
4
9
.
4
3
IN
V
.
I
N
4
9
1
7
.
4
8
(
W
)
IN
V
.
O
U
T
4
9
1
7
.
4
8
(
N
E
)
21.26 LF
12" PVC
@ 0.30%
45
D
E
G
B
E
N
D
4
-
4
ST
A
1
1
+
2
8
.
1
8
IN
V
.
I
N
4
9
1
7
.
4
2
(
S
W
)
IN
V
.
O
U
T
4
9
1
7
.
4
2
(
N
)
15.73 LF
12" PVC
@ 0.30%
11
.
2
5
D
E
G
B
E
N
D
4
-
3
ST
A
1
1
+
1
2
.
4
5
IN
V
.
I
N
4
9
1
7
.
3
7
(
S
)
IN
V
.
O
U
T
4
9
1
7
.
3
7
(
N
)
52.09 LF
12" PVC
@ 0.30%
22
.
5
D
E
G
B
E
N
D
4
-
2
ST
A
1
0
+
6
0
.
3
6
IN
V
.
I
N
4
9
1
7
.
2
1
(
S
)
IN
V
.
O
U
T
4
9
1
7
.
2
1
(
N
W
)
44.07 LF
12" PVC
@ 0.30%
78
.
7
5
D
E
G
B
E
N
D
4
-
1
ST
A
1
0
+
1
6
.
2
9
IN
V
.
I
N
4
9
1
7
.
0
8
(
S
E
)
IN
V
.
O
U
T
4
9
1
7
.
0
8
(
W
)
26.29 LF
12" PVC
@ 0.30%
FE
S
4
ST
A
9
+
9
0
.
0
0
IN
V
.
I
N
4
9
1
7
.
0
0
(
E
)
STA.=12+56.74
INV.= 4909.87
8" SANITARY
8" WATER
STA.=12+46.74
TOP=4914.25
18" MIN.
PROPOSED
GRADE
EXISTING
GROUND
5.90 LF 20"
STEEL CASING
PUBLICPRIVATE
RIPRAP SEE
BURIED RIPRAP
SCHEDULE
4905
4910
4915
4920
4925
4930
4935
4940
4905
4910
4915
4920
4925
4930
4935
4940
9+50 10+00 11+00 12+00 12+50
IN
L
E
T
5
-
4
ST
A
1
1
+
9
3
.
2
3
FL
.
E
L
4
9
2
2
.
1
±
IN
V
.
O
U
T
4
9
1
7
.
7
5
(
E
)
50.00 LF
15" RCP
@ 0.30%
IN
L
E
T
5
-
3
ST
A
1
1
+
4
3
.
2
3
FL
.
E
L
4
9
2
2
.
1
±
IN
V
.
I
N
4
9
1
7
.
6
0
(
W
)
IN
V
.
O
U
T
4
9
1
7
.
6
0
(
E
)
18.00 LF
15" RCP
@ 0.30%
DR
Y
W
E
L
L
5
-
2
ST
A
1
1
+
2
5
.
2
3
RI
M
4
9
2
1
.
7
±
IN
V
.
I
N
4
9
1
7
.
5
5
(
W
)
IN
V
.
O
U
T
4
9
1
7
.
3
8
(
N
)
103.63 LF
12" PVC
@ 0.30%
90
D
E
G
B
E
N
D
5
-
1
ST
A
1
0
+
2
1
.
6
0
IN
V
.
I
N
4
9
1
7
.
0
6
(
S
)
IN
V
.
O
U
T
4
9
1
7
.
0
6
(
S
E
)
21.60 LF
12" PVC
@ 0.30%
FE
S
5
ST
A
1
0
+
0
0
.
0
0
IN
V
.
I
N
4
9
1
7
.
0
0
(
N
W
)
8" WATER
STA.=11+76.94
TOP=4915.51
18" MIN.
100-YR HGL
PROPOSED
GRADE
EXISTING
GROUND
5.93 LF 20"
STEEL CASING
PUBLICPRIVATE
RIPRAP SEE
BURIED RIPRAP
SCHEDULE
S
SS
S
S
SS
SS
SS
SS
SS
SS
CS
CS
S
CS
S
S CS
S CS
HYD
S CS
S
CS
S
CS
S
CS
S
CS
D
FES
FES
V.
P
.
ut
i
l
ut
i
l
ut
i
l
ut
i
l
ut
i
l
ut
i
l
ut
i
l
ut
i
l
ut
i
l
ut
i
l
ut
i
l
ut
i
l
ut
i
l
D
ST
ST
ST
ST
S
S
S S
S
D
C.
O
.
D
ST
SS
SS
SS
SS
SS
SS
SS
SS
SSSSSSSSSS ST
ST
WW
E
FO
H2
O
OH
E
OH
E
8" W12" W12" W12" W12" W12" W12" W12" W12" W
S
SS
KI
T
D
E
N
D
R
I
V
E
CAR
R
I
A
G
E
P
A
R
K
W
A
Y
SANITARY SEWER B
SEE SHEET SS4
INLET 4-7
STA 12+41.75
N: 126421.03
E: 218219.47
INLET 4-8
STA 12+71.75
N: 126391.03
E: 218219.28
DRYWELL 4-6
STA 12+25.25
N: 126437.53
E: 218219.57
45DEG BEND 4-5
STA 11+49.43
N: 126437.07
E: 218295.38
45 DEG BEND 4-4
STA 11+28.18
N: 126452.04
E: 218310.47
11.25DEG BEND 4-3
STA 11+12.45
N: 126467.77
E: 218310.5022.5DEG BEND 4-2
STA 10+60.36
N: 126518.88
E: 218300.43
78.75DEG BEND 4-1
STA 10+16.29
N: 126555.57
E: 218276.01
FES 4
STA 9+90.00
N: 126545.55
E: 218251.71
16.50 LF
15" RCP
@ 0.30%
30.00 LF
15" RCP
@ 0.30%
26.29 LF
12" PVC
@ 0.30%
44.07 LF
12" PVC
@ 0.30%
52.09 LF
12" PVC
@ 0.30%
15.73 LF
12" PVC
@ 0.30%
21.26 LF
12" PVC
@ 0.30%
75
.
8
1
L
F
1
2
"
P
V
C
@
0
.
3
0
%
FO
X
G
R
O
V
E
D
R
I
V
E
LOT 59
LOT 60
LOT 62
LOT 63
LOT 64
LOT
65
LOT
66
LOT
67
OU
T
L
O
T
G
LOT 61
OUTLOT H
STORM DRAIN LINE 3
SEE SHEET ST2
CENTER 14 CORNER
SECTION 15-7-68
N:126217.91
E:218503.02
N39
°
2
6
'
0
4
"
W
303
.
1
4
'
TYPE M
BURIED RIPRAP
(SEE SHEET D4)
4905
4910
4915
4920
4925
4930
4935
4940
4905
4910
4915
4920
4925
4930
4935
4940
9+50 10+00 11+00 11+50
94.01 LF 24" RCP @ 0.43%
ST
R
M
H
E
A
D
W
A
L
L
3
s
-
1
ST
A
1
0
+
9
4
.
0
1
RI
M
4
9
1
8
.
7
±
IN
V
.
O
U
T
4
9
1
6
.
3
0
(
W
)
ST
R
M
H
E
A
D
W
A
L
L
3
s
ST
A
1
0
+
0
0
.
0
0
RI
M
4
9
1
8
.
3
±
IN
V
.
I
N
4
9
1
5
.
9
0
(
E
)
EXISTING
GROUND
PROPOSED
GRADE
8" WATER
STA.=10+41.37
TOP=4913.83
18" MIN.
11.00 LF 20"
STEEL CASING
PUBLIC
RIPRAP SEE
BURIED RIPRAP
SCHEDULE
S
SS
SS
S
CS
HYD
Wh2o
S
util
util
util util
utilutil
util util
util
ST
ST
S
D
ST
ST
SS SS SS SS SS SS
MH
STRM HEADWALL 3s-1
STA 10+94.01
N: 126237.54
E: 218143.06
94.01 LF 24" RCP @ 0.43%
STRM HEADWALL 3s
STA 10+00.00
N: 126238.91
E: 218049.06 CA
R
R
I
A
G
E
PA
R
K
W
A
Y
SANITARY SEWER B
SEE SHEET SS4
STORM DRAIN LINE 3
SEE SHEET ST2
LOT
67
LOT
53
LOT
54
OUTLOT E
TYPE M
BURIED RIPRAP
(SEE SHEET D4)
S
S
S
S
S
SS
SS
SS
SS
SS
SS
S
CS
C
S
S
CS
S
CS
S
CS
W
MH
h2
o
HYD
D
FES
FES
V.P
.
uti
l
uti
l
uti
l
uti
l
uti
l
uti
l
uti
l
uti
l
uti
l
uti
l
uti
l
uti
l
uti
l
uti
l
uti
l
uti
l
D
ST
ST
ST
ST
S
S
S
S
D
D
C.O
.
D
S
ST
OUTLOT E
INLET 5-4
STA 11+93.23
N: 126501.54
E: 218098.05
INLET 5-3
STA 11+43.23
N: 126487.05
E: 218145.90
DRYWELL 5-2
STA 11+25.23
N: 126481.83
E: 218163.13
90DEG BEND 5-1
STA 10+21.60
N: 126577.79
E: 218202.26
FES 5
STA 10+00.00
N: 126567.81
E: 218221.42
21.60 LF
12" PVC
@ 0.30%
103.63 LF 12"
P
V
C
@
0
.
3
0
%
18.00 LF
15" RCP
@ 0.30%
50.00 LF
15" RCP
@ 0.30%
LOT
66
LOT
67
LOT
55
OUTLOT H
FO
X
G
R
O
V
E
D
R
I
V
E
CARRIAGE PARKWAY
KIT
D
E
N
D
R
I
V
E
STORM DRAIN LINE 3
SEE SHEET ST2
TYPE M
BURIED RIPRAP
(SEE SHEET D4)
KEYMAP
PROPOSED RIGHT-OF-WAY
EXISTING WATER MAIN
PROPOSED WATER MAIN
PROPOSED STORM SEWER
LEGEND:
NOTES:
1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL
UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW
CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL
UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN
UNDERGROUND UTILITIES.
2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL
SANITARY SEWER MAINS, WATER MAINS, AND SERVICES.
3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX
STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF
FLARED END SECTIONS.
4.ALL RCP SHALL BE CLASS III OR GREATER. PIPE MATERIAL, BEDDING, AND
INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF
FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE
R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE
'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR
RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE).
5.ALL STORM MANHOLES LOCATED IN SIDEWALKS AND TRAILS SHALL HAVE
PEDESTRIAN RATED LIDS.
6.MANHOLE DIAMETERS SHOWN ARE THE MINIMUM SIZE PER CITY STANDARD DETAIL
D-3. CONTRACTOR SHALL SHALL CONFIRM THAT MANHOLE DIAMETERS ARE
SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN
PRE-CASTER'S TOLERANCES, ETC.).
7.SLOTTED MANHOLE COVERS SHALL BE NEENAH R-2559, TYPE G, OR APPROVED
EQUAL.
8.ALL RIPRAP PAD TO BE BURIED. SEE RIPRAP DETAIL.
9.A FLOODPLAIN USE PERMIT MUST BE SUBMITTED TO AND APPROVED BY THE CITY OF
FORT COLLINS FLOODPLAIN ADMINISTRATION PRIOR TO CONSTRUCTION OF THE
FOLLOWING ITEMS: STORM SEWER (STORM LINE 8), SEWER AND WATERLINE
CONSTRUCTION IN VIXEN DRIVE, WATERLINE IN TRACT A AND LOT 1 LEE MLD,
ROADWAY CONSTRUCTION OF VIXEN DRIVE, AND FORT COLLINS LIGHT AND POWER
PRIMARY INSTALLATION FROM THE FRONTAGE ROAD.
10.A NO-RISE CERTIFICATION MUST BE SUBMITTED TO AND APPROVED BY THE CITY OF
FORT COLLINS FLOODPLAIN ADMINISTRATION PRIOR TO CONSTRUCTION OF THE
FOLLOWING ITEMS: STORM SEWER (STORM LINE 8), WATERLINE IN LOT 1 LEE MLD,
AND FORT COLLINS LIGHT AND POWER PRIMARY INSTALLATION ACROSS THE
FLOODWAY.
W
G
T
EXISTING STORM SEWER
EXISTING TELEPHONE
EXISTING GAS
EXISTING SANITARY SEWER SS
PROPOSED CURB & GUTTER
PROPOSED SANITARY SEWER
PROPOSED LOTLINE
EASEMENT LINE
PROPERTY BOUNDARY
EEXISTING ELECTRIC
PROPOSED STORM INLET
Sheet
Of 45 Sheets
FO
X
G
R
O
V
E
30
1
N
.
H
o
w
e
s
S
t
r
e
e
t
,
S
u
i
t
e
1
0
0
Fo
r
t
C
o
l
l
i
n
s
,
C
o
l
o
r
a
d
o
8
0
5
2
1
E
N
G
I
N
E
E
R
N
G
I
E
H
T
R
O
N
R
N
PH
O
N
E
:
9
7
0
.
2
2
1
.
4
1
5
8
ww
w
.
n
o
r
t
h
e
r
n
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
before you dig.Call
R
STORM DRAIN LINE 4
NORTH
ST3
PL
A
N
A
N
D
P
R
O
F
I
L
E
ST
O
R
M
D
R
A
I
N
L
I
N
E
S
3
s
,
4
&
5
STORM
DRAIN 5
PROFILE SCALE:
VERT. 1"=5'
HORIZ. 1"=50'
STORM DRAIN LINE 5
NORTH
PROFILE SCALE:
VERT. 1"=5'
HORIZ. 1"=50'
STORM
DRAIN 4
STORM DRAIN LINE 3s
NORTH
PROFILE SCALE:
VERT. 1"=5'
HORIZ. 1"=50'
STORM
DRAIN 3s
EXISTING
SANITARY SEWER
RECO
R
D
D
R
A
W
I
N
G
4900
4905
4910
4915
4920
4925
4930
4935
4900
4905
4910
4915
4920
4925
4930
4935
9+50 10+00 11+00 12+00 13+00 13+50
EXISTING
GROUND PROPOSED
GRADE
18" MIN.
FE
S
6
ST
A
1
0
+
0
0
.
0
0
IN
V
.
I
N
4
9
1
4
.
2
2
(
E
)
225.30 LF 24" RCP @ 0.53%
ST
M
H
6
-
1
ST
A
1
2
+
2
5
.
3
0
RI
M
4
9
2
1
.
0
±
IN
V
.
I
N
4
9
1
5
.
4
2
(
N
)
IN
V
.
O
U
T
4
9
1
5
.
4
2
(
W
)
39.13 LF
18" RCP
@ 0.53%
FE
S
6
-
3
ST
A
1
2
+
9
0
.
1
0
IN
V
.
O
U
T
4
9
1
5
.
7
6
(
S
)
STA.=10+71.40
INV.= 4906.64
8" SANITARY
STA.=12+35.58
INV.= 4907.54
8" SANITARY
8" WATER
STA.=12+45.61
TOP=4913.178" WATER
STA.=10+82.30
TOP=4912.24
18" MIN.
ST
M
H
6
-
2
ST
A
1
2
+
6
4
.
4
3
RI
M
4
9
2
1
.
3
±
IN
V
.
I
N
4
9
1
5
.
6
3
(
N
)
IN
V
.
I
N
4
9
1
5
.
6
3
(
E
)
IN
V
.
O
U
T
4
9
1
5
.
6
3
(
S
)
25.67 LF 18" RCP @ 0.53%
100-YR HGL
5.92 LF 20"
STEEL CASING
5.95 LF 20"
STEEL CASING
PRIVATEPUBLIC
RIPRAP SEE
BURIED RIPRAP
SCHEDULE
4905
4910
4915
4920
4925
4930
4935
4940
4905
4910
4915
4920
4925
4930
4935
4940
9+50 10+00 11+00
PROPOSED
GRADE
EXISTING
GROUND
ST
R
M
H
E
A
D
W
A
L
L
7
ST
A
1
0
+
0
0
.
0
0
IN
V
.
I
N
4
9
1
5
.
7
0
(
E
)
72.00 LF 2x30" RCP @ 0.50%
ST
R
M
H
E
A
D
W
A
L
L
7
-
1
ST
A
1
0
+
7
2
.
0
0
IN
V
.
O
U
T
4
9
1
6
.
0
6
(
W
)
8" WATER
w/20" STEEL CASING
STA.=10+46.01
TOP=4914.74
2.89' COVER
40.00 LF 14"
STEEL CASING
PUBLIC
RIPRAP SEE
BURIED RIPRAP
SCHEDULE
4900
4905
4910
4915
4920
4925
4930
4935
4900
4905
4910
4915
4920
4925
4930
4935
9+50 10+00 11+00 12+00
PROPOSED
GRADE
EXISTING
GROUND
FE
S
8
ST
A
1
0
+
1
0
.
0
0
IN
V
.
I
N
4
9
1
1
.
2
8
(
E
)
104.21 LF 18" RCP @ 0.50%
OU
T
L
E
T
8
-
1
ST
A
1
1
+
1
5
.
9
9
RI
M
4
9
1
4
.
0
±
PRIVATE
RIPRAP SEE
BURIED RIPRAP
SCHEDULE
SS SSSS
SS
SS
FES 8
STA 10+10.00
N: 126322.71
E: 216418.82
104.21 LF 18" RCP @ 0.50%
OUTLET 8-1
STA 11+15.99
N: 126322.71
E: 216524.80
TRACT A
FND #4 REBAR
w/ PLASTIC CAP
LS 7839
N:126230.40
E:216472.74
S3
0
°
1
7
'
2
8
"
E
10
6
.
9
0
'
FES ST
SS SS SS SS SS SS SS
FOX GROVE DRIVE
SANITARY SEWER A
SEE SHEET SS1
FES 6
STA 10+00.00
N: 126404.45
E: 216875.36
225.30 LF 24" RCP @ 0.53%
STMH 6-1
STA 12+25.30
N: 126403.05
E: 217100.66
39.13 LF
18" RCP
@ 0.53%
FES 6-3
STA 12+90.10
N: 126466.79
E: 217112.31
VI
X
E
N
D
R
I
V
E
LOT 36
LOT 37
LOT
38
LOT
41
LOT
40LOT
39
OUTLOT D
TRACT A
STMH 6-2
STA 12+64.43
N: 126441.54
E: 217107.69
25.67 LF 18" RCP @ 0.53%
TYPE M
BURIED RIPRAP
(SEE SHEET D4)
S
S
SS
SS
SS
SS
SS
SS SS SS SS SS
FES
S
CS
S
CS
SS
CS
WH2O
HYD
HYD
CS
S
CS
S
CS
util
util
utilutil
util
util
util
util D ST
S
D
S
H2O
ST ST ST ST
SS SS SS SS
LOT
38
LOT
39STRM HEADWALL 7N
STA 10+00.00
N: 126249.46
E: 216910.71
STRM HEADWALL 7
STA 10+00.00
N: 126245.96
E: 216910.68
STRM HEADWALL 7-1N
STA 10+72.00
N: 126248.83
E: 216982.71
STRM HEADWALL 7-1
STA 10+72.00
N: 126245.33
E: 216982.68
72.00 LF
30" RCP
@ 0.50%
72.00 LF
30" RCP
@ 0.50%
3.5' ℄-℄
FOX GROVE DRIVE
VI
X
E
N
D
R
I
V
E
S
S
SS
SS
SS SS
FES
SS
CS
WH2O
HYD
Y
util
util
utilutil
util
STST
S
S
H2O
ST ST ST ST
KEYMAP
PROPOSED RIGHT-OF-WAY
EXISTING WATER MAIN
PROPOSED WATER MAIN
PROPOSED STORM SEWER
LEGEND:
NOTES:
1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL
UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW
CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL
UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN
UNDERGROUND UTILITIES.
2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL
SANITARY SEWER MAINS, WATER MAINS, AND SERVICES.
3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX
STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF
FLARED END SECTIONS.
4.ALL RCP SHALL BE CLASS III OR GREATER. PIPE MATERIAL, BEDDING, AND
INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF
FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE
R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE
'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR
RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE).
5.ALL STORM MANHOLES LOCATED IN SIDEWALKS AND TRAILS SHALL HAVE
PEDESTRIAN RATED LIDS.
6.MANHOLE DIAMETERS SHOWN ARE THE MINIMUM SIZE PER CITY STANDARD DETAIL
D-3. CONTRACTOR SHALL SHALL CONFIRM THAT MANHOLE DIAMETERS ARE
SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN
PRE-CASTER'S TOLERANCES, ETC.).
7.SLOTTED MANHOLE COVERS SHALL BE NEENAH R-2559, TYPE G, OR APPROVED
EQUAL.
8.ALL RIPRAP PAD TO BE BURIED. SEE RIPRAP DETAIL.
9.A FLOODPLAIN USE PERMIT MUST BE SUBMITTED TO AND APPROVED BY THE CITY OF
FORT COLLINS FLOODPLAIN ADMINISTRATION PRIOR TO CONSTRUCTION OF THE
FOLLOWING ITEMS: STORM SEWER (STORM LINE 8), SEWER AND WATERLINE
CONSTRUCTION IN VIXEN DRIVE, WATERLINE IN TRACT A AND LOT 1 LEE MLD,
ROADWAY CONSTRUCTION OF VIXEN DRIVE, AND FORT COLLINS LIGHT AND POWER
PRIMARY INSTALLATION FROM THE FRONTAGE ROAD.
10.A NO-RISE CERTIFICATION MUST BE SUBMITTED TO AND APPROVED BY THE CITY OF
FORT COLLINS FLOODPLAIN ADMINISTRATION PRIOR TO CONSTRUCTION OF THE
FOLLOWING ITEMS: STORM SEWER (STORM LINE 8), WATERLINE IN LOT 1 LEE MLD,
AND FORT COLLINS LIGHT AND POWER PRIMARY INSTALLATION ACROSS THE
FLOODWAY.
W
G
T
EXISTING STORM SEWER
EXISTING TELEPHONE
EXISTING GAS
EXISTING SANITARY SEWER SS
PROPOSED CURB & GUTTER
PROPOSED SANITARY SEWER
PROPOSED LOTLINE
EASEMENT LINE
PROPERTY BOUNDARY
EEXISTING ELECTRIC
PROPOSED STORM INLET
Sheet
Of 45 Sheets
FO
X
G
R
O
V
E
30
1
N
.
H
o
w
e
s
S
t
r
e
e
t
,
S
u
i
t
e
1
0
0
Fo
r
t
C
o
l
l
i
n
s
,
C
o
l
o
r
a
d
o
8
0
5
2
1
E
N
G
I
N
E
E
R
N
G
I
E
H
T
R
O
N
R
N
PH
O
N
E
:
9
7
0
.
2
2
1
.
4
1
5
8
ww
w
.
n
o
r
t
h
e
r
n
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
before you dig.Call
R
STORM DRAIN LINE 6
NORTH
ST4
PL
A
N
A
N
D
P
R
O
F
I
L
E
ST
O
R
M
D
R
A
I
N
L
I
N
E
S
6
,
7
&
8
STORM
DRAIN 6
PROFILE SCALE:
VERT. 1"=5'
HORIZ. 1"=50'
STORM DRAIN LINE 7
NORTH
PROFILE SCALE:
VERT. 1"=5'
HORIZ. 1"=50'
PROFILE SCALE:
VERT. 1"=5'
HORIZ. 1"=50'
STORM DRAIN LINE 8
NORTH
STORM
DRAIN 7
STORM
DRAIN 8
RECO
R
D
D
R
A
W
I
N
G
XXXXXXXXXXX
X
X
X
D
VAULT
ELEC
X
X
G
POND 2
(SEE DETAILED
GRADING SHEET G3)
VI
X
E
N
D
R
I
V
E
HUNTSMAN DRIVE
FOX GROVE DRIVE
SUNFLOWER SUBDIVISION
(SINGLE FAMILY)
CW SUBTRUST C/O AGUR FOUNDATION
INDUSTRIAL DISTRICT
(UNDEVELOPED)
POND 1
OUTLOT E
TRACT A
OUTLOT A
OUTLOT D
LOT 46
FG=24.34
TF=25.01
A
STORM DRAIN LINE 6
SEE SHEET ST4
STORM DRAIN LINE 7
SEE SHEET ST4
STORM DRAIN LINE 1
SEE SHEET ST1
STORM DRAIN LINE 8
SEE SHEET ST4
LOT 34
FG=25.22
TF=25.89
A
LOT 35
FG=25.13
TF=25.80
A/B
LOT 36
FG=23.42
TF=24.09
B
LOT 37
FG=23.27
TF=23.94
B
LOT 38
FG=23.61
TF=24.28
A
LOT 39
FG=23.90
TF=24.57
A LOT 40
FG=23.59
TF=24.26
A
LOT 41
FG=23.12
TF=23.79
A
LOT 42
FG=22.81
TF=23.48
A
LOT 43
FG=22.60
TF=23.27
A
LOT 44
FG=22.82
TF=23.49
A
LOT 45
FG=23.24
TF=23.91
B
LOT 47
FG=25.07
TF=25.74
A
LOT 48
FG=25.53
TF=26.20
A
LOT 33
FG=25.63
TF=26.30
G
LOT 32
FG=25.63
TF=26.30
G
LOT 31
FG=25.35
TF=26.02
G LOT 30
FG=24.85
TF=25.52
G
LOT 29
FG=23.75
TF=24.42
B
LOT 28
FG=23.28
TF=23.95
B
LOT 1
FG=25.53
TF=26.20
B
LOT 2
FG=25.53
TF=26.20
B
LOT 3
FG=25.24
TF=25.91
B
LOT 4
FG=24.87
TF=25.54
B
LOT 5
FG=24.41
TF=25.08
B
LOT 6
FG=24.11
TF=24.78
B
LOT 7
FG=23.86
TF=24.53
B
LOT 8
FG=23.42
TF=24.09
B
LOT 27
FG=23.27
TF=23.94
B
LOT 26
FG=24.33
TF=25.00
B
LOT 9
FG=23.41
TF=24.08
A
LOT 10
FG=23.75
TF=24.42
A
LOT 11
FG=23.55
TF=24.22
A
STORM DRAIN LINE 7
SEE SHEET ST4
VI
X
E
N
D
R
I
V
E
8.72'
8.77'
16.60'6.48'18.05
8.73
8.99
6.54
121°
130°133°
129°
4.5' SIDEWALK
4.5' SIDEWALK
Sheet
Of 45 Sheets
FO
X
G
R
O
V
E
30
1
N
.
H
o
w
e
s
S
t
r
e
e
t
,
S
u
i
t
e
1
0
0
Fo
r
t
C
o
l
l
i
n
s
,
C
o
l
o
r
a
d
o
8
0
5
2
1
E
N
G
I
N
E
E
R
N
G
I
E
H
T
R
O
N
R
N
PH
O
N
E
:
9
7
0
.
2
2
1
.
4
1
5
8
ww
w
.
n
o
r
t
h
e
r
n
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
G1
GR
A
D
I
N
G
P
L
A
N
KEYMAP
NORTH
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
before you dig.Call
R
G2G1
MA
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
G
2
LEGEND:
PROPOSED CONTOUR
EXISTING STORM SEWER
PROPOSED STORM SEWER
PROPOSED SWALE
EXISTING CONTOUR
PROPOSED CURB AND GUTTER
PROPERTY BOUNDARY
PROPOSED SPOT ELEVATION
PROPOSED SLOPES
1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL
UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW
CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL
UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN
UNDERGROUND UTILITIES.
2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS,
UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION.
3.ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM; NGVD 29
(UNADJUSTED). SEE COVER SHEET FOR BENCHMARK REFERENCES.
4.FLOOD ZONE DESIGNATION: ACCORDING TO FEMA MAP NUMBER 08069C1003G,
DATED MAY 2, 2012, A PORTION OF THIS TRACT OF LAND IS WITHIN A FEMA
DESIGNATED SPECIAL FLOOD HAZARD AREA (SFHA), AND IS SUBJECT TO
INUNDATION BY THE 1% ANNUAL CHANCE (100-YEAR) FLOOD.
5.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATORY 100-YR
BOXELDER CREEK FLOODWAY AND HIGH-RISK FLOOD FRINGE, AND MUST COMPLY
WITH THE FLOODPLAIN REQUIREMENTS OF CHAPTER 10 OF THE CITY OF FORT
COLLINS MUNICIPAL CODE.
6.CONSTRUCTION OF NEW RESIDENTIAL STRUCTURES IS NOT ALLOWED IN THE
FLOODWAY. RESIDENTIAL STRUCTURES ARE ALLOWED IN THE FLOOD FRINGE,
PROVIDED THAT ALL DUCT WORK, HEATING, VENTILATION AND AIR CONDITIONING
SYSTEMS, HOT WATER HEATER, ELECTRICAL AND THE LOWEST FLOOR OF THE
BUILDING ARE A MINIMUM OF 18-INCHES ABOVE THE BASE FLOOD ELEVATION (BFE).
THAT MINIMUM ELEVATION IS KNOWN AS THE REGULATORY FLOOD PROTECTION
ELEVATION (RFPE). RFPE=BFE+18".
7.THE FLOOD FRINGE IS AN AO ZONE, MEANING THAT THE BFE'S HAVE NOT BEEN
DETERMINED, SO THE BFE FOR EACH STRUCTURE WILL BE 2.0 FEET ABOVE THE
HIGHEST ADJACENT GRADE (HAG), AND THE RFPE WILL BE HAG + 3.5 FEET; OR THIS
AREA WILL HAVE TO BE MODELED BY A PROFESSIONAL ENGINEER LICENSED IN THE
STATE OF COLORADO TO ESTABLISH BFE'S.
8.BASEMENTS MAY NOT BE CONSTRUCTED BELOW THE RFPE IN THE FLOOD FRINGE.
CRAWL SPACES (IF USED RATHER THAN SLAB_ON_GRADE) MUST BE BUILT IN
CONFORMANCE WITH SECTION 10_40 OF CITY OF FORT COLLINS MUNICIPAL CODE
(THIS WILL INCLUDE VENTING, SUMP PUMPS, ETC.).
9.NONSTRUCTURAL DEVELOPMENT (FENCES, DETENTION PONDS, HARD SURFACE
PATHS, FILL, DRIVEWAYS, PARKING AREAS, VEGETATION, ETC.) IS ALLOWED WITHIN
THE 100_YEAR FLOODWAY AS LONG AS IT CAN BE PROVEN THAT THE
DEVELOPMENT WILL NOT CAUSE A RISE IN THE BASE FLOOD ELEVATION (BFE) OR A
CHANGE TO THE FLOODWAY OR FLOOD FRINGE BOUNDARIES. NONSTRUCTURAL
DEVELOPMENT IS NOT RESTRICTED WITHIN THE FLOOD FRINGE.
10.ANY AND ALL CONSTRUCTION ACTIVITIES IN THE FLOODWAY OR FLOOD FRINGE
MUST BE PRECEDED BY AN APPROVED FLOODPLAIN USE PERMIT. IF THE
CONSTRUCTION IS IN THE FLOODWAY A NO-RISE CERTIFICATION MUST BE
APPROVED PRIOR TO CONSTRUCTION.
11.LOT 3, SHALL REMAIN UNBUILDABLE UNTIL A SECOND ACCESS TO FOX GROVE IS
AVAILABLE. DURING THE INTERIM, LOT 3 SHALL BE OVERLOT GRADED AS A TYPE-B
LOT. THE EMERGENCY ACCESS EASEMENT SHALL CONSTRUCTED WITH
COMPACTED ROADBASE ENGINEERED TO SUPPORT 40 TONS.
12.THE GATED FIRE ACCESS SHALL NOT BE LOCKED FROM EITHER SIDE SO AS TO BE
ACCESSIBLE FROM EITHER HUNTSMAN OR QUEST DRIVE. THE GATE SHALL ALLOW
FOR A 20' OPENING MINIMUM.
NOTES:
PROPOSED STORM INLET
EXISTING SPOT ELEVATION
PROPOSED FIRE HYDRANT
PROPOSED LOT LINE
PROPOSED CONCRETE
CROSS PAN (TYP.)
EXISTING RIGHT OF WAY
PROPOSED RIGHT OF WAY
FLOODPLAIN AND FLOODWAY
POROUS LANDSCAPE DETENTION
WINGWALL DETAIL
SEE WINGWALL DETAIL THIS SHEET
RECO
R
D
D
R
A
W
I
N
G
X
XXXXXXXXXXXXXXXXX
ST
ST
E
FO
OHE OHE OHE OHE OHE OHE OHE
POND 4
SEE DETAILED
GRADING SHEET G3
FOX GROVE DRIVE
HUNTSMAN DRIVE
TO
D
D
R
I
V
E
KIT DEN DRIVE
CARR
I
A
G
E
P
A
R
K
W
A
Y
CA
R
R
I
A
G
E
P
A
R
K
W
A
Y
CLYDESDALE PARK
SUBDIVISION
(SINGLE FAMILY)
CW SUBTRUST C/O AGUR FOUNDATION
INDUSTRIAL DISTRICT
(UNDEVELOPED)
SUNFLOWER SUBDIVISION
(SINGLE FAMILY)
OUTLOT G
OUTLOT E
OUT
L
O
T
B
OUTLOT H
OUT
L
O
T
F
OUTLOT C
LOT 46
FG=24.34
TF=25.01
A
STORM DRAIN LINE 2
SEE SHEET ST2
STORM DRAIN LINE 5
SEE SHEET ST3
STORM DRAIN LINE 3
SEE SHEET ST2
STORM DRAIN LINE 4
SEE SHEET ST3
POND 3
SEE DETAILED
GRADING SHEET G3
LOT 47
FG=25.07
TF=25.74
A
LOT 48
FG=25.53
TF=26.20
A LOT 49
FG=25.95
TF=26.62
A
LOT 50
FG=26.41
TF=27.08
A
LOT 51
FG=26.54
TF=27.21
A LOT 52
FG=26.22
TF=26.89
A
LOT 53
FG=26.10
TF=26.77
A
LOT 54
FG=26.03
TF=26.70
A
LOT 55
FG=25.74
TF=26.41
A
LOT 56
FG=25.31
TF=25.98
A
LOT 57
FG=24.82
TF=25.49
A
LOT 58
FG=23.97
TF=24.64
A
LOT 27
FG=23.27
TF=23.94
B
LOT 26
FG=24.33
TF=25.00
B
LOT 25
FG=25.36
TF=26.03
B
LOT 24
FG=25.69
TF=26.36
B
LOT 23
FG=25.69
TF=26.36
B
LOT 22
FG=25.66
TF=26.33
B
LOT 9
FG=23.41
TF=24.08
A
LOT 10
FG=23.75
TF=24.42
A
LOT 11
FG=23.55
TF=24.22
A
LOT 12
FG=23.19
TF=23.86
A
LOT 13
FG=23.02
TF=23.69
A
LOT 14
FG=23.12
TF=23.79
A
LOT 15
FG=23.39
TF=24.06
A
LOT 16
FG=23.69
TF=24.36
A
LOT 17
FG=23.99
TF=24.66
A
LOT 18
FG=24.29
TF=24.96
A
LOT 19
FG=24.60
TF=25.27
A LOT 20
FG=24.97
TF=25.64
A
LOT 21
FG=25.19
TF=25.86
A
LOT 59
FG=26.89
TF=27.56
A
LOT 60
FG=26.90
TF=27.57
A
LOT 61
FG=27.31
TF=27.98
A
LOT 62
FG=26.72
TF=27.39
A
LOT 63
FG=25.95
TF=26.62
A
LOT 64
FG=25.68
TF=26.35
A
LOT 65
FG=25.12
TF=25.79
A
LOT 66
FG=24.50
TF=25.17
A
LOT 67
FG=24.53
TF=25.20
A
STORM DRAIN LINE 3
SEE SHEET ST2
CA
R
R
I
A
G
E
P
A
R
K
W
A
Y
13.73'
8.67'
19.99'7.05'
119°
133°19.28
8.65
8.62
7.00
138°
133°
5.0' SIDEWALK
5.0' SIDEWALK
Sheet
Of 45 Sheets
FO
X
G
R
O
V
E
30
1
N
.
H
o
w
e
s
S
t
r
e
e
t
,
S
u
i
t
e
1
0
0
Fo
r
t
C
o
l
l
i
n
s
,
C
o
l
o
r
a
d
o
8
0
5
2
1
E
N
G
I
N
E
E
R
N
G
I
E
H
T
R
O
N
R
N
PH
O
N
E
:
9
7
0
.
2
2
1
.
4
1
5
8
ww
w
.
n
o
r
t
h
e
r
n
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
G2
GR
A
D
I
N
G
P
L
A
N
KEYMAP
NORTH
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
before you dig.Call
R
MA
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
G
1
LEGEND:
PROPOSED CONTOUR
EXISTING STORM SEWER
PROPOSED STORM SEWER
PROPOSED SWALE
EXISTING CONTOUR
PROPOSED CURB AND GUTTER
PROPERTY BOUNDARY
PROPOSED SPOT ELEVATION
PROPOSED SLOPES
1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL
UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW
CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL
UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN
UNDERGROUND UTILITIES.
2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS,
UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION.
3.ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM; NGVD 29
(UNADJUSTED). SEE COVER SHEET FOR BENCHMARK REFERENCES.
4.FLOOD ZONE DESIGNATION: ACCORDING TO FEMA MAP NUMBER 08069C1003G,
DATED MAY 2, 2012, A PORTION OF THIS TRACT OF LAND IS WITHIN A FEMA
DESIGNATED SPECIAL FLOOD HAZARD AREA (SFHA), AND IS SUBJECT TO
INUNDATION BY THE 1% ANNUAL CHANCE (100-YEAR) FLOOD.
5.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATORY 100-YR
BOXELDER CREEK FLOODWAY AND HIGH-RISK FLOOD FRINGE, AND MUST COMPLY
WITH THE FLOODPLAIN REQUIREMENTS OF CHAPTER 10 OF THE CITY OF FORT
COLLINS MUNICIPAL CODE.
6.CONSTRUCTION OF NEW RESIDENTIAL STRUCTURES IS NOT ALLOWED IN THE
FLOODWAY. RESIDENTIAL STRUCTURES ARE ALLOWED IN THE FLOOD FRINGE,
PROVIDED THAT ALL DUCT WORK, HEATING, VENTILATION AND AIR CONDITIONING
SYSTEMS, HOT WATER HEATER, ELECTRICAL AND THE LOWEST FLOOR OF THE
BUILDING ARE A MINIMUM OF 18-INCHES ABOVE THE BASE FLOOD ELEVATION (BFE).
THAT MINIMUM ELEVATION IS KNOWN AS THE REGULATORY FLOOD PROTECTION
ELEVATION (RFPE). RFPE=BFE+18".
7.THE FLOOD FRINGE IS AN AO ZONE, MEANING THAT THE BFE'S HAVE NOT BEEN
DETERMINED, SO THE BFE FOR EACH STRUCTURE WILL BE 2.0 FEET ABOVE THE
HIGHEST ADJACENT GRADE (HAG), AND THE RFPE WILL BE HAG + 3.5 FEET; OR THIS
AREA WILL HAVE TO BE MODELED BY A PROFESSIONAL ENGINEER LICENSED IN THE
STATE OF COLORADO TO ESTABLISH BFE'S.
8.BASEMENTS MAY NOT BE CONSTRUCTED BELOW THE RFPE IN THE FLOOD FRINGE.
CRAWL SPACES (IF USED RATHER THAN SLAB_ON_GRADE) MUST BE BUILT IN
CONFORMANCE WITH SECTION 10_40 OF CITY OF FORT COLLINS MUNICIPAL CODE
(THIS WILL INCLUDE VENTING, SUMP PUMPS, ETC.).
9.NONSTRUCTURAL DEVELOPMENT (FENCES, DETENTION PONDS, HARD SURFACE
PATHS, FILL, DRIVEWAYS, PARKING AREAS, VEGETATION, ETC.) IS ALLOWED WITHIN
THE 100_YEAR FLOODWAY AS LONG AS IT CAN BE PROVEN THAT THE
DEVELOPMENT WILL NOT CAUSE A RISE IN THE BASE FLOOD ELEVATION (BFE) OR A
CHANGE TO THE FLOODWAY OR FLOOD FRINGE BOUNDARIES. NONSTRUCTURAL
DEVELOPMENT IS NOT RESTRICTED WITHIN THE FLOOD FRINGE.
10.ANY AND ALL CONSTRUCTION ACTIVITIES IN THE FLOODWAY OR FLOOD FRINGE
MUST BE PRECEDED BY AN APPROVED FLOODPLAIN USE PERMIT. IF THE
CONSTRUCTION IS IN THE FLOODWAY A NO-RISE CERTIFICATION MUST BE
APPROVED PRIOR TO CONSTRUCTION.
11.LOT 3, SHALL REMAIN UNBUILDABLE UNTIL A SECOND ACCESS TO FOX GROVE IS
AVAILABLE. DURING THE INTERIM, LOT 3 SHALL BE OVERLOT GRADED AS A TYPE-B
LOT. THE EMERGENCY ACCESS EASEMENT SHALL CONSTRUCTED WITH
COMPACTED ROADBASE ENGINEERED TO SUPPORT 40 TONS.
12.THE GATED FIRE ACCESS SHALL NOT BE LOCKED FROM EITHER SIDE SO AS TO BE
ACCESSIBLE FROM EITHER HUNTSMAN OR QUEST DRIVE. THE GATE SHALL ALLOW
FOR A 20' OPENING MINIMUM.
NOTES:
PROPOSED STORM INLET
EXISTING SPOT ELEVATION
PROPOSED FIRE HYDRANT
PROPOSED LOT LINE
PROPOSED CONCRETE
CROSS PAN (TYP.)
EXISTING RIGHT OF WAY
PROPOSED RIGHT OF WAY
FLOODPLAIN AND FLOODWAY
POROUS LANDSCAPE DETENTION
WINGWALL DETAIL
G1 G2
SEE WINGWALL DETAIL THIS SHEET
RECO
R
D
D
R
A
W
I
N
G
OUTLOT D
STORM DRAIN LINE 6
SEE SHEET ST4
INV=4914.17
INV=4914.13
INV=4914.03
INV=4914.02INV=4914.00
INV=4913.99
INV=4913.94
INV=4913.86INV=4913.44
26
L
F
6
"
P
V
C
@
0
.
3
%
15 LF 6" PERF. PVC @ 0.3%
12 LF 6" PERF. PVC @ 0.3%
4 LF 6" PERF. PVC @ 0.3%
45
L
F
6
"
P
E
R
F
.
P
V
C
@
0
.
3
%
142 LF 6" PVC @ 0.3%
48
L
F
6
"
P
E
R
F
.
P
V
C
@
0
.
3
%
19 LF 6" PERF. PVC @ 0.3%
4' SIDEWALK CULVERT
SEE UNDERDRAIN TO OUTLET
STRUCTURE CONNECTION DETAIL
SHEET D5
CONCRETE INFALL
BASIN
CONCRETE RUNDOWN
FOX GROVE DRIVE
TO
D
D
R
I
V
E
OUTLOT C
STORM DRAIN LINE 2
SEE SHEET ST2
INV=4914.17
INV=4914.08
INV=4914.00
INV=4913.91
INV=4913.88
INV=4913.76
INV=4913.55
40 LF 6" PERF. PVC @ 0.3%
40 LF 6" PERF. PVC @ 0.3%57 LF 6" PERF. PVC @ 0.3%
71 LF 6" PVC
@
0
.
3
%
27
L
F
6
"
P
E
R
F
.
P
V
C
@
0
.
3
%
12 LF 6" PERF. PVC @ 0.3%
LANDSCAPE WALL
SEE LANDSCAPE PLANS
FOR MORE DETAIL
SEE UNDERDRAIN TO OUTLET
STRUCTURE CONNECTION DETAIL
SHEET D5
KIT DEN DRIVE
OUTLOT H
STORM DRAIN LINE 5
SEE SHEET ST3
STORM DRAIN LINE 4
SEE SHEET ST3
FO
X
G
R
O
V
E
D
R
I
V
E
CA
R
R
I
A
G
E
P
A
R
K
W
A
Y
STORM DRAIN LINE 3
SEE SHEET ST2
INV=4915.16
INV=4915.09
INV=4915.07
INV=4914.77
4 LF 6" PERF. PVC @ 0.3%
25 LF
6
"
P
E
R
F
.
P
V
C
@
0
.
3
%
10
7
L
F
6
"
P
V
C
@
0
.
3
%
SEE UNDERDRAIN TO
OUTLET STRUCTURE CONNECTION
DETAIL SHEET D5
Sheet
Of 45 Sheets
FO
X
G
R
O
V
E
30
1
N
.
H
o
w
e
s
S
t
r
e
e
t
,
S
u
i
t
e
1
0
0
Fo
r
t
C
o
l
l
i
n
s
,
C
o
l
o
r
a
d
o
8
0
5
2
1
E
N
G
I
N
E
E
R
N
G
I
E
H
T
R
O
N
R
N
PH
O
N
E
:
9
7
0
.
2
2
1
.
4
1
5
8
ww
w
.
n
o
r
t
h
e
r
n
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
G3
GR
A
D
I
N
G
P
L
A
N
DE
T
E
N
T
I
O
N
P
O
N
D
KEYMAP
NORTH
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
before you dig.Call
R
POND 2
LEGEND:
PROPOSED CONTOUR
EXISTING STORM SEWER
PROPOSED STORM SEWER
PROPOSED SWALE
EXISTING CONTOUR
PROPOSED CURB AND GUTTER
PROPERTY BOUNDARY
PROPOSED SPOT ELEVATION
PROPOSED SLOPES
1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL
UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW
CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL
UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN
UNDERGROUND UTILITIES.
2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS,
UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION.
3.ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM; NGVD 29
(UNADJUSTED). SEE COVER SHEET FOR BENCHMARK REFERENCES.
4.FLOOD ZONE DESIGNATION: ACCORDING TO FEMA MAP NUMBER 08069C1003G,
DATED MAY 2, 2012, A PORTION OF THIS TRACT OF LAND IS WITHIN A FEMA
DESIGNATED SPECIAL FLOOD HAZARD AREA (SFHA), AND IS SUBJECT TO
INUNDATION BY THE 1% ANNUAL CHANCE (100-YEAR) FLOOD.
5.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATORY 100-YR
BOXELDER CREEK FLOODWAY AND HIGH-RISK FLOOD FRINGE, AND MUST COMPLY
WITH THE FLOODPLAIN REQUIREMENTS OF CHAPTER 10 OF THE CITY OF FORT
COLLINS MUNICIPAL CODE.
6.CONSTRUCTION OF NEW RESIDENTIAL STRUCTURES IS NOT ALLOWED IN THE
FLOODWAY. RESIDENTIAL STRUCTURES ARE ALLOWED IN THE FLOOD FRINGE,
PROVIDED THAT ALL DUCT WORK, HEATING, VENTILATION AND AIR CONDITIONING
SYSTEMS, HOT WATER HEATER, ELECTRICAL AND THE LOWEST FLOOR OF THE
BUILDING ARE A MINIMUM OF 18-INCHES ABOVE THE BASE FLOOD ELEVATION (BFE).
THAT MINIMUM ELEVATION IS KNOWN AS THE REGULATORY FLOOD PROTECTION
ELEVATION (RFPE). RFPE=BFE+18".
7.THE FLOOD FRINGE IS AN AO ZONE, MEANING THAT THE BFE'S HAVE NOT BEEN
DETERMINED, SO THE BFE FOR EACH STRUCTURE WILL BE 2.0 FEET ABOVE THE
HIGHEST ADJACENT GRADE (HAG), AND THE RFPE WILL BE HAG + 3.5 FEET; OR THIS
AREA WILL HAVE TO BE MODELED BY A PROFESSIONAL ENGINEER LICENSED IN THE
STATE OF COLORADO TO ESTABLISH BFE'S.
8.BASEMENTS MAY NOT BE CONSTRUCTED BELOW THE RFPE IN THE FLOOD FRINGE.
CRAWL SPACES (IF USED RATHER THAN SLAB_ON_GRADE) MUST BE BUILT IN
CONFORMANCE WITH SECTION 10_40 OF CITY OF FORT COLLINS MUNICIPAL CODE
(THIS WILL INCLUDE VENTING, SUMP PUMPS, ETC.).
9.NONSTRUCTURAL DEVELOPMENT (FENCES, DETENTION PONDS, HARD SURFACE
PATHS, FILL, DRIVEWAYS, PARKING AREAS, VEGETATION, ETC.) IS ALLOWED WITHIN
THE 100_YEAR FLOODWAY AS LONG AS IT CAN BE PROVEN THAT THE
DEVELOPMENT WILL NOT CAUSE A RISE IN THE BASE FLOOD ELEVATION (BFE) OR A
CHANGE TO THE FLOODWAY OR FLOOD FRINGE BOUNDARIES. NONSTRUCTURAL
DEVELOPMENT IS NOT RESTRICTED WITHIN THE FLOOD FRINGE.
10.ANY AND ALL CONSTRUCTION ACTIVITIES IN THE FLOODWAY OR FLOOD FRINGE
MUST BE PRECEDED BY AN APPROVED FLOODPLAIN USE PERMIT. IF THE
CONSTRUCTION IS IN THE FLOODWAY A NO-RISE CERTIFICATION MUST BE
APPROVED PRIOR TO CONSTRUCTION.
11.LOT 3, SHALL REMAIN UNBUILDABLE UNTIL A SECOND ACCESS TO FOX GROVE IS
AVAILABLE. DURING THE INTERIM, LOT 3 SHALL BE OVERLOT GRADED AS A TYPE-B
LOT. THE EMERGENCY ACCESS EASEMENT SHALL CONSTRUCTED WITH
COMPACTED ROADBASE ENGINEERED TO SUPPORT 40 TONS.
12.THE GATED FIRE ACCESS SHALL NOT BE LOCKED FROM EITHER SIDE SO AS TO BE
ACCESSIBLE FROM EITHER HUNTSMAN OR QUEST DRIVE. THE GATE SHALL ALLOW
FOR A 20' OPENING MINIMUM.
NOTES:
PROPOSED STORM INLET
EXISTING SPOT ELEVATION
PROPOSED FIRE HYDRANT
PROPOSED LOT LINE
PROPOSED CONCRETE
CROSS PAN (TYP.)
EXISTING RIGHT OF WAY
PROPOSED RIGHT OF WAY
FLOODPLAIN AND FLOODWAY
POROUS LANDSCAPE DETENTION
POND 2
POND 3
POND 4
POND 3 POND 4
RECO
R
D
D
R
A
W
I
N
G
D4
DR
A
I
N
A
G
E
D
E
T
A
I
L
S
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
before you dig.Call
R
300 STORMWATER BEDDING REQUIREMENTS STANDARD MANHOLE CHANNELING DETAILS FOR MANHOLES301302 FLARED END SECTION TRASH RACK303
CONCRETE END SECTIONS304
BURIED RIPRAP SCHEDULE307
Sheet
Of 45 Sheets
FO
X
G
R
O
V
E
30
1
N
.
H
o
w
e
s
S
t
r
e
e
t
,
S
u
i
t
e
1
0
0
Fo
r
t
C
o
l
l
i
n
s
,
C
o
l
o
r
a
d
o
8
0
5
2
1
E
N
G
I
N
E
E
R
N
G
I
E
H
T
R
O
N
R
N
PH
O
N
E
:
9
7
0
.
2
2
1
.
4
1
5
8
ww
w
.
n
o
r
t
h
e
r
n
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
CC
A
A
B
B
SECTION C-C
SECTION A-A SECTION B-B
WELL SCREEN FLOW CONTROL PLATE
PLAN
GENERAL NOTES
SECTION D-D
D
D
A A
ABBREVIATIONS
LEGEND
WATER QUALITY OUTLET STRUCTURE305
INLET SCHEDULE306
Storm Line Pipe
Diameter
(ft)
Ordinary
Riprap
Type
Length
of Riprap
(ft)
Width
of Riprap
(ft)
2*d50,
Depth of Riprap
(ft)
Storm Line 2 1.00 Type M 5.00 5.00 2.0
Storm Line 3 2.00 Type M 10.00 10.00 2.0
Storm Line 4 1.00 Type M 5.00 5.00 2.0
Storm Line 5 1.00 Type M 5.00 5.00 2.0
Storm Line 6 2.00 Type M 10.00 10.00 2.0
Storm Line 7 2.50 Type M 35.00 20.00 2.0
Storm Line 8 1.50 Type M 30.00 20.00 2.0
INLET ID INLET TYPE
2-2 Double Combination
2-3 Triple Combination
4-7 Single Combination
4-8 Double Combination
5-3 Single Combination
5-4 Single Combination
RECO
R
D
D
R
A
W
I
N
G
335-008
Fort Collins
MCR Date:6/18/2018
Pond No.:Pond 1
100-yr
1.75 acft 4917.00 ft.
Design Storm WQCV
Required Volume=10934 ft3 4914.13 ft.
Contour
Elevation (Y-
values)
Contour
Area Depth Column
Not Used
Incremental
Volume Total Volume Total
Volume
ft3 ft. ft3 ft3 ft3 acre-feet
4,912.00 2.17 0.00 0 0 0 0
4,912.50 442.18 0.10 36 65 0.00
4,913.00 2,327.99 0.10 203 650 0.01
4,913.50 7,483.00 0.10 682 2982 0.07
4,914.10 16,480.85 0.10 1601 10443 0.24
4,914.20 17,289.84 0.10 1687 12130 0.28
4,914.30 17,929.31 0.10 1759 13889 0.32
4,914.40 18,427.38 0.10 1816 15705 0.36
4,914.50 18,880.53 0.10 1863 17568 0.40
4,914.60 19,296.97 0.10 1907 19475 0.45
4,914.70 19,666.50 0.10 1946 21421 0.49
4,914.80 20,031.41 0.10 1983 23404 0.54
4,914.90 20,396.39 0.10 2019 25423 0.58
4,915.00 20,761.70 0.10 2056 27479 0.63
4,915.50 22,599.25 0.10 2239 38308 0.88
4,916.00 24,454.38 0.10 2424 50059 1.15
4,916.50 26,322.57 0.10 2611 62740 1.44
4,916.60 26,696.10 0.10 2648 65388 1.50
4,916.70 27,069.38 0.10 2686 68074 1.56
4,916.80 27,442.60 0.10 2723 70797 1.63
4,916.90 27,814.21 0.10 2760 73557 1.69
4,917.00 28,184.49 0.10 2797 76354 1.75
4,917.10 28,554.11 0.10 2834 79188 1.82
4,917.20 28,923.56 0.10 2871 82059 1.88
4,917.30 29,296.98 0.10 2908 84967 1.95
4,917.40 29,672.24 0.10 2945 87912 2.02
4,917.50 30,049.92 0.10 2983 90895 2.09
4,917.60 30,429.57 0.10 3021 93916 2.16
4,917.70 30,811.32 0.10 3059 96975 2.23
4,917.80 31,193.35 0.10 3097 100072 2.30
4,917.90 31,575.56 0.10 3135 103208 2.37
4,918.00 31,958.43 0.10 3174 106381 2.44
4,918.10 32,342.22 0.10 3212 109593 2.52
4,918.20 32,727.31 0.10 3250 112843 2.59
4,918.30 33,114.32 0.10 3289 116132 2.67
4,918.40 33,502.58 0.10 3327 119460 2.74
4,918.50 33,891.99 0.10 3366 122826 2.82
4,918.60 34,282.92 0.10 3405 126231 2.90
4,918.70 34,675.58 0.10 3444 129676 2.98
4,918.80 35,069.67 0.10 3484 133159 3.06
4,918.90 35,464.66 0.10 3523 136683 3.14
4,919.00 35,860.53 0.10 3563 140245 3.22
4,919.10 36,257.30 0.10 3602 143848 3.30
4,919.20 36,654.95 0.10 3642 147489 3.39
4,919.30 37,053.50 0.10 3682 151171 3.47
4,919.40 37,452.92 0.10 3722 154893 3.56
4,919.50 37,853.24 0.10 3762 158654 3.64
4,919.60 38,254.45 0.10 3802 162456 3.73
Design Point
Design Storm
Require Volume=
Stage - Storage Calculation
Project Number:
Project Location:
Calculations By:
Required Volume Water Surface Elevation (WSE)
335-008
Fort Collins
MCR Date:6/18/2018
Pond No.:Pond 2
100-yr
0.39 acft 4918.57 ft.
Design Storm WQCV
Required Volume=0 ft3 N/A ft.
Contour
Elevation (Y-
values)
Contour
Area Depth Column
Not Used
Incremental
Volume Total Volume Total
Volume
ft3 ft.ft3 ft3 ft3 acre-feet
4915.8 11.7 0.00 0 0 0 0
4,916.00 173.66 0.20 15 15 0.00
4,916.20 450.83 0.20 60 76 0.00
4,916.40 825.68 0.20 126 201 0.00
4,916.60 1,855.60 0.20 261 462 0.01
4,916.80 3,196.48 0.20 499 961 0.02
4,917.00 4,303.30 0.20 746 1707 0.04
4,917.20 5,707.29 0.20 997 2704 0.06
4,917.40 7,593.72 0.20 1324 4028 0.09
4,917.60 8,906.24 0.20 1647 5675 0.13
4,917.80 10,098.77 0.20 1897 7572 0.17
4,918.00 11,149.20 0.20 2122 9694 0.22
4,918.20 12,231.29 0.20 2335 12029 0.28
4,918.40 13,279.33 0.20 2548 14577 0.33
4,918.60 14,528.81 0.20 2777 17354 0.40
4,918.80 15,887.61 0.20 3038 20392 0.47
4,919.00 17,014.26 0.20 3286 23678 0.54
4,919.20 17,820.74 0.20 3480 27158 0.62
Design Point
Design Storm
Require Volume=
Stage - Storage Calculation
Project Number:
Project Location:
Calculations By:
Required Volume Water Surface Elevation (WSE)
335-008
Fort Collins
MCR Date:6/18/2018
Pond No.:Pond 3
100-yr
1.48 acft 4920.19 ft.
Design Storm WQCV
Required Volume=2962 ft3 4916.65 ft.
Contour
Elevation (Y-
values)
Contour
Area Depth Column
Not Used
Incremental
Volume
Total
Volume
Total
Volume
ft3 ft.ft3 ft3 ft3 acre-feet
4,915.60 335.6 0.00 0 0 0 0
4,915.80 923.66 0.20 121 121 0.00
4,916.00 2024.6 0.20 287 408 0.01
4,916.20 3,192.49 0.20 517 925 0.02
4,916.40 4,056.75 0.20 722 1648 0.04
4,916.60 6,013.06 0.20 1000 2647 0.06
4,916.69 6,524.22 0.09 563 3211 0.07
4,916.80 7,191.24 0.11 753 3964 0.09
4,917.00 8,461.37 0.20 1562 5526 0.13
4,917.20 9,908.73 0.20 1833 7359 0.17
4,917.40 11,664.15 0.20 2153 9512 0.22
4,917.60 13,032.22 0.20 2466 11978 0.27
4,917.80 14,210.48 0.20 2721 14699 0.34
4,918.00 15,773.22 0.20 2994 17693 0.41
4,918.20 16,791.02 0.20 3253 20945 0.48
4,918.40 17,767.24 0.20 3452 24397 0.56
4,918.60 18,814.35 0.20 3654 28051 0.64
4,918.80 19,807.76 0.20 3858 31909 0.73
4,919.00 20,809.23 0.20 4057 35966 0.83
4,919.20 21,840.16 0.20 4260 40227 0.92
4,919.40 22,856.77 0.20 4465 44691 1.03
4,919.60 23,833.60 0.20 4664 49355 1.13
4,919.80 24,831.14 0.20 4861 54217 1.24
4,920.00 25812 0.20 5059 59276 1.36
4,920.20 26754 0.20 5251 64527 1.48
4,920.40 27694 0.20 5439 69966 1.61
Design Point
Design Storm
Require Volume=
Stage - Storage Calculation
Project Number:
Project Location:
Calculations By:
Required Volume Water Surface Elevation (WSE)
335-008
Fox Grove
MCR Date:6/18/2018
Pond No.:Pond 4
100-yr
0.93 acft 4921.54 ft.
Design Storm WQCV
Required Volume=1699 ft3 4917.79 ft.
Contour
Elevation (Y-
values)
Contour
Area Depth Column
Not Used
Incremental
Volume
Total
Volume
Total
Volume
ft3 ft.ft3 ft3 ft3 acre-feet
4,916.80 11.82 0.00 0 0 0 0
4,917.00 737.94 0.20 56 56 0.00
4,917.20 1406.75 0.20 211 267 0.01
4,917.40 1970.51 0.20 336 603 0.01
4,917.60 2,747.92 0.20 469 1072 0.02
4,917.80 3,776.36 0.20 649 1721 0.04
4,918.00 4,944.22 0.20 869 2590 0.06
4,918.20 6,387.77 0.20 1129 3719 0.09
4,918.40 7,665.54 0.20 1402 5120 0.12
4,918.60 8,236.45 0.20 1588 6709 0.15
4,918.80 8,647.30 0.20 1687 8395 0.19
4,919.00 9,064.06 0.20 1769 10164 0.23
4,919.20 9,485.88 0.20 1853 12017 0.28
4,919.40 9,912.88 0.20 1938 13955 0.32
4,919.60 10,346.20 0.20 2024 15979 0.37
4,919.80 10,786.16 0.20 2111 18090 0.42
4,920.00 11,232.70 0.20 2200 20289 0.47
4,920.20 11,686.09 0.20 2289 22579 0.52
4,920.40 12,144.76 0.20 2381 24959 0.57
4,920.60 12,608.08 0.20 2473 27432 0.63
4,920.80 13,073.47 0.20 2565 29998 0.69
4,921.00 13,550.12 0.20 2660 32657 0.75
4,921.20 14,055.70 0.20 2758 35415 0.81
4,921.40 14,609.86 0.20 2864 38278 0.88
4,921.60 15147 0.20 2973 41251 0.95
4921.8 15694.32 0.20 3081 44332 1.02
Design Point
Design Storm
Require Volume=
Stage - Storage Calculation
Project Number:
Project Location:
Calculations By:
Required Volume Water Surface Elevation (WSE)
Stormwater Facility Name:
Facility Location & Jurisdiction:
User Input: Watershed Characteristics User Defined User Defined User Defined User Defined
Watershed Slope =0.010 ft/ft Stage [ft] Area [ft^2] Stage [ft] Discharge [cfs]
Watershed Length =894 ft 0.00 0 0.00 0.00
Watershed Area = 15.01 acres 2.00 15,570 2.00 1.51
Watershed Imperviousness = 70.0%percent 4.00 24,454 4.00 2.40
Percentage Hydrologic Soil Group A =percent 6.00 31,958 6.00 3.03
Percentage Hydrologic Soil Group B = 40.0%percent 7.60 38,254 7.60 3.46
Percentage Hydrologic Soil Groups C/D = 60.0%percent
User Input 17
WQCV Treatment Method = 40.00 hours
After completing and printing this worksheet to a pdf, go to:
https://maperture.digitaldataservices.com/gvh/?viewer=cswdif
create a new stormwater facility, and
attach the pdf of this worksheet to that record.
Routed Hydrograph Results
Design Storm Return Period =WQCV 2 Year 5 Year 10 Year 50 Year 100 Year
One-Hour Rainfall Depth =0.53 0.86 1.14 1.43 2.38 2.89 in
Calculated Runoff Volume =0.344 0.702 1.009 1.342 2.532 3.222 acre-ft
OPTIONAL Override Runoff Volume =acre-ft
Inflow Hydrograph Volume =0.344 0.702 1.008 1.342 2.531 3.221 acre-ft
Time to Drain 97% of Inflow Volume =5.3 7.4 9.0 10.4 15.0 17.3 hours
Time to Drain 99% of Inflow Volume =5.7 8.0 9.6 11.3 16.1 18.6 hours
Maximum Ponding Depth =1.61 2.44 3.05 3.64 5.43 6.32 ft
Maximum Ponded Area =0.29 0.40 0.46 0.52 0.68 0.76 acres
Maximum Volume Stored =0.231 0.523 0.787 1.079 2.160 2.806 acre-ft
Stormwater Detention and Infiltration Design Data Sheet
Fox Grove, Detention Pond 1
Fort Collins, CO
Location for 1-hr Rainfall Depths (use dropdown):
Workbook Protected Worksheet Protected
SDI_Design_Data_v1.08_Pond1.xlsm, Design Data 6/18/2018, 4:32 PM
WQCV_Trigger = 1
RunOnce= 1
CountA=1
Draintime Coeff=1.0
0 1 2 3
#N/A
#N/A
0 1 2 3
#N/A
#N/A
Check Data Set 1 Check Data Set 1
Stormwater Detention and Infiltration Design Data Sheet
Area
Discharge
0
10
20
30
40
50
60
0.1 1 10
FL
O
W
[
c
f
s
]
TIME [hr]
100YR IN
100YR OUT
50YR IN
50YR OUT
10YR IN
10YR OUT
5YR IN
5YR OUT
2YR IN
2YR OUT
WQCV IN
WQCV OUT
0
1
2
3
4
5
6
7
0.1 1 10 100
PO
N
D
I
N
G
D
E
P
T
H
[
f
t
]
DRAIN TIME [hr]
100YR
50YR
10YR
5YR
2YR
WQCV
SDI_Design_Data_v1.08_Pond1.xlsm, Design Data 6/18/2018, 4:32 PM
Stormwater Facility Name:
Facility Location & Jurisdiction:
User Input: Watershed Characteristics User Defined User Defined User Defined User Defined
Watershed Slope =0.010 ft/ft Stage [ft] Area [ft^2] Stage [ft] Discharge [cfs]
Watershed Length =538 ft 0.00 0 0.00 0.00
Watershed Area = 5.94 acres 1.00 3,196 1.00 4.70
Watershed Imperviousness = 49.0%percent 2.00 10,098 2.00 9.40
Percentage Hydrologic Soil Group A =percent 3.40 17,820 3.40 16.00
Percentage Hydrologic Soil Group B = 40.0%percent
Percentage Hydrologic Soil Groups C/D = 60.0%percent
User Input 17
WQCV Treatment Method = 40.00 hours
After completing and printing this worksheet to a pdf, go to:
https://maperture.digitaldataservices.com/gvh/?viewer=cswdif
create a new stormwater facility, and
attach the pdf of this worksheet to that record.
Routed Hydrograph Results
Design Storm Return Period =WQCV 2 Year 5 Year 10 Year 50 Year 100 Year
One-Hour Rainfall Depth =0.53 0.86 1.14 1.43 2.38 2.89 in
Calculated Runoff Volume =0.101 0.184 0.279 0.395 0.852 1.122 acre-ft
OPTIONAL Override Runoff Volume =acre-ft
Inflow Hydrograph Volume =0.100 0.184 0.279 0.395 0.852 1.122 acre-ft
Time to Drain 97% of Inflow Volume =0.8 1.0 1.2 1.2 1.5 1.7 hours
Time to Drain 99% of Inflow Volume =1.1 1.2 1.3 1.4 1.6 1.9 hours
Maximum Ponding Depth =0.37 0.64 0.91 1.20 2.06 2.48 ft
Maximum Ponded Area =0.03 0.05 0.07 0.11 0.24 0.29 acres
Maximum Volume Stored =0.005 0.015 0.030 0.055 0.202 0.314 acre-ft
Location for 1-hr Rainfall Depths (use dropdown):
Workbook Protected Worksheet Protected
Stormwater Detention and Infiltration Design Data Sheet
Fox Grove, Detention Pond 2
Fort Collins, CO
SDI_Design_Data_v1.08_Pond2.xlsm, Design Data 6/18/2018, 4:34 PM
WQCV_Trigger = 1
RunOnce= 1
CountA=1
Draintime Coeff=1.0
0 1 2 3
#N/A
#N/A
0 1 2 3
#N/A
#N/A
Check Data Set 1 Check Data Set 1
Area
Discharge
Stormwater Detention and Infiltration Design Data Sheet
0
5
10
15
20
25
0.1 1 10
FL
O
W
[
c
f
s
]
TIME [hr]
100YR IN
100YR OUT
50YR IN
50YR OUT
10YR IN
10YR OUT
5YR IN
5YR OUT
2YR IN
2YR OUT
WQCV IN
WQCV OUT
0
0.5
1
1.5
2
2.5
3
0.1 1 10 100
PO
N
D
I
N
G
D
E
P
T
H
[
f
t
]
DRAIN TIME [hr]
100YR
50YR
10YR
5YR
2YR
WQCV
SDI_Design_Data_v1.08_Pond2.xlsm, Design Data 6/18/2018, 4:34 PM
Stormwater Facility Name:
Facility Location & Jurisdiction:
User Input: Watershed Characteristics User Defined User Defined User Defined User Defined
Watershed Slope =0.010 ft/ft Stage [ft] Area [ft^2] Stage [ft] Discharge [cfs]
Watershed Length =557 ft 0.00 0 0.00 0.00
Watershed Area = 7.08 acres 1.00 6,013 1.00 0.66
Watershed Imperviousness = 41.0%percent 3.00 18,814 3.00 1.24
Percentage Hydrologic Soil Group A =percent 4.80 27,694 4.80 4.70
Percentage Hydrologic Soil Group B = 40.0%percent
Percentage Hydrologic Soil Groups C/D = 60.0%percent
User Input 17
WQCV Treatment Method = 40.00 hours
After completing and printing this worksheet to a pdf, go to:
https://maperture.digitaldataservices.com/gvh/?viewer=cswdif
create a new stormwater facility, and
attach the pdf of this worksheet to that record.
Routed Hydrograph Results
Design Storm Return Period =WQCV 2 Year 5 Year 10 Year 50 Year 100 Year
One-Hour Rainfall Depth =0.53 0.86 1.14 1.43 2.38 2.89 in
Calculated Runoff Volume =0.108 0.179 0.279 0.409 0.948 1.268 acre-ft
OPTIONAL Override Runoff Volume =acre-ft
Inflow Hydrograph Volume =0.107 0.179 0.279 0.409 0.948 1.268 acre-ft
Time to Drain 97% of Inflow Volume =3.3 4.1 5.3 6.6 10.9 11.9 hours
Time to Drain 99% of Inflow Volume =3.5 4.4 5.7 7.1 11.6 12.7 hours
Maximum Ponding Depth =0.94 1.29 1.68 2.10 3.30 3.80 ft
Maximum Ponded Area =0.13 0.18 0.24 0.30 0.47 0.52 acres
Maximum Volume Stored =0.060 0.113 0.196 0.307 0.771 1.020 acre-ft
Location for 1-hr Rainfall Depths (use dropdown):
Workbook Protected Worksheet Protected
Stormwater Detention and Infiltration Design Data Sheet
Fox Grove, Detention Pond 3
Fort Collins, CO
SDI_Design_Data_v1.08_Pond3.xlsm, Design Data 6/18/2018, 4:35 PM
WQCV_Trigger = 1
RunOnce= 1
CountA=1
Draintime Coeff=1.0
0 1 2 3
#N/A
#N/A
0 1 2 3
#N/A
#N/A
Check Data Set 1 Check Data Set 1
Area
Discharge
Stormwater Detention and Infiltration Design Data Sheet
0
5
10
15
20
25
0.1 1 10
FL
O
W
[
c
f
s
]
TIME [hr]
100YR IN
100YR OUT
50YR IN
50YR OUT
10YR IN
10YR OUT
5YR IN
5YR OUT
2YR IN
2YR OUT
WQCV IN
WQCV OUT
0
0.5
1
1.5
2
2.5
3
3.5
4
0.1 1 10 100
PO
N
D
I
N
G
D
E
P
T
H
[
f
t
]
DRAIN TIME [hr]
100YR
50YR
10YR
5YR
2YR
WQCV
SDI_Design_Data_v1.08_Pond3.xlsm, Design Data 6/18/2018, 4:35 PM
Stormwater Facility Name:
Facility Location & Jurisdiction:
User Input: Watershed Characteristics User Defined User Defined User Defined User Defined
Watershed Slope =0.010 ft/ft Stage [ft] Area [ft^2] Stage [ft] Discharge [cfs]
Watershed Length =451 ft 0.00 0 0.00 0.00
Watershed Area = 4.25 acres 2.00 2,747 2.00 0.24
Watershed Imperviousness = 41.0%percent 4.00 8,647 4.00 0.35
Percentage Hydrologic Soil Group A =percent 5.00 13,073 5.00 0.39
Percentage Hydrologic Soil Group B = 40.0%percent
Percentage Hydrologic Soil Groups C/D = 60.0%percent
User Input 17
WQCV Treatment Method = 40.00 hours
After completing and printing this worksheet to a pdf, go to:
https://maperture.digitaldataservices.com/gvh/?viewer=cswdif
create a new stormwater facility, and
attach the pdf of this worksheet to that record.
Routed Hydrograph Results
Design Storm Return Period =WQCV 2 Year 5 Year 10 Year 50 Year 100 Year
One-Hour Rainfall Depth =0.53 0.86 1.14 1.43 2.38 2.89 in
Calculated Runoff Volume =0.065 0.107 0.168 0.246 0.569 0.761 acre-ft
OPTIONAL Override Runoff Volume =acre-ft
Inflow Hydrograph Volume =acre-ft
Time to Drain 97% of Inflow Volume =hours
Time to Drain 99% of Inflow Volume =hours
Maximum Ponding Depth =ft
Maximum Ponded Area =acres
Maximum Volume Stored =acre-ft
Location for 1-hr Rainfall Depths (use dropdown):
Workbook Protected Worksheet Protected
Stormwater Detention and Infiltration Design Data Sheet
Fox Grove, Detention Pond 4
Fort Collins, CO
SDI_Design_Data_v1.08_Pond4.xlsm, Design Data 6/18/2018, 4:35 PM
WQCV_Trigger = 1
RunOnce=
CountA=1
Draintime Coeff=1.0
0 1 2 3
#N/A
#N/A
0 1 2 3
#N/A
#N/A
Check Data Set 1 Check Data Set 1
Area
Discharge
Stormwater Detention and Infiltration Design Data Sheet
0
2
4
6
8
10
12
14
16
0.1 1 10
FL
O
W
[
c
f
s
]
TIME [hr]
100YR IN
100YR OUT
50YR IN
50YR OUT
10YR IN
10YR OUT
5YR IN
5YR OUT
2YR IN
2YR OUT
WQCV IN
WQCV OUT
0
0.2
0.4
0.6
0.8
1
1.2
0.1 1 10 100
PO
N
D
I
N
G
D
E
P
T
H
[
f
t
]
DRAIN TIME [hr]
100YR
50YR
10YR
5YR
2YR
WQCV
SDI_Design_Data_v1.08_Pond4.xlsm, Design Data 6/18/2018, 4:35 PM