HomeMy WebLinkAboutLot Certifications - 04/20/20219.A smooth transition with no vertical offset (step) in grade is provided at the lot line to all No Yes T;fJ
adjacent properties.
10.The grading of this lot does not adversely affect neighboring properties or City
infrastructure.
11.Landscaping has been completed prior to survey. If not, please indicate who will be
responsible for completing landscaping: �P�-�;7_.�l��-""""-----------
12.Final site cleanup has been completed.
13.I personally visited the site as part of the certification process, and in my professional
opinion, the as-built survey is an accurate representation of the site conditions.
14.Based on this information, I certify that (check one):
No __ Yes ZlL_
No.12L._ Yes __
No Yes Dr"
No Yes T.1J'
D The elevations and drainage patterns of the lot/site are in substantial conformance with the City
approved drainage and grading plan for the property (information attached).
J'&f' The elevations and drainage patterns of the lot/site as measured are in general conformance with the
City approved drainage plan with exceptions (information attached). In my professional judgment the
elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the
specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a
manner consistent with the approved drainage plan. C,�t! "\+f-101c/ 6"'J;M..,,....'J H<>l-n /c:;1-u-r-h-,,.,., +o f/Q I-p/,..,.. )
PE Stamp
Sign and date
Name: David B. Teets
Email: jlange@llsurvey.com
Phone: 720-242-9732
Company: Lange Land Surveys, LLC
Address: 5511 W. 56th Ave, Suite #240
Arvada, CO 80002
NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy
for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed
elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other
information necessary to confirm the above certification to:
Email (preferred)
WaterUtilitiesEng@fcgov.com
2/14/17
Mailing Address
Fort Collins Utilities
ATTN: Water Utilities Engineering
281 North College Avenue
Fort Collins, CO 80521
Questions?
970-221-6700
City of
�
Page 2