Loading...
HomeMy WebLinkAboutLot Certifications - 04/20/20219.A smooth transition with no vertical offset (step) in grade is provided at the lot line to all No Yes T;fJ adjacent properties. 10.The grading of this lot does not adversely affect neighboring properties or City infrastructure. 11.Landscaping has been completed prior to survey. If not, please indicate who will be responsible for completing landscaping: �P�-�;7_.�l��-""""----------- 12.Final site cleanup has been completed. 13.I personally visited the site as part of the certification process, and in my professional opinion, the as-built survey is an accurate representation of the site conditions. 14.Based on this information, I certify that (check one): No __ Yes ZlL_ No.12L._ Yes __ No Yes Dr" No Yes T.1J' D The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). J'&f' The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. C,�t! "\+f-101c/ 6"'J;M..,,....'J H<>l-n /c:;1-u-r-h-,,.,., +o f/Q I-p/,..,.. ) PE Stamp Sign and date Name: David B. Teets Email: jlange@llsurvey.com Phone: 720-242-9732 Company: Lange Land Surveys, LLC Address: 5511 W. 56th Ave, Suite #240 Arvada, CO 80002 NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) WaterUtilitiesEng@fcgov.com 2/14/17 Mailing Address Fort Collins Utilities ATTN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 Questions? 970-221-6700 City of � Page 2