HomeMy WebLinkAboutSite Certifications - 09/20/20191/19 Page 1
OVERALL SITE and DRAINAGE CERTIFICATION
Commercial, Multi-Family and Subdivision Certification Form and Checklist
Project Name:
Date:
Building Permit Numbers:
(Commercial or multi-family)
Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Chapter 3, Section 3.0 to certify as-
built construction to the approved drainage and grading plans, please fill in all applicable items in this
Certification Form for Commercial, Multi-Family and Overall Single Family sites. NOTE: several items must be
verified during construction. A copy of the approved grading plan must be submitted with the as-built grading
plan. (As-built elevations must be written in red next to the approved elevations.)
•Use “Yes” for items completed as described.
•Use “N/A” for items that are not applicable to the site being certified.
•If any blanks are “No,” attach an explanation referencing the item number below.
Attach an explanation or description of the as-built condition for any items listed or for anything not listed but
shown on the approved construction plans.
Provide an as-built redline or Mylar drawing with the following:
I.Water Quality and Quantity Detention Basin - FCSCM Ch. 6 and 7
For multiple detention basins on a site, provide the following for each basin separately:
A. Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and
volume verification calculations for the water quality capture volume and the 100-year detention storage
volume.
1. Detention basin topography was prepared by a professional land surveyor registered in the state
of Colorado.
2.Both proposed and as-built contours are shown on the same plan sheet (dashed lines for
proposed and solid lines for as-built).
3.All critical spot elevations as shown on the approved construction plans have been verified and
the as-built elevations are shown on the plan sheet.
4.Stage-storage-discharge tables are provided on a separate document.
5.Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92-
602(8) is attached and has been uploaded to the Statewide Compliance Portal
(tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include:
a.The cover sheet from the approved drainage report
b.The stamped certification page from the approved drainage report
c.As-built topographic survey
d.Stamped certification page from the Overall Site & Drainage Certification
e.PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet
Accepted 9/20/2019 WL
1/19 Page 2
B. Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is
a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of
the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2%
grade requirement.
1. Low Flow: Choose one of the following detention basin low flow options as applicable:
a. Turf swale for low flow path in detention basin.
There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade
is .
b. Concrete pan for low flow in detention basin.
There is a concrete pan installed that meets the grades as shown on the approved construction
plans. (Show as-built spot elevations.)
c. Soft pan for low flow in detention basin.
• Verify and document the soft pan material gradation, trench width and depth - to be verified
during construction by engineer. Picture documentation is preferred or engineer’s statement of
visual inspection and compliance. (Choose one below.)
o There is a soft pan with an underdrain installed that meets the design on the approved
construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations,
bends, cleanouts, etc.)
o There is soft pan installed without an underdrain but there is a type A or B soil. The soil
type must be documented by supplying verification from a registered professional geotechnical
engineer.
NOTE: Spot elevations are to be within 0.2 ft. +/-.
2. Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown.
Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed
is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re-
graded. Provide documentation if a variance was granted for steeper slopes during the design process.
3. Spillway: The following items must be field verified:
a. The location of the spillway is indicated on the as-built plan.
b. The width of the spillway is indicated on the as-built plan.
c. The elevation(s) of the spillway is shown on the as-built plan.
d. A concrete ribbon defines the location and grade of the spillway.
e. There is downstream scour protection in the spillway as per the construction plans. Indicate
type: (riprap size “D50” gradation and bedding type, geotextile, buried
riprap with inches of bury, etc.).
f. There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape
features, rocks, etc.
1/19 Page 3
4. Outlet Structure:
a. The orifice plate for the approved release rate is installed with the correct size and location of
the orifice.
b. The orifice plate for the water quality outlet is installed with the correct hole size, number of
rows and columns of holes.
c. The bottom hole on both the water quality and quantity outlets are at the bottom of the plate
so no water ponds in front of the plate.
d. The well screen is the correct material and is installed as shown on the construction plans.
e. 100-year overflow grate elevation is . (Elev. A on detail D-46)
f. The top elevation of the water quality capture volume is . (Elev. B on detail
D-46)
g. Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the
top and bolted at the bottom.
h. The bottom of the outlet box has no obstructions or misalignments that will cause it to retain
runoff water and is sloped at 2% towards outlet.
II. Channels/Swales - FCSCM Ch. 8, Sec. 2.0 and Ch. 9, Sec. 5.0
A. Capacity: The as-built capacity of all the major channels and swales has been verified. They meet
or exceed capacity requirements shown in the approved drainage study for this project.
1. All swales are located within the drainage easements as shown on the construction plans.
2. Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires
longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these
criteria are not met, the certification engineer will write a justification and propose mitigation for each
instance or have the issues corrected. If variances to these criteria have previously been approved and
are shown on the construction plans, no justification is needed.
3. As-built spot elevations on channels/swales are shown that correspond to spot elevations
shown on the approved construction plans.
4. All permanent erosion control measures are installed as shown on the approved construction
plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used
as part of this verification.)
5. All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the
system. (Pictures at tie-in points suggested.)
6. The minimum freeboard is provided for all channels and swales as shown on the approved
construction plans or as identified in the approved drainage study. (Show the freeboard provided on
the cross-sections as on the construction plan set or attached as separate documentation.)
7. The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees,
shrubs, sod, etc. infringe on the low flow portion of channels or swales.)
1/19 Page 4
III. Storm Pipes (aka storm drains) - FCSCM Ch. 9, Sec. 4.0
A. Storm Drain Pipe Capacity: The as-built capacity of all pipes installed on this project has been
verified and meets or exceeds the capacity requirements shown in the approved drainage study for this
project.
1. All storm drain pipe sizes and materials have been verified and are in conformance with the
approved construction plans. (Indicate on the plan and profile sheets that they have been verified.)
Material and size substitutions must be approved prior to installation. If a pipe size or material was
changed during construction, the certification engineer must attach the approval documents or supply
them with this certification. Approval documents must include a calculation documenting the capacity
equivalency (equal or greater) of the substituted size.
2. The longitudinal slope of the pipe is as shown on the approved construction plans. The
acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans
must be justified with capacity calculations on an attached sheet.
3. The as-built invert elevations have been verified and are shown on the plan and profile sheets of
the approved construction plans.
B. Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the
approved construction plans and construction specifications.
1. The minimum cover requirements for all pipes have been met as shown on the approved
construction plans. These will be called out in critical locations.
2. All encasements and clearances as specified on the approved construction plans have been met.
3. Any specific joint types or construction methods specified on the approved construction plans
have been met. (List on a separate sheet and attach to this certification.)
IV. Concrete Pans - FCSCM Ch. 8, Sec. 2.0
A. Construction/Installation: All concrete pans have been constructed in accordance with the
approved construction plans.
1. The concrete pans are the correct size/width as shown on the approved construction plans.
2. The longitudinal slopes of the pans are as shown on the approved construction plans. The
certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless
a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or
justification by separate document.
3. The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross-
section is “V” shaped and meets the side slope shown on the detail.)
4. The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4
inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide
documentation of the reinforcement used if different than shown on the details or on the approved
construction plans.)
5. The spot elevations shown on the concrete pan(s) have been verified and are shown on the as-
built drawings.
1/19 Page 5
V. Storm Drain Inlets - FCSCM Ch. 9, Sec. 3.0
A. Construction/Installation: All storm drain inlets have been constructed in accordance with the
approved construction plans and construction specifications.
1. The size and type of inlets are consistent with the inlets shown on the approved construction
plan. Indicate by writing “Verified” on each inlet on the plan sheet or list on a separate document the
inlet number(s), type and size (length). If the inlet installed is other than the one on the approved
construction plan detail sheet, provide the name and source of the detail with justification for equal or
better capacity.
2. The size of the inlet opening is consistent with the approved detail. (Check height and width.)
3. The elevation of the grate (if applicable) is at the elevation shown on the street profile or as
indicated by a spot elevation on the construction plans.
4. The as-built invert elevations of all pipes entering and leaving the inlet are shown on the plan
and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide
justification and capacity calculations to show the capacity is not affected or propose mitigation.
5. The as-built size of the inlet box is as shown on the construction plans or an explanation or
justification is attached.
6. All Type C, R, 13 and 16 inlet covers are stenciled or stamped with the following designation (or
an equivalent): NO DUMPING – DRAINS TO POUDRE RIVER.
VI. Culverts - FCSCM Ch. 9, Sec. 4.0
A. Construction/Installation: All culverts have been constructed and/or installed in accordance with
the approved construction plans and construction specifications.
1. All culvert sizes have been verified as indicated on the as-built construction plans as correct.
2. The culvert material type for all culverts installed is as on the approved construction plans and is
indicated on the as-built plans.
3. The as-built invert “in and out” elevations have been verified and are indicated on the as-built
construction plans.
4. The culvert headwalls or wing walls have been installed as shown on the approved construction
plans. Headwalls or wing walls may be needed in the as-built conditions onsite if the slopes adjacent to
the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative.
An alternative to consider is a turf reinforcement mat (TRM).
VII. Sub-Drains
A. Construction/Installation: All sub-drains shown on the construction plans have been installed in
accordance with those plans and the construction specifications. Sub-drains installed with the sanitary
sewer are to be verified on the sanitary sewer plan and profile sheets of the construction plans. (NOTE:
Indicate any sub-drains installed after the plans were approved on the as-built plans.)
1. The size of the sub-drains are as approved on the construction plans and are indicated on the as-
built plans.
2. The type of sub-drain, in particular the perforated and non-perforated sections of the drain, are
as indicated on the approved construction plans.
1/19 Page 6
3. The cover requirements per the construction plans are provided.
4. The cleanouts have been installed at the locations shown on the construction plans and are
accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations
marked.)
5. The backfill materials for sub-drains are as shown on the approved construction plans. (This
includes the type, depth and width.)
6. The geo-textile liner completely wraps the sub-drain and the permeable backfill material unless
shown otherwise on the approved construction plans. (Sub-drain pipe wrapped in a sock filter material
is accepted only if approved prior to installation.)
VIII. Curb Cuts
A. Construction: All curb cut openings are constructed in accordance with the approved construction
plans and construction specifications.
1. The size (width) of the curb cut opening is as shown on the approved construction plans.
2. The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth
transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb
cut.
IX. Sidewalk Culverts & Chases
A. Construction/Installation: All sidewalk culverts have been installed at the locations shown on the
approved construction plans.
1. The size (width and length) of the culverts are as shown on the approved construction plans.
2. The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the
detail shown on the approved construction plans or per the City’s detail.
3. The sidewalk culvert invert “in and out” elevations have been verified and are indicated on the
as-built plans.
4. The sidewalk culvert opening is as shown on the approved construction plans or per the City’s
detail.
5. There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no
obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert.
X. Site Grading - FCSCM Ch. 8
A. Construction: All common open spaces have been graded in accordance with the approved
construction plans.
1. The grading on all common open spaces bordering private lots has been verified as correct and
the as-built rear lot corner elevations have been shown on the as-built plans.
1/19 Page 7
2. The as-built contours for “overlot grading” are shown on the as-built construction plans for all
common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the
situation for noncompliance and when it may be corrected. An escrow for overlot grading may be
required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site
Certification. It is understood that residential lots will be brought to final grade once the foundation is
backfilled so they may be lower than the plan shows at this Overall Site Certification stage.)
3. All turf reinforcement mats (TRMs) have been installed as shown on the approved construction
plans and the slopes are stabilized.
XI. Permanent Erosion Control BMPs - FCSCM Ch. 9, Sec. 7.0
A. Construction: All permanent erosion control BMPs have been installed per the approved
construction plans.
1. All riprap has been installed in the locations and sizes indicated on the approved construction
plans.
2. All fabric has been installed in the locations and sizes indicated on the approved construction
plans.
a. All fabric was installed per the details on the approved construction plans.
XII. Post-Construction Site Cleanup - FCSCM Ch. 3, Sec. 2.0
A. Construction: All construction debris and obstructions of any kind have been removed from
drainage paths.
1. All construction debris has been removed except in staging area(s).
2. All ruts have been smoothed out in all construction areas.
3. All areas needing reseeding have been identified and future stabilization goals have been
coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note
the area needing stabilization in the narrative.
XIII. Certification of LID and Water Quality Facilities - FCSCM Ch. 7
A. Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and
other items to be verified during construction, along with pictures and other required documentation.
XIV. Certification of Other Permanent BMPs
A. The construction of other permanent BMPs not specifically addressed in this certification is in
accordance with the approved plan. This may include grade control structures, rundowns, bridges, stream
access/improvements, etc.
Please specify other permanent BMPs included on this site:
1/19 Page 8
XV. Certification and Erosion Control Measures - FCSCM Ch. 3
A. All temporary erosion control measures shall be removed upon stabilization. If at the time of preparing
this certification there are any erosion control measures still remaining on the site, please note them in
the narrative and verify that they need to remain at this time. If in doubt as to the need for any control
measure, please consult with the Erosion Control Inspector at erosion@fcgov.com.
XVI. Statement of Compliance - FCSCM Ch. 3
A. This certification is signed and stamped. By signing this form, the engineer(s) attests that he/she has
visited and observed the site, and to the best of his/her knowledge, the as-built conditions of the drainage
facilities are as described in the above form and in the enclosed as-built plans.
B. Failure to properly disclose all known information could result in the rejection of this certification and
prevent the release of any and all Stormwater Utility permit holds on Building Permits and/or Certificates
of Occupancy within this development.
XVII. Signature and Stamp by a Colorado-Registered Professional Engineer
Engineer’s contact information:
Name:
Email:
Phone:
Company:
Address:
Sign and date over stamp
Stormwater Facility Name:
Facility Location & Jurisdiction:
User Input: Watershed Characteristics User Defined User Defined User Defined User Defined
Watershed Slope =0.005 ft/ft Stage [ft]Area [ft^2]Stage [ft]Discharge [cfs]
Watershed Length =178 ft 0.00 248 0.00 0.00
Watershed Area =0.22 acres 0.10 248 0.10 0.01
Watershed Imperviousness =90.0%percent 0.20 248 0.20 0.01
Percentage Hydrologic Soil Group A =percent 0.30 248 0.30 0.01
Percentage Hydrologic Soil Group B =percent 0.40 248 0.40 0.01
Percentage Hydrologic Soil Groups C/D =100.0%percent 0.50 248 0.50 0.01
0.60 248 0.60 0.01
User Input 17 0.70 248 0.70 0.01
0.80 248 0.80 0.01
0.90 248 0.90 0.01
0.91 248 0.91 0.01
WQCV Treatment Method =12.00 hours 1.00 248 1.00 0.01
After completing and printing this worksheet to a pdf, go to:
https://maperture.digitaldataservices.com/gvh/?viewer=cswdif
create a new stormwater facility, and
attach the pdf of this worksheet to that record.
Routed Hydrograph Results
Design Storm Return Period =WQCV 2 Year 5 Year 10 Year 50 Year 100 Year
One-Hour Rainfall Depth =0.53 0.99 1.10 1.40 2.15 2.86 in
Calculated Runoff Volume =0.006 0.016 0.019 0.024 0.038 0.052 acre-ft
OPTIONAL Override Runoff Volume =acre-ft
Inflow Hydrograph Volume =0.006 0.016 0.019 0.023 0.038 0.051 acre-ft
Time to Drain 97% of Inflow Volume =7.4 19.0 22.3 27.7 45.2 60.6 hours
Time to Drain 99% of Inflow Volume =8.3 19.7 23.0 28.5 46.2 61.9 hours
Maximum Ponding Depth =0.68 2.37 2.85 3.65 6.25 8.53 WARNING!
Maximum Ponded Area =0.01 0.01 0.01 0.01 0.01 0.01 acres
Maximum Volume Stored =0.004 0.006 0.006 0.006 0.006 0.006 acre-ft
Stormwater Detention and Infiltration Design Data Sheet
Bioretention Pond A
Fort Collins Jeep, 224 W Harmony Rd, Fort Collins, CO
Location for 1-hr Rainfall Depths (use dropdown):
Workbook Protected Worksheet Protected
Pond A SDI_Design_Data_v1.08.xlsm, Design Data 9/9/2019, 5:09 PM
A
WQCV_Trigger =1
RunOnce=1
CountA=1
Draintime Coeff=0.8
0 1 2 3
#N/A
#N/A
0 1 2 3
#N/A
#N/A
Check Data Set 1 Check Data Set 1
Stormwater Detention and Infiltration Design Data Sheet
Area
Discharge
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.1 1 10
FL
O
W
[
c
f
s
]
TIME [hr]
100YR IN
100YR OUT
50YR IN
50YR OUT
10YR IN
10YR OUT
5YR IN
5YR OUT
2YR IN
2YR OUT
WQCV IN
WQCV OUT
0
1
2
3
4
5
6
7
8
9
0.1 1 10 100
PO
N
D
I
N
G
D
E
P
T
H
[
f
t
]
DRAIN TIME [hr]
100YR
50YR
10YR
5YR
2YR
WQCV
Pond A SDI_Design_Data_v1.08.xlsm, Design Data 9/9/2019, 5:09 PM
Stormwater Facility Name:
Facility Location & Jurisdiction:
User Input: Watershed Characteristics User Defined User Defined User Defined User Defined
Watershed Slope =0.005 ft/ft Stage [ft]Area [ft^2]Stage [ft]Discharge [cfs]
Watershed Length =195 ft 0.00 517 0.00 0.00
Watershed Area =0.33 acres 0.10 517 0.10 0.01
Watershed Imperviousness =90.0%percent 0.20 517 0.20 0.01
Percentage Hydrologic Soil Group A =percent 0.30 517 0.30 0.01
Percentage Hydrologic Soil Group B =percent 0.40 517 0.40 0.01
Percentage Hydrologic Soil Groups C/D =100.0%percent 0.50 517 0.50 0.01
0.60 517 0.60 0.01
User Input 17 0.70 517 0.70 0.01
0.80 517 0.80 0.01
0.90 517 0.90 0.01
0.95 517 0.95 0.01
WQCV Treatment Method =12.00 hours 0.98 517 0.98 0.01
1.00 517 1.00 0.01
After completing and printing this worksheet to a pdf, go to:
https://maperture.digitaldataservices.com/gvh/?viewer=cswdif
create a new stormwater facility, and
attach the pdf of this worksheet to that record.
Routed Hydrograph Results
Design Storm Return Period =WQCV 2 Year 5 Year 10 Year 50 Year 100 Year
One-Hour Rainfall Depth =0.53 0.99 1.10 1.40 2.15 2.86 in
Calculated Runoff Volume =0.009 0.024 0.028 0.036 0.058 0.078 acre-ft
OPTIONAL Override Runoff Volume =acre-ft
Inflow Hydrograph Volume =0.008 0.023 0.027 0.035 0.057 0.078 acre-ft
Time to Drain 97% of Inflow Volume =11.5 27.9 32.2 41.9 67.3 91.6 hours
Time to Drain 99% of Inflow Volume =13.1 29.5 33.8 43.5 69.0 93.5 hours
Maximum Ponding Depth =0.56 1.77 2.08 2.79 4.59 6.33 WARNING!
Maximum Ponded Area =0.01 0.01 0.01 0.01 0.01 0.01 acres
Maximum Volume Stored =0.007 0.012 0.012 0.012 0.012 0.012 acre-ft
Stormwater Detention and Infiltration Design Data Sheet
Bioretention Pond B
Fort Collins Jeep, 224 W Harmonry Rd, Fort Collins, CO
Location for 1-hr Rainfall Depths (use dropdown):
Workbook Protected Worksheet Protected
Pond B SDI_Design_Data_v1.08.xlsm, Design Data 9/9/2019, 3:53 PM
WQCV_Trigger =1
RunOnce=1
CountA=1
Draintime Coeff=0.8
0 1 2 3
#N/A
#N/A
0 1 2 3
#N/A
#N/A
Check Data Set 1 Check Data Set 1
Stormwater Detention and Infiltration Design Data Sheet
Area
Discharge
0
0.2
0.4
0.6
0.8
1
1.2
0.1 1 10
FL
O
W
[
c
f
s
]
TIME [hr]
100YR IN
100YR OUT
50YR IN
50YR OUT
10YR IN
10YR OUT
5YR IN
5YR OUT
2YR IN
2YR OUT
WQCV IN
WQCV OUT
0
1
2
3
4
5
6
7
0.1 1 10 100
PO
N
D
I
N
G
D
E
P
T
H
[
f
t
]
DRAIN TIME [hr]
100YR
50YR
10YR
5YR
2YR
WQCV
Pond B SDI_Design_Data_v1.08.xlsm, Design Data 9/9/2019, 3:53 PM
Stormwater Facility Name:
Facility Location & Jurisdiction:
User Input: Watershed Characteristics User Defined User Defined User Defined User Defined
Watershed Slope =0.005 ft/ft Stage [ft]Area [ft^2]Stage [ft]Discharge [cfs]
Watershed Length =453 ft 0.00 1,988 0.00 0.00
Watershed Area =1.57 acres 0.10 1,988 0.10 0.02
Watershed Imperviousness =90.0%percent 0.20 1,988 0.20 0.03
Percentage Hydrologic Soil Group A =percent 0.30 1,988 0.30 0.03
Percentage Hydrologic Soil Group B =percent 0.40 1,988 0.40 0.03
Percentage Hydrologic Soil Groups C/D =100.0%percent 0.50 1,988 0.50 0.03
0.60 1,988 0.60 0.03
User Input 17 0.70 1,988 0.70 0.03
0.80 1,988 0.80 0.03
0.90 1,988 0.90 0.03
1.00 1,988 1.00 0.03
WQCV Treatment Method =12.00 hours 1.07 1,988 1.07 0.03
After completing and printing this worksheet to a pdf, go to:
https://maperture.digitaldataservices.com/gvh/?viewer=cswdif
create a new stormwater facility, and
attach the pdf of this worksheet to that record.
Routed Hydrograph Results
Design Storm Return Period =WQCV 2 Year 5 Year 10 Year 50 Year 100 Year
One-Hour Rainfall Depth =0.53 0.99 1.10 1.40 2.15 2.86 in
Calculated Runoff Volume =0.042 0.113 0.133 0.171 0.274 0.373 acre-ft
OPTIONAL Override Runoff Volume =acre-ft
Inflow Hydrograph Volume =0.042 0.113 0.132 0.170 0.273 0.372 acre-ft
Time to Drain 97% of Inflow Volume =19.7 45.4 52.7 67.3 107.3 146.1 hours
Time to Drain 99% of Inflow Volume =22.7 48.4 55.6 70.3 110.6 149.8 hours
Maximum Ponding Depth =0.79 2.31 2.73 3.56 5.81 7.98 WARNING!
Maximum Ponded Area =0.05 0.05 0.05 0.05 0.05 0.05 acres
Maximum Volume Stored =0.036 0.049 0.049 0.049 0.049 0.049 acre-ft
Location for 1-hr Rainfall Depths (use dropdown):
Workbook Protected Worksheet Protected
Stormwater Detention and Infiltration Design Data Sheet
Bioretention Pond C
Fort Collins Jeep 224 W Harmony Rd, Fort Collins, CO
Pond C SDI_Design_Data_v1.08.xlsm, Design Data 9/9/2019, 12:10 PM
WQCV_Trigger =1
RunOnce=1
CountA=1
Draintime Coeff=0.8
0 1 2 3
#N/A
#N/A
0 1 2 3
#N/A
#N/A
Check Data Set 1 Check Data Set 1
Area
Discharge
Stormwater Detention and Infiltration Design Data Sheet
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
0.1 1 10
FL
O
W
[
c
f
s
]
TIME [hr]
100YR IN
100YR OUT
50YR IN
50YR OUT
10YR IN
10YR OUT
5YR IN
5YR OUT
2YR IN
2YR OUT
WQCV IN
WQCV OUT
0
1
2
3
4
5
6
7
8
9
0.1 1 10 100
PO
N
D
I
N
G
D
E
P
T
H
[
f
t
]
DRAIN TIME [hr]
100YR
50YR
10YR
5YR
2YR
WQCV
Pond C SDI_Design_Data_v1.08.xlsm, Design Data 9/9/2019, 12:10 PM
Project:
Basin ID:
Depth Increment = 0.1 ft
Required Volume Calculation Media Surface -- 0.00 -- -- -- 248 0.006
Selected BMP Type =RG -- 0.10 -- -- -- 248 0.006 27 0.001
Watershed Area = 0.22 acres -- 0.20 -- -- -- 248 0.006 52 0.001
Watershed Length = 178 ft -- 0.30 -- -- -- 248 0.006 80 0.002
Watershed Slope = 0.005 ft/ft -- 0.40 -- -- -- 248 0.006 108 0.002
Watershed Imperviousness = 90.00% percent -- 0.50 -- -- -- 248 0.006 136 0.003
Percentage Hydrologic Soil Group A = 0.0% percent -- 0.60 -- -- -- 248 0.006 165 0.004
Percentage Hydrologic Soil Group B = 0.0% percent -- 0.70 -- -- -- 248 0.006 193 0.004
Percentage Hydrologic Soil Groups C/D = 100.0% percent -- 0.80 -- -- -- 248 0.006 221 0.005
Desired WQCV Drain Time = 12.0 hours -- 0.90 -- -- -- 248 0.006 249 0.006
Location for 1-hr Rainfall Depths = User Input WQCV -- 0.91 -- -- -- 248 0.006 252 0.006
Water Quality Capture Volume (WQCV) = 0.006 acre-feet -- 1.00 -- -- -- 248 0.006 277 0.006
Excess Urban Runoff Volume (EURV) = 0.020 acre-feet -- -- -- --
2-yr Runoff Volume (P1 = 0.99 in.) = 0.016 acre-feet 0.99 inches -- -- -- --
5-yr Runoff Volume (P1 = 1.1 in.) = 0.019 acre-feet 1.10 inches -- -- -- --
10-yr Runoff Volume (P1 = 1.4 in.) = 0.024 acre-feet 1.40 inches -- -- -- --
25-yr Runoff Volume (P1 = 1.99 in.) = 0.035 acre-feet 1.99 inches -- -- -- --
50-yr Runoff Volume (P1 = 2.15 in.) = 0.038 acre-feet 2.15 inches -- -- -- --
100-yr Runoff Volume (P1 = 2.86 in.) = 0.052 acre-feet 2.86 inches -- -- -- --
500-yr Runoff Volume (P1 = 3.89 in.) = 0.073 acre-feet 3.89 inches -- -- -- --
Approximate 2-yr Detention Volume = 0.015 acre-feet -- -- -- --
Approximate 5-yr Detention Volume = 0.017 acre-feet -- -- -- --
Approximate 10-yr Detention Volume = 0.022 acre-feet -- -- -- --
Approximate 25-yr Detention Volume = 0.029 acre-feet -- -- -- --
Approximate 50-yr Detention Volume = 0.029 acre-feet -- -- -- --
Approximate 100-yr Detention Volume = 0.035 acre-feet -- -- -- --
-- -- -- --
Stage-Storage Calculation -- -- -- --
Zone 1 Volume (WQCV) = 0.006 acre-feet -- -- -- --
Select Zone 2 Storage Volume (Optional) =acre-feet -- -- -- --
Select Zone 3 Storage Volume (Optional) =acre-feet -- -- -- --
Total Detention Basin Volume = 0.006 acre-feet -- -- -- --
Initial Surcharge Volume (ISV) = N/A ft^3 -- -- -- --
Initial Surcharge Depth (ISD) = N/A ft -- -- -- --
Total Available Detention Depth (Htotal ) =user ft -- -- -- --
Depth of Trickle Channel (HTC) =N/A ft -- -- -- --
Slope of Trickle Channel (STC) =N/A ft/ft -- -- -- --
Slopes of Main Basin Sides (Smain) =user H:V -- -- -- --
Basin Length-to-Width Ratio (RL/W) =user -- -- -- --
Optional User Override
1-hr Precipitation
Total detention volume
is less than 100-year
volume.
Volume
(ft^3)
Volume
(ac-ft)
Area
(acre)
DETENTION BASIN STAGE-STORAGE TABLE BUILDER
Optional
Override
Area (ft^2)
Length
(ft)
Optional
Override
Stage (ft)
Stage
(ft)
Stage - Storage
Description
Area
(ft^2)
Width
(ft)
16-018 Fort Collins Jeep
Bioretention Pond A
UD-Detention, Version 3.07 (February 2017)
Example Zone Configuration (Retention Pond)
Bioretention Pond A ASB.xlsm, Basin 9/12/2019, 9:31 AM
Project:
Basin ID:
Stage (ft) Zone Volume (ac-ft) Outlet Type
Zone 1 (WQCV)0.92 0.006 Filtration Media
Zone 2
Zone 3
0.006 Total
User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP)Calculated Parameters for Underdrain
Underdrain Orifice Invert Depth = 2.00 ft (distance below the filtration media surface) Underdrain Orifice Area = 0.0 ft2
Underdrain Orifice Diameter = 0.38 inches Underdrain Orifice Centroid = 0.02 feet
User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP) Calculated Parameters for Plate
Invert of Lowest Orifice = ft (relative to basin bottom at Stage = 0 ft) WQ Orifice Area per Row = N/A ft2
Depth at top of Zone using Orifice Plate = ft (relative to basin bottom at Stage = 0 ft)Elliptical Half-Width = N/A feet
Orifice Plate: Orifice Vertical Spacing = inches Elliptical Slot Centroid = N/A feet
Orifice Plate: Orifice Area per Row = inches Elliptical Slot Area = N/A ft2
User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest)
Row 1 (optional) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional)
Stage of Orifice Centroid (ft)
Orifice Area (sq. inches)
Row 9 (optional) Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional)
Stage of Orifice Centroid (ft)
Orifice Area (sq. inches)
User Input: Vertical Orifice (Circular or Rectangular)Calculated Parameters for Vertical Orifice
Not Selected Not Selected Not Selected Not Selected
Invert of Vertical Orifice =ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Area =ft2
Depth at top of Zone using Vertical Orifice =ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Centroid =feet
Vertical Orifice Diameter =inches
User Input: Overflow Weir (Dropbox) and Grate (Flat or Sloped)Calculated Parameters for Overflow Weir
Not Selected Not Selected Not Selected Not Selected
Overflow Weir Front Edge Height, Ho =ft (relative to basin bottom at Stage = 0 ft)Height of Grate Upper Edge, Ht =feet
Overflow Weir Front Edge Length =feet Over Flow Weir Slope Length =feet
Overflow Weir Slope =H:V (enter zero for flat grate) Grate Open Area / 100-yr Orifice Area =should be > 4
Horiz. Length of Weir Sides =feet Overflow Grate Open Area w/o Debris =ft2
Overflow Grate Open Area % =%, grate open area/total area Overflow Grate Open Area w/ Debris =ft2
Debris Clogging % =%
User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice)Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate
Not Selected Not Selected Not Selected Not Selected
Depth to Invert of Outlet Pipe =ft (distance below basin bottom at Stage = 0 ft)Outlet Orifice Area =ft2
Circular Orifice Diameter =inches Outlet Orifice Centroid =feet
Half-Central Angle of Restrictor Plate on Pipe = N/A N/A radians
User Input: Emergency Spillway (Rectangular or Trapezoidal)Calculated Parameters for Spillway
Spillway Invert Stage= ft (relative to basin bottom at Stage = 0 ft) Spillway Design Flow Depth= feet
Spillway Crest Length = feet Stage at Top of Freeboard = feet
Spillway End Slopes = H:V Basin Area at Top of Freeboard = acres
Freeboard above Max Water Surface = feet
Routed Hydrograph Results
Design Storm Return Period =WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 500 Year
One-Hour Rainfall Depth (in) =0.53 1.07 0.99 1.10 1.40 1.99 2.15 2.86 3.89
Calculated Runoff Volume (acre-ft) =0.006 0.020 0.016 0.019 0.024 0.035 0.038 0.052 0.073
OPTIONAL Override Runoff Volume (acre-ft) =
Inflow Hydrograph Volume (acre-ft) =0.006 0.020 0.016 0.019 0.023 0.034 0.038 0.051 0.072
Predevelopment Unit Peak Flow, q (cfs/acre) =0.00 0.00 0.01 0.06 0.19 0.58 0.73 1.15 1.83
Predevelopment Peak Q (cfs) =0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.3 0.4
Peak Inflow Q (cfs) =0.1 0.2 0.2 0.2 0.3 0.4 0.5 0.6 0.8
Peak Outflow Q (cfs) =0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Ratio Peak Outflow to Predevelopment Q =N/A N/A N/A 0.5 0.2 0.1 0.0 0.0 0.0
Structure Controlling Flow =Filtration Media Filtration Media Filtration Media Filtration Media Filtration Media Filtration Media Filtration Media Filtration Media Filtration Media
Max Velocity through Grate 1 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A N/A
Max Velocity through Grate 2 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A N/A
Time to Drain 97% of Inflow Volume (hours) =12 36 30 35 43 63 70 93 130
Time to Drain 99% of Inflow Volume (hours) =12 37 30 36 44 65 71 95 133
Maximum Ponding Depth (ft) =0.67 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Area at Maximum Ponding Depth (acres) =0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
Maximum Volume Stored (acre-ft) =0.004 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
Detention Basin Outlet Structure Design
UD-Detention, Version 3.07 (February 2017)
16-018 Fort Collins Jeep
Bioretention Pond A
Example Zone Configuration (Retention Pond)
Project:
Basin ID:
Depth Increment = 0.1 ft
Required Volume Calculation Media Surface -- 0.00 -- -- -- 517 0.012
Selected BMP Type =RG -- 0.10 -- -- -- 517 0.012 52 0.001
Watershed Area = 0.33 acres -- 0.20 -- -- -- 517 0.012 98 0.002
Watershed Length = 195 ft -- 0.30 -- -- -- 517 0.012 150 0.003
Watershed Slope = 0.005 ft/ft -- 0.40 -- -- -- 517 0.012 202 0.005
Watershed Imperviousness = 90.00% percent -- 0.50 -- -- -- 517 0.012 253 0.006
Percentage Hydrologic Soil Group A = 0.0% percent -- 0.60 -- -- -- 517 0.012 305 0.007
Percentage Hydrologic Soil Group B = 0.0% percent -- 0.70 -- -- -- 517 0.012 357 0.008
Percentage Hydrologic Soil Groups C/D = 100.0% percent -- 0.80 -- -- -- 517 0.012 408 0.009
Desired WQCV Drain Time = 12.0 hours -- 0.90 -- -- -- 517 0.012 460 0.011
Location for 1-hr Rainfall Depths = User Input -- 0.95 -- -- -- 517 0.012 486 0.011
Water Quality Capture Volume (WQCV) = 0.009 acre-feet WQCV -- 0.98 -- -- -- 517 0.012 501 0.012
Excess Urban Runoff Volume (EURV) = 0.029 acre-feet -- 1.00 -- -- -- 517 0.012 512 0.012
2-yr Runoff Volume (P1 = 0.99 in.) = 0.024 acre-feet 0.99 inches -- -- -- --
5-yr Runoff Volume (P1 = 1.1 in.) = 0.028 acre-feet 1.10 inches -- -- -- --
10-yr Runoff Volume (P1 = 1.4 in.) = 0.036 acre-feet 1.40 inches -- -- -- --
25-yr Runoff Volume (P1 = 1.99 in.) = 0.053 acre-feet 1.99 inches -- -- -- --
50-yr Runoff Volume (P1 = 2.15 in.) = 0.058 acre-feet 2.15 inches -- -- -- --
100-yr Runoff Volume (P1 = 2.86 in.) = 0.078 acre-feet 2.86 inches -- -- -- --
500-yr Runoff Volume (P1 = 3.87 in.) = 0.108 acre-feet 3.87 inches -- -- -- --
Approximate 2-yr Detention Volume = 0.022 acre-feet -- -- -- --
Approximate 5-yr Detention Volume = 0.026 acre-feet -- -- -- --
Approximate 10-yr Detention Volume = 0.033 acre-feet -- -- -- --
Approximate 25-yr Detention Volume = 0.044 acre-feet -- -- -- --
Approximate 50-yr Detention Volume = 0.043 acre-feet -- -- -- --
Approximate 100-yr Detention Volume = 0.053 acre-feet -- -- -- --
-- -- -- --
Stage-Storage Calculation -- -- -- --
Zone 1 Volume (WQCV) = 0.009 acre-feet -- -- -- --
Select Zone 2 Storage Volume (Optional) =acre-feet -- -- -- --
Select Zone 3 Storage Volume (Optional) =acre-feet -- -- -- --
Total Detention Basin Volume = 0.009 acre-feet -- -- -- --
Initial Surcharge Volume (ISV) = N/A ft^3 -- -- -- --
Initial Surcharge Depth (ISD) = N/A ft -- -- -- --
Total Available Detention Depth (Htotal ) =user ft -- -- -- --
Depth of Trickle Channel (HTC) =N/A ft -- -- -- --
Slope of Trickle Channel (STC) =N/A ft/ft -- -- -- --
Slopes of Main Basin Sides (Smain) =user H:V -- -- -- --
Basin Length-to-Width Ratio (RL/W) =user -- -- -- --
Optional User Override
1-hr Precipitation
Total detention volume
is less than 100-year
volume.
Volume
(ft^3)
Volume
(ac-ft)
Area
(acre)
DETENTION BASIN STAGE-STORAGE TABLE BUILDER
Optional
Override
Area (ft^2)
Length
(ft)
Optional
Override
Stage (ft)
Stage
(ft)
Stage - Storage
Description
Area
(ft^2)
Width
(ft)
16-018 Fort Collins Jeep
Bioretention Pond B
UD-Detention, Version 3.07 (February 2017)
Example Zone Configuration (Retention Pond)
Bioretention Pond B ASB.xlsm, Basin 9/12/2019, 9:36 AM
Project:
Basin ID:
Stage (ft) Zone Volume (ac-ft) Outlet Type
Zone 1 (WQCV)0.75 0.009 Filtration Media
Zone 2
Zone 3
0.009 Total
User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP)Calculated Parameters for Underdrain
Underdrain Orifice Invert Depth = 2.00 ft (distance below the filtration media surface) Underdrain Orifice Area = 0.0 ft2
Underdrain Orifice Diameter = 0.46 inches Underdrain Orifice Centroid = 0.02 feet
User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP) Calculated Parameters for Plate
Invert of Lowest Orifice = ft (relative to basin bottom at Stage = 0 ft) WQ Orifice Area per Row = N/A ft2
Depth at top of Zone using Orifice Plate = ft (relative to basin bottom at Stage = 0 ft)Elliptical Half-Width = N/A feet
Orifice Plate: Orifice Vertical Spacing = inches Elliptical Slot Centroid = N/A feet
Orifice Plate: Orifice Area per Row = inches Elliptical Slot Area = N/A ft2
User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest)
Row 1 (optional) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional)
Stage of Orifice Centroid (ft)
Orifice Area (sq. inches)
Row 9 (optional) Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional)
Stage of Orifice Centroid (ft)
Orifice Area (sq. inches)
User Input: Vertical Orifice (Circular or Rectangular)Calculated Parameters for Vertical Orifice
Not Selected Not Selected Not Selected Not Selected
Invert of Vertical Orifice =ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Area =ft2
Depth at top of Zone using Vertical Orifice =ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Centroid =feet
Vertical Orifice Diameter =inches
User Input: Overflow Weir (Dropbox) and Grate (Flat or Sloped)Calculated Parameters for Overflow Weir
Not Selected Not Selected Not Selected Not Selected
Overflow Weir Front Edge Height, Ho =ft (relative to basin bottom at Stage = 0 ft)Height of Grate Upper Edge, Ht =feet
Overflow Weir Front Edge Length =feet Over Flow Weir Slope Length =feet
Overflow Weir Slope =H:V (enter zero for flat grate) Grate Open Area / 100-yr Orifice Area =should be > 4
Horiz. Length of Weir Sides =feet Overflow Grate Open Area w/o Debris =ft2
Overflow Grate Open Area % =%, grate open area/total area Overflow Grate Open Area w/ Debris =ft2
Debris Clogging % =%
User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice)Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate
Not Selected Not Selected Not Selected Not Selected
Depth to Invert of Outlet Pipe =ft (distance below basin bottom at Stage = 0 ft)Outlet Orifice Area =ft2
Circular Orifice Diameter =inches Outlet Orifice Centroid =feet
Half-Central Angle of Restrictor Plate on Pipe = N/A N/A radians
User Input: Emergency Spillway (Rectangular or Trapezoidal)Calculated Parameters for Spillway
Spillway Invert Stage= ft (relative to basin bottom at Stage = 0 ft) Spillway Design Flow Depth= feet
Spillway Crest Length = feet Stage at Top of Freeboard = feet
Spillway End Slopes = H:V Basin Area at Top of Freeboard = acres
Freeboard above Max Water Surface = feet
Routed Hydrograph Results
Design Storm Return Period =WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 500 Year
One-Hour Rainfall Depth (in) =0.53 1.07 0.99 1.10 1.40 1.99 2.15 2.86 3.87
Calculated Runoff Volume (acre-ft) =0.009 0.029 0.024 0.028 0.036 0.053 0.058 0.078 0.108
OPTIONAL Override Runoff Volume (acre-ft) =
Inflow Hydrograph Volume (acre-ft) =0.008 0.029 0.023 0.027 0.035 0.052 0.057 0.078 0.108
Predevelopment Unit Peak Flow, q (cfs/acre) =0.00 0.00 0.01 0.07 0.21 0.63 0.80 1.24 1.96
Predevelopment Peak Q (cfs) =0.0 0.0 0.0 0.0 0.1 0.2 0.3 0.4 0.6
Peak Inflow Q (cfs) =0.1 0.4 0.3 0.3 0.5 0.7 0.7 1.0 1.4
Peak Outflow Q (cfs) =0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Ratio Peak Outflow to Predevelopment Q =N/A N/A N/A 0.4 0.1 0.0 0.0 0.0 0.0
Structure Controlling Flow =Filtration Media Filtration Media Filtration Media Filtration Media Filtration Media Filtration Media Filtration Media Filtration Media Filtration Media
Max Velocity through Grate 1 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A N/A
Max Velocity through Grate 2 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A N/A
Time to Drain 97% of Inflow Volume (hours) =12 37 30 35 45 65 71 96 133
Time to Drain 99% of Inflow Volume (hours) =12 38 31 36 46 67 73 99 136
Maximum Ponding Depth (ft) =0.56 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Area at Maximum Ponding Depth (acres) =0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
Maximum Volume Stored (acre-ft) =0.007 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
Detention Basin Outlet Structure Design
UD-Detention, Version 3.07 (February 2017)
16-018 Fort Collins Jeep
Bioretention Pond B
Example Zone Configuration (Retention Pond)
Project:
Basin ID:
Depth Increment = 0.1 ft
Required Volume Calculation Media Surface -- 0.00 -- -- -- 1,988 0.046
Selected BMP Type =RG -- 0.10 -- -- -- 1,988 0.046 199 0.005
Watershed Area = 1.57 acres -- 0.20 -- -- -- 1,988 0.046 378 0.009
Watershed Length = 453 ft -- 0.30 -- -- -- 1,988 0.046 577 0.013
Watershed Slope = 0.005 ft/ft -- 0.40 -- -- -- 1,988 0.046 775 0.018
Watershed Imperviousness = 90.00% percent -- 0.50 -- -- -- 1,988 0.046 974 0.022
Percentage Hydrologic Soil Group A = 0.0% percent -- 0.60 -- -- -- 1,988 0.046 1,173 0.027
Percentage Hydrologic Soil Group B = 0.0% percent -- 0.70 -- -- -- 1,988 0.046 1,372 0.031
Percentage Hydrologic Soil Groups C/D = 100.0% percent -- 0.80 -- -- -- 1,988 0.046 1,571 0.036
Desired WQCV Drain Time = 12.0 hours -- 0.90 -- -- -- 1,988 0.046 1,769 0.041
Location for 1-hr Rainfall Depths = Denver - Capitol Building -- 1.00 -- -- -- 1,988 0.046 1,968 0.045
Water Quality Capture Volume (WQCV) = 0.042 acre-feet -- 1.07 -- -- -- 1,988 0.046 2,107 0.048
Excess Urban Runoff Volume (EURV) = 0.140 acre-feet -- -- -- --
2-yr Runoff Volume (P1 = 0.99 in.) = 0.113 acre-feet 0.99 inches -- -- -- --
5-yr Runoff Volume (P1 = 1.1 in.) = 0.133 acre-feet 1.10 inches -- -- -- --
10-yr Runoff Volume (P1 = 1.4 in.) = 0.171 acre-feet 1.40 inches -- -- -- --
25-yr Runoff Volume (P1 = 1.99 in.) = 0.251 acre-feet 1.99 inches -- -- -- --
50-yr Runoff Volume (P1 = 2.15 in.) = 0.274 acre-feet 2.15 inches -- -- -- --
100-yr Runoff Volume (P1 = 2.86 in.) = 0.373 acre-feet 2.86 inches -- -- -- --
500-yr Runoff Volume (P1 = 3.14 in.) = 0.419 acre-feet inches -- -- -- --
Approximate 2-yr Detention Volume = 0.106 acre-feet -- -- -- --
Approximate 5-yr Detention Volume = 0.125 acre-feet -- -- -- --
Approximate 10-yr Detention Volume = 0.158 acre-feet -- -- -- --
Approximate 25-yr Detention Volume = 0.208 acre-feet -- -- -- --
Approximate 50-yr Detention Volume = 0.204 acre-feet -- -- -- --
Approximate 100-yr Detention Volume = 0.251 acre-feet -- -- -- --
-- -- -- --
Stage-Storage Calculation -- -- -- --
Zone 1 Volume (WQCV) = 0.042 acre-feet -- -- -- --
Select Zone 2 Storage Volume (Optional) =acre-feet -- -- -- --
Select Zone 3 Storage Volume (Optional) =acre-feet -- -- -- --
Total Detention Basin Volume = 0.042 acre-feet -- -- -- --
Initial Surcharge Volume (ISV) = N/A ft^3 -- -- -- --
Initial Surcharge Depth (ISD) = N/A ft -- -- -- --
Total Available Detention Depth (Htotal ) =user ft -- -- -- --
Depth of Trickle Channel (HTC) =N/A ft -- -- -- --
Slope of Trickle Channel (STC) =N/A ft/ft -- -- -- --
Slopes of Main Basin Sides (Smain) =user H:V -- -- -- --
Basin Length-to-Width Ratio (RL/W) =user -- -- -- --
-- -- -- --
Initial Surcharge Area (AISV) =user ft^2 -- -- -- --
Surcharge Volume Length (LISV) =user ft -- -- -- --
Surcharge Volume Width (WISV) =user ft -- -- -- --
Depth of Basin Floor (HFLOOR) =user ft -- -- -- --
Length of Basin Floor (LFLOOR) =user ft -- -- -- --
Width of Basin Floor (WFLOOR) =user ft -- -- -- --
Area of Basin Floor (AFLOOR) =user ft^2 -- -- -- --
Volume of Basin Floor (VFLOOR) =user ft^3 -- -- -- --
Depth of Main Basin (HMAIN) =user ft -- -- -- --
Length of Main Basin (LMAIN) =user ft -- -- -- --
Width of Main Basin (WMAIN) =user ft -- -- -- --
Area of Main Basin (AMAIN) =user ft^2 -- -- -- --
Volume of Main Basin (VMAIN) =user ft^3 -- -- -- --
Calculated Total Basin Volume (Vtotal ) =user acre-feet -- -- -- --
-- -- -- --
-- -- -- --
-- -- -- --
-- -- -- --
-- -- -- --
-- -- -- --
-- -- -- --
Optional User Override
1-hr Precipitation
Total detention volume
is less than 100-year
volume.
Volume
(ft^3)
Volume
(ac-ft)
Area
(acre)
DETENTION BASIN STAGE-STORAGE TABLE BUILDER
Optional
Override
Area (ft^2)
Length
(ft)
Optional
Override
Stage (ft)
Stage
(ft)
Stage - Storage
Description
Area
(ft^2)
Width
(ft)
16-018 Fort Collins Jeep
Bioretention Pond C - As-Built
UD-Detention, Version 3.07 (February 2017)
Example Zone Configuration (Retention Pond)
Bioretention Pond C As-Built.xlsm, Basin 9/12/2019, 9:40 AM
1 User Defined Stage-Area Boolean for Message
1 Equal Stage-Area Inputs Watershed L:W
1 CountA
0 Calc_S_TC
H_FLOOR
127.9089 L_FLOOR_OTHER
0.00 ISV 0.00 ISV
0.00 Floor 0.00 Floor
0.93 Zone 1 (WQCV) 0.93 Zone 1 (WQCV)
0.00 Zone 2 0.00 Zone 2
0.00 Zone 3 0.00 Zone 3
DETENTION BASIN STAGE-STORAGE TABLE BUILDER
UD-Detention, Version 3.07 (February 2017)
0.000
0.015
0.030
0.045
0.060
0.000
0.015
0.030
0.045
0.060
0.00 0.50 1.00 1.50 2.00
Vo
l
u
m
e
(
a
c
-
f
t
)
Ar
e
a
(
a
c
r
e
s
)
Stage (ft.)
Area (acres)Volume (ac-ft)
0
100
200
300
400
0
5
10
15
20
0.00 0.50 1.00 1.50 2.00
Ar
e
a
(
s
q
.
f
t
.
)
Le
n
g
t
h
,
W
i
d
t
h
(
f
t
.
)
Stage (ft)
Length (ft)Width (ft)Area (sq.ft.)
Bioretention Pond C As-Built.xlsm, Basin 9/12/2019, 9:40 AM
Project:
Basin ID:
Stage (ft) Zone Volume (ac-ft) Outlet Type
Zone 1 (WQCV)0.93 0.042
Zone 2
Zone 3
0.042 Total
User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP)Calculated Parameters for Underdrain
Underdrain Orifice Invert Depth = 0.77 ft (distance below the filtration media surface) Underdrain Orifice Area = 0.0 ft2
Underdrain Orifice Diameter = 1.00 inches Underdrain Orifice Centroid = 0.04 feet
User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP) Calculated Parameters for Plate
Invert of Lowest Orifice = ft (relative to basin bottom at Stage = 0 ft) WQ Orifice Area per Row = N/A ft2
Depth at top of Zone using Orifice Plate = ft (relative to basin bottom at Stage = 0 ft)Elliptical Half-Width = N/A feet
Orifice Plate: Orifice Vertical Spacing = inches Elliptical Slot Centroid = N/A feet
Orifice Plate: Orifice Area per Row = inches Elliptical Slot Area = N/A ft2
User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest)
Row 1 (optional) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional)
Stage of Orifice Centroid (ft)
Orifice Area (sq. inches)
Row 9 (optional) Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional)
Stage of Orifice Centroid (ft)
Orifice Area (sq. inches)
User Input: Vertical Orifice (Circular or Rectangular)Calculated Parameters for Vertical Orifice
Not Selected Not Selected Not Selected Not Selected
Invert of Vertical Orifice =ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Area =ft2
Depth at top of Zone using Vertical Orifice =ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Centroid =feet
Vertical Orifice Diameter =inches
User Input: Overflow Weir (Dropbox) and Grate (Flat or Sloped)Calculated Parameters for Overflow Weir
Not Selected Not Selected Not Selected Not Selected
Overflow Weir Front Edge Height, Ho =ft (relative to basin bottom at Stage = 0 ft)Height of Grate Upper Edge, Ht =feet
Overflow Weir Front Edge Length =feet Over Flow Weir Slope Length =feet
Overflow Weir Slope =H:V (enter zero for flat grate) Grate Open Area / 100-yr Orifice Area =should be > 4
Horiz. Length of Weir Sides =feet Overflow Grate Open Area w/o Debris =ft2
Overflow Grate Open Area % =%, grate open area/total area Overflow Grate Open Area w/ Debris =ft2
Debris Clogging % =%
User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice)Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate
Not Selected Not Selected Not Selected Not Selected
Depth to Invert of Outlet Pipe =ft (distance below basin bottom at Stage = 0 ft)Outlet Orifice Area =ft2
Circular Orifice Diameter =inches Outlet Orifice Centroid =feet
Half-Central Angle of Restrictor Plate on Pipe = N/A N/A radians
User Input: Emergency Spillway (Rectangular or Trapezoidal)Calculated Parameters for Spillway
Spillway Invert Stage= ft (relative to basin bottom at Stage = 0 ft) Spillway Design Flow Depth= feet
Spillway Crest Length = feet Stage at Top of Freeboard = feet
Spillway End Slopes = H:V Basin Area at Top of Freeboard = acres
Freeboard above Max Water Surface = feet
Routed Hydrograph Results
Design Storm Return Period =WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 500 Year
One-Hour Rainfall Depth (in) =0.53 1.07 0.99 1.10 1.40 1.99 2.15 2.86 3.14
Calculated Runoff Volume (acre-ft) =0.042 0.140 0.113 0.133 0.171 0.251 0.274 0.373 0.419
OPTIONAL Override Runoff Volume (acre-ft) =
Inflow Hydrograph Volume (acre-ft) =0.042 0.139 0.113 0.132 0.170 0.250 0.273 0.372 0.418
Predevelopment Unit Peak Flow, q (cfs/acre) =0.00 0.00 0.01 0.07 0.20 0.60 0.76 1.19 1.52
Predevelopment Peak Q (cfs) =0.0 0.0 0.0 0.1 0.3 0.9 1.2 1.9 2.4
Peak Inflow Q (cfs) =0.5 1.7 1.4 1.6 2.0 3.0 3.2 4.4 4.9
Peak Outflow Q (cfs) =0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Ratio Peak Outflow to Predevelopment Q =N/A N/A N/A 0.3 0.1 0.0 0.0 0.0 0.0
Structure Controlling Flow =Filtration Media Filtration Media Filtration Media Filtration Media Filtration Media Filtration Media Filtration Media Filtration Media Filtration Media
Max Velocity through Grate 1 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A N/A
Max Velocity through Grate 2 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A N/A
Time to Drain 97% of Inflow Volume (hours) =18 50 41 47 60 86 94 126 141
Time to Drain 99% of Inflow Volume (hours) =19 51 42 49 62 89 97 130 145
Maximum Ponding Depth (ft) =0.77 1.07 1.07 1.07 1.07 1.07 1.07 1.07 1.07
Area at Maximum Ponding Depth (acres) =0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
Maximum Volume Stored (acre-ft) =0.035 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048
Detention Basin Outlet Structure Design
UD-Detention, Version 3.07 (February 2017)
16-018 Fort Collins Jeep
Bioretention Pond C - As-Built
Example Zone Configuration (Retention Pond)
This unofficial copy was downloaded on Nov-02-2018 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com
For additional information or an official copy, please contact Engineering Office 281 North College Fort Collins, CO 80521 USA
RECORD DRAWING STATEMENT
I, TROY W. DENNING, CERTIFY ALL PUBLIC WATER, WASTEWATER AND STORMWATER SYSTEM IMPROVEMENTS SHOWN
HEREIN, INCLUDING ANY NOTED CHANGES OR REVISIONS, ARE IN GENERAL CONFORMANCE WITH THE
DESIGN/CONSTRUCTION DOCUMENTS, PURSUANT TO THIS RECORD DRAWING COPY OF FINAL UTILITY PLANS.
TROY W. DENNING P.E. 34200 DATE
ACTION CIVIL ENGINEERING LLC
RECORD DRAWINGS
C-20 POND C CROSS SECTIONS
C-21 STAIR AND CHASE GRADING PLAN
STORM SEWER PLAN AND PROFILEC-22
C-23 DOUBLE CURB INLET AS-BUILT DETAIL
7/25/19
STORM SEWER PLAN AND PROFILE
STORM SEWER PLAN AND PROFILE
MEDIAN CURB
(ASPHALT)
WEST HARMONY ROAD
SO
U
T
H
M
A
S
O
N
S
T
R
E
E
T
(6
0
'
R
.
O
.
W
.
)
(R.O.W. WIDTH VARIES)
EXIST. TRAFFIC LIGHT
POLE TO BE RELOCATED BY
CITY AT OWNERS EXPENSE
2-STORY METAL BUILDING
W/ ADD-ONS
APPROX. 31,553 S.F.
FINISHED FLOOR = 5045.9
LOT 1
PEDERSEN AUTO
PLAZA SUBDIVISION 2ND FILING
(A
S
P
H
A
L
T
)
BACK OF CURB
BUS ROAD
SS
SSSSSSSS
W W W W W W
W
W
W
W
S
S
S
S S S S S
W
W
W
W
W
W
W
W
W
W
W
W
W
S
S
S
S
S
E E E E
G G G
E
E
E
E
E
E
E
E
E
SS
SS
SS
SS
W
W
W
W
W
W
W
TRANSFORMER
N 1434390.80
E 3116578.59
N 1434320.81
E 3116577.26
N 1434215.35
E 3116603.75
N 1434215.26
E 3116608.75
N 1434133.98
E 3116607.20
N 1434133.98
E 3116612.20
N 1433909.92
E 3116607.92
N 1433912.65
E 3116980.38
N 1433925.66
E 3116993.62
N 1434389.41
E 3117002.13
4.
0
%
0.5%
4.
0
%
2.5%
3.0%
0.
5
%
2.4%
2.8%
4.
2
%
0.
5
%
0.
8
%
0.
5
%
1.7%2.2%
1.4%
1.
8
%
4.1%
2.7%
2.3%
2.0%
1.
0
%
2.4%
2.4%
2.
1
%
4.
7
%
1.
6
%
1.6%
0.
4
%
0.
4
%
1.0%
1.1%
3.
5
%
1.
2
%
1.1%
3.5%
1.
2
%
100'
BNSF RAIL-ROAD R.O.W.
504
0
504
2504
4
5042
50
4
6
5044
50
4
4
50
5
0
50
4
6
50
4
7
50
4
8
50
4
9
50
4
6
50
4
0
5044
50
4
2
50
4
3
50
4
4
5046
5047
5046
5046
5047504
7
5048 5046
5046
5046
50
4
0
50
4
1
5045.14 FL
5044.47 FL
5044.38 FL5044.38 FL
5043.20 FL
5043.53 FL
5043.46 FL
5043.14 FL
5042.74 LP
5043.48 FL
5043.52 FL
5043.59 FL
5044.67 FL
5045.7 TC
5044.91 FL
5043.85 FL
5043.73 FL
CURB CUT
5044.24 FL 5044.12 F
L
5044.31 FL
5044.18 FL
5044.43 FL
CURB CUT
5044.25 FL
CURB CUT
5044.43 FL
5044.88 FL
504
4
.
7
1
F
L
5045.00 FL
5045.16 FL
5045.35 FL
5044.76 FL
5044.92 FL
5045.06 FL
5046.02 FL
5045.40 FL
5045.42 FL 5044.97 FL
5044.86 FL
5044
.
8
8
F
L
5043.97 FL
5043.86 FL
504
4
.
1
7
F
L
5044.25 FL
5044.24 FL
5045.01 FL
5044.61 FL
5045.14 FL
5044.66 FL
5044.74 FL
5045.19 HP
5045.39 FL
5045.90 FL
5044.92 FL
5045.47 FL
5045.25 FL
5045.19 FL5045.40 FL
504
4
.
8
6
F
L
5045.17 FL
5045.51 FL5045.07 FL
5045.97 FL
5045.91 FL
5045.91 FL
5045.90 FL
504
5
.
9
5
F
L
504
5
.
7
6
F
L
5045.89 FL
504
5
.
5
4
F
L
5045.68 FL
504
5
.
6
8
F
L
5045.55 FL
504
5
.
8
6
F
L
50
4
5
.
7
5
F
L
504
6
.
0
2
F
L
504
5
.
9
5
F
L
5046.03 FL
5044.17 FL
5044.01 FL
504
4
.
7
9
F
L
504
4
.
7
6
F
L
5042.34 FL
5042.77 FL
5042.56 FL
5045.90 FL
504
5
.
6
2
F
L
504
5
.
4
7
F
L
5045.67 FL
5045.51 FL
5045.42 FL
5045.75 FL
5045.90 FL
5045.90 FL
5045.75 FL
5044.72 FL
5044.72 FL5045.14 FL
5044.78 FL
5043.44 FL
5043.28 FL
5044.99 HP
5043.22 FL5043.73 FL
504
6
.
1
1
F
G
5046.05 FG
504
5
.
7
9
F
G
5045.72 FG
5046.69 FG
5046.66 FG
5046.38 FG
5046.35 FG
5047.17 FG
504
5
.
4
0
F
L
5048.06
5046.65 5039.97 FG
5046.08
5046.27
5046.93
5046.80
5047.64
5047.34
5041.66 FL
5041.46 FL
5040.90 FL
50
4
5
.
6
0
F
L
CURB CUT
5045.08 FL
5045.90 FL
5042.47 FL
5042.60 FL
5043.70 FL
5044.22 FL
5044.25 FL
5042.74 FL
5042.74 FL 5043.43 FL
5043.34 FL HP
5042.55 FL
5042.45 FL
5042.22 FL
5042.74 FL
5042.74 FL
5043.41 FL HP5043.71 FG
5045.90 FL/TC
5042.34 FL
5044.54 FL
5042.97 FL
5042.71 FL
5042.41 FL
5042.37 FL 5042.41 FL
5043.61 FL
5044.48 FL
504
4
.
0
5
F
L
5042.53 FL
5045.90 FL
5045.90 FL
5042.17 LP
5042.37 FL
504
5
.
8
3
F
L
5044.59 FL
5044.59 FL
5044.43 FL
5044.45 FL
5044.56 FL
5042.82 FL
5042.73 HP
5044.06 FL
5043.50 FL
5045
50
4
5
50
4
3
50
4
4
504
1
50
4
2
50
4
0
50
4
2
50
4
3
50
4
0
50
4
5 50
4
4
50
4
4
5045
5044
50
4
6
5045
50
4
5
5048
50
4
6
50
4
6
50
4
7
G
H
TOW=5039.72
BOW=5039.62
TOW=5044.31
BOW=5043.57
5044.28 FL
LANDSCAPE
WALL
LANDSCAPE
WALL
5044.11 FL
5044.15 FL
5045.90 FL
5045.63 FL
5045.73 FL
5045.84 FL
5045.90 FL
5045.74 FL
5044.50 FL
5045.26 FL
3.
5
%
5042.36 FL
2.
5
%
2.
5
%
1.
3
%
0.5%
1.2%
5'
2.0%
8'
2'*
5038.34 FL
5039.38 FL
5038.89 FL
5038.58 FL
5039.18 FL
EX
I
S
T
.
G
R
A
V
E
L
DR
I
V
E
W
A
Y
/
P
A
R
K
I
N
G
LOT 2
EX
I
S
T
.
B
L
D
G
.
TO
R
E
M
A
I
N
EX
I
S
T
.
B
L
D
G
.
TO
R
E
M
A
I
N
EXIST. WALL
EXIST.
LOADING DOCK
EXIST.
FENCE
EXIST.
RAILROAD
TRACKS
EXIST.
CONC.
EXIST. GATE.
EXIST. CONC.
CURB CUT
TR
A
N
S
F
O
R
T
BU
S
S
T
O
P
EXIST.
CONC. WALK
NE
W
M
E
R
C
E
R
D
I
T
C
H
C
O
.
LA
R
K
B
O
R
O
U
G
H
S
U
B
D
I
V
I
S
I
O
N
TR
A
C
T
G
EX
I
S
T
.
C
O
N
C
.
D
R
I
V
E
LOT 1
50
4
5
504
5
5046
504
6
50
4
6
5045
5046
5050
5046
50
4
6
504
7
504
8
504
9
505
1
5052
5052
505
0
50
4
8
50
4
8
50
4
9
5051
50515052
50
5
0
50
4
2
504
4 50
5
0
50
5
1
CIT
Y
O
F
F
O
R
T
C
O
L
L
I
N
S
RE
C
.
N
O
.
2
0
1
2
0
0
3
3
2
1
3
8.4%
8.4%
6'6'
2.
5
%
3.
5
%
SEE SHEET C1.0
SEE SHEET C1.0
H
G
15' U.E.
EXIST. WALK
1.
5
%
0.
5
%
0.6%
5042.12 FL
3.3
%
5042.69 FL
5042.77 FL
5044.56 FL??? FL
5045.92 FL 5044.94 FL
504
5
5043
5043.85 FL
ROLLOVER CURB
AND GUTTER
PAVEMENT IS TO BE FLUSH
WITH TOP OF CURB
WHEEL STOPS
(TYPICAL)
0' CURB
0' CURB
5045.70 FL
5045.70 FL
5044.13 FL
5043.86 FL
5043.92 FL
5042.74 LP
5042.74 HP
5042.74 LP 5042.74 LP
4.
0
%
4.
7
%
3.
0
%
TOP OF MEDIA=5042.74
1.
8
%
1.2%
1.2
%
2.2%
5043.78 FL
50
4
7
.
3
5
F
L
50
4
7
.
1
5
F
L
50
4
6
.
7
4
F
L
50
4
6
.
6
8
F
L
50
4
6
.
1
0
F
L
5045.
6
9
F
L
504
5
.
7
9
F
L
504
6
.
1
9
F
L
1.
2
%
1.0%
5045.68 FL
SEE SHEET C-21 FOR
DETAILED GRADING PLAN
REVISED CURB RETURN
LANDSCAPE AREA REVISED
TO PROTECT EX. TREE
POND C REVISED
SEE SHEETS C-13 & C-20
FOR DETAILS
REMOVE EX.
STORAGE SHED
REMOVE EX. METAL VEHICLE
SHED W/ OVERHANG
ADD PARKING ISLAND
~257 SF OF ADDITIONAL
LANDSCAPING
Feet
0 30 60
BENCHMARK:
PROJECT DATUM: NAVD88
BENCHMARK #15-94, AN ALLOY CAP LOCATED ON THE RIM OF AN ELECTRIC
MANHOLE ON THE NORTH SIDE OF HARMONY ROAD, APPROXIMATELY 50'
EAST OF THE SOUTH 1/4 CORNER OF SECTION 35.
ELEVATION = 5054.79
BENCHMARK #48-01, APPROXIMATELY 1/2 SOUTH OF HORSETOOTH ROAD,
WEST OF COLLEGE AVENUE AT THE ENTRANCE OF BARNES AND NOBLE
BOOKSTORE, IN THE NORTHEAST CORNER OF THEIR PARKING LOT, ON A
CONCRETE CURB.
ELEVATION = 5036.76
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM.
SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE
FOLLOWING EQUATION SHOULD BE USED:
NGVD29 UNADJUSTED = NAVD88 - 3.19'
PROPERTY LINE
EXISTING LOT/TRACT LINE
LEGEND:
S
W
EXISTING SANITARY SEWER
EXISTING STORM SEWER
EXISTING WATER MAIN
EXISTING STORM MANHOLE
EXISTING FIRE HYDRANT
EXISTING WATER VALVE
EXISTING RIGHT-OF-WAY
E
G EXISTING GAS MAIN
X EXISTING FENCE
PROPOSED CONTOUR5530
EXISTING CONTOUR5530
PROPOSED AREA OUTLET
S PROPOSED SANITARY SEWER
PROPOSED SIGN
>>PROPOSED C.L. SWALE
PROPOSED STORM SEWER
W PROPOSED WATER MAIN
PROPOSED FIRE HYDRANT
CTV EXISTING CATV LINE
EXISTING UTILITY RISER
EXISTING STREET SIGN
5537.30 FL
2%PROPOSED SLOPE
PROPOSED FLOWLINE ELEVATION
PROPOSED STREET LIGHT
EXISTING VEGETATION
PROPOSED PHASING LINE
EXISTING BURIED ELECTRIC LINE
EXISTING SANITARY SEWER MH
EXISTING ASPHALT
PAVEMENT
PROPOSED ROADWAY STRIPING
PROPOSED ASPHALT PAVEMENT
PROPOSED CONCRETE PAVEMENT
PROPOSED DRAINAGE FLOW ARROW
COM EXISTING COMMUNICATION LINE
PROPOSED CLEANOUT
HIGH POINT
LOW POINT
HP
LP
FINISH GRADEFG
PROPOSED RED LANDSCAPE
EXISTING RED CONCRETE
* NOTE: THE STAIRS ARE SETBACK 2.0' FROM
THE BACK OF SIDEWALK AS SHOWN HEREON.
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
APPROVED: ____________________________________ _____________
CITY ENGINEER DATE
CHECKED BY: __________________________________ ______________
WATER & WASTE WATER UTILITY DATE
CHECKED BY: __________________________________ ______________
STORMWATER UTILITY DATE
CHECKED BY: __________________________________ _____________
PARKS & RECREATION DATE
CHECKED BY: __________________________________ _____________
TRAFFIC ENGINEER DATE
CHECKED BY: __________________________________ _____________
ENVIRONMENTAL PLANNER DATE
DATE
SHEETS SHEET
JOB NO.
DSG
CHK
DA
T
E
#
DRN
RE
V
I
S
I
O
N
D
E
S
C
R
I
P
T
I
O
N
AC
T
I
O
N
C
I
V
I
L
E
N
G
I
N
E
E
R
I
N
G
11
6
0
0
W
H
O
O
P
I
N
G
C
R
A
N
E
D
R
I
V
E
PA
R
K
E
R
,
C
O
8
0
1
3
4
7
2
0
.
2
6
0
.
0
4
3
3
td
e
n
n
i
n
g
@
a
c
t
i
o
n
c
i
v
i
l
e
n
g
.
c
o
m
7
SCALE
Know what's below.
before you dig.Call
R
FO
R
T
C
O
L
L
I
N
S
J
E
E
P
FO
R
T
C
O
L
L
I
N
S
,
C
O
C-
5
G
R
A
D
I
N
G
P
L
A
N
TWD
7/24/2019
---
TWD
16-018
----
RECORD DRAWINGS RECORD DRAWING STATEMENT
I, TROY W. DENNING, CERTIFY ALL PUBLIC WATER, WASTEWATER AND
STORMWATER SYSTEM IMPROVEMENTS SHOWN HEREIN, INCLUDING
ANY NOTED CHANGES OR REVISIONS, ARE IN GENERAL CONFORMANCE
WITH THE DESIGN/CONSTRUCTION DOCUMENTS, PURSUANT TO THIS
RECORD DRAWING COPY OF FINAL UTILITY PLANS.
. .
TROY W. DENNING P.E. 34200 DATE
ACTION CIVIL ENGINEERING LLC
REVISION BUBBLE INDICATES CHANGES
7/25/19
XX
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X X X X
X X
X
X
X
X
X
X
X
X
X X X XXXXXXXXXXXX
X
X
X
X
X
X
X
X
X
X
XXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
2-STORY METAL BUILDING
W/ ADD-ONS
APPROX. 31,553 S.F.
FINISHED FLOOR = 5045.9
LOT 1
PEDERSEN AUTO
PLAZA SUBDIVISION 2ND FILING
CIT
Y
O
F
F
O
R
T
C
O
L
L
I
N
S
RE
C
.
N
O
.
2
0
1
2
0
0
3
3
2
1
3
SS
SSSSSSSS
W W W W W W
W
W
W
W
S
S
S
S S S S S
W
W
W
W
W
W
W
W
W
W
W
W
W
S
S
S
S
S
E E E E
G G G
E
E
E
E
E
E
E
E
E
SS
SS
SS
SS
W
W
W
W
W
W
W
OIL AND SAND
INTERCEPTOR
(SEE DETAIL
SHEET C-15)
W W W W
S S S S S S S S S S S S S
M
S
S
S
S
S
S
S
S
W W W W
W W W WFDC
W W W W W
WV
100 LF ~ 6" PVC71 LF ~ 6" PVC
100 LF ~
6" PVC
6" SEWER
SERVICE
6" SEWER
SERVICE
11
5
L
F
~
6
"
P
V
C
EX. TRAFFIC LIGHT POLE
TO BE RELOCATED BY CITY
AT OWNERS EXPENSE
EXIST.
INLET
GRATE
EX. TRANSFORMER,
BOLLARDS AND CONCRETE
PAD TO BE REMOVED AND
REPLACED
EXIST. WATER METER AND
SERVICE LINE TO BE REMOVED
BACK FIRE HYDRANT LINE
EX. FIRE HYDRANT TO BE
RELOCATED CLEANED
AND PAINTED PER
DISTRICT STANDARDS
EX. SEWER SERVICE TO BE
ABANDONED AT MANHOLE
EX. 10" AC WATER EX. 12 " STORM
15' U.E.
EX. COMMS
15' U.E.
EXIST. 5' PERMANENT
UTILITY ESMT. REC.
NO. 20120033214
20' EMERGENCY
ACCESS ESMT.
10' Type R Inlet
N=1433935.78
E=3117002.31
INV. IN = 5036.95
4' FLAT TOP MH
W/ SOLID ADA
COMPLIANT COVER
N=1433933.28 E=3117013.60
INV=5036.89
Type C Outlet Structure
N=1433985.44
E=3116856.84
INV. OUT = 5040.66
6" Cleanout
N=1434094.50
E=3116645.37
INV. = 5041.77
Type C Outlet Structure
N=1434194.06
E=3116665.47
INV. OUT = 5042.15
6" - 90° Bend
N=1434194.50
E=3116645.37
INV. = 5041.62
6" - Tee
N=1434051.22
E=3116645.37
INV=5040.72
6" - 90° Bend
N=1433952.53
E=3116645.37
INV. = 5040.23
6" Tee and Cleanout
N=1433952.81
E=3116855.06
INV. = 5037.85
6" SD110LF ~ 6" HDPE SD100LF ~ 6" HDPE SD
6" Cleanout
N=1433952.53
E=3116745.37
INV. = 5039.73
SEE SHEET C-13 FOR
DETAILS
SEE SHEET C-13
FOR DETAILS
8'
3'
20
'
E
M
E
R
G
E
N
C
Y
AC
C
E
S
S
E
S
M
T
.
20
'
E
M
E
R
G
E
N
C
Y
AC
C
E
S
S
E
S
M
T
.
15' DRAINAGE
ESMT.15' DRAINAGE
ESMT.
15' DRAINAGE
ESMT.
N 1434390.80
E 3116578.59
N 1434389.41
E 3117002.13
N 1433912.65
E 3116980.38
N 1433909.92
E 3116607.92
N 1434133.98
E 3116612.20
N 1434133.98
E 3116607.20
N 1434215.26
E 3116608.75
N 1434215.35
E 3116603.75
6" CLEAN-OUT
N 1434336.00
E 3116767.37 6" CLEAN-OUT
N 1434336.00
E 3116838.16
6" CLEAN-OUT
N 1434336.00
E 3116938.16
6" CLEAN-OUT
N 1434221.04
E 3116772.37
10'
(ASPHALT PARKING LOT)
99
L
F
~
6
"
H
D
P
E
S
D
103LF ~ 6" HDPE SD
43LF ~ 6" HDPE SD
10
0
L
F
~
6
"
H
D
P
E
S
D
20LF ~ 6" HDPE SD
33
L
F
~
6
"
H
D
P
E
S
D
17LF ~ 6"
HDPE SD
15' U.E.
BNSF RAIL-ROAD R.O.W.
100'
(ASPHALT PARKING LOT)
(ASPHALT PARKING LOT)
6" CO
N=1433952.74
E=3116958.01
INV=5037.36
39LF ~ 6" HDPE SD
4
24"Ø NYLOPLAST DRAIN BASIN
W/ 6" OUTLETS AND 24" SOLID
ADA COMPLIANT GRATE
W/ SOLID ADA
COMPLIANT COVER
N=1433952.81 E=3116996.54
INV=5037.14
EX
I
S
T
.
G
R
A
V
E
L
DR
I
V
E
W
A
Y
/
P
A
R
K
I
N
G
TO
R
E
M
A
I
N
LOT 2
EX
I
S
T
.
B
L
D
G
.
TO
R
E
M
A
I
N
EX
I
S
T
.
B
L
D
G
.
TO
R
E
M
A
I
N
TR
A
N
S
F
O
R
T
BU
S
S
T
O
P
NE
W
M
E
R
C
E
R
D
I
T
C
H
C
O
.
LA
R
K
B
O
R
O
U
G
H
S
U
B
D
I
V
I
S
I
O
N
TR
A
C
T
G
LOT 1
15' U.E.
EXIST. FIRE HYDRANT LINE TO BE
REMOVED TO PROPOSED BEND.
Type C Outlet Structure
N=1434051.02
E=3116661.87
INV. OUT = 5041.43
CLEANOUT RIM = 5046.84
INV=5038.58
N=1434336.133
E=3116771.508
CLEANOUT RIM = 5047.04
INV=5037.44
N=14344336.913
E=3116840.610
CLEANOUT RIM = 5045.84
SEALED SHUT
N=14344337.378
E=3116940.520
WM RIM = 5043.17
N=1434303.543
E=3116989.364
WV RIM = 5043.24
N=1434303.249
E=3116992.680
6" GV AB RIM = 5041.12
N=1434325.573
E=3117053.108
EX WV RIM = 5041.08
N=1434335.044
E=3117054.287
WV RIM = 5042.67
N=1434302.327
E=3116981.752
6" C 900 PVC
T.O.P = 5036.23
N=1343326.227
E=3117003.839
6" - 90° BEND
FIRELINE
EX. STREET LIGHT TO BE RELOCATED
BY CITY AT OWNERS EXPENSE
158 LF ~ 6" C 900 PVC
CORP STOP
CURB
STOP
175 LF~TYPE ~ 1 1/2"
HDPE
1-1/2"
METER
19 LF ~ 6" C 900 PVC
90° BEND W/
THRUST BLOCK
30 LF ~ 6" PVC DR18
RELOCATED
STREET LIGHT
CONNECT TO
EXIST. 8"
WATERLINE
WITH WET TAP
RELOCATED TRAFFIC
LIGHT POLE
PROPOSED BI-FOLD
GATES W/ KNOX BOX
PROPOSED BI-FOLD
GATES W/ KNOX BOX
MEDIAN CURB
(ASPHALT)
WEST HARMONY ROAD
SO
U
T
H
M
A
S
O
N
S
T
R
E
E
T
(R.O.W. WIDTH VARIES)
EX
.
8
"
W
A
T
E
R
EX
.
8
"
S
A
N
I
T
A
R
Y
EX
I
S
T
.
C
O
N
C
.
D
R
I
V
E
KENSINGTON DRIVE
(54' R.O.W.)
TEL.
CLEANOUT RIM = 5045.47
INV = 5041.47
N=1434219.583
E=3116794.253
CLEANOUT RIM = 5046.14
INV = 5043.14
N=1434169.641
E=3116784.322
CLEANOUT RIM = 5046.11
INV = 5043.11
N=1434171.449
E=3116784.341
SH MH RIM = 5045.86
N=1434219.062
E=3116779.789
SH MH RIM = 5045.86
N=1434219.062
E=3116779.789
1.5" HDPE
6" WET TAP58.3'
6" WET TAP W/ TB
CORP STOP
4
MH RIM = 5038.81
INV(W) = 5036.45
INV(SE) = 5036.40
N=1433900.2052
E=3117003.2511
MH RIM = 5038.74
INV(W) = 5236.75
INV(SE) = 5236.73
N=1433952.6285
E=3116996.5883
DOUBLE CURB INLET
FL = 5038.28
INV(N) = 5236.67
INV(SE) = 5236.60
N=143396.2370
E= 3117002.3608
INV = 5037.92
N=1433952.8003
E=3116855.0632
GRATE = 5043.23
INV(S) = 5040.55
INV(W) = 5040.61
INV(E) = 5040.62
N=1433984.9947
E=3116857.0305S
CLEANOUT
INV = 5040.83
N=1433985.7850
E=3116766.9480
CLEANOUT
INV = 5041.42
N=1434051.1240
E=3116726.5201
BIKE RACK (4)
RELOCATED
PRIVATE FIRE
HYDRANT
EX. STORM INLET
TO BE REPLACED
WITH 4' Ø MANHOLE
INV. OUT SW (12") = 5036.89
RELOCATE EX.
"BUS STOP" SIGN EX. STORM MANHOLE
INV. IN NE (12") = 5035.96
INV. IN NW (6") = 5037.3±
INV. OUT SW = 5032.51
EX. SAN. MANHOLE
INV. OUT N = 5031.41
EX. SAN. MANHOLE
INV. IN S = 5031.18
INV. IN E = 5031.20
INV. OUT N = 5031.03
EX. SAN. MANHOLE
INV. IN S = 5031.00
INV. OUT NW = 5030.90
6" SERVICE
INV. = 5031.27±
VEHICLE STORAGE
CUSTOMER
EM
P
L
O
Y
E
E
EM
P
L
O
Y
E
E
CU
S
T
O
M
E
R
4"Ø X 30" H, PIPE BOLLARDS,
FILL WITH CONC. CAP AND
PAINT, TYP. INSTALL @ 6' 0.C.
4" PVC STORM
DRAIN CLEANOUT
4" PVC STORM
DRAIN CLEANOUT
2' WIDE
CURB-CUT
2' WIDE
CURB-CUT
4" PVC STORM
DRAIN CLEANOUT
4" PVC PERFORATED
UNDERDRAIN
@ 0.25% SLOPE
4" PVC
STORM DRAIN
CLEANOUT
4" PVC PERFORATED
UNDERDRAIN
@ 0.25% SLOPE
4" PVC PERFORATED
UNDERDRAIN @
0.25% SLOPE
4" PVC PERFORATED
UNDERDRAIN @
0.25% SLOPE
20' W.L. ESMT.
EXIST. WALL
EXIST.
LOADING DOCK
EXIST.
FENCE
EXIST.
RAILROAD
TRACKS
EXIST.
CONC.
EXIST. GATE.
EXIST. CONC.
CURB CUT
EXIST.
CONC. WALK
EXIST. WALK
GRATE = 5044.08
INV(W) = 5041.25
INV(E) = 5041.26
N=1434050.6810
E=3116661.8426
INV = 5040.71
N=1434051.2200
E=316645.3700
INV = 5040.23
N=1433952.5348
E=3116645.3732
INV = 5040.99
N=1434904.7067
E=316645.6970
GRATE = 5045.21
INV(E) = 5042.27
INV(W) = 5042.19
N=1434194.0579
E=3116665.4732
INV = 5042.32
N=1434194.0219
E=3116686.3246
INV = 5041.62
N=1434194.5009
E=316645.3732
5
CLEANOUT
INV = 5039.64
N=1433952.5348
E=3116746.3718 CLEAN-OUT
NOT INSTALLED
Feet
0 30 60
PROPERTY LINE
LOT / TRACT LINE
LEGEND:
S S
W W
EXISTING SANITARY LINE W/ MH
EXISTING STORM LINE W/ MH
EXISTING WATER LINE
EXISTING STORM AREA INLET
EXISTING FIRE HYDRANT
EXISTING WATER VALVE
DYH
EXISTING STORM TYPE 'R' INLET
RIGHT-OF-WAY
E E EXISTING ELECTRIC LINE
G G EXISTING GAS LINE
X X EXISTING FENCE LINE
PROPOSED CONTOUR5530
EXISTING CONTOUR5530
S S PROPOSED SANITARY SEWER W/ MH
PROPOSED STREET SIGN
PROPOSED STORM SEWER W/ MH
W W PROPOSED WATER LINE
PROPOSED FIRE HYDRANT
CTV EXISTING CATV LINE
CENTERLINE
EXISTING CONCRETE
PROPOSED EASEMENT LINE
EXISTING EASEMENT LINE
PROPOSED WATER VALVE
PROPOSED WATER FITTINGS
4
5
PROPOSED TYPE 'R' INLET
EXISTING RIGHT-OF-WAY
PROPOSED STREET LIGHT
D
S
COM COM EXISTING COMMUNICATION LINE
PROPOSED LANDSCAPE
PROPOSED ASPHALT
PROPOSED CONCRETE
UTILITY EASEMENTU.E.
EASEMENTESMT.
RIGHT-OF-WAYR.O.W.
PROPOSED RED LANDSCAPE
EXISTING RED CONCRETE
REVISION BUBBLE INDICATES
CHANGES TO THE SITE PLAN
SIDEWALK REPAIR NOTE:
ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS
STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO
CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT
COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF
COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF
OCCUPANCY.
BENCHMARK:
PROJECT DATUM: NAVD88
BENCHMARK #15-94, AN ALLOY CAP LOCATED ON THE RIM OF AN ELECTRIC
MANHOLE ON THE NORTH SIDE OF HARMONY ROAD, APPROXIMATELY 50'
EAST OF THE SOUTH 1/4 CORNER OF SECTION 35.
ELEVATION = 5054.79
BENCHMARK #48-01, APPROXIMATELY 1/2 SOUTH OF HORSETOOTH ROAD,
WEST OF COLLEGE AVENUE AT THE ENTRANCE OF BARNES AND NOBLE
BOOKSTORE, IN THE NORTHEAST CORNER OF THEIR PARKING LOT, ON A
CONCRETE CURB.
ELEVATION = 5036.76
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM.
SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE
FOLLOWING EQUATION SHOULD BE USED:
NGVD29 UNADJUSTED = NAVD88 - 3.19'
STREET CUT NOTE:
LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY
THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET
REPAIR STANDARDS.
DATE
SHEETS SHEET
JOB NO.
DSG
CHK
DA
T
E
#
DRN
RE
V
I
S
I
O
N
D
E
S
C
R
I
P
T
I
O
N
AC
T
I
O
N
C
I
V
I
L
E
N
G
I
N
E
E
R
I
N
G
11
6
0
0
W
H
O
O
P
I
N
G
C
R
A
N
E
D
R
I
V
E
PA
R
K
E
R
,
C
O
8
0
1
3
4
7
2
0
.
2
6
0
.
0
4
3
3
td
e
n
n
i
n
g
@
a
c
t
i
o
n
c
i
v
i
l
e
n
g
.
c
o
m
7
SCALE
Know what's below.
before you dig.Call
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
APPROVED: ____________________________________ _____________
CITY ENGINEER DATE
CHECKED BY: __________________________________ ______________
WATER & WASTE WATER UTILITY DATE
CHECKED BY: __________________________________ ______________
STORMWATER UTILITY DATE
CHECKED BY: __________________________________ _____________
PARKS & RECREATION DATE
CHECKED BY: __________________________________ _____________
TRAFFIC ENGINEER DATE
CHECKED BY: __________________________________ _____________
ENVIRONMENTAL PLANNER DATE
FO
R
T
C
O
L
L
I
N
S
J
E
E
P
FO
R
T
C
O
L
L
I
N
S
,
C
O
C-
7
O
V
E
R
A
L
L
U
T
I
L
I
T
Y
P
L
A
N
TWD
7/25/2019
---
TWD
16-018
----
NOTE:
RUN NEW COMMUNICATIONS WIRE TO BUILDING
RECORD DRAWINGS
RECORD DRAWING STATEMENT
I, TROY W. DENNING, CERTIFY ALL PUBLIC WATER, WASTEWATER AND
STORMWATER SYSTEM IMPROVEMENTS SHOWN HEREIN, INCLUDING
ANY NOTED CHANGES OR REVISIONS, ARE IN GENERAL CONFORMANCE
WITH THE DESIGN/CONSTRUCTION DOCUMENTS, PURSUANT TO THIS
RECORD DRAWING COPY OF FINAL UTILITY PLANS.
. .
TROY W. DENNING P.E. 34200 DATE
ACTION CIVIL ENGINEERING LLC
7/25/19
X-SECTION A-A: POROUS LANDSCAPE
DETENTION POND (BIORETENTION) DETAILS
N.T.S
8" THICK SECTION OF CDOT
NO. 4 AGGREGATE 12" FILTER MEDIA
(SEE SPECIFICATION
ON THIS SHEET.
CLEANOUT
ORIFICE PLATE FOR 100-YR
CONTROL AT PIPE INLET
100-YR GRATE
PAVEMENT
WQCV ELEV
POND BOTTOM ELEV
OUTLET PIPE
INV.
2' CATCH GUTTER
& 6" CURB HEAD
2' CATCH GUTTER
& 6" CURB HEAD10'
X-SECTION B-B: POROUS LANDSCAPE
DETENTION POND (BIORETENTION) DETAILS
N.T.S
PAVEMENT WITH NO
CURB AND GUTTER
WQCV ELEV
POND BOTTOM ELEV
PAVEMENT WITH NO CURB
AND GUTTER
WHEEL STOP
2'2'
WHEEL STOP
8"
4
1
8"
4
1
18" THICK SECTION OF FILTER MEDIA
(SEE "BIORETENTION/BIOSWALE
CROSS SECTION" ON THIS SHEET)
8" THICK SECTION OF CDOT
NO. 4 AGGREGATE
DIA HOLE ORIFICE
PLATE FOR UNDERDRAIN
2'
X
5' FENCE
NOTE:
1.CONTRACTOR IS REQUIRED TO PROVIDE SAMPLE OF THE FILTER MEDIA
MATERIALS AFTER DELIVERY AND PRIOR TO PLACEMENT.
DETAIL AND SPECIFICATION NOTES:
1.REFER TO SECTION B DETAILS BELOW (PER UDFCD, VOL. 3 CHAPTER 4,
SECTION T-3, PAGE B-16) FOR NO-INFILTRATION SECTION.
1.FOR GEOMEMBRANE LINER/CONCRETE CONNECTION DETAILS, SEE
FIGURE B-3 RIGHT.
2.FOR MATERIAL SPECIFICATION OF THE POROUS LANDSCAPE DETENTION
(BIORETENTION) POND, AND IMPERMEABLE LINER SPECIFICATION
REQUIREMENTS, SEE TABLE B-1 RIGHT.
3.FOR SEPARATOR FABRIC PHYSICAL REQUIREMENTS, SEE TABLE B-2.
OUTLET STRUCTURE DETAIL
N.T.S
4" CONTECH A-2000
SLOTTED PIPE
UNDISTURBED
EARTH
6" PEA GRAVEL
DIAPHRAM
WQCV
6"
280'
22.7'
2"
2"
4" CONTECH A-2000
SLOTTED PIPE
DATE
SHEETS SHEET
JOB NO.
DSG
CHK
DA
T
E
#
DRN
RE
V
I
S
I
O
N
D
E
S
C
R
I
P
T
I
O
N
AC
T
I
O
N
C
I
V
I
L
E
N
G
I
N
E
E
R
I
N
G
11
6
0
0
W
H
O
O
P
I
N
G
C
R
A
N
E
D
R
I
V
E
PA
R
K
E
R
,
C
O
8
0
1
3
4
7
2
0
.
2
6
0
.
0
4
3
3
td
e
n
n
i
n
g
@
a
c
t
i
o
n
c
i
v
i
l
e
n
g
.
c
o
m
7
SCALE
Know what's below.
before you dig.Call
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
APPROVED: ____________________________________ _____________
CITY ENGINEER DATE
CHECKED BY: __________________________________ ______________
WATER & WASTE WATER UTILITY DATE
CHECKED BY: __________________________________ ______________
STORMWATER UTILITY DATE
CHECKED BY: __________________________________ _____________
PARKS & RECREATION DATE
CHECKED BY: __________________________________ _____________
TRAFFIC ENGINEER DATE
CHECKED BY: __________________________________ _____________
ENVIRONMENTAL PLANNER DATE
FO
R
T
C
O
L
L
I
N
S
J
E
E
P
FO
R
T
C
O
L
L
I
N
S
,
C
O
C-
1
3
D
E
T
A
I
L
TWD
7/24/2019
---
TWD
16-018
----
3'
RECORD DRAWINGS
RECORD DRAWING STATEMENT
I, TROY W. DENNING, CERTIFY ALL PUBLIC WATER, WASTEWATER AND
STORMWATER SYSTEM IMPROVEMENTS SHOWN HEREIN, INCLUDING
ANY NOTED CHANGES OR REVISIONS, ARE IN GENERAL CONFORMANCE
WITH THE DESIGN/CONSTRUCTION DOCUMENTS, PURSUANT TO THIS
RECORD DRAWING COPY OF FINAL UTILITY PLANS.
. .
TROY W. DENNING P.E. 34200 DATE
ACTION CIVIL ENGINEERING LLC
REVISION BUBBLE INDICATES CHANGES
TO ORIGINAL DESIGN
7/25/19
0+00 1+00 2+00 2+22
0+
0
0
1+
0
0
1+
4
2
SECTION A-A
SECTION B-B
SS
SS
S S S S S S S S S
W W W W W W W W W
W
W
W
W
W
W
W
S
S
S
S
S
S
W
W
W
W
W
W
W
W
W
XXX
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X X X
X
X
X
4
5
WQ RELEASE STRUCTURE
GRATE=5042.67
INV. OUT (6") = 5040.55 (S)
INV. OUT (4") = 5040.84 (E)
INV. OUT (4") = 5040.83 (W)
4" CLEANOUT
FL = 5041.20
INV. IN (4") = 5040.83 (E)
INV. OUT (4") = 5040.83 (N)
4" CLEANOUT
FL = 5041.20
INV. IN (4") = 5040.83 (W)
INV. OUT (4") = 5040.83 (N)
GRATE =5042.7
INV IN=5040.62
INV IN=5040.61
X-SECTION B-B: BIORETENTION POND C
SCALE 1"=2'
PAVEMENT WITH NO
CURB AND GUTTER
6"
4
1
9" THICK SECTION OF FILTER MEDIA
6" THICK SECTION OF CDOT
NO. 4 AGGREGATE
4" CONTECH A-2000
SLOTTED PIPE
9"
WHEEL STOP
TOP OF MEDIA
EL=5041.80
47" TYPE C INLET
6" HDPE OUTLET PIPE
INV EL=5040.55 OUT
2"
9'
2'
6"
9"
TOP OF MEDIA
EL=5041.80
WATER QUALITY
WATER SURFACE
EL=5042.80
9" THICK SECTION OF FILTER MEDIA6" THICK SECTION OF CDOT
NO. 4 AGGREGATE
4
1 6"
9"
4
1
X-SECTION A-A: BIORETENTION POND C
SCALE 1"=2'
TOP OF MEDIA
EL=5041.80
WATER QUALITY
WATER SURFACE
EL=5042.80
CURB AND GUTTER
FLOWLINE ELEVATIONS
VARIES PER GRADING PLAN
0.5'
CURB AND GUTTER
FLOWLINE ELEVATIONS
VARIES PER GRADING PLAN
11"
SEPARATOR FABRIC PER TABLE B-2
SEPARATOR FABRIC
PER TABLE B-2
TOP OF INLET (AS-BUILT)
EL=5042.67
WALL EL=5042.67
(AS-BUILT)
EL=5042.7
MEDIA SURFACE EL=5041.6
(AS-BUILT)
EL=5041.7
EL=5041.7
DATE
SHEETS SHEET
JOB NO.
DSG
CHK
DA
T
E
#
DRN
RE
V
I
S
I
O
N
D
E
S
C
R
I
P
T
I
O
N
AC
T
I
O
N
C
I
V
I
L
E
N
G
I
N
E
E
R
I
N
G
11
6
0
0
W
H
O
O
P
I
N
G
C
R
A
N
E
D
R
I
V
E
PA
R
K
E
R
,
C
O
8
0
1
3
4
7
2
0
.
2
6
0
.
0
4
3
3
td
e
n
n
i
n
g
@
a
c
t
i
o
n
c
i
v
i
l
e
n
g
.
c
o
m
20
SCALE
Know what's below.
before you dig.Call
R
Feet
0 20 40
FO
R
T
C
O
L
L
I
N
S
J
E
E
P
FO
R
T
C
O
L
L
I
N
S
,
C
O
C-
2
0
P
O
N
D
C
C
R
O
S
S
-
S
E
C
T
I
O
N
S
TWD
8/21/2019
---
TWD
16-018
----
RECORD DRAWINGS
RECORD DRAWING STATEMENT
I, TROY W. DENNING, CERTIFY ALL PUBLIC WATER, WASTEWATER AND
STORMWATER SYSTEM IMPROVEMENTS SHOWN HEREIN, INCLUDING
ANY NOTED CHANGES OR REVISIONS, ARE IN GENERAL CONFORMANCE
WITH THE DESIGN/CONSTRUCTION DOCUMENTS, PURSUANT TO THIS
RECORD DRAWING COPY OF FINAL UTILITY PLANS.
. .
TROY W. DENNING P.E. 34200 DATE
ACTION CIVIL ENGINEERING LLC
REVISION BUBBLE INDICATES CHANGES
TO ORIGINAL DESIGN
8/21/19
C-20
SSSS
W W W W W W W W W
W
W
W
W
W
W
W
S
S
S
S
S
W
W
W
W
W
W
4
4
0+
2
5
1+
0
0
2+003+00
REMOVE EXISTING
10' TYPE R INLET
REMOVE 44' OF EXISTING
12" RCP
CONNECT TO EX. 12" STORM
WITH OFFSET FLAT TOP 5'Ø SDMH
STA: 0+84.10 (0.67' R)
NUMBER 16 INLET
W/ 4' WIDE BOX
STA: 1+16.38
24"Ø NYLOPLAST DRAIN BASIN
W/ 6" OUTLETS AND 24" SOLID
ADA COMPLIANT GRATE
STA: 1+34.43
29 LF~ TWO 12" RCP'S
WEST HARMONY ROAD
SO
U
T
H
M
A
S
O
N
S
T
R
E
E
T
504
0
50
3
9
504
15042504
3
50
4
0
50
4
1
50
4
2
5043
5039
5038.29 FL
0.2'
5
MH RIM = 5038.74
INV(W) = 5036.75
INV(SE) = 5036.73
N=1433952.6285
E=3116996.5883
DOUBLE CURB INLET
FL = 5038.28
INV(N) = 5036.67
INV(SE) = 5036.60
N=143396.2370
E= 3117002.3608
STORM SEWER LINE A PROFILE
5030
5040
5030
5040
0+251+002+00
EX. GRADE AT PIPE CL
PR. GRADE AT
PIPE CL
SCALE: HORIZONTAL 1"=20'
VERTICAL 1"=2'
0.6'
50
3
9
.
9
0
50
3
9
.
9
0
50
3
9
.
4
3
50
3
9
.
4
3
50
4
2
.
6
4
50
4
2
.
6
4
50
4
2
.
7
0
50
4
2
.
7
0
17.98' of 6" @ 0.33%
38.53' of 6" @ 1.57%
29.21' of TWO 12" Reinforced Concrete Pipe @ 0.51%56.29' of 15" RCP @ 0.78%
24"Ø NYLOPLAST DRAIN BASIN
W/ 6" OUTLETS AND 24" SOLID
ADA COMPLIANT GRATE
STA: 1+34.43
RIM = 5040.12
INV. IN = 5036.75 (W)
INV. OUT = 5036.73 (S)DO
U
B
L
E
N
U
M
B
E
R
1
6
I
N
L
E
T
WI
D
E
N
E
D
B
O
X
ST
A
:
1
+
1
6
.
3
8
RI
M
=
5
0
3
8
.
7
9
IN
V
.
I
N
=
5
0
3
6
.
6
7
(
N
)
5'
D
I
A
C
O
N
C
E
N
T
R
I
C
M
A
N
H
O
L
E
ST
A
:
0
+
8
4
.
1
0
RI
M
=
5
0
3
9
.
0
6
EX
.
4
'
S
T
M
H
ST
A
:
0
+
2
7
.
8
1
RI
M
=
5
0
4
0
.
6
7
IN
V
.
I
N
=
5
0
3
5
.
9
6
(
N
)
DATE
SHEETS SHEET
JOB NO.
DSG
CHK
DA
T
E
#
DRN
RE
V
I
S
I
O
N
D
E
S
C
R
I
P
T
I
O
N
AC
T
I
O
N
C
I
V
I
L
E
N
G
I
N
E
E
R
I
N
G
11
6
0
0
W
H
O
O
P
I
N
G
C
R
A
N
E
D
R
I
V
E
PA
R
K
E
R
,
C
O
8
0
1
3
4
7
2
0
.
2
6
0
.
0
4
3
3
td
e
n
n
i
n
g
@
a
c
t
i
o
n
c
i
v
i
l
e
n
g
.
c
o
m
7
SCALE
Know what's below.
before you dig.Call
R
Feet
0 20 40
FO
R
T
C
O
L
L
I
N
S
J
E
E
P
FO
R
T
C
O
L
L
I
N
S
,
C
O
C-
2
2
S
T
O
R
M
S
E
W
E
R
P
L
A
N
&
P
R
O
F
I
L
E
---
7/24/2019
---
---
16-018
----
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
APPROVED: ____________________________________ _____________
CITY ENGINEER DATE
CHECKED BY: __________________________________ ______________
WATER & WASTE WATER UTILITY DATE
CHECKED BY: __________________________________ ______________
STORMWATER UTILITY DATE
CHECKED BY: __________________________________ _____________
PARKS & RECREATION DATE
CHECKED BY: __________________________________ _____________
TRAFFIC ENGINEER DATE
CHECKED BY: __________________________________ _____________
ENVIRONMENTAL PLANNER DATE
SIDEWALK REPAIR NOTE:
ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS
STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO
CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT
COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF
COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF
OCCUPANCY.
STREET CUT NOTE:
LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY
THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET
REPAIR STANDARDS.
UTILITY CROSSINGS:
EXISTING UTILITY CROSSINGS ARE NOT SHOWN. CONTRACTOR TO LOCATE AND POTHOLE EXISTING
WET AND DRY UTILITIES BEFORE DIGGING. CONTRACTOR SHALL NOTIFY ENGINEER OF RECORD OF
ALL CONFLICTS BEFORE CONSTRUCTION.
PROPERTY LINE
LOT / TRACT LINE
LEGEND:
S S
W W
EXISTING SANITARY LINE W/ MH
EXISTING STORM LINE W/ MH
EXISTING WATER LINE
EXISTING STORM AREA INLET
EXISTING FIRE HYDRANT
EXISTING WATER VALVE
DYH
EXISTING STORM TYPE 'R' INLET
RIGHT-OF-WAY
E E EXISTING ELECTRIC LINE
G G EXISTING GAS LINE
X X EXISTING FENCE LINE
PROPOSED CONTOUR5530
EXISTING CONTOUR5530
S S PROPOSED SANITARY SEWER W/ MH
PROPOSED STREET SIGN
PROPOSED STORM SEWER W/ MH
W W PROPOSED WATER LINE
PROPOSED FIRE HYDRANT
CTV EXISTING CATV LINE
CENTERLINE
EXISTING CONCRETE
PROPOSED EASEMENT LINE
EXISTING EASEMENT LINE
PROPOSED WATER VALVE
PROPOSED WATER FITTINGS
4
5
PROPOSED TYPE 'R' INLET
EXISTING RIGHT-OF-WAY
PROPOSED STREET LIGHT
D
S
COM COM EXISTING COMMUNICATION LINE
PROPOSED LANDSCAPE
PROPOSED ASPHALT
PROPOSED CONCRETE
UTILITY EASEMENTU.E.
EASEMENTESMT.
RIGHT-OF-WAYR.O.W.
PROPOSED RED LANDSCAPE
EXISTING RED CONCRETE
REVISION BUBBLE INDICATES
CHANGES TO THE SITE PLAN
BENCHMARK:
PROJECT DATUM: NAVD88
BENCHMARK #15-94, AN ALLOY CAP LOCATED ON THE RIM OF AN ELECTRIC
MANHOLE ON THE NORTH SIDE OF HARMONY ROAD, APPROXIMATELY 50'
EAST OF THE SOUTH 1/4 CORNER OF SECTION 35.
ELEVATION = 5054.79
BENCHMARK #48-01, APPROXIMATELY 1/2 SOUTH OF HORSETOOTH ROAD,
WEST OF COLLEGE AVENUE AT THE ENTRANCE OF BARNES AND NOBLE
BOOKSTORE, IN THE NORTHEAST CORNER OF THEIR PARKING LOT, ON A
CONCRETE CURB.
ELEVATION = 5036.76
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM.
SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE
FOLLOWING EQUATION SHOULD BE USED:
NGVD29 UNADJUSTED = NAVD88 - 3.19'
RECORD DRAWINGS
RECORD DRAWING STATEMENT
I, TROY W. DENNING, CERTIFY ALL PUBLIC WATER, WASTEWATER AND
STORMWATER SYSTEM IMPROVEMENTS SHOWN HEREIN, INCLUDING
ANY NOTED CHANGES OR REVISIONS, ARE IN GENERAL CONFORMANCE
WITH THE DESIGN/CONSTRUCTION DOCUMENTS, PURSUANT TO THIS
RECORD DRAWING COPY OF FINAL UTILITY PLANS.
. .
TROY W. DENNING P.E. 34200 DATE
ACTION CIVIL ENGINEERING LLC
7/25/19
20 C-21