Loading...
HomeMy WebLinkAboutLot Certifications - 08/13/2018Certification of Lot GradingCertification of Lot GradingCertification of Lot GradingCertification of Lot Grading Supplementary NotesSupplementary NotesSupplementary NotesSupplementary Notes August August August August 13131313, , , , 2018201820182018 RE:RE:RE:RE: Fort Collins Brewery (Revisions for Red Truck Brewery Minor Amendment)Fort Collins Brewery (Revisions for Red Truck Brewery Minor Amendment)Fort Collins Brewery (Revisions for Red Truck Brewery Minor Amendment)Fort Collins Brewery (Revisions for Red Truck Brewery Minor Amendment) This project included very minor modifications to the existing detention/WQL pond, originally constructed as part of the Fort Collins Brewery project. Those modifications are shown on Revision 1 to the approved Fort Collins Brewery Utility Plans, dated 12/28/2017, and in the approved Drainage Memorandum, dated 8/23/2017. Both documents are attached for reference. Although there were minor deviations from the approved grading plan (greater than 0.2’), the as-built conditions indicate that the project was constructed in general conformance with the approved revised grading plan and approved Drainage Memorandum. Adequate slopes are provided to convey runoff from the site to the existing detention and water quality pond. The detention volume within the detention pond located on site is in accordance with the approved Drainage Memo referenced above. As such, there is negligible impact from the modifications and no modification to the outlet structure is required. The pond will function in a substantially identical manner as the pre-project conditions. OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P 4025 Automation Way, Suite C4 Fort Collins, CO 80525 970-232-9645 www.WashburnSurveying.com Sheet 1 of 1 Project #: 2018-002 Date: July 9, 2018 Scale: 1"=10' Drawn: CDB Sc a l e : 1 " = 1 0 ' AS-BUILT EXHIBIT RED TRUCK BEER COMPANY LOT 2, FORT COLLINS BREWERY, LOCATED IN THE SOUTHEAST OF THE NORTHEAST QUARTER OF SECTION 12, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO ELEVATIONS SHOWN ARE FROM AN AS-BUILT SURVEY OF THE SITE PERFORMED ON July 9 & 17, 2018 CHAD R. WASHBURN COLORADO LICENSED PROFESSIONAL LAND SURVEYOR 37963 FOR AND ON BEHALF OF WASHBURN LAND SURVEYING, LLC. 970.232.9645 EngineeringEngineeringEngineeringEngineering 908 Laporte Avenue  Fort Collins, Colorado 80521  970.219.2834  bob@apex-engineer.com AugustAugustAugustAugust 23, 201723, 201723, 201723, 2017 Mr. Shane Boyle, P.E. Stormwater Department City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80521 RE:RE:RE:RE: Drainage Drainage Drainage Drainage MemoMemoMemoMemo Red Truck Brewery Red Truck Brewery Red Truck Brewery Red Truck Brewery –––– Minor AmendmentMinor AmendmentMinor AmendmentMinor Amendment Dear Shane, This purpose of this letter is to examine the potential impacts of the proposed site improvements associated with the above referenced Minor Amendment (MA) project on the existing drainage facilities located on the project site. As we discussed in our meeting on 5/31/2017, the project consists of exterior and interior remodeling of the existing Fort Collins Brewery located at 1020 East Lincoln Avenue. There is also an elevated deck proposed over the existing detention pond. The deck is supported by 38 12”x12” concrete piers and four 24”x24” concrete piers. The total plan area of the 42 proposed piers is 54 square feet. The changes in impervious cover created by the revisions to the site design are as follows: • Removal of concrete from parking area and sidewalk (190) • Expansion of existing patios and sidewalk (906 SF) • A gravel trail along the west side of the building (1283 SF) In preparing this drainage memo, the following approved documents prepared by Apex Engineering for the Fort Collins Brewery (FCB) project are referenced: • Utility Plans (and subsequent drawings of record), dated 4/20/2009 • Final Drainage, Erosion Control and Water Quality Report, dated 4/20/2009 • Drainage Certification, dated 9/24/2010 RunoffRunoffRunoffRunoff ParametersParametersParametersParameters The net effect of the removal and additions listed above, the weighted composite runoff Coefficient (C) and percentage of impervious area changes very slightly. The following is a comparison of the existing and proposed values (calculations attached): C % Imp. Existing 0.852 82.1% Proposed 0.857 83.0% Detention StorageDetention StorageDetention StorageDetention Storage The original FTB detention analysis was based on a proposed C of 0.852 for full build out of both phases of the project. The original analysis was modified to reflect the higher proposed C of 0.857. The results indicate that these revisions do not increase required detention volume. Please note that this result is to be expected since the City’s detention volume calculation spreadsheet adds a 25% factor of safety to all runoff coefficients. Basin Roof Area (sqft) Asphalt Area (sqft) Concrete Area (sqft) Gravel Area (sqft) Lawn Area (sqft) Total Area Composite No."C=0.95" "C=0.95" "C=0.95" "C=0.50" "C=0.25" (sqft) "C" P-1 38,843 32,013 33,510 1,283 11,927 117,576 0.874 Total SITE 38,843 32,013 33,510 1,283 11,927 117,576 0.874 Total Acreage 0.89 0.73 0.77 0.03 0.27 2.70 Impervious Ratio Basin Roof Area (sqft) Asphalt Area (sqft) Concrete Area (sqft) Gravel Area (sqft) Lawn Area (sqft) Total Area Imperviousness No.(sqft) Ratio P-1 38,843 32,013 33,510 1,283 11,927 117,576 0.830 Total SITE 38,843 32,013 33,510 1,283 11,927 117,576 0.830 Total Acreage 0.89 0.73 0.77 0.03 0.27 2.70 Composite Calculations Basins Total Area Sum CxA Composite C P-1, E-4 3.64 3.12 0.857 Business: Commercial areas Neighborhood areas Residential: Single-family Multiunit (detached) Multiunit (attached) Half-acre lot or larger Apartments Industrial: Light areas Heavy areas Parks, cemeteries: Playgrounds: Schools: Railroad yard areas: Undeveloped areas: Historical Flow Analysis Greenbelts, agricultural Off-site flow analysis (when land use not defined) Streets: Paved Gravel (packed) Driveways and sidewalks: Roofs: Lawns, sandy soil Lawns, clayey soil *Refer to Figures RO-3 through RO-5 in Runoff Chapter Notes: 1. Net increase in concrete area = 535 SF 2. Net increase in gravel area = 1340 SF 45 0 0 100 40 90 90 10 50 15 2 * 80 80 90 5 95 85 * 60 75 Land Use or Surface Characteristics Percent Imper-viousness Developed Weighted Runoff Coefficients Red Truck Beer APEX ENGINEERING 1:32 AM 8/23/2017 100 Year This is to convert % imp. to a C value 100-year (must insert % imp. and C pervious). ft3 acre-ft. 'C' value 0.86 42981.1 0.9867 'C' * 1.25 1 Area 3.64 acres Modified Modified Release Rate 0.73 M. FATER D. JUDISH C. LI 5/95 Nov-97 Nov-98 DETENTION POND SIZING TIME TIME INTENSITY Q 100 Runoff Release Required Required cum 100 year Volume Cum total Detention Detention (mins) (secs) (in/hr) (cfs) (ft^3) (ft^3) (ft^3) (ac-ft) 0 0 0 0.00 0 0.0 0.0 0.0000 5 300 9.950 36.22 10865.4 218.4 10647.0 0.2444 10 600 7.720 28.10 16860.48 436.8 16423.7 0.3770 15 900 6.520 23.73 21359.52 655.2 20704.3 0.4753 20 1200 5.600 20.38 24460.8 873.6 23587.2 0.5415 25 1500 4.980 18.13 27190.8 1092.0 26098.8 0.5991 30 1800 4.520 16.45 29615.04 1310.4 28304.6 0.6498 35 2100 4.080 14.85 31187.52 1528.8 29658.7 0.6809 40 2400 3.740 13.61 32672.64 1747.2 30925.4 0.7100 45 2700 3.460 12.59 34004.88 1965.6 32039.3 0.7355 50 3000 3.230 11.76 35271.6 2184.0 33087.6 0.7596 55 3300 3.030 11.03 36396.36 2402.4 33994.0 0.7804 60 3600 2.860 10.41 37477.44 2620.8 34856.6 0.8002 65 3900 2.720 9.90 38613.12 2839.2 35773.9 0.8213 70 4200 2.590 9.43 39595.92 3057.6 36538.3 0.8388 75 4500 2.480 9.03 40622.4 3276.0 37346.4 0.8574 80 4800 2.380 8.66 41583.36 3494.4 38089.0 0.8744 85 5100 2.290 8.34 42511.56 3712.8 38798.8 0.8907 90 5400 2.210 8.04 43439.76 3931.2 39508.6 0.9070 95 5700 2.130 7.75 44193.24 4149.6 40043.6 0.9193 100 6000 2.060 7.50 44990.4 4368.0 40622.4 0.9326 105 6300 2.000 7.28 45864 4586.4 41277.6 0.9476 110 6600 1.940 7.06 46606.56 4804.8 41801.8 0.9596 115 6900 1.890 6.88 47469.24 5023.2 42446.0 0.9744 120 7200 1.840 6.70 48222.72 5241.6 42981.1 0.9867 Required detention Page 1 Red Truck Detention Pond As Built Detention Pond Volume Rating Curve Elevation (ft.) Area (ft.2 ) Area (acre) Storage (acre-ft.) Cumulative Storage (acre-ft.) 35.01 0 0.000 0.000 0.000 35.50 332 0.008 0.001 0.001 36.00 3,495 0.080 0.019 0.020 36.50 7,007 0.161 0.059 0.079 36.627 37.00 7,059 0.162 0.081 0.160 37.50 7,097 0.163 0.081 0.241 38.00 7,136 0.164 0.082 0.322 38.50 7,518 0.173 0.084 0.406 39.00 9,004 0.207 0.095 0.501 39.50 9,653 0.222 0.107 0.608 40.00 16,220 0.372 0.147 0.755 40.50 28,703 0.659 0.254 1.009 40.60 31,206 0.716 0.069 1.078 40.604 (100 year Volume) Required =0.99 acre-ft WQCV Required = 0.094 acre-ft (100 year Volume+ WQCV) Required =1.08 acre-ft 40.60 36.63 where: V = volume between contour interval d = elevationn - elevationn-1 A = area of elevationn-1 contour B = area of elevationn contour 100-year WSEL = WQ WSEL = Based on As-Built Topography of Existing Detention Pond ()V d A B AB= + +1 3 APEX ENGINEERING 1:33 AM 8/23/2017