HomeMy WebLinkAboutLot Certifications - 11/10/2022Date:
Address:951 Pear Drive
September 16,2022 Subdivision: Elizabeth Street Farms
Permit Application g' 82101430
Larimer County Parcel g; 9716255003
Larimer County Reception g; 20180035039
(on development agreement)
Lot: 3 Block:
l, (print) Robert R. Greenwald ll a Colorado registered professional engineer, verify that construction
of all stormwater facilities and grading is complete and hereby submit this certification.
Please answer the following questions by initialing the appropriate response. For each question initialed "No," attach an
explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots.
v", Q(1. Certification includes attached Stormwater-approved grading plan. (NOTE: City's No
Building Department does not approve grading plans).
Certification includes the attached as-built survey 6a|e6 9113122 . (must be within 60
days of the date the certification is submitted) accurately and truthfully depicting
elevations for:
o Top of foundationfinished floor
r Finished grade on each side of the structure
r Quarter points along each lot line (not more than 50 feet apart)
o Break points/high points
o Swales
o Berms
o Retaining walls
o Air conditioning pads
o Window wells
o Any other appurtenance(s) within an easement
All elevations are within a 0.2 foot tolerance of the approved grading plan.
The top of foundation is at least 6 inches above the highest grade surrounding the
structure.
There is a minimum grade of 5% away from the structure within the first 5 to 10 feet
adjacent to the residence.
All slopes meet or exceed the minimum requirement of 2% lLo/o is acceptable on single
family lots when the swale is draining the runofffrom only two adjoining properties)
and are not steeperthan 33% (3:1).
All flow lines of stormwater drainage swales are a minimum of 5 inches below the
elevation of ground adjacent to the structure and will direct drainage as shown on the
Stormwater-approved grading plan.
8. All downspout locations and discharge directions are shown on the as-built survey.
Runoff is directed into an appropriate drainage system or lot line swale, and it is not
directed onto neighboring properties.
2lt4lt7
No2.v", kG
No-Yet ![(.
Yes
No Yes
No-ves Q(
No
-Ye'-sL
No
3.
4.
5.
6.
2[6
-Ua-
Aa
7.
No Yes
Page I
CERTI
Pursuant to Fort Collins City Code S 26-544 & City Land Use Code $ 3.3.2 (e)
Wes Lamarque
11/10/2022
9. A smooth transition with no vertical offset (step) in grade is provided at the lot line to all
adjacent properties.
10. The grading of this lot does not adversely affect neighboring properties or City
infrastructure.
11. Landscaping has been completed prior to survey. lf not, please indicate who will be
responsible for completing landscaping:
12. Final site cleanup has been completed.
High Plains Builders
No-Ye, (16
v", (06
,ro(((r-r",
No-r"rtK
ves S13. I personally visited the site as part of the certification procest and in my professional No
-
opinion, the as-built survey is an accurate representation of the site conditions.
14. Based on this information, I certify that (check one):
tr The elevations and drainage patterns of the lot/site are in substantial conformance with the City
approved drainage and grading plan for the property (information attached).
E The elevations and drainage patterns of the lot/site as measured are in generalconformance with the
City approved drainage plan with exceptions (information attached). ln my professionaljudgment the
elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the
specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a
manner consistent with the approved drainage plan.
Name: Robe{ E g*g!rq!9ll
Email: rgreenwald@cds-eng.net
phone: 970-667-8010
Company:
Address:
CDS Engineering
165 Second Street SW
Loveland, CO 80537
PE Stamp
Sign and date
NOTE: A compl*e certification must be submitted at least two weeks prior to a reguest for a Certificate of Occupancy
for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed
elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other
information necessary to confirm the above certification to:
Email (preferred)
WaterUtilitiesEng@fcgov.com
Mailing Address
Fort Collins Utilities
ATTN: Water Utilities Engineering
281 North College Avenue
Fort Collins, CO 80521.
Questions?
970-22L^6700
2/14t17 Page2
f8Pfborins' \=--;;;'*-