Loading...
HomeMy WebLinkAboutLot Certifications - 11/10/2022Date: Address:951 Pear Drive September 16,2022 Subdivision: Elizabeth Street Farms Permit Application g' 82101430 Larimer County Parcel g; 9716255003 Larimer County Reception g; 20180035039 (on development agreement) Lot: 3 Block: l, (print) Robert R. Greenwald ll a Colorado registered professional engineer, verify that construction of all stormwater facilities and grading is complete and hereby submit this certification. Please answer the following questions by initialing the appropriate response. For each question initialed "No," attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots. v", Q(1. Certification includes attached Stormwater-approved grading plan. (NOTE: City's No Building Department does not approve grading plans). Certification includes the attached as-built survey 6a|e6 9113122 . (must be within 60 days of the date the certification is submitted) accurately and truthfully depicting elevations for: o Top of foundationfinished floor r Finished grade on each side of the structure r Quarter points along each lot line (not more than 50 feet apart) o Break points/high points o Swales o Berms o Retaining walls o Air conditioning pads o Window wells o Any other appurtenance(s) within an easement All elevations are within a 0.2 foot tolerance of the approved grading plan. The top of foundation is at least 6 inches above the highest grade surrounding the structure. There is a minimum grade of 5% away from the structure within the first 5 to 10 feet adjacent to the residence. All slopes meet or exceed the minimum requirement of 2% lLo/o is acceptable on single family lots when the swale is draining the runofffrom only two adjoining properties) and are not steeperthan 33% (3:1). All flow lines of stormwater drainage swales are a minimum of 5 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Stormwater-approved grading plan. 8. All downspout locations and discharge directions are shown on the as-built survey. Runoff is directed into an appropriate drainage system or lot line swale, and it is not directed onto neighboring properties. 2lt4lt7 No2.v", kG No-Yet ![(. Yes No Yes No-ves Q( No -Ye'-sL No 3. 4. 5. 6. 2[6 -Ua- Aa 7. No Yes Page I CERTI Pursuant to Fort Collins City Code S 26-544 & City Land Use Code $ 3.3.2 (e) Wes Lamarque 11/10/2022 9. A smooth transition with no vertical offset (step) in grade is provided at the lot line to all adjacent properties. 10. The grading of this lot does not adversely affect neighboring properties or City infrastructure. 11. Landscaping has been completed prior to survey. lf not, please indicate who will be responsible for completing landscaping: 12. Final site cleanup has been completed. High Plains Builders No-Ye, (16 v", (06 ,ro(((r-r", No-r"rtK ves S13. I personally visited the site as part of the certification procest and in my professional No - opinion, the as-built survey is an accurate representation of the site conditions. 14. Based on this information, I certify that (check one): tr The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). E The elevations and drainage patterns of the lot/site as measured are in generalconformance with the City approved drainage plan with exceptions (information attached). ln my professionaljudgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. Name: Robe{ E g*g!rq!9ll Email: rgreenwald@cds-eng.net phone: 970-667-8010 Company: Address: CDS Engineering 165 Second Street SW Loveland, CO 80537 PE Stamp Sign and date NOTE: A compl*e certification must be submitted at least two weeks prior to a reguest for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) WaterUtilitiesEng@fcgov.com Mailing Address Fort Collins Utilities ATTN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521. Questions? 970-22L^6700 2/14t17 Page2 f8Pfborins' \=--;;;'*-