Loading...
HomeMy WebLinkAboutSite Certifications - 10/06/2020 Drainage Certification Letter October 1, 2020 Confluence Page 1 of 3 October 1, 2020 Dan Mogen City of Fort Collins 700 Wood Street Fort Collins, CO 80522 RE: Permit: B1804579 – Confluence Fort Collins, Colorado Dear Mr. Mogen: This drainage certification letter is provided to verify as-constructed conditions for Confluence. Northern Engineering completed survey work January 9, 2020, to verify general compliance with the Final Utility Plans for Confluence Lot 2, dated July 27, 2018, including revised drawings dated November 1, 2018, by Northern Engineering. Included in this drainage certification submittal are the following: Appendix A - City of Fort Collins Overall Site and Drainage Certification Form. Appendix B - City of Fort Collins During Construction Inspection Checklist and photographs provided by contractor. Appendix C - As-constructed sand filter and detention vault calculations. Appendix D - As-constructed record drawings for Grading and Storm Drain Plan and Profile Sheets. Appendix E - Documents provided to the Colorado State Drain Portal website. Based on the calculations shown in Appendix C, the as-built water quality pond volumes are in Table 1. The as-built sand filter and detention vault will provide water quality treatment within the site. Table 1: Pond Record Volumes Pond Design Vol. (ft3) As-built Vol. (ft3) Sand Filter Vault 273 338 Detention Vault 482 575 We have concluded, based on the attached information and personal site inspection, that the drainage features for the project site have been constructed in substantial compliance with the above referenced Final Utility Plans, with the following exceptions: Drainage Certification Letter October 1, 2020 Confluence Page 2 of 3 • Item I.A.2: Water quality and detention for this project is provided by an internal vault with vertical walls. Proposed and as-built contours will be unreadable on the record drawings. Instead, the record drawings show as-built depth and elevations of the sand filter and detention vaults. • Item I.B.3.b: Detail 206 on Sheet C602 called for a 15” pipe for the emergency overflow, but a 12” pipe was installed. Northern Engineering re-analyzed the overflow with a 12” pipe, and the 12” pipe will provide enough capacity to safely pass the 100-year storm. (See attached exhibit.) • Item IV.A: In the northwest corner of the project, the contractor installed a 20’ x 47.5’ concrete pad. A 14” wide valley pan was specified on the approved design drawings surrounded by landscaping within this area. Runoff from the concrete pad will flow in the intended direction of the approved design drawings at a slope of 1.5% to 4%. • Item IV.A.1: In the northwest corner of the project, the contractor installed a 20’ x 47.5’ concrete pad. A 14” wide valley pan was specified on the approved design drawings surrounded by landscaping within this area. The drainage within the concrete pad will flow in the intended direction of the approved design drawings at a slope of 1.5% to 4%. • Item V.A.2: Along the west edge of the building, behind 316 and 320 Willow Street, the contractor installed eleven (11) slot inlets with a 1’ wide concrete pan along the building. The approved design drawings specified a trench drain along the entire length. Finish grades drain towards the slot inlets. The slot inlets discharge into the building’s internal drainage system and ultimately into Storm Sewer A per the approved design drawings. • Item V.A.2: A note on the approved design drawings called for a trench drain along the west property line between the project and 320 Willow Street. The trench drain was not installed, but the finish grades along the property line drains towards the slot inlets mentioned above at 1.0% along the property line. • Item X.A: The longitudinal grade along the main walkway, located between Confluence and 405 Linden Street, was revised to provide an ADA accessible gate at the entrance. The revised grades are located on the record drawings. • Item X.A: The grades along Willow Street were revised by the City of Fort Collins Willow Street Improvements Project. The grading design for the plaza was not completed by Northern Engineering, so we cannot speak to the efficacy of the actual design. However, field survey information and site observations indicate the plaza drains away from the Confluence building and towards the larger storm drainage system in Willow Street. Northern Engineering does not assume responsibility for site, grading, and drainage revisions from the City of Fort Collins Willow Street Improvements Project. Drainage Certification Letter October 1, 2020 Confluence Page 3 of 3 Please feel free to contact me with any questions you may have. Northern Engineering Services, Inc. Frederick S. Wegert, PE Project Engineer 10/1/2020 Appendix A Overall Site and Drainage Certification Form Page 1 OVERALL SITE and DRAINAGE CERTIFICATION Commercial, Multi-Family and Subdivision Certification Form and Checklist Project Name: Date: Building Permit Numbers: (Commercial or multi-family) Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Chapter 3, Section 3.0 to certify as- built construction to the approved drainage and grading plans, please fill in all applicable items in this Certification Form for Commercial, Multi-Family and Overall Single Family sites. NOTE: several items must be verified during construction. A copy of the approved grading plan must be submitted with the as-built grading plan. (As-built elevations must be written in red next to the approved elevations.) •Use “Yes” for items completed as described. •Use “N/A” for items that are not applicable to the site being certified. •If any blanks are “No,” attach an explanation referencing the item number below. Attach an explanation or description of the as-built condition for any items listed or for anything not listed but shown on the approved construction plans. Provide an as-built redline or Mylar drawing with the following: I.Water Quality and Quantity Detention Basin - FCSCM Ch. 6 and 7 For multiple detention basins on a site, provide the following for each basin separately: A. Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and volume verification calculations for the water quality capture volume and the 100-year detention storage volume. 1. Detention basin topography was prepared by a professional land surveyor registered in the state of Colorado. 2.Both proposed and as-built contours are shown on the same plan sheet (dashed lines for proposed and solid lines for as-built). 3.All critical spot elevations as shown on the approved construction plans have been verified and the as-built elevations are shown on the plan sheet. 4.Stage-storage-discharge tables are provided on a separate document. 5.Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92- 602(8) is attached and has been uploaded to the Statewide Compliance Portal (tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include: a.The cover sheet from the approved drainage report b.The stamped certification page from the approved drainage report c.As-built topographic survey d.Stamped certification page from the Overall Site & Drainage Certification e.PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet 11/19 Confluence October 1, 2020 B1804579 Yes Yes No Yes Yes Yes Page 2 B.Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2% grade requirement. 1.Low Flow: Choose one of the following detention basin low flow options as applicable: a. Turf swale for low flow path in detention basin. There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade is . b.Concrete pan for low flow in detention basin. There is a concrete pan installed that meets the grades as shown on the approved construction plans. (Show as-built spot elevations.) c.Soft pan for low flow in detention basin. •Verify and document the soft pan material gradation, trench width and depth - to be verified during construction by engineer. Picture documentation is preferred or engineer’s statement of visual inspection and compliance. (Choose one below.) o There is a soft pan with an underdrain installed that meets the design on the approved construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations, bends, cleanouts, etc.) o There is soft pan installed without an underdrain but there is a type A or B soil. The soil type must be documented by supplying verification from a registered professional geotechnical engineer. NOTE: Spot elevations are to be within 0.2 ft. +/-. 2. Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown. Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re- graded. Provide documentation if a variance was granted for steeper slopes during the design process. 3.Spillway: The following items must be field verified: a.The location of the spillway is indicated on the as-built plan. b.The width of the spillway is indicated on the as-built plan. c.The elevation(s) of the spillway is shown on the as-built plan. d.A concrete ribbon defines the location and grade of the spillway. e.There is downstream scour protection in the spillway as per the construction plans. Indicate type: (riprap size “D50” gradation and bedding type, geotextile, buried riprap with inches of bury, etc.). f.There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape features, rocks, etc. 11/19 Yes N/A N/A Yes Yes N/A N/A Yes No Yes N/A Yes PVC pipe into storm sewer Yes Page 3 4.Outlet Structure: a.The orifice plate for the approved release rate is installed with the correct size and location of the orifice. b.The orifice plate for the water quality outlet is installed with the correct hole size, number of rows and columns of holes. c.The bottom hole on both the water quality and quantity outlets are at the bottom of the plate so no water ponds in front of the plate. d.The well screen is the correct material and is installed as shown on the construction plans. e.100-year overflow grate elevation is . (Elev. A on detail D-46) f.The top elevation of the water quality capture volume is . (Elev. B on detail D-46) g.Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the top and bolted at the bottom. h.The bottom of the outlet box has no obstructions or misalignments that will cause it to retain runoff water and is sloped at 2% towards outlet. II.Channels/Swales - FCSCM Ch. 8, Sec. 2.0 and Ch. 9, Sec. 5.0 A. Capacity: The as-built capacity of all the major channels and swales has been verified. They meet or exceed capacity requirements shown in the approved drainage study for this project. 1.All swales are located within the drainage easements as shown on the construction plans. 2.Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these criteria are not met, the certification engineer will write a justification and propose mitigation for each instance or have the issues corrected. If variances to these criteria have previously been approved and are shown on the construction plans, no justification is needed. 3.As-built spot elevations on channels/swales are shown that correspond to spot elevations shown on the approved construction plans. 4.All permanent erosion control measures are installed as shown on the approved construction plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used as part of this verification.) 5.All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the system. (Pictures at tie-in points suggested.) 6.The minimum freeboard is provided for all channels and swales as shown on the approved construction plans or as identified in the approved drainage study. (Show the freeboard provided on the cross-sections as on the construction plan set or attached as separate documentation.) 7.The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees, shrubs, sod, etc. infringe on the low flow portion of channels or swales.) 11/19 Yes Yes Yes N/A Yes 4966.71 Yes 4966.39 N/A Yes Yes N/A N/A Yes N/A Yes Yes Yes Page 4 III.Storm Pipes (aka storm drains) - FCSCM Ch. 9, Sec. 4.0 A. Storm Drain Pipe Capacity: The as-built capacity of all pipes installed on this project has been verified and meets or exceeds the capacity requirements shown in the approved drainage study for this project. 1.All storm drain pipe sizes and materials have been verified and are in conformance with the approved construction plans. (Indicate on the plan and profile sheets that they have been verified.) Material and size substitutions must be approved prior to installation. If a pipe size or material was changed during construction, the certification engineer must attach the approval documents or supply them with this certification. Approval documents must include a calculation documenting the capacity equivalency (equal or greater) of the substituted size. 2.The longitudinal slope of the pipe is as shown on the approved construction plans. The acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans must be justified with capacity calculations on an attached sheet. 3.The as-built invert elevations have been verified and are shown on the plan and profile sheets of the approved construction plans. B.Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the approved construction plans and construction specifications. 1.The minimum cover requirements for all pipes have been met as shown on the approved construction plans. These will be called out in critical locations. 2.All encasements and clearances as specified on the approved construction plans have been met. 3.Any specific joint types or construction methods specified on the approved construction plans have been met. (List on a separate sheet and attach to this certification.) IV.Concrete Pans - FCSCM Ch. 8, Sec. 2.0 A. Construction/Installation: All concrete pans have been constructed in accordance with the approved construction plans. 1.The concrete pans are the correct size/width as shown on the approved construction plans. 2.The longitudinal slopes of the pans are as shown on the approved construction plans. The certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or justification by separate document. 3.The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross- section is “V” shaped and meets the side slope shown on the detail.) 4.The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4 inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide documentation of the reinforcement used if different than shown on the details or on the approved construction plans.) 5.The spot elevations shown on the concrete pan(s) have been verified and are shown on the as- built drawings. 11/19 Yes Yes Yes Yes Yes Yes Yes N/A No No Yes Yes Yes Yes Page 5 V. Storm Drain Inlets - FCSCM Ch. 9, Sec. 3.0 A. Construction/Installation: All storm drain inlets have been constructed in accordance with the approved construction plans and construction specifications. 1.The size and type of inlets are consistent with the inlets shown on the approved construction plan. Indicate by writing “Verified” on each inlet on the plan sheet or list on a separate document the inlet number(s), type and size (length). If the inlet installed is other than the one on the approved construction plan detail sheet, provide the name and source of the detail with justification for equal or better capacity. 2.The size of the inlet opening is consistent with the approved detail. (Check height and width.) 3.The elevation of the grate (if applicable) is at the elevation shown on the street profile or as indicated by a spot elevation on the construction plans. 4.The as-built invert elevations of all pipes entering and leaving the inlet are shown on the plan and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide justification and capacity calculations to show the capacity is not affected or propose mitigation. 5.The as-built size of the inlet box is as shown on the construction plans or an explanation or justification is attached. 6.All Type C, R, 13 and 16 inlet covers are stenciled or stamped with the following designation (or an equivalent): NO DUMPING – DRAINS TO POUDRE RIVER. VI.Culverts - FCSCM Ch. 9, Sec. 4.0 A. Construction/Installation: All culverts have been constructed and/or installed in accordance with the approved construction plans and construction specifications. 1.All culvert sizes have been verified as indicated on the as-built construction plans as correct. 2.The culvert material type for all culverts installed is as on the approved construction plans and is indicated on the as-built plans. 3.The as-built invert “in and out” elevations have been verified and are indicated on the as-built construction plans. 4.The culvert headwalls or wing walls have been installed as shown on the approved construction plans. Headwalls or wing walls may be needed in the as-built conditions onsite if the slopes adjacent to the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative. An alternative to consider is a turf reinforcement mat (TRM). VII.Sub-Drains A. Construction/Installation: All sub-drains shown on the construction plans have been installed in accordance with those plans and the construction specifications. Sub-drains installed with the sanitary sewer are to be verified on the sanitary sewer plan and profile sheets of the construction plans. (NOTE: Indicate any sub-drains installed after the plans were approved on the as-built plans.) 1.The size of the sub-drains are as approved on the construction plans and are indicated on the as- built plans. 2.The type of sub-drain, in particular the perforated and non-perforated sections of the drain, are as indicated on the approved construction plans. 11/19 Yes Yes No Yes Yes Yes Yes N/A N/A N/A N/A N/A N/A N/A N/A Page 6 3.The cover requirements per the construction plans are provided. 4.The cleanouts have been installed at the locations shown on the construction plans and are accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations marked.) 5.The backfill materials for sub-drains are as shown on the approved construction plans. (This includes the type, depth and width.) 6.The geo-textile liner completely wraps the sub-drain and the permeable backfill material unless shown otherwise on the approved construction plans. (Sub-drain pipe wrapped in a sock filter material is accepted only if approved prior to installation.) VIII.Curb Cuts A. Construction: All curb cut openings are constructed in accordance with the approved construction plans and construction specifications. 1.The size (width) of the curb cut opening is as shown on the approved construction plans. 2.The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb cut. IX.Sidewalk Culverts & Chases A. Construction/Installation: All sidewalk culverts have been installed at the locations shown on the approved construction plans. 1.The size (width and length) of the culverts are as shown on the approved construction plans. 2.The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the detail shown on the approved construction plans or per the City’s detail. 3.The sidewalk culvert invert “in and out” elevations have been verified and are indicated on the as-built plans. 4.The sidewalk culvert opening is as shown on the approved construction plans or per the City’s detail. 5.There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert. X. Site Grading - FCSCM Ch. 8 A. Construction: All common open spaces have been graded in accordance with the approved construction plans. 1.The grading on all common open spaces bordering private lots has been verified as correct and the as-built rear lot corner elevations have been shown on the as-built plans. 11/19 N/A N/A N/A N/A N/A N/A N/A Yes Yes Yes Yes Yes Yes No Yes Page 7 2.The as-built contours for “overlot grading” are shown on the as-built construction plans for all common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the situation for noncompliance and when it may be corrected. An escrow for overlot grading may be required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site Certification. It is understood that residential lots will be brought to final grade once the foundation is backfilled so they may be lower than the plan shows at this Overall Site Certification stage.) 3.All turf reinforcement mats (TRMs) have been installed as shown on the approved construction plans and the slopes are stabilized. XI.Permanent Erosion Control BMPs - FCSCM Ch. 9, Sec. 7.0 A. Construction: All permanent erosion control BMPs have been installed per the approved construction plans. 1.All riprap has been installed in the locations and sizes indicated on the approved construction plans. 2.All fabric has been installed in the locations and sizes indicated on the approved construction plans. a.All fabric was installed per the details on the approved construction plans. XII.Post-Construction Site Cleanup - FCSCM Ch. 3, Sec. 2.0 A. Construction: All construction debris and obstructions of any kind have been removed from drainage paths. 1.All construction debris has been removed except in staging area(s). 2.All ruts have been smoothed out in all construction areas. 3.All areas needing reseeding have been identified and future stabilization goals have been coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note the area needing stabilization in the narrative. XIII.Certification of LID and Water Quality Facilities - FCSCM Ch. 7 A.Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and other items to be verified during construction, along with pictures and other required documentation. B.Attached is verification of the rain garden and/or sand filter flat surface area(s) and ponding volume(s). This verification includes survey of critical elevations. C.Attached is verification of the underground infiltration required volume(s), weir elevations, orifices, inspection ports and filtering fabric. This verification includes survey of critical elevations. D.All visible LID design features were verified as part of the engineer's site visit. 11/19 No N/A Yes N/A N/A N/A Yes Yes Yes Yes Yes Yes Yes Yes 2/14/17 Page 1 CERTIFICATION OF LOT GRADING Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e) Date: Address: Lot: Block: Subdivision: Permit Application #: Larimer County Parcel #: Larimer County Reception #: (on development agreement) I, (print) , a Colorado registered professional engineer, verify that construction of all stormwater facilities and grading is complete and hereby submit this certification. Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots. 1.Certification includes attached Stormwater-approved grading plan. (NOTE: City’s Building Department does not approve grading plans). 2.Certification includes the attached as-built survey dated (must be within 60 days of the date the certification is submitted) accurately and truthfully depicting elevations for: Top of foundation/finished floor Finished grade on each side of the structure Quarter points along each lot line (not more than 50 feet apart) Break points/high points Swales Berms Retaining walls Air conditioning pads Window wells Any other appurtenance(s) within an easement 3.All elevations are within a 0.2 foot tolerance of the approved grading plan. 4.The top of foundation is at least 6 inches above the highest grade surrounding the structure. 5.There is a minimum grade of 5% away from the structure within the first 5 to 10 feet adjacent to the residence. 6.All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than 33% (3:1). 7.All flow lines of stormwater drainage swales are a minimum of 6 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Stormwater-approved grading plan. 8.All downspout locations and discharge directions are shown on the as-built survey. Runoff is directed into an appropriate drainage system or lot line swale, and it is not directed onto neighboring properties. No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes September 24, 2020 Confluence 401 Linden Street B1804579 Fort Collins, Colorado 80524 9712240201, 9712240322, 9712240000 2 Frederick S. Wegert 7/30/2020 FSW There is only 3" between the building and the property line. The grades around the outsideparameter of the building are per the approved design drawings unless noted within the Site,Grading, and Drainage Certification. The buildings parameter is concrete with some small landscaped areas. The gradesaround the outside parameter of the building are per the approved design drawingsunless noted within the Site, Grading, and Drainage Certification. The building's roof drainage system is collected into a single system, passed throughsand filter and detention vaults, and discharged into the City's storm sewer system. FSW FSW FSW FSW FSW FSW FSW Drainage Certification Letter August 14, 2020 Confluence Page 5 of 3 Appendix B During Construction Inspection Checklist 1/19 Page 1 of 2 DURING CONSTRUCTION INSPECTION CHECKLIST To be completed by Construction Superintendent This checklist is to be completed during construction and included with the Overall Site and Drainage Certification. Use “Yes” for items completed as described. Use “N/A” for items that are not applicable to the site being certified. If any blanks are “No,” attach an explanation referencing the item number below. Project Name: Confluence Date: 07/29/2020 Building Permit Numbers: B1804579 I. Compaction A.Yes All berms and embankments meet the compaction requirements as specified in the project geotechnical report or comply with the City’s standard, which is “soils should be compacted within a moisture content range of 2% below to 2% above optimum moisture content and compacted to 95% of the Maximum Standard Proctor Density (ASTM D698).” Compaction requires verification during construction. Provide testing log from contractor/engineer. II. Storm Drain Pipe Installation Requirements A.Yes The pipe trenches have been compacted in accordance with Section 02225-3.07.A.1. of the Fort Collins Development Construction Standards for Water, Wastewater, Stormwater (e.g., the trenches in the roadways are to be 95% of maximum density and all other areas are to be at 90%, both in accordance with ASTM D698). III.Energy Dissipation and Erosion Protection - FCSCM Chapter 9, Section 7.0 A.Riprap 1. N/A The riprap bedding is a granular bedding of the gradation and thickness indicated on the approved construction plans. 2. Yes A filter fabric was installed instead of granular bedding and is the material shown on the approved construction plans or was an approved equal. Provide documentation for an approved equal. 3. N/A The riprap is the gradation shown on the approved construction plans with a D50 of . 4. N/A The riprap thickness is as shown on the approved construction plans and extends to the horizontal limits shown. 5. N/A The riprap is buried to the depth indicated on the approved construction plans. (A minimum of 6 inches of soil is required.) B. Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7 1. Yes All fabric was installed per manufacturer’s specifications. 1/19 Page 2 of 2 IV. Other Permanent BMPs A.N/A All cut-off walls have been installed in accordance with the approved construction plans. (Cut-off walls are required for irrigation ditch crossings of storm drain pipes.) V.Extended Detention Basins A.Yes Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the water quality control box(es). Provide date of inspection and name of inspector: Martha Cruse 7/24/2020 Included certification sheet(s): Please check the appropriate box(es) for the Low Impact Development (LID) facilities found on this site and complete the corresponding certification sheets. ☐ Permeable Interlocking Concrete Pavers ☐ Bioretention Cells (Rain Gardens) ☒ Sand Filters ☐ Vegetated Buffers ☐ Underground Infiltration ☐ Other LID – For certification of Dry Wells, Tree Filters, Constructed Wetland Channels & Ponds, etc., contact City Staff to determine requirements to exhibit the LID facility has been constructed and functions as intended per the approved drainage report. *Please provide photographic documentation of the installation of all stages of all LID facilities. **Please contact the City Stormwater Inspector at stormwaterinspection@fcgov.com to discuss inspection requirements for each LID facility and request inspections. ***All facilities being certified must be “clean” – free of sediment & construction debris – prior to certification or acceptance of the facility. Completed by: Name: Cory Surbrugg Title: Project Engineer Email: c.surbrugg@saundersheath.com Phone: 970-685-26003 Company: Saunders Heath Address: 1212 Riverside Fort CCollins, CO 80524 1/19 Page 1 of 3 Sand Filters Item/Activity Yes No N/A Submittal Requirements Submitted?/Response Stormwater Inspection Pre-construction meeting was held with City-Stormwater Inspector to discuss installation, inspection, checklist, and protection from sedimentation ☐☐☒ Record date, inspector name, meeting location (i.e. DCP, initial erosion control inspection, etc.) Underdrain and basecourse inspection(s): Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the outlet, underdrain, geomembrane layer, and base course (per design in Final Plan Documents) ☒☐☐ Record date(s) of inspection and inspector’s name Pea gravel and filter media inspection(s): Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the pea gravel and filter media ☒☐☐ Record date(s) of inspection and inspector’s name Excavation Heavy equipment did not encroach into the excavated area (prevents over-compaction)☒☐☐ Bottom of cell was “ripped” after excavation ☐☐☒Provide photographs before and after “ripping” Bottom surface of cell is flat and level ☒☐☐Provide photograph Excavated area is protected/surrounded by sediment/runoff control measures during construction ☒☐☐Provide photograph Intake Upstream catchment drains to inlet/sand filter per plan and flows are fully captured ☒☐☐ Forebay (If Applicable) Forebay is installed according to design specifications ☐☐☒Provide photograph There is a minimum 3” drop at the forebay entrance ☐☐☒Provide photograph Forebay will drain fully and not hold standing water ☐☐☒ Outlet Structure/Overflow Overflow inlet elevation is set above sand filter media per plan (typically 1 to 3 feet)☒☐☐Provide photograph Overflow inlet invert elevation is at least 3 inches below containment wall/berm (to direct overflow into inlet)☒☐☐ Measure and record distance between inlet and top of containment wall/berm; provide photograph 1/19 Page 2 of 3 Overflow path and check dams, if used, are armored to protect from erosion and maintain elevations ☒☐☐Provide photograph Impermeable Liner (If Applicable) Impermeable liner meets design specifications ☐☐☒Provide specifications of delivered material Impermeable liner is appropriately anchored to the perimeter wall ☐☐☒Provide photograph Impermeable liner is buried with no exposure ☐☐☒ Any penetrations of the impermeable liner have been sealed and checked for water-tightness ☐☐☒Provide photograph (if necessary) Underdrain System Underdrain pipe meets design specifications ☒☐☐Provide photograph At least one cleanout is provided per underdrain lateral ☒☐☐Provide photograph Cleanout pipe is solid (not perforated/slotted)☒☐☐Provide photograph Cleanout covers are installed and watertight ☒☐☐Provide photograph Verify the underdrain is NOT wrapped in geotextile fabric ☒☐☐Provide photograph Verify there is no orifice plate on the underdrain outfall ☒☐☐Provide photograph Underdrain integrity tested after backfilling using TV and/or water test ☐☒☒Provide documentation of test results Filter Media Filter media composition (e.g. ASTM C 33 Sand): - meets design specifications - is installed to the required design depth ☒☐☐ Provide load ticket, photographs, and record depth installed Pea gravel layer: - meets design specifications - is installed to the required design depth ☒☐☐ Provide load ticket, photographs, and record depth installed Filter Media is installed flat and level ☒☐☐ Other Structural Components Containment wall/berm is continuous and level ☒☐☐ Landscaping Verify final landscaping is free of sod ☐☐☒ If sod is used, it must be shown to be “sand-grown” Final landscaping (non-floatable mulch) is flat and level ☐☐☒Provide photograph Vegetation is planted according to landscape design specifications and final landscaping plan ☐☐☒Provide photograph Verify that weed barrier is NOT installed ☐☐☒ 1/19 Page 3 of 3 Temporary irrigation installed ☐☐☒ If N/A, then verify that permanent irrigation is installed to establish/maintain vegetation Close Out Upstream catchment stabilized prior to diverting runoff into sand filter cell ☒☐☐ Drainage Certification Letter August 14, 2020 Confluence Page 6 of 3 Appendix C Water Quality Capture Volume Project Number:Project: Project Location: Calculations By:Date: Width:6.6 ft Width:4.7 ft Length:20.6 ft Length:43.6 ft Area:136 ft2 Area:203 ft2 Bottom Elev.:62.48 Bottom Elev.:64.72 Overflow Inv.:66.71 Overflow Inv.:66.39 Height to Overflow (SW):4.2 ft Height to Overflow (SW):1.7 ft Overall Inside Height:5.5 ft Overall Inside Height:5.6 ft Volume:575 ft3 Volume:338 ft3 F. Wegert 7/30/2020 Detention Vault Volume Sand Filter Vault Volume Detention Pond & Sand Filter Vault Calculations 998-003 Confluence Fort Collins Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Friday, Sep 11 2020 100-Year Storm from Basin 1 for 12-in Overflow Circular Diameter (ft)= 1.00 Invert Elev (ft)= 1000.00 Slope (%)= 0.80 N-Value = 0.012 Calculations Compute by:Known Q Known Q (cfs)= 2.34 Highlighted Depth (ft)= 0.61 Q (cfs)= 2.340 Area (sqft)= 0.50 Velocity (ft/s)= 4.65 W etted Perim (ft)= 1.79 Crit Depth, Yc (ft)= 0.66 Top W idth (ft)= 0.97 EGL (ft)= 0.95 0 1 2 3 Elev (ft)Depth (ft)Section 999.50 -0.50 1000.00 0.00 1000.50 0.50 1001.00 1.00 1001.50 1.50 1002.00 2.00 Reach (ft) Drainage Certification Letter August 14, 2020 Confluence Page 7 of 3 Appendix D Record Drawings E AC S S D S D D S VAULT ELEC CS VAULT CABLE CONTROL IRR CONTROL IRR CONTROL IRR CS CO N T R O L IRR CO N T R O L IRR CO N T R O L IRR CO N T R O L IRR CO N T R O L IRR CON T R O L IRR CO N T R O L IR R CO N T R O L IRR VAU L T ELE C VAU L T ELE C CS T FOFOFOFOFOFO T T T T T T T T T T T T T T T FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO T T T T T T T T T T TTTTTTTTTTTT T T TTT T T T T T T X X STST W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWW X X XX X X ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS CA B L E TE L E VAULT CABLE VAULT ELEC W W W CT V CT V CT V CT V CT V CT V CT V CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CT V CT V CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CT V CTV CTV CTV E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE EEEEEEE G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G IRR X X X X X X XXXX X X X X M X EX. SIDEWALK LINDEN STREET (100' ROW) EX. SIDEWALKEX. SIDEWALK EXISTING DECK 409 LINDEN STREET 405 LINDEN STREETPROPOSED BUILDING PROPOSED BUILDING 3' MIN. 46 . 3 L F 6 " P V C S A N I T A R Y SE W E R S E R V I C E A T 4 . 0 % 46 . 3 L F 6 " P V C S A N I T A R Y SE W E R S E R V I C E A T 4 . 0 % EX. 12" C900 PVC WATER MAIN EX. 12" C900 PVC WATER MAIN EX. 8" PVC SANITARY SEWER @ 0.40% EX. 36" RCP STORM SEWER @ 1.89% EX . 6 " D I P W A T E R M A I N RELOCATE EXISTING CABLE TELEVISION PROPOSE GAS SERVICES. SEE MEP PLANS FOR CONTINUATION. RELOCATED FIRE HYDRANT PROPOSED 8" FIRE SERVICE. SEE PLUMBING PLANS FOR CONTINUATION. PRESERVE & PROTECT EXISTING TREE (TRUNK LOCATED ON NEIGHBORS PROPERTY)EX. PROPERTY LINE EX. RIGHT-OF-WAY EX. RIGHT-OF-WAY EX. PROPERTY LINE EX. PROPERTY LINE EX. SANITARY SEWER MH RIM: 4971.86 INV IN: 4956.76 (NW) INV IN: 4958.03 (NE) INV IN: 4958.06 (SW) INV OUT: 4956.68 (SE) EX. SAN. SEWER MH RIM: 4968.40 INV IN: 4959.06 (NE) INV OUT: 4959.01 (SW) EX. PROPERTY LINE EX. RIGHT-OF-WAY EX. PROPERTY LINE EX. PROPERTY LINE EX. RIGHT-OF-WAY CONNECT TO EXISTING GAS MAIN PER UTILITY COMPANY'S STANDARDS & REGULATIONS CONNECT TO EXISTING STORM SEWER WITH PROPOSED MANHOLE (SEE SHEET C402) CONNECT ELECTRIC SERVICE TO BUILDING SERVICE AT EXISTING ELECTRIC METER (RE: MEP) 1 2 3 PROPOSED NYLOPLAST INLET 1 4 3 PRESERVE & PROTECT EX. WATER METER & CURB STOP 2 1 CONNECT INTO EXISTING 12" WATER MAIN WITH 12"x6" SWIVEL TEE, THRUST BLOCK, AND 6" GATE VALVE. CONNECT TO EXISTING SANITARY SEWER WITH 8"x6" TEE AT INVERT ELEVATION 4959.21.CONNECT TO EXISTING SANITARY SEWER WITH 8"x6" TEE AT INVERT ELEVATION 4959.22. PROPOSED STORM SEWER 1 4 PROPOSED AREA INLET (SEE SHEET C402) PROPOSE ELECTRIC SERVICE. SEE MEP PLANS FOR CONTINUATION. EXISTING CABLE TELEVISION PEDESTAL TO BE REMOVED AND RESPLICED INTO A VAULT REMOVE & REPLACE EXISTING AIR CONDITIONING UNIT FOR REGRADING IN THIS AREA 5 5 RELOCATE BANK OF IRRIGATION VAULTS, CONTROLS, & WATER METER. CONTRACTOR TO COORDINATE WITH CITY OF FORT COLLINS REGARDING LOCATION, DETAILS, AND SPECIFICATIONS. PROPOSED 18.3 LF OF 6" PVC COMMERCIAL SANITARY SEWER SERVICE AT 1.0% AT INVERT ELEVATION 4963.51. SEE PLUMBING PLANS FOR CONTINUATION. PROPOSED 6" RESIDENTIAL SANITARY SEWER SERVICE AT INVERT ELEVATION 4961.07. SEE PLUMBING PLANS FOR CONTINUATION. CONNECT INTO EX. 12" WATER MAIN PER CITY'S STANDARDS & REGULATIONS RELOCATE EXISTING ELECTRIC SERVICE PROPOSED STORM SEWER UNDER FLOWLINE MATCHLINE SEE SHEET C301 MATCHLINE SEE SHEET C301 320 WILLOW STREET EX . 3 4" W A T E R S E R V I C E EX . 3 4" C O P P E R WA T E R S E R V I C E EX . 3 4" C O P P E R WA T E R S E R V I C E CONNECT TO EX. 6' Ø STORM SEWER MANHOLE (SEE SHEET C403) STORM SEWER A SEE SHEET C402 CONNECT TO SAND FILTER (RE: MEP) STORM SEWER A SEE SHEET C402 3' MIN. 5' MIN. PRESERVE & PROTECT EXISTING POWERLINE LOCATION OF RELOCATED BENCH (RE: LANDSCAPE ARCHITECT) CONNECT INTO EXISTING 12" WATER MAIN WITH 12"x8" TAPPING SADDLE, THRUST BLOCK, AND 8" GATE VALVE. PROPOSED NYLOPLAST INLET CONNECT TO BUILDING DRAIN SYSTEM (RE: MEP) EX . A S P H A L T P A T H EXISTING EDGE OF ASPHALT PROPOSED 2" RESIDENTIAL WATER SERVICE WITH METER & CURB STOP WI L L O W S T R E E T (R O W V A R I E S ) PROPOSED AREA INLET (SEE SHEET C403) STORM SEWER C SEE SHEET C403 TRENCH DRAIN AGAINST BUILDING TRENCH DRAIN AGAINST BUILDING CONNECT TRENCH DRAIN TO BUILDING'S INTERNAL DRAINAGE SYSTEM (RE: ARCHITECT & MEP) CONNECT TRENCH DRAIN TO BUILDING'S INTERNAL DRAINAGE SYSTEM (RE: ARCHITECT & MEP) CONNECT TRENCH DRAIN TO BUILDING'S INTERNAL DRAINAGE SYSTEM (RE: ARCHITECT & MEP) REFER TO THE WILLOW STREET PLAZA IMPROVEMENT PROJECT FOR PLANS OF THIS AREA REFER TO THE WILLOW STREET PLAZA IMPROVEMENT PROJECT FOR PLANS OF THIS AREA SAWCUT LINE (TYP.) SAWCUT LINE (TYP.) CONNECT TO BUILDING DRAIN SYSTEM (RE: MEP) PROPOSED STORM SEWER 1 1 2" W 1 1 2" W 5.5' MIN. 7 9.0' MIN. FIRE HYDRANT INSTALLED PER PLAN PER PLAN STORM SEWER C EXCLUDED FROM CONTRACT 60.42 LF 15" RCP @ 0.73% 56.65 LF 15" HDPE @ 0.65% 15" HDPE 6" PVC 6" PVC PROPOSED 1 1 2" COMMERCIAL WATER SERVICE WITH METER & CURB STOP FIRE LINE MOVED 8' TO THE NORTHEAST, FULLY RESTRAINED WALL MOUNTED FIRE HYDRANT PROPOSED 6" COMMERCIAL SANITARY SEWER SERVICE AT INVERT ELEVATION 4961.06. SEE PLUMBING PLANS FOR CONTINUATION. 6 PROPOSED STORM SEWER RELOCATE EXISTING CABLE AMPLIFIER & TELEPHONE BOX 2" W 2" W 2" W 1 1 2" W 1 1 2" W CTV G G MH MH E E E E EE8" F 8" F 8" F MH E 2" W 2" W 2" W HYD CS CS D C.O . C.O . C.O . C.O . WW HYD 6" S S 6" S S 6" S S 6" S S 6" S S 6" S S 6" S S 6" S S FO FO FO FO VAULT CABLE VAULT ELEC CT V CT V CT V EEE E E C.O . C.O . C.O . C.O . 6" S S 6" S S 6" S S 6" S S Sheet of 17 CO N F L U E N C E L O T 2 Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 E N G I N E E R N G I E H T R O N R N PH O N E : 9 7 0 . 2 2 1 . 4 1 5 8 ww w . n o r t h e r n e n g i n e e r i n g . c o m C300 UT I L I T Y P L A N ( S O U T H H A L F ) LEGEND: ( IN FEET ) 010 10 20 30 1 INCH = 10 FEET CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R E 6" SS 2" W 8" F T CTV SS W VAULT ELEC HYD G T ST E CTV FO 1.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2.THE PLUMBING CONTRACTOR SHALL TERMINATE UTILITY LATERALS 5' OUTSIDE OF BUILDING UNLESS NOTED OTHERWISE. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF ALL UTILITY CONNECTIONS INTO THE PROPOSED BUILDING SHALL BE COORDINATED WITH APPROVED ARCHITECTURAL DRAWINGS. 3.REFER TO APPROVED SITE ELECTRICAL PLANS FOR ALL CONDUITS AND POWER LINE ROUTING FOR SITE LIGHTING. 4.WATER AND SEWER SERVICE PROVIDED BY THE CITY OF FORT COLLINS AND ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 5.MINIMUM DEPTH OF COVER OVER WATER MAINS SHALL BE 4.5'. MAXIMUM COVER SHALL BE 5.5'. 6.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER & WATER MAINS & SERVICES. 7.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 8.WATER MAINS AND FIRE SERVICES SHALL BE AWWA C-900 PVC. WATER SERVICES SHALL BE TYPE K COPPER. HDPE PIPE MAY BE USED FOR 1 12" AND 2" WATER SERVICES. SEE WATERLINE NOTE 4 ON SHEET C001 REGARDING 1 12" AND 2" WATER SERVICES. 9.SANITARY SEWER SERVICES SHALL BE SDR-35 PVC UNLESS OTHERWISE NOTED. 10.ALL ROOF DRAIN CONNECTIONS SHALL BE HIGH DENSITY POLYETHYLENE PIPE (HDPE) OR APPROVED EQUAL. THE CONTRACTOR SHALL TERMINATE THE ROOF DRAIN LATERALS 5.0-FEET OUTSIDE OF BUILDING. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF THE ROOF DRAIN CONNECTIONS TO THE DOWNSPOUTS AT THE PROPOSED BUILDING SHALL BE COORDINATED WITH THE ARCHITECTURAL DRAWINGS. THE CONNECTION TRANSITION FROM THE SITE HDPE ROOF DRAINS TO THE INTERNAL SCH40 PVC BUILDING DRAINS SHALL BE MADE WITH A HDPE TO PVC ADAPTER. 11.ALL PROPOSED STORM SEWER INFRASTRUCTURE, UNLESS SPECIFIED, SHALL BE PRIVATELY OWNED AND MAINTAINED. 12.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 13.LIMITS OF CONCRETE REPAIRS TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. CONCRETE TO BE REMOVED JOINT TO JOINT. 14.ANY DAMAGED CURB, GUTTER, AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 17.CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 18.THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, SIDEWALKS, PRIVATE FENCES, AND ABOVE GROUND OR UNDERGROUND UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 19.ANY PRIVATE FEATURES ON ADJOINING PROPERTIES EXISTING PRIOR TO CONSTRUCTION - INCLUDING SIDEWALKS, PRIVATE FENCES, RETAINING WALLS, AND VEGETATION - DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO THEIR PRE-CONSTRUCTION OR BETTER CONDITIONS. NOTES: DRY UTILITY NOTES 1.THE LOCATION OF PROPOSED DRY UTILITIES AS SHOWN ON THIS DRAWING ARE SHOWN FOR HORIZONTAL ALIGNMENTS ONLY AND ARE APPROXIMATE. FINAL DESIGNS OF DRY UTILITIES WILL BE PERFORMED BY THE APPROPRIATE UTILITY COMPANY. 2.PHONE, INTERNET, CABLE AND FIBER SERVICE TO BE PROVIDED BY CENTURYLINK AND/OR COMCAST. THE PROVIDER SHALL MAKE THE CONNECTION FROM EXISTING SERVICE LINE AND PULL ALL CABLE WITHIN THE CONDUIT TO THE PROPOSED PEDESTAL. THE DEVELOPER SHALL BE RESPONSIBLE FOR INSTALLING THE REQUIRED QUANTITY AND SIZE OF CONDUIT, AS DELINEATED BY THE PROVIDER, FROM THE CONNECTION POINT TO THE BUILDING AS SHOWN ON THIS PLAN. DEVELOPER WILL DETERMINE WHO THE PROVIDER WILL BE BETWEEN CENTURYLINK OR COMCAST. 3.ALL CONDUIT PLACED BY THE DEVELOPER FOR PHONE, INTERNET, CABLE AND FIBER SHALL BE EQUIPPED WITH PULL TAPE AND LOCATE WIRE PER THE SPECIFICATIONS OF EACH UTILITY COMPANY. 4.ELECTRIC SERVICE TO BE PROVIDED BY THE CITY OF FORT COLLINS. THE CITY SHALL INSTALL THE TRANSFORMER, VAULT, AND PRIMARY LINE FROM THE CONNECTION POINT AT THE EXISTING VAULT TO THE PROPOSED VAULT. THE COST OF THE PRIMARY LINE, TRANSFORMER, VAULT, THE INSTALLATION OF THE SECONDARY LINE FROM THE TRANSFORMER TO THE BUILDING, AND THE RELOCATION OF ANY EXISTING ELECTRIC FACILITIES SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. 5.ELECTRIC TRANSFORMER VAULT SIZE IS APPROXIMATE. COORDINATE FINAL LOCATION AND SIZE OF TRANSFORMER AND VAULT WITH APPROVED ARCHITECTURAL PLANS AND CITY OF FORT COLLINS LIGHT AND POWER. 6.XCEL SHALL INSTALL THE CONNECTIONS TO THE EXISTING GAS MAIN, AND INSTALL THE SERVICE TO GAS METER AT THE BUILDING AT THE DEVELOPERS EXPENSE. 7.IT IS RECOMMENDED THAT A DRY UTILITY COORDINATION MEETING TO BE SET UP BY THE CONTRACTOR AND/OR OWNER WITH ALL DRY UTILITY AGENCIES PRIOR TO CONSTRUCTION TO COORDINATE THEIR DESIGN. PRESERVE & PROTECT EXISTING ELECTRIC VAULT. 1 PRESERVE & PROTECT EXISTING LIGHT POLE. KEY NOTES: PRESERVE & PROTECT EXISTING CABLE VAULT. 2 3 4 PRESERVE & PROTECT EXISTING IRRIGATION VAULT. 5 PROPOSED TREE (RE: LANDSCAPE ARCHITECT) 6 CONNECT TO EXISTING ELECTRIC LINE. 4" SS 6 7/27/18 2" W 1 1 2" W 1 1 7 APPROXIMATE LOCATION OF CURB STOP WITH 22.5° BEND BEHIND CURB STOP. 1 1 1 THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERING SERVICES, INC., ARE BASED IN WHOLE, OR IN PART, UPON INFORMATION PROVIDED BY OTHERS. NORTHERN ENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. RECORD DRAWING I, FREDERICK WEGERT, CERTIFY ALL PUBLIC WATER, WASTEWATER, AND STORMWATER SYSTEM IMPROVEMENTS SHOWN HEREIN, INCLUDING ANY NOTED CHANGES OR REVISIONS, ARE IN GENERAL CONFORMANCE WITH THE DESIGN/CONSTRUCTION DOCUMENTS, PURSUANT TO THIS RECORD DRAWING COPY OF THE FINAL UTILITY PLANS. SCALE: 1" = 5' 10/11/19 SANITARY SEWER SERVICE DETAIL E AC S D S S EL E C C TC T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T X X ST W W W W W W W WWWWWW X X X X X X ST ST ST ST ST ST ST ST SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS C.O . SS SS SS SS SS SS SS SS SS SS SS SS CTV CTV CT V CTV CT V CT V CT V CT V CT V CT V CT V CT V CT V CT V CTV CT V CT V CT V CT V CT V CT V CTV E E E E E E E E E E E E E E E E E E E E E E E G G G G G X X X X X X X X X X X XXXX X X X X X X X M M TEL E M M AC AC M M C CON T R O L IRRWSOG E C.O . X X X X X PO U D R E S T R E E T PO U D R E S T R E E T (2 0 ' R O W ) 409 LINDEN STREET 405 LINDEN STREETPROPOSED BUILDING 310 WILLOW STREET EX . 2 4 " S A N I T A R Y S E W E R M A I N PROPOSED BUILDING PROPOSED BUILDING EX . 8 " P E S A N I T A R Y S E W E R @ 0 . 7 4 % EXISTING TRANSFORMER TO BE RELOCATED ON OPPOSITE SIDE OF POUDRE STREET WITHIN EXISTING EASEMENT. INSTALL TRAFFIC RATED VAULT FOR EXISTING ELECTRICAL TERMINATIONS. CONTACT FORT COLLINS CITY LIGHT AND POWER FOR VAULT SIZE. PROPOSE GAS SERVICES. SEE MEP PLANS FOR CONTINUATION. PROPOSED 18.3 LF OF 6" PVC RESIDENTIAL SANITARY SEWER SERVICE AT 1.0% AT INVERT ELEVATION 4963.49. SEE PLUMBING PLANS FOR CONTINUATION. PRESERVE & PROTECT EXISTING TREE (TRUNK LOCATED ON NEIGHBORS PROPERTY)EX. PROPERTY LINE EX. PROPERTY LINE EX. PROPERTY LINE EX. SANITARY SEWER MH RIM: 4970.68 INV IN: 495712 (NE) INV OUT: 4957.12 (SE) EX. SANITARY SEWER MH RIM: 4968.87 INV OUT: 4963.28 (NW) EX. PROPERTY LINE EX. PROPERTY LINE EX. PROPERTY LINE EX. PROPERTY LINE EX. RIGHT-OF-WAY EX. RIGHT-OF-WAY CONNECT TO EXISTING GAS MAIN PER UTILITY COMPANY'S STANDARDS & REGULATIONS CONNECT ELECTRIC SERVICE TO BUILDING SERVICE AT EXISTING ELECTRIC METER (RE: MEP) CONNECT TO EX. 3-PHASE ELECTRIC LINE IN LINDEN ST. WITH A PRIMARY DUCT LINE AND VAULT PER UTILITY COMPANY'S SPECIFICATIONS. PROPOSED NYLOPLAST INLET PROPOSED STORM SEWER APPROX. LOCATION OF RELOCATED SHED TO BE COORDINATED WITH ADJACENT PROPERTY OWNER PROPOSE ELECTRIC SERVICE. SEE MEP PLANS FOR CONTINUATION. EXISTING CABLE TELEVISION PEDESTAL TO BE REMOVED AND RESPLICED INTO A VAULT EXISTING CABLE TELEVISION PEDESTAL TO BE REMOVED AND RESPLICED INTO A VAULT REMOVE & REPLACE EXISTING AIR CONDITIONING UNIT FOR REGRADING IN THIS AREA CONNECT TO EXISTING SANITARY SEWER WITH 8"x6" TEE AT INVERT ELEVATION 4963.33. CONNECT TO EXISTING SANITARY SEWER WITH 8"x6" TEE AT INVERT ELEVATION 4963.30. PROPOSED 18.3 LF OF 6" PVC COMMERCIAL SANITARY SEWER SERVICE AT 1.0% AT INVERT ELEVATION 4963.51. SEE PLUMBING PLANS FOR CONTINUATION. PROPOSED STORM SEWER UNDER FLOWLINE EX. SANITARY SEWER MH RIM: 4971.49 INV IN: 4957.27 (NW) INV OUT: 4957.19 (SE) EX. 24" S A N I T A R Y S E W E R M A I N EX . 3 6 " R C P ST O R M S E W E R MATCHLINE SEE SHEET C300 MATCHLINE SEE SHEET C300 320 WILLOW STREET 316 WILLOW STREET CONTRACTOR TO ABANDON IN PLACE EXISTING SANITARY SEWER SERVICE DIRECT BORE 142.71 LF SANITARY SEWER SERVICE AT 3.4% CONNECT TO SAND FILTER (RE: MEP) 3' MIN. APPROXIMATE LOCATION OF RELOCATED TRANSFORMER VAULT 8' EX. UTILITY EASEMENT PROPOSED NYLOPLAST INLET CONNECT TO BUILDING DRAIN SYSTEM (RE: MEP)WI L L O W S T R E E T (R O W V A R I E S ) EXISTING EDGE OF ASPHALT CONTRACTOR SHALL COORDINATE SANITARY SEWER BORE WITH UTILITY COMPANIES TO AVOID IMPACTING PEDESTALS AND VAULTS. IF NECESSARY, SANITARY SEWER ALIGNMENT SHALL BE REALIGNED TO THE SOUTH TO AVOID CONFLICTING WITH PEDESTALS AND VAULTS. CONTRACTOR SHALL COORDINATE SANITARY SEWER BORE UNDER RAIN GARDEN AND BLOCK STONE WALL WITH OWNER OF 316 WILLOW STREET. (SEE NOTES 15, 16, AND 17.) EXISTING FENCE (SEE NOTES 15, 16, AND 17) EXISTING TREE EDGE OF EXISTING CONCRETE PATH EX . 2 4 " S A N I T A R Y S E W E R M A I N PROPOSED SWITCH VAULT PER UTILITY COMPANY'S SPECIFICATIONS PROPOSED AREA INLET (SEE SHEET C403) PROPOSED TRANSFORMER (CONNECT TRANSFORMER TO EX. 3-PHASE ELECTRIC LINE IN LINDEN ST. WITH A PRIMARY DUCT LINE AND VAULT PER UTILITY COMPANY'S SPECIFICATIONS.) PROPOSED 4' x 5' ELECTRIC EASEMENT TRENCH DRAIN AGAINST BUILDING STORM SEWER C SEE SHEET C403 TRENCH DRAIN AGAINST BUILDING CONNECT TRENCH DRAIN TO BUILDING'S INTERNAL DRAINAGE SYSTEM (RE: ARCHITECT & MEP) TRENCH DRAIN AGAINST BUILDING CONNECT TRENCH DRAIN TO BUILDING'S INTERNAL DRAINAGE SYSTEM (RE: ARCHITECT & MEP) CONNECT TRENCH DRAIN TO BUILDING'S INTERNAL DRAINAGE SYSTEM (RE: ARCHITECT & MEP) CONNECT TRENCH DRAIN TO BUILDING'S INTERNAL DRAINAGE SYSTEM (RE: ARCHITECT & MEP) CONNECT TRENCH DRAIN TO BUILDING'S INTERNAL DRAINAGE SYSTEM (RE: ARCHITECT & MEP) REFER TO THE WILLOW STREET PLAZA IMPROVEMENT PROJECT FOR PLANS OF THIS AREA ABANDONMENT PER PLAN TIE INTO MAIN SEWER END OF BORE END OF BORE CONNECT TO EXISTING SANITARY SEWER SERVICE AT INVERT 4964.67. CONTRACTOR TO VERIFY INVERT OF SEWER SERVICE PRIOR TO CONSTRUCTION. PER PLAN SS CLEANOUT 15" HDPE 6" PVC 6" PVC 100 LF 4" C900 PVC (BORE)58 LF 4" SDR 35 CONNECT TO EXISTING SANITARY SEWER MAIN AT INVERT = 4959.78 3.8 LF 5 LF 6 LF 16 LF SS CLEANOUTSS CLEANOUT 5.8 LF PROPOSED STORM SEWER SS SS APPROX. LOCATION OF CITY OF FORT COLLINS SANITARY SEWER (24") 4" SS 6" SS G G E E T T E E E MH E E E E E E E E Sheet of 17 CO N F L U E N C E L O T 2 Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 E N G I N E E R N G I E H T R O N R N PH O N E : 9 7 0 . 2 2 1 . 4 1 5 8 ww w . n o r t h e r n e n g i n e e r i n g . c o m C301 UT I L I T Y P L A N ( N O R T H H A L F ) ( IN FEET ) 010 10 20 30 1 INCH = 10 FEET CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NOTES: LEGEND: E 6" SS 2" W 8" F T CTV SS W VAULT ELEC HY D G T ST E CTV FO1.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2.THE PLUMBING CONTRACTOR SHALL TERMINATE UTILITY LATERALS 5' OUTSIDE OF BUILDING UNLESS NOTED OTHERWISE. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF ALL UTILITY CONNECTIONS INTO THE PROPOSED BUILDING SHALL BE COORDINATED WITH APPROVED ARCHITECTURAL DRAWINGS. 3.REFER TO APPROVED SITE ELECTRICAL PLANS FOR ALL CONDUITS AND POWER LINE ROUTING FOR SITE LIGHTING. 4.WATER AND SEWER SERVICE PROVIDED BY THE CITY OF FORT COLLINS AND ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 5.MINIMUM DEPTH OF COVER OVER WATER MAINS SHALL BE 4.5'. MAXIMUM COVER SHALL BE 5.5'. 6.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER & WATER MAINS & SERVICES. 7.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 8.WATER MAINS AND FIRE SERVICES SHALL BE AWWA C-900 PVC. WATER SERVICES SHALL BE TYPE K COPPER. HDPE PIPE MAY BE USED FOR 1 12" AND 2" WATER SERVICES. SEE WATERLINE NOTE 4 ON SHEET C001 REGARDING 1 12" AND 2" WATER SERVICES. 9.SANITARY SEWER SERVICES SHALL BE SDR-35 PVC UNLESS OTHERWISE NOTED. 10.ALL ROOF DRAIN CONNECTIONS SHALL BE HIGH DENSITY POLYETHYLENE PIPE (HDPE) OR APPROVED EQUAL. THE CONTRACTOR SHALL TERMINATE THE ROOF DRAIN LATERALS 5.0-FEET OUTSIDE OF BUILDING. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF THE ROOF DRAIN CONNECTIONS TO THE DOWNSPOUTS AT THE PROPOSED BUILDING SHALL BE COORDINATED WITH THE ARCHITECTURAL DRAWINGS. THE CONNECTION TRANSITION FROM THE SITE HDPE ROOF DRAINS TO THE INTERNAL SCH40 PVC BUILDING DRAINS SHALL BE MADE WITH A HDPE TO PVC ADAPTER. 11.ALL PROPOSED STORM SEWER INFRASTRUCTURE, UNLESS SPECIFIED, SHALL BE PRIVATELY OWNED AND MAINTAINED. 12.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 13.LIMITS OF CONCRETE REPAIRS TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. CONCRETE TO BE REMOVED JOINT TO JOINT. 14.ANY DAMAGED CURB, GUTTER, AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 15.CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 16.THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, SIDEWALKS, PRIVATE FENCES, AND ABOVE GROUND OR UNDERGROUND UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 17.ANY PRIVATE FEATURES ON ADJOINING PROPERTIES EXISTING PRIOR TO CONSTRUCTION - INCLUDING SIDEWALKS, PRIVATE FENCES, RETAINING WALLS, AND VEGETATION - DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO THEIR PRE-CONSTRUCTION OR BETTER CONDITIONS. DRY UTILITY NOTES 1.THE LOCATION OF PROPOSED DRY UTILITIES AS SHOWN ON THIS DRAWING ARE SHOWN FOR HORIZONTAL ALIGNMENTS ONLY AND ARE APPROXIMATE. FINAL DESIGNS OF DRY UTILITIES WILL BE PERFORMED BY THE APPROPRIATE UTILITY COMPANY. 2.PHONE, INTERNET, CABLE AND FIBER SERVICE TO BE PROVIDED BY CENTURYLINK AND/OR COMCAST. THE PROVIDER SHALL MAKE THE CONNECTION FROM EXISTING SERVICE LINE AND PULL ALL CABLE WITHIN THE CONDUIT TO THE PROPOSED PEDESTAL. THE DEVELOPER SHALL BE RESPONSIBLE FOR INSTALLING THE REQUIRED QUANTITY AND SIZE OF CONDUIT, AS DELINEATED BY THE PROVIDER, FROM THE CONNECTION POINT TO THE BUILDING AS SHOWN ON THIS PLAN. DEVELOPER WILL DETERMINE WHO THE PROVIDER WILL BE BETWEEN CENTURYLINK OR COMCAST. 3.ALL CONDUIT PLACED BY THE DEVELOPER FOR PHONE, INTERNET, CABLE AND FIBER SHALL BE EQUIPPED WITH PULL TAPE AND LOCATE WIRE PER THE SPECIFICATIONS OF EACH UTILITY COMPANY. 4.ELECTRIC SERVICE TO BE PROVIDED BY THE CITY OF FORT COLLINS. THE CITY SHALL INSTALL THE TRANSFORMER, VAULT, AND PRIMARY LINE FROM THE CONNECTION POINT TO THE PROPOSED TRANSFORMER. THE COST OF THE PRIMARY LINE, TRANSFORMER, VAULT, AND THE INSTALLATION OF THE SECONDARY LINE FROM THE TRANSFORMER TO THE BUILDING SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. THE COST OF THE RELOCATION OR MODIFICATION OF EXISTING TRANSFORMERS INCLUDING ANY EXTENSIONS, SPLICES, AND RELOCATION OF EXISTING SERVICES, SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. 5.ELECTRIC TRANSFORMER VAULT SIZE IS APPROXIMATE. COORDINATE FINAL LOCATION AND SIZE OF TRANSFORMER AND VAULT WITH APPROVED ARCHITECTURAL PLANS AND CITY OF FORT COLLINS LIGHT AND POWER. 6.XCEL SHALL INSTALL THE CONNECTIONS TO THE EXISTING GAS MAIN, AND INSTALL THE SERVICE TO GAS METER AT THE BUILDING AT THE DEVELOPERS EXPENSE. 7.IT IS RECOMMENDED THAT A DRY UTILITY COORDINATION MEETING TO BE SET UP BY THE CONTRACTOR AND/OR OWNER WITH ALL DRY UTILITY AGENCIES PRIOR TO CONSTRUCTION TO COORDINATE THEIR DESIGN. PRESERVE & PROTECT EXISTING ELECTRIC VAULT. 1 PRESERVE & PROTECT EXISTING LIGHT POLE. KEY NOTES: PRESERVE & PROTECT EXISTING CABLE VAULT. 2 3 4 PRESERVE & PROTECT EXISTING IRRIGATION VAULT. 5 PROPOSED TREE (RE: LANDSCAPE ARCHITECT) 6 CONNECT TO EXISTING ELECTRIC LINE. 4" SS 7 7/27/18 THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERING SERVICES, INC., ARE BASED IN WHOLE, OR IN PART, UPON INFORMATION PROVIDED BY OTHERS. NORTHERN ENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. RECORD DRAWING I, FREDERICK WEGERT, CERTIFY ALL PUBLIC WATER, WASTEWATER, AND STORMWATER SYSTEM IMPROVEMENTS SHOWN HEREIN, INCLUDING ANY NOTED CHANGES OR REVISIONS, ARE IN GENERAL CONFORMANCE WITH THE DESIGN/CONSTRUCTION DOCUMENTS, PURSUANT TO THIS RECORD DRAWING COPY OF THE FINAL UTILITY PLANS. 10/11/19 E D D D VAULT ELEC CSCONTROL IRR CONTROL IRR CONTROL IRR CS CO N T R O L IRR CO N T R O L IRR CO N T R O L IRR CO N T R O L IRR CO N T R O L IRR CON T R O L IRR CO N T R O L IR R CO N T R O L IRR VAU L T ELE C CS CS X X STST STST X XX X X ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST VAULT ELEC W W W IRR X X X X X X XXXX X X X X X X M X LINDEN STREET (100' ROW) EX. SIDEWALK EX. SIDEWALK WITH PAVERS EXISTING DECK 409 LINDEN STREET 405 LINDEN STREET PROPOSED BUILDING 320 WILLOW STREET EX . A S P H A L T P A T H WI L L O W S T R E E T (R O W V A R I E S ) PROPOSED BUILDING (SEE ARCHITECTURAL DRAWINGS FOR GARAGE FIRST FLOOR GRADING) STAIRS ST A I R S PROPOSED SIDEWALK EX . 3 6 " R C P S T O R M S E W E R @ 0 . 1 1 % EX . 3 6 " R C P ST O R M S E W E R EX. 12" RCP STORM SEWER EX. PROPERTY LINE EX. PROPERTY LINE EX. PROPERTY LINE PRESERVE & PROTECT TREE PRESERVE & PROTECT TREE PROPOSED TOP BACK OF VERTICAL CURB PRESERVE & PROTECT EX. TREE (TRUNK LOCATED ON NEIGHBORS PROPERTY) SAWCUT LINE (TYP.) MATCH INTO EX. CURB, GUTTER, & SIDEWALK EXISTING HANDICAP RAMP (TYP.) MATCH INTO EX. SIDEWALK MATCH INTO EXISTING CURB & GUTTER SAWCUT LINE (TYP.) MATCH INTO EX. SIDEWALK MATCH INTO EX. CURB & GUTTER PROPOSED STORM SEWER MANHOLE EXISTING DOOR THRESHOLD ELEV. = 4971.42 EXISTING DOOR THRESHOLD ELEV. = 4971.42 PROPOSED STORM SEWER A UNDER FLOWLINE (SEE SHEET C402) PROPOSED AREA INLET PROPOSED TOP BACK OF VERTICAL CURB EXISTING DOOR THRESHOLD ELEV. = 4970.74 EXISTING DOOR THRESHOLD ELEV. = 4971.20 REMOVE & REPLACE EXISTING AIR CONDITIONING UNIT FOR REGRADING IN THIS AREA INSTALL VAPOR/MEMBRANE AGAINST EXISTING BUILDING AS RECOMMENDED OR SPECIFIED BY BUILDING ARCHITECT EXISTING 6' Ø STORM SEWER (SEE SHEET C403) EX. 6' Ø STORM SEWER MANHOLE MATCHLINE SEE SHEET C401 MATCHLINE SEE SHEET C401 EXISTING SHED THICKEN CONCRETE EDGE (68 . 3 1 ) FL69.1 5 FL70.3 9 FL70.4 7 FL (70 . 5 6 ) FL (71 . 3 0 ) 70.0 0 TC 69.8 7 TC70.0 8 TC 69.8 7 FL 71.0 6 FL 69.4 1 FL 69.1 4 GRA T E 69.48 FL 1.5% 3. 4 % 3. 5 % 2. 0 % 2. 0 % 1. 1 % 2. 0 % 2.0 % 1. 6 % 1.0% 2.0% 2.0% 2.0% 2. 0 % 2.0%7.0% 2. 0 % 2. 0 % 1.9 % 2.0% 2.5% 2.7%1.0%2.8%0.9% LOWER FINISH FLOOR ELEV = 4970.08 UPPER FINISH FLOOR ELEV = 4971.25 71.2 4 TC71.2 3 TC 71.2 3 TC 71.2 4 TC 71.2 4 TC 71.1 1 GRD 71.23 TC 71.2 3TC 71.2 3TC 1. 1 % (70 . 9 3 ) FL 69.6 5 (69 . 4 5 ) 69.8 4 (69 . 9 4 ) (69 . 4 5 ) 9. 9 % 8: 1 6. 6 % 10 : 1 70.4 0GRD 4: 1 4: 1 70.0 0GRD GRD:69.70 TC:70.23 (69 . 4 4 ) 1.5% 2.4 % 71.1 2 TC/T S 69.9 7 TC 69.9 2 TC 69.4 6 GRA T E 2. 0 % 2. 0 % 1. 5 % 1. 6 % 70 . 0 8 TC 1. 5 % 2.0% 5.0% 70.0 6 GRD / B W 4.1% (69 . 4 6 ) (69 . 8 0 ) 1.0% 2. 0 % (3.6%) (70 . 1 1 ) GRD 71.7 2 (1.7%) 71.1 7 BW 70.0 1 BW 69.6 5 (69 . 6 8 ) 68.6 0 INV 70.2 5 GRD (69 . 8 3 ) GRD (69 . 9 3 ) (69 . 9 7 ) 69.3 5 FL 70.9 9 71.0 0 71.00 71.00 71.07 70.9 8 3.1% 3.2 % 3.1% (71 . 1 0 ) FL 4: 1 4:1 1.5 % 2. 0 % 70.2 0GRD 71.2 5 GRD / T C 3. 2 % 6.4% 2.1% 2.0% 4.6% 5.0 % 4.8% 71.1 5 FL 70.7 9 FL 70.9 3 FL 1. 7 % 0.5 % 0.5 % 2.5 % 1.6% 68.7 1 FL 0.9% TRENCH DRAIN AGAINST BUILDING CONNECT TRENCH DRAIN TO BUILDING'S INTERNAL DRAINAGE SYSTEM (RE: ARCHITECT & MEP) TRENCH DRAIN AGAINST BUILDING 68. 6 0 INV (69.69) GRD 68. 6 0 INV (69 . 7 7 ) GRD 69.0 6 INV 68.8 0 FL (69 . 8 1 ) GRD 68. 7 0 FL (69.7 0 ) GRD 68.80 FL(69.81) GRD 3. 5 % 1. 1 % CONNECT TRENCH DRAIN TO BUILDING'S INTERNAL DRAINAGE SYSTEM (RE: ARCHITECT & MEP) CONNECT TRENCH DRAIN TO BUILDING'S INTERNAL DRAINAGE SYSTEM (RE: ARCHITECT & MEP) CONNECT TRENCH DRAIN TO BUILDING'S INTERNAL DRAINAGE SYSTEM (RE: ARCHITECT & MEP) 0. 8 % 0. 8 % 1. 6 % 1. 6 % 0. 8 % REFER TO THE WILLOW STREET PLAZA IMPROVEMENT PROJECT FOR PLANS OF THIS AREA REFER TO THE WILLOW STREET PLAZA IMPROVEMENT PROJECT FOR PLANS OF THIS AREA 4971.25 4970.07 Sheet of 17 CO N F L U E N C E L O T 2 Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 E N G I N E E R N G I E H T R O N R N PH O N E : 9 7 0 . 2 2 1 . 4 1 5 8 ww w . n o r t h e r n e n g i n e e r i n g . c o m LEGEND: ( IN FEET ) 010 10 20 30 1 INCH = 10 FEET CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NOTES: C400 GR A D I N G P L A N ( S O U T H ) VAULT ELEC 1.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2.SPOT ELEVATIONS SHOWN ARE FLOWLINE, EDGE OF PAVEMENT, OR EDGE OF WALK UNLESS NOTED OTHERWISE. 3.ALL DISTURBED AREAS SHALL BE REVEGETATED PER THE APPROVED LANDSCAPE PLANS. 4.ALL SOIL (NOT MULCH) IN LANDSCAPE BEDS ADJACENT TO BUILDINGS SHALL BE PLACED SUCH THAT THE TOP OF SOIL IS AT THE SAME ELEVATION AS ADJACENT SIDEWALK TO ALLOW FOR PROPER DRAINAGE. 5.CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 6.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 7.LIMITS OF CONCRETE REPAIRS TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. CONCRETE TO BE REMOVED JOINT TO JOINT. 8.SEE ARCHITECTURAL PLANS FOR DIMENSIONS/DESIGN OF ALL BUILDING CONCRETE DOOR STOOPS. 9.ALL PROPOSED PAVEMENT SECTIONS WITHIN THE PUBLIC RIGHT-OF-WAY SHALL BE SUBMITTED TO AND APPROVED BY THE CITY OF FORT COLLINS PRIOR TO CONSTRUCTION. SEE GENERAL NOTES FOR ADDITIONAL INFORMATION. 10.ALL ROOF DRAIN CONNECTIONS SHALL BE HIGH DENSITY POLYETHYLENE PIPE (HDPE) OR APPROVED EQUAL. THE CONTRACTOR SHALL TERMINATE THE ROOF DRAIN LATERALS 5.0-FEET OUTSIDE OF BUILDING. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF THE ROOF DRAIN CONNECTIONS TO THE DOWNSPOUTS AT THE PROPOSED BUILDING SHALL BE COORDINATED WITH THE ARCHITECTURAL DRAWINGS. THE CONNECTION TRANSITION FROM THE SITE HDPE ROOF DRAINS TO THE INTERNAL SCH40 PVC BUILDING DRAINS SHALL BE MADE WITH A HDPE TO PVC ADAPTER. 11.THE SITE MUST BE SWEPT AND MAINTAINED TO PREVENT DIRT, SAW CUTTINGS, CONCRETE WASH, TRASH & DEBRIS, LANDSCAPE MATERIALS AND OTHER POLLUTANTS FROM ENTERING THE STORM SEWER AT ALL TIMES OR BMP'S WILL BE REQUIRED PER CITY OF FORT COLLINS REGULATIONS. 12.CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 13.THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, SIDEWALKS, PRIVATE FENCES, AND ABOVE GROUND OR UNDERGROUND UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 14.ANY PRIVATE FEATURES ON ADJOINING PROPERTIES EXISTING PRIOR TO CONSTRUCTION - INCLUDING SIDEWALKS, PRIVATE FENCES, RETAINING WALLS, AND VEGETATION - DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO THEIR PRE-CONSTRUCTION OR BETTER CONDITIONS. 77.71 (77.90) 1.8% (1.8%) AC 8 7/27/18 THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERING SERVICES, INC., ARE BASED IN WHOLE, OR IN PART, UPON INFORMATION PROVIDED BY OTHERS. NORTHERN ENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. RECORD DRAWING E D D VAULT ELEC CSCONTROL IRR CONTROL IRR IRR CS CO N T R O L IRR CON T R O L IRR CO N T R O L IRR CON T R O L IRR CO N T R O L IRR CON T R O L IRR CO N T R O L IR R CO N T R O L IRR EL E C CS X X ST X X X X X X X X X X X XX X X ST ST ST ST ST ST ST ST ST ST ST ST C.O . VAULT ELEC W W W IR R X X X X X X X X X X X X XXXX X X X X X X X M M TEL E M M M M CON T R O L IRRWSOG E C.O . X X X X X T T EX. SIDEWALK PO U D R E S T R E E T (2 0 ' R O W ) EX. SIDEWALK WITH PAVERS NO BUILD EASEMENT PO U D R E S T R E E T (2 0 ' R O W ) EXISTING DECK 409 LINDEN STREET 405 LINDEN STREET PROPOSED BUILDING 320 WILLOW STREET 316 WILLOW STREET 310 WILLOW STREET EX . A S P H A L T P A T H WI L L O W S T R E E T (R O W V A R I E S ) PROPOSED BUILDING (SEE ARCHITECTURAL DRAWINGS FOR GARAGE FIRST FLOOR GRADING) STAIRS ST A I R S PROPOSED SIDEWALK EX . 3 6 " R C P S T O R M S E W E R @ 0 . 1 1 % EX . 3 6 " R C P ST O R M S E W E R EX. PROPERTY LINE EX. PROPERTY LINE EX. PROPERTY LINE EX. PROPERTY LINE EX. RIGHT-OF-WAY PRESERVE & PROTECT TREE PRESERVE & PROTECT EX. TREE (TRUNK LOCATED ON NEIGHBORS PROPERTY) MATCH INTO EX. SIDEWALK MATCH INTO EX. SIDEWALK EXISTING DOOR THRESHOLD ELEV. = 4971.42 EXISTING DOOR THRESHOLD ELEV. = 4971.42 PROPOSED STORM SEWER A UNDER FLOWLINE (SEE SHEET C402) PROPOSED AREA INLET EXISTING DOOR THRESHOLD ELEV. = 4970.74 EXISTING DOOR THRESHOLD ELEV. = 4971.11 EXISTING DOOR THRESHOLD ELEV. = 4971.20 REMOVE & REPLACE EXISTING AIR CONDITIONING UNIT FOR REGRADING IN THIS AREA INSTALL VAPOR/MEMBRANE AGAINST EXISTING BUILDING AS RECOMMENDED OR SPECIFIED BY BUILDING ARCHITECT EXISTING 6' Ø STORM SEWER (SEE SHEET C403) EX. 6' Ø STORM SEWER MANHOLE MATCHLINE SEE SHEET C400 MATCHLINE SEE SHEET C400 MATCH INTO BACK OF EXISTING RIBBON CURB MATCH INTO BACK OF EXISTING RIBBON CURB MATCH INTO BACK OF EX. RIBBON CURB EXISTING SHED THICKEN CONCRETE EDGE CONSTRUCT CURB & GUTTER AGAINST BUILDING. DRAIN FLOWLINE OF CURB TOWARDS POUDRE ST. AT EX. GRADE (71 . 3 0 ) 70.0 0 TC 69.8 7 TC70.0 8 TC 69. 8 7 FL 71.0 6 FL 69.4 1 FL 69.1 4 GRA T E 69.48 FL 1.5% 3. 4 % 3. 5 % 2. 0 % 2. 0 % 1. 1 % 2. 0 % 2.0 % 1. 6 % 1.0% 2.0% 2.0% 2.0% 2. 0 % 2.0%7.0% 2. 0 % 2. 0 % 1.9 % 2.0% 2.5% 4.7% 2.9% 3.7% 3.1% 3.6% 2.6% LOWER FINISH FLOOR ELEV = 4970.08 UPPER FINISH FLOOR ELEV = 4971.25 71.2 4 TC71.2 3 TC 71.2 3 TC 71.2 4 TC 71.2 4 TC 71. 1 1 GRD 71.23 TC 71.2 3TC 71. 2 3TC 1. 1 % 69. 2 5TC/ F F 69.45 TC 69.0 0 TC/F F 69.6 5 (69 . 4 5 ) 69.8 4 (69 . 9 4 ) (69 . 4 5 ) 9. 9 % 8: 1 6. 6 % 10 : 1 70.4 0GRD 4: 1 4: 1 70.0 0GRD GRD:69.70 TC:70.23 (69 . 4 4 ) 1.5% 71.1 2 TC/T S 69.9 7 TC 69.9 2 TC 69.4 6 GRA T E 2. 0 % 68. 7 7TC 69. 0 0TC/ F F 69.2 5 TC/F F 2. 0 % 1. 5 % 1. 6 % 70 . 0 8 TC 1. 5 % 2.0% 70.0 6 GRD / B W 4.1% 2. 0 % (70 . 1 1 ) GRD (2 . 7 % ) (1. 5 % ) 71.7 2 71.1 7 BW 70.0 1 BW 69. 6 5 (69 . 6 8 ) 3.1% 3.8% 2.6% 70.5 0 GRD 68.6 0 INV (69 . 4 3 ) FL 6.3% 70.2 5 GRD 2.8% 4.2 % (69 . 8 3 ) GRD (69 . 0 2 ) (68 . 9 1 ) (68 . 7 1 ) (68 . 5 0 ) (69 . 9 3 ) (69 . 9 7 ) 70.0 0 GRD (69 . 8 3 ) 70.9 9 71.0 0 71.00 71.00 71.07 70.9 8 3.1% 3.2 % 3.1% 4: 1 4:1 1.5 % 2. 0 % 70.2 0GRD 71.2 5 GRD / T C 3. 2 % 6.4% 2.1% 2.0% 4.6% 5.0 % 4.8% 71.1 5 FL 70.7 9 FL 70.9 3 FL 1. 7 % 0.5 % 0.5 % 2.5 % (8. 6 % ) (3.1%)(4.9%)(5.6%) (9. 2 % ) (4.9%) (69 . 6 7 ) 70.3 8 1.6% TRENCH DRAIN AGAINST BUILDING CONNECT TRENCH DRAIN TO BUILDING'S INTERNAL DRAINAGE SYSTEM (RE: ARCHITECT & MEP) TRENCH DRAIN AGAINST BUILDING 68.6 0 INV (69.69) GRD 68.6 0 INV (69 . 7 7 ) GRD (69.43) GRD 69.0 6 INV 68.8 0 FL (69 . 8 1 ) GRD 68.7 0 FL (69.7 0 ) GRD 68.80 FL(69.81) GRD 68.5 0 FL (69 . 6 6 ) GRD 3. 5 % 1. 1 % CONNECT TRENCH DRAIN TO BUILDING'S INTERNAL DRAINAGE SYSTEM (RE: ARCHITECT & MEP) CONNECT TRENCH DRAIN TO BUILDING'S INTERNAL DRAINAGE SYSTEM (RE: ARCHITECT & MEP) CONNECT TRENCH DRAIN TO BUILDING'S INTERNAL DRAINAGE SYSTEM (RE: ARCHITECT & MEP) CONNECT TRENCH DRAIN TO BUILDING'S INTERNAL DRAINAGE SYSTEM (RE: ARCHITECT & MEP) 0. 8 % 0. 8 % 1. 6 % 1. 6 % 0. 8 % 1. 6 % REFER TO THE WILLOW STREET PLAZA IMPROVEMENT PROJECT FOR PLANS OF THIS AREA REFER TO THE WILLOW STREET PLAZA IMPROVEMENT PROJECT FOR PLANS OF THIS AREA 6.3 % 10.3% 6. 9 % 7.5% 0.5%69.3 5FL PROPOSED 14" WIDE VALLEY PAN WITH FL SLOPE @ 0.5%. MATCH UPSTREAM END OF VALLEY PAN INTO EXISTING GRADE. MATCH DOWNSTREAM END OF VALLEY PAN INTO TOP OF GRATE OF PROPOSED TRENCH DRAIN. 70.3 9FL 2. 0 % PROPOSED SWALE WITH FL @ 2.0% 70. 5 0 GRD 70.7 5 GRD 70. 2 5 GRD 70. 2 5 GRD 70.46 4971.25 4970.07 9: 1 APPROX. LOCATION OF RELOCATED SHED TO BE COORDINATED WITH ADJACENT PROPERTY OWNER 68.3 3 INV (70 . 0 2 ) FL Sheet of 17 CO N F L U E N C E L O T 2 Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 E N G I N E E R N G I E H T R O N R N PH O N E : 9 7 0 . 2 2 1 . 4 1 5 8 ww w . n o r t h e r n e n g i n e e r i n g . c o m LEGEND: ( IN FEET ) 010 10 20 30 1 INCH = 10 FEET CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R C401 GR A D I N G P L A N ( N O R T H H A L F ) VAULT ELEC 77.71 (77.90) 1.8% (1.8%) AC NOTES: 1.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2.SPOT ELEVATIONS SHOWN ARE FLOWLINE, EDGE OF PAVEMENT, OR EDGE OF WALK UNLESS NOTED OTHERWISE. 3.ALL DISTURBED AREAS SHALL BE REVEGETATED PER THE APPROVED LANDSCAPE PLANS. 4.ALL SOIL (NOT MULCH) IN LANDSCAPE BEDS ADJACENT TO BUILDINGS SHALL BE PLACED SUCH THAT THE TOP OF SOIL IS AT THE SAME ELEVATION AS ADJACENT SIDEWALK TO ALLOW FOR PROPER DRAINAGE. 5.CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 6.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 7.LIMITS OF CONCRETE REPAIRS TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. CONCRETE TO BE REMOVED JOINT TO JOINT. 8.SEE ARCHITECTURAL PLANS FOR DIMENSIONS/DESIGN OF ALL BUILDING CONCRETE DOOR STOOPS. 9.ALL PROPOSED PAVEMENT SECTIONS WITHIN THE PUBLIC RIGHT-OF-WAY SHALL BE SUBMITTED TO AND APPROVED BY THE CITY OF FORT COLLINS PRIOR TO CONSTRUCTION. SEE GENERAL NOTES FOR ADDITIONAL INFORMATION. 10.ALL ROOF DRAIN CONNECTIONS SHALL BE HIGH DENSITY POLYETHYLENE PIPE (HDPE) OR APPROVED EQUAL. THE CONTRACTOR SHALL TERMINATE THE ROOF DRAIN LATERALS 5.0-FEET OUTSIDE OF BUILDING. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF THE ROOF DRAIN CONNECTIONS TO THE DOWNSPOUTS AT THE PROPOSED BUILDING SHALL BE COORDINATED WITH THE ARCHITECTURAL DRAWINGS. THE CONNECTION TRANSITION FROM THE SITE HDPE ROOF DRAINS TO THE INTERNAL SCH40 PVC BUILDING DRAINS SHALL BE MADE WITH A HDPE TO PVC ADAPTER. 11.THE SITE MUST BE SWEPT AND MAINTAINED TO PREVENT DIRT, SAW CUTTINGS, CONCRETE WASH, TRASH & DEBRIS, LANDSCAPE MATERIALS AND OTHER POLLUTANTS FROM ENTERING THE STORM SEWER AT ALL TIMES OR BMP'S WILL BE REQUIRED PER CITY OF FORT COLLINS REGULATIONS. 12.CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 13.THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, SIDEWALKS, PRIVATE FENCES, AND ABOVE GROUND OR UNDERGROUND UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 14.ANY PRIVATE FEATURES ON ADJOINING PROPERTIES EXISTING PRIOR TO CONSTRUCTION - INCLUDING SIDEWALKS, PRIVATE FENCES, RETAINING WALLS, AND VEGETATION - DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO THEIR PRE-CONSTRUCTION OR BETTER CONDITIONS. 9 7/27/18 THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERING SERVICES, INC., ARE BASED IN WHOLE, OR IN PART, UPON INFORMATION PROVIDED BY OTHERS. NORTHERN ENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. RECORD DRAWING 4958 4960 4965 4970 4975 4958 4960 4965 4970 4975 9+75 10+00 11+00 11+50 PR O P O S E D 5 ' D I A . S T O R M M H A 1 ST A : 1 0 + 0 0 . 0 0 RI M : 4 9 7 0 . 1 0 IN V I N : 4 9 6 1 . 0 5 1 5 " R C P ( N W ) IN V I N : 4 9 5 9 . 3 0 3 6 " R C P ( S W ) IN V O U T : 4 9 5 9 . 3 0 3 6 " R C P ( N E ) 58.64 LF 15" RCP @ 0 . 8 0 % PR O P O S E D S T O R M I N L E T A 2 ST A : 1 0 + 5 8 . 6 4 FL : 4 9 6 9 . 4 9 IN V I N : 4 9 6 1 . 5 2 1 5 " H D P E ( N W ) IN V O U T : 4 9 6 1 . 5 2 1 5 " R C P ( S E ) 56.71 LF 15" HDPE @ 0 . 8 0 % PR O P O S E D C O N N E C T I O N TO B U I L D I N G ST A : 1 1 + 2 9 . 3 1 IN V O U T : 4 9 6 2 . 0 9 1 5 " H D P E ( S E ) EXISTING GROUND FINISH GROUND STA.=10+52.19 ASSUMED T.O.P. = 4965.14 EX. FIBER OPTIC STA.=10+45.69 ASSUMED T.O.P. = 4964.70 EX. ELECTRIC STA.=10+44.56 ASSUMED T.O.P. = 4964.55 EX. IRRIGATION STA.=10+41.42 ASSUMED T.O.P. = 4964.50 EX. ELECTRIC STA.=10+38.66 ASSUMED T.O.P. = 4964.71 EX. CABLE TV STA.=10+31.17 ASSUMED T.O.P. = 4965.24 EX. GAS STA.=10+24.73 ASSUMED T.O.P. = 4965.53 EX. TELEPHONE STA.=10+74.26 ASSUMED T.O.P. = 4965.80 PROPSOED ELECTRIC STA.=10+11.42 INV. = 4958.72 EX. SANITARY SEWER STA.=10+22.11 ASSUMED T.O.P. = 4965.15 EX. WATER STA.=10+39.55 ASSUMED T.O.P. = 4964.65 EX. ELECTRIC EX . EX . PR O P O S E D S T O R M I N L E T A 3 ST A : 1 1 + 1 5 . 3 5 FL : 4 9 7 1 . 1 3 IN V I N : 4 9 6 1 . 9 7 1 5 " H D P E ( N W ) IN V I N : 4 9 6 1 . 9 7 6 " P V C ( S W ) IN V O U T : 4 9 6 1 . 9 7 1 5 " H D P E ( S E ) 13.96 LF 15" HDPE @ 0.81% MH EEE E E 2" W 2" W 2" W CS CS D W E IR R IR R IR R IR R IR R CS FO FO FO FO FO T T T T T W W W W W W W W ST ST ST ST ST ST SS SS SS SS SS SS W CT V CT V CT V CT V CT V E E E E E E E E E E E E E E E E E E E E E E E E E E G G G G G STORM MH A1 STA 10+00.00 N: 132238.46 E: 195991.71 58.64 LF 15" RCP @ 0.80% STORM INLET A2 STA 10+58.64 N: 132277.46 E: 195947.92 56.71 LF 15" HDPE @ 0.80% CONNECTION TO BUILDING STA 11+29.31 N: 132324.46 E: 195895.14LI N D E N S T R E E T (1 0 0 ' R O W ) EX I S T I N G D E C K 405 LINDEN STREET PROPOSED BUILDING 3' MIN. EX . 8 " P V C S A N I T A R Y S E W E R EX. RIGHT-OF-WAY PROPOSED STORM SEWER UNDER FLOWLINE EX. 3 4" COPPER WATER SERVICE EX . 1 2 " C 9 0 0 WA T E R M A I N EX . 3 6 " S T O R M S E W E R 11.86 LF 6" PVC @ 4.00% 13.96 LF 15" HDPE @ 0.81% STORM INLET A3 STA 11+15.35 N: 132315.18 E: 195905.57 STORM INLET A3-1 PROPOSED 12" NYLOPLAST INLET GRATE: 4969.14 INV OUT: 4962.71 7.00 LF 6" HDPE @ 2.0% Sheet of 17 CO N F L U E N C E L O T 2 Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 E N G I N E E R N G I E H T R O N R N PH O N E : 9 7 0 . 2 2 1 . 4 1 5 8 ww w . n o r t h e r n e n g i n e e r i n g . c o m LEGEND: ( IN FEET ) 010 10 20 30 1 INCH = 10 FEET CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R C402 ST O R M S E W E R A P L A N & P R O F I L E E 6" SS 2" W 6" F T CTV SS W VAULT ELEC HYD G T ST E CTV FO NOTES: PROFILE SCALE: 1.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2.THE PLUMBING CONTRACTOR SHALL TERMINATE UTILITY LATERALS 5' OUTSIDE OF BUILDING UNLESS NOTED OTHERWISE. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF ALL UTILITY CONNECTIONS INTO THE PROPOSED BUILDING SHALL BE COORDINATED WITH APPROVED ARCHITECTURAL DRAWINGS. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.MANHOLE DIAMETERS SHOWN ARE THE MINIMUM SIZE PER CITY STANDARD DETAIL D-3. CONTRACTOR SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). 5.CONTRACTOR SHALL PROVIDE A MINIMUM COVER OVER STORM SEWER PIPE DURING CONSTRUCTION IN ACCORDANCE WITH MANUFACTURER RECOMMENDATIONS. 6.ALL ROOF DRAIN CONNECTIONS SHALL BE HIGH DENSITY POLYETHYLENE PIPE (HDPE) OR APPROVED EQUAL. THE CONTRACTOR SHALL TERMINATE THE ROOF DRAIN LATERALS 5.0-FEET OUTSIDE OF BUILDING. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF THE ROOF DRAIN CONNECTIONS TO THE DOWNSPOUTS AT THE PROPOSED BUILDING SHALL BE COORDINATED WITH THE ARCHITECTURAL DRAWINGS. THE CONNECTION TRANSITION FROM THE SITE HDPE ROOF DRAINS TO THE INTERNAL SCH40 PVC BUILDING DRAINS SHALL BE MADE WITH A HDPE TO PVC ADAPTER. 7.UNLESS NOTED, ALL PROPOSED STORM SEWER AS SHOWN ON THESE DRAWINGS ARE PRIVATE. 8.STORM SEWER MAINS SHOWN ON THESE DRAWINGS ARE HIGH DENSITY POLYETHYLENE (HDPE) AND SHALL BE WATERTIGHT ADS N-12 OR APPROVED EQUAL. STORM SEWER MAINS SHOWN ON THESE DRAWINGS AS REINFORCED CONCRETE PIPE (RCP) SHALL BE CLASS III RCP. 9.ANY DAMAGED CURB, GUTTER, AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. SCHEDULE OF INLETS: INLET NUMBER TYPE STORM INLET A2 AREA INLET STORM INLET A3 18" NYLOPLAST STORM INLET A3-1 12" NYLOPLAST 10 7/27/18 THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERING SERVICES, INC., ARE BASED IN WHOLE, OR IN PART, UPON INFORMATION PROVIDED BY OTHERS. NORTHERN ENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. RECORD DRAWING P-Strm-C 4962 4965 4970 4975 4962 4965 4970 4975 9+75 10+00 11+00 PR O P O S E D S T O R M I N L E T C 2 CO N T E C H F I L T E R R A B I O R E T E N T I O N S Y S T E M ST A : 1 0 + 7 4 . 6 6 FL : 4 9 7 0 . 4 8 IN V O U T : 4 9 6 3 . 9 2 1 5 " R C P ( S ) 74.66 LF 15" RCP @ 0.70% EXISTING GROUND CONNECT PROPOSED 15" RCP STORM SEWER TO EXISTING MANHOLE (CORE & SEAL) FINISH GROUND St o r m M H C 1 ST A 1 0 + 0 0 . 0 0 RI M 4 9 7 1 . 4 ± IN V . I N 4 9 6 3 . 4 0 ( N W ) IN V . I N 4 9 6 3 . 4 0 ( N ) IN V . O U T 4 9 6 3 . 1 8 ( S E ) STA.=10+66.93 ASSUMED T.O.P. = 4967.34 EX. WATER STA.=10+59.39 ASSUMED T.O.P. = 4967.79 EX. TELEPHONE STA.=10+08.26 INV. = 4956.92 EXISTING SANITARY SEWER (LOCATED OUTSIDE OF PROFILE) IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IR R D CS CON T R O L IRR CO N T R O L IRR CON T R O L IRR CON T R O L IRR CON T R O L IRR CO N T R O L IRR CO N T R O L IR R CON T R O L IRR VAU L T ELE C T T T T T T T T T T T FO FO FO FO FO FO FO FO FO FO T T T T T T T T T T W W W W W W W W W ST ST ST ST ST ST ST ST CA B L E TE L E W CT V CT V CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV E E E E E E E E E G G G G G G G G IRR EX. STORM MH C1 STA 10+00.00 N: 132149.06 E: 195819.67 74.6 6 L F 1 5 " R C P @ 0 . 7 0 % STORM INLET C2 STA 10+74.66 N: 132222.91 E: 195830.59 RELOCATED CONNECT PROPOSED 15" RCP STORM SEWER TO EXISTING MANHOLE (CORE & SEAL) EX . A S P H A L T P A T H WI L L O W S T R E E T (R O W V A R I E S ) EX. SIDEWALK BU I L D I N G EX . 2 4 " S A N I T A R Y S E W E R M A I N EX . 6 " D I P W A T E R M A I N EX . 3 6 " S T O R M S E W E R M A I N REFER TO THE WILLOW STREET PLAZA IMPROVEMENT PROJECT FOR PLANS OF THIS AREA Sheet of 17 CO N F L U E N C E L O T 2 Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 E N G I N E E R N G I E H T R O N R N PH O N E : 9 7 0 . 2 2 1 . 4 1 5 8 ww w . n o r t h e r n e n g i n e e r i n g . c o m LEGEND: ( IN FEET ) 010 10 20 30 1 INCH = 10 FEET CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R C403 ST O R M S E W E R C P L A N & P R O F I L E E 6" SS 2" W 6" F T CTV SS W VAULT ELEC HYD G T ST E CTV FO NOTES: PROFILE SCALE: 1.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2.THE PLUMBING CONTRACTOR SHALL TERMINATE UTILITY LATERALS 5' OUTSIDE OF BUILDING UNLESS NOTED OTHERWISE. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF ALL UTILITY CONNECTIONS INTO THE PROPOSED BUILDING SHALL BE COORDINATED WITH APPROVED ARCHITECTURAL DRAWINGS. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.MANHOLE DIAMETERS SHOWN ARE THE MINIMUM SIZE PER CITY STANDARD DETAIL D-3. CONTRACTOR SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). 5.CONTRACTOR SHALL PROVIDE A MINIMUM COVER OVER STORM SEWER PIPE DURING CONSTRUCTION IN ACCORDANCE WITH MANUFACTURER RECOMMENDATIONS. 6.ALL ROOF DRAIN CONNECTIONS SHALL BE HIGH DENSITY POLYETHYLENE PIPE (HDPE) OR APPROVED EQUAL. THE CONTRACTOR SHALL TERMINATE THE ROOF DRAIN LATERALS 5.0-FEET OUTSIDE OF BUILDING. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF THE ROOF DRAIN CONNECTIONS TO THE DOWNSPOUTS AT THE PROPOSED BUILDING SHALL BE COORDINATED WITH THE ARCHITECTURAL DRAWINGS. THE CONNECTION TRANSITION FROM THE SITE HDPE ROOF DRAINS TO THE INTERNAL SCH40 PVC BUILDING DRAINS SHALL BE MADE WITH A HDPE TO PVC ADAPTER. 7.UNLESS NOTED, ALL PROPOSED STORM SEWER AS SHOWN ON THESE DRAWINGS ARE PRIVATE. 8.STORM SEWER MAINS SHOWN ON THESE DRAWINGS ARE HIGH DENSITY POLYETHYLENE (HDPE) AND SHALL BE WATERTIGHT ADS N-12 OR APPROVED EQUAL. STORM SEWER MAINS SHOWN ON THESE DRAWINGS AS REINFORCED CONCRETE PIPE (RCP) SHALL BE CLASS III RCP. 9.ANY DAMAGED CURB, GUTTER, AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. SCHEDULE OF INLETS: INLET NUMBER TYPE STORM INLET C2 AREA INLET 11 7/27/18 THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERING SERVICES, INC., ARE BASED IN WHOLE, OR IN PART, UPON INFORMATION PROVIDED BY OTHERS. NORTHERN ENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. RECORD DRAWING STORM SEWER REMOVED PER CITY OF FORT COLLINS WILLOW STREET IMPROVEMENT PROJECT Drainage Certification Letter August 14, 2020 Confluence Page 8 of 3 Appendix E State Portal Documents Stormwater Facility Name: Facility Location & Jurisdiction: User Input: Watershed Characteristics User Defined User Defined User Defined User Defined Selected BMP Type =SF Stage [ft]Area [ft^2]Stage [ft]Discharge [cfs] Watershed Area =0.23 acres 0.00 575 0.00 0.00 Watershed Length =127 ft 0.25 575 0.25 0.14 Watershed Length to Centroid =64 ft 0.50 575 0.50 0.39 Watershed Slope =0.010 ft/ft 0.75 575 0.75 0.53 Watershed Imperviousness =100.0%percent 1.00 575 1.00 0.64 Percentage Hydrologic Soil Group A =100.0%percent 1.25 575 1.25 0.73 Percentage Hydrologic Soil Group B =0.0%percent 1.50 575 1.50 0.82 Percentage Hydrologic Soil Groups C/D =0.0%percent 1.75 575 1.75 0.89 Target WQCV Drain Time =12.0 hours 2.00 575 2.00 0.96 2.25 914 2.25 1.03 User Input 2.50 914 2.50 1.09 2.75 914 2.75 1.15 3.00 914 3.00 1.20 3.25 914 3.25 1.26 3.50 914 3.50 1.31 3.75 914 3.75 1.35 4.00 914 4.00 1.40 After completing and printing this worksheet to a pdf, go to: https://maperture.digitaldataservices.com/gvh/?viewer=cswdif Create a new stormwater facility, and attach the PDF of this worksheet to that record. Routed Hydrograph Results Design Storm Return Period =WQCV 2 Year 5 Year 10 Year 50 Year 100 Year One-Hour Rainfall Depth =N/A 0.82 1.14 1.40 2.27 2.86 in CUHP Runoff Volume =0.008 0.014 0.020 0.025 0.042 0.053 acre-ft Inflow Hydrograph Volume =N/A 0.014 0.020 0.025 0.042 0.053 acre-ft Time to Drain 97% of Inflow Volume =1.0 2.3 2.3 2.3 2.3 2.2 hours Time to Drain 99% of Inflow Volume =1.3 2.7 2.7 2.7 2.6 2.6 hours Maximum Ponding Depth =0.58 0.28 0.37 0.43 0.77 1.03 ft Maximum Ponded Area =0.01 0.01 0.01 0.01 0.01 0.01 acres Maximum Volume Stored =0.008 0.004 0.005 0.006 0.010 0.014 acre-ft Once CUHP has been run and the Stage-Area-Discharge information has been provided, click 'Process Data' to interpolate the Stage-Area-Volume-Discharge data and generate summary results in the table below. Once this is complete, click 'Print to PDF'. Stormwater Detention and Infiltration Design Data Sheet Confluence Detention Vault Fort Collins, Colorado SDI-Design Data v2.00, Released January 2020 Location for 1-hr Rainfall Depths (use dropdown): After providing required inputs above including 1-hour rainfall depths, click 'Run CUHP' to generate runoff hydrographs using the embedded Colorado Urban Hydrograph Procedure. SDI_Design_Data_v2.00.xlsm, Design Data 7/30/2020, 11:38 AM Booleans for Message Booleans for CUHP Watershed L:W 1 CUHP Inputs Complete Watershed Lc:L 1 CUHP Results Calculated Watershed Slope FALSE Time Interval RunOnce 1 CountA 1 Draintime Coeff 0.8 User Precip 1 Equal SA Inputs 1 Equal SD Inputs 1 Stormwater Detention and Infiltration Design Data Sheet 0 0.2 0.4 0.6 0.8 1 1.2 0.1 1 10 FL O W [ c f s ] TIME [hr] 100YR IN 100YR OUT 50YR IN 50YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT WQCV IN WQCV OUT 0 0.2 0.4 0.6 0.8 1 1.2 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 100YR 50YR 10YR 5YR 2YR WQCV SDI_Design_Data_v2.00.xlsm, Design Data 7/30/2020, 11:38 AM This unofficial copy was downloaded on Jul-30-2020 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA