Loading...
HomeMy WebLinkAboutSite Certifications - 03/19/2024Wes Lamarque 3/19/2024 Page 2 B.Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2% grade requirement. 1.Low Flow: Choose one of the following detention basin low flow options as applicable: a. Turf swale for low flow path in detention basin. There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade is . b. Concrete pan for low flow in detention basin. There is a concrete pan installed that meets the grades as shown on the approved construction plans. (Show as-built spot elevations.) c. Soft pan for low flow in detention basin. •Verify and document the soft pan material gradation, trench width and depth - to be verified during construction by engineer. Picture documentation is preferred or engineer’s statement of visual inspection and compliance. (Choose one below.) o There is a soft pan with an underdrain installed that meets the design on the approved construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations, bends, cleanouts, etc.) o There is soft pan installed without an underdrain but there is a type A or B soil. The soil type must be documented by supplying verification from a registered professional geotechnical engineer. NOTE: Spot elevations are to be within 0.2 ft. +/-. 2. Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown. Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re- graded. Provide documentation if a variance was granted for steeper slopes during the design process. 3.Spillway: The following items must be field verified: a. The location of the spillway is indicated on the as-built plan. b. The width of the spillway is indicated on the as-built plan. c. The elevation(s) of the spillway is shown on the as-built plan. d. A concrete ribbon defines the location and grade of the spillway. e. There is downstream scour protection in the spillway as per the construction plans. Indicate type: (riprap size “D50” gradation and bedding type, geotextile, buried riprap with inches of bury, etc.). f. There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape features, rocks, etc. 11/19 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Page 3 4.Outlet Structure: a. The orifice plate for the approved release rate is installed with the correct size and location of the orifice. b. The orifice plate for the water quality outlet is installed with the correct hole size, number of rows and columns of holes. c. The bottom hole on both the water quality and quantity outlets are at the bottom of the plate so no water ponds in front of the plate. d. The well screen is the correct material and is installed as shown on the construction plans. e. 100-year overflow grate elevation is . (Elev. A on detail D-46) f. The top elevation of the water quality capture volume is . (Elev. B on detail D-46) g. Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the top and bolted at the bottom. h. The bottom of the outlet box has no obstructions or misalignments that will cause it to retain runoff water and is sloped at 2% towards outlet. II. Channels/Swales - FCSCM Ch. 8, Sec. 2.0 and Ch. 9, Sec. 5.0 A. Capacity: The as-built capacity of all the major channels and swales has been verified. They meet or exceed capacity requirements shown in the approved drainage study for this project. 1. All swales are located within the drainage easements as shown on the construction plans. 2. Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these criteria are not met, the certification engineer will write a justification and propose mitigation for each instance or have the issues corrected. If variances to these criteria have previously been approved and are shown on the construction plans, no justification is needed. 3. As-built spot elevations on channels/swales are shown that correspond to spot elevations shown on the approved construction plans. 4. All permanent erosion control measures are installed as shown on the approved construction plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used as part of this verification.) 5. All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the system. (Pictures at tie-in points suggested.) 6. The minimum freeboard is provided for all channels and swales as shown on the approved construction plans or as identified in the approved drainage study. (Show the freeboard provided on the cross-sections as on the construction plan set or attached as separate documentation.) 7. The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees, shrubs, sod, etc. infringe on the low flow portion of channels or swales.) 11/19 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Page 4 III. Storm Pipes (aka storm drains) - FCSCM Ch. 9, Sec. 4.0 A. Storm Drain Pipe Capacity: The as-built capacity of all pipes installed on this project has been verified and meets or exceeds the capacity requirements shown in the approved drainage study for this project. 1. All storm drain pipe sizes and materials have been verified and are in conformance with the approved construction plans. (Indicate on the plan and profile sheets that they have been verified.) Material and size substitutions must be approved prior to installation. If a pipe size or material was changed during construction, the certification engineer must attach the approval documents or supply them with this certification. Approval documents must include a calculation documenting the capacity equivalency (equal or greater) of the substituted size. 2. The longitudinal slope of the pipe is as shown on the approved construction plans. The acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans must be justified with capacity calculations on an attached sheet. 3. The as-built invert elevations have been verified and are shown on the plan and profile sheets of the approved construction plans. B.Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the approved construction plans and construction specifications. 1. The minimum cover requirements for all pipes have been met as shown on the approved construction plans. These will be called out in critical locations. 2. All encasements and clearances as specified on the approved construction plans have been met. 3. Any specific joint types or construction methods specified on the approved construction plans have been met. (List on a separate sheet and attach to this certification.) IV. Concrete Pans - FCSCM Ch. 8, Sec. 2.0 A. Construction/Installation: All concrete pans have been constructed in accordance with the approved construction plans. 1. The concrete pans are the correct size/width as shown on the approved construction plans. 2. The longitudinal slopes of the pans are as shown on the approved construction plans. The certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or justification by separate document. 3. The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross- section is “V” shaped and meets the side slope shown on the detail.) 4. The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4 inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide documentation of the reinforcement used if different than shown on the details or on the approved construction plans.) 5. The spot elevations shown on the concrete pan(s) have been verified and are shown on the as- built drawings. 11/19 Yes Yes Yes Yes Yes Yes N/A N/A N/A N/A N/A N/A N/A N/A Page 5 V.Storm Drain Inlets - FCSCM Ch. 9, Sec. 3.0 A. Construction/Installation: All storm drain inlets have been constructed in accordance with the approved construction plans and construction specifications. 1. The size and type of inlets are consistent with the inlets shown on the approved construction plan. Indicate by writing “Verified” on each inlet on the plan sheet or list on a separate document the inlet number(s), type and size (length). If the inlet installed is other than the one on the approved construction plan detail sheet, provide the name and source of the detail with justification for equal or better capacity. 2. The size of the inlet opening is consistent with the approved detail. (Check height and width.) 3. The elevation of the grate (if applicable) is at the elevation shown on the street profile or as indicated by a spot elevation on the construction plans. 4. The as-built invert elevations of all pipes entering and leaving the inlet are shown on the plan and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide justification and capacity calculations to show the capacity is not affected or propose mitigation. 5. The as-built size of the inlet box is as shown on the construction plans or an explanation or justification is attached. 6. All Type C, R, 13 and 16 inlet covers are stenciled or stamped with the following designation (or an equivalent): NO DUMPING – DRAINS TO POUDRE RIVER. VI. Culverts - FCSCM Ch. 9, Sec. 4.0 A. Construction/Installation: All culverts have been constructed and/or installed in accordance with the approved construction plans and construction specifications. 1. All culvert sizes have been verified as indicated on the as-built construction plans as correct. 2. The culvert material type for all culverts installed is as on the approved construction plans and is indicated on the as-built plans. 3. The as-built invert “in and out” elevations have been verified and are indicated on the as-built construction plans. 4. The culvert headwalls or wing walls have been installed as shown on the approved construction plans. Headwalls or wing walls may be needed in the as-built conditions onsite if the slopes adjacent to the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative. An alternative to consider is a turf reinforcement mat (TRM). VII. Sub-Drains A. Construction/Installation: All sub-drains shown on the construction plans have been installed in accordance with those plans and the construction specifications. Sub-drains installed with the sanitary sewer are to be verified on the sanitary sewer plan and profile sheets of the construction plans. (NOTE: Indicate any sub-drains installed after the plans were approved on the as-built plans.) 1. The size of the sub-drains are as approved on the construction plans and are indicated on the as- built plans. 2. The type of sub-drain, in particular the perforated and non-perforated sections of the drain, are as indicated on the approved construction plans. 11/19 Yes Yes Yes Yes Yes N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Page 6 3. The cover requirements per the construction plans are provided. 4. The cleanouts have been installed at the locations shown on the construction plans and are accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations marked.) 5. The backfill materials for sub-drains are as shown on the approved construction plans. (This includes the type, depth and width.) 6. The geo-textile liner completely wraps the sub-drain and the permeable backfill material unless shown otherwise on the approved construction plans. (Sub-drain pipe wrapped in a sock filter material is accepted only if approved prior to installation.) VIII. Curb Cuts A. Construction: All curb cut openings are constructed in accordance with the approved construction plans and construction specifications. 1. The size (width) of the curb cut opening is as shown on the approved construction plans. 2. The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb cut. IX. Sidewalk Culverts & Chases A. Construction/Installation: All sidewalk culverts have been installed at the locations shown on the approved construction plans. 1. The size (width and length) of the culverts are as shown on the approved construction plans. 2. The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the detail shown on the approved construction plans or per the City’s detail. 3. The sidewalk culvert invert “in and out” elevations have been verified and are indicated on the as-built plans. 4. The sidewalk culvert opening is as shown on the approved construction plans or per the City’s detail. 5. There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert. X.Site Grading - FCSCM Ch. 8 A. Construction: All common open spaces have been graded in accordance with the approved construction plans. 1. The grading on all common open spaces bordering private lots has been verified as correct and the as-built rear lot corner elevations have been shown on the as-built plans. 11/19 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Page 7 2. The as-built contours for “overlot grading” are shown on the as-built construction plans for all common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the situation for noncompliance and when it may be corrected. An escrow for overlot grading may be required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site Certification. It is understood that residential lots will be brought to final grade once the foundation is backfilled so they may be lower than the plan shows at this Overall Site Certification stage.) 3. All turf reinforcement mats (TRMs) have been installed as shown on the approved construction plans and the slopes are stabilized. XI. Permanent Erosion Control BMPs - FCSCM Ch. 9, Sec. 7.0 A. Construction: All permanent erosion control BMPs have been installed per the approved construction plans. 1. All riprap has been installed in the locations and sizes indicated on the approved construction plans. 2. All fabric has been installed in the locations and sizes indicated on the approved construction plans. a. All fabric was installed per the details on the approved construction plans. XII. Post-Construction Site Cleanup - FCSCM Ch. 3, Sec. 2.0 A. Construction: All construction debris and obstructions of any kind have been removed from drainage paths. 1. All construction debris has been removed except in staging area(s). 2. All ruts have been smoothed out in all construction areas. 3. All areas needing reseeding have been identified and future stabilization goals have been coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note the area needing stabilization in the narrative. XIII. Certification of LID and Water Quality Facilities - FCSCM Ch. 7 A. Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and other items to be verified during construction, along with pictures and other required documentation. B. Attached is verification of the rain garden and/or sand filter flat surface area(s) and ponding volume(s). This verification includes survey of critical elevations. C. Attached is verification of the underground infiltration required volume(s), weir elevations, orifices, inspection ports and filtering fabric. This verification includes survey of critical elevations. D. All visible LID design features were verified as part of the engineer's site visit. 11/19 N/A N/A Yes N/A N/A N/A Yes Yes Yes N/A Yes N/A N/A N/A 3/18/2024 DW UP 9+ 7 5 10 + 0 0 11+00 12+0012+00 EXISTING BUILDING FFE = 4954.2 20' DRAINAGE AND UTILITY EASEMENT EXISTING BURIED ELECTRIC BASIN 1 (24'' NYLOPLAST BASIN W/ DOMED GRATE) STA 10+00.16 N: 1453692.54 E: 3120276.88 53.3 LF 8" STORM 26.4 LF 8" STORM 11.25° BEND STA 10+53.49 N: 1453690.89 E: 3120330.18 90° BEND STA 10+79.93 N: 1453685.16 E: 3120356.00 9.9 LF 8" STORM BASIN 2 (24'' NYLOPLAST BASIN W/ SOLID LID) STA 10+98.10 N: 1453702.89 E: 3120359.93 14.8 LF 8" STORM BASIN 3 (24'' NYLOPLAST PERFORATED BASIN W/ STANDARD GRATE) STA 11+81.68 N: 1453684.77 E: 3120441.53 STA: 9+75.00 N: 1453668.87 E: 3120268.36 START ALIGNMENT STA: 12+00.00 N: 1453680.80 E: 3120459.41 END ALIGNMENT PROPOSED PERMEABLE DRAIN SECTION (SEE DETAIL ON THIS SHEET) STA: 11+15.04 N: 1453699.22 E: 3120376.48 BEGIN PERMEABLE DRAIN SECTION & PERFORATED PIPE SECTION STA: 11+73.99 N: 1453686.44 E: 3120434.02 END PERMEABLE DRAIN SECTION FFE=4950.70 FFE=4953.20 FFE=4949.20 PROPOSED BUILDING EXPANSION PROPOSED BULLPEN AREA PROPOSED AGGREGATE DRAIN SECTION (SEE DETAIL ON THIS SHEET) PROPOSED DRAINAGE & UTILITY EASEMENT CONNECT TO 4'' PVC TO BLDG ROOF DRAIN INV. OUT=4945.70 (N) 23.9 LF 4" PVC @ 6.06% 27.2 LF 4" PVC @ 5.34% CONNECT TO 4'' PVC TO BLDG ROOF DRAIN INV. OUT=4945.70 (N) 26.9 LF 8" STORM 41.9 LF 8" STORM 8''X4'' TEE INV.=4944.25 FG=4948.06 8''X4'' TEE INV.=4944.25 FG=4948.23 8.3 LF 8" STORM 8''X8'' TEE W/ 8''X4'' REDUCER (W) STA 10+89.83 N: 1453694.82 E: 3120358.14 1.7 LF 4" PVC @ 50.00% 9''X9'' DRAIN BASIN W/ GRATE (SEE NOTE 6) INV.=4945.67 FG=4948.07 STA: 9+75 - STA: 12+00 4940 4945 4950 4955 4960 4940 4945 4950 4955 4960 9+75 10+00 10+50 11+00 11+50 12+00 BA S I N 1 (2 4 ' ' N Y L O P L A S T B A S I N W/ D O M E D G R A T E ) ST A : 1 0 + 0 0 . 1 6 GR A T E 4 9 5 0 . 3 ± IN V . O U T 4 9 4 8 . 5 0 ( E ) SU M P 4 9 4 7 . 5 0 53.3 L F 8 " P V C @ 4 . 1 4 % 11 . 2 5 ° B E N D ST A : 1 0 + 5 3 . 4 9 IN V . 4 9 4 6 . 2 9 26.4 L F 8 " P V C @ 4 . 1 3 % 90 ° B E N D ST A : 1 0 + 7 9 . 9 3 9.9 LF 8" PVC @ 4.13% BA S I N 2 (2 4 ' ' N Y L O P L A S T B A S I N W/ S O L I D L I D ) ST A : 1 0 + 9 8 . 1 0 GR A T E 4 9 4 8 . 1 ± IN V . I N 4 9 4 4 . 4 5 ( S ) IN V . O U T 4 9 4 4 . 2 5 ( E ) 14.8 LF 8" PVC @ 0.00% BA S I N 3 (2 4 ' ' N Y L O P L A S T PE R F O R A T E D B A S I N W/ S T A N D A R D G R A T E ) ST A : 1 1 + 8 1 . 6 8 GR A T E 4 9 4 7 . 8 ± IN V . I N 4 9 4 4 . 2 5 ( W ) SU M P 4 9 4 3 . 2 5 PROPOSED GRADE EXISTING GROUND 41.9 LF 8" PVC @ 0.00% 8' ' X 4 ' ' T E E ST A : 1 1 + 1 2 . 8 8 IN V . I N 4 9 4 4 . 2 5 ( W ) IN V . I N 4 9 4 4 . 2 5 ( S ) IN V . O U T 4 9 4 4 . 2 5 ( E ) 8' ' X 4 ' ' T E E ST A : 1 1 + 3 9 . 7 5 IN V . I N 4 9 4 4 . 2 5 ( W ) IN V . I N 4 9 4 4 . 2 5 ( S ) IN V . O U T 4 9 4 4 . 2 5 ( E ) BEGIN PERFORATED PIPE SECTION END PERFORATED PIPE SECTION 26.9 LF 8" PVC @ 0.00% 17' 58.94' 8.3 LF 8" PVC @ 4.13% 8' ' X 8 ' ' T E E W/ 8 ' ' X 4 ' ' R E D U C E R ( W ) ST A : 1 0 + 8 9 . 8 3 1" = 20' 1" = 2' 3/ 1 5 / 2 0 2 4 12 : 0 9 : 2 0 P M C: \ U N I T E D C I V I L D R O P B O X \ P R O J E C T S \ U 2 2 0 3 0 - T R I P L E C R O W N S P O R T S \ C A D D \ C P \ R E C O R D D R A W I N G S \ C 3 . 1 0 - S T O R M P L A N & P R O F I L E . D W G C3 . 1 0 - S T O R M P L A N & P R O F I L E SM E JR S C3.10 ST O R M S E W E R P L A N & P R O F I L E 8 PR E P A R E D F O R : JOB NUMBER SHEET NUMBER SHEETSOF DA T E S U B M I T T E D : VERTICAL: HORIZONTAL: SCALE PR O J . M G R : DR A W I N G N A M E : PA T H : DE S I G N E R : DA T E : TI M E : Th e e n g i n e e r p r e p a r i n g t h e s e p l a n s w i l l n o t b e r e s p o n s i b l e f o r , o r l i a b l e f o r , un a u t h o r i z e d c h a n g e s t o o r u s e s o f t h e s e p l a n s . A l l c h a n g e s t o t h e p l a n s mu s t b e i n w r i t i n g a n d m u s t b e a p p r o v e d b y t h e p r e p a r e r o f t h e s e p l a n s . NO . BY DA T E CAUTION RE V I S I O N S : CIVIL ENGINEERING & CONSULTING UNITED CIVIL Design Group 19 OLD TOWN SQUARE #238 FORT COLLINS, CO 80524 (970) 530-4044 www.unitedcivil.com TR I P L E C R O W N S P O R T S U22030 TR I P L E C R O W N S P O R T S E X P A N S I O N 15 6/ 1 6 / 2 0 2 3 1/8/24 NO R T H 0 20'40' SCALE: 1" = 20' 10' 36" 48" VARIES (APPROX. 16") 8" PERFORATED PVC PIPE RESERVOIR AGGREGATE PER CITY OF FORT COLLINS SPECIFICATIONS (GRADATION ASTM #57 OR #67) EXISTING SOILS (TYP) 16" 12" PERMEABLE DRAIN SECTION NOT TO SCALE 48" VARIES (APPROX. 6") RESERVOIR AGGREGATE PER CITY OF FORT COLLINS SPECIFICATIONS (GRADATION ASTM #57 OR #67) GRAVEL SURFACE PER TRIPLE CROWN SPORTS SPECIFICATIONS EXISTING SOILS (TYP) AGGREGATE DRAIN SECTION NOT TO SCALE LEGEND DS DOMESTIC SERVICE LINE AND METER FIRE DEPARTMENT CONNECTION DOWNSPOUT, ROOF DRAIN, AND ROOF OVERFLOW STORM PIPE AND DRAIN BASIN ELECTRIC LINE AND TRANSFROMER GAS LINE AND METER LIGHT POLE RD OVF G FDC UTILITY NOTES 1.ALL EXISTING UTILITIES ARE APPROXIMATELY SHOWN AND LOCATIONS NEED TO BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. 2.THE PROPOSED CONSTRUCTION WILL BE IN CLOSE PROXIMITY TO SEVERAL UNDERGROUND UTILITIES. THE CONTRACTOR SHALL COORDINATE WITH ALL UTILITY PROVIDERS PRIOR TO AND DURING CONSTRUCTION TO MINIMIZE SERVICE INTERRUPTIONS TO SURROUNDING BUILDINGS OR PROPERTIES. 3.REFER TO APPROVED SITE ELECTRICAL PLANS FOR ALL LIGHTING, TELECOM CONDUITS (PHONE, TELEVISION AND FIBER) AND POWER LINE ROUTING FOR SITE LIGHTING. 4.THE CONTRACTOR SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) AT 811 OR 1-800-922-1987, TO HAVE LOCATIONS OF UNCC REGISTERED LINES MARKED BY MEMBER COMPANIES. ALL OTHER UNDERGROUND FACILITIES SHALL BE LOCATED BY CONTACTING THE RESPECTIVE OWNER. 5.THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION AND DEPTH OF ALL EXISTING UTILITIES AS NECESSARY TO ENSURE THE UTILITIES WILL NOT BE IMPACTED BY CONSTRUCTION ACTIVITIES. 6.INVERT SHOWN AT 9"X9" DRAIN BASIN IS INVERT AT 45° VERTICAL BEND ON 4" PVC LATERAL. BASIN TO BE CONNECTED VERTICALLY TO LATERAL W/ 4" PVC. SANITARY SERVICE AND CLEANOUT FIRE LINE PERMEABLE/BURIED AGGREGATE DRAIN SECTION PERFORATED GEOFABRIC 36" 48" VARIES (APPROX. 10") VARIES (APPROX. 16") 8" PERFORATED PVC PIPE RESERVOIR AGGREGATE PER CITY OF FORT COLLINS SPECIFICATIONS (GRADATION ASTM #57 OR #67) TURF SUBGRADE PER TRIPLE CROWN SPORTS SPECIFICATIONS FOR PLAYING SURFACE AREAS EXISTING SOILS (TYP) 16" 12" PERFORATED GEOFABRIC CONCRETE SIDEWALK JR S 9/ 2 9 / 2 0 2 3 RF I 1 2 - C O N C R E T E W A L L & R A M P R E V I S I O N S 1 1 1 2 JR S 3/ 1 5 / 2 0 2 4 ST O R M S E W E R A S - B U I L T 2 RECORD DRAWING THESE RECORD DRAWINGS, PRODUCED BY UNITED CIVIL DESIGN GROUP LLC, ARE BASED ON FIELD INFORMATION GATHERED BY OTHERS. UNITED CIVIL DESIGN GROUP LLC, ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. EXISTING BUILDING FFE = 4954.2 AU T O M A T I O N W A Y EXISTING 2' CONCRETE PAN 20' DRAINAGE AND UTILITY EASEMENT 15' UTILITY EASEMENT 9' UTILITY EASEMENT EXISTING SOFTBALL FIELD EXISTING SOFTBALL FIELD EXISTING 3.8' CONCRETE PAN EXISTING HEADWALL EXISTING 3.8' CONCRETE PAN HEADWALL AND 15" RCP STORM DRAIN EXISTING GRAVEL & CONCRETE STAIRS GRASS FIELD EXISTING GRAVEL STORAGE AREA EXISTING 1.8' CONCRETE PAN EXISTING HEADWALL AND 24" RCP STORM DRAIN EXISTING 2' CONCRETE PAN EXISTING 5' PUBLIC SERVICE COMPANY EASEMENT EXISTING 24" RCP STORM DRAIN EXISTING 15" RCP STORM DRAIN EXISTING 5' TYPE R INLET EXISTING 5' TYPE R INLET TI M B E R L I N E R O A D PROPOSED BUILDING ADDITION EXISTING DUG OUT LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE EXISTING 2' CONCRETE PAN NORTH GRADING DETAIL (SEE SHEET C4.01) SOUTH GRADING DETAIL (SEE SHEET C4.01) PROPOSED DRAINAGE & UTILITY EASEMENT EXISTING TREE CRITICAL ROOT ZONE (TYP) EXISTING TREE CRITICAL ROOT ZONE (TYP) EXISTING TREE CRITICAL ROOT ZONE (TYP) 1" = 30' 1" = N/A 6/ 1 6 / 2 0 2 3 3: 1 4 : 1 5 P M C: \ U N I T E D C I V I L D R O P B O X \ P R O J E C T S \ U 2 2 0 3 0 - T R I P L E C R O W N S P O R T S \ C A D D \ C P \ C 4 . 0 0 - G R A D I N G & E R O S I O N C O N T R O L P L A N . D W G C4 . 0 0 - G R A D I N G & E R O S I O N C O N T R O L P L A N SM E JR S C4.00 OV E R A L L G R A D I N G & E R O S I O N C O N T R O L P L A N 9 PR E P A R E D F O R : JOB NUMBER SHEET NUMBER SHEETSOF DA T E S U B M I T T E D : VERTICAL: HORIZONTAL: SCALE PR O J . M G R : DR A W I N G N A M E : PA T H : DE S I G N E R : DA T E : TI M E : Th e e n g i n e e r p r e p a r i n g t h e s e p l a n s w i l l n o t b e r e s p o n s i b l e f o r , o r l i a b l e f o r , un a u t h o r i z e d c h a n g e s t o o r u s e s o f t h e s e p l a n s . A l l c h a n g e s t o t h e p l a n s mu s t b e i n w r i t i n g a n d m u s t b e a p p r o v e d b y t h e p r e p a r e r o f t h e s e p l a n s . NO . BY DA T E CAUTION RE V I S I O N S : CIVIL ENGINEERING & CONSULTING UNITED CIVIL Design Group 19 OLD TOWN SQUARE #238 FORT COLLINS, CO 80524 (970) 530-4044 www.unitedcivil.com TR I P L E C R O W N S P O R T S U22030 TR I P L E C R O W N S P O R T S E X P A N S I O N 15 6/ 1 6 / 2 0 2 3 6/16/23 NO R T H 0 30'60' SCALE: 1" = 30' 15' LEGEND NOTES 1.THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE FIELD CONDITIONS ARE AS SHOWN IN THE DRAWINGS. IF THE CONTRACTOR FINDS DISCREPANCIES THE CONTRACTOR SHALL CONTACT THE ENGINEER. 2.SEE SOILS REPORT FOR PAVEMENT AND FOUNDATION PREPARATION, DESIGN AND RECOMMENDATIONS. 3.EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 4.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 5.THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, PAVEMENT, PRIVATE FENCES, ABOVE GROUND OR UNDERGROUND UTILITIES, STRUCTURES, AND UNDERGROUND FOUNDATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 6.ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS. EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 7.CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 8.SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON SEEDING/PLANTING, REVEGETATION, IRRIGATION, HARDSCAPE AND OTHER TEMPORARY AND PERMANENT SITE STABILIZATION METHODS. 9.ALL SPOT ELEVATIONS SHOWN ADJACENT TO PAVEMENT ARE TO FLOWLINE, EDGE OF WALK OR EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. 10.SEDIMENT CONTROL LOGS MAY BE USED IN LIEU OF SILT FENCE. SWALE FLOWLINE INLET PROTECTION ROCK SOCK CONCRETE WASHOUT AREA SILT FENCE VEHICLE TRACKING CONTROL 90. 3 0 PROPOSED SPOT ELEVATION FFE = FINISHED FLOOR ELEVATION FG = FINISHED GRADE AT EXTERIOR WALL EOP = EDGE OF PAVEMENT LP = LOW POINT HP = HIGH POINT TOW = TOP OF WALL BOW = BOTTOM OF WALL 3.1 3 EXISTING GRADE 10.0%4.0:1 (10.0%)(4.0:1) PROPOSED SLOPE EXISTING SLOPE PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR STORM SEWER GRADE BREAK LIMITS OF DISTURBANCE CATCH CURB & GUTTER SPILL CURB & GUTTER PERMANENT SEEDING EROSION CONTROL NOTES 1.TOTAL DISTURBED AREA = 17,424 SF (0.40 ACRES). 2.THE SITE WILL BE LANDSCAPED TO FINAL STABILIZATION. SEE FINAL LANDSCAPE PLAN FOR DETAILS. 3.REFER TO SHEET C0.01 FOR STANDARD EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES. 4.EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 5.PERMANENT SITE STABILIZATION SHALL BE DONE IN ACCORDANCE WITH THE APPROVED LANDSCAPE PLAN FOR THIS DEVELOPMENT. 6.ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. THE ITEMS MAY INCLUDE BUT ARE NOT LIMITED TO VEHICLE TRACKING CONTROL, SILT FENCE, CONSTRUCTION FENCE, CONCRETE WASHOUT, AND SEDIMENT TRAP. 7.SOIL AMENDMENTS SHALL BE INCORPORATED IN ALL LANDSCAPE AREAS TO A DEPTH OF 6" AT A RATE OF 3 CUBIC YARDS PER 1000 SQUARE FEET OF AREA -OR- 4" OF LOOSE TOPSOIL IMPORTED ONTO THE SITE OVER 4" OF LOOSENED SUBGRADE SOILS. REFER TO CITY OF FORT COLLINS CODE SECTIONS 12-130 THROUGH 12-132. 8.TEMPORARY SEEDING SHALL BE UTILIZED IN THE EVENT THAT A GRADED AREA IS EXPOSED LONGER THAN 30 DAYS. THE SITE SHALL BE SEEDED WITH THE APPROPRIATE SEED MIX AND INSTALLATION METHOD AS SPECIFIED ON THE APPROVED LANDSACPE PLANS. 9.A COMMERCIAL FERTILIZER WITH THE FOLLOWING SPECS SHALL BE USED: INGREDIENT % AVAILABLE BY WEIGHT APPLICATION RATE IN LBS/ACRE NITROGEN 13 65 POTASSIUM 16 80 POTASSIUM M 120 PROJECT:TRIPLE CROWN SPORTS EXPANSION BEST MANAGEMENT PRACTICE ITEM: PRESERVE EXISTING VEGETATION STAGING AREAS (if applicable) CONSTRUCTION FENCE (if applicable) INLET PROTECTION ROCK SOCKS SILT FENCE CONCRETE WASHOUT AREA VEHICLE TRACKING CONTROL 1.COLUMNS SHOWN BELOW FOR TEMPORARY EROSION CONTROL ITEMS REPRESENT PHASE OF CONSTRUCTION INCREMENTS, NOT SPECIFIC TIME DURATIONS. 2.CONTRACTOR IS RESPONSIBLE FOR REGULAR MAINTENANCE OF ALL BMPs. MOBILIZATIONDEMOLITION SITE GRADING & UTILITIES FINAL LANDSCAPING & STABILIZATIONPHASE OF CONSTRUCTION EROSION CONTROL SEQUENCING VERTICAL CONST. & PAVING EROSION CONTROL CALCULATIONS TOTAL AREA OF DISTURBANCE 0.39 ACRES TOTAL "ONSITE" AREA OF DISTURBANCE 0.39 ACRES TOTAL "OFFSITE" AREA OF DISTURBANCE 0.00 ACRES TOTAL STORAGE/STAGING AREA 0.01 ACRES TOTAL HAUL ROADS AREA N/A CONSTRUCTION VEHICLE TRAFFIC AREA N/A APPROX. % OF PROJECT DISTURBED AT ANY TIME 100% ESTIMATED PRE-EXISTING % VEGETATIVE COVER 60% EXISTING SOIL TYPE TYPE C/NUNN CLAY LOAM DEPTH TO GROUNDWATER 7 FEET NUMBER OF PROJECT PHASES N/A TOTAL VOLUME OF MATERIAL IMPORT/EXPORT 40 CY TOTAL AREA OF OFFSITE STOCKPILING OF FILL/BORROW 0 STEEPEST SLOPE (H:V)4:1 DISTANCE FROM A RIPARIAN OR SENSITIVE AREA N/A FFE=4950.70 FFE=4953.20 EXISTING DUG OUT 50.35 48 . 1 2 48.84 48.63 49.6 8 49 . 5 4 49 . 9 3 49.94 LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE PROPOSED DRAINAGE & UTILITY EASEMENT EXISTING BUILDING FFE = 4954.2 PROPOSED BUILDING ADDITION 50. 1 8 50 . 7 0 52. 1 5 53.9 6 52. 1 5 53. 2 0 49. 2 0 49. 2 0 48. 3 1 48 . 0 9 48. 1 7 F G 48 . 1 5 48. 1 5 F G 48 . 1 0 48.00 48.20 48 . 4 4 48 . 2 0 48. 0 8 48. 0 5 49. 1 2 F G 48. 2 0 48. 1 3 53.1853. 0 8 53 . 2 0 51.4850. 8 6 50.54 50. 5 2 50. 0 7 49 . 2 5 48.29 BTM 49 . 9 0 49 . 8 0 49.80 51 . 4 8 B T M 51. 5 2 B T M 49.10 BTM 48.37 BTM 48. 2 7 48.37 49 . 9 0 48 . 4 7 53 . 1 0 49. 9 4 49. 9 5 49. 8 8 49. 4 9 49.5 8 48 . 2 1 48 . 3 1 F G 48. 3 3 F G 48. 3 3 F G 48 . 3 1 F G 48. 3 3 F G 48. 3 3 F G 48. 5 4 F G 51.0 0 48 . 1 3 48 . 5 9 48 . 1 5 48 . 0 3 48. 1 0 47 . 9 9 54 . 1 4 53.9 8 53.20 53.20 53.08 53. 0 8 48 . 3 1 (2) 6" RISERS (7) 7" RISERS (2) 4.5" RISERS PROPOSED BULLPEN AREA FFE=4949.20 53. 9 4 53.92 52 . 1 5 52. 1 7 50 . 9 1 51 . 0 1 52 . 1 5 52. 1 7 50 . 3 6 53 . 2 0 49.20 49.07 49.10 52 . 7 7 49.90 B T M 49 . 0 7 B T M 49 . 1 0 B T M 51 . 4 8 51 . 4 8 52 . 0 4 52 . 0 4 51.52 BTM50 . 9 2 50. 8 3 49 . 3 1 49. 3 2 7.4% 7.8 % 8.3% 2.0 % 2.0% 5.0% 2. 0 % 2. 6 % 2.0 % 0.7% 2. 0 % 48.11 48.20 48. 0 3 48 . 0 2 48. 2 0 47.44 47.32 47.38 48.07 47.43 47.3 1 47.3 7 50.42 50.18 50.70PROPOSED FLOOD PROOF FLUSH HOLLOW METAL DOOR (SEE ARCHITECTURAL PLANS) 51.76 51.80 51.52 51.42 52.01 52.03 53.48 53.39 8.3% 8.6% 2.3% 3.3% (7.9% ) (8.7% ) (9.3%) (3.3%) (4.2%) (4.2%) 0.2 % 0.7 % MATCH EXISTING CURB LIMITS OF ASPHALT REMOVAL (TYP) LIMITS OF ASPHALT REMOVAL (TYP) MATCH EXISTING CURB & GUTTER MATCH EXISTING CURB & GUTTER RECONSTRUCTED 2' CONCRETE PAN MATCH EXISTING CURB MATCH EXISTING CURB MATCH EXISTING CURB MATCH EXISTING SIDEWALK PROPOSED RAMP 52 . 8 3 53 . 1 3 52 . 8 1 52.4 5 51.9 3 52.3 8 53 . 9 1 53.41 52 . 0 9 52 . 2 3 53.91 52. 3 5 52.43 52 . 4 3 52.89 52. 3 0 52.93 TBC 53 . 2 7 52. 5 8 52.50 53. 5 6 53.77 T B C 53 . 3 0 53 . 9 1 MATCH EXISTING SIDEWALK 52 . 8 4 52.1 0 51.8 4 52 . 8 9 52 . 9 6 52.93 53.40 53.90 TBC 53 . 1 1 53 . 4 7 53. 5 8 53.77 53. 8 9 53 . 9 7 T B C 53.61 TBC 53.51 52 . 9 4 52. 4 5 52.57 52. 1 9 52. 9 5 MATCH EXISTING CURB 53 . 0 6 52 . 8 4 52.72 53. 0 6 54.3 3 54 . 2 1 54.17 54.09 54 . 1 9 54 . 0 8 53. 9 9 53. 7 7 53 . 8 6 52. 9 8 53. 0 0 52.69 52.81 1.3% 2.0 % 1.7% 1.9 % 2.0% 1.5 % 3.3 % 2.0 % 2.5% 2. 0 % 1.8% 2.0 % 15 . 2 % 1.7 % 1.7 % 1.0% 4.2% 4.0 % 6.7% 10.2% 7.6 % (2.7 % ) (5.2%) (4.8%) (9.3 % ) 1. 6 % 2.1 % 2.8% 4.0 % 1.9% 0.0 % 2.0%4.8% 3.1% 1.4% 0.1 % 2.5% 2.8% 4.4% 5.7% 6.0 % 1.3% 1.3% 52. 3 7 51. 9 3 1.2% 53.00 52.98 53. 0 8 53. 1 953. 1 5 53.30 T B C 53.48 T B C PROPOSED CURB (HEIGHT VARIES; MATCH EXISTING GROUND) 53. 3 5 53. 4 2 53. 5 1 53. 3 8 53. 2 9 T B C 1.5 % 2.5% 1.4 % 1.5 % 52.602.5% 53.45 53.45 53 . 8 9 T B C 54.00 (3 . 3 % ) (3 . 2 % ) (2. 6 % ) 53.83 53.89 9.0 % 53.50 53 . 9 7 T B C (8.0 % ) (6.7% ) (2.6%) (3.0%) 54.0253.89 53.76 GRADE BREAK MATCH EXISTING RAMP AT OUTSIDE OF CMU WALL (SEE ARCH. PLANS) 1.9 % 1" = ##' 1" = N/A 6/ 1 6 / 2 0 2 3 3: 1 4 : 2 2 P M C: \ U N I T E D C I V I L D R O P B O X \ P R O J E C T S \ U 2 2 0 3 0 - T R I P L E C R O W N S P O R T S \ C A D D \ C P \ C 4 . 0 0 - G R A D I N G & E R O S I O N C O N T R O L P L A N . D W G C4 . 0 0 - G R A D I N G & E R O S I O N C O N T R O L P L A N SM E JR S C4.01 DE T A I L E D G R A D I N G P L A N 10 PR E P A R E D F O R : JOB NUMBER SHEET NUMBER SHEETSOF DA T E S U B M I T T E D : VERTICAL: HORIZONTAL: SCALE PR O J . M G R : DR A W I N G N A M E : PA T H : DE S I G N E R : DA T E : TI M E : Th e e n g i n e e r p r e p a r i n g t h e s e p l a n s w i l l n o t b e r e s p o n s i b l e f o r , o r l i a b l e f o r , un a u t h o r i z e d c h a n g e s t o o r u s e s o f t h e s e p l a n s . A l l c h a n g e s t o t h e p l a n s mu s t b e i n w r i t i n g a n d m u s t b e a p p r o v e d b y t h e p r e p a r e r o f t h e s e p l a n s . NO . BY DA T E CAUTION RE V I S I O N S : CIVIL ENGINEERING & CONSULTING UNITED CIVIL Design Group 19 OLD TOWN SQUARE #238 FORT COLLINS, CO 80524 (970) 530-4044 www.unitedcivil.com TR I P L E C R O W N S P O R T S U22030 TR I P L E C R O W N S P O R T S E X P A N S I O N 15 6/ 1 6 / 2 0 2 3 6/16/23 NO R T H 0 ##'##' SCALE: 1" = ##' #' LEGEND NOTES 1.THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE FIELD CONDITIONS ARE AS SHOWN IN THE DRAWINGS. IF THE CONTRACTOR FINDS DISCREPANCIES THE CONTRACTOR SHALL CONTACT THE ENGINEER. 2.SEE SOILS REPORT FOR PAVEMENT AND FOUNDATION PREPARATION, DESIGN AND RECOMMENDATIONS. 3.EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 4.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 5.THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, PAVEMENT, PRIVATE FENCES, ABOVE GROUND OR UNDERGROUND UTILITIES, STRUCTURES, AND UNDERGROUND FOUNDATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 6.ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS. EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 7.CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 8.SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON SEEDING/PLANTING, REVEGETATION, IRRIGATION, HARDSCAPE AND OTHER TEMPORARY AND PERMANENT SITE STABILIZATION METHODS. 9.ALL SPOT ELEVATIONS SHOWN ADJACENT TO PAVEMENT ARE TO FLOWLINE, EDGE OF WALK OR EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. 10.SEDIMENT CONTROL LOGS MAY BE USED IN LIEU OF SILT FENCE. SWALE FLOWLINE INLET PROTECTION ROCK SOCK CONCRETE WASHOUT AREA SILT FENCE VEHICLE TRACKING CONTROL 90. 3 0 PROPOSED SPOT ELEVATION FFE = FINISHED FLOOR ELEVATION FG = FINISHED GRADE AT EXTERIOR WALL EOP = EDGE OF PAVEMENT LP = LOW POINT HP = HIGH POINT TOW = TOP OF WALL BOW = BOTTOM OF WALL 3.1 3 EXISTING GRADE 10.0%4.0:1 (10.0%)(4.0:1) PROPOSED SLOPE EXISTING SLOPE PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR STORM SEWER GRADE BREAK LIMITS OF DISTURBANCE CATCH CURB & GUTTER SPILL CURB & GUTTER PERMANENT SEEDING NORTH GRADING DETAIL SCALE: 1" = 10' SOUTH GRADING DETAIL SCALE: 1" = 10' 13 3 0 . 1 2 ' UP DW UP EXISTING BUILDING FFE = 4954.2 AU T O M A T I O N W A Y EXISTING 2' CONCRETE PAN 20' DRAINAGE AND UTILITY EASEMENT 15' UTILITY EASEMENT 9' UTILITY EASEMENT EXISTING SOFTBALL FIELD EXISTING SOFTBALL FIELD EXISTING 3.8' CONCRETE PAN EXISTING HEADWALL EXISTING 3.8' CONCRETE PAN HEADWALL AND 15" RCP STORM DRAIN EXISTING GRAVEL & CONCRETE STAIRS GRASS FIELD EXISTING GRAVEL STORAGE AREA EXISTING 1.8' CONCRETE PAN EXISTING HEADWALL AND 24" RCP STORM DRAIN EXISTING 2' CONCRETE PAN EXISTING 5' PUBLIC SERVICE COMPANY EASEMENT EXISTING 24" RCP STORM DRAIN EXISTING 15" RCP STORM DRAIN EXISTING 5' TYPE R INLET EXISTING 5' TYPE R INLET TI M B E R L I N E R O A D PROPOSED BUILDING ADDITION EXISTING DUG OUT LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE EXISTING 2' CONCRETE PAN NORTH GRADING DETAIL (SEE SHEET C4.01) SOUTH GRADING DETAIL (SEE SHEET C4.01) PROPOSED DRAINAGE & UTILITY EASEMENT EXISTING TREE CRITICAL ROOT ZONE (TYP) EXISTING TREE CRITICAL ROOT ZONE (TYP) EXISTING TREE CRITICAL ROOT ZONE (TYP) 1" = 30' 1" = N/A 3/ 1 5 / 2 0 2 4 12 : 0 0 : 0 4 P M C: \ U N I T E D C I V I L D R O P B O X \ P R O J E C T S \ U 2 2 0 3 0 - T R I P L E C R O W N S P O R T S \ C A D D \ C P \ R E C O R D D R A W I N G S \ C 4 . 0 0 - G R A D I N G & E R O S I O N C O N T R O L P L A N . D W G C4 . 0 0 - G R A D I N G & E R O S I O N C O N T R O L P L A N SM E JR S C4.00 OV E R A L L G R A D I N G & E R O S I O N C O N T R O L P L A N 9 PR E P A R E D F O R : JOB NUMBER SHEET NUMBER SHEETSOF DA T E S U B M I T T E D : VERTICAL: HORIZONTAL: SCALE PR O J . M G R : DR A W I N G N A M E : PA T H : DE S I G N E R : DA T E : TI M E : Th e e n g i n e e r p r e p a r i n g t h e s e p l a n s w i l l n o t b e r e s p o n s i b l e f o r , o r l i a b l e f o r , un a u t h o r i z e d c h a n g e s t o o r u s e s o f t h e s e p l a n s . A l l c h a n g e s t o t h e p l a n s mu s t b e i n w r i t i n g a n d m u s t b e a p p r o v e d b y t h e p r e p a r e r o f t h e s e p l a n s . NO . BY DA T E CAUTION RE V I S I O N S : CIVIL ENGINEERING & CONSULTING UNITED CIVIL Design Group 19 OLD TOWN SQUARE #238 FORT COLLINS, CO 80524 (970) 530-4044 www.unitedcivil.com TR I P L E C R O W N S P O R T S U22030 TR I P L E C R O W N S P O R T S E X P A N S I O N 15 6/ 1 6 / 2 0 2 3 1/8/24 NO R T H 0 30'60' SCALE: 1" = 30' 15' LEGEND NOTES 1.THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE FIELD CONDITIONS ARE AS SHOWN IN THE DRAWINGS. IF THE CONTRACTOR FINDS DISCREPANCIES THE CONTRACTOR SHALL CONTACT THE ENGINEER. 2.SEE SOILS REPORT FOR PAVEMENT AND FOUNDATION PREPARATION, DESIGN AND RECOMMENDATIONS. 3.EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 4.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 5.THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, PAVEMENT, PRIVATE FENCES, ABOVE GROUND OR UNDERGROUND UTILITIES, STRUCTURES, AND UNDERGROUND FOUNDATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 6.ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS. EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 7.CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 8.SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON SEEDING/PLANTING, REVEGETATION, IRRIGATION, HARDSCAPE AND OTHER TEMPORARY AND PERMANENT SITE STABILIZATION METHODS. 9.ALL SPOT ELEVATIONS SHOWN ADJACENT TO PAVEMENT ARE TO FLOWLINE, EDGE OF WALK OR EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. 10.SEDIMENT CONTROL LOGS MAY BE USED IN LIEU OF SILT FENCE. SWALE FLOWLINE INLET PROTECTION ROCK SOCK CONCRETE WASHOUT AREA SILT FENCE VEHICLE TRACKING CONTROL 90. 3 0 PROPOSED SPOT ELEVATION FFE = FINISHED FLOOR ELEVATION FG = FINISHED GRADE AT EXTERIOR WALL EOP = EDGE OF PAVEMENT LP = LOW POINT HP = HIGH POINT TOW = TOP OF WALL BOW = BOTTOM OF WALL 3.1 3 EXISTING GRADE 10.0%4.0:1 (10.0%)(4.0:1) PROPOSED SLOPE EXISTING SLOPE PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR STORM SEWER GRADE BREAK LIMITS OF DISTURBANCE CATCH CURB & GUTTER SPILL CURB & GUTTER PERMANENT SEEDING EROSION CONTROL NOTES 1.TOTAL DISTURBED AREA = 17,424 SF (0.40 ACRES). 2.THE SITE WILL BE LANDSCAPED TO FINAL STABILIZATION. SEE FINAL LANDSCAPE PLAN FOR DETAILS. 3.REFER TO SHEET C0.01 FOR STANDARD EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES. 4.EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 5.PERMANENT SITE STABILIZATION SHALL BE DONE IN ACCORDANCE WITH THE APPROVED LANDSCAPE PLAN FOR THIS DEVELOPMENT. 6.ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. THE ITEMS MAY INCLUDE BUT ARE NOT LIMITED TO VEHICLE TRACKING CONTROL, SILT FENCE, CONSTRUCTION FENCE, CONCRETE WASHOUT, AND SEDIMENT TRAP. 7.SOIL AMENDMENTS SHALL BE INCORPORATED IN ALL LANDSCAPE AREAS TO A DEPTH OF 6" AT A RATE OF 3 CUBIC YARDS PER 1000 SQUARE FEET OF AREA -OR- 4" OF LOOSE TOPSOIL IMPORTED ONTO THE SITE OVER 4" OF LOOSENED SUBGRADE SOILS. REFER TO CITY OF FORT COLLINS CODE SECTIONS 12-130 THROUGH 12-132. 8.TEMPORARY SEEDING SHALL BE UTILIZED IN THE EVENT THAT A GRADED AREA IS EXPOSED LONGER THAN 30 DAYS. THE SITE SHALL BE SEEDED WITH THE APPROPRIATE SEED MIX AND INSTALLATION METHOD AS SPECIFIED ON THE APPROVED LANDSACPE PLANS. 9.A COMMERCIAL FERTILIZER WITH THE FOLLOWING SPECS SHALL BE USED: INGREDIENT % AVAILABLE BY WEIGHT APPLICATION RATE IN LBS/ACRE NITROGEN 13 65 POTASSIUM 16 80 POTASSIUM M 120 PROJECT:TRIPLE CROWN SPORTS EXPANSION BEST MANAGEMENT PRACTICE ITEM: PRESERVE EXISTING VEGETATION STAGING AREAS (if applicable) CONSTRUCTION FENCE (if applicable) INLET PROTECTION ROCK SOCKS SILT FENCE CONCRETE WASHOUT AREA VEHICLE TRACKING CONTROL 1.COLUMNS SHOWN BELOW FOR TEMPORARY EROSION CONTROL ITEMS REPRESENT PHASE OF CONSTRUCTION INCREMENTS, NOT SPECIFIC TIME DURATIONS. 2.CONTRACTOR IS RESPONSIBLE FOR REGULAR MAINTENANCE OF ALL BMPs. MOBILIZATIONDEMOLITION SITE GRADING & UTILITIES FINAL LANDSCAPING & STABILIZATIONPHASE OF CONSTRUCTION EROSION CONTROL SEQUENCING VERTICAL CONST. & PAVING EROSION CONTROL CALCULATIONS TOTAL AREA OF DISTURBANCE 0.39 ACRES TOTAL "ONSITE" AREA OF DISTURBANCE 0.39 ACRES TOTAL "OFFSITE" AREA OF DISTURBANCE 0.00 ACRES TOTAL STORAGE/STAGING AREA 0.01 ACRES TOTAL HAUL ROADS AREA N/A CONSTRUCTION VEHICLE TRAFFIC AREA N/A APPROX. % OF PROJECT DISTURBED AT ANY TIME 100% ESTIMATED PRE-EXISTING % VEGETATIVE COVER 60% EXISTING SOIL TYPE TYPE C/NUNN CLAY LOAM DEPTH TO GROUNDWATER 7 FEET NUMBER OF PROJECT PHASES N/A TOTAL VOLUME OF MATERIAL IMPORT/EXPORT 40 CY TOTAL AREA OF OFFSITE STOCKPILING OF FILL/BORROW 0 STEEPEST SLOPE (H:V)4:1 DISTANCE FROM A RIPARIAN OR SENSITIVE AREA N/A JR S 9/ 2 9 / 2 0 2 3 RF I 1 2 - C O N C R E T E W A L L & R A M P R E V I S I O N S 1 1 2 JR S 3/ 1 4 / 2 0 2 4 SI T E & D R A I N A G E C E R T I F I C A T I O N 2 RECORD DRAWING THESE RECORD DRAWINGS, PRODUCED BY UNITED CIVIL DESIGN GROUP LLC, ARE BASED ON FIELD INFORMATION GATHERED BY OTHERS. UNITED CIVIL DESIGN GROUP LLC, ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. UP FFE=4950.70 FFE=4953.20 EXISTING DUG OUT 48 . 1 2 48.84 48.63 49.6 8 49 . 5 4 49 . 9 3 49.94 LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE PROPOSED DRAINAGE & UTILITY EASEMENT EXISTING BUILDING FFE = 4954.2 PROPOSED BUILDING ADDITION 49. 8 0 50 . 2 0 53.9 6 52. 1 5 53. 2 0 48. 8 4 48. 3 3 48 . 0 9 48. 1 7 F G 48 . 1 5 48. 1 5 F G 48 . 1 0 48.00 48.20 48 . 4 4 48 . 2 0 48. 0 8 48. 0 5 49. 1 2 F G 48. 2 0 48. 1 3 53.1853. 0 8 53 . 2 0 48.71 49 . 6 2 48. 2 1 53 . 1 0 49. 8 4 49. 6 4 49. 5 0 49.5 8 48 . 2 1 48 . 3 1 F G 48. 3 3 F G 48. 3 3 F G 48 . 3 1 F G 48. 3 3 F G 48. 3 3 F G 48. 5 4 F G 51.0 0 48 . 0 9 48. 2 5 48. 0 7 48 . 0 3 48. 1 0 47 . 9 9 54 . 1 4 53.9 8 53.20 53.20 53.08 53. 0 8 48 . 3 1 6" TO 7" RISER (8) 6.5" RISERS (2) 4.5" RISERS PROPOSED BULLPEN AREA FFE=4949.20 53. 9 4 53.92 52 . 1 5 52. 1 7 51 . 4 1 52 . 1 5 52. 1 7 50 . 3 6 53 . 2 0 48.91 48.80 52 . 0 4 52 . 0 4 51 . 3 1 50. 1 3 49 . 1 6 48 . 7 5 7.4% 7.8 % 8.1% 2.0 % 7.9%3.2% 2. 0 % 2. 6 % 2.0 % 0.7% 1. 9 % 48.11 48. 2 0 48. 0 3 48 . 0 2 48. 2 0 48.07 47.43 47.3 1 47.3 7 50.42 50.18 50.70PROPOSED FLOOD PROOF FLUSH HOLLOW METAL DOOR (SEE ARCHITECTURAL PLANS) 53.48 53.39 8.3% 8.6% 2.3% 3.3% 0.7 % MATCH EXISTING CURB LIMITS OF ASPHALT REMOVAL (TYP) LIMITS OF ASPHALT REMOVAL (TYP) MATCH EXISTING CURB & GUTTER MATCH EXISTING CURB & GUTTER 49. 9 0 49 . 5 7 48. 3 2 48.81 48.39 48 . 4 2 48 . 4 9 48. 5 0 48 . 4 6 51 . 6 7 51 . 5 7 2. 0 % 49. 7 1 48 . 8 9 49. 2 4 2.1%48.97 48.65 48.60 48. 1 0 47 . 9 8 50.58 50.54 48 . 1 0 48 . 0 7 47 . 8 6 48 . 0 1 48 . 0 2 47 . 9 1 48. 1 5 48. 2 6 48. 4 1 48. 2 9 50. 2 6 48 . 5 2 48. 0 2 UP RECONSTRUCTED 2' CONCRETE PAN MATCH EXISTING CURB MATCH EXISTING CURB MATCH EXISTING CURB MATCH EXISTING SIDEWALK PROPOSED RAMP 52 . 8 3 53 . 1 3 52.3 8 53 . 9 1 53.41 53.91 52. 3 5 52.43 52 . 4 3 52.89 52. 3 0 52.93 TBC 53 . 2 7 52. 5 8 52.50 53. 5 6 53.77 T B C 53 . 3 0 53 . 9 1 MATCH EXISTING SIDEWALK 52 . 8 4 52 . 9 6 52.93 53.40 53.90 TBC 53 . 1 1 53 . 4 7 53. 5 8 53.77 53. 8 9 53 . 9 7 T B C 53.61 TBC 53.51 52 . 9 4 52. 4 5 52.57 52. 1 9 52. 9 5 MATCH EXISTING CURB 53 . 0 6 52 . 8 4 52.72 53. 0 6 54.3 3 54 . 2 1 54.17 54.09 54 . 1 9 54 . 0 8 53. 9 9 53. 7 7 53 . 8 6 52. 9 8 53. 0 0 52.69 52.81 1.3% 2.0 % 1.7% 1.9 % 2.0% 1.5 % 2.0 % 2.5% 2. 0 % 1.8% 2.0 % 15 . 2 % 1.7 % 1.7% 1.0% 4.2% 4.0 % 6.7% 7.6 % 1. 6 % 2.1 % 4.0 % 1.9% 0.0 % 2.0%4.8% 3.1% 1.4% 0.1 % 2.5% 2.8% 4.4% 5.7% 6.0 % 1.3% 1.3% 52. 3 7 51. 9 3 1.2% 53. 0 8 53. 1 953. 1 5 53.30 T B C 53.48 T B C PROPOSED CURB (HEIGHT VARIES; MATCH EXISTING GROUND) 53. 3 5 53. 4 2 53. 5 1 53. 3 8 53. 2 9 T B C 1.5 % 52.602.5% 53.45 53.45 53 . 8 9 T B C 54.0053.83 53.89 53.50 53 . 9 7 T B C 54.0253.89 53.76 GRADE BREAK MATCH EXISTING RAMP AT OUTSIDE OF CMU WALL (SEE ARCH. PLANS) 52. 6 9 52. 2 4 52. 3 9 1" = ##' 1" = N/A 3/ 1 5 / 2 0 2 4 12 : 0 0 : 1 1 P M C: \ U N I T E D C I V I L D R O P B O X \ P R O J E C T S \ U 2 2 0 3 0 - T R I P L E C R O W N S P O R T S \ C A D D \ C P \ R E C O R D D R A W I N G S \ C 4 . 0 0 - G R A D I N G & E R O S I O N C O N T R O L P L A N . D W G C4 . 0 0 - G R A D I N G & E R O S I O N C O N T R O L P L A N SM E JR S C4.01 DE T A I L E D G R A D I N G P L A N 10 PR E P A R E D F O R : JOB NUMBER SHEET NUMBER SHEETSOF DA T E S U B M I T T E D : VERTICAL: HORIZONTAL: SCALE PR O J . M G R : DR A W I N G N A M E : PA T H : DE S I G N E R : DA T E : TI M E : Th e e n g i n e e r p r e p a r i n g t h e s e p l a n s w i l l n o t b e r e s p o n s i b l e f o r , o r l i a b l e f o r , un a u t h o r i z e d c h a n g e s t o o r u s e s o f t h e s e p l a n s . A l l c h a n g e s t o t h e p l a n s mu s t b e i n w r i t i n g a n d m u s t b e a p p r o v e d b y t h e p r e p a r e r o f t h e s e p l a n s . NO . BY DA T E CAUTION RE V I S I O N S : CIVIL ENGINEERING & CONSULTING UNITED CIVIL Design Group 19 OLD TOWN SQUARE #238 FORT COLLINS, CO 80524 (970) 530-4044 www.unitedcivil.com TR I P L E C R O W N S P O R T S U22030 TR I P L E C R O W N S P O R T S E X P A N S I O N 15 6/ 1 6 / 2 0 2 3 1/8/24 NO R T H 0 ##'##' SCALE: 1" = ##' #' LEGEND NOTES 1.THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE FIELD CONDITIONS ARE AS SHOWN IN THE DRAWINGS. IF THE CONTRACTOR FINDS DISCREPANCIES THE CONTRACTOR SHALL CONTACT THE ENGINEER. 2.SEE SOILS REPORT FOR PAVEMENT AND FOUNDATION PREPARATION, DESIGN AND RECOMMENDATIONS. 3.EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 4.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 5.THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, PAVEMENT, PRIVATE FENCES, ABOVE GROUND OR UNDERGROUND UTILITIES, STRUCTURES, AND UNDERGROUND FOUNDATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 6.ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS. EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 7.CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 8.SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON SEEDING/PLANTING, REVEGETATION, IRRIGATION, HARDSCAPE AND OTHER TEMPORARY AND PERMANENT SITE STABILIZATION METHODS. 9.ALL SPOT ELEVATIONS SHOWN ADJACENT TO PAVEMENT ARE TO FLOWLINE, EDGE OF WALK OR EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. 10.SEDIMENT CONTROL LOGS MAY BE USED IN LIEU OF SILT FENCE. SWALE FLOWLINE INLET PROTECTION ROCK SOCK CONCRETE WASHOUT AREA SILT FENCE VEHICLE TRACKING CONTROL 90. 3 0 PROPOSED SPOT ELEVATION FFE = FINISHED FLOOR ELEVATION FG = FINISHED GRADE AT EXTERIOR WALL EOP = EDGE OF PAVEMENT LP = LOW POINT HP = HIGH POINT TOW = TOP OF WALL BOW = BOTTOM OF WALL 3.1 3 EXISTING GRADE 10.0%4.0:1 (10.0%)(4.0:1) PROPOSED SLOPE EXISTING SLOPE PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR STORM SEWER GRADE BREAK LIMITS OF DISTURBANCE CATCH CURB & GUTTER SPILL CURB & GUTTER PERMANENT SEEDING NORTH GRADING DETAIL SCALE: 1" = 10' SOUTH GRADING DETAIL SCALE: 1" = 10' JR S 9/ 2 9 / 2 0 2 3 RF I 1 2 - C O N C R E T E W A L L & R A M P R E V I S I O N S 1 1 1 2 JR S 3/ 1 4 / 2 0 2 4 SI T E & D R A I N A G E C E R T I F I C A T I O N 2 RECORD DRAWING THESE RECORD DRAWINGS, PRODUCED BY UNITED CIVIL DESIGN GROUP LLC, ARE BASED ON FIELD INFORMATION GATHERED BY OTHERS. UNITED CIVIL DESIGN GROUP LLC, ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. 2 2 1/19 Page 1 of 2 DURING CONSTRUCTION INSPECTION CHECKLIST To be completed by Construction Superintendent This checklist is to be completed during construction and included with the Overall Site and Drainage Certification. · Use “Yes” for items completed as described. · Use “N/A” for items that are not applicable to the site being certified. · If any blanks are “No,” attach an explanation referencing the item number below. Project Name: Triple Crown Sports Date: 2/15/24 Building Permit Numbers: B2303850 I. Compaction A. N/A All berms and embankments meet the compaction requirements as specified in the project geotechnical report or comply with the City’s standard, which is “soils should be compacted within a moisture content range of 2% below to 2% above optimum moisture content and compacted to 95% of the Maximum Standard Proctor Density (ASTM D698).” Compaction requires verification during construction. Provide testing log from contractor/engineer. II. Storm Drain Pipe Installation Requirements A. Yes The pipe trenches have been compacted in accordance with Section 02225-3.07.A.1. of the Fort Collins Development Construction Standards for Water, Wastewater, Stormwater (e.g., the trenches in the roadways are to be 95% of maximum density and all other areas are to be at 90%, both in accordance with ASTM D698). III. Energy Dissipation and Erosion Protection - FCSCM Chapter 9, Section 7.0 A. Riprap 1. N/A The riprap bedding is a granular bedding of the gradation and thickness indicated on the approved construction plans. 2. N/A A filter fabric was installed instead of granular bedding and is the material shown on the approved construction plans or was an approved equal. Provide documentation for an approved equal. 3. N/A The riprap is the gradation shown on the approved construction plans with a D50 of . 4. N/A The riprap thickness is as shown on the approved construction plans and extends to the horizontal limits shown. 5. Yes The riprap is buried to the depth indicated on the approved construction plans. (A minimum of 6 inches of soil is required.) B. Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7 1. N/A All fabric was installed per manufacturer’s specifications. 1/19 Page 2 of 2 IV. Other Permanent BMPs A. N/A All cut-off walls have been installed in accordance with the approved construction plans. (Cut-off walls are required for irrigation ditch crossings of storm drain pipes.) V. Extended Detention Basins A. N/A Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the water quality control box(es). Provide date of inspection and name of inspector: Included certification sheet(s): Please check the appropriate box(es) for the Low Impact Development (LID) facilities found on this site and complete the corresponding certification sheets. ☐ Permeable Interlocking Concrete Pavers ☐ Bioretention Cells (Rain Gardens) ☐ Sand Filters ☐ Vegetated Buffers ☐ Underground Infiltration ☒ Other LID – For certification of Dry Wells, Tree Filters, Constructed Wetland Channels & Ponds, etc., contact City Staff to determine requirements to exhibit the LID facility has been constructed and functions as intended per the approved drainage report. *Please provide photographic documentation of the installation of all stages of all LID facilities. **Please contact the City Stormwater Inspector at stormwaterinspection@fcgov.com to discuss inspection requirements for each LID facility and request inspections. ***All facilities being certified must be “clean” – free of sediment & construction debris – prior to certification or acceptance of the facility. Completed by: Name: Drew Jeffryes Title: Project Engineer Email: djeffryes@coeconstruction.com Phone: 970-342-8673 Company: Coe Construction Address: 2302 E. 13th St. Loveland, CO 80537 1/19 Page 1 of 2 Permeable Interlocking Concrete Pavers Item/Activity Yes No N/A Submittal Requirements Submitted?/Response Stormwater Inspection Pre-construction meeting was held with City-Stormwater Inspector to discuss installation, inspection, checklist, and protection from sedimentation ☐ ☐ ☐ Record date, inspector name, meeting location (i.e. DCP, initial erosion control inspection, etc.) Sub-surface inspection(s): Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the outlet, underdrain, geomembrane layer, and sub-base courses (per design in Final Plan Documents) ☐ ☐ ☐ Record date(s) of inspection and inspector’s name Surface inspection(s): Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the pavers and joint fill material ☐ ☐ ☐ Record date(s) of inspection and inspector’s name Excavation Heavy equipment did not encroach into the excavated area (prevents over-compaction) ☐ ☐ ☐ Bottom of cell was “ripped” after excavation ☐ ☐ ☐ Provide photographs before and after “ripping” Bottom surface of cell is flat and level ☐ ☐ ☐ Provide photograph Impermeable Liner Impermeable liner meets design specifications ☐ ☐ ☐ Provide specifications of delivered material Impermeable liner is attached to concrete perimeter wall ☐ ☐ ☐ Provide photograph Impermeable liner is buried with no exposure ☐ ☐ ☐ Any penetrations of the impermeable liner have been sealed and checked for water-tightness ☐ ☐ ☐ Provide photograph (if necessary) Edge Restraint and Concrete Cut-Off Wall The required edge restraint meets design specifications ☐ ☐ ☐ Provide specification of installation Concrete cut-off wall meets design specifications for: ☐ ☐ ☐ Provide specification of installation - Dimensions ☐ ☐ ☐ - Reinforcement ☐ ☐ ☐ - Footings ☐ ☐ ☐ Underdrain System Underdrain pipe meets design specifications ☐ ☐ ☐ Provide photograph At least one cleanout is provided per underdrain lateral ☐ ☐ ☐ Provide photograph 1/19 Page 2 of 2 Cleanout pipe is solid (not perforated/slotted) ☐ ☐ ☐ Provide photograph Cleanout covers are installed and watertight ☐ ☐ ☐ Provide photograph Verify the underdrain is NOT wrapped in geotextile fabric ☐ ☐ ☐ Provide photograph Verify there is no orifice plate on the underdrain outfall ☐ ☐ ☐ Provide photograph Underdrain integrity tested after backfilling using TV and/or water test ☐ ☐ ☐ Provide documentation of test results Aggregate Sub-base Course(e.g., #2/4): - Has 90% fractured faces - Is thoroughly washed (virtually free of fine sediment) - Is installed to the required design depth ☐ ☐ ☐ Provide load ticket, photographs, and record depth installed Basecourse (e.g., #57): - Has 90% fractured faces - Is thoroughly washed (virtually free of fine sediment) - Is installed to the required design depth ☐ ☐ ☐ Provide load ticket, photographs, and record depth installed Leveling Course / Joint Fill (e.g., crushed #89): - Has 90% fractured faces - Is thoroughly washed (virtually free of fine sediment) - Is dry screened - Is installed to the required design depth and to the top of the paver joints ☐ ☐ ☐ Provide load ticket, photographs, and record depth installed Aggregate materials are installed and compacted according to manufacturer’s and/or design specifications ☐ ☐ ☐ Provide photographs and documentation of compaction Protection During Construction PICP area is protected from construction site sediment, including runoff from the upstream catchment and construction equipment traffic ☐ ☐ ☐ Specify how the area was covered and/or otherwise protected to prevent construction runoff from entering the pavement Close Out Cracked/broken paver units have been removed and replaced ☐ ☐ ☐ Paver height offsets are no more than 1/4” between adjacent units & surface contains no deformations (depressions/settlement) exceeding 1/2" ☐ ☐ ☐ Upstream catchment is stabilized prior to diverting runoff into PICP system ☐ ☐ ☐ 1/19 Page 1 of 3 Bioretention Cells (Rain Gardens) Item/Activity Yes No N/A Submittal Requirements Submitted?/Response Stormwater Inspection Pre-construction meeting was held with City-Stormwater Inspector to discuss installation, inspection, checklist, and protection from sedimentation ☐ ☐ ☐ Record date, inspector name, meeting location (i.e. DCP, initial erosion control inspection, etc.) Underdrain and basecourse inspection(s): Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the outlet, underdrain, geomembrane layer, and base course (per design in Final Plan Documents) ☐ ☐ ☐ Record date(s) of inspection and inspector’s name Pea gravel and BSM inspection(s): Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the pea gravel and bioretention sand media ☐ ☐ ☐ Record date(s) of inspection and inspector’s name Excavation Heavy equipment did not encroach into the excavated area (prevents over-compaction) ☐ ☐ ☐ Bottom of cell was “ripped” after excavation ☐ ☐ ☐ Provide photographs before and after “ripping” Bottom surface of cell is flat and level ☐ ☐ ☐ Provide photograph Excavated area is protected/surrounded by sediment/runoff control measures during construction ☐ ☐ ☐ Provide photograph Intake Upstream catchment drains to inlet/bioretention cell per plan and flows are fully captured ☐ ☐ ☐ Forebay Forebay is installed according to design specifications ☐ ☐ ☐ Provide photograph There is a minimum 3” drop at the forebay entrance ☐ ☐ ☐ Provide photograph Forebay will drain fully and not hold standing water ☐ ☐ ☐ Outlet Structure/Overflow Emergency overflow elevation is confirmed ☐ ☐ ☐ Measure and record distance from overflow to top of media filter; provide photograph Overflow inlet elevation is set above bioretention media per plan ☐ ☐ ☐ Provide photograph 1/19 Page 2 of 3 Overflow inlet invert elevation is at least 3 inches below containment wall/berm (to direct overflow into inlet) ☐ ☐ ☐ Measure and record distance between inlet and top of containment wall/berm; provide photograph Overflow path and check dams, if used, are armored to protect from erosion and maintain elevations ☐ ☐ ☐ Provide photograph Impermeable Liner Impermeable liner meets design specifications ☐ ☐ ☐ Provide specifications of delivered material Impermeable liner is appropriately anchored ☐ ☐ ☐ Provide photograph Impermeable liner is buried with no exposure ☐ ☐ ☐ Any penetrations of the impermeable liner have been sealed and checked for water-tightness ☐ ☐ ☐ Provide photograph (if necessary) Underdrain System Underdrain pipe meets design specifications ☐ ☐ ☐ Provide photograph At least one cleanout is provided per underdrain lateral ☐ ☐ ☐ Provide photograph Cleanout pipe is solid (not perforated/slotted) ☐ ☐ ☐ Provide photograph Cleanout covers are installed and watertight ☐ ☐ ☐ Provide photograph Verify the underdrain is NOT wrapped in geotextile fabric ☐ ☐ ☐ Provide photograph Verify there is no orifice plate on the underdrain outfall ☐ ☐ ☐ Provide photograph Underdrain integrity tested after backfilling using TV and/or water test ☐ ☐ ☐ Provide documentation of test results Filter Media and Aggregate Reservoir aggregate layer (ASTM #57 or #67): - meets design specifications - is installed to the required design depth ☐ ☐ ☐ Provide load ticket, photographs, and record depth installed Diaphragm aggregate layer (“Pea Gravel” with gradation ASTM #8, #89, or #9): - meets design specifications - is installed to the required design depth ☐ ☐ ☐ Provide load ticket, photographs, and record depth installed Bioretention Sand Media (BSM) composition: - meets design specifications - is installed to the required design depth ☐ ☐ ☐ Provide load ticket, photographs, and record depth installed BSM was “machine mixed” by supplier prior to delivery ☐ ☐ ☐ Provide load ticket BSM is installed flat and level ☐ ☐ ☐ Provide photograph Other Structural Components Containment wall/berm is continuous and level ☐ ☐ ☐ Landscaping 1/19 Page 3 of 3 Verify final landscaping is free of sod ☐ ☐ ☐ If sod is used, it must be shown to be “sand-grown” Final landscaping (non-floatable mulch) is flat and level ☐ ☐ ☐ Provide photograph Vegetation is planted according to landscape design specifications and final landscaping plan ☐ ☐ ☐ Provide photograph Verify that weed barrier is NOT installed ☐ ☐ ☐ Temporary irrigation installed ☐ ☐ ☐ If N/A, then verify that permanent irrigation is installed to establish/maintain vegetation Close Out Upstream catchment stabilized prior to diverting runoff into bioretention cell ☐ ☐ ☐ 1/19 Page 1 of 1 Vegetated Buffers Item/Activity Yes No N/A Submittal Requirements Submitted?/Response Construction Buffer area was sectioned off to eliminate site disturbance and compaction during construction ☐ ☐ ☐ Provide photograph(s) Level spreader has been installed per plan (if applicable) ☐ ☐ ☐ Provide photograph Soils in the buffer area have been amended ☐ ☐ ☐ Record soil amendment certification with Environmental & Regulatory Affairs Vegetation is planted according to landscape design specifications and final landscaping plan ☐ ☐ ☐ Provide photograph 1/19 Page 1 of 3 Sand Filters Item/Activity Yes No N/A Submittal Requirements Submitted?/Response Stormwater Inspection Pre-construction meeting was held with City-Stormwater Inspector to discuss installation, inspection, checklist, and protection from sedimentation ☐ ☐ ☐ Record date, inspector name, meeting location (i.e. DCP, initial erosion control inspection, etc.) Underdrain and basecourse inspection(s): Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the outlet, underdrain, geomembrane layer, and base course (per design in Final Plan Documents) ☐ ☐ ☐ Record date(s) of inspection and inspector’s name Pea gravel and filter media inspection(s): Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point of installation of the pea gravel and filter media ☐ ☐ ☐ Record date(s) of inspection and inspector’s name Excavation Heavy equipment did not encroach into the excavated area (prevents over-compaction) ☐ ☐ ☐ Bottom of cell was “ripped” after excavation ☐ ☐ ☐ Provide photographs before and after “ripping” Bottom surface of cell is flat and level ☐ ☐ ☐ Provide photograph Excavated area is protected/surrounded by sediment/runoff control measures during construction ☐ ☐ ☐ Provide photograph Intake Upstream catchment drains to inlet/sand filter per plan and flows are fully captured ☐ ☐ ☐ Forebay (If Applicable) Forebay is installed according to design specifications ☐ ☐ ☐ Provide photograph There is a minimum 3” drop at the forebay entrance ☐ ☐ ☐ Provide photograph Forebay will drain fully and not hold standing water ☐ ☐ ☐ Outlet Structure/Overflow Overflow inlet elevation is set above sand filter media per plan (typically 1 to 3 feet) ☐ ☐ ☐ Provide photograph Overflow inlet invert elevation is at least 3 inches below containment wall/berm (to direct overflow into inlet) ☐ ☐ ☐ Measure and record distance between inlet and top of containment wall/berm; provide photograph 1/19 Page 2 of 3 Overflow path and check dams, if used, are armored to protect from erosion and maintain elevations ☐ ☐ ☐ Provide photograph Impermeable Liner (If Applicable) Impermeable liner meets design specifications ☐ ☐ ☐ Provide specifications of delivered material Impermeable liner is appropriately anchored to the perimeter wall ☐ ☐ ☐ Provide photograph Impermeable liner is buried with no exposure ☐ ☐ ☐ Any penetrations of the impermeable liner have been sealed and checked for water-tightness ☐ ☐ ☐ Provide photograph (if necessary) Underdrain System Underdrain pipe meets design specifications ☐ ☐ ☐ Provide photograph At least one cleanout is provided per underdrain lateral ☐ ☐ ☐ Provide photograph Cleanout pipe is solid (not perforated/slotted) ☐ ☐ ☐ Provide photograph Cleanout covers are installed and watertight ☐ ☐ ☐ Provide photograph Verify the underdrain is NOT wrapped in geotextile fabric ☐ ☐ ☐ Provide photograph Verify there is no orifice plate on the underdrain outfall ☐ ☐ ☐ Provide photograph Underdrain integrity tested after backfilling using TV and/or water test ☐ ☐ ☐ Provide documentation of test results Filter Media Filter media composition (e.g. ASTM C 33 Sand): - meets design specifications - is installed to the required design depth ☐ ☐ ☐ Provide load ticket, photographs, and record depth installed Pea gravel layer: - meets design specifications - is installed to the required design depth ☐ ☐ ☐ Provide load ticket, photographs, and record depth installed Filter Media is installed flat and level ☐ ☐ ☐ Other Structural Components Containment wall/berm is continuous and level ☐ ☐ ☐ Landscaping Verify final landscaping is free of sod ☐ ☐ ☐ If sod is used, it must be shown to be “sand-grown” Final landscaping (non-floatable mulch) is flat and level ☐ ☐ ☐ Provide photograph Vegetation is planted according to landscape design specifications and final landscaping plan ☐ ☐ ☐ Provide photograph Verify that weed barrier is NOT installed ☐ ☐ ☐ 1/19 Page 3 of 3 Temporary irrigation installed ☐ ☐ ☐ If N/A, then verify that permanent irrigation is installed to establish/maintain vegetation Close Out Upstream catchment stabilized prior to diverting runoff into sand filter cell ☐ ☐ ☐ 1/19 Page 1 of 2 Underground Infiltration Item/Activity Yes No N/A Submittal Requirements Submitted?/Response Stormwater Inspection Manufacturer’s representative pre-construction meeting: A pre-construction meeting was completed with the manufacturer’s representative and installers ☐ ☐ ☐ Record date and who was present at the meeting Pre-construction meeting was held with City-Stormwater Inspector to discuss installation, inspection, checklist, and protection from sedimentation ☐ ☐ ☐ Record date, inspector name, meeting location (i.e. DCP, initial erosion control inspection, etc.) Inspection(s): Installation of this facility was verified via inspection by a City-Stormwater Inspector at the point at which the chambers had been laid/prior to backfilling. Correct fabric placement was confirmed. ☐ ☐ ☐ Record date(s) of inspection and inspector’s name Excavation Heavy equipment did not travel across underground cell area during excavation (prevents over-compaction) ☐ ☐ ☐ Bottom of cell was “ripped” after excavation ☐ ☐ ☐ Provide photographs before and after “ripping” Bottom of cell is flat and level, or graded per approved grading plans ☐ ☐ ☐ Provide photograph Non-woven fabric is installed per manufacturer’s specifications and was not damaged during construction (around system) ☐ ☐ ☐ Provide photograph Woven fabric is installed per manufacturer’s specifications and was not damaged during construction (beneath chambers) ☐ ☐ ☐ Provide photograph Excavated area is protected/surrounded by sediment/runoff control BMPs during construction ☐ ☐ ☐ Provide photograph Impermeable Liner Impermeable liner meets design specifications ☐ ☐ ☐ Provide specifications of delivered material Impermeable liner is not exposed ☐ ☐ ☐ Any penetrations of the impermeable liner have been sealed and checked for water-tightness. ☐ ☐ ☐ Provide photograph (if necessary) Aggregate Foundation and embedment materials are installed and compacted according to design and manufacturer’s specifications ☐ ☐ ☐ Provide load ticket and photograph(s) Underdrain System 1/19 Page 2 of 2 Underdrain pipe meets design specifications ☐ ☐ ☐ Provide photograph At least one cleanout is provided per underdrain lateral ☐ ☐ ☐ Provide photograph Cleanout pipe is solid (not perforated/slotted) ☐ ☐ ☐ Provide photograph Cleanout covers are installed and watertight ☐ ☐ ☐ Provide photograph Verify the underdrain is NOT wrapped in geotextile fabric ☐ ☐ ☐ Provide photograph Verify there is no orifice plate on the underdrain outfall ☐ ☐ ☐ Provide photograph Underdrain integrity tested after backfilling using TV and/or water test ☐ ☐ ☐ Provide documentation of test results Manifold system Overflow weir elevation is set at/above water quality storm elevation ☐ ☐ ☐ Record weir elevation on survey Maintenance access is provided for each Isolator Row ☐ ☐ ☐ At least one inspection port has been provided for each Isolator Row (located in middle third of each row) ☐ ☐ ☐ Upstream catchment drains to inlet/intake properly ☐ ☐ ☐ Underground Detention Chambers All chambers were installed per approved Utility Plans and manufacturer’s specifications ☐ ☐ ☐ Photograph Close Out Upstream catchment is stabilized prior to diverting runoff into Underground Detention system ☐ ☐ ☐ All Isolator Rows, chambers, and pipes are cleaned and sediment/debris has been removed ☐ ☐ ☐