Loading...
HomeMy WebLinkAboutLot Certifications - 04/14/20222/14/17 Page 1 CERTIFICATION OF LOT GRADING Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e) Date: Address: Lot: Block: Subdivision: Permit Application #: Larimer County Parcel #: Larimer County Reception #: (on development agreement) I, (print) , a Colorado registered professional engineer, verify that construction of all stormwater facilities and grading is complete and hereby submit this certification. Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots. 1.Certification includes attached Stormwater-approved grading plan. (NOTE: City’s Building Department does not approve grading plans). 2.Certification includes the attached as-built survey dated (must be within 60 days of the date the certification is submitted) accurately and truthfully depicting elevations for: Top of foundation/finished floor Finished grade on each side of the structure Quarter points along each lot line (not more than 50 feet apart) Break points/high points Swales Berms Retaining walls Air conditioning pads Window wells Any other appurtenance(s) within an easement 3.All elevations are within a 0.2 foot tolerance of the approved grading plan. 4.The top of foundation is at least 6 inches above the highest grade surrounding the structure. 5.There is a minimum grade of 5% away from the structure within the first 5 to 10 feet adjacent to the residence. 6.All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than 33% (3:1). 7.All flow lines of stormwater drainage swales are a minimum of 6 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Stormwater-approved grading plan. 8.All downspout locations and discharge directions are shown on the as-built survey. Runoff is directed into an appropriate drainage system or lot line swale, and it is not directed onto neighboring properties. No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes ALB ALB ALB ALB ALB ALB ALB ALB* See Narrative above. Except in areas where concrete walks were poured directly adjacent to the foundation. The Walks slope away from the building at 2%. * = Downspouts are on the grading record drawing Two entrances were added to the front of the building with attached walks. A retaining wall (2 to 3' tall) was added to the south west corner adjacent to the 6' sidewalk to make room for a drainage path. The area between the wall and the building is paved with concrete. On the north side a trench drain was added to the proposed driveway with a catch basin and storm line to capture inflows and discharge downstream. An additional drain basin and storm line was added to the north end of the proposed wing wall to intercept flow from behind the wall. See narrative on sheet 2. Wes Lamarque 4/14/2022 2/14/17 Page 2 9.A smooth transition with no vertical offset (step) in grade is provided at the lot line to all adjacent properties. 10.The grading of this lot does not adversely affect neighboring properties or City infrastructure. 11.Landscaping has been completed prior to survey. If not, please indicate who will be responsible for completing landscaping: 12.Final site cleanup has been completed. 13.I personally visited the site as part of the certification process, and in my professional opinion, the as-built survey is an accurate representation of the site conditions.. No Yes No Yes No Yes No Yes No Yes 14.Based on this information, I certify that (check one): □The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). □The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. Name: Email: Phone: Company: Address: NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) WaterUtilitiesEng@fcgov.com Mailing Address Fort Collins Utilities ATTN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 Questions? 970-221-6700 PE Stamp Sign and date 04/13/2022 ALB ALB ALB ALB ALB Soil amendments and landscaping yet to commence at time of site visit. 7. Due to the addition of the southern entrance and associated attached walk, an earthen swale was not feasible per the approved plan. A concrete apron and pan was installed to direct flow south, around the buildings columns and out to an open swale. The concrete adjacent to the building is sloped at 2% away from the foundation. The catch slope of the concrete pan is sloped at 2%, and the concrete apron's slope varies between the walk and the pan. VAN 2 3 3 2 2 3 3 3 2 3 32 UGE UGE UGE UGE UGE UG E UG E S SS SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W 21.61 FL 21.83 FL 22.20 FL 21.69 FL 21.98 FL 22.39 FL 22.58 FL 22.84 FL 23.42 FL 23.92 FL 24.13 FL 24.30 FL 24.03 FL 24.19 FL 24.70 FL 25.83 FL 26.15 FL 26.51 FL 28.49 FL 30.26 FL 31.50 FL 33.67 EOC 32.15 EOC 31.75 EOC 31.16 EOC 30.12 EOC 29.18 EOC 28.39 EOC 27.22 EOC 26.31 EOC 26.12 EOC 26.06 EOC 26.03 EOC 26.03 EOC 26.05 H2O MTR 25.93 FL PAN 25.67 FL PAN 25.36 FL PAN 25.32 FL PAN 25.27 FL PAN 28.64 CL WALL 28.11 CL WALL 27.53 CL WALL 26.66 CL WALL 27.07 EOC 26.05 EOC 25.72 EOC 25.45 EOC 25.36 TOP RAMP 24.89 TOP RAMP 25.21 EOC 25.30 EOC 25.21 EOC 24.76 EOC 24.83 TOP RAMP 24.72 TOP RAMP 24.94 EOC 24.27 BOTT RAMP 24.07 BOTT RAMP 24.30 TOP RAMP 24.17 TOP RAMP 23.77 EOC 23.43 EOC 23.01 EOC 22.97 TOP RAMP 22.86 TOP RAMP 22.30 BOTT RAMP 22.46 BOTT RAMP 22.33 EOC 22.08 EOC 21.88 EOC 21.73 EOC 21.45 EOC 20.74 EOC 19.64 EOC 18.18 EOC 17.06 EOC 16.40 EOC 15.99 EOC @ DRAIN15.93 EOC @ DRAIN 15.85 EOC @ DRAIN 15.93 EOC @ DRAIN 15.24 AD RIM 13.93 INV 16.21 EOC 16.01 EOC 15.91 EOC 15.90 EOC 16.15 EOC 16.28 EOC 16.30 FF BASEMENT 16.15 CO 16.14 CO 15.33 FL 15.42 FL 16.86 EOC 18.36 EOC 19.43 EOC 20.46 EOC 20.88 EOC 20.91 EOC 20.79 EOC 19.88 EOC 18.97 EOC 18.09 EOC 17.57 EOC 17.53 EOC 18.64 EOC 19.78 EOC 20.84 EOC 22.06 EOC 21.94 EOC 22.13 EOC 21.89 EOC 21.59 EOC 24.81 SWALE 24.17 SWALE 23.60 SWALE 22.95 SWALE 21.91 SWALE 20.94 SWALE 20.29 SWALE 20.43 GND 21.56 GND 23.11 GND 24.10 GND 24.73 GND 25.67 GND 25.53 GND 25.70 GND 25.79 GND 25.29 GND 25.52 GND 24.23 SWALE 22.69 SWALE 20.63 SWALE 19.89 SWALE 19.15 SWALE 17.52 SWALE 17.26 SWALE 20.94 WALL 20.96 WALL 21.94 WALL 22.93 WALL 23.92 WALL 25.92 WALL 24.47 GND 23.46 GND 22.26 GND 21.18 GND 20.49 GND 20.10 GND 18.34 GND 17.79 GND 21.67 GND 22.47 GND 21.71 GND 23.06 GND 24.81 GND 26.10 EOC 26.19 EOC 26.08 EOC 18.26 GND 17.33 GND 17.18 GND 18.19 CL ROCK WALL 18.38 CL ROCK WALL 18.91 CL ROCK WALL 18.18 GND 16.39 GND 15.97 GND 17.69 GND 16.81 GND 15.39 GND 13.78 GND 13.67 IVN 15.59 IVN 15.55 IVN 16.29 GND 15.98 GND 13.99 GND15.00 GND 15.97 AD INV 26.43 CURB STOP 26.10 GND 28.62 GND 27.33 GND 27.23 GND 26.48 GND 27.44 GND 27.96 GND 27.95 GND 28.33 CL ROCK WALL 27.66 CL ROCK WALL 28.76 CL ROCK WALL 28.00 CL ROCK WALL 27.96 CL ROCK WALL 26.77 CL ROCK WALL 25.52 GND 24.36 GND 22.69 GND 21.66 GND 23.98 GND 24.40 FL PAN 25.51 GND 25.77 GND 25.60 GND 25.68 GND 26.11 GND 26.04 GND 25.83 GND 25.37 GND 25.90 GND 25.89 GND 25.43 SWALE25.15 SWALE 25.54 GND25.54 GND 24.93 GND 23.04 GND 21.96 GND 21.90 GND 23.87 GND 26.00 EOC 26.01 EOC 26.04 EOC 25.97 EOC25.99 EOC 26.16 EOC 26.18 FF 26.18 FF 23.89 FL PAN 23.21 FL PAN 20.79 GND 21.41 GND 21.07 GND 20.68 GND 19.62 GND 19.13 GND 18.85 GND 19.06 GND 19.24 GND 19.23 GND 18.75 GND 18.24 GND 20.01 WALL 19.60 WALL 19.03 WALL 18.74 WALL 18.17 WALL 18.19 WALL 18.21 WALL18.42 EOC 18.42 EOC 18.41 EOC 18.41 EOC 19.46 CL WALL 19.47 CL WALL 19.45 CL WALL 16.28 TOC 16.27 TOC 16.31 TOC 16.30 TOC 16.82 STEP 18.42 STEP 18.27 GND 16.42 GND 16.80 GND 16.93 GND 17.83 GND 20.01 GND 18.27 GND 17.90 GND 17.54 GND JESSUP FARM BUILDING 13 AS-BUILT EXHIBIT LOCATED IN SECTION 20, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO 4025 Automation Way, Suite C4 Fort Collins, CO 80525 970-232-9645 www.WashburnSurveying.com Sheet 1 of 2 Project #: 2021-0060 Date: March 4, 2022 Scale: 1"=10' Drawn: CDB NOTE ELEVATIONS SHOWN HEREON ARE FROM AN AS-BUILT SURVEY OF THE SITE PERFORMED ON MARCH 1, 2022. Sc a l e : 1 " = 1 0 ' VAN 2 2 3 3 2 3 32 3 22323232 2 3322 F E E E E W FDC UG E UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UG E UG E HYD C W W W W W W W W W W W W W W W W W W W W W W W W W W W W W 24.13 FL 24.30 FL 24.19 FL 24.70 FL 25.83 FL 26.15 FL 26.51 FL 28.49 FL 30.26 FL 31.50 FL 38.50 EOC 38.49 EOC 38.45 EOC 38.37 EOC 37.88 EOC 36.98 EOC 35.57 EOC 34.79 EOC 33.67 EOC 32.15 EOC 31.75 EOC 31.16 EOC 30.12 EOC 29.18 EOC 28.39 EOC 27.22 EOC 26.31 EOC 26.12 EOC 26.06 EOC 26.03 EOC 26.03 EOC 26.05 H2O MTR 25.93 FL PAN 25.67 FL PAN 25.36 FL PAN 25.32 FL PAN 25.27 FL PAN 28.64 CL WALL 28.11 CL WALL 27.53 CL WALL 26.66 CL WALL 27.07 EOC 26.05 EOC 25.72 EOC 25.45 EOC 25.36 TOP RAMP 24.89 TOP RAMP 25.21 EOC 25.30 EOC 25.21 EOC 24.76 EOC 24.83 TOP RAMP 24.72 TOP RAMP 24.94 EOC 24.27 BOTT RAMP 15.99 EOC @ DRAIN15.93 EOC @ DRAIN 15.85 EOC @ DRAIN 15.93 EOC @ DRAIN 15.24 AD RIM 13.93 INV 16.21 EOC 16.01 EOC 15.91 EOC 15.90 EOC 16.15 EOC 16.28 EOC 16.30 FF BASEMENT 16.15 CO 16.14 CO 15.33 FL 15.42 FL 24.81 SWALE 24.17 SWALE 24.73 GND 25.67 GND 25.53 GND 25.70 GND 25.79 GND 25.29 GND 25.52 GND 24.23 SWALE SWALE WALL 23.92 WALL 25.92 WALL 24.47 GND 23.46 GND 24.81 GND 26.10 EOC 26.19 EOC 26.08 EOC 17.33 GND 17.18 GND 18.19 CL ROCK WALL 18.38 CL ROCK WALL 18.91 CL ROCK WALL 18.18 GND 16.39 GND 17.69 GND 26.43 CURB STOP 26.10 GND 38.53 EOC 38.61 EOC38.62 EOC 28.62 GND 27.33 GND 27.23 GND 26.48 GND 27.44 GND 27.96 GND 27.95 GND 28.33 CL ROCK WALL 27.66 CL ROCK WALL 28.76 CL ROCK WALL 28.00 CL ROCK WALL 27.96 CL ROCK WALL 26.77 CL ROCK WALL 25.52 GND 24.36 GND 22.69 GND 21.66 GND 18.95 GND 19.44 GND 20.54 GND 21.73 GND 22.82 GND23.48 GND 24.26 GND 25.57 GND26.69 GND 26.72 GND 27.73 GND 30.28 GND 32.72 GND 32.72 GND 34.82 GND 35.68 GND 35.95 GND 36.80 GND 37.15 GND 37.27 GND 37.02 GND 36.38 GND 34.48 GND 32.02 GND 31.03 GND 30.06 GND 28.77 GND 27.09 GND 25.40 GND 23.98 GND 24.40 FL PAN 25.51 GND 25.77 GND 25.60 GND 25.68 GND 26.11 GND 26.04 GND 25.83 GND 25.37 GND 25.90 GND 25.89 GND 25.43 SWALE25.15 SWALE 25.54 GND25.54 GND 24.93 GND 23.04 GND 21.96 GND 21.90 GND 23.87 GND 26.00 EOC 26.01 EOC 26.04 EOC 25.97 EOC25.99 EOC 26.16 EOC 26.18 FF 26.18 FF 37.77 EOC 38.01 EOC 18.86 GND 20.79 GND 21.41 GND 21.07 GND 20.68 GND 19.62 GND 19.13 GND 18.85 GND 19.06 GND 19.24 GND 19.23 GND 18.75 GND 18.24 GND 20.01 WALL 19.60 WALL 19.03 WALL 18.74 WALL 18.17 WALL 18.19 WALL 18.21 WALL18.42 EOC 18.42 EOC 18.41 EOC 18.41 EOC 19.46 CL WALL 19.47 CL WALL 19.45 CL WALL 16.28 TOC 16.27 TOC 16.31 TOC 16.30 TOC 16.82 STEP 18.42 STEP 18.27 GND 16.42 GND 16.80 GND 16.93 GND 17.83 GND 20.01 GND 18.27 GND 17.90 GND 17.54 GND JESSUP FARM BUILDING 13 AS-BUILT EXHIBIT LOCATED IN SECTION 20, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO 4025 Automation Way, Suite C4 Fort Collins, CO 80525 970-232-9645 www.WashburnSurveying.com Sheet 2 of 2 Project #: 2021-0060 Date: March 4, 2022 Scale: 1"=10' Drawn: CDB NOTE ELEVATIONS SHOWN HEREON ARE FROM AN AS-BUILT SURVEY OF THE SITE PERFORMED ON MARCH 1, 2022 Sc a l e : 1 " = 1 0 ' EM UP 2 3 3 2 3 2 32 3 32 3 32 32 32 3 2 3 2 2 3 3 2 2 3 2 2 21 22 509 S FGAR A G E 1 168 S FSTO R A G E 2 131 S F OFF I C E 3 28 29 E G G G G G G E E E E E E HYD C S HYD S C E EE E G G G G G CTV CTV CTV CTV CTV CTV W W SSSSSSSSSSSSSS EEEEEEEEEE E E E E E E CTVCTVCTVCTVCTVCTVCTVCTVCTVCTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTVCTVCTVCTVCTVCTVCTVCTVCTV CTV CTV E E CTV CTV CT V CT V CT V CTV WWWWWWWWWWWWWW SSSSSSSSSSSSSSSSSSSSSSSSSS EE WWWWW SO U T H T I M B E R L I N E R O A D 6' SIDEWALK 6' SIDEW A L K 6' SIDEWALK PROPOSED STEPS 4-7" FFE=28.00 (23 . 4 2 ) 24.5 7 24.72 25.13 25.50 25.76 27. 9 0 26.00 26 . 3 2 26.8 2 27.0 9 27.0 9 26.8 2 26.7 3 26.31 27.9 0 28.0 0 26.9 2 24.4 9 24.4 9 24.7 9 24.7 9 24.6 3 23.4 5 24.9 2 25.15 25.21 33.11 33.4 9 34. 6 1 33 . 9 2 29 . 8 6 28 . 5 0 29.49 29. 9 1 27.86 28.12 32.61 33. 5 4 25 . 4 1 27 . 2 3 27 . 5 8 27 . 4 9 28 . 4 6 28 . 6 1 27 . 5 8 24. 2 7 24.35 24.59 24. 6 7 24. 6 4 27 . 9 1 27.9 1 28.00 28.0 0 (28.49) (28 . 7 8 ) 25.81 24.1 9 25 . 7 9 27.18 27.5 0 28.0 0 27.5 027.49 28.00 27.50 26.95 27.20 27.32 26.7 1 26.71 26.7 1 26.25 26.2 8 24.6 9 24.76 26.3 9 26.35 26.85 26.8 5 26.53 27. 5 0 28.00 28. 0 0 2. 1 % 4.5% 1.6% 2.0% 1.6% 1.6% 1.6% 2.0%2.0%2.0%2.0%1.0% 2.0% 27.3 1 27.5 0 27.7 5 27. 8 0 27.8 0 26.94 27.84 27.80 27.84 27. 8 6 28.0 0 27.23 6.6 % 8: 1 9:1 5:1 4:1 5: 1 6: 1 4: 1 4:1 4:1 5:1 4:1 5. 1 % 5. 0 % 10 : 1 2. 0 % 9.7 % 8.1% 11 . 9 % 8.9% 4: 1 4: 1 4: 19:1 73 . 4 % 5: 1 8: 1 4: 1 2. 0 % 1.9%2.0%2.1% 2.0% PROPOSED STAIRS RE: ARCH. PROPOSED WALL EXISTING 18" VERTICAL CURB & GUTTER PROPOSED 2' CURB CUT PROPOSED SIDEWALK CHASE 32.77 34. 8 0 28.86 30 . 8 6 30. 1 6 28.16 2.0% 2. 0 % 4. 6 % 2.0% 1.8% 3.7% (24 . 0 0 ) (23 . 6 8 ) (24 . 3 1 ) (24 . 2 3 ) (23 . 6 9 ) (24 . 2 6 ) (23 . 6 9 ) PROPOSED COBBLE SWALE RE: LANDSCAPE PLANS BOULDER RETAINING WALL TO BE REQUIRED ONLY WHERE NEEDED TO KEEP SLOPES NO GREATER THAN 4:1 PROPOSED STEP 1-7" 48.95 LF 12" HDPE @ 4.33% PROPOSED 2' CURB OUTFALL TO SIDEWALK CHASE SEE DETAIL 207/D2 26 . 6 8 26.5 8 26.4 926.4 5 BUILDING 9 (23 . 4 2 ) (2 3 . 2 9 ) (1 . 1 % ) (2 6 . 7 % ) (25 . 1 % ) EXISTING CONCRETE STAIRS 3.8 % 24.60 25.0 8 25.08 23.92 6.7 % 26.15 25.84 28 . 0 0 4.4% 2.1 % 24.6424.14 24.6 1 24.42 24.1 0 2. 0 % 27.6 2 27.8 0 27.99 24.31 24.3 1 24.41 24.3 7 24.6824 . 7 0 24.5 5 25 . 9 7 25.57 25 . 6 0 24.50 24.71 26.35 PROPOSED RETAINING WALL SEE DETAIL 205/D2 PROPOSED RETAINING WALL SEE DETAIL 205/D2 PROTECT EXISTING STREET LIGHT (TYP.) ?? ? 25.85 33 . 5 % ( A B ) 31 . 5 % ( A B ) 22 . 6 % ( A B ) 24 . 2 % ( A B ) 26 . 6 % ( A B ) 24 . 1 % ( A B ) 10 . 4 % ( A B ) 4.8% ( A B ) 13 . 4 % ( A B ) W CS C.O . C.O . 2. 0 % EM 2 33223 3 3 2 3 3 2 3 2 2 3 2 3 2 3 223 3 2 2 3 3 3 3 3 3 3 3 HYD C S SS SS G G G G G G G GGGG G E E E E E E E E E E E E E EE E E E E W W W W W W W W W W W WJES S U P D R I V E 6' SIDEWALK 6' SID E W A L K 8' DRIVE 5' T R A I L 5' E X I S T I N G T R A I L PROPOSED ACCESS RAMPS 25.7 4 23.9 1 18.3 1 17.3 4 16.36 16. 3 4 2.5 % 9.2% 5.0% 9.2 % 4.3% 2.9 % 4.6% 2.0 % 6.9% 12 . 7 % 7: 1 3:1 3: 14:1 4:1 7:1 9:1 4:1 4: 1 24.46 25.5 8 (37 . 9 1 ) 38.6 1 37. 5 5 37.2 3 36.7 5 FG 36.7 0 34.5 2 FG 36.0 0 34 . 3 3 FG 32.2 7 31.8 9 FG 30.93 27.1 1 25.8 2 25.98 26 . 0 8 26.0 8 26.08 25.98 25.74 25.63 25.6 8 25.4 7 25.19 24.8 0 24.2 1 24.1 9 24.1 2 23.8 7 22.8 2 22.86 22.7 1 22.82 22.3 6 22.2 5 21.9 1 20.59 19.5 8 17.4 3 25.5 8 25.5 8 17.34 16.08 16.08 18.5 3 20.61 20.7 2 20.61 20.70 21.6 4 26.0 8 PROPOSED ACCESS RAMP 15. 1 0 12. 7 4 3.0 % 7.2% (7.2:1) 4: 1 (20.5 1 ) (19.6 1 ) (19.3 4 ) (17.9 7 ) (16.7 3 ) 7.9 % 8. 2 % 20.67 25. 3 1 24.9 4 24.0 0 23.9 1 23.82 22.3 2 21.41 21.3 6 5. 8 % 2. 0 % 4. 5 % 16. 4 8 EXISTING STORM DRAIN EXISTING STORM DRAIN PROPOSED WALL EXISTING INLET 15. 8 3 15.8 3 15. 8 3 16. 4 5 15.8 3 (7.0:1) (6.3 : 1 ) (9. 0 : 1 ) (8.5 : 1 ) 25.9 8 26.08 26.04 BURY FOUNDATION BOULDER RETAINING WALL TO BE REQUIRED ONLY WHERE NEEDED TO KEEP SLOPES NO GREATER THAN 4:1 BUILDING 13 (1.8% ) 2. 0 % EXISTING 18" VERTICAL CURB & GUTTER FFE=26.08 (11.6%) (3.5:1) 2. 0 % SPILL ELEVATION OF EXISTING POND ±5905.06 PROPOSED COBBLE SWALE 4:1 CONTRACTOR TO GRADE OVERTOPPING SPILL PATH ELEV. 4915.83 W C.O . C.O . ST ST ST ST ST ST Sheet JE S S U P F A R M M I N O R A M E N D M E N T E N G I N E E R N G I E H T R O N R N FO R T C O L L I N S : 3 0 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 , 8 0 5 2 1 GR E E L E Y : 8 2 0 8 t h S t r e e t , 8 0 6 3 1 97 0 . 2 2 1 . 4 1 5 8 no r t h e r n e n g i n e e r i n g . c o m of 14 G2 GR A D I N G P L A N - B U I L D I N G 9 & 1 3 9 NORTH CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 LEGEND: PROPERTY BOUNDARY EXISTING RIGHT-OF-WAY EXISTING LOT LINE 33.43 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 4.SPOT ELEVATIONS DEPICTED ADJACENT TO RETAINING WALLS REPRESENT THE FINISHED GRADE ELEVATIONS AT THE LOW SIDE AND HIGH SIDE OF EACH WALL. RETAINING WALLS OVER 4 FEET IN HEIGHT, MEASURED FROM THE LOW SIDE GRADE TO THE TOP OF THE WALL, WILL REQUIRE A SEPARATE PERMIT THROUGH THE BUILDING DEPARTMENT. A SEPARATE PERMIT IS NOT REQUIRED FOR RETAINING WALLS THAT ARE NOT OVER 4 FEET IN HEIGHT, MEASURED FROM THE LOW SIDE GRADE TO THE TOP OF THE WALL, PROVIDED THE HORIZONTAL DISTANCE TO THE NEXT UPHILL RETAINING WALL IS AT LEAST EQUAL TO THE TOTAL HEIGHT OF THE LOWER RETAINING WALL. 5.RETAINING WALLS SHOWN ON PLANS ARE BASED ON BEST AVAILABLE INFO AT TIME OF DESIGN. 6.FINAL EXTENTS AND CONFIGURATION MAY VARY BASED ON ACTUAL FIELD CONDITIONS. NOTES: 2.0% PROPOSED STORM SEWER PROPOSED AREA DRAIN PROPOSED CONTOUR EXISTING CONTOUR PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION PROPOSED SLOPES (33.43 ) EXISTING STORM DRAIN PROJECT BENCHMARKS: PROJECT DATUM: NAVD 88 BENCHMARK #1: CITY OF FORT COLLINS BENCHMARK 4-07 SOUTHWEST CORNER OF TIMBERLINE RD. AND BEAR MOUNTAIN DR. DUE NORTH OF NEW POLICE BUILDING ON THE SOUTHWEST CORNER OF A CATCH BASIN. ELEVATION = 4942.84 BENCHMARK #2: CITY OF FORT COLLINS BENCHMARK 17-92 300 FEET SOUTH OF THE SOUTHWEST CORNER OF EAST DRAKE RD. AND TIMBERLINE RD. IN THE TOP OF AN IRRIGATION STRUCTURE. ELEVATION = 4938.70 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 - 3.185' BASIS OF BEARING: THE SOUTH LINE OF THE SOUTHWEST ONE-QUARTER OF SECTION 20, TOWNSHIP 7 NORTH, RANGE 68 WEST OF THE 6TH PRINCIPAL MERIDIAN, MONUMENTED ON THE WEST END BY A 2.5" ALUMINUM CAP IN RANGE BOX MARKED "CITY OF FORT COLLINS 2001 LS 17497" AND ON THE EAST END BY A 3.25" ALUMINUM CAP IN A RANGE BOX MARKED "JR ENGINEERING 2005 PLS 37963", WHICH, ACCORDING TO THE PLAT OF SIDEHILL - FILING TWO, BEARS S89°26'35"E A DISTANCE OF 2641.77'. (2.0%)EXISTING SLOPES NORTH BUILDING 13 BUILDING 9 KEYMAP S T I M B E R L I N E R O A D 19 21 22 509 SFGARAGE1 168 SFSTORAGE2 131 SF OFFICE3 28 29 UP BLACKBIRD DRIVE JE S S U P D R I V E BLUE Y O N D E R WAY BUILDING 11 BUILDING 13 BUILDING 9 BUILDING 12 MATCHLINE-SEE SHEET G1 RECORD DRAWING 1 2