HomeMy WebLinkAboutLot Certifications - 04/14/20222/14/17 Page 1
CERTIFICATION OF LOT GRADING
Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e)
Date:
Address:
Lot: Block:
Subdivision:
Permit Application #:
Larimer County Parcel #:
Larimer County Reception #:
(on development agreement)
I, (print) , a Colorado registered professional engineer, verify that construction
of all stormwater facilities and grading is complete and hereby submit this certification.
Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an
explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots.
1.Certification includes attached Stormwater-approved grading plan. (NOTE: City’s
Building Department does not approve grading plans).
2.Certification includes the attached as-built survey dated (must be within 60
days of the date the certification is submitted) accurately and truthfully depicting
elevations for:
Top of foundation/finished floor
Finished grade on each side of the structure
Quarter points along each lot line (not more than 50 feet apart)
Break points/high points
Swales
Berms
Retaining walls
Air conditioning pads
Window wells
Any other appurtenance(s) within an easement
3.All elevations are within a 0.2 foot tolerance of the approved grading plan.
4.The top of foundation is at least 6 inches above the highest grade surrounding the
structure.
5.There is a minimum grade of 5% away from the structure within the first 5 to 10 feet
adjacent to the residence.
6.All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single
family lots when the swale is draining the runoff from only two adjoining properties)
and are not steeper than 33% (3:1).
7.All flow lines of stormwater drainage swales are a minimum of 6 inches below the
elevation of ground adjacent to the structure and will direct drainage as shown on the
Stormwater-approved grading plan.
8.All downspout locations and discharge directions are shown on the as-built survey.
Runoff is directed into an appropriate drainage system or lot line swale, and it is not
directed onto neighboring properties.
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
ALB
ALB
ALB
ALB
ALB
ALB
ALB
ALB*
See Narrative above.
Except in areas where concrete walks were poured directly adjacent to the foundation.
The Walks slope away from the building at 2%.
* = Downspouts are on the grading record drawing
Two entrances were added to the front of the building with
attached walks. A retaining wall (2 to 3' tall) was added to the
south west corner adjacent to the 6' sidewalk to make room for a
drainage path. The area between the wall and the building is
paved with concrete. On the north side a trench drain was added
to the proposed driveway with a catch basin and storm line to
capture inflows and discharge downstream. An additional drain
basin and storm line was added to the north end of the proposed
wing wall to intercept flow from behind the wall.
See narrative
on sheet 2.
Wes Lamarque
4/14/2022
2/14/17 Page 2
9.A smooth transition with no vertical offset (step) in grade is provided at the lot line to all
adjacent properties.
10.The grading of this lot does not adversely affect neighboring properties or City
infrastructure.
11.Landscaping has been completed prior to survey. If not, please indicate who will be
responsible for completing landscaping:
12.Final site cleanup has been completed.
13.I personally visited the site as part of the certification process, and in my professional
opinion, the as-built survey is an accurate representation of the site conditions..
No Yes
No Yes
No Yes
No Yes
No Yes
14.Based on this information, I certify that (check one):
□The elevations and drainage patterns of the lot/site are in substantial conformance with the City
approved drainage and grading plan for the property (information attached).
□The elevations and drainage patterns of the lot/site as measured are in general conformance with the
City approved drainage plan with exceptions (information attached). In my professional judgment the
elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the
specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a
manner consistent with the approved drainage plan.
Name:
Email:
Phone:
Company:
Address:
NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy
for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed
elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other
information necessary to confirm the above certification to:
Email (preferred)
WaterUtilitiesEng@fcgov.com
Mailing Address
Fort Collins Utilities
ATTN: Water Utilities Engineering
281 North College Avenue
Fort Collins, CO 80521
Questions?
970-221-6700
PE Stamp
Sign and date
04/13/2022
ALB
ALB
ALB
ALB
ALB
Soil amendments and landscaping yet to
commence at time of site visit.
7. Due to the addition of the southern entrance and associated attached walk, an earthen swale was not
feasible per the approved plan. A concrete apron and pan was installed to direct flow south, around the
buildings columns and out to an open swale. The concrete adjacent to the building is sloped at 2% away
from the foundation. The catch slope of the concrete pan is sloped at 2%, and the concrete apron's slope
varies between the walk and the pan.
VAN
2
3
3
2
2
3
3
3
2
3
32 UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
S
SS
SS
SS
SS
SS
SS
SS
SS
SS
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
21.61
FL
21.83
FL
22.20
FL
21.69
FL
21.98
FL
22.39
FL
22.58
FL
22.84
FL
23.42
FL
23.92
FL
24.13
FL
24.30
FL
24.03
FL
24.19
FL
24.70
FL
25.83
FL
26.15
FL
26.51
FL
28.49
FL
30.26
FL
31.50
FL
33.67
EOC
32.15
EOC
31.75
EOC
31.16
EOC
30.12
EOC
29.18
EOC
28.39
EOC
27.22
EOC
26.31
EOC
26.12
EOC
26.06
EOC 26.03
EOC
26.03
EOC
26.05
H2O MTR
25.93
FL PAN
25.67
FL PAN
25.36
FL PAN
25.32
FL PAN
25.27
FL PAN
28.64
CL WALL
28.11
CL WALL
27.53
CL WALL
26.66
CL WALL
27.07
EOC
26.05
EOC
25.72
EOC
25.45
EOC
25.36
TOP RAMP
24.89
TOP RAMP
25.21
EOC
25.30
EOC
25.21
EOC
24.76
EOC
24.83
TOP RAMP
24.72
TOP RAMP
24.94
EOC
24.27
BOTT RAMP
24.07
BOTT RAMP
24.30
TOP RAMP
24.17
TOP RAMP
23.77
EOC
23.43
EOC
23.01
EOC
22.97
TOP RAMP
22.86
TOP RAMP
22.30
BOTT RAMP
22.46
BOTT RAMP
22.33
EOC
22.08
EOC
21.88
EOC
21.73
EOC 21.45
EOC
20.74
EOC
19.64
EOC
18.18
EOC
17.06
EOC
16.40
EOC
15.99
EOC @ DRAIN15.93
EOC @ DRAIN
15.85
EOC @ DRAIN
15.93
EOC @ DRAIN
15.24
AD RIM
13.93
INV
16.21
EOC
16.01
EOC
15.91
EOC
15.90
EOC
16.15
EOC
16.28
EOC
16.30
FF BASEMENT
16.15
CO
16.14
CO
15.33
FL
15.42
FL
16.86
EOC
18.36
EOC
19.43
EOC
20.46
EOC
20.88
EOC
20.91
EOC
20.79
EOC
19.88
EOC
18.97
EOC
18.09
EOC
17.57
EOC
17.53
EOC
18.64
EOC
19.78
EOC
20.84
EOC
22.06
EOC
21.94
EOC
22.13
EOC
21.89
EOC
21.59
EOC
24.81
SWALE
24.17
SWALE
23.60
SWALE
22.95
SWALE
21.91
SWALE
20.94
SWALE
20.29
SWALE
20.43
GND
21.56
GND
23.11
GND
24.10
GND
24.73
GND
25.67
GND
25.53
GND
25.70
GND
25.79
GND
25.29
GND
25.52
GND
24.23
SWALE
22.69
SWALE
20.63
SWALE
19.89
SWALE
19.15
SWALE
17.52
SWALE
17.26
SWALE
20.94
WALL
20.96
WALL
21.94
WALL
22.93
WALL
23.92
WALL
25.92
WALL
24.47
GND
23.46
GND
22.26
GND
21.18
GND
20.49
GND
20.10
GND
18.34
GND
17.79
GND
21.67
GND
22.47
GND
21.71
GND
23.06
GND
24.81
GND
26.10
EOC
26.19
EOC
26.08
EOC
18.26
GND
17.33
GND
17.18
GND
18.19
CL ROCK WALL
18.38
CL ROCK WALL
18.91
CL ROCK WALL
18.18
GND
16.39
GND
15.97
GND
17.69
GND
16.81
GND
15.39
GND
13.78
GND
13.67
IVN
15.59
IVN
15.55
IVN
16.29
GND
15.98
GND
13.99
GND15.00
GND
15.97
AD INV
26.43
CURB STOP
26.10
GND
28.62
GND
27.33
GND
27.23
GND
26.48
GND
27.44
GND
27.96
GND
27.95
GND
28.33
CL ROCK WALL
27.66
CL ROCK WALL
28.76
CL ROCK WALL
28.00
CL ROCK WALL
27.96
CL ROCK WALL
26.77
CL ROCK WALL
25.52
GND
24.36
GND
22.69
GND
21.66
GND
23.98
GND
24.40
FL PAN
25.51
GND
25.77
GND
25.60
GND
25.68
GND
26.11
GND
26.04
GND
25.83
GND
25.37
GND
25.90
GND 25.89
GND
25.43
SWALE25.15
SWALE
25.54
GND25.54
GND
24.93
GND
23.04
GND
21.96
GND
21.90
GND
23.87
GND
26.00
EOC
26.01
EOC
26.04
EOC
25.97
EOC25.99
EOC
26.16
EOC
26.18
FF
26.18
FF
23.89
FL PAN
23.21
FL PAN
20.79
GND
21.41
GND 21.07
GND
20.68
GND
19.62
GND
19.13
GND
18.85
GND
19.06
GND
19.24
GND
19.23
GND
18.75
GND 18.24
GND
20.01
WALL
19.60
WALL
19.03
WALL
18.74
WALL
18.17
WALL
18.19
WALL
18.21
WALL18.42
EOC
18.42
EOC
18.41
EOC
18.41
EOC
19.46
CL WALL
19.47
CL WALL
19.45
CL WALL
16.28
TOC
16.27
TOC
16.31
TOC
16.30
TOC
16.82
STEP
18.42
STEP
18.27
GND
16.42
GND
16.80
GND
16.93
GND
17.83
GND
20.01
GND
18.27
GND
17.90
GND
17.54
GND
JESSUP FARM BUILDING 13 AS-BUILT EXHIBIT
LOCATED IN SECTION 20, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS,
COUNTY OF LARIMER, STATE OF COLORADO
4025 Automation Way, Suite C4
Fort Collins, CO 80525
970-232-9645
www.WashburnSurveying.com
Sheet 1 of 2 Project #: 2021-0060 Date: March 4, 2022 Scale: 1"=10' Drawn: CDB
NOTE
ELEVATIONS SHOWN HEREON ARE FROM AN AS-BUILT SURVEY OF THE SITE PERFORMED ON MARCH 1, 2022.
Sc
a
l
e
:
1
"
=
1
0
'
VAN
2
2
3
3
2
3
32
3
22323232
2
3322
F
E
E
E
E
W
FDC
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
HYD
C
W
W
W
W
W
W W W W W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
24.13
FL
24.30
FL
24.19
FL
24.70
FL
25.83
FL
26.15
FL
26.51
FL
28.49
FL
30.26
FL
31.50
FL
38.50
EOC
38.49
EOC
38.45
EOC
38.37
EOC
37.88
EOC
36.98
EOC
35.57
EOC
34.79
EOC
33.67
EOC
32.15
EOC
31.75
EOC
31.16
EOC
30.12
EOC
29.18
EOC
28.39
EOC
27.22
EOC
26.31
EOC
26.12
EOC
26.06
EOC 26.03
EOC
26.03
EOC
26.05
H2O MTR
25.93
FL PAN
25.67
FL PAN
25.36
FL PAN
25.32
FL PAN
25.27
FL PAN
28.64
CL WALL
28.11
CL WALL
27.53
CL WALL
26.66
CL WALL
27.07
EOC
26.05
EOC
25.72
EOC
25.45
EOC
25.36
TOP RAMP
24.89
TOP RAMP
25.21
EOC
25.30
EOC
25.21
EOC
24.76
EOC
24.83
TOP RAMP
24.72
TOP RAMP
24.94
EOC
24.27
BOTT RAMP 15.99
EOC @ DRAIN15.93
EOC @ DRAIN
15.85
EOC @ DRAIN
15.93
EOC @ DRAIN
15.24
AD RIM
13.93
INV
16.21
EOC
16.01
EOC
15.91
EOC
15.90
EOC
16.15
EOC
16.28
EOC
16.30
FF BASEMENT
16.15
CO
16.14
CO
15.33
FL
15.42
FL
24.81
SWALE
24.17
SWALE
24.73
GND
25.67
GND
25.53
GND
25.70
GND
25.79
GND
25.29
GND
25.52
GND
24.23
SWALE
SWALE WALL
23.92
WALL
25.92
WALL
24.47
GND
23.46
GND
24.81
GND
26.10
EOC
26.19
EOC
26.08
EOC
17.33
GND
17.18
GND
18.19
CL ROCK WALL
18.38
CL ROCK WALL
18.91
CL ROCK WALL
18.18
GND
16.39
GND
17.69
GND
26.43
CURB STOP
26.10
GND
38.53
EOC
38.61
EOC38.62
EOC
28.62
GND
27.33
GND
27.23
GND
26.48
GND
27.44
GND
27.96
GND
27.95
GND
28.33
CL ROCK WALL
27.66
CL ROCK WALL
28.76
CL ROCK WALL
28.00
CL ROCK WALL
27.96
CL ROCK WALL
26.77
CL ROCK WALL
25.52
GND
24.36
GND
22.69
GND
21.66
GND
18.95
GND
19.44
GND
20.54
GND
21.73
GND
22.82
GND23.48
GND
24.26
GND
25.57
GND26.69
GND
26.72
GND
27.73
GND
30.28
GND
32.72
GND
32.72
GND
34.82
GND
35.68
GND
35.95
GND
36.80
GND
37.15
GND
37.27
GND
37.02
GND
36.38
GND 34.48
GND
32.02
GND
31.03
GND
30.06
GND
28.77
GND
27.09
GND
25.40
GND
23.98
GND
24.40
FL PAN
25.51
GND
25.77
GND
25.60
GND
25.68
GND
26.11
GND
26.04
GND
25.83
GND
25.37
GND
25.90
GND 25.89
GND
25.43
SWALE25.15
SWALE
25.54
GND25.54
GND
24.93
GND
23.04
GND
21.96
GND
21.90
GND
23.87
GND
26.00
EOC
26.01
EOC
26.04
EOC
25.97
EOC25.99
EOC
26.16
EOC
26.18
FF
26.18
FF
37.77
EOC
38.01
EOC
18.86
GND
20.79
GND
21.41
GND 21.07
GND
20.68
GND
19.62
GND
19.13
GND
18.85
GND
19.06
GND
19.24
GND
19.23
GND
18.75
GND 18.24
GND
20.01
WALL
19.60
WALL
19.03
WALL
18.74
WALL
18.17
WALL
18.19
WALL
18.21
WALL18.42
EOC
18.42
EOC
18.41
EOC
18.41
EOC
19.46
CL WALL
19.47
CL WALL
19.45
CL WALL
16.28
TOC
16.27
TOC
16.31
TOC
16.30
TOC
16.82
STEP
18.42
STEP
18.27
GND
16.42
GND
16.80
GND
16.93
GND
17.83
GND
20.01
GND
18.27
GND
17.90
GND
17.54
GND
JESSUP FARM BUILDING 13 AS-BUILT EXHIBIT
LOCATED IN SECTION 20, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS,
COUNTY OF LARIMER, STATE OF COLORADO
4025 Automation Way, Suite C4
Fort Collins, CO 80525
970-232-9645
www.WashburnSurveying.com
Sheet 2 of 2 Project #: 2021-0060 Date: March 4, 2022 Scale: 1"=10' Drawn: CDB
NOTE
ELEVATIONS SHOWN HEREON ARE FROM AN AS-BUILT SURVEY OF THE SITE PERFORMED ON MARCH 1, 2022
Sc
a
l
e
:
1
"
=
1
0
'
EM
UP
2
3
3
2
3
2
32
3
32
3
32
32
32
3
2
3
2 2 3
3
2
2 3
2
2
21
22
509
S
FGAR
A
G
E
1
168
S
FSTO
R
A
G
E
2
131
S
F
OFF
I
C
E
3
28
29
E
G
G
G
G
G
G
E
E
E
E
E
E
HYD
C
S
HYD
S
C
E
EE
E
G
G
G
G
G
CTV
CTV
CTV
CTV
CTV
CTV
W
W
SSSSSSSSSSSSSS
EEEEEEEEEE
E
E
E
E
E
E
CTVCTVCTVCTVCTVCTVCTVCTVCTVCTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTV
CTVCTVCTVCTVCTVCTVCTVCTVCTV
CTV
CTV
E
E
CTV CTV
CT
V
CT
V
CT
V
CTV
WWWWWWWWWWWWWW
SSSSSSSSSSSSSSSSSSSSSSSSSS
EE
WWWWW
SO
U
T
H
T
I
M
B
E
R
L
I
N
E
R
O
A
D
6' SIDEWALK
6' SIDEW
A
L
K
6' SIDEWALK
PROPOSED
STEPS 4-7"
FFE=28.00
(23
.
4
2
)
24.5
7
24.72
25.13
25.50
25.76
27.
9
0
26.00
26
.
3
2
26.8
2 27.0
9
27.0
9
26.8
2
26.7
3
26.31
27.9
0
28.0
0
26.9
2
24.4
9
24.4
9
24.7
9
24.7
9
24.6
3
23.4
5
24.9
2
25.15
25.21
33.11
33.4
9
34.
6
1
33
.
9
2
29
.
8
6
28
.
5
0
29.49
29.
9
1
27.86
28.12
32.61
33.
5
4
25
.
4
1
27
.
2
3
27
.
5
8
27
.
4
9
28
.
4
6
28
.
6
1
27
.
5
8
24.
2
7
24.35
24.59 24.
6
7
24.
6
4
27
.
9
1
27.9
1
28.00
28.0
0
(28.49)
(28
.
7
8
)
25.81
24.1
9
25
.
7
9
27.18
27.5
0
28.0
0
27.5
027.49
28.00
27.50
26.95
27.20
27.32
26.7
1 26.71
26.7
1
26.25
26.2
8
24.6
9
24.76
26.3
9
26.35
26.85
26.8
5
26.53
27.
5
0
28.00
28.
0
0
2.
1
%
4.5%
1.6%
2.0%
1.6%
1.6%
1.6%
2.0%2.0%2.0%2.0%1.0%
2.0%
27.3
1
27.5
0
27.7
5
27.
8
0
27.8
0
26.94 27.84
27.80
27.84
27.
8
6
28.0
0
27.23
6.6
%
8:
1
9:1
5:1
4:1
5:
1
6:
1 4:
1
4:1
4:1
5:1
4:1
5.
1
%
5.
0
%
10
:
1
2.
0
%
9.7
%
8.1%
11
.
9
%
8.9%
4:
1
4:
1
4:
19:1
73
.
4
%
5:
1 8:
1 4:
1
2.
0
%
1.9%2.0%2.1%
2.0%
PROPOSED
STAIRS RE: ARCH.
PROPOSED
WALL
EXISTING 18"
VERTICAL CURB
& GUTTER
PROPOSED 2' CURB CUT
PROPOSED
SIDEWALK CHASE
32.77
34.
8
0
28.86
30
.
8
6
30.
1
6
28.16
2.0%
2.
0
%
4.
6
%
2.0%
1.8%
3.7%
(24
.
0
0
)
(23
.
6
8
)
(24
.
3
1
)
(24
.
2
3
)
(23
.
6
9
)
(24
.
2
6
)
(23
.
6
9
)
PROPOSED COBBLE SWALE
RE: LANDSCAPE PLANS
BOULDER RETAINING
WALL TO BE REQUIRED
ONLY WHERE NEEDED
TO KEEP SLOPES NO
GREATER THAN 4:1
PROPOSED
STEP 1-7"
48.95 LF
12" HDPE
@ 4.33%
PROPOSED
2' CURB OUTFALL
TO SIDEWALK
CHASE SEE
DETAIL 207/D2
26
.
6
8
26.5
8
26.4
926.4
5
BUILDING 9
(23
.
4
2
)
(2
3
.
2
9
)
(1
.
1
%
)
(2
6
.
7
%
)
(25
.
1
%
)
EXISTING
CONCRETE STAIRS
3.8
%
24.60
25.0
8
25.08
23.92 6.7
%
26.15
25.84
28
.
0
0
4.4%
2.1
%
24.6424.14
24.6
1 24.42
24.1
0
2.
0
%
27.6
2
27.8
0
27.99
24.31
24.3
1
24.41
24.3
7
24.6824
.
7
0
24.5
5
25
.
9
7
25.57
25
.
6
0
24.50
24.71
26.35
PROPOSED
RETAINING WALL
SEE DETAIL 205/D2
PROPOSED
RETAINING WALL
SEE DETAIL 205/D2
PROTECT EXISTING
STREET LIGHT (TYP.)
??
?
25.85
33
.
5
%
(
A
B
)
31
.
5
%
(
A
B
)
22
.
6
%
(
A
B
)
24
.
2
%
(
A
B
)
26
.
6
%
(
A
B
)
24
.
1
%
(
A
B
)
10
.
4
%
(
A
B
)
4.8%
(
A
B
)
13
.
4
%
(
A
B
)
W
CS
C.O
.
C.O
.
2.
0
%
EM
2 33223
3
3
2
3
3
2
3
2
2
3
2
3
2
3
223
3
2
2
3 3 3 3 3 3 3 3
HYD C
S
SS
SS
G
G
G
G
G
G
G
GGGG
G
E
E
E
E
E
E
E
E
E E
E
E
E
EE
E
E
E
E
W
W
W
W
W
W
W
W
W W W
WJES
S
U
P
D
R
I
V
E
6' SIDEWALK
6' SID
E
W
A
L
K
8' DRIVE
5'
T
R
A
I
L
5'
E
X
I
S
T
I
N
G
T
R
A
I
L
PROPOSED
ACCESS RAMPS
25.7
4
23.9
1
18.3
1
17.3
4
16.36
16.
3
4
2.5
%
9.2%
5.0%
9.2
%
4.3%
2.9
%
4.6%
2.0
%
6.9%
12
.
7
%
7:
1
3:1
3:
14:1
4:1
7:1
9:1
4:1
4:
1
24.46
25.5
8
(37
.
9
1
)
38.6
1
37.
5
5
37.2
3
36.7
5
FG
36.7
0
34.5
2
FG
36.0
0
34
.
3
3
FG
32.2
7
31.8
9
FG
30.93
27.1
1
25.8
2
25.98
26
.
0
8
26.0
8
26.08
25.98
25.74
25.63
25.6
8
25.4
7 25.19
24.8
0
24.2
1
24.1
9
24.1
2
23.8
7
22.8
2
22.86
22.7
1
22.82
22.3
6
22.2
5
21.9
1
20.59
19.5
8
17.4
3
25.5
8
25.5
8
17.34
16.08
16.08
18.5
3
20.61
20.7
2
20.61
20.70
21.6
4
26.0
8
PROPOSED
ACCESS RAMP
15.
1
0
12.
7
4
3.0
%
7.2%
(7.2:1)
4:
1
(20.5
1
)
(19.6
1
)
(19.3
4
)
(17.9
7
)
(16.7
3
)
7.9
%
8.
2
%
20.67
25.
3
1
24.9
4
24.0
0
23.9
1
23.82
22.3
2 21.41
21.3
6
5.
8
%
2.
0
%
4.
5
%
16.
4
8
EXISTING STORM
DRAIN
EXISTING STORM DRAIN
PROPOSED
WALL
EXISTING INLET
15.
8
3
15.8
3
15.
8
3
16.
4
5
15.8
3
(7.0:1)
(6.3
:
1
)
(9.
0
:
1
)
(8.5
:
1
)
25.9
8
26.08
26.04
BURY
FOUNDATION
BOULDER RETAINING
WALL TO BE REQUIRED
ONLY WHERE NEEDED
TO KEEP SLOPES NO
GREATER THAN 4:1
BUILDING 13
(1.8%
)
2.
0
%
EXISTING 18" VERTICAL
CURB & GUTTER
FFE=26.08
(11.6%)
(3.5:1)
2.
0
%
SPILL ELEVATION
OF EXISTING POND
±5905.06
PROPOSED
COBBLE SWALE
4:1
CONTRACTOR
TO GRADE
OVERTOPPING
SPILL PATH
ELEV. 4915.83
W
C.O
.
C.O
.
ST
ST
ST
ST
ST
ST
Sheet
JE
S
S
U
P
F
A
R
M
M
I
N
O
R
A
M
E
N
D
M
E
N
T
E
N
G
I
N
E
E
R
N
G
I
E
H
T
R
O
N
R
N
FO
R
T
C
O
L
L
I
N
S
:
3
0
1
N
o
r
t
h
H
o
w
e
s
S
t
r
e
e
t
,
S
u
i
t
e
1
0
0
,
8
0
5
2
1
GR
E
E
L
E
Y
:
8
2
0
8
t
h
S
t
r
e
e
t
,
8
0
6
3
1
97
0
.
2
2
1
.
4
1
5
8
no
r
t
h
e
r
n
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
of 14
G2
GR
A
D
I
N
G
P
L
A
N
-
B
U
I
L
D
I
N
G
9
&
1
3
9
NORTH
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
before you dig.Call
R
( IN FEET )
0
1 INCH = 20 FEET
20 20 40 60
LEGEND:
PROPERTY BOUNDARY
EXISTING RIGHT-OF-WAY
EXISTING LOT LINE
33.43
1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN
SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY
THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE
COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL
UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND
UTILITIES.
2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY
EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION.
3.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE
ELEVATIONS.
4.SPOT ELEVATIONS DEPICTED ADJACENT TO RETAINING WALLS REPRESENT THE FINISHED GRADE
ELEVATIONS AT THE LOW SIDE AND HIGH SIDE OF EACH WALL. RETAINING WALLS OVER 4 FEET IN
HEIGHT, MEASURED FROM THE LOW SIDE GRADE TO THE TOP OF THE WALL, WILL REQUIRE A
SEPARATE PERMIT THROUGH THE BUILDING DEPARTMENT. A SEPARATE PERMIT IS NOT REQUIRED
FOR RETAINING WALLS THAT ARE NOT OVER 4 FEET IN HEIGHT, MEASURED FROM THE LOW SIDE
GRADE TO THE TOP OF THE WALL, PROVIDED THE HORIZONTAL DISTANCE TO THE NEXT UPHILL
RETAINING WALL IS AT LEAST EQUAL TO THE TOTAL HEIGHT OF THE LOWER RETAINING WALL.
5.RETAINING WALLS SHOWN ON PLANS ARE BASED ON BEST AVAILABLE INFO AT TIME OF DESIGN.
6.FINAL EXTENTS AND CONFIGURATION MAY VARY BASED ON ACTUAL FIELD CONDITIONS.
NOTES:
2.0%
PROPOSED STORM SEWER
PROPOSED AREA DRAIN
PROPOSED CONTOUR
EXISTING CONTOUR
PROPOSED SPOT ELEVATION
EXISTING SPOT ELEVATION
PROPOSED SLOPES
(33.43
)
EXISTING STORM DRAIN
PROJECT BENCHMARKS:
PROJECT DATUM: NAVD 88
BENCHMARK #1: CITY OF FORT COLLINS BENCHMARK 4-07
SOUTHWEST CORNER OF TIMBERLINE RD. AND BEAR MOUNTAIN DR. DUE NORTH OF NEW POLICE
BUILDING ON THE SOUTHWEST CORNER OF A CATCH BASIN.
ELEVATION = 4942.84
BENCHMARK #2: CITY OF FORT COLLINS BENCHMARK 17-92
300 FEET SOUTH OF THE SOUTHWEST CORNER OF EAST DRAKE RD. AND TIMBERLINE RD. IN THE TOP OF
AN IRRIGATION STRUCTURE.
ELEVATION = 4938.70
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING
DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATION SHOULD BE USED:
NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 - 3.185'
BASIS OF BEARING:
THE SOUTH LINE OF THE SOUTHWEST ONE-QUARTER OF SECTION 20, TOWNSHIP 7 NORTH, RANGE 68
WEST OF THE 6TH PRINCIPAL MERIDIAN, MONUMENTED ON THE WEST END BY A 2.5" ALUMINUM CAP IN
RANGE BOX MARKED "CITY OF FORT COLLINS 2001 LS 17497" AND ON THE EAST END BY A 3.25" ALUMINUM
CAP IN A RANGE BOX MARKED "JR ENGINEERING 2005 PLS 37963", WHICH, ACCORDING TO THE PLAT OF
SIDEHILL - FILING TWO, BEARS S89°26'35"E A DISTANCE OF 2641.77'.
(2.0%)EXISTING SLOPES
NORTH
BUILDING 13
BUILDING 9
KEYMAP
S
T
I
M
B
E
R
L
I
N
E
R
O
A
D
19
21
22
509 SFGARAGE1
168 SFSTORAGE2
131 SF
OFFICE3
28
29
UP
BLACKBIRD DRIVE
JE
S
S
U
P
D
R
I
V
E
BLUE
Y
O
N
D
E
R
WAY
BUILDING 11
BUILDING 13
BUILDING 9
BUILDING 12
MATCHLINE-SEE SHEET G1
RECORD DRAWING
1
2