Loading...
HomeMy WebLinkAboutLot Certifications - 07/16/20202/14/17 Page 1 CERTIFICATION OF LOT GRADING Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e) Date: Address: Lot: Block: Subdivision: Permit Application #: Larimer County Parcel #: Larimer County Reception #: (on development agreement) I, (print) , a Colorado registered professional engineer, verify that construction of all stormwater facilities and grading is complete and hereby submit this certification. Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots. 1.Certification includes attached Stormwater-approved grading plan. (NOTE: City’s Building Department does not approve grading plans). 2.Certification includes the attached as-built survey dated (must be within 60 days of the date the certification is submitted) accurately and truthfully depicting elevations for: Top of foundation/finished floor Finished grade on each side of the structure Quarter points along each lot line (not more than 50 feet apart) Break points/high points Swales Berms Retaining walls Air conditioning pads Window wells Any other appurtenance(s) within an easement 3.All elevations are within a 0.2 foot tolerance of the approved grading plan. 4.The top of foundation is at least 6 inches above the highest grade surrounding the structure. 5.There is a minimum grade of 5% away from the structure within the first 5 to 10 feet adjacent to the residence. 6.All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than 33% (3:1). 7.All flow lines of stormwater drainage swales are a minimum of 6 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Stormwater-approved grading plan. 8.All downspout locations and discharge directions are shown on the as-built survey. Runoff is directed into an appropriate drainage system or lot line swale, and it is not directed onto neighboring properties. No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes ALB ALB ALB ALB ALB ALB ALB ALB* Retaining wall west of building 9 deviates more than 0.2' from plan, but does not negatively impact drainage functionality Directly adjacent to concrete patios attached to building in west and south sides of building 9, separation is 0.4' which is within tolerance with positive drainage away from structure. * = Downspouts are on the grading record drawing July 15, 2020 Bucking Horse Filing 1 - Jessup Farm MA 1817 Jessup Drive B1917179 Building Envelope #9 8720259014 2 4 20120079864 & 20130064616 Adam L. Boese 7/15/2020 2/14/17 Page 2 9.A smooth transition with no vertical offset (step) in grade is provided at the lot line to all adjacent properties. 10.The grading of this lot does not adversely affect neighboring properties or City infrastructure. 11.Landscaping has been completed prior to survey. If not, please indicate who will be responsible for completing landscaping: 12.Final site cleanup has been completed. 13.I personally visited the site as part of the certification process, and in my professional opinion, the as-built survey is an accurate representation of the site conditions.. No Yes No Yes No Yes No Yes No Yes 14.Based on this information, I certify that (check one): □The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). □The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. Name: Email: Phone: Company: Address: NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) WaterUtilitiesEng@fcgov.com Mailing Address Fort Collins Utilities ATTN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 Questions? 970-221-6700 PE Stamp Sign and date ALB ALB ALB ALB ALB Soil amendments and landscaping yet to commence at time of site visit. 07.15.20 Longs Peak Landscape 4 Adam L. Boese adam@northernengineering.com 970-227-0557 Northern Engineering 301 N. Howes Street, Suite 100 Fort Collins, CO 80521 S HYD S C E E G G G G CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV W W W W SSSSSSSSSSSSSSSSSSSSSSSSSSSS EEEEEEEEEEEEE E E E E E E E E E E E E E CTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTVCTV CTV CTV CTV CTV CTV WWWWWWWWWWWWWWWWWWW W SSSSSSSSSSSS 2 3 3 2 3 2 32 3 32 3 32 32 32 3 2 3 2 2 3 3 2 2 3 2 2 S E/T/ C E/T/ C E/T/ C E/T/ C E/T/ C E/T/ C E/T/ C E/T/ C E/T/ C E/T/ C E/T/ C E G G G G G G E E E E E E 4025 Automation Way, Suite C4 Fort Collins, CO 80525 970-232-9645 www.WashburnSurveying.com Sheet 1 of 1 Project #: 2020-004 Date: July 14, 2020 Scale: 1"=10' Drawn: CDB Scale: 1"=10' TENDER GIFTS AS-BUILT EXHIBIT BUILDING 9, JESSUP FARM MINOR AMENDMENT, LOCATED IN THE SECTION 20, TOWNSHIP 7 NORTH, RANGE 68 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO ELEVATIONS SHOWN ARE FROM AN AS-BUILT SURVEY OF THE SITE PERFORMED ON JULY 13, 2020 EM UP 2 3 3 2 3 2 32 3 32 3 32 32 32 3 2 3 2 2 3 3 2 2 3 2 2 21 22 509 S FGAR A G E 1 168 S FSTO R A G E 2 131 S F OFF I C E 3 28 29 E G G G G G G E E E E E E HYD C S HYD S C E EE E G G G G G CTV CTV CTV CTV CTV CTV W W SSSSSSSSSSSSSS EEEEEEEEEE E E E E E E CTVCTVCTVCTVCTVCTVCTVCTVCTVCTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTVCTVCTVCTVCTVCTVCTVCTVCTV CTV CTV E E CTV CTV CT V CT V CT V CTV WWWWWWWWWWWWWW SSSSSSSSSSSSSSSSSSSSSSSSSS EE WWWWW SO U T H T I M B E R L I N E R O A D 6' SIDEWALK 6' SIDEW A L K 6' SIDEWALK PROPOSED STEPS 4-7" FFE=28.00 (23 . 4 2 ) 24.5 7 24.72 25.13 25.50 25.76 27. 9 0 26.00 26 . 3 2 26.8 2 27.0 9 27.0 9 26.8 2 26.7 3 26.31 27.9 0 28.0 0 26.9 2 24.4 9 24.4 9 24.7 9 24.7 9 24.6 3 23.4 5 24.9 2 25.15 25.21 33.11 33.4 9 34. 6 1 33 . 9 2 29 . 8 6 28 . 5 0 29.49 29. 9 1 27.86 28.12 32.61 33. 5 4 25 . 4 1 27 . 2 3 27 . 5 8 27 . 4 9 28 . 4 6 28 . 6 1 27 . 5 8 24. 2 7 24.35 24.59 24. 6 7 24. 6 4 27 . 9 1 27.9 1 28.00 28.0 0 (28.49) (28 . 7 8 ) 25.81 24.1 9 25 . 7 9 27.18 27.5 0 28.0 0 27.5 027.49 28.00 27.50 26.95 27.20 27.32 26.7 1 26.71 26.7 1 26.25 26.2 8 24.6 9 24.76 26.3 9 26.35 26.85 26.8 5 26.53 27. 5 0 28.00 28. 0 0 2. 1 % 4.5% 1.6% 2.0% 1.6% 1.6% 1.6% 2.0%2.0%2.0%2.0%1.0% 2.0% 27.3 1 27.5 0 27.7 5 27. 8 0 27.8 0 26.94 27.84 27.80 27.84 27. 8 6 28.0 0 27.23 6.6 % 8: 1 9:1 5:1 4:1 5: 1 6: 1 4: 1 4:1 4:1 5:1 4:1 5. 1 % 5. 0 % 10 : 1 2. 0 % 9.7 % 8.1% 11 . 9 % 8.9% 4: 1 4: 1 4: 19:1 73 . 4 % 5: 1 8: 1 4: 1 2. 0 % 1.9%2.0%2.1% 2.0% PROPOSED STAIRS RE: ARCH. PROPOSED WALL EXISTING 18" VERTICAL CURB & GUTTER PROPOSED 2' CURB CUT PROPOSED SIDEWALK CHASE 32.77 34. 8 0 28.86 30 . 8 6 30. 1 6 28.16 2.0% 2. 0 % 4. 6 % 2.0% 1.8% 3.7% (24 . 0 0 ) (23 . 6 8 ) (24 . 3 1 ) (24 . 2 3 ) (23 . 6 9 ) (24 . 2 6 ) (23 . 6 9 ) PROPOSED COBBLE SWALE RE: LANDSCAPE PLANS BOULDER RETAINING WALL TO BE REQUIRED ONLY WHERE NEEDED TO KEEP SLOPES NO GREATER THAN 4:1 PROPOSED STEP 1-7" 48.95 LF 12" HDPE @ 4.33% PROPOSED 2' CURB OUTFALL TO SIDEWALK CHASE SEE DETAIL 207/D2 26 . 6 8 26.5 8 26.4 926.4 5 BUILDING 9 (23 . 4 2 ) (2 3 . 2 9 ) (1 . 1 % ) (2 6 . 7 % ) (25 . 1 % ) EXISTING CONCRETE STAIRS 3.8 % 24.60 25.0 8 25.08 23.92 6.7 % 26.15 25.84 28 . 0 0 4.4% 2.1 % 24.6424.14 24.6 1 24.42 24.1 0 2. 0 % 27.6 2 27.8 0 27.99 24.31 24.3 1 24.41 24.3 7 24.6824 . 7 0 24.5 5 25 . 9 7 25.57 25 . 6 0 24.50 24.71 26.35 PROPOSED RETAINING WALL SEE DETAIL 205/D2 PROPOSED RETAINING WALL SEE DETAIL 205/D2 PROTECT EXISTING STREET LIGHT (TYP.) ?? ? 25.85 33 . 5 % ( A B ) 31 . 5 % ( A B ) 22 . 6 % ( A B ) 24 . 2 % ( A B ) 26 . 6 % ( A B ) 24 . 1 % ( A B ) 10 . 4 % ( A B ) 4.8% ( A B ) 13 . 4 % ( A B ) EM 2 33223 3 3 2 3 3 2 3 2 2 3 2 3 2 3 223 3 2 2 HYD C S SS SS G G G G G G G GGGG G E E E E E E E E E E E E E EE E E E E W W W W W W W W W W W WJES S U P D R I V E 6' SIDEWALK 6' SID E W A L K 8' DRIVE 5' T R A I L 5' E X I S T I N G T R A I L PROPOSED ACCESS RAMPS 25.0 8 24.5 1 18.3 1 17.3 4 15.6 8 15. 6 4 2.5 % 12 . 2 % 2.2% 12 . 2 % 4.3% 2.9 % 4.6% 2.0 % 6.9% 2.4% 7: 1 3:1 5: 15:1 7:1 6:1 9:1 4: 1 4: 1 24.9 9 27.5 8 (37 . 9 1 ) 38.6 1 37. 5 5 37.2 3 36.7 5 FG 36.7 0 34.5 2 FG 36.0 0 34 . 3 3 FG 32.2 7 31.8 9 FG 30.93 27.1 1 25.8 2 25.98 26 . 0 8 26.3 3 26.08 25.98 25.74 25.63 25.6 8 25.4 7 25.19 24.8 0 24.2 1 24.1 9 24.1 2 23.8 7 22.8 2 22.86 22.7 1 22.82 22.3 6 22.2 5 21.9 1 20.24 18.9 5 17.4 3 25.5 8 25.5 8 17.34 16.08 16.08 18.5 3 20.61 20.7 2 20.61 20.7 021.6 4 25.5 8 PROPOSED ACCESS RAMP 14. 8 0 12. 7 4 4.3 % 4.5% (7.2:1) 4: 1 (20.5 1 ) (19.6 1 ) (19.3 4 ) (17.9 7 ) (16.7 3 ) 7.9 % 8. 2 % 20.67 26. 7 9 25.7 6 24.0 0 23.9 1 23.82 22.3 2 21.41 21.3 6 5. 8 % 2. 0 % 4. 5 % 16. 4 8 EXISTING STORM DRAIN EXISTING STORM DRAIN PROPOSED WALL EXISTING INLET 15. 8 3 15.8 3 15. 8 3 16. 4 5 15.8 3 (7.0:1) (6.3 : 1 ) (9. 0 : 1 ) (8.5 : 1 ) 26.9 9 27.58 26.05 BURY FOUNDATION BOULDER RETAINING WALL TO BE REQUIRED ONLY WHERE NEEDED TO KEEP SLOPES NO GREATER THAN 4:1 BUILDING 13 (1.8% ) 2. 0 % EXISTING 18" VERTICAL CURB & GUTTER FFE=26.08(11.6%) (3.5:1) 6. 2 % 12.7 % SPILL ELEVATION OF EXISTING POND ±5905.06 PROPOSED COBBLE SWALE 4:1 CONTRACTOR TO GRADE OVERTOPPING SPILL PATH ELEV. 5915.83 Sheet JE S S U P F A R M M I N O R A M E N D M E N T E N G I N E E R N G I E H T R O N R N FO R T C O L L I N S : 3 0 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 , 8 0 5 2 1 GR E E L E Y : 8 2 0 8 t h S t r e e t , 8 0 6 3 1 97 0 . 2 2 1 . 4 1 5 8 no r t h e r n e n g i n e e r i n g . c o m of 14 G2 GR A D I N G P L A N - B U I L D I N G 9 & 1 3 9 NORTH CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 LEGEND: PROPERTY BOUNDARY EXISTING RIGHT-OF-WAY EXISTING LOT LINE 33.43 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 4.SPOT ELEVATIONS DEPICTED ADJACENT TO RETAINING WALLS REPRESENT THE FINISHED GRADE ELEVATIONS AT THE LOW SIDE AND HIGH SIDE OF EACH WALL. RETAINING WALLS OVER 4 FEET IN HEIGHT, MEASURED FROM THE LOW SIDE GRADE TO THE TOP OF THE WALL, WILL REQUIRE A SEPARATE PERMIT THROUGH THE BUILDING DEPARTMENT. A SEPARATE PERMIT IS NOT REQUIRED FOR RETAINING WALLS THAT ARE NOT OVER 4 FEET IN HEIGHT, MEASURED FROM THE LOW SIDE GRADE TO THE TOP OF THE WALL, PROVIDED THE HORIZONTAL DISTANCE TO THE NEXT UPHILL RETAINING WALL IS AT LEAST EQUAL TO THE TOTAL HEIGHT OF THE LOWER RETAINING WALL. 5.RETAINING WALLS SHOWN ON PLANS ARE BASED ON BEST AVAILABLE INFO AT TIME OF DESIGN. 6.FINAL EXTENTS AND CONFIGURATION MAY VARY BASED ON ACTUAL FIELD CONDITIONS. NOTES: 2.0% PROPOSED STORM SEWER PROPOSED AREA DRAIN PROPOSED CONTOUR EXISTING CONTOUR PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION PROPOSED SLOPES (33.43 ) EXISTING STORM DRAIN PROJECT BENCHMARKS: PROJECT DATUM: NAVD 88 BENCHMARK #1: CITY OF FORT COLLINS BENCHMARK 4-07 SOUTHWEST CORNER OF TIMBERLINE RD. AND BEAR MOUNTAIN DR. DUE NORTH OF NEW POLICE BUILDING ON THE SOUTHWEST CORNER OF A CATCH BASIN. ELEVATION = 4942.84 BENCHMARK #2: CITY OF FORT COLLINS BENCHMARK 17-92 300 FEET SOUTH OF THE SOUTHWEST CORNER OF EAST DRAKE RD. AND TIMBERLINE RD. IN THE TOP OF AN IRRIGATION STRUCTURE. ELEVATION = 4938.70 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 - 3.185' BASIS OF BEARING: THE SOUTH LINE OF THE SOUTHWEST ONE-QUARTER OF SECTION 20, TOWNSHIP 7 NORTH, RANGE 68 WEST OF THE 6TH PRINCIPAL MERIDIAN, MONUMENTED ON THE WEST END BY A 2.5" ALUMINUM CAP IN RANGE BOX MARKED "CITY OF FORT COLLINS 2001 LS 17497" AND ON THE EAST END BY A 3.25" ALUMINUM CAP IN A RANGE BOX MARKED "JR ENGINEERING 2005 PLS 37963", WHICH, ACCORDING TO THE PLAT OF SIDEHILL - FILING TWO, BEARS S89°26'35"E A DISTANCE OF 2641.77'. (2.0%)EXISTING SLOPES NORTH BUILDING 13 BUILDING 9 KEYMAP S T I M B E R L I N E R O A D 19 21 22 509 SFGARAGE1 168 SFSTORAGE2 131 SF OFFICE3 28 29 UP BLACKBIRD DRIVE JE S S U P D R I V E BLUE Y O N D E R WAY BUILDING 11 BUILDING 13 BUILDING 9 BUILDING 12 MATCHLINE-SEE SHEET G1 RECORD DRAWING 1