Loading...
HomeMy WebLinkAboutLot Certifications - 06/07/2018Certification of Lot GradingCertification of Lot GradingCertification of Lot GradingCertification of Lot Grading Supplementary NotesSupplementary NotesSupplementary NotesSupplementary Notes May May May May 29292929, 201, 201, 201, 2018888 RE:RE:RE:RE: 427 Wood Street, Fo427 Wood Street, Fo427 Wood Street, Fo427 Wood Street, Fort Collins, COrt Collins, COrt Collins, COrt Collins, CO Actual as-built conditions vary from the approved grading plan. The field constructed changes consist of the addition of a concrete swale along the north side of the house, and minor grading changes throughout the site due to field changes during construction. As a result, as-built grading throughout the property does not exactly match the grading plan. Additionally, underground drainage systems were added to collect roof drainage and route that runoff towards Wood Street. These systems provide additional drainage capacity for the more frequent runoff events. Otherwise, the as-built condition complies in principal with the approved Grading Plan for the project. A Westrian Company DRAINAGE SURVEY 427 WOOD STREET FORT COLLINS, CO 80521 34176 SHEET: OF 90 8 L a p o r t e A v e n u e Fo r t C o l l i n s , C O 8 0 5 2 1 (9 7 0 ) 2 1 9 - 2 8 3 4 EN G I N E E R I N G PE X GR A D I N G P L A N C1 10' SCALE: 1" = 10' 0 10'