Loading...
HomeMy WebLinkAboutLot Certifications - 04/26/2018 (4)Accepted 4/26/2018 WL GM GM GM FDC X X X X X X X X X X X X X X X X X X X X X XXX X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X BLDG 15 CLU B H O U S E 4025 Automation Way, Suite C4 Fort Collins, CO 80525 970-232-9645 www.WashburnSurveying.com Sheet 1 of 1 Project #: 2017-002 Date: April 10, 2018 Scale: 1"=10' Drawn: CDB Scale: 1"=10' AS-BUILT EXHIBIT BUCKING HORSE APARTMENTS BUILDING 15 ELEVATIONS SHOWN ARE FROM AN AS-BUILT SURVEY OF THE SITE PERFORMED ON APRIL 3 AND 9, 2018 UD TF X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXX X X X X X X X X X X X X X X X X X X X X X YEAR L I N G R O A D (PRIV A T E D R I V E ) 1.5% 1.6 % 4.2% 93.02 93.39 CLUBHOUSE FFE=92.47 92. 5 1 96.7 1 95.2 7 93.59 92 . 4 7 92 . 5 5 92.7593 . 8 0 93 . 1 4 95.34 94.26 95. 1 9 91. 9 5 91 . 6 0 90.9 5 94.32 92. 8 9 94 . 3 7 92.08 92.09 93 . 9 8 95.07 93.97 94.19 94.08 93.9 6 93.9 6 93 . 9 8 93.77 93.69 93.9 6 95.0 6 95.7 6 95.5 9 95 . 5 9 95.4 8 95.5 9 95.4 8 94.80 95 . 7 2 91.81 91.81 91 . 8 1 92. 4 7 92. 4 7 93.41 92.32 92.41 96 . 2 2 97. 5 4 93. 6 5 AREA DRAIN SEE SHEET AD1 91.40 91.55 91.95 91 . 5 5 91 . 9 5 92 . 0 9 92.8 1 12" LANDSCAPE WALL (RE: LANDSCAPE PLANS) 91 . 8 4 91.95 92.4 7 92 . 5 5 92.54 92. 5 8 93 . 3 9 92.40 BLDG 15 FFE=94.64 FFE=94.64 FFE=96.14 FFE=96.14 92. 0 9 92. 0 8 92. 1 4 96. 1 4 96. 1 4 94. 6 4 94. 6 4 8.4 % 8.1 % 11.1% 6.6 % 5.9% 2.6% 2.3 % 92 . 0 8 92.06 1.3 % 1. 7 % 1.1% 1.5% 2.3 % 2.3% 2. 1 % 97.0 7 97 . 3 9 97.5 4 21.4 % 92.4 7 92.3 2 91 . 2 5 91.13 91.56 5.0% 92 . 7 7 92.90 92.98 92.4 9 92.71 92 . 8 2 92. 8 2 92.91 93.00 93.05 11 . 1 % 6.6 % 4.6 % 1. 6 % 5.8% 5.0% 4. 8 % 5.2% 4. 7 % 6.7% 7.3% 7. 5 % 1. 5 % BUCKING HORSE APARTMENTS SHEET NO: \\ B R O N C O S \ E N G I N E E R S \ P R O J E C T S \ 6 8 7 - 0 0 4 \ D W G \ R E C O R D D R A W I N G S \ B U I L D I N G C E R T S \ 6 8 7 - 0 0 4 _ G R A D _ A B . D W G DRAWING REFERENCE: BUILDING 15 CERTIFICATION M. Kuehnel 1in=20ft 04-20-18 AB-15 DRAWN BY: SCALE: ISSUED: ( IN FEET ) 0 1 INCH = 20 FEET 20 20 FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 E N G I N E E R N GI EHTRON R N 970.221.4158 northernengineering.com LEGEND: EXISTING STORM SEWER DESIGNED STORM SEWER DESIGNED STORM INLET DESIGNED CONTOUR DESIGNED SWALE DESIGNED OUTFLOW CURB AND GUTTER DESIGNED SPOT ELEVATION EXISTING SPOT ELEVATION AS-BUILT SLOPES AS-BUILT SPOT ELEVATION AS-BUILT SWALE DIRECTION OF DOWNSPOUT TF TF TF TF XXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXX X X X X X X X LU S I T A N O L A N E (P R I V A T E D R I V E ) 1.5% 1.6% 3.7% 4.2% 1.5%2.9% 6.0% 1. 5 % 1. 5 % 1. 4 % 1.5%1.5%1.5%3. 8 % 3. 8 % 2.0% 3.2% 5.0% 4.3% 2.0% 5.3% 5.0% 5.0% 4. 4 % 5. 0 % 2.0%3.8%2.0%2.0% 3.9%2.8%2.0%5.0% 1. 2 % 2. 0 % 3. 7 % 2. 0 % 2. 0 % 92. 4 6 95. 6 3 94.9 8 94.5 6 92.9 3 92.4 8 92.7 2 94.7 7 94.7 8 94.5 2 92. 2 5 92 . 2 6 92.21 92.09 91.80 91 . 6 8 92.0 3 92. 5 8 92.2 1 91. 6 5 91.8 5 94 . 1 5 94 . 2 0 93.02 93.39 95. 2 7 95.3 4 91.6 7 91 . 5 7 91 . 0 7 91.26 CLUBHOUSE FFE=92.47 96.43 95.3 5 95. 3 0 93 . 7 7 92.4 5 92.00 92.4 1 91.3 5 91.2 2 92. 0 0 91.88 91. 7 3 91 . 7 4 91. 8 4 92. 1 1 92 . 3 7 92.1 0 92.0 4 92. 3 1 91.9 5 92 . 5 1 91.8 0 96.3 1 97. 2 9 96.7 1 95.2 7 93.59 92. 4 0 92 . 4 7 92 . 5 5 93 . 1 4 95.08 95.1 8 95.3 3 95.4 2 92. 8 5 91 . 9 2 92. 2 1 94 . 4 7 94 . 6 2 92. 5 4 91 . 1 8 91 . 0 6 91.5 6 92 . 0 5 91.6692.52 93.31 93. 4 4 92.77 93 . 9 1 94.2294 . 5 8 95.09 94.26 95.19 97. 6 8 94.4 7 94.48 92 . 0 9 92.0 9 91. 9 5 92.0 9 91. 6 0 90.9 5 91. 9 2 94 . 0 9 94 . 5 6 93 . 3 3 90 . 9 7 94 . 3 7 92.1 2 97.1 4 96.6 3 96. 0 5 96. 4 3 95.58 92.08 92.09 93 . 9 8 94.5195.12 95.07 93.97 94.19 94.08 93.96 93.96 93.98 93.77 93.69 93.9 6 95.0 6 95.7 6 95.5 9 95.5 9 95 . 4 8 94.80 98.2 0 95 . 7 2 95 . 3 0 95.20 94.9 0 94 . 8 7 94 . 5 8 95 . 2 0 94 . 3 9 94 . 2 0 93 . 5 9 93 . 6 0 95 . 2 0 95 . 2 0 95 . 3 6 94 . 9 0 94 . 2 0 93 . 8 0 93 . 6 0 93 . 7 8 94 . 2 0 94 . 2 0 93 . 7 8 97.3 9 97.3 9 97.5 0 97.3 9 97.6 8 97.3 9 97.1 8 96.6 9 96.8 9 96.8 9 96.8 9 97.00 96.69 96.9 5 97 . 6 0 97.3 9 97.3 9 93. 3 5 94.1 8 95 . 3 5 91.8191.81 91 . 8 1 92. 4 7 92. 4 7 91. 8 1 92 . 2 7 95. 0 7 95. 1 9 92. 2 3 92. 2 9 92. 1 8 92 . 1 9 92.1 594.41 94. 1 0 95.1 7 94 . 8 6 95. 4 1 95.6 5 92. 5 0 93.6 4 93.9 3 94. 8 7 95. 2 0 94. 7 9 93. 9 1 96.69 95.26 92 . 9 8 94 . 0 1 93 . 2 6 94 . 5 7 91 . 7 5 91 . 8 0 91 . 5 0 92 . 4 0 91 . 5 7 96 . 5 3 96.01 96 . 1 0 97.03 93.41 92 . 9 8 95 . 0 0 94 . 4 5 94.33 94 . 2 9 91. 9 8 92. 6 9 91. 5 5 91. 4 5 91.0 8 95.40 95.53 97.01 97.2 6 97.4 8 93. 6 5 AREA DRAIN SEE SHEET AD1AREA DRAIN SEE SHEET AD1 AREA DRAIN SEE SHEET AD2 AREA DRAIN SEE SHEET AD2 AREA DRAIN SEE SHEET AD2 AREA DRAIN SEE SHEET AD1 96. 3 5 93. 6 8 95.87 96.30 96.65 96.8 9 95. 6 2 97. 2 0 91.40 91. 9 5 91 . 8 0 91. 5 691 . 7 9 91. 5 5 91. 9 4 91 . 5 5 92. 0 9 91. 9 5 91.55 91.95 91 . 5 5 91 . 9 5 92 . 0 4 91 . 6 7 92 . 2 0 92 . 1 0 91 . 6 5 92 . 0 9 96.3 4 92.79 92.08 91 . 7 6 92.33 92.65 95.2 1 94.5 6 94.6 8 91.8 1 91. 8 0 91.2 3 12" LANDSCAPE WALL (RE: LANDSCAPE PLANS) 91 . 8 4 91.95 92.47 92 . 5 5 92.5 4 92. 5 8 93. 3 9 92.40 95.63 CUTTING HORSE DRIVE (PRIVATE DRIVE) BLDG 15 FFE=94.64 FFE=94.64 FFE=96.14 FFE=96.14 BLDG 13 FFE=98.06 FFE=98.06 FFE=97.56 FFE=97.56 BLDG 8 FFE=95.86 FFE=95.86 FFE=94.86 FFE=94.86 POOL FFE=92.25 92. 0 9 92. 0 9 92. 1 0 92. 0 8 92. 1 4 2-6" STEPS 2-6" STEPS 93 . 8 0 94 . 2 6 95 . 2 3 97.02 97. 1 8 2. 0 % 95 . 8 6 95 . 8 6 94 . 8 6 94 . 8 6 96. 1 4 96. 1 4 94. 6 4 94. 6 4 97. 5 6 98. 0 6 97. 5 6 97. 5 6 8. 0 % 92.70 10 . 5 % 7.0 % 8. 6 % 8. 1 % 11 . 1 % 7.6 % 14.5% 8.5 % 4.3% 4.0% 4.6 % 5.9 % 3.9 % 3.8 % 3.6% 4.4% 11.2% 10 . 5 % 9. 7 % 14.2% 8.2 %5. 8 % 6.6% 9.5 % 1.2% 2.0% 1. 3 % 92 . 0 9 92 . 0 8 92.06 92.0 9 92. 0 9 1.2% 1.5% 1.3% 1.7 % 1.1% 1.5% 1.5% 13.1% 9.7 % 6. 6 % 10 . 3 % 6.8 % 10 . 9 % 2.1% 1.9 % 2.4 % 2.2 % 2. 1 % 2. 1 % 3. 0 % 2. 2 % 1.9 % 3. 0 % 1.9 % 1. 9 % 1.9 % 98.2 098.0 4 97.86 98.3 1 97.8 0 98.2 0 97. 7 0 97. 5 6 96.8 8 97.6 8 97.0 7 97.5 4 92.10 92.0 2 91.7 5 92. 1 0 91.6 5 92.07 2' SIDEWALK CULVERT MAIL KIOSK 92. 2 6 92.09 92 . 2 5 91 . 3 1 91. 8 1 91.0 1 91.5 4 92.4 792.4 7 92 . 4 7 92.3 2 91.7 4 92. 4 8 92.38 91 . 2 5 91.13 91.565. 0 % 92. 0 8 92 . 7 7 92. 4 9 92. 7 1 92. 8 2 92. 8 2 92.9 1 93.00 8.0 % 14. 3 % 1' SIDEWALK CHASE CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 G5 GR A D I N G P L A N MA T C H L I N E - S E E S H E E T G 4 MATCHLINE - SEE SHEET G2 Sheet Of 39 Sheets DR A W I N G F I L E N A M E : D : \ P r o j e c t s \ 6 8 7 - 0 0 4 \ D w g \ G r a d \ 6 8 7 - 0 0 4 _ G R A D . d w g L A Y O U T N A M E : G 5 D A T E : M a r 3 1 , 2 0 1 7 - 1 : 0 4 p m C A D O P E R A T O R : a n d y LI S T O F X R E F S : [ 6 8 7 - 0 0 4 _ x U T I L ] [ 6 8 7 - 0 0 4 _ x E X S T ] [ 6 8 7 - 0 0 4 _ x G R A D ] [ 6 8 7 - 0 0 4 _ x S I T E ] [ 6 8 7 - 0 0 4 _ x T O P O ] [ N E S - x b o r d e r ] [ 6 8 7 - 0 0 4 _ K E Y M A P ] [ 6 8 7 - 0 0 4 _ x A D J ] [ 6 8 7 - 0 0 4 _ 3 D _ P r o p o s e d ] [ 6 8 7 - 0 0 4 _ x G R A D _ l e g ] E N G I N E E R N G I E H T R O N R N 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 ww w . n o r t h e r n e n g i n e e r i n g . c o m Ph o n e : 9 7 0 . 2 2 1 . 4 1 5 8 - F i l i n g F o u r 9.30.16 KEYMAP G1 G2G4 G3 LEGEND: PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED OUTFLOW CURB AND GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 4.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM. 5.CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTION OF PRIVATE DRIVES SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE. 6.ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM; NGVD 29 (UNADJUSTED). SEE COVER SHEET FOR BENCHMARK REFERENCES. 7.TRACT A IS BEYOND THE LIMITS OF THESE PLANS. NO IMPROVEMENTS ARE PROPOSED OUTSIDE THE LIMITS SHOWN. 8.SEE SHEETS CS1 AND CS2 FOR PROJECT BENCHMARKS AND VERTICAL DATUM. ADD 4800-FT TO PROPOSED CONTOURS, SPOT ELEVATIONS, AND FFE LABELS, WHERE TRUNCATED; EXCEPT IN WESTERN AREA OF SITE, WHERE ACTUAL ELEVATIONS RANGE FROM 4900-FT TO 4910-FT. NOTES: PROPOSED STORM INLET PEDESTRIAN ACCESS RAMPS EXISTING SPOT ELEVATION PROPOSED FIRE HYDRANT PROPOSED ELECTRIC TRANSFORMER PROPOSED LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) EXISTING RIGHT OF WAY PROPOSED INFLOW CURB AND GUTTER MA T C H L I N E - S E E S H E E T G 6 MATCHLINE - SEE SHEET G8 G5 G6 G7 G8 G9 2 SI T E P L A N U P D A T E S AG R 3/ 2 9 / 3 0 2 REVISION #2 KEY 1 REVISED CURB LOCATION AND ELEVATIONS 2 REVISED GARAGE FOOTPRINT 3 ADDED MAIL KIOSK/RELOCATED BIKE RACKS 4 REVISED CLUBHOUSE FOOTPRINT AND FLATWORK 5 REVISED 'C' BUILDING FOOTPRINT AND FLATWORK 3 4 3 3 UD UD UD TF TF TF TF 6.5% 6.2% NA N C Y G R A Y A V E N U E CUTTING HORSE DRIVE (PRIVATE DRIVE) MILES HOUSE AVENUE (PRIVATE DRIVE) YE A R L I N G R O A D (P R I V A T E D R I V E ) YE A R L I N G R O A D (P R I V A T E D R I V E ) N:16814.86 E:12564.55 N:16899.16 E:12481.75 3.0% 1. 0 % 2.0%1.6%1.2%1.8% 4.9% 6.0% 1.1 % 1.5 % 1.5% 6.7%0.8 % 3.3 % 1.5% 1.5%1.5% 5-5" STEPS2. 0 % 2. 0 % 2. 0 % 1. 0 % 4. 5 % 3. 5 % 3.2% 89.8 290 . 4 7 90.85 91 . 3 9 91.44 91.53 91.6 2 91. 7 9 91 . 2 5 92.16 93 . 8 3 92.6 9 93.02 90.8 2 90 . 7 8 90 . 8 0 91.0 0 93.02 93.39 91. 9 8 91.5 6 91.4 5 91.03 92 . 0 7 92.75 91.62 91.52 90.23 90 . 4 1 90 . 5 7 90. 6 790. 6 691.26 91 . 1 7 91 . 3 0 91 . 4 9 91 . 5 9 91 . 5 4 91.6 7 91 . 5 7 91 . 0 7 91.26 91.2 5 (92.5 3 ) (92 . 4 6 ) (92.89) (92 . 3 7 ) CLUBHOUSE FFE=92.47 91.2 2 92. 0 0 91.88 91. 7 3 91 . 7 4 91. 8 4 92. 1 1 91.8 0 91.60 90 . 7 6 94.27 94.88 91.84 92 . 5 8 93 . 1 4 92.47 93.83 92 . 5 5 92.75 92 . 9 6 (92 . 1 3 ) (92 . 1 3 ) (92 . 5 6 ) (92 . 4 7 ) (92.27)91.76 92.38 91 . 1 2 92.1 0 91.56 91 . 7 5 (92.6 8 ) (93. 1 3 ) (93.9 0 ) (9 3 . 4 6 ) (93 . 4 5 ) (9 3 . 0 8 ) (93 . 0 8 ) 91. 1 8 91.2 3 90 . 8 9 90.6 8 90.5 6 90.32 89.72 91 . 1 8 91 . 0 6 90 . 8 8 91 . 5 0 91. 0 9 91.5 6 91. 1 2 90.1190.87 90 . 8 4 91. 4 2 91.13 90 . 9 1 91.2992.08 91.76 92 . 1 7 91.66 93. 4 4 92.68 92.97 92.8 3 92.84 94.26 90.9 5 90.5 0 90.5 4 91.3 3 90.7 1 92. 8 9 90.88 91.84 94.28 92.0 1 90.0 4 90.92 92.93 91.9892.19 92.6 9 92 . 6 9 92.2 3 91.4 7 92.6 9 92.8 5 92.6 9 92.6592.65 92.11 92.69 92.54 94.19 94.08 93.96 93.96 93.98 92.32 91.81 91.8191.81 91 . 9 7 92 . 2 7 93. 9 4 93.5 1 94.51 94. 5 1 94.58 94 . 9 4 93.51 93.51 93.78 94.0 1 95. 2 6 94. 8 3 94. 8 3 91.37 90.9 5 90. 3 7 90.02 91. 7 9 92. 3 2 91. 9 8 91.62 91.8 7 91.65 91 . 2 9 91.3 4 91 . 7 4 91.7 5 91. 7 6 91.1 4 (92 . 0 0 ) (91 . 8 6 ) 91 . 1 4 91. 2 9 91. 3 4 91 . 7 4 91 . 6 8 91 . 7 6 91.11 91.0 8 90.8 2 (92. 6 9 ) 92 . 1 5 92 . 1 7 92 . 1 0 92.04 92.8 7 92.58 92.75 92 . 3 6 92.23 92.32 92.41 91.84 92.1 3 93. 8 4 90. 8 8 90. 8 5 91.87 91. 8 0 91.86 90.8 6 91.8 8 90 . 8 7 91.8 9 93.00 90 . 3 2 90 . 8 1 90 . 8 0 90 . 3 1 90. 3 090. 8 1 90.8 0 90 . 3 1 93. 6 5 RAIN GARDEN E SEE SHEET RG1 RAIN GARDEN B SEE SHEET RG1 AREA DRAIN SEE SHEET AD1 AREA DRAIN SEE SHEET AD1 AREA DRAIN SEE SHEET AD2 93. 4 7 92. 6 5 92. 1 5 AREA DRAIN SEE SHEET AD1 91 . 6 7 92 . 2 0 92 . 1 0 91 . 6 5 92.79 90.23 91. 8 0 91.2 3 90.9 2 91.28 90 . 8 2 5' SIDEWALK CULVERT 91.50 91.34 91.4 6 5' SIDEWALK CULVERT 92 . 2 0 5' SIDEWALK CHASE 92.8 1 92.5 4 92. 5 8 89.97 BLDG 16 FFE=95.01 FFE=94.01 BLDG 10 FFE=93.35 FFE=93.35 FFE=91.45 93 . 5 0 93. 9 3 94. 0 1 93. 5 1 93. 4 3 94 . 9 2 94 . 9 2 94 . 9 3 94 . 8 4 92 . 9 3 2-6" STEPS 90.89 90.47 90.5 6 91.10 93.92 93. 9 2 91.45 5:1 8.9% 2.9% 9.6% 7.9% 5.5% 4-6" STEPS 91.4 7 14 . 5 % 8. 9 % 7. 8 % 8. 0 % 9. 5 % 13.9% 8. 4 % 8. 1 % 11 . 1 % 6.6 % 2.2% 2.3% 2.5% 7.6 % 4.3% 2.1% 2.2%2.2% 2.3% 2.1% 2.2% 2.1% 2.1% 2.1% 2.1 % 2.1 % 3. 0 % 2. 2 % 2.1 % 2.0 % 0.9% 93.35 93.35 93.35 93.35 92.8 5 92.8 5 92. 6 9 92. 5 3 92. 7 8 92. 6 8 92.08 91. 3 1 92.69 91.51 92 . 6 9 92.5 4 90.4 5 91.8 7 92.6 9 92.6 9 1. 0 % 5.8% 4.0% 15 . 3 % 5. 2 % 5. 4 % 6. 2 % 6.4% 14 . 8 % 11 . 2 % 14 . 9 % 92.5 6 93.93 94.40 91.3 7 91.2 9 91.3 6 91.3 6 91.1 7 91. 2 8 91.03 90.80 29.8% 28 . 9 % 4.3% 2.8% 91 . 3 1 91. 8 1 91 . 9 3 90.90 91.0 1 91.5 4 92 . 4 7 91. 9 3 92.08 92.08 91.99 92.01 92. 4 7 92. 3 6 92.2 0 91. 8 6 91.3 1 91.3 191 . 2 5 91.13 10.6 % 92 . 7 7 92.90 92.98 92.9 1 93.00 93.0514. 3 % 1' SIDEWALK CHASE CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 G6 GR A D I N G P L A N MA T C H L I N E - S E E S H E E T G 5 MATCHLINE - SEE SHEET G3 Sheet Of 39 Sheets DR A W I N G F I L E N A M E : D : \ P r o j e c t s \ 6 8 7 - 0 0 4 \ D w g \ G r a d \ 6 8 7 - 0 0 4 _ G R A D . d w g L A Y O U T N A M E : G 6 D A T E : M a r 3 1 , 2 0 1 7 - 1 : 0 4 p m C A D O P E R A T O R : a n d y LI S T O F X R E F S : [ 6 8 7 - 0 0 4 _ x U T I L ] [ 6 8 7 - 0 0 4 _ x E X S T ] [ 6 8 7 - 0 0 4 _ x G R A D ] [ 6 8 7 - 0 0 4 _ x S I T E ] [ 6 8 7 - 0 0 4 _ x T O P O ] [ N E S - x b o r d e r ] [ 6 8 7 - 0 0 4 _ K E Y M A P ] [ 6 8 7 - 0 0 4 _ x A D J ] [ 6 8 7 - 0 0 4 _ 3 D _ P r o p o s e d ] [ 6 8 7 - 0 0 4 _ x G R A D _ l e g ] E N G I N E E R N G I E H T R O N R N 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 ww w . n o r t h e r n e n g i n e e r i n g . c o m Ph o n e : 9 7 0 . 2 2 1 . 4 1 5 8 - F i l i n g F o u r 9.30.16 KEYMAP G1 G2G4 G3 LEGEND: PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED OUTFLOW CURB AND GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 4.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM. 5.CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTION OF PRIVATE DRIVES SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE. 6.ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM; NGVD 29 (UNADJUSTED). SEE COVER SHEET FOR BENCHMARK REFERENCES. 7.TRACT A IS BEYOND THE LIMITS OF THESE PLANS. NO IMPROVEMENTS ARE PROPOSED OUTSIDE THE LIMITS SHOWN. 8.SEE SHEETS CS1 AND CS2 FOR PROJECT BENCHMARKS AND VERTICAL DATUM. ADD 4800-FT TO PROPOSED CONTOURS, SPOT ELEVATIONS, AND FFE LABELS, WHERE TRUNCATED; EXCEPT IN WESTERN AREA OF SITE, WHERE ACTUAL ELEVATIONS RANGE FROM 4900-FT TO 4910-FT. NOTES: PROPOSED STORM INLET PEDESTRIAN ACCESS RAMPS EXISTING SPOT ELEVATION PROPOSED FIRE HYDRANT PROPOSED ELECTRIC TRANSFORMER PROPOSED LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) EXISTING RIGHT OF WAY PROPOSED INFLOW CURB AND GUTTER MATCHLINE - SEE SHEET G9 G5 G6 G7 G8 G9 2 SI T E P L A N U P D A T E S AG R 3/ 2 9 / 3 0 2 REVISION #2 KEY 1 REVISED CURB LOCATION AND ELEVATIONS 2 REVISED GARAGE FOOTPRINT 3 ADDED MAIL KIOSK/RELOCATED BIKE RACKS 4 REVISED CLUBHOUSE FOOTPRINT AND FLATWORK 5 REVISED 'C' BUILDING FOOTPRINT AND FLATWORK 4 3 1 2 5 UD UD TF TF TF 7: 1 4: 1 8: 1 4: 1 7:1 9. 4 % 5. 8 % 1.0% 1.0% 1.5%2.9% 1.9% 1.5% 1. 5 % 1.5 % 5.0% 4.3% 2. 0 % 4. 4 % 2. 0 % 5. 0 % 2. 0 % 2. 7 % 2. 0 % 4. 5 % PROPOSED ± 74 LF 12" HDPE w/ (2) FES 93.40 94.5 5 94 . 4 4 94 . 4 1 94 . 2 5 94 . 0 4 93.99 95 . 8 7 96.1 5 96 . 4 6 95 . 6 6 95.36 95.22 95 . 2 6 95 . 5 6 95 . 3 8 94 . 9 9 95 . 4 8 96.87 95.94 96 . 3 4 95 . 9 2 97 . 0 9 96 . 7 5 97.1 1 97 . 1 0 97.1 2 97 . 4 6 96.4 2 96.4 8 96.5 9 96 . 4 6 97 . 5 3 98. 7 1 97 . 8 6 97 . 5 4 96.2 7 97 . 2 4 97 . 3 1 93.20 92.92 93.02 93.39 96.8 3 97.2 0 96.3 0 96. 3 4 95. 2 5 96.87 96.9 1 96.90 96.8 8 97.6 9 98.65 96 . 2 8 95 . 7 4 95 . 6 9 96. 5 5 96 . 8 5 (2. 7 6 ) 96.3 1 96.7 1 98.0 9 96.3 8 98. 3 1 95 . 3 0 94 . 8 5 96.69 95 . 5 8 93. 8 2 93. 2 6 93 . 8 0 95. 8 8 95 . 5 3 96.9 2 97.98 97.16 96.3 9 96 . 1 5 96.1 1 97 . 5 8 95.34 96. 0 3 95 . 6 4 96 . 4 4 (2 . 7 1 ) 96.9 0 96.13 95.19 97.6 9 94.32 96.6 2 96.47 96 . 1 5 97.09 94 . 3 7 97.1 4 96.6 3 95.07 95.5 9 95.5 9 95.48 95.5 9 95 . 4 8 94.80 97 . 8 497. 7 5 98 . 2 0 98.2 0 95. 7 2 95 . 8 9 97 . 5 4 97 . 3 9 97.5 4 98 . 0 4 97 . 8 8 98 . 3 2 97.3 9 97.3 9 97.5 0 97.3 9 96 . 7 5 96. 3 3 96.33 96. 4 2 96.85 97. 5 3 97. 9 6 97. 9 4 97. 8 4 97. 4 2 97. 4 2 97. 5 3 98. 4 8 97. 9 8 98. 0 3 98. 2 1 98. 6 5 98. 6 3 95.6 9 96. 0 6 97 . 1 5 97. 0 2 97. 7 8 96. 2 3 97.2 6 97.4 8 97. 7 8 96 . 6 5 95 . 4 6 95 . 8 6 97 . 3 5 96 . 5 3 96.5 8 97.3 3 97.0 9 96.9 2 98.00 97. 5 7 96 . 2 0 95 . 9 5 96. 4 6 96. 6 8 96 . 2 2 97 . 5 4 96. 8 7 96. 6 5 96.8 6 95.9 5 98. 1 6 93.49 93.74 94.6 2 94.37 97.57 RAIN GARDEN C SEE SHEET RG1 RAIN GARDEN D SEE SHEET RG1 AREA DRAIN SEE SHEET AD1 AREA DRAIN SEE SHEET AD1 96.3 4 97 . 8 0 96.2 3 93 . 4 0 92.79 93.10 98.5 4 97 . 7 7 96.8 4 (4. 2 4 ) 97. 8 6 2' CONCRETE CHASE 98.6 3 98.73 98.2 3 97 . 5 1 97 . 1 8 97. 4 8 97.48 97. 8 0 96 . 5 7 96. 3 3 CONTRACTOR TO ENSURE THAT ALL FES ARE BURIED PRIOR TO LANDSCAPE INSTALLATION 94 . 0 3 93.7 5 4' CURB CUT 4' CURB CUT 97. 4 5 2.81 3.55 2.55 2.0 2 99.02 2.0 0 99 . 5 2 8: 1 1.8 0 0.3 0 99 . 2 3 98 . 1 6 96. 8 4 8: 1 3. 7 % 6: 1 6.2% 5: 1 3: 1 4: 1 97 . 5 9 97 . 3 7 97.9 1 97.2 7 BLDG 21 BLDG 20 BLDG 19 BLDG 18 FFE=99.21 FFE=98.71 FFE=98.53 FFE=98.03 FFE=97.92 FFE=96.92 FFE=96.83 FFE=96.14 BLDG 14 FFE=98.20FFE=98.70 98. 1 7 98. 1 7 98 . 1 7 98 . 1 2 97. 4 5 97 . 5 3 97.5 3 97.4 5 96. 9 2 96. 8 4 97. 4 2 96. 4 2 96. 3 4 95.75 95.83 95.33 95.25 5.0 % 7.5 % 5.6 % 5.8 % 6.4 % 8. 7 % 9.3 % 9. 9 % 8. 2 % 7. 5 % 7. 4 % 5. 9 % 8.2 % 7. 0 % 6.6 % 5. 6 % 9:1 4:1 5:1 10 : 1 8:1 5:1 8.1 % 95. 6 4 95. 9 2 96. 7 4 96. 7 4 96. 6 6 96.76 96.46 95.86 96 . 2 6 96.7 6 96.8 3 96.8 3 96. 4 2 96.4 2 96.8 4 96.9 2 97.8 3 97.8 3 97.7 6 97. 8 5 97. 3 5 97.5 3 97. 5 2 97.5 3 98.4 498.4 498.3 6 96.9 2 97. 9 4 98.4 5 5. 8 % 98. 6 2 98.6 2 98 . 0 4 98 . 0 4 98 . 0 4 99 . 1 1 99 . 1 2 97. 5 6 6.8% 99 . 0 2 97 . 3 7 0.8 8 98. 7 0 98. 7 0 98. 2 0 98. 2 0 96. 1 4 4.0% 7.9% 5.4 % 4.6 % 5.9 % 2.6% 2.3% 5.5 % 5. 3 % 7.8 % 10 . 4 % 7. 2 % 5.5% 3.9 % 3. 8 % 2.4 % 2.4% 2.3% 2. 4 % 2. 4 % 2.4 % 2.3% 2.1 % 2.1 % 2. 1 % 2. 1 % 2.1 % GARAGE OPENINGS=97.81 GARAGE OPENINGS=97.48 EXTEND FO U N D A T I O N W A L L MIN. 6" ABO V E F G EXTEND FO U N D A T I O N W A L L MIN. 6" ABO V E F G 97.7 5 97 . 1 5 97.2 6 97 . 8 6 3.6 % 2.3 % 21 . 6 % 1.0% 2.0% 2. 2 % 2.2% 2.1% 94.5 4 FFE=98.20FFE=98.70 97.1 2 97 . 7 0 97 . 0 0 98. 0 4 4.7% 97 . 9 5 98. 0 4 98 . 0 4 97. 9 5 98.2 098.0 4 97.86 98.3 1 97.8 0 98.2 0 97. 7 0 97. 5 6 96.8 8 97.6 8 97.0 7 97 . 3 9 97.5 4 21.4% 97 . 0 7 96.7 7 97. 9 5 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 G8 GR A D I N G P L A N MA T C H L I N E - S E E S H E E T G 7 MATCHLINE - SEE SHEET G5 Sheet Of 39 Sheets DR A W I N G F I L E N A M E : D : \ P r o j e c t s \ 6 8 7 - 0 0 4 \ D w g \ G r a d \ 6 8 7 - 0 0 4 _ G R A D . d w g L A Y O U T N A M E : G 8 D A T E : M a r 3 1 , 2 0 1 7 - 1 : 0 5 p m C A D O P E R A T O R : a n d y LI S T O F X R E F S : [ 6 8 7 - 0 0 4 _ x U T I L ] [ 6 8 7 - 0 0 4 _ x E X S T ] [ 6 8 7 - 0 0 4 _ x G R A D ] [ 6 8 7 - 0 0 4 _ x S I T E ] [ 6 8 7 - 0 0 4 _ x T O P O ] [ N E S - x b o r d e r ] [ 6 8 7 - 0 0 4 _ K E Y M A P ] [ 6 8 7 - 0 0 4 _ x A D J ] [ 6 8 7 - 0 0 4 _ 3 D _ P r o p o s e d ] [ 6 8 7 - 0 0 4 _ x G R A D _ l e g ] E N G I N E E R N G I E H T R O N R N 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 ww w . n o r t h e r n e n g i n e e r i n g . c o m Ph o n e : 9 7 0 . 2 2 1 . 4 1 5 8 - F i l i n g F o u r 9.30.16 KEYMAP G1 G2G4 G3 LEGEND: PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED OUTFLOW CURB AND GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 4.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM. 5.CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTION OF PRIVATE DRIVES SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE. 6.ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM; NGVD 29 (UNADJUSTED). SEE COVER SHEET FOR BENCHMARK REFERENCES. 7.TRACT A IS BEYOND THE LIMITS OF THESE PLANS. NO IMPROVEMENTS ARE PROPOSED OUTSIDE THE LIMITS SHOWN. 8.SEE SHEETS CS1 AND CS2 FOR PROJECT BENCHMARKS AND VERTICAL DATUM. ADD 4800-FT TO PROPOSED CONTOURS, SPOT ELEVATIONS, AND FFE LABELS, WHERE TRUNCATED; EXCEPT IN WESTERN AREA OF SITE, WHERE ACTUAL ELEVATIONS RANGE FROM 4900-FT TO 4910-FT. NOTES: PROPOSED STORM INLET PEDESTRIAN ACCESS RAMPS EXISTING SPOT ELEVATION PROPOSED FIRE HYDRANT PROPOSED ELECTRIC TRANSFORMER PROPOSED LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) EXISTING RIGHT OF WAY PROPOSED INFLOW CURB AND GUTTER MA T C H L I N E - S E E S H E E T G 9 G5 G6 G7 G8 G9 2 SI T E P L A N U P D A T E S AG R 3/ 2 9 / 3 0 2 REVISION #2 KEY 1 REVISED CURB LOCATION AND ELEVATIONS 2 REVISED GARAGE FOOTPRINT 3 ADDED MAIL KIOSK/RELOCATED BIKE RACKS 4 REVISED CLUBHOUSE FOOTPRINT AND FLATWORK 5 REVISED 'C' BUILDING FOOTPRINT AND FLATWORK 5 5 5 5 1 1