Loading...
HomeMy WebLinkAboutLot Certifications - 06/01/2018 (2)Accepted 6/1/2018 WL TF EM GM GM EM EM GM GM FDC BLDG 14 4025 Automation Way, Suite C4 Fort Collins, CO 80525 970-232-9645 www.WashburnSurveying.com Sheet 1 of 1 Project #: 2017-002 Date: May 15, 2018 Scale: 1"=10' Drawn: CDB Scale: 1"=10' AS-BUILT EXHIBIT BUCKING HORSE APARTMENTS BUILDING 14 ELEVATIONS SHOWN ARE FROM AN AS-BUILT SURVEY OF THE SITE PERFORMED ON APRIL 24 AND MAY 11 AND 17, 2018 UD TF 1.5 % 2.0% 2. 0 % 97 . 3 1 96.8 3 97.2 0 96.87 96.9 1 96.9 0 96.8 8 96 . 2 8 95 . 7 4 95 . 6 9 96.3 1 97. 2 9 96. 7 1 95.2 7 95. 8 8 95 . 5 3 97 . 5 8 95.34 96. 0 3 95 . 6 4 96.9 0 97. 6 9 94.32 96.1 597.0 9 97 . 1 4 96. 6 3 96 . 4 3 95.7 6 95.5 9 95.5 9 95.48 95.5 9 97.84 97 . 7 5 98 . 2 0 98.2 0 95.7 2 95 . 8 9 97 . 5 4 97 . 3 9 97.5 4 98.0 4 97. 8 8 98. 3 2 97.3 9 97.39 97.50 97.3 9 97.3 9 97 . 3 9 97. 1 5 97 . 0 1 97.2 6 97.48 97 . 7 8 96 . 6 5 95 . 4 6 96.9 2 96 . 2 2 97 . 5 4 98. 1 6 97.57 RAIN GARDEN C SEE SHEET RG1 AREA DRAIN SEE SHEET AD1 97. 2 0 96.3 4 97 . 8 0 97 . 4 5 FFE=96.14 BLDG 14 FFE=98.20 FFE=98.70 FFE=98.06 97. 1 8 98. 7 0 98. 7 0 98. 2 0 98. 2 0 96. 1 4 97. 5 6 5.4 % 4.6 % 7. 2 % 2.4 % 2.4% 2. 4 % 2.1% FFE=98.20 FFE=98.70 97 . 1 2 97 . 7 0 97 . 0 0 98. 0 4 97 . 9 5 98 . 0 4 98 . 0 4 97 . 9 5 98 . 2 0 98.0 4 97 . 8 6 98 . 3 1 97.8 0 98.2 0 97. 7 0 97. 5 6 96.88 97 . 6 8 97 . 0 7 97 . 3 9 97.5 4 21.4% 97 . 0 7 96.77 7.0 % 1.4% 2.2% 10. 6 % 5. 6 % 4.3 % 8.6% 7. 6 % 3. 9 % 2.4 % 4. 7 % 5.5% 7.0 % 3.2% 6.6% 7.1 % 4.0% 4.7% BUCKING HORSE APARTMENTS SHEET NO: \\ B R O N C O S \ E N G I N E E R S \ P R O J E C T S \ 6 8 7 - 0 0 4 \ D W G \ R E C O R D D R A W I N G S \ B U I L D I N G C E R T S \ 6 8 7 - 0 0 4 _ G R A D _ A B _ B L D G 1 0 . D W G DRAWING REFERENCE: BUILDING 14 CERTIFICATION M. Kuehnel 1in=20ft 05-31-18 AB-14 DRAWN BY: SCALE: ISSUED: ( IN FEET ) 0 1 INCH = 20 FEET 20 20 FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 E N G I N E E R N GI EHTRON R N 970.221.4158 northernengineering.com LEGEND: EXISTING STORM SEWER DESIGNED STORM SEWER DESIGNED STORM INLET DESIGNED CONTOUR DESIGNED SWALE DESIGNED OUTFLOW CURB AND GUTTER DESIGNED SPOT ELEVATION EXISTING SPOT ELEVATION AS-BUILT SLOPES AS-BUILT SPOT ELEVATION AS-BUILT SWALE DIRECTION OF DOWNSPOUT UD UD TF TF TF 7: 1 4: 1 8: 1 4: 1 7:1 9. 4 % 5. 8 % 1.0% 1.0% 1.5%2.9% 1.9% 1.5% 1. 5 % 1.5 % 5.0% 4.3% 2. 0 % 4. 4 % 2. 0 % 5. 0 % 2. 0 % 2. 7 % 2. 0 % 4. 5 % PROPOSED ± 74 LF 12" HDPE w/ (2) FES 93.40 94.5 5 94 . 4 4 94 . 4 1 94 . 2 5 94 . 0 4 93.99 95 . 8 7 96.1 5 96 . 4 6 95 . 6 6 95.36 95.22 95 . 2 6 95 . 5 6 95 . 3 8 94 . 9 9 95 . 4 8 96.87 95.94 96 . 3 4 95 . 9 2 97 . 0 9 96 . 7 5 97.1 1 97 . 1 0 97.1 2 97 . 4 6 96.4 2 96.4 8 96.5 9 96 . 4 6 97 . 5 3 98. 7 1 97 . 8 6 97 . 5 4 96.2 7 97 . 2 4 97 . 3 1 93.20 92.92 93.02 93.39 96.8 3 97.2 0 96.3 0 96. 3 4 95. 2 5 96.87 96.9 1 96.90 96.8 8 97.6 9 98.65 96 . 2 8 95 . 7 4 95 . 6 9 96. 5 5 96 . 8 5 (2. 7 6 ) 96.3 1 96.7 1 98.0 9 96.3 8 98. 3 1 95 . 3 0 94 . 8 5 96.69 95 . 5 8 93. 8 2 93. 2 6 93 . 8 0 95. 8 8 95 . 5 3 96.9 2 97.98 97.16 96.3 9 96 . 1 5 96.1 1 97 . 5 8 95.34 96. 0 3 95 . 6 4 96 . 4 4 (2 . 7 1 ) 96.9 0 96.13 95.19 97.6 9 94.32 96.6 2 96.47 96 . 1 5 97.09 94 . 3 7 97.1 4 96.6 3 95.07 95.5 9 95.5 9 95.48 95.5 9 95 . 4 8 94.80 97 . 8 497. 7 5 98 . 2 0 98.2 0 95. 7 2 95 . 8 9 97 . 5 4 97 . 3 9 97.5 4 98 . 0 4 97 . 8 8 98 . 3 2 97.3 9 97.3 9 97.5 0 97.3 9 96 . 7 5 96. 3 3 96.33 96. 4 2 96.85 97. 5 3 97. 9 6 97. 9 4 97. 8 4 97. 4 2 97. 4 2 97. 5 3 98. 4 8 97. 9 8 98. 0 3 98. 2 1 98. 6 5 98. 6 3 95.6 9 96. 0 6 97 . 1 5 97. 0 2 97. 7 8 96. 2 3 97.2 6 97.4 8 97. 7 8 96 . 6 5 95 . 4 6 95 . 8 6 97 . 3 5 96 . 5 3 96.5 8 97.3 3 97.0 9 96.9 2 98.00 97. 5 7 96 . 2 0 95 . 9 5 96. 4 6 96. 6 8 96 . 2 2 97 . 5 4 96. 8 7 96. 6 5 96.8 6 95.9 5 98. 1 6 93.49 93.74 94.6 2 94.37 97.57 RAIN GARDEN C SEE SHEET RG1 RAIN GARDEN D SEE SHEET RG1 AREA DRAIN SEE SHEET AD1 AREA DRAIN SEE SHEET AD1 96.3 4 97 . 8 0 96.2 3 93 . 4 0 92.79 93.10 98.5 4 97 . 7 7 96.8 4 (4. 2 4 ) 97. 8 6 2' CONCRETE CHASE 98.6 3 98.73 98.2 3 97 . 5 1 97 . 1 8 97. 4 8 97.48 97. 8 0 96 . 5 7 96. 3 3 CONTRACTOR TO ENSURE THAT ALL FES ARE BURIED PRIOR TO LANDSCAPE INSTALLATION 94 . 0 3 93.7 5 4' CURB CUT 4' CURB CUT 97. 4 5 2.81 3.55 2.55 2.0 2 99.02 2.0 0 99 . 5 2 8: 1 1.8 0 0.3 0 99 . 2 3 98 . 1 6 96. 8 4 8: 1 3. 7 % 6: 1 6.2% 5: 1 3: 1 4: 1 97 . 5 9 97 . 3 7 97.9 1 97.2 7 BLDG 21 BLDG 20 BLDG 19 BLDG 18 FFE=99.21 FFE=98.71 FFE=98.53 FFE=98.03 FFE=97.92 FFE=96.92 FFE=96.83 FFE=96.14 BLDG 14 FFE=98.20FFE=98.70 98. 1 7 98. 1 7 98 . 1 7 98 . 1 2 97. 4 5 97 . 5 3 97.5 3 97.4 5 96. 9 2 96. 8 4 97. 4 2 96. 4 2 96. 3 4 95.75 95.83 95.33 95.25 5.0 % 7.5 % 5.6 % 5.8 % 6.4 % 8. 7 % 9.3 % 9. 9 % 8. 2 % 7. 5 % 7. 4 % 5. 9 % 8.2 % 7. 0 % 6.6 % 5. 6 % 9:1 4:1 5:1 10 : 1 8:1 5:1 8.1 % 95. 6 4 95. 9 2 96. 7 4 96. 7 4 96. 6 6 96.76 96.46 95.86 96 . 2 6 96.7 6 96.8 3 96.8 3 96. 4 2 96.4 2 96.8 4 96.9 2 97.8 3 97.8 3 97.7 6 97. 8 5 97. 3 5 97.5 3 97. 5 2 97.5 3 98.4 498.4 498.3 6 96.9 2 97. 9 4 98.4 5 5. 8 % 98. 6 2 98.6 2 98 . 0 4 98 . 0 4 98 . 0 4 99 . 1 1 99 . 1 2 97. 5 6 6.8% 99 . 0 2 97 . 3 7 0.8 8 98. 7 0 98. 7 0 98. 2 0 98. 2 0 96. 1 4 4.0% 7.9% 5.4 % 4.6 % 5.9 % 2.6% 2.3% 5.5 % 5. 3 % 7.8 % 10 . 4 % 7. 2 % 5.5% 3.9 % 3. 8 % 2.4 % 2.4% 2.3% 2. 4 % 2. 4 % 2.4 % 2.3% 2.1 % 2.1 % 2. 1 % 2. 1 % 2.1 % GARAGE OPENINGS=97.81 GARAGE OPENINGS=97.48 EXTEND FO U N D A T I O N W A L L MIN. 6" ABO V E F G EXTEND FO U N D A T I O N W A L L MIN. 6" ABO V E F G 97.7 5 97 . 1 5 97.2 6 97 . 8 6 3.6 % 2.3 % 21 . 6 % 1.0% 2.0% 2. 2 % 2.2% 2.1% 94.5 4 FFE=98.20FFE=98.70 97.1 2 97 . 7 0 97 . 0 0 98. 0 4 4.7% 97 . 9 5 98. 0 4 98 . 0 4 97. 9 5 98.2 098.0 4 97.86 98.3 1 97.8 0 98.2 0 97. 7 0 97. 5 6 96.8 8 97.6 8 97.0 7 97 . 3 9 97.5 4 21.4% 97 . 0 7 96.7 7 97. 9 5 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 G8 GR A D I N G P L A N MA T C H L I N E - S E E S H E E T G 7 MATCHLINE - SEE SHEET G5 Sheet Of 39 Sheets DR A W I N G F I L E N A M E : D : \ P r o j e c t s \ 6 8 7 - 0 0 4 \ D w g \ G r a d \ 6 8 7 - 0 0 4 _ G R A D . d w g L A Y O U T N A M E : G 8 D A T E : M a r 3 1 , 2 0 1 7 - 1 : 0 5 p m C A D O P E R A T O R : a n d y LI S T O F X R E F S : [ 6 8 7 - 0 0 4 _ x U T I L ] [ 6 8 7 - 0 0 4 _ x E X S T ] [ 6 8 7 - 0 0 4 _ x G R A D ] [ 6 8 7 - 0 0 4 _ x S I T E ] [ 6 8 7 - 0 0 4 _ x T O P O ] [ N E S - x b o r d e r ] [ 6 8 7 - 0 0 4 _ K E Y M A P ] [ 6 8 7 - 0 0 4 _ x A D J ] [ 6 8 7 - 0 0 4 _ 3 D _ P r o p o s e d ] [ 6 8 7 - 0 0 4 _ x G R A D _ l e g ] E N G I N E E R N G I E H T R O N R N 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 ww w . n o r t h e r n e n g i n e e r i n g . c o m Ph o n e : 9 7 0 . 2 2 1 . 4 1 5 8 - F i l i n g F o u r 9.30.16 KEYMAP G1 G2G4 G3 LEGEND: PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED OUTFLOW CURB AND GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 4.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM. 5.CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTION OF PRIVATE DRIVES SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE. 6.ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM; NGVD 29 (UNADJUSTED). SEE COVER SHEET FOR BENCHMARK REFERENCES. 7.TRACT A IS BEYOND THE LIMITS OF THESE PLANS. NO IMPROVEMENTS ARE PROPOSED OUTSIDE THE LIMITS SHOWN. 8.SEE SHEETS CS1 AND CS2 FOR PROJECT BENCHMARKS AND VERTICAL DATUM. ADD 4800-FT TO PROPOSED CONTOURS, SPOT ELEVATIONS, AND FFE LABELS, WHERE TRUNCATED; EXCEPT IN WESTERN AREA OF SITE, WHERE ACTUAL ELEVATIONS RANGE FROM 4900-FT TO 4910-FT. NOTES: PROPOSED STORM INLET PEDESTRIAN ACCESS RAMPS EXISTING SPOT ELEVATION PROPOSED FIRE HYDRANT PROPOSED ELECTRIC TRANSFORMER PROPOSED LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) EXISTING RIGHT OF WAY PROPOSED INFLOW CURB AND GUTTER MA T C H L I N E - S E E S H E E T G 9 G5 G6 G7 G8 G9 2 SI T E P L A N U P D A T E S AG R 3/ 2 9 / 3 0 2 REVISION #2 KEY 1 REVISED CURB LOCATION AND ELEVATIONS 2 REVISED GARAGE FOOTPRINT 3 ADDED MAIL KIOSK/RELOCATED BIKE RACKS 4 REVISED CLUBHOUSE FOOTPRINT AND FLATWORK 5 REVISED 'C' BUILDING FOOTPRINT AND FLATWORK 5 5 5 5 1 1