Loading...
HomeMy WebLinkAboutSite Certifications - 02/26/2019FORT COLLINS: 301 North Howes Street, Suite 100, 80521 | 970.221.4158 GREELEY: 820 8 th Street, 80631 | 970.395.9880 | WEB: www.northernengineering.com February 12, 2019 Wes Lamarque Acme Inc. 700 Wood Street Fort Collins, Colorado 80521 RE: Bucking Horse Filing Four Fort Collins, Colorado Dear Wes: This drainage certification letter is provided to verify as-constructed conditions for Bucking Horse Filing Four (more commonly known as Bucking Horse Apartments). Washburn Land Surveying completed survey work January 23, 2019, to verify general compliance with the Final Utility Plans for Bucking Horse Filing Four dated September 30, 2016, including revised drawings dated 2/22/2017 and 3/29/2017 by Northern Engineering. Included in this drainage certification submittal are the following: Attachment 1 - City of Fort Collins Overall Site and Drainage Certification Form. Attachment 2 - City of Fort Collins During Construction Inspection Checklist and photographs provided by contractor. Attachment 3 - As-constructed underground water quality vaults and rain gardens calculations. Attachment 4 - As-constructed record drawings for Grading and Storm Drain Plan and Profile Sheets. Attachment 5 – Documents provided to the Colorado State Drain Time website. Based on the calculations shown in Attachment 3, the as-built water quality pond volumes are in Table 1. The as-built underground water quality vaults and rain gardens will provide water quality treatment within the site. Wes Lamarque 2/26/2019 FORT COLLINS: 301 North Howes Street, Suite 100, 80521 | 970.221.4158 GREELEY: 820 8 th Street, 80631 | 970.395.9880 | WEB: www.northernengineering.com Table 1: Pond Record Volumes Pond Required Water Quality Vol. (ft3) Design Water Quality Vol. (ft3) Constructed Water Quality Vol. (ft3) Vault 1 1,610 1,640 2,148 Vault 2 1,967 2,022 2,741 Vault 3 1,176 1,201 1,585 Vault 4 760 762 1,078 Rain Garden 1 2,728 1,118 2,036 Rain Garden 2 174 195 316 Rain Garden 3 298 350 360 Rain Garden 4 1,343 1,120 1,083 Rain Garden 5 270 382 639 We have concluded, based on the attached information and personal site inspection, that the drainage features for the project site have been constructed in substantial compliance with the above referenced Final Utility Plans, with the following exceptions: • Item I.A: Rain Garden 4, at the intersection of Yearling Road and Miles House Drive, was constructed to provide 1,083 ft3 of water quality volume. The design water quality volume within the approved drainage report is 1,120 ft3. Rain Garden 4, as constructed, will provide 97% of the design water quality volume. The asbuilt volume is short from the design volume by 37 ft3. However, Rain Garden 4 was not designed to provide the full capacity of the required LID volume according to the approved drainage report (see Table 1). Multiple rain gardens throughout the project meet or exceed both the design and required volumes (see Table 1). Rain Garden 5 located crossways from Rain Garden 4, at the intersection of Yearling Road and Cutting Horse Drive, was constructed with an excess volume of 257 ft3. The excess volume in Rain Garden 5 more than accommodates the missing volume within Rain Garden 4. While the water quality volume for Rain Garden 4 is less than optimal, it is still capable of providing 97% of the design volume per the approved drainage report, and the shortfall within Rain Garden 4 is provided by the excess volume of nearby rain gardens. We feel the constructed LID features meet or exceed the intention of the approved drainage report and civil drawings. • Item III.A.2: Storm Line A from the Storm Manhole A11 to Storm Inlet A12, shown on the Storm Drain A Plan and Profile Sheet (Sheet ST1) was constructed with a slope below the design of 2.0% (a slope of 0.96% was constructed). We have re-analyzed this storm line and compared the hydraulic grade line. As shown below, there is minimal change to the 100-year HGL. Based on the revised HGL, we feel this will convey the design storm hydraulic capacity. FORT COLLINS: 301 North Howes Street, Suite 100, 80521 | 970.221.4158 GREELEY: 820 8 th Street, 80631 | 970.395.9880 | WEB: www.northernengineering.com • Item III.B.3: Northern Engineering did not observe construction. Northern Engineering was unable to verify if the specific joint types or construction methods for the storm drain pipes. • Item IV.A.2: Approximately 20’ of the vertical curb and gutter along Cutting Horse Drive, immediately south and discharging into Rain Garden A, was constructed at 0.08%. The City of Fort Collins minimum gutter flowline standard is 0.4%. According to the contractor, they performed a flow test on the flowline of this gutter, and the gutter drained towards the sidewalk chase and into Rain Garden A. Northern Engineering did not observe this flow test and was unable to verify if this curb and gutter will drain per the approved design drawings. During Northern Engineering’s site visit, we observed less than 0.05’ of standing water within approximately 1’ of the gutter immediately east of the curb cut. We feel the curb and gutter construction, while not optimal, will provide adequate conveyance of stormwater flows, and it will not pose a life/safety hazard. • Item IV.A.2: Approximately 25’ of the parking lot pan, south of Building 7, was constructed at 0.18%. The City of Fort Collins minimum gutter flowline standard is 0.4%. According to the contractor, they performed a flow test on the flowline of this pan, and the pan drained towards Lusitano Lane. Northern Engineering did not observe this flow test and was unable to verify if this pan will drain per the approved design drawings. During Northern Engineering’s site visit, we observed no standing water within the valley pan. We feel the curb and gutter construction, while not optimal, will provide adequate conveyance of stormwater flows, and it will not pose a life/safety hazard. • Item IV.A.2: Approximately 21’ of the vertical curb and gutter along Lusitano Lane, southeast of Building 12, was constructed at 0.1%. The City of Fort Collins minimum gutter flowline standard is 0.4%. According to the contractor, they performed a flow FORT COLLINS: 301 North Howes Street, Suite 100, 80521 | 970.221.4158 GREELEY: 820 8 th Street, 80631 | 970.395.9880 | WEB: www.northernengineering.com test on the flowline of this gutter, and the gutter drained towards the north. Northern Engineering did not observe this flow test and was unable to verify if this curb and gutter will drain per the approved design drawings. During Northern Engineering’s site visit, we observed no standing water within the gutter. We feel the curb and gutter construction, while not optimal, will provide adequate conveyance of stormwater flows, and it will not pose a life/safety hazard. • Item IV.A.2: Approximately 16’ of the vertical curb and gutter along Lusitano Lane, east of the detached garages, was constructed at 0.2%. The City of Fort Collins minimum gutter flowline standard is 0.4%. According to the contractor, they performed a flow test on the flowline of this gutter, and the gutter drained towards the north. Northern Engineering did not observe this flow test and was unable to verify if this curb and gutter will drain per the approved design drawings. During Northern Engineering’s site visit, we observed no standing water within the gutter. We feel the curb and gutter construction, while not optimal, will provide adequate conveyance of stormwater flows, and it will not pose a life/safety hazard. • Item IV.A.2: Approximately 20’ of the vertical curb and gutter along Lusitano Lane, southeast of Building 7, was constructed at 0.3%. The City of Fort Collins minimum gutter flowline standard is 0.4%. According to the contractor, they performed a flow test on the flowline of this gutter, and the gutter drained towards the north. Northern Engineering did not observe this flow test and was unable to verify if this curb and gutter will drain per the approved design drawings. During Northern Engineering’s site visit, we observed no standing water within the gutter. We feel the curb and gutter construction, while not optimal, will provide adequate conveyance of stormwater flows, and it will not pose a life/safety hazard. • Item IV.A.2: Approximately 38’ of the vertical curb and gutter along Cutting Horse Drive, north of Building 10, was constructed at 0.29%. The City of Fort Coll ins minimum gutter flowline standard is 0.4%. According to the contractor, they performed a flow test on the flowline of this gutter, and the gutter drained towards the east. Northern Engineering did not observe this flow test and was unable to verify if this curb and gutter will drain per the approved design drawings. During Northern Engineering’s site visit, we observed no standing water within the gutter. We feel the curb and gutter construction, while not optimal, will provide adequate conveyance of stormwater flows, and it will not pose a life/safety hazard. • Item IV.A.2: The valley pan at the intersection of Cutting Horse Drive and Yearling Road, northwest of Building 10, was constructed at 0.3%. The City of Fort Collins minimum gutter flowline standard is 0.4%. According to the contractor, they performed a flow test on the flowline of this pan, and the pan drained towards the east. Northern Engineering did not observe this flow test and was unable to verify if this pan will drain per the approved design drawings. During Northern Engineering’s site visit, we observed no standing water within the pan. We feel the curb and gutter construction, while not optimal, will provide adequate conveyance of stormwater flows, and it will not pose a life/safety hazard. FORT COLLINS: 301 North Howes Street, Suite 100, 80521 | 970.221.4158 GREELEY: 820 8 th Street, 80631 | 970.395.9880 | WEB: www.northernengineering.com • Item IV.A.2: The flowline of the eastern concrete fillet at the intersection of Cutting Horse Drive and east entrance to the clubhouse parking lot was constructed at 0.08%. The City of Fort Collins minimum gutter flowline standard is 0.4%. According to the contractor, they performed a flow test on the flowline of this fillet, and the fillet drained towards the east. Northern Engineering did not observe this flow test and was unable to verify if this fillet will drain per the approved design drawings. During Northern Engineering’s site visit, we observed no standing water within the fillet. We feel the curb and gutter construction, while not optimal, will provide adequate conveyance of stormwater flows, and it will not pose a life/safety hazard. • Item VI.A.4: The flared end sections to the outlet for Storm Drains A, B, C, and D are exposed to the elements. While this is aesthetically unpleasing, Northern Engineering believes it will not impact the drainage and outflow from Storm Drains A, B, C, and D. • Item VII.A.5: Northern Engineering did not observe construction. Northern Engineering was unable to verify the backfill material and construction methods of the subdrains. • Item VII.A.6: Northern Engineering did not observe construction. Northern Engineering was unable to verify if the subdrains were wrapped with a geotextile liner. • Item VIII.A: The curb cut at the northwest corner of the site, near Storm Drain D, was increased to 8 ft wide during construction to increase flow into the riprap channel and reduce parking lot flooding that occurred during construction. • Item XIII: At the time of Northern Engineering’s site visit, there was still vertical construction activities occurring within Buildings 20 to 23. Construction debris and obstructions were contained to the immediate vicinity of Buildings 20 to 23 and the nearby staging areas. We feel these ongoing construction activities will not impact the site drainage. Please feel free to contact me with any questions you may have. NORTHERN ENGINEERING SERVICES, INC. Frederick S. Wegert, PE Project Engineer 2/12/19 APPENDIX A OVERALL SITE AND DRAINAGE CERTIFICATION FORM 8/16 Page 1 OVERALL SITE and DRAINAGE CERTIFICATION Commercial, Multi-Family and Subdivision Certification Form and Checklist Project Name: Date: Building Permit Numbers: (Commercial or multi-family) Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Volume 1, Section 6.11, please fill in all applicable items in this Certification Form for Commercial, Multi-Family and Overall Single Family sites. NOTE: several items must be verified during construction. A copy of the approved grading plan must be submitted with the as-built grading plan. (As-built elevations must be written in red next to the approved elevations.) •Use “Yes” for items completed as described. •Use “N/A” for items that are not applicable to the site being certified. •If any blanks are “No,” attach an explanation referencing the item number below. Attach an explanation or description of the as-built condition for any items listed or for anything not listed but shown on the approved construction plans. Provide an as-built redline or Mylar drawing with the following: I.Water Quality and Quantity Detention Basin Certification - FCSCM Vol.2, Ch.10 For multiple detention basins on a site, provide the following for each basin separately: A. Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and volume verification calculations for the water quality capture volume and the 100-year detention storage volume. 1. Detention basin topography was prepared by a professional land surveyor registered in the state of Colorado. 2.Both proposed and as-built contours are shown on the same plan sheet (dashed lines for proposed and solid lines for as-built). 3.All critical spot elevations as shown on the approved construction plans have been verified and the as-built elevations are shown on the plan sheet. 4.Stage-storage-discharge tables are provided on a separate document. 5.Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92- 602(8) is attached and has been uploaded to the Statewide Compliance Portal (tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include: a.The cover sheet from the approved drainage report b.The stamped certification page from the approved drainage report c.As-built topographic survey d.Stamped certification page from the Overall Site & Drainage Certification e.PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet Bucking Horse Filing Four February 12, 2019 Yes Yes Yes Yes Yes Yes B1606788 to B1606792, B1607068 to B1607070, B1607072 to B1607074, B1607076, B1607077, B1607763 to B1607772, B1701182 to B1701185, B1701187 to B1701193, B1701195 to B1701200 8/16 Page 2 B.Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2% grade requirement. 1.Low Flow: Choose one of the following detention basin low flow options as applicable: a. Turf swale for low flow path in detention basin. There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade is . b.Concrete pan for low flow in detention basin. There is a concrete pan installed that meets the grades as shown on the approved construction plans. (Show as-built spot elevations.) c.Soft pan for low flow in detention basin. •Verify and document the soft pan material gradation, trench width and depth - to be verified during construction by engineer. Picture documentation is preferred or engineer’s statement of visual inspection and compliance. (Choose one below.) o There is a soft pan with an underdrain installed that meets the design on the approved construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations, bends, cleanouts, etc.) o There is soft pan installed without an underdrain but there is a type A or B soil. The soil type must be documented by supplying verification from a registered professional geotechnical engineer. NOTE: Spot elevations are to be within 0.2 ft. +/-. 2. Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown. Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re- graded. Provide documentation if a variance was granted for steeper slopes during the design process. 3.Spillway Certification: The following items must be field verified: a.The location of the spillway is indicated on the as-built plan. b.The width of the spillway is indicated on the as-built plan. c.The elevation(s) of the spillway is shown on the as-built plan. d.A concrete ribbon defines the location and grade of the spillway. e.There is downstream scour protection in the spillway as per the construction plans. Indicate type: (riprap size “D50” gradation and bedding type, geotextile, buried riprap with inches of bury, etc.). f.There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape features, rocks, etc. Yes N/A N/A Yes Yes N/A Yes Yes Yes Yes N/A Yes Yes Concrete Chase 8/16 Page 3 4.Outlet Structure Certification a.The orifice plate for the approved release rate is installed with the correct size and location of the orifice. b.The orifice plate for the water quality outlet is installed with the correct hole size, number of rows and columns of holes. c.The bottom hole on both the water quality and quantity outlets are at the bottom of the plate so no water ponds in front of the plate. d.The well screen is the correct material and is installed as shown on the construction plans. e.100-year overflow grate elevation is . (Elev. A on detail D-46) f.The top elevation of the water quality capture volume is . (Elev. B on detail D-46) g.Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the top and bolted at the bottom. h.The bottom of the outlet box has no obstructions or misalignments that will cause it to retain runoff water and is sloped at 2% towards outlet. II.Channels/Swales - FCSCM Vol.1, Ch.7, Sect.3&4 A. Capacity: The as-built capacity of all the major channels and swales has been verified. They meet or exceed capacity requirements shown in the approved drainage study for this project. 1.All swales are located within the drainage easements as shown on the construction plans. 2.Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these criteria are not met, the certification engineer will write a justification and propose mitigation for each instance or have the issues corrected. If variances to these criteria have previously been approved and are shown on the construction plans, no justification is needed. 3.As-built spot elevations on channels/swales are shown that correspond to spot elevations shown on the approved construction plans. 4.All permanent erosion control measures are installed as shown on the approved construction plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used as part of this verification.) 5.All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the system. (Pictures at tie-in points suggested.) 6.The minimum freeboard is provided for all channels and swales as shown on the approved construction plans or as identified in the approved drainage study. (Show the freeboard provided on the cross-sections as on the construction plan set or attached as separate documentation.) 7.The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees, shrubs, sod, etc. infringe on the low flow portion of channels or swales.) N/A N/A N/A N/A N/A N/A N/A N/A Yes Yes Yes Yes Yes Yes Yes Yes 8/16 Page 4 III.Storm Pipes (aka storm drains) - FCSCM Vol.1, Ch.6, Sec. 4 A. Storm Drain Pipe Capacity: The as-built capacity of all pipes installed on this project has been verified and meets or exceeds the capacity requirements shown in the approved drainage study for this project. 1.All storm drain pipe sizes and materials have been verified and are in conformance with the approved construction plans. (Indicate on the plan and profile sheets that they have been verified.) Material and size substitutions must be approved prior to installation. If a pipe size or material was changed during construction, the certification engineer must attach the approval documents or supply them with this certification. Approval documents must include a calculation documenting the capacity equivalency (equal or greater) of the substituted size. 2.The longitudinal slope of the pipe is as shown on the approved construction plans. The acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans must be justified with capacity calculations on an attached sheet. 3.The as-built invert elevations have been verified and are shown on the plan and profile sheets of the approved construction plans. B.Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the approved construction plans. 1.The minimum cover requirements for all pipes have been met as shown on the approved construction plans. These will be called out in critical locations. 2.All encasements and clearances as specified on the approved construction plans have been met. 3.Any specific joint types or construction methods specified on the approved construction plans have been met. (List on a separate sheet and attach to this certification.) IV.Concrete Pans - FCSCM Vol.1, Ch.7, Sec.4.1.3.4 A. Construction/Installation: All concrete pans have been constructed in accordance with the approved construction plans. 1.The concrete pans are the correct size/width as shown on the approved construction plans. 2.The longitudinal slopes of the pans are as shown on the approved construction plans. The certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or justification by separate document. 3.The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross- section is “V” shaped and meets the side slope shown on the detail.) 4.The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4 inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide documentation of the reinforcement used if different than shown on the details or on the approved construction plans.) 5.The spot elevations shown on the concrete pan(s) have been verified and are shown on the as- built drawings. Yes No Yes Yes Yes Yes No Yes Yes No Yes Yes Yes 8/16 Page 5 V. Storm Drain Inlets - FCSCM Vol.1, Ch.6, Sec. 3 A. Construction/Installation: All storm drain inlets have been constructed in accordance with the approved construction plans. 1.The size and type of inlets are consistent with the inlets shown on the approved construction plan. Indicate by writing “Verified” on each inlet on the plan sheet or list on a separate document the inlet number(s), type and size (length). If the inlet installed is other than the one on the approved construction plan detail sheet, provide the name and source of the detail with justification for equal or better capacity. 2.The size of the inlet opening is consistent with the approved detail. (Check height and width.) 3.The elevation of the grate (if applicable) is at the elevation shown on the street profile or as indicated by a spot elevation on the construction plans. 4.The as-built invert elevations of all pipes entering and leaving the inlet are shown on the plan and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide justification and capacity calculations to show the capacity is not affected or propose mitigation. 5.The as-built size of the inlet box is as shown on the construction plans or an explanation or justification is attached. 6.All Type C, R, 13 and 16 inlet covers are stenciled or stamped with the following (or an equivalent) designation: NO DUMPING – DRAINS TO POUDRE RIVER. VI.Culverts - FCSCM Vol.2, Ch.9 A. Construction/Installation: All culverts have been constructed and/or installed in accordance with the approved construction plans. 1.All culvert sizes have been verified as indicated on the as-built construction plans as correct. 2.The culvert material type for all culverts installed is as on the approved construction plans and is indicated on the as-built plans. 3.The as-built invert “in and out” elevations have been verified and are indicated on the as-built construction plans. 4.The culvert headwalls or wing walls have been installed as shown on the approved construction plans. Headwalls or wing walls may be needed in the as-built conditions onsite if the slopes adjacent to the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative. An alternative to consider is a turf reinforcement mat (TRM). VII.Sub-Drains A. Construction/Installation: All sub-drains shown on the construction plans have been installed in accordance with those plans. Sub-drains installed with the sanitary sewer are to be verified on the sanitary sewer plan and profile sheets of the construction plans. (NOTE: Indicate any sub-drains installed after the plans were approved on the as-built plans.) 1.The size of the sub-drains are as approved on the construction plans and are indicated on the as- built plans. 2.The type of sub-drain, in particular the perforated and non-perforated sections of the drain, are as indicated on the approved construction plans. Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes Yes 8/16 Page 6 3.The cover requirements per the construction plans are provided. 4.The cleanouts have been installed at the locations shown on the construction plans and are accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations marked.) 5.The backfill materials for sub-drains are as shown on the approved construction plans. (This includes the type, depth and width.) 6.The geo-textile liner completely wraps the sub-drain and the permeable backfill material unless shown otherwise on the approved construction plans. (Sub-drain pipe wrapped in a sock filter material is accepted only if approved prior to installation.) VIII.Curb Cuts A. Construction: All curb cut openings are constructed in accordance with the approved construction plans. 1.The size (width) of the curb cut opening is as shown on the approved construction plans. 2.The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb cut. IX.Sidewalk Culverts & Chases A. Construction/Installation: All sidewalk culverts have been installed at the locations shown on the approved construction plans. 1.The size (width and length) of the culverts are as shown on the approved construction plans. 2.The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the detail shown on the approved construction plans or per the City’s detail. 3.The sidewalk culvert invert “in and out” elevations have been verified and are indicated on the as-built plans. 4.The sidewalk culvert opening is as shown on the approved construction plans or per the City’s detail. 5.There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert. X. Site Grading A. Construction: All common open spaces have been graded in accordance with the approved construction plans. 1.The grading on all common open spaces bordering private lots has been verified as correct and the as-built rear lot corner elevations have been shown on the as-built plans. Yes Yes No No No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 8/16 Page 7 2.The as-built contours for “overlot grading” are shown on the as-built construction plans for all common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the situation for noncompliance and when it may be corrected. An escrow for overlot grading may be required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site Certification. It is understood that residential lots will be brought to final grade once the foundation is backfilled so they may be lower than the plan shows at this Overall Site Certification stage.) 3.All turf reinforcement mats (TRMs) have been installed as shown on the approved construction plans and the slopes are stabilized. XI.Riprap - FCSCM Vol.1, Ch.7, Sec.4.4.4.3 A. Construction: All riprap has been installed in the locations and sizes indicated on the approved construction plans. XII.Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7 A. Construction: All fabric has been installed in the locations and sizes indicated on the approved construction plans. 1.All fabric was installed per the details on the approved construction plans. XIII.Post-Construction Site Cleanup - FCSCM Vol.3, Ch.7 A. Construction: All construction debris and obstructions of any kind have been removed from drainage paths. 1.All construction debris has been removed except in staging area(s). 2.All ruts have been smoothed out in all construction areas. 3.All areas needing reseeding have been identified and future stabilization goals have been coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note the area needing stabilization in the narrative. XIV.Certification of Other Permanent BMPs - FCSCM Vol.2, Ch.8, Sec.2 & FCSCM Vol.2, Ch.12 A.The construction of channel drop structures is in accordance with the approved plan both in location, horizontal dimensions and cross-section. XV.Certification of LID and Water Quality Facilities - FCSCM Vol.3, Ch.4 A.Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and other items to be verified during construction, along with pictures and other required documentation. N/A Yes Yes Yes Yes Yes Yes No No Yes Yes APPENDIX B DURING CONSTRUCTION INSPECTION CHECKLIST Bucking Horse Apartments Rain Garden Submittal 02.06.2018 12/15 Page 1 DURING CONSTRUCTION INSPECTION CHECKLIST To be completed by Construction Superintendent This checklist is to be completed during construction and included with the Overall Site and Drainage Certification. •Use “Yes” for items completed as described. •Use “N/A” for items that are not applicable to the site being certified. •If any blanks are “No,” attach an explanation referencing the item number below. I.Compaction A.All berms and embankments meet the compaction requirements as specified in the project geotechnical report or comply with the City’s standard, which is “soils should be compacted within a moisture content range of 2% below to 2% above optimum moisture content and compacted to 95% of the Maximum Standard Proctor Density (ASTM D698).” Compaction requires verification during construction. Provide testing log from contractor/engineer. II.Storm Drain Pipe Installation Requirements A.The pipe trenches have been compacted in accordance with Section 02225-3.07.A.1. of the Fort Collins Development Construction Standards (e.g., the trenches in the roadways are to be 95% of maximum density and all other areas are to be at 90%, both in accordance with ASTM D698). III. Riprap - FCSCM Vol.1, Ch.7, Sec.4.4.4.3 A.The riprap bedding is a granular bedding of the gradation and thickness indicated on the approved construction plans. B.A filter fabric was installed instead of granular bedding and is the material shown on the approved construction plans or was an approved equal. Provide documentation for an approved equal. C.The riprap is the gradation shown on the approved construction plans with a D50 of . D.The riprap thickness is as shown on the approved construction plans and extends to the horizontal limits shown. E.The riprap is buried to the depth indicated on the approved construction plans. (A minimum of 6 inches of soil is required.) IV. Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7 A.All fabric was installed per manufacturer’s specifications. V. Certification of Other Permanent BMPs - FCSCM Vol.2, Ch.8, Sec.2 & FCSCM Vol.2, Ch.12 A.All cut-off walls have been installed in accordance with the approved construction plans. (Cut-off walls are required for irrigation ditch crossings of storm drain pipes and at the end of flared end sections.) 12/15 Page 2 Permeable Interlocking Concrete Pavers Item/Activity Yes No N/A Documentation/Submittal Requirements Excavation Post-excavation infiltration rates are consistent with design infiltration capacity (for “full or partial infiltration” designs) Impermeable Liner Impermeable liner meets design specifications Impermeable liner attached to concrete perimeter wall Impermeable liner is not exposed Any penetrations of the impermeable liner have been sealed and checked for water-tightness. Concrete Cut-Off Wall Meets specifications for: -Dimensions -Reinforcement -Footings Underdrain System Underdrain pipe is per design specifications At least one cleanout is provided per underdrain lateral Cleanout pipe is not perforated Cleanout covers are installed and watertight Underdrain is NOT wrapped in geotextile fabric Underdrain orifice plate installed at outlet structure Underdrain integrity tested after backfilling using TV and/or water test Aggregate Base coarse (e.g., #2/4) has 90% fractured faces Bedding coarse (e.g., #89) is thoroughly washed Sub-base materials are installed and compacted according to manufacturer’s specifications Protection During Construction PICP area is protected from construction site sediment, including runoff from the upstream catchment and construction equipment traffic Close Out Upstream catchment is stabilized prior to diverting runoff into PICP system 12/15 Page 3 Bioretention Cells Item/Activity Yes No N/A Documentation/Submittal Requirements Excavation Heavy equipment did not travel over bioretention cell during excavation Bottom of cell was “ripped” after excavation Photograph before/after “ripping” Bottom of cell is flat and level Photograph Excavated area is protected/surrounded by sediment/runoff control BMPs during construction Photograph Inlet Overflow inlet elevation is set above bioretention media per plan (typically 12 inches) Overflow inlet invert elevation is at least 3 inches below containment wall/berm (to direct overflow into inlet) Measure/record distance between inlet and top of containment wall/berm Upstream catchment drains to inlet Forebay Forebay is installed according to design specifications Forebay has flat, concrete bottom Outlet Structure/Overflow Outlet structure/overflow elevation is confirmed Measure/record distance from overflow to top of media filter Impermeable Liner Impermeable liner meets design specifications Impermeable liner attached to concrete perimeter wall Impermeable liner is not exposed Underdrain System Underdrain pipe is per design specifications At least one cleanout is provided per underdrain lateral Cleanout pipe is not perforated Cleanout covers are installed and watertight Underdrain is NOT wrapped in geotextile fabric Underdrain orifice plate installed at outlet structure Underdrain integrity tested after backfilling using TV and/or water test Bucking Horse Apartments Rain Garden Submittal Exhibit A – Rain Garden Photos 02.06.2018 Bucking Horse Apartments Rain Garden Submittal Exhibit B – Water Quality Vault Photos 02.06.2018 APPENDIX C WATER QUALITY CAPTURE VOLUME Project: Date: Subgrade Design Subgrade Asbuilt Difference Finish Grade Depth Unused Depth Depth Chamber Volume Volume Gravel Vol. (Unadjusted) Gravel Vol. (40% Void) Total Volume Vault 1 1,533 4889.64 4888.82 0.82 4893.81 4.99 2.00 2.99 809 4,157.60 3,348.60 1,339.44 2,148 4889.70 4889.21 0.49 4893.81 4.60 2.00 2.60 4889.41 4889.37 0.04 4894.00 4.63 2.00 2.63 4889.47 4889.37 0.10 4894.00 4.63 2.00 2.63 0.36 0.19 0.19 0.30 4.63 2.63 0.36 4.71 2.71 Vault 2 2,289 4886.55 4886.54 0.01 4890.10 3.56 1.17 2.39 1000 5,352.15 4,352.15 1,740.86 2,741 4886.61 4886.59 0.02 4890.10 3.51 1.17 2.34 4887.42 4887.42 0.00 4890.91 3.49 1.17 2.32 4887.48 4887.45 0.03 4890.91 3.46 1.17 2.29 0.01 0.04 0.04 0.01 3.50 2.33 0.01 3.51 2.34 Vault 3 1,332 4885.71 4885.69 0.02 4889.35 3.66 1.50 2.16 603 3,056.94 2,453.94 981.58 1,585 4885.75 4885.73 0.02 4889.35 3.62 1.50 2.12 4886.28 4886.27 0.01 4890.23 3.96 1.50 2.46 4886.32 4886.29 0.03 4890.23 3.94 1.50 2.44 0.01 0.18 0.18 0.02 3.80 2.30 0.02 3.80 2.30 Vault 4 929 4887.69 4887.61 0.08 4891.16 3.55 1.50 2.05 382 2,121.07 1,739.07 695.63 1,078 4887.65 4887.13 0.52 4891.16 4.03 1.50 2.53 4888.06 4887.93 0.13 4891.73 3.80 1.50 2.30 4888.02 4887.98 0.04 4891.73 3.75 1.50 2.25 0.22 0.20 0.20 0.11 3.77 2.27 0.19 3.78 2.28 F. WegertProject Number:Bucking Horse Filing 4 Project Location:2/11/2019 As-Built Vault Calculations 687-004 Fort Collins, Colorado Calculations By: Vault Asbuilt Subgrade Area (ft2) Subgrade Elevations Depth Volume (ft3) Average Standard Deviation Mean Average Standard Deviation Mean Average Standard Deviation Mean Average Standard Deviation Mean Project: Date: Outlet Elevation:4892.94 1,118 ft3 Grate Elevation:4892.94 1,186 ft3 Crest of Pond Elev.:4893.5 4892.9 Maximum Elevation Minimum Elevation cu. ft.acre ft cu. ft.acre ft 4891.6 N/A 0.0 0 0.0 0.00 0.0 0.00 4892.0 4891.6 769.7 0.4 161.6 0.00 161.6 0.00 4892.5 4892.0 1,116.1 0.5 471.4 0.01 633.1 0.01 4893.0 4892.5 1,397.3 0.5 628.3 0.01 1,261.4 0.03 4893.5 4893.0 1,700.2 0.5 774.4 0.02 2,035.8 0.05 Detention Pond Stage Storage Curve Contour Contour Surface Area (ft2) Depth Incremental Volume Cummalitive Volume Pond Stage Storage Curve 687-004 Fort Collins, Colorado F. Wegert Rain Garden 1 Elev at Design Volume: Bucking Horse Filing 4 2/11/2019 Pond Outlet and Volume Data Design Volume: Volume at Grate: Project Number: Project Location: Calculations By: Pond No.: 2/7/2019 2:47 PM \\broncos\engineers\Projects\687-004\Drainage\LID\Asbuilt Volumes\ 687-004_Stage-Storage_RG1.xlsx\Pond Project: Date: Outlet Elevation:4894.86 195 ft3 Grate Elevation:4894.86 60 ft3 Crest of Pond Elev.:4895.75 4895.4 Maximum Elevation Minimum Elevation cu. ft.acre ft cu. ft.acre ft 4894.3 N/A 0.0 0 0.0 0.00 0.0 0.00 4894.5 4894.3 67.7 0.2 6.8 0.00 6.8 0.00 4895.0 4894.5 227.1 0.5 73.7 0.00 80.5 0.00 4895.5 4895.0 342.2 0.5 142.3 0.00 222.8 0.01 4895.8 4895.5 406.1 0.3 93.5 0.00 316.4 0.01 Volume at Grate: Project Number: Project Location: Calculations By: Pond No.: Detention Pond Stage Storage Curve Contour Contour Surface Area (ft2) Depth Incremental Volume Cummalitive Volume Pond Stage Storage Curve 687-004 Fort Collins, Colorado F. Wegert Rain Garden 2 Elev at Design Volume: Bucking Horse Filing 4 2/11/2019 Pond Outlet and Volume Data Design Volume: 2/7/2019 2:47 PM \\broncos\engineers\Projects\687-004\Drainage\LID\Asbuilt Volumes\ 687-004_Stage-Storage_RG2.xlsx\Pond Project: Date: Outlet Elevation:4892.65 350 ft3 Grate Elevation:4892.65 198 ft3 Crest of Pond Elev.:4895.75 4893.0 Maximum Elevation Minimum Elevation cu. ft.acre ft cu. ft.acre ft 4891.9 N/A 0.0 0 0.0 0.00 0.0 0.00 4892.0 4891.9 107.4 0.1 5.4 0.00 5.4 0.00 4892.5 4892.0 384.7 0.5 123.0 0.00 128.4 0.00 4893.0 4892.5 540.6 0.5 231.3 0.01 359.7 0.01 Detention Pond Stage Storage Curve Contour Contour Surface Area (ft2) Depth Incremental Volume Cummalitive Volume Pond Stage Storage Curve 687-004 Fort Collins, Colorado F. Wegert Rain Garden 3 Elev at Design Volume: Bucking Horse Filing 4 2/11/2019 Pond Outlet and Volume Data Design Volume: Volume at Grate: Project Number: Project Location: Calculations By: Pond No.: 2/7/2019 2:48 PM \\broncos\engineers\Projects\687-004\Drainage\LID\Asbuilt Volumes\ 687-004_Stage-Storage_RG3.xlsx\Pond Project: Date: Outlet Elevation:4890.82 1,120 ft3 Grate Elevation:4890.82 143 ft3 Crest of Pond Elev.:4891.83 Overtops Spillway Maximum Elevation Minimum Elevation cu. ft.acre ft cu. ft.acre ft 4890.4 N/A 0.0 0 0.0 0.00 0.0 0.00 4890.5 4890.4 50.1 0.1 1.7 0.00 1.7 0.00 4891.0 4890.5 824.9 0.5 218.7 0.01 220.4 0.01 4891.5 4891.0 1,099.9 0.5 481.2 0.01 701.6 0.02 4891.8 4891.5 1,207.8 0.3 380.8 0.01 1,082.3 0.02 Detention Pond Stage Storage Curve Contour Contour Surface Area (ft2) Depth Incremental Volume Cummalitive Volume Pond Stage Storage Curve 687-004 Fort Collins, Colorado F. Wegert Rain Garden 4 Elev at Design Volume: Bucking Horse Filing 4 2/11/2019 Pond Outlet and Volume Data Design Volume: Volume at Grate: Project Number: Project Location: Calculations By: Pond No.: 2/7/2019 2:48 PM \\broncos\engineers\Projects\687-004\Drainage\LID\Asbuilt Volumes\ 687-004_Stage-Storage_RG4.xlsx\Pond Project: Date: Outlet Elevation:4890.25 382 ft3 Grate Elevation:4890.25 268 ft3 Crest of Pond Elev.:4890.75 4890.4 Maximum Elevation Minimum Elevation cu. ft.acre ft cu. ft.acre ft 4889.6 N/A 0.0 0 0.0 0.00 0.0 0.00 4890.0 4889.6 507.9 0.4 109.2 0.00 109.2 0.00 4890.5 4890.0 769.8 0.5 319.4 0.01 428.6 0.01 4890.8 4890.5 912.5 0.3 210.3 0.00 638.9 0.01 Volume at Grate: Project Number: Project Location: Calculations By: Pond No.: Detention Pond Stage Storage Curve Contour Contour Surface Area (ft2) Depth Incremental Volume Cummalitive Volume Pond Stage Storage Curve 687-004 Fort Collins, Colorado F. Wegert Rain Garden 5 Elev at Design Volume: Bucking Horse Filing 4 2/11/2019 Pond Outlet and Volume Data Design Volume: 2/7/2019 2:49 PM \\broncos\engineers\Projects\687-004\Drainage\LID\Asbuilt Volumes\ 687-004_Stage-Storage_RG5.xlsx\Pond APPENDIX D RECORD DRAWINGS UD UD UD TF XXXXXXXXXXXXXXXXX 9.2% 2. 1 % GO O S E B E R R Y L A N E CUTTING HORSE DRIVE CU T T I N G H O R S E D R I V E (P R I V A T E D R I V E ) TRACT A EXISTING 2' CONCRETE PAN N:17734.95 E:11994.09 N:17811.14 E:12058.85 STORM DRAIN A SEE SHEET ST1 STORM DRAIN B SEE SHEET ST2 2.0% 4:1 4: 1 4.1 % 1.5%1.5%1.5%1.5% 2.0%1.5%1.5% 2. 0 % 3. 4 % 2. 0 % 3. 5 % 3. 9 % 1. 8 % 2. 0 % (95. 4 7 )95 . 5 1 95 . 6 7 95.6 9 95 . 5 7 95 . 1 4 94. 1 0 93. 5 8 93 . 4 5 93.85 93.94 95.11 95.7 2 95 . 6 1 95 . 6 1 (95 . 6 6 ) 94 . 7 1 94 . 6 3 94 . 7 2 94.9 8 94.15 94.0 5 94 . 0 4 94 . 1 0 94.4 0 93.72 94. 5 2 93. 9 3 93. 6 6 93 . 6 0 93 . 4 1 92.48 93.42 93.5 2 92. 8 4 92.7 2 92. 7 8 93.84 93.9 4 93.20 93.5 5 (9 2 . 5 1 ) (92 . 6 5 ) 92. 6 7 91 . 1 0 91 . 5 5 91 . 9 0 (96. 5 9 ) 93.7 0 94. 7 0 (96.01) (96 . 3 9 ) 92.9 7 92.6 8 (9 6 . 2 0 ) (9 5 . 8 7 ) (9 6 . 5 5 ) (9 6 . 8 4 ) (9 6 . 6 6 ) (9 7 . 0 0 ) (9 6 . 8 9 ) (96 . 2 4 ) (9 7 . 2 8 ) (9 6 . 9 2 ) (9 6 . 3 9 ) (9 6 . 7 2 ) 94 . 0 1 93 . 9 6 93 . 3 4 94.36 94. 1 1 93. 8 5 93. 7 6 93. 8 3 93. 8 3 93.69 93.1 8 93.4 7 93.3 1 93.1 4 93. 8 3 93. 4 8 93. 5 4 92.74 94.0 2 93. 1 8 93. 1 2 92.38 94.45 93.6 2 (89 . 4 1 ) (90 . 1 0 ) 93. 4 9 94.2294 . 5 8 94.02 94 . 4 6 93 . 9 5 94.82 95.47 95.30 95.09 93.49 94.00 95.4 7 93. 9 2 93 . 5 3 93.20 92.00 92.00 92.00 94.83 95 . 5 8 92.96 95.74 93.29 93.82 96.76 95.52 (88 . 7 5 ) (89 . 2 2 ) 95.30 95.3 0 95 . 2 7 94 . 9 9 95 . 3 0 95 . 5 0 95. 2 9 95 . 3 0 94 . 9 8 95.01 97.6 2 97 . 6 0 97.4 1 97.8 1 97.8 1 97.6 0 97.8 1 97.8 1 95.3 0 95 . 1 5 94.70 95 . 3 0 95. 1 1 95.30 95.3 0 95 . 1 0 95 . 5 9 95.02 93.64 96 . 1 4 95.20 95. 8 5 95.0 7 95.9 6 94.40 94. 1 0 94. 8 7 94.31 95.2 5 94 . 8 7 97.40 95. 2 0 94.3 3 95.5 9 RAIN GARDEN A SEE SHEET RG1 AREA DRAIN SEE SHEET AD1 93 . 6 9 93 . 1 9 93 . 6 9 93. 1 9 93.1 9 92.8 7 92.70 93 . 3 0 93 . 1 4 93. 8 9 95. 2 9 94.84 94 . 9 8 95.11 93.09 93. 0 0 2' CONCRETE CHASE 5' SIDEWALK CULVERT 94.0 8 AREA DRAIN SEE SHEET AD1 96. 1 1 FFE=98.48 BLDG 1 FFE=95.97 FFE=95.97 FFE=95.97 FFE=95.97 EXTEND FOUNDATION WALL MIN. 6" ABOVE FG EXTEND FOUNDATION WALL MIN. 6" ABOVE FG EXTEND FOUNDATION WALL MIN. 6" ABOVE FG 2-6" STEPS 95 . 9 7 95 . 9 7 95 . 9 7 95 . 9 7 93 . 4 4 93 . 5 5 93. 0 2 93. 0 2 92. 7 3 92. 9 3 12 . 1 % 11 . 7 % 11 . 9 % 9. 8 % 16 . 3 % 6. 6 % 4. 0 % 2.1 % 2.1 % GARAGE OPENINGS=92.70 GARAGE OPENINGS=93.19 GARAGE OPENINGS=93.69 92.13 0.5%0.5% 2. 1 % 2. 1 % 2. 1 % 2. 1 % 2.0% 7. 7 % 5.2% 8. 6 % 8. 1 % 12 . 4 % 23.9% 6. 6 % 7. 1 % 2. 1 % 2. 9 % 2. 1 % 2. 1 % 2. 1 % 2. 1 % 11 . 0 % 92 . 8 3 94 . 1 4 96. 2 1 3. 0 % 3. 5 % 0.5% 0.4% 0.4% CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 G1 GR A D I N G P L A N MATCHLINE - SEE SHEET G4 MA T C H L I N E - S E E S H E E T G2 Sheet Of 39 Sheets DR A W I N G F I L E N A M E : C : \ U s e r s \ f r e d \ a p p d a t a \ l o c a l \ t e m p \ A c P u b l i s h _ 3 5 4 8 \ 6 8 7 - 0 0 4 _ G R A D _ A B . d w g L A Y O U T N A M E : G 1 D A T E : F e b 1 2 , 2 0 1 9 - 9 : 4 7 a m C A D O P E R A T O R : f r e d LI S T O F X R E F S : [ 6 8 7 - 0 0 4 _ x U T I L ] [ 6 8 7 - 0 0 4 _ x E X S T ] [ 6 8 7 - 0 0 4 _ x G R A D ] [ 6 8 7 - 0 0 4 _ x S I T E ] [ 6 8 7 - 0 0 4 _ x T O P O ] [ N E S - x b o r d e r ] [ 6 8 7 - 0 0 4 _ K E Y M A P ] [ 6 8 7 - 0 0 4 _ x A D J ] [ 6 8 7 - 0 0 4 _ 3 D _ P r o p o s e d ] [ 6 8 7 - 0 0 4 _ x G R A D _ l e g ] [ 2 0 1 8 - 0 3 - 0 7 G r a d i n g A s - B u i l t ] [ 2 0 1 9 - 0 1 - 2 3 S i t e A s - B u i l t U p d a t e s ] E N G I N E E R N G I E H T R O N R N 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 ww w . n o r t h e r n e n g i n e e r i n g . c o m Ph o n e : 9 7 0 . 2 2 1 . 4 1 5 8 - F i l i n g F o u r D: \ P r o j e c t s \ 6 8 7 - 0 0 2 \ A r c h s u r v \ R e c e i v e d \ C a m p a n a \ 2 0 1 2 - 0 3 - 2 1 _ p r o j e c t - l o g o s \ B H l o g o . g i f 9.30.16 KEYMAP LEGEND: PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED OUTFLOW CURB AND GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 4.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM. 5.CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTION OF PRIVATE DRIVES SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE. 6.ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM; NGVD 29 (UNADJUSTED). SEE COVER SHEET FOR BENCHMARK REFERENCES. 7.TRACT A IS BEYOND THE LIMITS OF THESE PLANS. NO IMPROVEMENTS ARE PROPOSED OUTSIDE THE LIMITS SHOWN. 8.SEE SHEETS CS1 AND CS2 FOR PROJECT BENCHMARKS AND VERTICAL DATUM. ADD 4800-FT TO PROPOSED CONTOURS, SPOT ELEVATIONS, AND FFE LABELS, WHERE TRUNCATED; EXCEPT IN WESTERN AREA OF SITE, WHERE ACTUAL ELEVATIONS RANGE FROM 4900-FT TO 4910-FT. NOTES: PROPOSED STORM INLET PEDESTRIAN ACCESS RAMPS EXISTING SPOT ELEVATION PROPOSED FIRE HYDRANT PROPOSED ELECTRIC TRANSFORMER PROPOSED LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) EXISTING RIGHT OF WAY PROPOSED INFLOW CURB AND GUTTER G1 G2G4 G3G5 G6 G7 G8 G9 2 SI T E P L A N U P D A T E S AG R 3/ 2 9 / 3 0 2 11 REVISION #2 KEY 1 REVISED CURB LOCATION AND ELEVATIONS 2 REVISED GARAGE FOOTPRINT 3 ADDED MAIL KIOSK/RELOCATED BIKE RACKS 4 REVISED CLUBHOUSE FOOTPRINT AND FLATWORK 5 REVISED 'C' BUILDING FOOTPRINT AND FLATWORK THE S E R E C O R D D R A W I N G S , P R O D U C E D B Y N O R T H E R N E N G I N E E R I N G SER V I C E S , I N C . , A R E B A S E D I N W H O L E , O R I N P A R T , U P O N I N F O R M A T I O N PRO V I D E D B Y O T H E R S . N O R T H E R N E N G I N E E R I N G S E R V I C E S , I N C . A S S U M E S NO L I A B I L I T Y F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F T H I S I N F O R M A T I O N . REC O R D D R A W I N G TF TF XXXXXXXXXXXXXXXXXX TRACT A 1. 5 % 1. 5 % 1.5%1.5% 1.5%1.5% 1. 5 % 2. 0 % 1.5% 2.0% 2. 0 % 2. 0 % 0. 7 % 2. 0 % 4. 5 % 5. 0 % 3. 8 % 2. 0 % 3. 8 % 4. 0 % 4. 0 % 4. 6 % 3. 0 % 3. 6 % 92. 4 6 92. 3 0 92 . 4 8 93.72 93 . 5 2 93.5 8 93.90 93. 2 3 93. 1 3 93 . 1 1 93 . 1 8 93.5 0 92. 8 3 92 . 7 2 92.80 92.9 3 92.4 8 92.72 94.7 7 94.7 8 94. 5 2 92 . 4 9 92.55 92.9 0 92.20 92 . 0 8 92 . 1 4 92 . 4 7 92. 2 5 92 . 2 6 92.21 91. 5 3 91.43 90 . 7 9 90 . 7 3 90 . 7 5 91 . 4 3 91 . 2 8 91 . 1 7 92.1 0 91.5 4 92.7 8 92.1 0 92.04 93.1 0 93.0 0 92.36 92.30 92.48 92.1 0 92 . 6 9 92.49 91. 9 9 91 . 4 9 91 . 2 0 90 . 9 9 90 . 7 1 90 . 6 7 90 . 6 1 90 . 5 4 91. 9 8 92.6 8 94. 5 5 90 . 1 1 92.1 9 91.9 8 91.7 0 92 . 8 5 92. 3 0 92. 2 5 94.0 2 92.74 92. 8 0 93. 1 8 93. 1 2 92.38 92.00 91. 5 0 91. 4 5 92. 0 8 92. 0 3 93. 1 5 93.5 5 92. 5 4 93.6 2 91. 4 5 91.6692.52 93.3 1 93. 4 4 93.31 92. 8 1 92.82 92.77 94.17 93.02 94.43 93 . 4 0 94.10 93 . 4 0 93.99 95.3 0 93 . 9 1 94.42 94.2294 . 5 8 94.02 94 . 4 6 95.30 95.09 94 . 7 2 91. 9 2 92.2 5 90. 8 5 95 . 3 0 94 . 9 8 95.01 94.51 95.0 1 94.5 1 94.1 0 94.6294.43 94 . 6 0 94 . 0 8 95.0 7 94.10 94 . 6 6 95. 0 2 95.12 93.1 5 93.1 5 93 . 8 2 92 . 7 4 93.82 95. 1 1 95 . 3 0 95.30 95 . 0 1 95.3 0 93. 3 5 90. 9 1 91 . 2 7 91.2 9 92. 0 8 92. 5 2 92. 4 7 92. 5 8 93.6994.00 93. 3 9 92. 2 3 92. 2 9 92. 1 8 92 . 1 9 92.1 594.4 1 94. 1 0 93.6 4 93.9 3 94. 8 7 94 . 3 4 94 . 0 2 94 . 4 4 94.8 2 95. 2 0 94.7 9 93.9 1 93. 9 7 91. 9 8 92. 6 9 93. 2 3 92. 8 5 AREA DRAIN SEE SHEET AD1 AREA DRAIN SEE SHEET AD1 AREA DRAIN SEE SHEET AD1 92.2092.7 0 92.3 4 92.3 1 91. 7 1 92 . 1 8 91 . 8 7 91 . 3 2 91 . 7 1 91.2 1 93 . 1 4 93.5 9 92 . 9 2 93. 1 9 92.33 92.65 90.7 291 . 2 1 90 . 8 8 94.0 8 AREA DRAIN SEE SHEET AD1 AREA DRAIN SEE SHEET AD1 CUTTING HORSE DRIVE (PRIVATE DRIVE) FFE=95.97 BLDG 2 FFE=95.68 FFE=95.68 FFE=95.18 FFE=95.18 BLDG 3 FFE=93.82 FFE=93.82 FFE=93.82 EXTEND FOUNDATION WALL MIN. 6" ABOVE FG EXTEND FOUNDATION WALL MIN. 6" ABOVE FG EXTEND FOUNDATION WALL MIN. 6" ABOVE FG EXTEND FOUNDATION WALL MIN. 6" ABOVE FG EXTEND FOUNDATION WALL MIN. 6" ABOVE FG 1-6" STEP 95 . 6 8 95 . 6 8 95 . 1 8 95 . 1 8 93 . 8 2 93 . 8 2 93.8 2 93.82 92. 0 5 91. 8 5 91. 7 8 91. 5 8 91. 0 4 90. 8 4 90. 7 8 90. 5 8 5. 8 % 10 . 0 % 7. 5 % 8. 2 % 7. 9 % 14 . 2 % 12 . 8 % 12 . 1 % 2. 0 % 2. 0 % GARAGE OPENINGS=90.72 GARAGE OPENINGS=91.21 GARAGE OPENINGS=91.71 GARAGE OPENINGS=92.20GARAGE OPENINGS=92.70 92.13 91.49 0.5%0.5%0.5% 2. 1 % 2. 1 % 2. 1 % 2. 1 % 2. 1 % 2. 1 % 2. 2 % 2. 2 % 6. 7 % 5.1 % 7.0% 8. 2 % 8. 0 % 92.70 11. 4 % 5.0% 10 . 5 % 15 . 0 % 5.4 % 5.8 % 7. 0 % 7.8% 15 . 7 % 7. 7 % 5.2% 8. 6 % 2.4 % 2.6 % 2.7 % 2.1 % 2. 1 % 2. 1 % 2. 1 % 2.1 % 91.9 3 91.2 9 91. 5 9 0.4% 0.6% / / / / / ////// / / / / / / / / ////// / / / / ///// / / / / / ////// CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 G2 GR A D I N G P L A N MA T C H L I N E - S E E S H E E T G1 MATCHLINE - SEE SHEET G5 Sheet Of 39 Sheets DR A W I N G F I L E N A M E : C : \ U s e r s \ f r e d \ a p p d a t a \ l o c a l \ t e m p \ A c P u b l i s h _ 3 5 4 8 \ 6 8 7 - 0 0 4 _ G R A D _ A B . d w g L A Y O U T N A M E : G 2 D A T E : F e b 1 2 , 2 0 1 9 - 9 : 4 7 a m C A D O P E R A T O R : f r e d LI S T O F X R E F S : [ 6 8 7 - 0 0 4 _ x U T I L ] [ 6 8 7 - 0 0 4 _ x E X S T ] [ 6 8 7 - 0 0 4 _ x G R A D ] [ 6 8 7 - 0 0 4 _ x S I T E ] [ 6 8 7 - 0 0 4 _ x T O P O ] [ N E S - x b o r d e r ] [ 6 8 7 - 0 0 4 _ K E Y M A P ] [ 6 8 7 - 0 0 4 _ x A D J ] [ 6 8 7 - 0 0 4 _ 3 D _ P r o p o s e d ] [ 6 8 7 - 0 0 4 _ x G R A D _ l e g ] [ 2 0 1 8 - 0 3 - 0 7 G r a d i n g A s - B u i l t ] [ 2 0 1 9 - 0 1 - 2 3 S i t e A s - B u i l t U p d a t e s ] E N G I N E E R N G I E H T R O N R N 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 ww w . n o r t h e r n e n g i n e e r i n g . c o m Ph o n e : 9 7 0 . 2 2 1 . 4 1 5 8 - F i l i n g F o u r D: \ P r o j e c t s \ 6 8 7 - 0 0 2 \ A r c h s u r v \ R e c e i v e d \ C a m p a n a \ 2 0 1 2 - 0 3 - 2 1 _ p r o j e c t - l o g o s \ B H l o g o . g i f 9.30.16 KEYMAP LEGEND: PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED OUTFLOW CURB AND GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 4.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM. 5.CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTION OF PRIVATE DRIVES SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE. 6.ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM; NGVD 29 (UNADJUSTED). SEE COVER SHEET FOR BENCHMARK REFERENCES. 7.TRACT A IS BEYOND THE LIMITS OF THESE PLANS. NO IMPROVEMENTS ARE PROPOSED OUTSIDE THE LIMITS SHOWN. 8.SEE SHEETS CS1 AND CS2 FOR PROJECT BENCHMARKS AND VERTICAL DATUM. ADD 4800-FT TO PROPOSED CONTOURS, SPOT ELEVATIONS, AND FFE LABELS, WHERE TRUNCATED; EXCEPT IN WESTERN AREA OF SITE, WHERE ACTUAL ELEVATIONS RANGE FROM 4900-FT TO 4910-FT. NOTES: PROPOSED STORM INLET PEDESTRIAN ACCESS RAMPS EXISTING SPOT ELEVATION PROPOSED FIRE HYDRANT PROPOSED ELECTRIC TRANSFORMER PROPOSED LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) EXISTING RIGHT OF WAY PROPOSED INFLOW CURB AND GUTTER G1 G2G4 G3G5 G6 G7 G8 G9 MA T C H L I N E - S E E S H E E T G3 2 SI T E P L A N U P D A T E S AG R 3/ 2 9 / 3 0 2 1 REVISION #2 KEY 1 REVISED CURB LOCATION AND ELEVATIONS 2 REVISED GARAGE FOOTPRINT 3 ADDED MAIL KIOSK/RELOCATED BIKE RACKS 4 REVISED CLUBHOUSE FOOTPRINT AND FLATWORK 5 REVISED 'C' BUILDING FOOTPRINT AND FLATWORK 1 1 1 1 THE S E R E C O R D D R A W I N G S , P R O D U C E D B Y N O R T H E R N E N G I N E E R I N G SER V I C E S , I N C . , A R E B A S E D I N W H O L E , O R I N P A R T , U P O N I N F O R M A T I O N PRO V I D E D B Y O T H E R S . N O R T H E R N E N G I N E E R I N G S E R V I C E S , I N C . A S S U M E S NO L I A B I L I T Y F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F T H I S I N F O R M A T I O N . REC O R D D R A W I N G TF TFTF XXXXXXXXXXXXXXXXX CUTTING HORSE DRIVE (PRIVATE DRIVE) TRACT A STORM DRAIN C SEE SHEET ST2 STORM DRAIN D SEE SHEET ST3 N:17203.96 E:12871.22 EXISTING 2' CONCRETE PAN EXISTING 15" RCP FUTURE CURB & GUTTER EXISTING 42" RCP 1. 0 % 1. 0 % 6.6% 12.5% 2.0% 1.5%1.5%1.5%1.6% 1. 5 % 1. 5 % 1.6%1.2%1.8% 1.5%1.4% 1.5% 1. 3 % 1.5% 2. 0 % 3. 0 % 3. 6 % 2. 0 % 3. 5 % 3. 2 % 4. 8 % 4. 5 % 2. 0 % 91 . 4 5 91.7 2 91 . 6 2 91.5 2 91.58 91.8 8 91.18 91 . 0 6 91.1 2 91.4 5 90.3 4 90 . 0 1 90.0 6 89.7 9 89 . 5 7 89 . 3 8 89 . 4 1 89 . 8 9 89.9 0 90.6 4 90 . 7 0 90. 6 9 91.0 9 90.99 90.35 90 . 2 9 91. 5 3 91.43 90 . 7 9 90 . 7 3 90 . 7 5 91.0 8 92.02 91.13 91.1 9 90.49 90.3 9 90 . 5 0 90 . 2 2 90 . 0 0 89 . 8 2 89. 5 7 89 . 2 9 89 . 6 2 90 . 5 6 90.23 90 . 4 1 90 . 5 7 90. 6 790. 6 691.26 91 . 1 7 91 . 3 0 91 . 4 9 91 . 5 9 91 . 5 4 91.2 5 90 . 8 7 91.0 3 (91. 5 0 ) FFE=91.45 90.76 90. 7 5 90.29 90 . 0 4 90. 1 2 89 . 4 8 89 . 5 3 89 . 4 0 GARAGE OPENINGS=89.73 90.00 (9 1 . 6 4 ) (91. 9 5 ) (9 2 . 0 0 ) (9 2 . 2 6 ) (92.31 ) (92 . 5 5 ) (92. 1 7 ) (9 1 . 4 1 ) (9 2 . 1 9 ) 90.7 9 90.32 91. 4 5 91.48 90.55 88.9 4 (86 . 8 0 ) (86.18) 90. 2 5 91.01 90.1190.87 90 . 8 4 91. 4 2 91.13 90 . 9 1 91.2992.08 92.21 91. 2 8 91. 3 5 91.69 91. 9 7 91.76 92 . 1 7 91.66 93. 4 4 92.8 8 92 . 6 7 92.80 93.24 91.79 92. 2 0 90 . 3 5 90 . 0 4 90.56 90 . 0 4 (85.28)(86.39) 90. 8 5 90.1 5 92.93 93.1 5 93.1 5 93.6 0 92.94 92 . 7 4 93.82 92.75 91.98 92.5 9 92.6 5 92.3 6 92 . 2 7 92. 1 8 92 . 5 9 92.5 9 92 . 4 7 92 . 5 9 92.19 91.37 90.9 5 90.95 91. 3 8 90.8 1 90. 4 0 89 . 6 4 89.9 0 89.8 5 89.59 89.5 3 89.7 9 89.7 9 89.2 7 89.2 8 88 . 7 9 89 . 9 5 90.1 2 90. 3 7 90.02 91. 7 9 92. 3 2 91. 9 8 92. 8 5 92. 3 2 91. 9 9 91. 6 6 AREA DRAIN SEE SHEET AD1 AREA DRAIN SEE SHEET AD1 AREA DRAIN SEE SHEET AD1 90.22 90 . 2 3 90 . 7 2 90 . 2 2 90.2 3 89 . 7 2 90 . 3 3 90.3 5 89 . 1 2 89 . 8 7 89.62 5' SIDEWALK CHASE 5' CURB CUT 90.23 92.08 AREA DRAIN SEE SHEET AD1 NA N C Y G R A Y A V E N U E BLDG 3 FFE=93.82 FFE=93.82 FFE=93.82 BLDG 4 FFE=93.26 FFE=93.26 FFE=93.26 FFE=93.26 BLDG 5 FFE=91.45 90.92 90.95 90.95 90.89 90.47 90. 6 4 90. 8 9 90 . 5 4 90 . 2 8 90 . 1 3 90.9 5 90.95 90.1 8 90 . 1 490.6 6 91.1 9 88 . 4 9 89.56 88.4 3 86 . 1 7 (85.54) 90.55 89 . 7 8 89 . 9 1 91.10 EXTEND FOUNDATION WALL MIN. 6" ABOVE FG EXTEND FOUNDATION WALL MIN. 6" ABOVE FG EXTEND FOUNDATION WALL MIN. 6" ABOVE FG EX T E N D F O U N D A T I O N W A L L 6" A B O V E F F E 1-6" STEP 2-6" STEPS 2-6" STEPS 92.8 8 91.4 7 93.8 2 93.82 93 . 2 6 93 . 2 6 93 . 2 6 93 . 2 6 90. 0 5 89. 8 5 89. 9 5 89. 7 2 4. 3 % 7. 5 % 5. 3 % 6. 1 % 8. 4 % 5. 8 % 2. 0 % 2.3 % 4.7% PROPOSED INTERIM TRAIL RIPRAP CHANNEL (TYPE M RIPRAP ±30' LONG x 8' WIDE) GARAGE OPENINGS=90.22 GARAGE OPENINGS=90.72 GA R A G E OP E N I N G S = 8 9 . 6 2 3.2%3.2% 90 . 0 3 89.49 88.99 0.5%0.5%0.5% 2. 1 % 2. 1 % 2. 1 % 2. 1 % 2.3%2. 1 % 2. 1 % 7.9% 6.0% 14 . 5 % 10 . 3 % 8.9 % 7. 8 % 7.5% 5.2% 13 . 3 % 7. 4 % 9. 6 % 8. 3 % 6. 7 % 8. 0 % 9. 5 % 2. 1 % 2.0 % 2.1% 0.9% 2.0% 2.1% 2.0% 2.2% 2.6% 2. 1 % 2.1 % 2. 1 % 2. 1 % 91 . 3 2 91 . 7 5 91 . 9 3 (92. 6 3 ) 89.51 90.17 90. 5 9 91.3 7 91.2 9 91.3 6 91.3 6 91.1 7 91. 2 890.80 91.3 6 91.2891.37 2-6" STEPS 90.3 7 91.36 90. 9 5 5.9% 24.9% 6.3% 23.1% 29.8% 2.8% 90.52 0.4%0.3% / ////// / / / / / / ////// CURB CUT = 8' CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 G3 GR A D I N G P L A N Sheet Of 39 Sheets DR A W I N G F I L E N A M E : C : \ U s e r s \ f r e d \ a p p d a t a \ l o c a l \ t e m p \ A c P u b l i s h _ 3 5 4 8 \ 6 8 7 - 0 0 4 _ G R A D _ A B . d w g L A Y O U T N A M E : G 3 D A T E : F e b 1 2 , 2 0 1 9 - 9 : 4 7 a m C A D O P E R A T O R : f r e d LI S T O F X R E F S : [ 6 8 7 - 0 0 4 _ x U T I L ] [ 6 8 7 - 0 0 4 _ x E X S T ] [ 6 8 7 - 0 0 4 _ x G R A D ] [ 6 8 7 - 0 0 4 _ x S I T E ] [ 6 8 7 - 0 0 4 _ x T O P O ] [ N E S - x b o r d e r ] [ 6 8 7 - 0 0 4 _ K E Y M A P ] [ 6 8 7 - 0 0 4 _ x A D J ] [ 6 8 7 - 0 0 4 _ 3 D _ P r o p o s e d ] [ 6 8 7 - 0 0 4 _ x G R A D _ l e g ] [ 2 0 1 8 - 0 3 - 0 7 G r a d i n g A s - B u i l t ] [ 2 0 1 9 - 0 1 - 2 3 S i t e A s - B u i l t U p d a t e s ] E N G I N E E R N G I E H T R O N R N 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 ww w . n o r t h e r n e n g i n e e r i n g . c o m Ph o n e : 9 7 0 . 2 2 1 . 4 1 5 8 - F i l i n g F o u r D: \ P r o j e c t s \ 6 8 7 - 0 0 2 \ A r c h s u r v \ R e c e i v e d \ C a m p a n a \ 2 0 1 2 - 0 3 - 2 1 _ p r o j e c t - l o g o s \ B H l o g o . g i f 9.30.16 KEYMAP LEGEND: PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED OUTFLOW CURB AND GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 4.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM. 5.CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTION OF PRIVATE DRIVES SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE. 6.ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM; NGVD 29 (UNADJUSTED). SEE COVER SHEET FOR BENCHMARK REFERENCES. 7.TRACT A IS BEYOND THE LIMITS OF THESE PLANS. NO IMPROVEMENTS ARE PROPOSED OUTSIDE THE LIMITS SHOWN. 8.SEE SHEETS CS1 AND CS2 FOR PROJECT BENCHMARKS AND VERTICAL DATUM. ADD 4800-FT TO PROPOSED CONTOURS, SPOT ELEVATIONS, AND FFE LABELS, WHERE TRUNCATED; EXCEPT IN WESTERN AREA OF SITE, WHERE ACTUAL ELEVATIONS RANGE FROM 4900-FT TO 4910-FT. NOTES: PROPOSED STORM INLET PEDESTRIAN ACCESS RAMPS EXISTING SPOT ELEVATION PROPOSED FIRE HYDRANT PROPOSED ELECTRIC TRANSFORMER PROPOSED LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) EXISTING RIGHT OF WAY PROPOSED INFLOW CURB AND GUTTER MA T C H L I N E - S E E S H E E T G 2 MATCHLINE - SEE SHEET G6 G1 G2G4 G3G5 G6 G7 G8 G9 2 SI T E P L A N U P D A T E S AG R 3/ 2 9 / 3 0 2 REVISION #2 KEY 1 REVISED CURB LOCATION AND ELEVATIONS 2 REVISED GARAGE FOOTPRINT 3 ADDED MAIL KIOSK/RELOCATED BIKE RACKS 4 REVISED CLUBHOUSE FOOTPRINT AND FLATWORK 5 REVISED 'C' BUILDING FOOTPRINT AND FLATWORK 111 1 2 5 THE S E R E C O R D D R A W I N G S , P R O D U C E D B Y N O R T H E R N E N G I N E E R I N G SER V I C E S , I N C . , A R E B A S E D I N W H O L E , O R I N P A R T , U P O N I N F O R M A T I O N PRO V I D E D B Y O T H E R S . N O R T H E R N E N G I N E E R I N G S E R V I C E S , I N C . A S S U M E S NO L I A B I L I T Y F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F T H I S I N F O R M A T I O N . REC O R D D R A W I N G TF TF TF TF 9.8% 9.2% LU S I T A N O L A N E (P R I V A T E D R I V E ) STORM DRAIN A SEE SHEET ST1 3. 4 % 1. 5 % 1. 5 % 1. 5 % 1.5%1.5%1.5%1.5% 2.0% 1.5%1.5%1.5%1.5% 0.9%2.0% 1.9%2.0% 2.3%0.3% 0.6% 2.0% 0.5%2.0%2.0%5.4% 4.9%2.0% 2.0% 4-6" STEPS 2.0% 2. 0 % 2. 0 % 2. 0 % 0. 8 % 2. 9 % 2. 0 % 2. 0 % 2. 0 % 3. 4 % 4-6" STEPS 4-6" STEPS 95. 6 3 95.63 95. 9 3 97.38 97. 0 2 97.1 7 96 . 9 2 96.7 8 94.9 8 94.56 94 . 7 1 94 . 0 7 93.94 94. 5 2 93. 9 3 93. 6 6 93 . 6 0 93 . 4 1 96 . 8 2 96.7 1 96 . 6 5 96 . 6 5 95. 2 7 95.3 4 95. 8 3 97.0 2 96. 1 5 96.4 7 95.8 0 95 . 5 1 96.0 6 96. 4 8 96.8 7 96 . 7 8 96 . 7 4 96.4 5 95 . 7 0 (1. 8 0 ) (1. 2 4 ) (0.0 9 ) (99.86) (99. 4 4 ) 93.7 0 95 . 9 5 97.46 96 . 0 1 95 . 7 6 97 . 9 4 98 . 3 5 94. 7 0 96 . 4 0 0.7 7 96.4 5 95.0 8 95.1 8 95.33 95.4 2 97.47 95.65 1.6 9 94 . 0 1 93 . 9 6 94 . 4 7 94 . 6 2 95. 4 4 94.2294 . 5 8 95.09 93.49 94.00 95. 4 7 93. 9 2 98.07 97.9 0 98.31 97.03 95 . 8 3 95.86 96.4 4 97.25 96.43 96.05 97.25 96.78 93.82 98.26 0.72 99.17 98. 7 5 97.8 6 1.69 98.1 0 98. 1 0 98.97 98.9 8 99.25 97.61 96.76 95.52 96.18 97.2 6 99 . 5 1 99.21 98.2 5 0.3 2 98 . 8 8 96 . 1 6 96.58 99. 4 0 99 . 4 0 99. 4 0 99 . 4 0 99.6 9 99.4 6 98.6 8 99.19 98.4 0 98.0 1 97.97 98.4 0 0.77 1.07 0.55 99.8 4 0.03 0.03 0.140.14 0.03 0.0 3 0.03 0.43 1.6 9 1.2 3 0.9 6 1.2 6 0.3 2 98.8 1 98.8 1 98. 9 7 99.0 3 98.5 1 98.8 1 97.8 1 98.2 1 98 . 1 0 97.6 2 97 . 6 0 97.4 1 97.8 1 97.8 1 97.6 0 97.8 1 97.8 1 98. 2 6 99 . 1 9 98 . 9 7 99. 0 3 98 . 5 1 98 . 3 9 98 . 5 4 98.10 96.66 96 . 7 6 97 . 0 2 96 . 9 7 97. 2 6 96 . 9 7 97 . 0 8 96 . 9 7 96 . 9 7 96.97 96 . 9 7 96 . 7 6 97 . 3 7 97.0 2 97.0 2 97.25 96.9 7 97.3 7 96.5 7 96.5 4 96 . 9 7 96.97 96.5 4 95 . 1 5 94.70 95 . 3 0 99 . 4 7 FFE=96.75 FFE=96.50 95. 0 7 95. 1 9 96.30 95.88 96.56 97.0098.00 94. 1 0 95.1 7 94 . 8 6 95. 4 1 96 . 3 7 95.58 96.36 94. 8 7 (99. 9 7 ) (98. 8 6 ) (98. 0 1 ) 95. 2 0 94. 3 3 96 . 8 4 96.69 (1. 5 1 ) 97.40 96.10 96.1 8 95.40 95.53 97.01 0.2 8 95 . 9 7 96 . 2 7 96.66 97.2 4 96 . 9 2 95.5 9 AREA DRAIN SEE SHEET AD1 AREA DRAIN SEE SHEET AD1 95. 6 2 93.09 95 . 7 8 2' CONCRETE CHASE 95 . 6 2 95 . 5 2 95.2 1 94.5 6 94.68 5' SIDEWALK CULVERT 96.50 96. 5 8 96.5 7 96. 6 1 96. 6 2 96. 7 4 96.6 5 96.6 0 95 . 8 9 4' PAN 4' PAN 96.7 2 97.17 95.63 GO O S E B E R R Y L A N E BLDG 11 FFE=2.20 FFE=0.70 FFE=0.70 BLDG 6 FFE=99.48 FFE=99.48 FFE=98.48 FFE=98.48 BLDG 7 FFE=97.63 FFE=97.63 FFE=97.63 FFE=97.63 2-6" STEPS 2-6" STEPS 2-6" STEPS 98 . 4 8 98 . 4 8 99 . 4 8 99 . 4 8 97 . 6 3 97 . 6 3 97 . 6 3 97 . 6 3 0.7 0 0.7 0 2.2 0 2.2 0 0.0 7 99.57 8. 6 % 8. 1 % 12 . 4 % 7. 4 % 6.9 % 11 . 2 % 9.0% 13.1% 2.1% 1.7 % 1.9 % 2.0 % 2.0% 2.0 % 2. 1 % 1.1% 2.0% 1.9 % 2. 1 % 2. 9 % 5.0% 6.7% 8.4% 12.4% 14.5% 10 . 6 % 6.6% 2.1 % 7.0% 6.6% 9.6 % 6.7% 6.7% 11 . 0 % 4.7% 5.2% 6.7% 8.8% 8. 3 % 5. 0 % 8.3 % 11.8% 10.3% 7. 5 % 5. 2 % 10 . 3 % 9. 1 % 6.8% 5.2% 96.96 97.0 7 96. 8 7 96.9 3 2' CONCRETE PAN CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 G4 GR A D I N G P L A N MATCHLINE - SEE SHEET G1 Sheet Of 39 Sheets DR A W I N G F I L E N A M E : C : \ U s e r s \ f r e d \ a p p d a t a \ l o c a l \ t e m p \ A c P u b l i s h _ 3 5 4 8 \ 6 8 7 - 0 0 4 _ G R A D _ A B . d w g L A Y O U T N A M E : G 4 D A T E : F e b 1 2 , 2 0 1 9 - 9 : 4 7 a m C A D O P E R A T O R : f r e d LI S T O F X R E F S : [ 6 8 7 - 0 0 4 _ x U T I L ] [ 6 8 7 - 0 0 4 _ x E X S T ] [ 6 8 7 - 0 0 4 _ x G R A D ] [ 6 8 7 - 0 0 4 _ x S I T E ] [ 6 8 7 - 0 0 4 _ x T O P O ] [ N E S - x b o r d e r ] [ 6 8 7 - 0 0 4 _ K E Y M A P ] [ 6 8 7 - 0 0 4 _ x A D J ] [ 6 8 7 - 0 0 4 _ 3 D _ P r o p o s e d ] [ 6 8 7 - 0 0 4 _ x G R A D _ l e g ] [ 2 0 1 8 - 0 3 - 0 7 G r a d i n g A s - B u i l t ] [ 2 0 1 9 - 0 1 - 2 3 S i t e A s - B u i l t U p d a t e s ] E N G I N E E R N G I E H T R O N R N 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 ww w . n o r t h e r n e n g i n e e r i n g . c o m Ph o n e : 9 7 0 . 2 2 1 . 4 1 5 8 - F i l i n g F o u r D: \ P r o j e c t s \ 6 8 7 - 0 0 2 \ A r c h s u r v \ R e c e i v e d \ C a m p a n a \ 2 0 1 2 - 0 3 - 2 1 _ p r o j e c t - l o g o s \ B H l o g o . g i f 9.30.16 KEYMAP G1 G2G4 G3 LEGEND: PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED OUTFLOW CURB AND GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 4.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM. 5.CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTION OF PRIVATE DRIVES SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE. 6.ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM; NGVD 29 (UNADJUSTED). SEE COVER SHEET FOR BENCHMARK REFERENCES. 7.TRACT A IS BEYOND THE LIMITS OF THESE PLANS. NO IMPROVEMENTS ARE PROPOSED OUTSIDE THE LIMITS SHOWN. 8.SEE SHEETS CS1 AND CS2 FOR PROJECT BENCHMARKS AND VERTICAL DATUM. ADD 4800-FT TO PROPOSED CONTOURS, SPOT ELEVATIONS, AND FFE LABELS, WHERE TRUNCATED; EXCEPT IN WESTERN AREA OF SITE, WHERE ACTUAL ELEVATIONS RANGE FROM 4900-FT TO 4910-FT. NOTES: PROPOSED STORM INLET PEDESTRIAN ACCESS RAMPS EXISTING SPOT ELEVATION PROPOSED FIRE HYDRANT PROPOSED ELECTRIC TRANSFORMER PROPOSED LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) EXISTING RIGHT OF WAY PROPOSED INFLOW CURB AND GUTTER MA T C H L I N E - S E E S H E E T G 5 MATCHLINE - SEE SHEET G7 G5 G6 G7 G8 G9 2 SI T E P L A N U P D A T E S AG R 3/ 2 9 / 3 0 2 REVISION #2 KEY 1 REVISED CURB LOCATION AND ELEVATIONS 2 REVISED GARAGE FOOTPRINT 3 ADDED MAIL KIOSK/RELOCATED BIKE RACKS 4 REVISED CLUBHOUSE FOOTPRINT AND FLATWORK 5 REVISED 'C' BUILDING FOOTPRINT AND FLATWORK 1 2 2 1 1 2 THE S E R E C O R D D R A W I N G S , P R O D U C E D B Y N O R T H E R N E N G I N E E R I N G SER V I C E S , I N C . , A R E B A S E D I N W H O L E , O R I N P A R T , U P O N I N F O R M A T I O N PRO V I D E D B Y O T H E R S . N O R T H E R N E N G I N E E R I N G S E R V I C E S , I N C . A S S U M E S NO L I A B I L I T Y F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F T H I S I N F O R M A T I O N . REC O R D D R A W I N G TF TF TF TF XXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXX X X X X X X X LU S I T A N O L A N E (P R I V A T E D R I V E ) 1.5% 1.6% 3.7% 4.2% 1.5%2.9% 6.0% 1. 5 % 1. 5 % 1. 4 % 1.5%1.5%1.5%3. 8 % 3. 8 % 2.0% 3.2% 5.0% 4.3% 2.0% 5.3% 5.0% 5.0% 4. 4 % 5. 0 % 2.0%3.8%2.0%2.0% 3.9%2.8%2.0%5.0% 1. 2 % 2. 0 % 3. 7 % 2. 0 % 2. 0 % 92. 4 6 95. 6 3 94.9 8 94.56 92.9 3 92.4 8 92.72 94.7 7 94.7 8 94. 5 2 92. 2 5 92 . 2 6 92.21 92.09 91.8 0 91 . 6 8 92.0 3 92.5 8 92.2 1 91. 6 5 91.8 5 94 . 1 5 94 . 2 0 93.02 93.39 95. 2 7 95.3 4 91.6 7 91 . 5 7 91 . 0 7 91. 2 6 CLUBHOUSE FFE=92.47 96.43 95 . 3 5 95. 3 0 93 . 7 7 92. 4 5 92.00 92.4 1 91.3 5 91.2 2 92. 0 0 91.88 91. 7 3 91 . 7 4 91. 8 4 92. 1 1 92 . 3 7 92.1 0 92.0 4 92. 3 1 91.9 5 92.51 91.8 0 96.3 1 97. 2 9 96.7 1 95.2 7 93.59 92. 4 0 92 . 4 7 92 . 5 5 93 . 1 4 95.0 8 95.1 8 95.33 95.4 2 92 . 8 5 91 . 9 2 92. 2 1 94 . 4 7 94 . 6 2 92. 5 4 91 . 1 8 91 . 0 6 91.5 6 92 . 0 5 91.6692.52 93.3 1 93. 4 4 92.77 93 . 9 1 94.2294 . 5 8 95.09 94.26 95.19 97 . 6 8 94.47 94 . 4 8 92 . 0 9 92.0 9 91.95 92.0 9 91. 6 0 90.9 5 91. 9 2 94.09 94.56 93 . 3 3 90 . 9 7 94 . 3 7 92.1 2 97.1 4 96.6 3 96. 0 5 96. 4 3 95.58 92.08 92.09 93 . 9 8 94.5195.12 95.07 93.97 94.19 94.08 93.96 93.96 93.98 93.77 93.69 93.9 6 95.0 6 95.7 6 95.5 9 95.5 9 95 . 4 8 94.80 98.2 0 95 . 7 2 95 . 3 0 95 . 2 0 94.9 0 94.8 7 94 . 5 8 95 . 2 0 94 . 3 9 94.2 0 93. 5 9 93 . 6 0 95 . 2 0 95 . 2 0 95. 3 6 94 . 9 0 94 . 2 0 93 . 8 0 93 . 6 0 93 . 7 8 94 . 2 0 94 . 2 0 93 . 7 8 97.3 9 97.3 9 97.5 0 97.3 9 97.6 8 97.3 9 97.1 8 96.6 9 96.8996.8 9 96.8 9 97.00 96.69 96.9 5 97 . 6 0 97.3 9 97.3 9 93. 3 5 94 . 1 8 95.3 5 91.8 1 91 . 8 1 91 . 8 1 92. 4 7 92. 4 7 91. 8 1 92 . 2 7 95. 0 7 95. 1 9 92. 2 3 92. 2 9 92. 1 8 92 . 1 9 92.1 594.4 1 94. 1 0 95.1 7 94 . 8 6 95. 4 1 95.65 92. 5 0 93.6 4 93.9 3 94. 8 7 95. 2 0 94. 7 9 93. 9 1 96.69 95 . 2 6 92 . 9 8 94 . 0 1 93 . 2 6 94 . 5 7 91 . 7 5 91 . 8 0 91.50 92 . 4 0 91 . 5 7 96 . 5 3 96.01 96 . 1 0 97.03 93.41 92.98 95.00 94 . 4 5 94.3 3 94 . 2 9 91. 9 8 92. 6 9 91. 5 5 91. 4 5 91.0 8 95.40 95.53 97.01 97.2 6 97.4 8 93. 6 5 AREA DRAIN SEE SHEET AD1AREA DRAIN SEE SHEET AD1 AREA DRAIN SEE SHEET AD2 AREA DRAIN SEE SHEET AD2 AREA DRAIN SEE SHEET AD2 AREA DRAIN SEE SHEET AD1 96. 3 5 93. 6 8 95.87 96.30 96.65 96.8 9 95. 6 2 97. 2 0 91.40 91 . 8 0 91. 5 691 . 7 9 91. 5 5 91. 9 4 91 . 5 5 92. 0 9 91. 9 5 91.55 91.95 91 . 5 5 91 . 9 5 92 . 0 4 91 . 6 7 92 . 2 0 92 . 1 0 91 . 6 5 92 . 0 9 96.3 4 92.79 92.08 91 . 7 6 92.33 92.65 95.2 1 94.5 6 94.68 91.8 1 91. 8 0 91.2 3 12" LANDSCAPE WALL (RE: LANDSCAPE PLANS) 91 . 8 4 91.95 92.47 92 . 5 5 92.5 4 92. 5 8 93. 3 9 92.40 95.63 CUTTING HORSE DRIVE (PRIVATE DRIVE) BLDG 15 FFE=94.64 FFE=94.64 FFE=96.14 FFE=96.14 BLDG 13 FFE=98.06 FFE=98.06 FFE=97.56 FFE=97.56 BLDG 8 FFE=95.86 FFE=95.86 FFE=94.86 FFE=94.86 POOL FFE=92.25 92. 0 9 92 . 0 9 92. 1 0 92. 0 8 92. 1 4 2-6" STEPS 2-6" STEPS 93 . 8 0 94.26 95 . 2 3 97.02 97.1 8 2. 0 % 95 . 8 6 95 . 8 6 94 . 8 6 94 . 8 6 96. 1 4 96. 1 4 94. 6 4 94. 6 4 97. 5 6 98. 0 6 97. 5 6 97. 5 6 8. 0 % 92.70 10 . 5 % 7.0 % 8. 6 % 8. 1 % 11 . 1 % 7.6 % 14.5% 8.5 % 4.3% 4.0% 4.6 % 5.9 % 3.9 % 3.8 % 3.6% 4.4% 11.2% 10 . 5 % 9. 7 % 14.2% 8.2 %5. 8 % 6.6% 9.5 % 1.2% 2.0% 1. 3 % 92 . 0 9 92 . 0 8 92.06 92.0 9 92. 0 9 1.2% 1.5% 1.3% 1.7 % 1.1% 1.5% 1.5% 13.1% 9.7 % 6. 6 % 10 . 3 % 6. 8 % 10 . 9 % 2.1% 1.9 % 2.4 % 2.2 % 2. 1 % 2.1 % 3. 0 % 2. 2 % 1.9 % 3. 0 % 1.9 % 1.9 % 1.9 % 98.2 098.0 4 97.86 98.3 1 97.8 0 98.2 0 97. 7 0 97. 5 6 96.8 8 97.6 8 97.0 7 97.5 4 92.10 92.0 2 91.7 5 92. 1 0 91.6 5 92.07 2' SIDEWALK CULVERT MAIL KIOSK 92. 2 6 92.09 92 . 2 5 91.3 1 91. 8 1 91.0 1 91.5 4 92.4 7 92. 4 7 92 . 4 7 92.3 2 91.7 4 92. 4 8 92.38 91 . 2 5 91.13 91.56 5. 0 % 92. 0 8 92 . 7 7 92. 4 9 92.7192. 8 2 92. 8 2 92.9 1 93.00 8.0 % 14. 3 % 1' SIDEWALK CHASE 3.1% 2.8% 0.9% 5.0 % 4.8 % 0. 4 % 2. 6 % 4. 8 % 4. 8 % 4.7%4.3% 0.4% 5' SIDEWALK CURB CUT = 4' CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 G5 GR A D I N G P L A N MA T C H L I N E - S E E S H E E T G 4 MATCHLINE - SEE SHEET G2 Sheet Of 39 Sheets DR A W I N G F I L E N A M E : C : \ U s e r s \ f r e d \ a p p d a t a \ l o c a l \ t e m p \ A c P u b l i s h _ 3 5 4 8 \ 6 8 7 - 0 0 4 _ G R A D _ A B . d w g L A Y O U T N A M E : G 5 D A T E : F e b 1 2 , 2 0 1 9 - 9 : 4 8 a m C A D O P E R A T O R : f r e d LI S T O F X R E F S : [ 6 8 7 - 0 0 4 _ x U T I L ] [ 6 8 7 - 0 0 4 _ x E X S T ] [ 6 8 7 - 0 0 4 _ x G R A D ] [ 6 8 7 - 0 0 4 _ x S I T E ] [ 6 8 7 - 0 0 4 _ x T O P O ] [ N E S - x b o r d e r ] [ 6 8 7 - 0 0 4 _ K E Y M A P ] [ 6 8 7 - 0 0 4 _ x A D J ] [ 6 8 7 - 0 0 4 _ 3 D _ P r o p o s e d ] [ 6 8 7 - 0 0 4 _ x G R A D _ l e g ] [ 2 0 1 8 - 0 3 - 0 7 G r a d i n g A s - B u i l t ] [ 2 0 1 9 - 0 1 - 2 3 S i t e A s - B u i l t U p d a t e s ] E N G I N E E R N G I E H T R O N R N 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 ww w . n o r t h e r n e n g i n e e r i n g . c o m Ph o n e : 9 7 0 . 2 2 1 . 4 1 5 8 - F i l i n g F o u r D: \ P r o j e c t s \ 6 8 7 - 0 0 2 \ A r c h s u r v \ R e c e i v e d \ C a m p a n a \ 2 0 1 2 - 0 3 - 2 1 _ p r o j e c t - l o g o s \ B H l o g o . g i f 9.30.16 KEYMAP G1 G2G4 G3 LEGEND: PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED OUTFLOW CURB AND GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 4.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM. 5.CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTION OF PRIVATE DRIVES SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE. 6.ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM; NGVD 29 (UNADJUSTED). SEE COVER SHEET FOR BENCHMARK REFERENCES. 7.TRACT A IS BEYOND THE LIMITS OF THESE PLANS. NO IMPROVEMENTS ARE PROPOSED OUTSIDE THE LIMITS SHOWN. 8.SEE SHEETS CS1 AND CS2 FOR PROJECT BENCHMARKS AND VERTICAL DATUM. ADD 4800-FT TO PROPOSED CONTOURS, SPOT ELEVATIONS, AND FFE LABELS, WHERE TRUNCATED; EXCEPT IN WESTERN AREA OF SITE, WHERE ACTUAL ELEVATIONS RANGE FROM 4900-FT TO 4910-FT. NOTES: PROPOSED STORM INLET PEDESTRIAN ACCESS RAMPS EXISTING SPOT ELEVATION PROPOSED FIRE HYDRANT PROPOSED ELECTRIC TRANSFORMER PROPOSED LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) EXISTING RIGHT OF WAY PROPOSED INFLOW CURB AND GUTTER MA T C H L I N E - S E E S H E E T G 6 MATCHLINE - SEE SHEET G8 G5 G6 G7 G8 G9 2 SI T E P L A N U P D A T E S AG R 3/ 2 9 / 3 0 2 REVISION #2 KEY 1 REVISED CURB LOCATION AND ELEVATIONS 2 REVISED GARAGE FOOTPRINT 3 ADDED MAIL KIOSK/RELOCATED BIKE RACKS 4 REVISED CLUBHOUSE FOOTPRINT AND FLATWORK 5 REVISED 'C' BUILDING FOOTPRINT AND FLATWORK 3 4 3 3 THE S E R E C O R D D R A W I N G S , P R O D U C E D B Y N O R T H E R N E N G I N E E R I N G SER V I C E S , I N C . , A R E B A S E D I N W H O L E , O R I N P A R T , U P O N I N F O R M A T I O N PRO V I D E D B Y O T H E R S . N O R T H E R N E N G I N E E R I N G S E R V I C E S , I N C . A S S U M E S NO L I A B I L I T Y F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F T H I S I N F O R M A T I O N . REC O R D D R A W I N G UD UD UD TF TF TF TF 6.5% 6.2% NA N C Y G R A Y A V E N U E CUTTING HORSE DRIVE (PRIVATE DRIVE) MILES HOUSE AVENUE (PRIVATE DRIVE) YE A R L I N G R O A D (P R I V A T E D R I V E ) YE A R L I N G R O A D (P R I V A T E D R I V E ) N:16814.86 E:12564.55 N:16899.16 E:12481.75 3.0% 1. 0 % 2.0%1.6%1.2%1.8% 4.9% 6.0% 1.1 % 1.5 % 1.5% 6.7%0.8 % 3.3 % 1.5% 1.5%1.5% 5-5" STEPS2. 0 % 2. 0 % 2. 0 % 1. 0 % 4. 5 % 3. 5 % 3.2% 89.8 290 . 4 7 90.85 91 . 3 9 91.44 91.53 91.6 2 91. 7 9 91 . 2 5 92.16 93 . 8 3 92.6 9 93.02 90.8 2 90 . 7 8 90 . 8 0 91.0 0 93.02 93.39 91. 9 8 91.5 6 91.4 5 91.03 92 . 0 7 92.75 91.62 91.52 90.23 90 . 4 1 90 . 5 7 90. 6 790. 6 691.26 91 . 1 7 91 . 3 0 91 . 4 9 91 . 5 9 91 . 5 4 91.6 7 91 . 5 7 91 . 0 7 91. 2 6 91.2 5 (92.5 3 ) (92 . 4 6 ) (92.89) (92 . 3 7 ) CLUBHOUSE FFE=92.47 91.2 2 92. 0 0 91.88 91. 7 3 91 . 7 4 91. 8 4 92. 1 1 91.8 0 91.60 90.76 94.2 7 94.88 91.84 92 . 5 8 93 . 1 4 92.47 93.83 92 . 5 5 92.75 92 . 9 6 (92 . 1 3 ) (92 . 1 3 ) (92 . 5 6 ) (92 . 4 7 ) (92.27)91.76 92.38 91 . 1 2 92.1 0 91.56 91 . 7 5 (92.6 8 ) (93. 1 3 ) (93.9 0 ) (9 3 . 4 6 ) (93 . 4 5 ) (9 3 . 0 8 ) (93 . 0 8 ) 91. 1 8 91.2 3 90 . 8 9 90.6 8 90.5 6 90.32 89.72 91 . 1 8 91 . 0 6 90 . 8 8 91 . 5 0 91. 0 9 91.5 6 91. 1 2 90.1190.87 90 . 8 4 91. 4 2 91.13 90 . 9 1 91.2992.08 91.76 92 . 1 7 91.66 93. 4 4 92.68 92.9 7 92 . 8 3 92.84 94.26 90.9 5 90.5 0 90.5 4 91.3 3 90.7 1 92.89 90.88 91.84 94.28 92.0 1 90 . 0 4 90.92 92.93 91.9892.19 92.6 9 92 . 6 9 92.23 91.4 7 92.6 9 92.8 5 92.6 9 92.6592.65 92.11 92.69 92.54 94.19 94.08 93.96 93.96 93.98 92.32 91.8191.8 1 91 . 8 1 91 . 9 7 92 . 2 7 93. 9 4 93.5 1 94.51 94. 5 1 94.58 94 . 9 4 93.51 93.51 93.78 94.0 1 95. 2 6 94. 8 3 94. 8 3 91.37 90.9 5 90. 3 7 90.02 91. 7 9 92. 3 2 91. 9 8 91.62 91.8 7 91.65 91 . 2 9 91.34 91 . 7 4 91.7 5 91. 7 6 91.1 4 (92 . 0 0 ) (91 . 8 6 ) 91 . 1 4 91. 2 9 91. 3 4 91 . 7 4 91 . 6 8 91 . 7 6 91.11 91.0 8 90.8 2 (92. 6 9 ) 92.15 92 . 1 7 92 . 1 0 92.04 92.8 7 92.58 92.75 92 . 3 6 92.23 92.32 92.41 91.84 92.1 3 93. 8 4 90. 8 8 90. 8 5 91.87 91.80 91.86 90.8 6 91.8 8 90 . 8 7 91.8 9 93.00 90 . 3 2 90 . 8 1 90 . 8 0 90 . 3 1 90 . 3 0 90. 8 1 90.80 90 . 3 1 93. 6 5 RAIN GARDEN E SEE SHEET RG1 RAIN GARDEN B SEE SHEET RG1 AREA DRAIN SEE SHEET AD1 AREA DRAIN SEE SHEET AD1 AREA DRAIN SEE SHEET AD2 93. 4 7 92. 6 5 92. 1 5 AREA DRAIN SEE SHEET AD1 91 . 6 7 92 . 2 0 92 . 1 0 91 . 6 5 92.79 90.23 91. 8 0 91.2 3 90.9 2 91.28 90 . 8 2 91.50 91 . 3 4 91.4 6 5' SIDEWALK CULVERT 92 . 2 0 5' SIDEWALK CHASE 92.8 1 92.5 4 92. 5 8 89 . 9 7 BLDG 16 FFE=95.01 FFE=94.01 BLDG 10 FFE=93.35 FFE=93.35 FFE=91.45 93 . 5 0 93. 9 3 94.01 93. 5 1 93. 4 3 94 . 9 2 94 . 9 2 94 . 9 3 94 . 8 4 92 . 9 3 2-6" STEPS 90.89 90.47 90.56 91.10 93.92 93. 9 2 91.45 5:1 8.9% 2.9% 9.6% 7.9% 5.5% 4-6" STEPS 91.4 7 14 . 5 % 8. 9 % 7. 8 % 8. 0 % 9. 5 % 13.9% 8. 4 % 8. 1 % 11 . 1 % 6. 6 % 2.2% 2.3% 2.5% 7.6 % 4.3% 2.1% 2.2%2.2% 2.3% 2.1 % 2.2% 2.1% 2.1% 2.1% 2.1 % 2.1 % 3. 0 % 2. 2 % 2.1 % 2.0 % 0.9% 93.35 93.35 93.35 93.35 92.8 5 92.8 5 92. 6 9 92. 5 3 92. 7 8 92. 6 8 92. 0 8 91.3 1 92.69 91.51 92 . 6 9 92.5 4 90.45 91.8 7 92.6 9 92.6 9 1. 0 % 5.8% 4.0% 15 . 3 % 5. 2 % 5. 4 % 6. 2 % 6.4% 14 . 8 % 11 . 2 % 14 . 9 % 92.5 6 93.93 94.40 91.3 7 91.2 9 91.3 6 91.3 6 91.1 7 91. 2 8 91.03 90.80 29.8% 28 . 9 % 4.3% 2.8% 91.3 1 91. 8 1 91 . 9 3 90.9 0 91.0 1 91.5 4 92 . 4 7 91. 9 3 92.08 92.0 8 91.99 92.01 92. 4 7 92. 3 6 92.2 0 91. 8 6 91.3 1 91.3 191 . 2 5 91.13 10.6 % 92 . 7 7 92.90 92.98 92.9 1 93.00 93.0514. 3 % 1' SIDEWALK CHASE 0.4%0.08% 0.4%0.5% 0.3% 0.5% 5' SIDEWALK CHASE 5' SIDEWALK CULVERT CURB CUT = 4' CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 G6 GR A D I N G P L A N MA T C H L I N E - S E E S H E E T G 5 MATCHLINE - SEE SHEET G3 Sheet Of 39 Sheets DR A W I N G F I L E N A M E : C : \ U s e r s \ f r e d \ a p p d a t a \ l o c a l \ t e m p \ A c P u b l i s h _ 3 5 4 8 \ 6 8 7 - 0 0 4 _ G R A D _ A B . d w g L A Y O U T N A M E : G 6 D A T E : F e b 1 2 , 2 0 1 9 - 9 : 4 8 a m C A D O P E R A T O R : f r e d LI S T O F X R E F S : [ 6 8 7 - 0 0 4 _ x U T I L ] [ 6 8 7 - 0 0 4 _ x E X S T ] [ 6 8 7 - 0 0 4 _ x G R A D ] [ 6 8 7 - 0 0 4 _ x S I T E ] [ 6 8 7 - 0 0 4 _ x T O P O ] [ N E S - x b o r d e r ] [ 6 8 7 - 0 0 4 _ K E Y M A P ] [ 6 8 7 - 0 0 4 _ x A D J ] [ 6 8 7 - 0 0 4 _ 3 D _ P r o p o s e d ] [ 6 8 7 - 0 0 4 _ x G R A D _ l e g ] [ 2 0 1 8 - 0 3 - 0 7 G r a d i n g A s - B u i l t ] [ 2 0 1 9 - 0 1 - 2 3 S i t e A s - B u i l t U p d a t e s ] E N G I N E E R N G I E H T R O N R N 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 ww w . n o r t h e r n e n g i n e e r i n g . c o m Ph o n e : 9 7 0 . 2 2 1 . 4 1 5 8 - F i l i n g F o u r D: \ P r o j e c t s \ 6 8 7 - 0 0 2 \ A r c h s u r v \ R e c e i v e d \ C a m p a n a \ 2 0 1 2 - 0 3 - 2 1 _ p r o j e c t - l o g o s \ B H l o g o . g i f 9.30.16 KEYMAP G1 G2G4 G3 LEGEND: PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED OUTFLOW CURB AND GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 4.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM. 5.CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTION OF PRIVATE DRIVES SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE. 6.ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM; NGVD 29 (UNADJUSTED). SEE COVER SHEET FOR BENCHMARK REFERENCES. 7.TRACT A IS BEYOND THE LIMITS OF THESE PLANS. NO IMPROVEMENTS ARE PROPOSED OUTSIDE THE LIMITS SHOWN. 8.SEE SHEETS CS1 AND CS2 FOR PROJECT BENCHMARKS AND VERTICAL DATUM. ADD 4800-FT TO PROPOSED CONTOURS, SPOT ELEVATIONS, AND FFE LABELS, WHERE TRUNCATED; EXCEPT IN WESTERN AREA OF SITE, WHERE ACTUAL ELEVATIONS RANGE FROM 4900-FT TO 4910-FT. NOTES: PROPOSED STORM INLET PEDESTRIAN ACCESS RAMPS EXISTING SPOT ELEVATION PROPOSED FIRE HYDRANT PROPOSED ELECTRIC TRANSFORMER PROPOSED LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) EXISTING RIGHT OF WAY PROPOSED INFLOW CURB AND GUTTER MATCHLINE - SEE SHEET G9 G5 G6 G7 G8 G9 2 SI T E P L A N U P D A T E S AG R 3/ 2 9 / 3 0 2 REVISION #2 KEY 1 REVISED CURB LOCATION AND ELEVATIONS 2 REVISED GARAGE FOOTPRINT 3 ADDED MAIL KIOSK/RELOCATED BIKE RACKS 4 REVISED CLUBHOUSE FOOTPRINT AND FLATWORK 5 REVISED 'C' BUILDING FOOTPRINT AND FLATWORK 4 3 1 2 5 THE S E R E C O R D D R A W I N G S , P R O D U C E D B Y N O R T H E R N E N G I N E E R I N G SER V I C E S , I N C . , A R E B A S E D I N W H O L E , O R I N P A R T , U P O N I N F O R M A T I O N PRO V I D E D B Y O T H E R S . N O R T H E R N E N G I N E E R I N G S E R V I C E S , I N C . A S S U M E S NO L I A B I L I T Y F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F T H I S I N F O R M A T I O N . REC O R D D R A W I N G TF CT 6:1 4: 1 2.9 % 5: 1 8:1 YEARLING ROAD YEARLING ROAD (PRIVATE DRIVE) GO O S E B E R R Y L A N E N:17213.72 E:11584.51 LANDSCAPE RETAINING WALLS (RE: LANDSCAPE PLANS) 3.7%1.5% 1. 4 % 2.5 % 0.9% 1. 5 % 2. 2 % 0.9%2.0%2.0% 2. 0 % 2. 0 % 1. 8 % 1. 1 % 1. 4 % 2. 0 % 4-6" STEPS 4-6" STEPS 98 . 0 0 0.2 6 2.1 4 2.00 2.2 2 98. 7 1 97 . 8 6 97 . 5 4 98. 6 5 99.57 99.01 1.373.38 2.3 5 1.99 2.66 2.7 0 (2 . 8 2 ) 0.48 0.3 9 98. 4 2 98 . 3 6 98.39 98.8 1 96.2 7 96.8 3 98.46 2.1 9 96.87 96.9 1 96.90 96.8 8 98.0 0 98. 5 4 98. 6 7 98. 3 2 98 . 1 2 1.9 0 1.79 0.9 0 (3. 1 2 ) 2.7 8 2.3 3 2.1 5 0.641.00 98 . 9 6 97 . 1 7 96.72 96 . 6 5 (3.2 3 ) (3.38) (3.3 1 ) (1. 8 0 ) (1. 2 4 ) 0.7 1 0.36 98.3 7 97 . 7 1 96.3 8 97.7 7 98.9 7 96.9 4 96.69 0.36 (2 . 9 2 ) (4.1 6 ) (2 . 9 0 ) (4 . 7 0 ) (5 . 2 5 ) (4 . 9 0 ) (3.74 ) (3 . 8 5 ) (3 . 1 9 ) (3.2 0 ) (3.65) (2 . 1 5 ) (2 . 4 1 ) (2 . 0 5 ) (3.0 3 ) 2.47 2.80 2.02 1.6 9 96.9 0 98.37 99 . 2 6 98. 8 4 96.1397.58 0.5 9 0.72 1.69 96.6 2 96. 7 0 96.48 96. 5 0 96.47 0.96 99.1 6 98 . 8 8 98 . 4 0 98 . 4 0 98.76 99 . 4 0 99 . 4 0 99 . 5 2 99.4 0 99. 4 0 99 . 4 0 99. 4 0 99 . 4 0 99.6 9 99.4 6 98.6 8 99.1 9 98.4 0 98.0 1 97.97 98.4 0 98.4 0 97.97 1.53 1.53 0.77 1.5 31.5 3 1.6 9 1.2 3 1.2 6 99.14 98. 7 1 99. 0 1 99. 4 4 99. 4 3 0.9 4 0.5 1 0.5 0 2.31 1.8 9 3.3 9 3.8 2 3.89 2.8 7 1.8 9 99.9 8 (1. 5 1 ) 98 . 5 3 99.5 4 0.54 1.30 0.69 0.2 8 96 . 5 3 96.5 8 97.3 3 97.0 9 96.9 2 99 . 9 6 99 . 7 3 99 . 9 5 1.8 5 1.4 6 1.67 1.93 6.00 3. 0 5 2.41 98.72 97 . 7 0 97.3 9 96.59 98. 0 1 98. 1 7 99. 9 4 0.2 0 2.26 8.9 2 9.04 9.8 0 5.88 8.3 8 1.4 2 3.3 4 0.3 4 5.1 8 2. 1 8 9.8 0 AREA DRAIN SEE SHEET AD1 97.83 98. 2 0 97.5 9 96.8 1 96.2 3 97.0 7 2.8 6 0. 5 0 99. 0 4 98. 9 7 2.5 3 3.74 2' CONCRETE CHASE 96. 5 1 2.11 1.05 98.71 98. 7 1 98.31 98.73 97 . 7 6 97 . 5 1 97.48 97. 8 0 98. 2 0 97.81 98.21 97 . 5 0 2.63 6.0 8 6.78 9.2 8 3.0 9 3.00 2.9 1 1.72 4. 4 2 5.1 2 7.62 6.5 4 4.04 99. 1 1 2.11 5.3 1 2.81 98. 4 9 9. 2 % 11 : 1 10 : 1 8: 1 3. 7 % 3.8 0 3.8 0 1.9 5 2.3 9 FFE=3.89 BLDG 23 FFE=2.39 FFE=1.01 FFE=99.51BLDG 22 FFE=99.21 BLDG 12 FFE=99.07FFE=99.07FFE=0.07FFE=0.07 FFE=2.20 2.8 9 2.3 9 1.9 8 1.8 8 2.3 3 0.0 1 99. 5 1 99. 0 1 99. 0 1 99.45 98. 1 7 98. 1 7 3-6" STEPS 6.6 % 5. 6 % 8.2 % 6. 8 % 7.0 %9.6 % 12 . 0 % 6. 1 %8.4 %7. 0 % 5.0 % 4.4 % 7. 4 % 98. 0 4 98. 0 4 99. 1 1 99 . 1 2 99.1 3 98 . 4 1 99 . 3 5 99. 4 2 99 . 4 2 99 . 0 1 99 . 0 1 99. 5 1 0.0 1 0.9 2 0.9 2 0.8 5 0.73 98.44 98.64 0.93 2.22 2.3 0 2.30 3.2 2 0.2 1 2-6" STEPS 2.2 0 2.2 0 0.0 7 0.0 7 99.57 99 . 0 7 98 . 7 3 99. 6 9 7. 4 % 6.9 % 11 . 2 % 9.0% 5.2% 6.1 % 6.2 % 5. 7 % 4.0% 9.6% 13.1% 2.2 % 2.2% 2.7% 2.6% 2.9 % 2.4% 2.8% 2.8% 3.4% 2.1 % 2. 1 % GARAGE OPENINGS=98.21 GARAGE OPENINGS=97.81 GARAGE OPENINGS=97.48 EXTEND FO U N D A T I O N W A L L MIN. 6" ABO V E F G EXTEND FO U N D A T I O N W A L L MIN. 6" ABO V E F G EXTEND FO U N D A T I O N W A L L MIN. 6" ABO V E F G 13 . 6 % 21 . 6 % 2.1% 99.8 8 7.4 % 5.4% 5. 7 % 6.2% 5.0%8.4% 2.32 3.82 1-5" STEP 99. 0 2 0. 1 % RAMP 98.6 3 2' SIDEWALK CHASE CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 G7 GR A D I N G P L A N MATCHLINE - SEE SHEET G4 Sheet Of 39 Sheets DR A W I N G F I L E N A M E : C : \ U s e r s \ f r e d \ a p p d a t a \ l o c a l \ t e m p \ A c P u b l i s h _ 3 5 4 8 \ 6 8 7 - 0 0 4 _ G R A D _ A B . d w g L A Y O U T N A M E : G 7 D A T E : F e b 1 2 , 2 0 1 9 - 9 : 4 8 a m C A D O P E R A T O R : f r e d LI S T O F X R E F S : [ 6 8 7 - 0 0 4 _ x U T I L ] [ 6 8 7 - 0 0 4 _ x E X S T ] [ 6 8 7 - 0 0 4 _ x G R A D ] [ 6 8 7 - 0 0 4 _ x S I T E ] [ 6 8 7 - 0 0 4 _ x T O P O ] [ N E S - x b o r d e r ] [ 6 8 7 - 0 0 4 _ K E Y M A P ] [ 6 8 7 - 0 0 4 _ x A D J ] [ 6 8 7 - 0 0 4 _ 3 D _ P r o p o s e d ] [ 6 8 7 - 0 0 4 _ x G R A D _ l e g ] [ 2 0 1 8 - 0 3 - 0 7 G r a d i n g A s - B u i l t ] [ 2 0 1 9 - 0 1 - 2 3 S i t e A s - B u i l t U p d a t e s ] E N G I N E E R N G I E H T R O N R N 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 ww w . n o r t h e r n e n g i n e e r i n g . c o m Ph o n e : 9 7 0 . 2 2 1 . 4 1 5 8 - F i l i n g F o u r D: \ P r o j e c t s \ 6 8 7 - 0 0 2 \ A r c h s u r v \ R e c e i v e d \ C a m p a n a \ 2 0 1 2 - 0 3 - 2 1 _ p r o j e c t - l o g o s \ B H l o g o . g i f 9.30.16 KEYMAP G1 G2G4 G3 LEGEND: PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED OUTFLOW CURB AND GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 4.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM. 5.CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTION OF PRIVATE DRIVES SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE. 6.ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM; NGVD 29 (UNADJUSTED). SEE COVER SHEET FOR BENCHMARK REFERENCES. 7.TRACT A IS BEYOND THE LIMITS OF THESE PLANS. NO IMPROVEMENTS ARE PROPOSED OUTSIDE THE LIMITS SHOWN. 8.SEE SHEETS CS1 AND CS2 FOR PROJECT BENCHMARKS AND VERTICAL DATUM. ADD 4800-FT TO PROPOSED CONTOURS, SPOT ELEVATIONS, AND FFE LABELS, WHERE TRUNCATED; EXCEPT IN WESTERN AREA OF SITE, WHERE ACTUAL ELEVATIONS RANGE FROM 4900-FT TO 4910-FT. NOTES: PROPOSED STORM INLET PEDESTRIAN ACCESS RAMPS EXISTING SPOT ELEVATION PROPOSED FIRE HYDRANT PROPOSED ELECTRIC TRANSFORMER PROPOSED LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) EXISTING RIGHT OF WAY PROPOSED INFLOW CURB AND GUTTER MA T C H L I N E - S E E S H E E T G 8 G5 G6 G7 G8 G9 2 SI T E P L A N U P D A T E S AG R 3/ 2 9 / 3 0 2 REVISION #2 KEY 1 REVISED CURB LOCATION AND ELEVATIONS 2 REVISED GARAGE FOOTPRINT 3 ADDED MAIL KIOSK/RELOCATED BIKE RACKS 4 REVISED CLUBHOUSE FOOTPRINT AND FLATWORK 5 REVISED 'C' BUILDING FOOTPRINT AND FLATWORK 5 5 5 THE S E R E C O R D D R A W I N G S , P R O D U C E D B Y N O R T H E R N E N G I N E E R I N G SER V I C E S , I N C . , A R E B A S E D I N W H O L E , O R I N P A R T , U P O N I N F O R M A T I O N PRO V I D E D B Y O T H E R S . N O R T H E R N E N G I N E E R I N G S E R V I C E S , I N C . A S S U M E S NO L I A B I L I T Y F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F T H I S I N F O R M A T I O N . REC O R D D R A W I N G UD UD TF TF TF 7: 1 4: 1 8: 1 4: 1 7:1 9. 4 % 5. 8 % 1.0% 1.0% 1.5%2.9% 1.9% 1.5% 1. 5 % 1.5 % 5.0% 4.3% 2. 0 % 4. 4 % 2. 0 % 5. 0 % 2. 0 % 2. 7 % 2. 0 % 4. 5 % PROPOSED ± 74 LF 12" HDPE w/ (2) FES 93.40 94.5 5 94 . 4 4 94 . 4 1 94 . 2 5 94 . 0 4 93.99 95 . 8 7 96. 1 5 96 . 4 6 95 . 6 6 95.36 95.22 95 . 2 6 95 . 5 6 95 . 3 8 94 . 9 9 95 . 4 8 96.87 95.94 96 . 3 4 95 . 9 2 97 . 0 9 96 . 7 5 97.1 1 97 . 1 0 97.1 2 97 . 4 6 96.4 2 96.4 8 96.5 9 96 . 4 6 97 . 5 3 98. 7 1 97 . 8 6 97 . 5 4 96.2 7 97. 2 4 97. 3 1 93.20 92.92 93.02 93.39 96.8 3 97.2 0 96. 3 0 96. 3 4 95. 2 5 96.87 96.9 1 96.90 96.8 8 97.6 9 98.65 96 . 2 8 95 . 7 4 95 . 6 9 96. 5 5 96 . 8 5 (2. 7 6 ) 96.3 1 96.7 1 98.0 9 96.3 8 98. 3 1 95 . 3 0 94 . 8 5 96.69 95 . 5 8 93. 8 2 93. 2 6 93 . 8 0 95. 8 8 95 . 5 3 96.9 2 97.98 97.16 96.3 9 96 . 1 5 96.1 1 97 . 5 8 95.34 96. 0 3 95.64 96 . 4 4 (2 . 7 1 ) 96.9 0 96.13 95.19 97.6 9 94.32 96.6 2 96.47 96. 1 5 97.09 94 . 3 7 97.1 4 96.6 3 95.07 95.5 9 95.5 9 95.48 95.5 9 95 . 4 8 94.80 97 . 8 4 97 . 7 5 98 . 2 0 98.2 0 95. 7 2 95. 8 9 97. 5 4 97. 3 9 97.5 4 98 . 0 4 97 . 8 8 98. 3 2 97.3 9 97.3 9 97.5 0 97.3 9 96 . 7 5 96. 3 3 96.33 96. 4 2 96.85 97. 5 3 97. 9 6 97. 9 4 97. 8 4 97. 4 2 97. 4 2 97. 5 3 98. 4 8 97. 9 8 98. 0 3 98. 2 1 98. 6 5 98. 6 3 95.6 9 96. 0 6 97. 1 5 97. 0 2 97. 7 8 96. 2 3 97.2 6 97.4 8 97 . 7 8 96 . 6 5 95 . 4 6 95 . 8 6 97 . 3 5 96 . 5 3 96.5 8 97.3 3 97.0 9 96.9 2 98 . 0 0 97. 5 7 96 . 2 0 95 . 9 5 96. 4 6 96. 6 8 96. 2 2 97. 5 4 96. 8 7 96. 6 5 96.8 6 95.9 5 98. 1 6 93.49 93.74 94.6 2 94.37 97.57 RAIN GARDEN C SEE SHEET RG1 RAIN GARDEN D SEE SHEET RG1 AREA DRAIN SEE SHEET AD1 AREA DRAIN SEE SHEET AD1 96.3 4 97 . 8 0 96.2 3 93 . 4 0 92.79 93.10 98.5 4 97 . 7 7 96.8 4 (4. 2 4 ) 97. 8 6 2' CONCRETE CHASE 98.73 98.2 3 97 . 5 1 97 . 1 8 97. 4 8 97.48 97. 8 0 96 . 5 7 96. 3 3 CONTRACTOR TO ENSURE THAT ALL FES ARE BURIED PRIOR TO LANDSCAPE INSTALLATION 94 . 0 3 93.7 5 4' CURB CUT 4' CURB CUT 97 . 4 5 2.81 3.55 2.55 2.0 2 99.02 2.0 0 99 . 5 2 8: 1 1.8 0 0.3 0 99 . 2 3 98 . 1 6 96. 8 4 8: 1 3. 7 % 6: 1 6.2% 5: 1 3: 1 4: 1 97 . 5 9 97 . 3 7 97.9 1 97.2 7 BLDG 21 BLDG 20 BLDG 19 BLDG 18 FFE=99.21 FFE=98.71 FFE=98.53 FFE=98.03 FFE=97.92 FFE=96.92 FFE=96.83 FFE=96.14 BLDG 14 FFE=98.20FFE=98.70 98. 1 7 98. 1 7 98 . 1 7 98 . 1 2 97. 4 5 97 . 5 3 97.5 3 97.4 5 96. 9 2 96. 8 4 97.42 96. 4 2 96. 3 4 95.75 95.83 95.33 95.25 5.0 % 7.5 % 5.6 % 5.8 % 6.4 % 8.7 % 9.3 % 9. 9 % 8. 2 % 7. 5 % 7. 4 % 5. 9 % 8.2 % 7. 0 % 6.6 % 5. 6 % 9:1 4:1 5:1 10 : 1 8:1 5:1 8.1 % 95. 6 4 95. 9 2 96. 7 4 96. 7 4 96. 6 6 96.76 96.46 95.86 96 . 2 6 96.7 6 96.8 3 96.8 3 96. 4 2 96.4 2 96.8 4 96.9 2 97.8 3 97.8 3 97. 7 6 97. 8 5 97.3 5 97.5 3 97 . 5 2 97.5 3 98.4 498.4 498.3 6 96.9 2 97. 9 4 98.4 5 5. 8 % 98. 6 2 98.6 2 98. 0 4 98. 0 4 98. 0 4 99. 1 1 99 . 1 2 97. 5 6 6.8% 99.02 97 . 3 7 0.8 8 98. 7 0 98. 7 0 98. 2 0 98. 2 0 96. 1 4 4.0% 7.9% 5.4 % 4.6 % 5.9 % 2.6% 2.3% 5.5 % 5. 3 % 7.8 % 10 . 4 % 7. 2 % 5.5% 3.9 % 3. 8 % 2.4 % 2.4% 2.3% 2. 4 % 2. 4 % 2.4 % 2.3% 2.1 % 2.1 % 2. 1 % 2. 1 % 2.1 % GARAGE OPENINGS=97.81 GARAGE OPENINGS=97.48 EXTEND FO U N D A T I O N W A L L MIN. 6" ABO V E F G EXTEND FO U N D A T I O N W A L L MIN. 6" ABO V E F G 97.7 5 97 . 1 5 97.2 6 97 . 8 6 3.6 % 2.3 % 21 . 6 % 1.0% 2.0% 2. 2 % 2.2% 2.1% 94.5 4 FFE=98.20FFE=98.70 97.1 2 97 . 7 0 97 . 0 0 98. 0 4 4.7% 97. 9 5 98. 0 4 98 . 0 4 97. 9 5 98.2 098.0 4 97.86 98.3 1 97.8 0 98.2 0 97. 7 0 97. 5 6 96.8 8 97.6 8 97.0 7 97 . 3 9 97.5 4 21.4% 97 . 0 7 96.7 7 97. 9 5 0. 1 % RAMP 98.6 3 2' SIDEWALK CHASE CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 G8 GR A D I N G P L A N MA T C H L I N E - S E E S H E E T G 7 MATCHLINE - SEE SHEET G5 Sheet Of 39 Sheets DR A W I N G F I L E N A M E : C : \ U s e r s \ f r e d \ a p p d a t a \ l o c a l \ t e m p \ A c P u b l i s h _ 3 5 4 8 \ 6 8 7 - 0 0 4 _ G R A D _ A B . d w g L A Y O U T N A M E : G 8 D A T E : F e b 1 2 , 2 0 1 9 - 9 : 4 9 a m C A D O P E R A T O R : f r e d LI S T O F X R E F S : [ 6 8 7 - 0 0 4 _ x U T I L ] [ 6 8 7 - 0 0 4 _ x E X S T ] [ 6 8 7 - 0 0 4 _ x G R A D ] [ 6 8 7 - 0 0 4 _ x S I T E ] [ 6 8 7 - 0 0 4 _ x T O P O ] [ N E S - x b o r d e r ] [ 6 8 7 - 0 0 4 _ K E Y M A P ] [ 6 8 7 - 0 0 4 _ x A D J ] [ 6 8 7 - 0 0 4 _ 3 D _ P r o p o s e d ] [ 6 8 7 - 0 0 4 _ x G R A D _ l e g ] [ 2 0 1 8 - 0 3 - 0 7 G r a d i n g A s - B u i l t ] [ 2 0 1 9 - 0 1 - 2 3 S i t e A s - B u i l t U p d a t e s ] E N G I N E E R N G I E H T R O N R N 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 ww w . n o r t h e r n e n g i n e e r i n g . c o m Ph o n e : 9 7 0 . 2 2 1 . 4 1 5 8 - F i l i n g F o u r D: \ P r o j e c t s \ 6 8 7 - 0 0 2 \ A r c h s u r v \ R e c e i v e d \ C a m p a n a \ 2 0 1 2 - 0 3 - 2 1 _ p r o j e c t - l o g o s \ B H l o g o . g i f 9.30.16 KEYMAP G1 G2G4 G3 LEGEND: PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED OUTFLOW CURB AND GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 4.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM. 5.CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTION OF PRIVATE DRIVES SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE. 6.ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM; NGVD 29 (UNADJUSTED). SEE COVER SHEET FOR BENCHMARK REFERENCES. 7.TRACT A IS BEYOND THE LIMITS OF THESE PLANS. NO IMPROVEMENTS ARE PROPOSED OUTSIDE THE LIMITS SHOWN. 8.SEE SHEETS CS1 AND CS2 FOR PROJECT BENCHMARKS AND VERTICAL DATUM. ADD 4800-FT TO PROPOSED CONTOURS, SPOT ELEVATIONS, AND FFE LABELS, WHERE TRUNCATED; EXCEPT IN WESTERN AREA OF SITE, WHERE ACTUAL ELEVATIONS RANGE FROM 4900-FT TO 4910-FT. NOTES: PROPOSED STORM INLET PEDESTRIAN ACCESS RAMPS EXISTING SPOT ELEVATION PROPOSED FIRE HYDRANT PROPOSED ELECTRIC TRANSFORMER PROPOSED LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) EXISTING RIGHT OF WAY PROPOSED INFLOW CURB AND GUTTER MA T C H L I N E - S E E S H E E T G 9 G5 G6 G7 G8 G9 2 SI T E P L A N U P D A T E S AG R 3/ 2 9 / 3 0 2 REVISION #2 KEY 1 REVISED CURB LOCATION AND ELEVATIONS 2 REVISED GARAGE FOOTPRINT 3 ADDED MAIL KIOSK/RELOCATED BIKE RACKS 4 REVISED CLUBHOUSE FOOTPRINT AND FLATWORK 5 REVISED 'C' BUILDING FOOTPRINT AND FLATWORK 5 5 5 5 1 1 THE S E R E C O R D D R A W I N G S , P R O D U C E D B Y N O R T H E R N E N G I N E E R I N G SER V I C E S , I N C . , A R E B A S E D I N W H O L E , O R I N P A R T , U P O N I N F O R M A T I O N PRO V I D E D B Y O T H E R S . N O R T H E R N E N G I N E E R I N G S E R V I C E S , I N C . A S S U M E S NO L I A B I L I T Y F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F T H I S I N F O R M A T I O N . REC O R D D R A W I N G TF 4:1 6.3 % 5:1 BUCKING HORSE- FILING THREE YE A R L I N G R O A D (P R I V A T E D R I V E ) EXISTING 18" RCP (2) - EXISTING 18" RCP EXISTING 24" RCP NAN C Y G R A Y A V E N U E 0.8 % 1.0% 1.0% PROPOSED ± 38 LF 12" HDPE w/ (2) FES PROPOSED 18" RCP FES 93.40 94. 1 2 94.09 94.1 4 94.44 94 . 5 6 94.9 3 94.5 5 94 . 4 4 94 . 4 1 94 . 2 5 94 . 0 4 93.99 95 . 3 8 94 . 9 9 93.20 92.92 93.02 93.39 (94.48) 94 . 8 5 95 . 4 6 94.2 7 94.88 94 . 2 8 94.05 93.83 93. 8 2 94.06 93.62 94.08 90.43 94.51 94. 5 1 94.58 94 . 9 4 94.0 1 95. 2 6 94. 8 3 94. 8 3 95. 3 3 95.33 95. 3 3 95.33 95 . 7 6 95. 3 3 96 . 7 5 96.33 91.71 93 . 2 2 93.49 93.74 94 . 0 7 94 . 2 6 94.37 95.1 6 93. 9 2 93.58 (94 . 9 6 ) RAIN GARDEN D SEE SHEET RG1 92.79 93.10 95. 7 5 95. 1 6 CONTRACTOR TO ENSURE THAT ALL FES ARE BURIED PRIOR TO LANDSCAPE INSTALLATION 94 . 0 3 93.7 54' CURB CUT BLDG 18 BLDG 17 FFE=96.83 FFE=95.83 FFE=95.83 FFE=95.33 FFE=95.01 95.75 95.83 95.33 95.25 95.78 94.75 94.83 94.8 3 94.7 8 94 . 9 2 94 . 9 2 94 . 9 3 94 . 8 4 95. 2 4 95. 2 4 95.25 94. 8 3 94. 8 3 94. 8 3 94. 8 3 95. 7 4 95. 7 4 95.75 95. 6 6 95.02 90.81 91.13 91.45 94.66 94.7 4 94. 3 7 95.76 95.6 7 95. 7 4 95 . 7 4 3:1 6:1 5:1 12.0% 6:1 8.0% 6.6% 4.6 % 5.0 % 7.5 % 1.2% 8:1 9:1 4:1 8.1 % 95. 3 3 95. 3 3 95. 6 4 95. 9 2 96. 7 4 96. 7 4 96. 6 6 2.2% 2.2% 2.2 % 93.9 2 94.5 4 94.40 93.74 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 G9 GR A D I N G P L A N MA T C H L I N E - S E E S H E E T G 8 MATCHLINE - SEE SHEET G6 Sheet Of 39 Sheets DR A W I N G F I L E N A M E : C : \ U s e r s \ f r e d \ a p p d a t a \ l o c a l \ t e m p \ A c P u b l i s h _ 3 5 4 8 \ 6 8 7 - 0 0 4 _ G R A D _ A B . d w g L A Y O U T N A M E : G 9 D A T E : F e b 1 2 , 2 0 1 9 - 9 : 4 9 a m C A D O P E R A T O R : f r e d LI S T O F X R E F S : [ 6 8 7 - 0 0 4 _ x U T I L ] [ 6 8 7 - 0 0 4 _ x E X S T ] [ 6 8 7 - 0 0 4 _ x G R A D ] [ 6 8 7 - 0 0 4 _ x S I T E ] [ 6 8 7 - 0 0 4 _ x T O P O ] [ N E S - x b o r d e r ] [ 6 8 7 - 0 0 4 _ K E Y M A P ] [ 6 8 7 - 0 0 4 _ x A D J ] [ 6 8 7 - 0 0 4 _ 3 D _ P r o p o s e d ] [ 6 8 7 - 0 0 4 _ x G R A D _ l e g ] [ 2 0 1 8 - 0 3 - 0 7 G r a d i n g A s - B u i l t ] [ 2 0 1 9 - 0 1 - 2 3 S i t e A s - B u i l t U p d a t e s ] E N G I N E E R N G I E H T R O N R N 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 ww w . n o r t h e r n e n g i n e e r i n g . c o m Ph o n e : 9 7 0 . 2 2 1 . 4 1 5 8 - F i l i n g F o u r D: \ P r o j e c t s \ 6 8 7 - 0 0 2 \ A r c h s u r v \ R e c e i v e d \ C a m p a n a \ 2 0 1 2 - 0 3 - 2 1 _ p r o j e c t - l o g o s \ B H l o g o . g i f 9.30.16 KEYMAP G1 G2G4 G3 LEGEND: PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED OUTFLOW CURB AND GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 4.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM. 5.CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTION OF PRIVATE DRIVES SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE. 6.ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM; NGVD 29 (UNADJUSTED). SEE COVER SHEET FOR BENCHMARK REFERENCES. 7.TRACT A IS BEYOND THE LIMITS OF THESE PLANS. NO IMPROVEMENTS ARE PROPOSED OUTSIDE THE LIMITS SHOWN. 8.SEE SHEETS CS1 AND CS2 FOR PROJECT BENCHMARKS AND VERTICAL DATUM. ADD 4800-FT TO PROPOSED CONTOURS, SPOT ELEVATIONS, AND FFE LABELS, WHERE TRUNCATED; EXCEPT IN WESTERN AREA OF SITE, WHERE ACTUAL ELEVATIONS RANGE FROM 4900-FT TO 4910-FT. NOTES: PROPOSED STORM INLET PEDESTRIAN ACCESS RAMPS EXISTING SPOT ELEVATION PROPOSED FIRE HYDRANT PROPOSED ELECTRIC TRANSFORMER PROPOSED LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) EXISTING RIGHT OF WAY PROPOSED INFLOW CURB AND GUTTER G5 G6 G7 G8 G9 2 SI T E P L A N U P D A T E S AG R 3/ 2 9 / 3 0 2 REVISION #2 KEY 1 REVISED CURB LOCATION AND ELEVATIONS 2 REVISED GARAGE FOOTPRINT 3 ADDED MAIL KIOSK/RELOCATED BIKE RACKS 4 REVISED CLUBHOUSE FOOTPRINT AND FLATWORK 5 REVISED 'C' BUILDING FOOTPRINT AND FLATWORK 5 5 5 THE S E R E C O R D D R A W I N G S , P R O D U C E D B Y N O R T H E R N E N G I N E E R I N G SER V I C E S , I N C . , A R E B A S E D I N W H O L E , O R I N P A R T , U P O N I N F O R M A T I O N PRO V I D E D B Y O T H E R S . N O R T H E R N E N G I N E E R I N G S E R V I C E S , I N C . A S S U M E S NO L I A B I L I T Y F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F T H I S I N F O R M A T I O N . REC O R D D R A W I N G UD UD UD GM EM BLD G 1 CU T T I N G H O R S E D R I V E (P R I V A T E D R I V E ) 93.20 94. 9 8 PROPOSED 5' SIDEWALK CULVERT RG BASIN B5 INV.=4890.36 FG=4892.56 64. 6 3 L F 6 " P E R F . H D P E @ 0 . 4 0 % INLET B4 INV.=4890.10 FG=4894.72 STORM DRAIN B SEE SHEET ST2 92. 0 0 92.0093.00 92. 0 0 93. 5 3 95 . 1 1 95. 5 1 94.32 93 . 0 9 93.0 6 93.1 1 93.14 93 . 0 0 93.00 UD EM BLD G 1 4 YEARL I N G R O A D (PRIV A T E D R I V E ) AREA DRAIN SEE SHEET AD1 RG BASIN C4-9.1 (S) INV.=4892.16 FG=4895.08 AD TEE C4-9 (S) INV.=4891.93 FG=4896.82 95.6 5 94.68 94.6 8 95.67 94.67 95.68 95.65 94.65 PROPOSED 4' CURB CUT 95.66 28.98 LF 6" PERF. HDPE @ 0.50% UD EM FDCBLDG 15 YEARLING ROAD (PRIVATE DRIVE) 94.30 AREA DRAIN SEE SHEET AD1 93.1 7 92.16 92.1 8 93. 1 6 93.17 92.1792.18 93.16 RG TEE C4-7.1A (S) INV.=4890.48 FG=4893.11 11.56 LF 6" PERF. HDPE @ 0.50% 15.79 LF 6" PERF. HDPE @ 0.50% 12.66 LF 6" PERF. HDPE @ 0.50% RG TEE C4-7.2 (S) INV.=4890.49 FG=4892.81 AD TEE C4-7 (S) INV.=4890.26 FG=4894.29 RG TEE C4-7.1 (S) INV.=4890.43 FG=4892.31 93.18 PROPOSED 4' CURB CUT UD UD EM GM BLD G 16 MILE S H O U S E AVE N U E (PR I V A T E D R I V E ) 90.8 5 YEA R L I N G R O A D (PR I V A T E D R I V E ) PROPOSED 5' SIDEWALK CULVERT STORM DRAIN C SEE SHEET ST2 INLET C7 INV.=4888.43 FG=4891.65 18.48 LF 6" PERF. HDPE @ 0.50% RG TEE C8 INV.=4888.52 FG=4890.85 11.00 LF 6" PERF. HDPE @ 0.50%42.24 LF 6" PERF. HDPE @ 0.50% RG BASIN C9 INV.=4888.73 FG=4891.40 RG BASIN C8-1 INV.=4888.57 FG=4891.33 92. 1 8 92.3 8 90.87 91 . 8 8 91.86 90.8 6 90.85 91.87 91 . 8 6 PROPOSED 5' SIDEWALK CHASE 91. 2 5 91.37 91 . 5 1 91. 3 5 92.4 4 92 . 3 5 92.29 92.18 UD TF EM GM EM FD C TF YE A R L I N G R O A D (P R I V A T E D R I V E ) CUT T I N G HOR S E D R I V E (PR I V A T E DRI V E ) BLD G 1 0 CLU B H O U S E PROPOSED 5' SIDEWALK CHASE AD CROSS C4-1 INV.=4888.09 FG=4890.05 34.71 LF 6" PERF. HDPE @ 0.50%17.23 LF 6" PERF. HDPE @ 0.50% RG BASIN C4-1.1 INV.=4888.64 FG=4890.29 RG BASIN C4-1.1A INV.=4888.55 FG=4890.28 STORM DRAIN C SEE SHEET ST2 AREA DRAIN SEE SHEET AD2 AREA DRAIN SEE SHEET AD2 91.6 6 90.81 90. 7 8 90.05 90.0 7 90 . 0 7 90.8090.78 90 . 0 5 90.8 1 90.07 90.05 90 . 8 0 PROPOSED 4' CURB CUT 91.03 90 . 7 3 90.6990.79 90 . 7 5 90.8 4 90 . 8 0 Sheet Of 39 Sheets DR A W I N G F I L E N A M E : \ \ b r o n c o s \ e n g i n e e r s \ P r o j e c t s \ 6 8 7 - 0 0 4 \ D w g \ R e c o r d D r a w i n g s \ 6 8 7 - 0 0 4 _ R A I N G A R D E N S _ A B . d w g L A Y O U T N A M E : R G 1 D A T E : F e b 1 2 , 2 0 1 9 - 9 : 5 6 a m C A D O P E R A T O R : f r e d LI S T O F X R E F S : [ 6 8 7 - 0 0 4 _ x U T I L ] [ 6 8 7 - 0 0 4 _ x A D J ] [ 6 8 7 - 0 0 4 _ x E X S T ] [ 6 8 7 - 0 0 4 _ x G R A D ] [ 6 8 7 - 0 0 4 _ x S I T E ] [ 6 8 7 - 0 0 4 _ x T O P O ] [ N E S - x b o r d e r ] [ 6 8 7 - 0 0 4 _ K E Y M A P ] [ 6 8 7 - 0 0 4 _ 3 D _ P r o p o s e d ] [ 2 0 1 7 - 0 3 - 2 4 S t r o m A s - B u i l t ] [ 2 0 1 8 - 0 3 - 0 7 G r a d i n g A s - B u i l t ] E N G I N E E R N G I E H T R O N R N 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 ww w . n o r t h e r n e n g i n e e r i n g . c o m Ph o n e : 9 7 0 . 2 2 1 . 4 1 5 8 - F i l i n g F o u r D: \ P r o j e c t s \ 6 8 7 - 0 0 2 \ A r c h s u r v \ R e c e i v e d \ C a m p a n a \ 2 0 1 2 - 0 3 - 2 1 _ p r o j e c t - l o g o s \ B H l o g o . g i f 9.30.16 RG1 RA I N G A R D E N D E T A I L S CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R LEGEND: PROPOSED UNDERDRAIN PROPOSED STORM UD PROPOSED FINISHED GRADE SPOT ELEVATION 33.43 NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF BASINS AND FITTINGS. 4.CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD LOCATES AND POTHOLING OF SUBSURFACE UTILITIES. ENGINEER AND CITY SHALL BE NOTIFIED OF ANY POTENTIAL CONFLICTS. 5.CONTRACTOR SHALL COORDINATE ANY NECESSARY TELEPHONE, CABLE AND ELECTRIC LOWERINGS (OR RE-ROUTING) WITH THE RESPECTIVE UTILITY PROVIDERS TO FACILITATE THE INSTALLATION OF THE PROPOSED UNDERDRAINS AND RAIN GARDEN SOIL SECTIONS. 6.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 7.REFER TO RAIN GARDEN DETAILS FOR ADDITIONAL INFORMATION. 8.REFER TO LANDSCAPE PLANS FOR ADDITIONAL INFORMATION. KEYMAP NORTH ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 RAIN GARDEN A RAIN GARDEN B RAIN GARDEN ERAIN GARDEN D RAIN GARDEN C RAIN GARDEN A RAIN GARDEN B RAIN GARDEN C RAIN GARDEN D RAIN GARDEN E REFER TO THE LANDSCAPE PLANS FOR PLANTING WITHIN THE BIO-RETENTION AREA 12" (9" MIN.) BIO-RETENTION SAND MEDIA 6" PERFORATED HDPE UNDERDRAIN NOTES: 1.REFER TO THE BIORETENTION SAND MEDIA SPECIFICATIONS FOR MORE INFORMATION ON THE SOIL MIX. 2.BIORETENTION SAND MEDIA SHALL BE PROVIDED BY HAGEMAN EARTH CYCLE OR APPROVED EQUAL. 3.THE SOIL SECTION AS SHOWN ON THIS DETAIL SHALL BE PLACED IN ALL RAIN GARDEN LOCATIONS. MIN. 10" GRAVEL LAYER MEETING CDOT #4 COARSE AGGREGATE SPECIFICATION. 6" (4" MIN.) PEA GRAVEL TYPICAL RAIN GARDEN SECTION REFER TO THE LANDSCAPE PLANS FOR PLANTING WITHIN THE BIO-RETENTION AREA BIO-RETENTION SAND MEDIA 6" PERFORATED HDPE UNDERDRAIN GRAVEL LAYER PEA GRAVEL BIORETENTION SOIL LAYERING (RAIN GARDEN) CDOT CLASS B GEOTEXTILE SEPARATOR FABRIC (TYPICAL SIDES & 24" MIN. BOTTOM) CITY OF FORT COLLINS BIORETENTION SAND MEDIA SPECIFICATION PART 1 - GENERAL A.Bioretention Sand Media (BSM) shall be uniformly mixed, uncompacted, free of stones, stumps, roots, or other similar objects larger than two inches.  No other materials or substances shall be mixed or dumped within the bioretention area that may be harmful to plant growth or prove a hindrance to the facility's function and maintenance. B.BSM shall be free of plant or seed material of non-native, invasive species, or weeds. C.Fully mixed BSM shall be tested prior to installation and meet the following criteria: 1.P-Index of less than 30 2.pH of 5.5-6.5. Should pH fall outside of the acceptable range, it may be modified with lime (to raise) or iron sulfate plus sulfur (to lower). The lime or iron sulfate must be mixed uniformly into the BSM prior to use in the bioretention facility. 3.Cation Exchange Capacity (CEC) greater than 10 4.Phosphorous (Phosphate, P2O5) not to exceed 69 ppm  5.BSM that fails to meet the minimum requirements shall be replaced at the Contractor's expense. D.BSM shall be delivered fully mixed in a drum mixer.  Onsite mixing of piles will not be allowed.  Mixing of the BSM to a homogeneous consistency shall be done to the satisfaction of the Owner. PART 2 - SOIL MATERIALS A.Sand 1.BSM shall consist of 60-70% sand by volume meeting ASTM C-33. B.Shredded Paper 1.BSM shall consist of 5-10% shredded paper by volume. 2.Shredded paper shall be loosely packed, approximate bulk density of 50-100 lbs/CY. 3.Shredded paper shall consist of loose leaf paper, not shredded phone books, and shall be thoroughly and mechanically mixed to prevent clumping. C.Topsoil 1.BSM shall consist of 5-10% topsoil by volume. 2.Topsoil shall be classified as sandy loam, loamy sand, or loam per USDA textural triangle with less than 5% clay material. 3.Onsite, native material shall not be used as topsoil. 4.Textural analysis shall be performed on topsoil, preferably at its source, prior to including topsoil in the mix.  Topsoil shall be free of subsoil, debris, weeds, foreign matter, and any other material deleterious to plant health. 5.Topsoil shall have a pH range of 5.5 to 7.5 and moisture content between 25-55%.  6.Contractor shall certify that topsoil meets these specifications. D.Leaf Compost 1.BSM shall consist of 10-20% leaf compost by volume. 2.Leaf compost shall consist of Class 1 organic leaf compost consisting of aged leaf mulch resulting from biological degradation and transformation of plant-derived materials under controlled conditions designed to promote aerobic decomposition. 3.The material shall be well composted, free of viable weed seeds and contain material of a generally humus nature capable of sustaining growth of vegetation, with no materials toxic to plant growth.  4.Compost shall be provided by a local US Composting Council Seal of Testing Assurance (STA) member.  A copy of the provider's most recent independent STA test report shall be submitted to and approved by the Owner prior to delivery of BSM to the project site. 5.Compost material shall also meet the following criteria: a.100 percent of the material shall pass through a 1/2 inch screen b.PH of the material shall be between 6.0 and 8.4 c.Moisture content shall be between 35 and 50 percent d.Maturity greater than 80 percent (maturity indicator expressed as percentage of germination/vigor, 80+/80+) e.Maturity indicator expressed as Carbon to Nitrogen ration < 12 f.Maturity indicator expressed as AmmoniaN/NitrateN Ratio <4 g.Minimum organic matter shall be 40 percent dry weight basis h.Soluble salt content shall be no greater than 5500 parts per million or 0-5 mmhos/cm i.Phosphorus content shall be no greater than 325 parts per million j.Heavy metals (trace) shall not exceed 0.5 parts per million k.Chemical contaminants: meet or exceed US EPA Class A standard, 40 CFR 503.13, Tables 1 & 3 levels l.Pathogens: meet or exceed US EPA Class A standard, 40 CFR 503.32(a) levels PART 3 - EXECUTION A.General 1.Refer to project specifications for excavation requirements. B.Placement Method 1.BSM material shall be spread evenly in horizontal layers. 2.Thickness of loose material in each layer shall not exceed 9-inches. 3.Compaction of BSM material is not required. BIORETENTION SAND MEDIA SPECIFICATIONS RAIN GARDEN BASIN 12" - 30" DRAIN BASIN 12" - 30" INLINE DRAIN NON TRAFFIC INSTALLATION BACKFILL MATERIAL BELOW AND TO SIDES OF STRUCTURE SHALL BE NATIVE SOIL AND BE PLACED UNIFORMLY IN 12" LIFTS AND COMPACTED TO A MIN OF 90% REV B7001-110-111DWG NO.1 OF 1SHEET1:25SCALEDWG SIZE A 3130 VERONA AVE BUFORD, GA 30518 PHN (770) 932-2443 FAX (770) 932-2490 www.nyloplast-us.com 12 IN - 30 IN DB & ID NON TRAFFIC INSTALLATION TITLE PROJECT NO./NAME MATERIAL DATE APPD BY 9-30-99DATE CJADRAWN BYTHIS PRINT DISCLOSES SUBJECT MATTER IN WHICH NYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPT OR POSSESSION OF THIS PRINT DOES NOT CONFER, TRANSFER, OR LICENSE THE USE OF THE DESIGN OR TECHNICAL INFORMATION SHOWN HEREIN REPRODUCTION OF THIS PRINT OR ANY INFORMATION CONTAINED HEREIN, OR MANUFACTURE OF ANY ARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERS IS FORBIDDEN, EXCEPT BY SPECIFIC WRITTEN PERMISSION FROM NYLOPLAST. 9-30-99 CJA NOTE: 1.ALL DRAINS SHALL INCLUDE SUMP INSERT REV B7001-110-206DWG NO.1 OF 1SHEET1:8SCALEDWG SIZE A 3130 VERONA AVE BUFORD, GA 30518 PHN (770) 932-2443 FAX (770) 932-2490 www.nyloplast-us.com 12 IN DOME GRATE ASSEMBLY TITLE PROJECT NO./NAME MATERIAL DATE APPD BY 3-6-06DATE EBCDRAWN BYTHIS PRINT DISCLOSES SUBJECT MATTER IN WHICH NYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPT OR POSSESSION OF THIS PRINT DOES NOT CONFER, TRANSFER, OR LICENSE THE USE OF THE DESIGN OR TECHNICAL INFORMATION SHOWN HEREIN REPRODUCTION OF THIS PRINT OR ANY INFORMATION CONTAINED HEREIN, OR MANUFACTURE OF ANY ARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERS IS FORBIDDEN, EXCEPT BY SPECIFIC WRITTEN PERMISSION FROM NYLOPLAST. 3-6-06 CJA 8" DOME: PART #7001-110-197 10" DOME: PART #7001-110-201 12" DOME: PART #7001-110-206 15" DOME: PART #7001-110-211 QUALITY: MATERIAL SHALL CONFORM TO ASTM A536 GRADE 70-50-05 PAINT: CASTINGS ARE FURNISHED WITH A BLACK PAINT LOCKING DEVICE AVAILABLE UPON REQUEST SEE DRAWING NO. 7001-110-229 DUCTILE IRON D U C T I L E I RON-DO NOT P O L L U T DRAINS TO WAT E R W A Y S E NYLOPLAST 2.47 5.00 .93 TYPICAL DOME GRATE ASSEMBLY 4 1 4 1 PROPOSED OUTFALL CURB & GUTTER PROPOSED INFLOW CURB & GUTTER PROPOSED RAIN GARDEN THE S E R E C O R D D R A W I N G S , P R O D U C E D B Y N O R T H E R N E N G I N E E R I N G SER V I C E S , I N C . , A R E B A S E D I N W H O L E , O R I N P A R T , U P O N I N F O R M A T I O N PRO V I D E D B Y O T H E R S . N O R T H E R N E N G I N E E R I N G S E R V I C E S , I N C . A S S U M E S NO L I A B I L I T Y F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F T H I S I N F O R M A T I O N . REC O R D D R A W I N G SS SS SS SS SS SS SS SS SS SS SS SS SS SS 0. 4 % 0.2% BASIN B3 (FLAT TOP) INV. IN=4889.97 (SW) INV. OUT=4889.97 (NE) INV. OUT=4889.97 (SE) FG=4894.40 BASIN B2 INV. IN=4889.92 (SW) INV. IN=4889.92 (SE) INV. OUT=4889.92 (NE) FG=4894.14 STORM DRAIN B SEE SHEET ST2 VAULT 1 (SC-740 VAULTS) 12.63 LF 24" RCP @ 0.40% 89.6 4 SG 89 . 7 0 SG 93.5 6 94.1 5 94.4 6 93 . 8 8 EXISTING 10" SANITARY SEWER 110.23 LF 6" PERF. HD P E @ 0 . 2 0 % BASIN B2-1 INV. OUT=4890.14 (NW) FG=4893.59 89.4 7 SG 89 . 4 1 SG VAULT 2: (SC-310 VAULTS) 87.4 2 SG 86.6 1 SG 87.4 8 SG 91 . 0 8 90 . 1 8 91 . 0 5 AD INLET C1-4 INV. OUT=4887.97 (SE) FG=4890.91 AD CONNECTION C1-3 INV. IN=4887.93 (NW) FG=4890.87 8.10 LF 12" PVC @ 0.50% 8" P V C W A T E R STORM DRAIN C SEE SHEET ST2 0.5% 0.5% 0. 5 % 0. 5 % 90.2 1 86.5 5 SG BASIN C1-1 INV. OUT=4887.92 (SE) FG=4891.07 179.61 LF 6" PERF. HD P E @ 0 . 5 0 % BASIN C1 INV. IN=4887.02 (SW) INV. IN=4887.02 (NW) INV. OUT=4887.02 (NE) FG=4890.17 AD INLET C1-1 INV. IN=4887.09 (NW) FG=4890.03 AD CONNECTION C1-2 INV. OUT=4887.11 (SE) FG=4890.04 3.37 LF 12" PVC @ 0.50% UD UD UD TF VAULT 4: (SC-310 VAULTS) 88.06 SG 87.6 9SG 87.65 SG 88.0 2 SG 91.72 91.8 8 91.19 91.3 4 AD BASIN C4-2 INV. IN=4888.14 (NW) INV. IN=4888.14 (NE) INV. OUT=4888.14 (SE) FG=4891.13 AD TEE C4-3 INV. IN=4888.45 (NW) INV. IN=4888.74 (SW) INV. OUT=4888.45 (SE) FG=4891.57 AD CROSS C4-1 INV. IN=4888.09 (NW) INV. IN=4888.46 (NE) INV. IN=4888.46 (SW) INV. OUT=4888.09 (SE) FG=4890.05 87.94 LF 15" RCP @ 0 . 3 5 % 15.32 LF 15" RCP @ 0.35% 23.50 LF 15" RCP @ 0 . 3 5 % AREA DRAIN SEE SHEET AD2 RAIN GARDEN B SEE SHEET RG1 0.3% 0. 5 % 0. 5 % AD BASIN C4-3A INV. IN=4888.50 (NW) INV. OUT=4888.50 (SE) INV. OUT=4888.50 (NE) FG=4891.65 14.42 LF 15" RCP @ 0.35% 10.42 LF 6" PERF. HDPE @ 0.50% AD BASIN C4-2.1 INV. OUT=4888.20 (SW) FG=4891.32 SS SS SS SS SS TF CUTT I N G H O R S E D R I V E (PRIV A T E D R I V E ) VAULT 3: (SC-310 VAULTS) 86.2 8 SG 86.3 2 SG 85.75 SG 85.7 1 SG 90 . 2 2 89.3 7 89. 3 6 90.2 9 0. 5 % 0.3% 0.3% 0. 5 % BASIN D1 INV. IN=4886.20 (SW) INV. IN=4886.20 (SE) INV. OUT=4886.20 (NE) FG=4889.44 75.81 LF 18" RCP @ 0.35% CONNECTION D2 INV. IN=4886.47 (SW) INV. IN=4886.89 (NW) INV. OUT=4886.47 (NE) FG=4889.90 83.56 LF 18" RCP @ 0.35% BASIN D3 INV. IN=4886.76 (SW) INV. IN=4886.76 (NW) INV. OUT=4886.76 (NE) INV. OUT=4886.76 (SE) FG=4890.28 STORM DRAIN D SEE SHEET ST3 AREA DRAIN SEE SHEET AD1 AREA DRAIN SEE SHEET AD1 AD TEE D2 INV. IN=4886.50 (SE) FG=4889.91 26.92 LF 12" PVC @ 0.50% AD BASIN D2.1 INV. OUT=4886.63 (NW) FG=4889.78 EXISTING 12" SANITARY SEWER 8" P V C W A T E R AREA DRAIN SEE SHEET AD1 9.83 LF 6" PERF. HDPE @ 0.50% BASIN D1-1 INV. OUT=4886.25 (NW) FG=4889.35 LEGEND: PROPOSED SUBGRADE SPOT ELEVATION 33.43 PROPOSED SUBGRADE SLOPES NOTES: 2.0% EXISTING SPOT ELEVATION PROPOSED SUBDRAIN PROPOSED PVC STORM UD PROPOSED FINISHED GRADE SPOT ELEVATION 33.43 (33.43 ) SUB SG1 SU B G R A D E P L A N CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R 1.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 2.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 3.ALL SPOTS SHOWN ARE FISHED GRADE ELEVATIONS UNLESS OTHERWISE NOTED. 4.CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER AND THE CITY OF FORT COLLINS STORMWATER UTILITY A MINIMUM OF ONE WEEK IN ADVANCE SO AS TO ALLOW FOR FIELD OBSERVATION AND DOCUMENTATION OF THE FOLLOWING SYSTEM ITEMS IN THE SUBGRADE AREA: - SUBGRADE - INSTALLATION OF GEOTEXTILE FABRIC - INSTALLATION OF UNDERDRAIN - PLACEMENT AND COMPACTION OF SUB-BASE MATERIAL - PLACEMENT AND COMPACTION OF BASE MATERIAL - PLACEMENT OF SETTING BED 5.SUBGRADE AREAS ARE TO BE FIELD SURVEYED BY A LICENSED PROFESSIONAL. THE DESIGN ENGINEER MUST CONFIRM THE SUBGRADE ELEVATIONS AND DIMENSIONS PRIOR TO PLACEMENT OF GEOTEXTILE FABRIC, SUB-BASE, OR ANY OTHER MATERIAL. 6.THE CONTRACTOR SHOULD PROVIDE SLACK IN GEOTEXTILE FABRIC TO ENSURE PROPER INSTALLATION AND AGGREGATE PLACEMENT WITHOUT DAMAGE. PROVIDE SUFFICIENT SLACK SO THE FABRIC IS NOT TORN WHEN ROCK IS PLACED. IF TEARS ARE SEEN OR DISCOVERED, REPAIR THEM AS RECOMMENDED BY MANUFACTURER WITH NO LESS THAN 18 INCHES OF OVERLAP ON ALL SIDES OF THE TEAR. 7.THE CONTRACTOR SHALL, AT ALL TIMES DURING AND AFTER SYSTEM INSTALLATION, PREVENT SEDIMENT, DEBRIS, AND DIRT FROM ANY SOURCE FROM ENTERING THE VAULT SYSTEM. 8.SEE DETAIL SHEETS AND PLANS BY ADS FOR ADDITIONAL DESIGN INFORMATION. 9.CONTRACTOR SHALL COORDINATE ANY NECESSARY TELEPHONE, CABLE AND ELECTRIC LOWERINGS (OR RE-ROUTING) WITH THE RESPECTIVE UTILITY PROVIDERS TO FACILITATE THE INSTALLATION OF THE PROPOSED STORM DRAIN AND UTILITY SERVICES. 10.AREA DRAIN PIPE AND DRAIN BASIN CONNECTIONS TO RCP STORM SHALL USE INSERTA TEE OR APPROVED EQUAL FOR CONNECTION. 11.ALL STORM VAULTS ARE TO BE CONSTRUCTED AS ISOLATOR ROWS. 12.VAULT LAYOUT SHOWN IN THESE PLANS IS FOR REFERENCE ONLY. FINAL VAULT LAYOUT AND DESIGN SHALL BE PER MANUFACTURER. CURRENT DESIGN AND SPECIFICATIONS PROVIDED BY ADS (ADS PROJECT #152446) Sheet Of 39 Sheets DR A W I N G F I L E N A M E : \ \ b r o n c o s \ e n g i n e e r s \ P r o j e c t s \ 6 8 7 - 0 0 4 \ D w g \ R e c o r d D r a w i n g s \ 6 8 7 - 0 0 4 _ S U B G R A D _ A B . d w g L A Y O U T N A M E : S G 1 D A T E : F e b 1 2 , 2 0 1 9 - 1 0 : 1 2 a m C A D O P E R A T O R : f r e d LI S T O F X R E F S : [ N E S - x b o r d e r ] [ 6 8 7 - 0 0 4 _ K E Y M A P ] [ 6 8 7 - 0 0 4 _ x U T I L ] [ 6 8 7 - 0 0 4 _ x A D J ] [ 6 8 7 - 0 0 4 _ x E X S T ] [ 6 8 7 - 0 0 4 _ x S I T E ] [ 6 8 7 - 0 0 4 _ C 3 D _ S u b g r a d e ] [ 2 0 1 7 - 0 3 - 2 4 S t r o m A s - B u i l t ] E N G I N E E R N G I E H T R O N R N 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 ww w . n o r t h e r n e n g i n e e r i n g . c o m Ph o n e : 9 7 0 . 2 2 1 . 4 1 5 8 - F i l i n g F o u r D: \ P r o j e c t s \ 6 8 7 - 0 0 2 \ A r c h s u r v \ R e c e i v e d \ C a m p a n a \ 2 0 1 2 - 0 3 - 2 1 _ p r o j e c t - l o g o s \ B H l o g o . g i f 9.30.16 KEYMAP NORTHVAULT AREA 2 NORTH NORTH VAULT AREA 1 VAULT AREA 3 VAULT AREA 4 VAULT AREA 1 VAULT AREA 2 VAULT AREA 3VAULT AREA 4 NORTH STORMTECH VAULT INLET/OUTLET SCHEDULE Structure ID Type Pipe Invert Weir Hight (Fom Invert) BASIN B2 30" BASIN 4889.94 -- BASIN B3 4' DIVERSION MH 4889.97 42" BASIN C4-2 30" BASIN 4888.15 -- BASIN C4-3 30" BASIN w/ WEIR 4888.5 28" BASIN D1 30" BASIN 4886.21 -- BASIN D3 30" BASIN w/ WEIR 4886.76 28" **ALL VAULT BASINS SHALL HAVE SOLID GRATE OR LID INLET SCHEDULE INLET SCHEDULE INLET ID INLET TYPE A1 Double Combination A2 Double Combination A12 Double Combination B1 Single Area Inlet B4 Double Area Inlet C4 Double Combination C6 Single Combination C7 Single Combination D4 Double Combination AD C1-1 Double Area Inlet AD C1-4 Double Area Inlet AD C4-5 Double Area Inlet Area Drain 12" Nyloplast Drain Basin** **ALL DRAIN BASINS SHALL USE DOME GRATES UNLESS OTHERWISE NOTED THE S E R E C O R D D R A W I N G S , P R O D U C E D B Y N O R T H E R N E N G I N E E R I N G SER V I C E S , I N C . , A R E B A S E D I N W H O L E , O R I N P A R T , U P O N I N F O R M A T I O N PRO V I D E D B Y O T H E R S . N O R T H E R N E N G I N E E R I N G S E R V I C E S , I N C . A S S U M E S NO L I A B I L I T Y F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F T H I S I N F O R M A T I O N . REC O R D D R A W I N G W W W W W W W W W W W W W W W W W W X X X CO COCO CO SS SS S EM GM GM EM GM EM EM GM EM GM FDCFDC FO VAU L T F.O . HYD GAS h2o GAS HYD h2o GAS S CT SS SS SS SS SS SS SS SS SS SS SS SS SS 140.46 LF 30" RCP @ 0.50% 25.02 LF 24" RCP @ 0.50% 87.90 LF 18" RC P @ 1 . 2 0 % 71.57 LF 18" RCP @ 1.20% 53.96 LF 18" RCP @ 2.00% S S IR F F WW BLDG 6BLDG 11 EXISTING 2' CONCRETE PAN STMH A11 STA 16+36.62 N: 17327.00 E: 11688.68 INLET A12 STA 16+90.58 N: 17291.75 E: 11647.82 STMH A3 STA 12+53.38 N: 17619.00 E: 11936.88 INLET A2 STA 11+65.48 N: 17679.19 E: 12000.95 INLET A1 STA 11+40.46 N: 17698.14 E: 12017.28 FES A STA 10+00.00 N: 17805.58 E: 12107.76 GOOSEBERRY LANE BL U E Y O N D E R W A Y YE A R L I N G R O A D CU T T I N G H O R S E DR I V E CUT T I N G H O R S E DRIV E (PR I V A T E D R I V E ) YE A R L I N G R O A D (P R I V A T E D R I V E ) INSTALL 4' CONCRETE PAN EXISTING WATER LINE TOP = 4898.22 WATER LINE LOWERING SEE DETAILS 2" WATER SERVICE SEE NOTE #4 WATER LINE LOWERING SEE DETAILS 2" WATER SERVICE SEE NOTE #4 WATER LINE LOWERING SEE DETAILS EXISTING 10" SANITARY SEWER EXISTING 8" SANITARY SEWER BASIN A4 STA 13+24.95 N: 17564.47 E: 11890.53 69.83 LF 18" RCP @ 1.20% BASIN A5 STA 13+94.77 N: 17511.27 E: 11845.31 38.93 LF 18" RCP @ 1.20% 64.00 LF 18" RCP @ 1.20% BASIN A8 STA 15+16.15 N: 17418.79 E: 11766.70 72.37 LF 18" RCP @ 1.20% BASIN A9 STA 15+88.52 N: 17363.59 E: 11719.90 39.50 LF 18" RCP @ 1.20% CONNECTION A10 STA 16+28.02 N: 17333.55 E: 11694.25 8.60 LF 18" RCP @ 1.20% BASIN A6 STA 14+33.71 N: 17481.61 E: 11820.09 BASIN A7 STA 14+52.14 N: 17467.56 E: 11808.15 18.44 LF 18" RCP @ 1.20% 12.16 LF 8" HDPE @ 0.50% AD BASIN A10-1 INV. OUT=4896.96 (NW) FG=4900.59 4880 4885 4890 4895 4900 4905 4910 4915 4880 4885 4890 4895 4900 4905 4910 4915 9+5010+0011+0012+0013+0014+0015+0016+0017+0017+50 140.46 LF 30" RCP @ 0.50% 25.02 LF 24" RCP @ 0.50% 87.90 LF 18" RC P @ 1 . 2 0 % 71.57 LF 18" RCP @ 1.20% 53.96 LF 18" RCP @ 2.00% ST M H A 1 1 ST A 1 6 + 3 6 . 6 2 RI M 4 9 0 2 . 8 ± IN V . I N 4 8 9 6 . 5 8 ( S W ) IN V . O U T 4 8 9 6 . 5 8 ( N E ) IN L E T A 1 2 ST A 1 6 + 9 0 . 5 8 FL . E L 4 9 0 3 . 1 ± IN V . O U T 4 8 9 7 . 6 6 ( N E ) ST M H A 3 ST A 1 2 + 5 3 . 3 8 RI M 4 8 9 7 . 4 ± IN V . I N 4 8 9 1 . 9 8 ( S W ) IN V . O U T 4 8 9 1 . 9 8 ( N E ) IN L E T A 2 ST A 1 1 + 6 5 . 4 8 FL . E L 4 8 9 5 . 6 ± IN V . I N 4 8 9 0 . 9 3 ( S W ) IN V . O U T 4 8 9 0 . 9 3 ( N E ) IN L E T A 1 ST A 1 1 + 4 0 . 4 6 FL . E L 4 8 9 5 . 5 ± IN V . I N 4 8 9 0 . 8 0 ( S W ) IN V . O U T 4 8 9 0 . 8 0 ( N E ) FE S A ST A 1 0 + 0 0 . 0 0 IN V . 4 8 9 0 . 1 0 ( S W ) PROPOSED GROUND EXISTING GROUND 6" PVC WATER STA.=14+97.17 TOP=4893.19 18" MIN. 6" PVC WATER STA.=13+09.76 TOP=4890.95 8" PVC WATER STA.=11+49.65 TOP=4889.10 10" PVC SANITARY STA.=11+52.64 INV.=4885.82 18" MIN. 18" MIN. 18" MIN. 2" WATER SERVICE STA.=15+04.05 TOP=4893.28 2" WATER SERVICE STA.=13+17.00 TOP=4891.04 6" PVC SANITARY SERVICE STA.=15+55.09 INV.=4891.35 6" PVC SANITARY SERVICE STA.=13+68.10 INV.=4888.13 8.60 LF 18" RCP @ 1.20% CO N N E C T I O N A 1 0 ST A 1 6 + 2 8 . 0 2 IN V . 4 8 9 6 . 4 8 ( S W ) IN V . 4 8 9 6 . 8 9 ( S E ) IN V . 4 8 9 6 . 4 8 ( N E ) 39.50 LF 18" RCP @ 1.20% BA S I N A 9 ST A 1 5 + 8 8 . 5 2 FL . E L 4 9 0 0 . 7 ± IN V . I N 4 8 9 6 . 0 0 ( S W ) IN V . O U T 4 8 9 6 . 0 0 ( N E ) 72.37 LF 18" RCP @ 1.20% BA S I N A 8 ST A 1 5 + 1 6 . 1 5 FL . E L 4 8 9 9 . 2 ± IN V . I N 4 8 9 5 . 1 4 ( S W ) IN V . O U T 4 8 9 5 . 1 4 ( N E ) 64.00 LF 18" RCP @ 1.20% BA S I N A 7 ST A 1 4 + 5 2 . 1 4 FL . E L 4 8 9 8 . 7 ± IN V . I N 4 8 9 4 . 3 7 ( S W ) IN V . O U T 4 8 9 4 . 3 7 ( N E ) 18.44 LF 18" RCP @ 1.20% BA S I N A 6 ST A 1 4 + 3 3 . 7 1 FL . E L 4 8 9 7 . 9 ± IN V . I N 4 8 9 4 . 1 5 ( S W ) IN V . O U T 4 8 9 4 . 1 5 ( N E ) 38.93 LF 18" RCP @ 1.20% BA S I N A 5 ST A 1 3 + 9 4 . 7 7 FL . E L 4 8 9 8 . 1 ± IN V . I N 4 8 9 3 . 6 8 ( S W ) IN V . O U T 4 8 9 3 . 6 8 ( N E ) 69.83 LF 18" RCP @ 1.20% BA S I N A 4 ST A 1 3 + 2 4 . 9 5 FL . E L 4 8 9 7 . 0 ± IN V . I N 4 8 9 2 . 8 4 ( S W ) IN V . O U T 4 8 9 2 . 8 4 ( N E ) 100-YR HGL PUBLIC STORM DRAIN EZ-WRAP OR EQUAL TO BE USED 5' EITHER SIDE OF UTILITY CROSSING EZ-WRAP OR EQUAL TO BE USED 5' EITHER SIDE OF UTILITY CROSSING EZ-WRAP OR EQUAL TO BE USED 5' EITHER SIDE OF UTILITY CROSSING EZ-WRAP OR EQUAL TO BE USED 5' EITHER SIDE OF UTILITY CROSSING SEE NOTE #7 (TYP.)APPROX. LOCATION AS-BUILT 8" PVC WATER 18" MIN. AS-BUILT 18" RCP 8" PVC WATER STA.=16+64.10 TOP=4895.42 EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: EXISTING SANITARY SEWER PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOT LINE EXISTING EASEMENT LINE PROJECT BOUNDARY EXISTING RIGHT OF WAY EXISTING STORM SEWER PROPOSED EASEMENT LINE 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL STORM DRAINS, SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.WATER SERVICE MUST HAVE MINIMUM OF 4.5' COVER AND MINIMUM OF 18" VERTICAL CLEARANCE FROM STORM SEWER. ANY STORM SEWER SHALLOWER THAN 5.0' WILL REQUIRE THE WATER SERVICE TO BE INSTALLED UNDER THE PROPOSED STORM SEWER. 5.STORM DRAIN PIPE JOINTS SHALL NOT BE LOCATED OVER UTILITY CROSSINGS. 6.PRIVATE STORM SEWER MATERIAL MAY BE RCP, PVC OR HDPE. ALL RCP SHALL BE CLASS III OR GREATER. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. HDPE MUST BE SMOOTH WALLED INTERIOR. HDPE FITTINGS MAY BE USED FOR PVC INSTALLATIONS. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 7.AREA DRAIN PIPE AND DRAIN BASIN CONNECTIONS TO RCP STORM SHALL USE INSERTA TEE OR APPROVED EQUAL FOR CONNECTION. PROPOSED RIGHT OF WAY PROPOSED AREA DRAINS CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R INLET SCHEDULE RIPRAP SCHEDULE RIPRAP SCHEDULE Storm Line/Culvert Label Riprap Type Length of Riprap (ft) Width of Riprap (ft) 2*d50, Depth of Riprap (ft) Storm A Type M 12.00 10.00 2.0 Storm B Type M 10.00 8.00 2.0 Storm C Type M 5.00 5.00 2.0 Storm D Type M 5.00 5.00 2.0 Note: ScourStop may be used as an alternative to buried riprap. If the alternate is to be used, it shall be sized according to manufacturer recommendations for velocities of <10 ft/sec. INLET SCHEDULE INLET ID INLET TYPE A1 Double Combination A2 Double Combination A12 Double Combination B1 Single Area Inlet B4 Double Area Inlet C4 Double Combination C6 Single Combination C7 Single Combination D4 Double Combination AD C1-1 Double Area Inlet AD C1-4 Double Area Inlet AD C4-5 Double Area Inlet Area Drain 12" Nyloplast Drain Basin** **ALL DRAIN BASINS SHALL USE DOME GRATES UNLESS OTHERWISE NOTED Sheet Of 39 Sheets DR A W I N G F I L E N A M E : \ \ b r o n c o s \ e n g i n e e r s \ P r o j e c t s \ 6 8 7 - 0 0 4 \ D w g \ R e c o r d D r a w i n g s \ 6 8 7 - 0 0 4 _ S T R M A _ A B . d w g L A Y O U T N A M E : S T 1 D A T E : F e b 1 2 , 2 0 1 9 - 1 0 : 0 1 a m C A D O P E R A T O R : f r e d LI S T O F X R E F S : [ 6 8 7 - 0 0 4 _ x U T I L ] [ 6 8 7 - 0 0 4 _ x A D J ] [ 6 8 7 - 0 0 4 _ x E X S T ] [ 6 8 7 - 0 0 4 _ x G R A D ] [ 6 8 7 - 0 0 4 _ x S I T E ] [ N E S - x b o r d e r ] [ 6 8 7 - 0 0 4 _ K E Y M A P ] [ 6 8 7 - 0 0 4 _ x S T R M _ l e g ] [ 6 8 7 - 0 0 4 _ x T O P O _ C R O P P E D ] [ 2 0 1 7 - 0 3 - 2 4 S t r o m A s - B u i l t ] E N G I N E E R N G I E H T R O N R N 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 ww w . n o r t h e r n e n g i n e e r i n g . c o m Ph o n e : 9 7 0 . 2 2 1 . 4 1 5 8 - F i l i n g F o u r D: \ P r o j e c t s \ 6 8 7 - 0 0 2 \ A r c h s u r v \ R e c e i v e d \ C a m p a n a \ 2 0 1 2 - 0 3 - 2 1 _ p r o j e c t - l o g o s \ B H l o g o . g i f 9.30.16 ST1 PL A N & P R O F I L E ST O R M D R A I N A NORTH ( IN FEET ) 0 1 INCH = 50 FEET 50 50 100 150 KEYMAP STORM DRAIN A STORM DRAIN A PROFILE SCALE: 1 ST O R M D R A I N A & P A V I N G R E V I S I O N S BR R 2/ 2 2 / 1 7 THE S E R E C O R D D R A W I N G S , P R O D U C E D B Y N O R T H E R N E N G I N E E R I N G SER V I C E S , I N C . , A R E B A S E D I N W H O L E , O R I N P A R T , U P O N I N F O R M A T I O N PRO V I D E D B Y O T H E R S . N O R T H E R N E N G I N E E R I N G S E R V I C E S , I N C . A S S U M E S NO L I A B I L I T Y F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F T H I S I N F O R M A T I O N . REC O R D D R A W I N G VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED SS SS SS X X CO S GM EM EM S IR UD CU T T I N G H O R S E D R I V E (P R I V A T E D R I V E ) INLET B1 STA 10+70.47 N: 17671.70 E: 12156.49 FES B STA 10+00.00 N: 17725.39 E: 12202.13 70.47 LF 24" RCP @ 0.40%BLDG 1 EXISTING 2' CONCRETE PAN INSTALL 4' CONCRETE PAN EXISTING 10" SANITARY SEWER 57.00 LF 24" RCP @ 0.40% RAIN GARDEN A SEE SHEET RG1 BASIN B2 STA 11+27.47 N: 17628.27 E: 12119.57 32.62 LF 24" RCP @ 0.40%INLET B4 STA 11+72.72 N: 17593.79 E: 12090.27 BASIN B3 (FLAT TOP) STA 11+40.09 N: 17618.65 E: 12111.40 12.63 LF 24" RCP @ 0.40% VAULT AREA 1 SEE SHEET SG1 4875 4880 4885 4890 4895 4900 4905 4910 4875 4880 4885 4890 4895 4900 4905 4910 9+5010+0011+0012+0012+50 PROPOSED GROUND EXISTING GROUND FE S B ST A 1 0 + 0 0 . 0 0 IN V . 4 8 8 9 . 4 1 ( S W ) 70.47 LF 24" RCP @ 0.40% IN L E T B 1 ST A 1 0 + 7 0 . 4 7 FL . E L 4 8 9 3 . 0 ± IN V . I N 4 8 8 9 . 7 0 ( S W ) IN V . O U T 4 8 8 9 . 7 0 ( N E ) 57.00 LF 24" RCP @ 0.40% BA S I N B 2 ST A 1 1 + 2 7 . 4 7 RI M 4 8 9 4 . 1 ± IN V . I N 4 8 8 9 . 9 2 ( S W ) IN V . I N 4 8 8 9 . 9 2 ( S E ) IN V . O U T 4 8 8 9 . 9 2 ( N E ) 32.62 LF 24" RCP @ 0.40% IN L E T B 4 ST A 1 1 + 7 2 . 7 2 FL . E L 4 8 9 4 . 7 ± IN V . I N 4 8 9 0 . 1 0 ( S W ) IN V . O U T 4 8 9 0 . 1 0 ( N E ) 10" SANITARY SEWER STA.=11+52.38 INV.= 4885.35 BA S I N B 3 ( F L A T T O P ) ST A 1 1 + 4 0 . 0 9 RI M 4 8 9 4 . 4 ± IN V . I N 4 8 8 9 . 9 7 ( S W ) IN V . O U T 4 8 8 9 . 9 7 ( N E ) IN V . O U T 4 8 8 9 . 9 7 ( S E ) 12.63 LF 24" RCP @ 0.40% 100-YR HGL PRIVATE STORM DRAIN SS SS SS SS SS X X X CO TF TF EM EM GM GM EM EM EM GM GM GM EM GM FD C FDC FDC FD C FD C TF TF TF S IR W S W S W W S F FF S F F S W W UD MI L E S H O U S E A V E N U E (P R I V A T E D R I V E ) YEARLING R O A D (PRIVATE D R I V E ) STMH C3 (FLAT TOP) STA 12+57.20 N: 17143.12 E: 12487.38 INLET C4 STA 13+49.11 N: 17075.17 E: 12425.48 FES C STA 10+00.00 N: 17339.09 E: 12653.96 62.01 LF 18" RCP @ 0.35% 91.91 LF 18" RCP @ 0.35% BLDG 4 BLDG 3 BASIN D1 106.75 LF 18" RCP @ 0.35% BASIN C1 STA 10+62.01 N: 17291.84 E: 12613.80 EXISTING 2' CONCRETE PAN INSTALL 4' CONCRETE PAN CU T T I N G H O R S E D R I V E (P R I V A T E D R I V E ) 88.44 LF 18" RCP @ 0.35% CONNECTION C2 STA 11+68.76 N: 17210.50 E: 12544.66 23.05 LF 12" RCP @ 0.35% STMH C5 (FLAT TOP) STA 13+72.17 N: 17060.24 E: 12443.05 60.13 LF 12" RCP @ 0.35% INLET C6 STA 14+32.30 N: 17004.00 E: 12421.77 WATER LINE LOWERING SEE DETAILS WATER LINE LOWERING SEE DETAILS EXISTING 10" SANITARY SEWER AREA DRAIN SEE SHEET AD1AREA DRAIN SEE SHEET AD1 8" P V C W A T E R 8" P V C W A T E R 31.09 LF 12" RCP @ 0.35% INLET C7 STA 14+63.39 N: 16980.28 E: 12401.67 AREA DRAIN SEE SHEET AD1 AREA DRAIN SEE SHEET AD1 8" PVC WATER 8" P V C W A T E R RAIN GARDEN E SEE SHEET RG1 VAULT AREA 2 SEE SHEET SG1 VAULT AREA 4 SEE SHEET SG1 RAIN GARDEN B SEE SHEET RG1 4875 4880 4885 4890 4895 4900 4905 4910 4875 4880 4885 4890 4895 4900 4905 4910 9+5010+0011+0012+0013+0014+0015+0015+50 62.01 LF 18" RCP @ 0.35% 91.91 LF 18" RCP @ 0.35% ST M H C 3 ( F L A T T O P ) ST A 1 2 + 5 7 . 2 0 RI M 4 8 9 2 . 1 ± IN V . I N 4 8 8 7 . 7 1 ( S W ) IN V . I N 4 8 8 7 . 7 1 ( N W ) IN V . O U T 4 8 8 7 . 7 1 ( N E ) IN L E T C 4 ST A 1 3 + 4 9 . 1 1 FL . E L 4 8 9 0 . 7 ± IN V . I N 4 8 8 8 . 0 3 ( N W ) IN V . I N 4 8 8 8 . 0 3 ( S W ) IN V . I N 4 8 8 8 . 0 3 ( S E ) IN V . O U T 4 8 8 8 . 0 3 ( N E ) PROPOSED GROUNDEXISTING GROUND 106.75 LF 18" RCP @ 0.35% BA S I N C 1 ST A 1 0 + 6 2 . 0 1 RI M 4 8 9 0 . 2 ± IN V . I N 4 8 8 7 . 0 2 ( S W ) IN V . I N 4 8 8 7 . 0 2 ( N W ) IN V . O U T 4 8 8 7 . 0 2 ( N E ) 88.44 LF 18" RCP @ 0.35% CO N N E C T I O N C 2 ST A 1 1 + 6 8 . 7 6 IN V . 4 8 8 7 . 4 0 ( S W ) IN V . 4 8 8 7 . 8 1 ( N W ) IN V . 4 8 8 7 . 4 0 ( N E ) FE S C ST A 1 0 + 0 0 . 0 0 IN V . 4 8 8 6 . 8 0 ( S W ) IN L E T C 6 ST A 1 4 + 3 2 . 3 0 FL . E L 4 8 9 1 . 2 ± IN V . I N 4 8 8 8 . 3 2 ( S W ) IN V . O U T 4 8 8 8 . 3 2 ( N ) 60.13 LF 12" RCP @ 0.35% ST M H C 5 ( F L A T T O P ) ST A 1 3 + 7 2 . 1 7 RI M 4 8 9 1 . 2 ± IN V . I N 4 8 8 8 . 1 1 ( S ) IN V . O U T 4 8 8 8 . 1 1 ( N W ) 23.05 LF 12" RCP @ 0.35% 8" PVC WATER STA.=12+86.39 TOP=4886.12 8" PVC WATER STA.=11+35.76 TOP=4885.59 18" MIN. 18" MIN. 10" PVC SANITARY STA.=11+50.80 INV.=4883.53 IN L E T C 7 ST A 1 4 + 6 3 . 3 9 FL . E L 4 8 9 1 . 2 ± IN V . I N 4 8 8 8 . 4 3 ( S W ) IN V . O U T 4 8 8 8 . 4 3 ( N E ) 8" PVC SANITARY STA.=14+47.87 INV.=4885.22 8" PVC WATER STA.=14+37.69 TOP=4886.67 18" MIN. 31.09 LF 12" RCP @ 0.35% 8" PVC WATER STA.=13+60.66 TOP=4886.33 18" MIN. 100-YR HGL EZ-WRAP OR EQUAL TO BE USED 5' EITHER SIDE OF UTILITY CROSSING EZ-WRAP OR EQUAL TO BE USED 5' EITHER SIDE OF UTILITY CROSSING EZ-WRAP OR EQUAL TO BE USED 5' EITHER SIDE OF UTILITY CROSSING EZ-WRAP OR EQUAL TO BE USED 5' EITHER SIDE OF UTILITY CROSSING SEE NOTE #7 (TYP.) Sheet Of 39 Sheets DR A W I N G F I L E N A M E : \ \ b r o n c o s \ e n g i n e e r s \ P r o j e c t s \ 6 8 7 - 0 0 4 \ D w g \ R e c o r d D r a w i n g s \ 6 8 7 - 0 0 4 _ S T R M B C D _ A B . d w g L A Y O U T N A M E : S T 2 D A T E : F e b 1 2 , 2 0 1 9 - 1 0 : 0 8 a m C A D O P E R A T O R : f r e d LI S T O F X R E F S : [ 6 8 7 - 0 0 4 _ x U T I L ] [ 6 8 7 - 0 0 4 _ x A D J ] [ 6 8 7 - 0 0 4 _ x E X S T ] [ 6 8 7 - 0 0 4 _ x S I T E ] [ N E S - x b o r d e r ] [ 6 8 7 - 0 0 4 _ K E Y M A P ] [ 6 8 7 - 0 0 4 _ x S T R M _ l e g ] [ 6 8 7 - 0 0 4 _ x G R A D ] [ 6 8 7 - 0 0 4 _ x T O P O _ C R O P P E D ] [ 2 0 1 7 - 0 3 - 2 4 S t r o m A s - B u i l t ] E N G I N E E R N G I E H T R O N R N 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 ww w . n o r t h e r n e n g i n e e r i n g . c o m Ph o n e : 9 7 0 . 2 2 1 . 4 1 5 8 - F i l i n g F o u r D: \ P r o j e c t s \ 6 8 7 - 0 0 2 \ A r c h s u r v \ R e c e i v e d \ C a m p a n a \ 2 0 1 2 - 0 3 - 2 1 _ p r o j e c t - l o g o s \ B H l o g o . g i f 9.30.16 KEYMAP EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: EXISTING SANITARY SEWER PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOT LINE EXISTING EASEMENT LINE PROJECT BOUNDARY EXISTING RIGHT OF WAY EXISTING STORM SEWER PROPOSED EASEMENT LINE 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL STORM DRAINS, SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.WATER SERVICE MUST HAVE MINIMUM OF 4.5' COVER AND MINIMUM OF 18" VERTICAL CLEARANCE FROM STORM SEWER. ANY STORM SEWER SHALLOWER THAN 5.0' WILL REQUIRE THE WATER SERVICE TO BE INSTALLED UNDER THE PROPOSED STORM SEWER. 5.STORM DRAIN PIPE JOINTS SHALL NOT BE LOCATED OVER UTILITY CROSSINGS. 6.PRIVATE STORM SEWER MATERIAL MAY BE RCP, PVC OR HDPE. ALL RCP SHALL BE CLASS III OR GREATER. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. HDPE MUST BE SMOOTH WALLED INTERIOR. HDPE FITTINGS MAY BE USED FOR PVC INSTALLATIONS. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 7.AREA DRAIN PIPE AND DRAIN BASIN CONNECTIONS TO RCP STORM SHALL USE INSERTA TEE OR APPROVED EQUAL FOR CONNECTION. PROPOSED RIGHT OF WAY PROPOSED AREA DRAINS CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R INLET SCHEDULE RIPRAP SCHEDULE RIPRAP SCHEDULE Storm Line/Culvert Label Riprap Type Length of Riprap (ft) Width of Riprap (ft) 2*d50, Depth of Riprap (ft) Storm A Type M 12.00 10.00 2.0 Storm B Type M 10.00 8.00 2.0 Storm C Type M 5.00 5.00 2.0 Storm D Type M 5.00 5.00 2.0 Note: ScourStop may be used as an alternative to buried riprap. If the alternate is to be used, it shall be sized according to manufacturer recommendations for velocities of <10 ft/sec. INLET SCHEDULE INLET ID INLET TYPE A1 Double Combination A2 Double Combination A12 Double Combination B1 Single Area Inlet B4 Double Area Inlet C4 Double Combination C6 Single Combination C7 Single Combination D4 Double Combination AD C1-1 Double Area Inlet AD C1-4 Double Area Inlet AD C4-5 Double Area Inlet Area Drain 12" Nyloplast Drain Basin** **ALL DRAIN BASINS SHALL USE DOME GRATES UNLESS OTHERWISE NOTED ( IN FEET ) 0 1 INCH = 50 FEET 50 50 100 150 STORM DRAIN C PROFILE SCALE: STORM DRAIN B NORTH ST2 PL A N & P R O F I L E ST O R M D R A I N B & C STORM DRAIN B PROFILE SCALE: STORM DRAIN C PRIVATE STORM DRAIN THE S E R E C O R D D R A W I N G S , P R O D U C E D B Y N O R T H E R N E N G I N E E R I N G SER V I C E S , I N C . , A R E B A S E D I N W H O L E , O R I N P A R T , U P O N I N F O R M A T I O N PRO V I D E D B Y O T H E R S . N O R T H E R N E N G I N E E R I N G S E R V I C E S , I N C . A S S U M E S NO L I A B I L I T Y F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F T H I S I N F O R M A T I O N . REC O R D D R A W I N G VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED HYD GAS SS SS SS SS SSSSSS W W W W W W CO CO TF EMGM EMGM EM GM GM EM FD C W S F W S NANCY GRAY AVENUE BLDG 5 BLDG 4INLET D4 STA 12+94.00 N: 16993.92 E: 12609.34 BASIN D1 STA 10+92.95 N: 17137.01 E: 12748.17 FES D STA 10+00.00 N: 17207.83 E: 12808.37 92.95 LF 18" RCP @ 0.35% 75.81 LF 18" RCP @ 0.35% EXISTING 2' CONCRETE PAN INSTALL 4' CONCRETE PAN 83.56 LF 18" RCP @ 0.35% CONNECTION D2 STA 11+68.76 N: 17079.25 E: 12699.07 EXISTING 10" SANITARY SEWER WATER LINE LOWERING SEE DETAILS AREA DRAIN SEE SHEET AD1 41.68 LF 18" RCP @ 0.35% BASIN D3 STA 12+52.32 N: 17015.58 E: 12644.95 AREA DRAIN SEE SHEET AD1 8" P V C W A T E R AREA DRAIN SEE SHEET AD1 VAULT AREA 3 SEE SHEET SG1 4875 4880 4885 4890 4895 4900 4905 4910 4875 4880 4885 4890 4895 4900 4905 4910 9+5010+0011+0012+0013+0013+50 92.95 LF 18" RCP @ 0.35% 75.81 LF 18" RCP @ 0.35% IN L E T D 4 ST A 1 2 + 9 4 . 0 0 FL . E L 4 8 8 9 . 7 ± IN V . I N 4 8 8 7 . 1 0 ( S E ) IN V . O U T 4 8 8 6 . 9 1 ( N E ) BA S I N D 1 ST A 1 0 + 9 2 . 9 5 RI M 4 8 8 9 . 4 ± IN V . I N 4 8 8 6 . 2 0 ( S W ) IN V . I N 4 8 8 6 . 2 0 ( S E ) IN V . O U T 4 8 8 6 . 2 0 ( N E ) FE S D ST A 1 0 + 0 0 . 0 0 IN V . 4 8 8 5 . 8 8 ( S W ) PROPOSED GROUND EXISTING GROUND CO N N E C T I O N D 2 ST A 1 1 + 6 8 . 7 6 IN V . 4 8 8 6 . 4 7 ( S W ) IN V . 4 8 8 6 . 8 9 ( N W ) IN V . 4 8 8 6 . 4 7 ( N E ) 83.56 LF 18" RCP @ 0.35% 41.68 LF 18" RCP @ 0.35% BA S I N D 3 ST A 1 2 + 5 2 . 3 2 RI M 4 8 9 0 . 3 ± IN V . I N 4 8 8 6 . 7 6 ( S W ) IN V . I N 4 8 8 6 . 7 6 ( N W ) IN V . O U T 4 8 8 6 . 7 6 ( N E ) IN V . O U T 4 8 8 6 . 7 6 ( S E ) 8" PVC WATER STA.=11+35.76 TOP=4884.65 12" PVC SANITARY STA.=11+51.46 INV.=4882.86 18" MIN. 100-YR HGL EZ-WRAP OR EQUAL TO BE USED 5' EITHER SIDE OF UTILITY CROSSING PRIVATE STORM DRAIN SEE NOTE #7 (TYP.) Sheet Of 39 Sheets DR A W I N G F I L E N A M E : \ \ b r o n c o s \ e n g i n e e r s \ P r o j e c t s \ 6 8 7 - 0 0 4 \ D w g \ R e c o r d D r a w i n g s \ 6 8 7 - 0 0 4 _ S T R M B C D _ A B . d w g L A Y O U T N A M E : S T 3 D A T E : F e b 1 2 , 2 0 1 9 - 1 0 : 0 7 a m C A D O P E R A T O R : f r e d LI S T O F X R E F S : [ 6 8 7 - 0 0 4 _ x U T I L ] [ 6 8 7 - 0 0 4 _ x A D J ] [ 6 8 7 - 0 0 4 _ x E X S T ] [ 6 8 7 - 0 0 4 _ x S I T E ] [ N E S - x b o r d e r ] [ 6 8 7 - 0 0 4 _ K E Y M A P ] [ 6 8 7 - 0 0 4 _ x S T R M _ l e g ] [ 6 8 7 - 0 0 4 _ x G R A D ] [ 6 8 7 - 0 0 4 _ x T O P O _ C R O P P E D ] [ 2 0 1 7 - 0 3 - 2 4 S t r o m A s - B u i l t ] E N G I N E E R N G I E H T R O N R N 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 ww w . n o r t h e r n e n g i n e e r i n g . c o m Ph o n e : 9 7 0 . 2 2 1 . 4 1 5 8 - F i l i n g F o u r D: \ P r o j e c t s \ 6 8 7 - 0 0 2 \ A r c h s u r v \ R e c e i v e d \ C a m p a n a \ 2 0 1 2 - 0 3 - 2 1 _ p r o j e c t - l o g o s \ B H l o g o . g i f 9.30.16 KEYMAP EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: EXISTING SANITARY SEWER PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOT LINE EXISTING EASEMENT LINE PROJECT BOUNDARY EXISTING RIGHT OF WAY EXISTING STORM SEWER PROPOSED EASEMENT LINE 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL STORM DRAINS, SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.WATER SERVICE MUST HAVE MINIMUM OF 4.5' COVER AND MINIMUM OF 18" VERTICAL CLEARANCE FROM STORM SEWER. ANY STORM SEWER SHALLOWER THAN 5.0' WILL REQUIRE THE WATER SERVICE TO BE INSTALLED UNDER THE PROPOSED STORM SEWER. 5.STORM DRAIN PIPE JOINTS SHALL NOT BE LOCATED OVER UTILITY CROSSINGS. 6.PRIVATE STORM SEWER MATERIAL MAY BE RCP, PVC OR HDPE. ALL RCP SHALL BE CLASS III OR GREATER. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. HDPE MUST BE SMOOTH WALLED INTERIOR. HDPE FITTINGS MAY BE USED FOR PVC INSTALLATIONS. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 7.AREA DRAIN PIPE AND DRAIN BASIN CONNECTIONS TO RCP STORM SHALL USE INSERTA TEE OR APPROVED EQUAL FOR CONNECTION. PROPOSED RIGHT OF WAY PROPOSED AREA DRAINS CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R INLET SCHEDULE RIPRAP SCHEDULE RIPRAP SCHEDULE Storm Line/Culvert Label Riprap Type Length of Riprap (ft) Width of Riprap (ft) 2*d50, Depth of Riprap (ft) Storm A Type M 12.00 10.00 2.0 Storm B Type M 10.00 8.00 2.0 Storm C Type M 5.00 5.00 2.0 Storm D Type M 5.00 5.00 2.0 Note: ScourStop may be used as an alternative to buried riprap. If the alternate is to be used, it shall be sized according to manufacturer recommendations for velocities of <10 ft/sec. INLET SCHEDULE INLET ID INLET TYPE A1 Double Combination A2 Double Combination A12 Double Combination B1 Single Area Inlet B4 Double Area Inlet C4 Double Combination C6 Single Combination C7 Single Combination D4 Double Combination AD C1-1 Double Area Inlet AD C1-4 Double Area Inlet AD C4-5 Double Area Inlet Area Drain 12" Nyloplast Drain Basin** **ALL DRAIN BASINS SHALL USE DOME GRATES UNLESS OTHERWISE NOTED ( IN FEET ) 0 1 INCH = 50 FEET 50 50 100 150 PROFILE SCALE: STORM DRAIN D NORTH ST3 PL A N & P R O F I L E ST O R M D R A I N D STORM DRAIN D THE S E R E C O R D D R A W I N G S , P R O D U C E D B Y N O R T H E R N E N G I N E E R I N G SER V I C E S , I N C . , A R E B A S E D I N W H O L E , O R I N P A R T , U P O N I N F O R M A T I O N PRO V I D E D B Y O T H E R S . N O R T H E R N E N G I N E E R I N G S E R V I C E S , I N C . A S S U M E S NO L I A B I L I T Y F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F T H I S I N F O R M A T I O N . REC O R D D R A W I N G VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED TF TF TF TF TF TF TF TF TF TF TF EM EM EM EM GM EM GM GM GM GM GM EM GM GM GM GM GM GM GM GM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM EM GM GM GM GM GM EM GM GM GM EM EM GM GM GM GMGM EMGM EMGM EM GM EM GM EM GM EMGM GM EM XXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X FDCFDC FDC FD C FDC FDC FD C FD C FDC FDC FDC FDC FD C FD C FDC X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X X X TF TF TF TF TF GAS h2o GAS HYD h2o GAS HYD HYD GAS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSS SS S S S S S S S S S S IR IR W W W W W S W S W W S W F F F F F F F F F F F F S F F W W W W W W S SW W UD UD W S W W W W W W W W W W W WWWW W WWWW W W W W W W W W W W W SS SS SS SS SS SS CO COCOCOCO S S S WW S S S S S S S MILES HOUSE AVENUE (PRIVATE DRIVE) YE A R L I N G R O A D (P R I V A T E D R I V E ) YEARLING ROAD (PRIVATE DRIVE) CUTTING HORSE DRIVE (PRIVATE DRIVE) LU S I T A N O L A N E (P R I V A T E D R I V E ) BUILDING 12 BUILDING 14 BUILDING 13 BUILDING 11 BUILDING 6 BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 4 BU I L D I N G 5 BUILDING 10 BU I L D I N G 1 6 BU I L D I N G 1 7 BUI L D I N G 1 8 BUILDING 7 BUILDING 8 CLUBHOUSE BU I L D I N G 1 5 YEA R L I N G R O A D (PR I V A T E D R I V E ) NA N C Y G R A Y A V E N U E AD BASIN 2-3.1 INV.=4896.79 FG=4898.84 AD BASIN 2-6 INV.=4897.08 FG=4898.37 AD 45° BEND 2-5 INV.=4896.97 FG=4899.33 AD 45° BEND 2-4 INV.=4896.91 FG=4899.70 AD TEE 2-3 INV.=4896.78 FG=4899.51 AD PIPE END 2 w/ CONCRETE COLLAR INV.=4896.22 FG=4896.17 AD BASIN 1-1 INV.=4894.05 FG=4896.78 AD BASIN 1-6 INV.=4894.56 FG=4895.86 AD BASIN 1-4.1 INV.=4894.49 FG=4895.83 AD 45° BEND 1-5 INV.=4894.55 FG=4896.75 AD TEE 1-4 INV.=4894.47 FG=4896.95 AD 45° BEND 1-3 INV.=4894.35 FG=4897.37 AD 45° BEND 1-2 INV.=4894.33 FG=4896.95 AD PIPE END 1 w/ CONCRETE COLLAR INV.=4893.93 FG=4893.88 33.42 LF 8" HDPE @ 0.35% 80.89 LF 8" HDPE @ 0.35% 7.07 LF 8" HDPE @ 0.35% 32.70 LF 8" HDPE @ 0.35% 23.24 LF 8" HDPE @ 0.35% 3.68 LF 8" HDPE @ 0.35% 4.32 LF 8" HDPE @ 0.50% 70.91 LF 8" HDPE @ 0.40% 6.24 LF 8" HDPE @ 0.40% 61.87 LF 8" HDPE @ 0.40% 32.66 LF 8" HDPE @ 0.40% 14.14 LF 8" HDPE @ 0.40% 27.97 LF 8" HDPE @ 0.40% 2.91 LF 8" HDPE @ 0.50% STORM DRAIN A SEE SHEET ST1 STORM DRAIN B SEE SHEET ST2 STORM DRAIN C SEE SHEET ST2 STORM DRAIN D SEE SHEET ST3 LID VAULTS LID VAULTS LI D V A U L T S RAIN GARDEN A SEE SHEET RG1 RAIN GARDEN B SEE SHEET RG1 RAIN GARDEN C SEE SHEET RG1 RAIN GARDEN D SEE SHEET RG1 RAIN GARDEN E SEE SHEET RG1 STORM DRAIN C SEE SHEET ST2 AREA DRAIN SEE SHEET AD2 AREA DRAIN SEE SHEET AD2 AREA DRAIN SEE SHEET AD2 8" PVC WATER 8" P V C W A T E R 8" P V C W A T E R 8" PVC W A T E R LID VAULTS 8" P V C W A T E R 8" PVC WATER 8" P V C W A T E R 8" PVC WA T E R 8" P V C W A T E R AD BASIN C4-12 (S) INV.=4892.77 FG=4897.09 11.12 LF 8" HDPE @ 0.90% AD 22.5° BEND C4-11 (S) INV.=4892.67 FG=4897.82 71.31 LF 8" HDPE @ 0.90% AD TEE C4-9 (S) INV. IN=4891.93 (NW) INV. IN=4892.01 (SW) INV. OUT=4891.93 (SE) FG=4896.82 11.46 LF 8" HDPE @ 0.90% AD TEE C4-10 (S) INV.=4892.03 FG=4896.73 2.67 LF 8" HDPE @ 0.50% AD BASIN C4-10.1 (S) INV.=4892.05 FG=4896.15 110.89 L F 8 " H D P E @ 0 . 9 0 % 3.93 LF 8" HDPE @ 0.50%AD TEE C4-8 (S) INV.=4890.93 FG=4895.08 AD BASIN C4-8.1 (S) INV.=4890.95 FG=4894.32 74.0 3 L F 8 " H D P E @ 0 . 9 0 % AD TEE C4-7 (S) INV. IN=4890.26 (W) INV. IN=4890.35 (S) INV. OUT=4890.26 (E) FG=4894.29 15 4 . 3 2 L F 8 " H D P E @ 0 . 9 0 % INLET C4 INV.=4888.03 FG=4890.71 AREA DRAIN SEE SHEET AD2 AD BASIN C2-9 INV.=4891.04 FG=4893.95 7.84 LF 8" HDPE @ 0.50% AD 22.5° BEND C2-8 INV.=4891.00 FG=4894.91 36.08 LF 8" HDPE @ 0.50% AD TEE C2-7 INV.=4890.82 FG=4894.49 55.49 LF 8" HDPE @ 0.50%68.86 LF 8" HDPE @ 0.50%100.50 LF 8" HDPE @ 0.50%105.38 LF 8" HDPE @ 0.50% 26.58 LF 8" HDPE @ 0.50% 38.69 LF 8" HDPE @ 2.85% CONNECTION C2 INV. IN=4887.40 (SW) INV. IN=4887.81 (NW) INV. OUT=4887.40 (NE) FG=4892.59 AD TEE C2-1 INV.=4888.92 FG=4892.55 3.33 LF 8" HDPE @ 0.50% AD BASIN C2-1.1 INV.=4888.93 FG=4891.79 AD TEE C2-2 INV.=4889.05 FG=4892.67 3.00 LF 8" HDPE @ 0.50% AD BASIN C2-2.1 INV.=4889.07 FG=4891.95 AD TEE C2-3 INV.=4889.58 FG=4893.17 3.03 LF 8" HDPE @ 0.50% AD BASIN C2-3.1 INV.=4889.60 FG=4892.30 AD TEE C2-4 INV.=4890.09 FG=4893.74 3.33 LF 8" HDPE @ 0.50% AD BASIN C2-4.1 INV.=4890.10 FG=4893.02 21.54 LF 8" HDPE @ 0.50% AD TEE C2-5 INV.=4890.19 FG=4893.90 3.00 LF 8" HDPE @ 0.50% AD BASIN C2-5.1 INV.=4890.21 FG=4893.40 AD TEE C2-6 INV.=4890.54 FG=4894.18 3.33 LF 8" HDPE @ 0.50% AD BASIN C2-6.1 INV.=4890.55 FG=4893.40 2.37 LF 8" HDPE @ 0.50% AD BASIN C2-7.1 INV.=4890.83 FG=4894.02 AD BASIN C3-7.9 INV.=4893.43 FG=4896.31 36.86 LF 8" HDPE @ 1.00% AD 45° BEND C3-7.8 INV.=4893.06 FG=4896.88 7.07 LF 8" HDPE @ 1.00% AD 45° BEND C3-7.7 INV.=4892.99 FG=4896.91 30 . 9 0 L F 8" H D P E @ 1 . 0 0 % AD BASIN C3-7.6 INV.=4892.68 FG=4896.93 3.33 LF 8" HDPE @ 0.50% AD BASIN C3-7.6-1 INV.=4892.70 FG=4896.43 62 . 7 5 L F 8 " H D P E @ 1 . 0 0 % AD TEE C3-7.5 INV.=4892.06 FG=4896.59 3.33 LF 8" HDPE @ 0.50% AD BASIN C3-7.5-1 INV.=4892.07 FG=4896.05 27 . 3 9 L F 8" H D P E @ 1 . 0 0 % AD TEE C3-7.4 INV.=4891.78 FG=4896.38 3.36 LF 8" HDPE @ 0.50% AD BASIN C3-7.4-1 INV.=4891.80 FG=4895.58 86 . 8 5 L F 8 " H D P E @ 1 . 0 0 % AD TEE C3-7.3 INV.=4890.91 FG=4895.86 4.00 LF 8" HDPE @ 0.50% AD BASIN C3-7.3-1 INV.=4890.93 FG=4894.56 21.32 LF 8" HDPE @ 1.00% AD BASIN C3-7.2 INV.=4890.70 FG=4895.48 10.45 LF 8" HDPE @ 1.00% AD BASIN C3-7.1 INV.=4890.60 FG=4894.09 64 . 8 1 L F 8 " H D P E @ 1 . 0 0 % AD TEE C3-7 INV.=4889.94 FG=4894.95 20.25 LF 8" HDPE @ 0.50% AD BASIN C3-8.1 INV.=4890.06 FG=4894.22 1.91 LF 8" HDPE @ 0.50% AD TEE C3-8 INV.=4890.05 FG=4894.69 96.05 LF 8" HDPE @ 0.50% AD 22.5° BEND C3-9 INV.=4890.53 FG=4894.20 7.84 LF 8" HDPE @ 0.50% AD BASIN C3-10 INV.=4890.57 FG=4893.49 STMH C3 (FLAT TOP) INV.=4887.71 FG=4892.08 38.77 LF 8" HDPE @ 0.50% 3.33 LF 8" HDPE @ 0.50% AD BASIN C3-1.1 INV.=4887.92 FG=4891.76 AD TEE C3-1 INV.=4887.90 FG=4892.14 21.58 LF 8" HDPE @ 0.50% AD TEE C3-2 INV.=4888.01 FG=4892.19 3.00 LF 8" HDPE @ 0.50% AD BASIN C3-2.1 INV.=4888.02 FG=4891.65 112.56 LF 8" HDPE @ 0.50% AD TEE C3-3 INV.=4888.57 FG=4892.71 3.85 LF 8" HDPE @ 0.50% AD BASIN C3-3.1 INV.=4888.59 FG=4891.92 98.31 LF 8" HDPE @ 0.50% AD TEE C3-4 INV.=4889.06 FG=4893.51 3.33 LF 8" HDPE @ 0.50% AD BASIN C3-4.1 INV.=4889.08 FG=4892.77 25.88 LF 8" HDPE @ 0.50% AD TEE C3-5 INV.=4889.19 FG=4893.88 2.60 LF 8" HDPE @ 0.50% AD BASIN C3-5.1 INV.=4889.20 FG=4893.35 64.45 LF 8" HDPE @ 0.90% AD TEE C3-6 INV.=4889.77 FG=4894.74 3.33 LF 8" HDPE @ 0.50% AD BASIN C3-6.1 INV.=4889.79 FG=4893.91 AD TEE D2 CONNECT TO VAULTS FG=4889.91 AD BASIN D2.1 INV.=4886.63 FG=4889.78 26.92 LF 12" PVC @ 0.50% CONNECTION D2 INV. IN=4886.47 (SW) INV. IN=4886.89 (NW) INV. OUT=4886.47 (NE) FG=4889.90 100.23 LF 8" HDPE @ 0.50% 27.05 LF 8" HDPE @ 0.50% AD 11.25° BEND D3-1 INV.=4886.90 FG=4890.99 9.36 LF 8" HDPE @ 0.50% AD BASIN D3-2.1 FG=4890.11 2.86 LF 8" HDPE @ 0.50% AD TEE D3-2 INV.=4886.94 INV.=4886.94 FG=4890.84 63.74 LF 8" HDPE @ 0.50% AD TEE D3-3 INV.=4887.26 FG=4891.34 2.60 LF 8" HDPE @ 0.50% AD BASIN D3-3.1 INV.=4887.27 FG=4890.84 60.56 LF 8" HDPE @ 0.50% AD 45° BEND D3-4 INV.=4887.56 FG=4891.63 4.71 LF 8" HDPE @ 0.50% AD BASIN D3-5 INV.=4887.59 FG=4890.91 AD TEE D2-1 INV.=4887.39 FG=4891.88 3.00 LF 8" HDPE @ 0.50% AD BASIN D2-1.1 INV.=4887.40 FG=4891.35 60.00 LF 8" HDPE @ 0.50% AD 45° BEND D2-2 INV.=4887.69 FG=4892.11 4.71 LF 8" HDPE @ 0.50% AD BASIN D2-3 INV.=4887.71 FG=4891.28 INLET D4 INV.=4886.91 FG=4889.72 28.22 LF 8" HDPE @ 0.50% AD BASIN D5-1 INV.=4887.48 FG=4889.97 49.23 LF 8" HDPE @ 0.50% AD BASIN D5 INV.=4887.34 FG=4890.92 66 . 9 7 L F 8 " H D P E @ 0 . 5 0 % AD 45° BEND D6 INV.=4887.68 FG=4892.30 21.74 LF 8" HDPE @ 0.50% AD BASIN D7 INV.=4887.79 FG=4891.51 8.63 LF 8" HDPE @ 0.50% AD 45° BEND D8 INV.=4887.83 FG=4893.04 54.72 LF 8" HDPE @ 0.50% AD 45° BEND D9 INV.=4888.10 FG=4892.62 8.24 LF 8" HDPE @ 0.50% AD BASIN D10 INV.=4888.14 FG=4891.31 BASIN D3 INV. IN=4886.76 (SW) INV. IN=4886.76 (NW) INV. OUT=4886.76 (NE) INV. OUT=4886.76 (SE) FG=4890.28 AD INLET C1-4 INV.=4887.97 FG=4890.91 AD CONNECTION C1-3 INV.=4887.93 FG=4890.87 VAULT AREA 1 SEE SHEET SG1 VAULT AREA 2 SEE SHEET SG1 VAULT AREA 3 SEE SHEET SG1 VAULT AREA 4 SEE SHEET SG1 110.23 LF 6" PERF. HDPE @ 0.20% BASIN B2-1 INV.=4890.14 FG=4893.59 BASIN B2 INV.=4889.92 FG=4894.14 BASIN C1-1 INV.=4887.92 FG=4891.07 179.61 LF 6" PERF. HDPE @ 0.50% BASIN C1 INV.=4887.02 FG=4890.17 AD INLET C1-1 FG=4890.03 AD CONNECTION C1-2 INV.=4887.11 FG=4890.04 BASIN D1-1 INV.=4886.25 FG=4889.35 9.83 LF 6" PERF. HDPE @ 0.50% BASIN D1 INV.=4886.20 FG=4889.44 AS-BUILT DRAIN BASIN/INLET (TYP.) 33.08 LF 8" PERF. HDPE @ 0.50% Sheet Of 39 Sheets DR A W I N G F I L E N A M E : \ \ b r o n c o s \ e n g i n e e r s \ P r o j e c t s \ 6 8 7 - 0 0 4 \ D w g \ R e c o r d D r a w i n g s \ 6 8 7 - 0 0 4 _ A R E A D R A I N _ A B . d w g L A Y O U T N A M E : A D 1 D A T E : F e b 1 2 , 2 0 1 9 - 9 : 3 3 a m C A D O P E R A T O R : f r e d LI S T O F X R E F S : [ 6 8 7 - 0 0 4 _ x A D J ] [ 6 8 7 - 0 0 4 _ x E X S T ] [ 6 8 7 - 0 0 4 _ x S I T E ] [ N E S - x b o r d e r ] [ 6 8 7 - 0 0 4 _ K E Y M A P ] [ 6 8 7 - 0 0 4 _ x U T I L ] [ 6 8 7 - 0 0 4 _ x T O P O _ C R O P P E D ] [ 6 8 7 - 0 0 4 _ x G R A D ] [ 6 8 7 - 0 0 4 _ x A D _ l e g ] [ 2 0 1 7 - 0 3 - 2 4 S t r o m A s - B u i l t ] E N G I N E E R N G I E H T R O N R N 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 ww w . n o r t h e r n e n g i n e e r i n g . c o m Ph o n e : 9 7 0 . 2 2 1 . 4 1 5 8 - F i l i n g F o u r D: \ P r o j e c t s \ 6 8 7 - 0 0 2 \ A r c h s u r v \ R e c e i v e d \ C a m p a n a \ 2 0 1 2 - 0 3 - 2 1 _ p r o j e c t - l o g o s \ B H l o g o . g i f 9.30.16 AD1 AR E A D R A I N P L A N DUC TILE IRON-DONOT POLL UT DRAINSTOWATERWAYS E NYLOPLAST DUC TILE IRON-DONOTPOL LUT DRAINSTOWATERWAYS E NYLOPLAST DUCT ILE IRON -DONOTPOL LUT DRAINSTOWATERWAYS E NYLOPLAST TYPICAL JUNCTIONS AREA DRAIN GRATE ELEVATION FINISHED GRADE GRATE ELEVATION NOTE:GRATE ELEVATIONS AND FINISHED GRADE ELEVATIONS DEPICTED HEREIN REPRESENT THE TOP LEVEL OF FINISHED SURFACES, UNLESS OTHERWISE NOTED. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ACCOUNT FOR DOME HEIGHT, DEPTH OF COBBLE ROCK MULCH OR OTHER LANDSCAPE SURFACE TREATMENTS TO ENSURE PROPER FINISHED GRADE AND GRATE ELEVATIONS ARE ACHIEVED. PLAN VIEW INLINE JUNCTION - PROFILE KEYMAP AD1 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R ( IN FEET ) 0 1 INCH = 40 FEET 40 40 80 120 NORTH TSALPOLYN PROPOSED AREA DRAIN TSALPOLYN 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.AREA DRAINS SHALL BE PROCURED BY A DESIGN-BUILD CONTRACT. THESE PLANS SERVE AS A GUIDELINE ONLY WITH RESPECT TO THE NUMBER/TYPE OF FITTINGS, BENDS, CONNECTIONS, ADAPTERS, JUNCTIONS, CLEANOUTS, ETC. INSTALLER SHALL BE RESPONSIBLE FOR ENSURING AREA DRAIN SYSTEM IS DESIGNED AND BUILT CORRECTLY. THERE SHALL BE NO VERTICAL DEVIATIONS FROM PLAN INVERTS, GRATE ELEVATIONS, SLOPES, ETC. WITHOUT THE APPROVAL OF THE ENGINEER. 3.ALL BENDS AND FITTINGS SHOWN ARE SCHEMATIC ONLY, AND ARE NOT TO SCALE. INSTALLATION MAY REQUIRE DIFFERENT AND/OR ADDITIONAL BENDS, CLEAN-OUTS OR SIMILAR FITTINGS IN ORDER TO FUNCTION CORRECTLY. 4.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF STRUCTURES AND MAJOR JUNCTIONS. 5.AREA DRAIN GRATES SHALL BE DOMED, LIGHT-DUTY, 8" MINIMUM DIAMETER, DUCTILE IRON PER ASTM A536 GRADE 70-50-05. 6.AREA DRAIN RISERS, DROP INLETS, DRAIN BASINS, CLEAN-OUTS AND OTHER JUNCTION STRUCTURES NECESSARY FOR COMPLETION OF THIS SYSTEM CAN BE CUSTOM MANUFACTURED PVC, IF DESIRED. 7.DRAIN PIPE SHALL BE SMOOTH WALL HDPE PIPE OR EQUAL. 8.ALL PRODUCTS AND MATERIALS TO BE USED FOR AREA DRAIN SYSTEM SHALL BE SUBMITTED TO ENGINEER FOR APPROVAL PRIOR TO BIDDING. 9.ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE ELASTOMERIC SEALS (GASKETS) OR MECHANICAL JOINT WRAPS (PER ASTM F477 OR ASTM D3212). 10.ALL TRENCHING, BEDDING, BACKFILLING, AND COMPACTION REQUIREMENTS SHALL BE PER THE MANUFACTURERS RECOMMENDATIONS, OR CITY STANDARDS, WHICHEVER IS STRICTEST. 11.GRATE ELEVATIONS DEPICTED REPRESENT TOP OF FINISHED GRADE ABOVE AREA DRAINS. CONTRACTOR IS RESPONSIBLE FOR SETTING DRAIN ELEVATIONS CORRECTLY, AND FOR COMPENSATING FOR ANY DIFFERENCES IN DOME HEIGHTS, COBBLE DEPTHS, ETC. 12.CONNECTIONS TO CONCRETE STORM STRUCTURES AND SIDES OF STORM MAINS SHALL BE MADE BY CORE-DRILLING AND USING WATERTIGHT 'INSERTA TEE'®, OR APPROVED EQUAL, SERVICE CONNECTION ASSEMBLY. 13.ALL AREA DRAIN CONNECTIONS TO STORM MAINS, DOWNSPOUT LATERALS, AND OTHER PIPING RUNNING UNDER FUTURE PAVEMENT SHALL BE INSTALLED WITH MAIN LINE STORM SEWER AND STUBBED PAST THE FUTURE CURB LINE TO THE NEAREST DRAIN BASIN OR CLEAN-OUT. 14.ALL AREA DRAIN GRATES, DRAIN BASIN LIDS, CLEAN-OUT COVERS, AND SIMILAR SURFACE APPURTENANCES SHALL BE CAREFULLY COORDINATED WITH THE FINE GRADING AND LANDSCAPE INSTALLATION. 15.CONTRACTOR TO COORDINATE DEPTH AND TIMING OF DRY UTILITY AND IRRIGATION INSTALLATION TO AVOID CONFLICTS WITH AREA DRAIN SYSTEM. 16.AREA DRAIN SYSTEM SHALL BE INSPECTED AFTER FINAL LANDSCAPING TO ENSURE SYSTEM IS FREE OF DEBRIS AND DAMAGE. 17.AREA DRAIN PIPE AND DRAIN BASIN CONNECTIONS TO RCP STORM SHALL USE INSERTA TEE OR APPROVED EQUAL FOR CONNECTION. EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: EXISTING STORM SEWER EXISTING SANITARY SEWER PROPOSED STORM INLET PROPOSED SANITARY SEWER PROPERTY BOUNDARY SS W PROPOSED AREA DRAIN PIPE w/ BASIN RAIN GARDEN PROPOSED UNDERDRAIN UD INLET SCHEDULE INLET ID INLET TYPE A1 Double Combination A2 Double Combination A12 Double Combination B1 Single Area Inlet B4 Double Area Inlet C4 Double Combination C6 Single Combination C7 Single Combination D4 Double Combination AD C1-1 Double Area Inlet AD C1-4 Double Area Inlet AD C4-5 Double Area Inlet Area Drain 12" Nyloplast Drain Basin** **ALL DRAIN BASINS SHALL USE DOME GRATES UNLESS OTHERWISE NOTED THE S E R E C O R D D R A W I N G S , P R O D U C E D B Y N O R T H E R N E N G I N E E R I N G SER V I C E S , I N C . , A R E B A S E D I N W H O L E , O R I N P A R T , U P O N I N F O R M A T I O N PRO V I D E D B Y O T H E R S . N O R T H E R N E N G I N E E R I N G S E R V I C E S , I N C . A S S U M E S NO L I A B I L I T Y F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F T H I S I N F O R M A T I O N . REC O R D D R A W I N G TF TF TF EM EM GM GM GM GM GM GM EM EM GM GM GM GM GM EMGM EMGM XXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X FDC FDC FD C FD C FDC FDC FDC X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X X X X X X X X TF S S S IR W W S W F F F F F W SW W UD UD UD MILES HOUSE AVENUE (PRIVATE DRIVE) YE A R L I N G R O A D (P R I V A T E D R I V E ) CUTTING HORSE DRIVE (PRIVATE DRIVE) BUILDING 13 4 BU I L D I N G 1 6 BUILDING 8 CLUBHOUSE BU I L D I N G 1 5 RAIN GARDEN B SEE SHEET RG1 RAIN GARDEN E SEE SHEET RG1 INLET C4 INV.=4888.03 FG=4890.71 18.11 LF 15" RCP @ 0.35% AD CROSS C4-1 INV. IN=4888.09 (NW) INV. IN=4888.46 (NE) INV. IN=4888.46 (SW) INV. OUT=4888.09 (SE) FG=4890.05 15.32 LF 15" RCP @ 0.35% AD BASIN C4-2 INV.=4888.14 FG=4891.13 87.94 LF 15" RCP @ 0.35% 30 . 6 4 L F 8 " H D P E @ 0 . 5 0 % AD TEE C4-3 INV.=4888.45 FG=4891.57 23.50 LF 15" RCP @ 0.35% AD BASIN C4-3.1 INV.=4888.90 FG=4891.81 AD TEE C4-4 INV.=4888.58 FG=4891.76 24.35 LF 15" RCP @ 0.35% 41 . 6 4 L F 8 " H D P E @ 0 . 5 1 % AD BASIN C4-4.1 INV.=4889.11 FG=4891.57 46 . 5 4 L F 8 " H D P E @ 0 . 5 0 % AD BASIN C4-4.2 INV.=4889.35 FG=4891.40 AD AREA INLET C4-5 INV.=4888.67 FG=4890.97 11.32 LF 12" HDPE @ 0.35% AD 45° BEND C4-6 INV.=4888.71 FG=4891.56 9.43 LF 12" HDPE @ 0.35% AD 45° BEND C4-7 INV.=4888.74 FG=4891.88 40.63 LF 12" HDPE @ 0.35% AD TEE C4-8 INV.=4888.88 FG=4892.42 9.50 LF 8" HDPE @ 0.50% 15.93 LF 12" HDPE @ 0.35% AD BASIN C4-9 (24" Ø) INV.=4888.94 FG=4892.23 62.67 LF 8 " H D P E @ 0 . 5 0 % AD BASIN C4-9.1 INV.=4889.25 FG=4893.33 57.65 LF 8" HDPE @ 3.00% AD 45° BEND C4-9.2 INV.=4890.98 FG=4895.02 4.24 LF 8" HDPE @ 3.00% AD BASIN C4-9.3 INV.=4891.11 FG=4894.18 15.94 LF 8" HDPE @ 0.35% AD 45° BEND C4-10 INV.=4889.00 FG=4892.64 10.23 LF 8" HDPE @ 0.35% AD 45° BEND C4-11 INV.=4889.03 FG=4892.22 11.53 LF 8" HDPE @ 0.35% 36.08 LF 8" HDPE @ 0.35% AD TEE C4-12 INV.=4889.07 FG=4891.68 8.99 LF 8" HDPE @ 0.50% AD BASIN C4-12.1 INV.=4889.12 FG=4891.55 AD TEE C4-13 INV.=4889.20 FG=4892.59 8.72 LF 8" HDPE @ 0.50% AD BASIN C4-13.1 INV.=4889.24 FG=4891.55 16.20 LF 8" HDPE @ 0.35% AD 45° BEND C4-14 INV.=4889.26 FG=4893.04 14.96 LF 8" HDPE @ 0.35% AD 45° BEND C4-15 INV.=4889.31 FG=4893.25 21.22 LF 8" HDPE @ 0.35% AD BASIN C4-16 INV.=4889.38 FG=4892.87 3.00 LF 8" HDPE @ 0.50% AD BASIN C4-16.1 INV.=4889.40 FG=4891.55 42.01 LF 8" HDPE @ 0.35% AD 90° BEND C4-17 INV.=4889.53 FG=4892.70 3.00 LF 8" HDPE @ 0.35% AD BASIN C4-18 INV.=4889.54 FG=4891.55 STORM DRAIN C SEE SHEET ST2 LID VAULTS AD BASIN C4-8.1 INV.=4889.10 FG=4891.54 AREA DRAIN SEE SHEET AD1 AREA DRAIN SEE SHEET AD1 AREA DRAIN SEE SHEET AD1 8" PVC WATER 8" P V C W A T E R 8" P V C W A T E R 8" PVC W A T E R 15 4 . 3 2 L F 8 " H D P E @ 0 . 9 0 % AD TEE C4-6 (S) INV.=4888.88 FG=4892.29 26.04 LF 8" HDPE @ 0.50% 5.65 LF 8" HDPE @ 0.90% AD 45° BEND C4-5 (S) INV.=4888.83 FG=4891.68 AD BASIN C4-6.1 (S) INV.=4889.01 FG=4890.95 8.26 LF 8" HDPE @ 0.90% 16.05 LF 8" HDPE @ 0.90% 12.52 LF 8" HDPE @ 0.90% AD TEE C4-2 (S) INV.=4888.49 FG=4891.70 27.44 LF 8" HDPE @ 0.90% AD BASIN C4-1 (S) INV.=4888.25 FG=4890.54 43 . 9 3 L F 8 " H D P E @ 0 . 5 0 % INLET C4 INV.=4888.03 FG=4890.71 AD BASIN C4-2 .1 (S) INV.=4888.59 FG=4890.50 9.33 LF 8" HDPE @ 0.50% AD 11.25° BEND C4-4 (S) INV.=4888.68 FG=4892.12 AD 45 ° BEND C4-3 (S) INV.=4888.61 FG=4892.04 14.42 LF 15" RCP @ 0.35% AD BASIN C4-3A INV.=4888.50 INV.=4888.50 FG=4891.65 VAULT AREA 4 SEE SHEET SG1 10.42 LF 6" PERF. HDPE @ 0.50% AD BASIN C4-2.1 INV.=4888.20 FG=4891.32 33.08 LF 8" PERF. HDPE @ 0.50% Sheet Of 39 Sheets DR A W I N G F I L E N A M E : \ \ b r o n c o s \ e n g i n e e r s \ P r o j e c t s \ 6 8 7 - 0 0 4 \ D w g \ R e c o r d D r a w i n g s \ 6 8 7 - 0 0 4 _ A R E A D R A I N _ A B . d w g L A Y O U T N A M E : A D 2 D A T E : F e b 1 2 , 2 0 1 9 - 9 : 3 3 a m C A D O P E R A T O R : f r e d LI S T O F X R E F S : [ 6 8 7 - 0 0 4 _ x A D J ] [ 6 8 7 - 0 0 4 _ x E X S T ] [ 6 8 7 - 0 0 4 _ x S I T E ] [ N E S - x b o r d e r ] [ 6 8 7 - 0 0 4 _ K E Y M A P ] [ 6 8 7 - 0 0 4 _ x U T I L ] [ 6 8 7 - 0 0 4 _ x T O P O _ C R O P P E D ] [ 6 8 7 - 0 0 4 _ x G R A D ] [ 6 8 7 - 0 0 4 _ x A D _ l e g ] [ 2 0 1 7 - 0 3 - 2 4 S t r o m A s - B u i l t ] E N G I N E E R N G I E H T R O N R N 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 ww w . n o r t h e r n e n g i n e e r i n g . c o m Ph o n e : 9 7 0 . 2 2 1 . 4 1 5 8 - F i l i n g F o u r D: \ P r o j e c t s \ 6 8 7 - 0 0 2 \ A r c h s u r v \ R e c e i v e d \ C a m p a n a \ 2 0 1 2 - 0 3 - 2 1 _ p r o j e c t - l o g o s \ B H l o g o . g i f 9.30.16 AD2 AR E A D R A I N P L A N DUC TILE IRON-DONOT POLL UT DRAINSTOWATERWAYS E NYLOPLAST DUC TILE IRON-DONOTPOL LUT DRAINSTOWATERWAYS E NYLOPLAST DUCT ILE IRON -DONOTPOL LUT DRAINSTOWATERWAYS E NYLOPLAST TYPICAL JUNCTIONS AREA DRAIN GRATE ELEVATION FINISHED GRADE GRATE ELEVATION NOTE:GRATE ELEVATIONS AND FINISHED GRADE ELEVATIONS DEPICTED HEREIN REPRESENT THE TOP LEVEL OF FINISHED SURFACES, UNLESS OTHERWISE NOTED. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ACCOUNT FOR DOME HEIGHT, DEPTH OF COBBLE ROCK MULCH OR OTHER LANDSCAPE SURFACE TREATMENTS TO ENSURE PROPER FINISHED GRADE AND GRATE ELEVATIONS ARE ACHIEVED. PLAN VIEW INLINE JUNCTION - PROFILE KEYMAP AD2 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 NORTH TSALPOLYN PROPOSED AREA DRAIN TSALPOLYN 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.AREA DRAINS SHALL BE PROCURED BY A DESIGN-BUILD CONTRACT. THESE PLANS SERVE AS A GUIDELINE ONLY WITH RESPECT TO THE NUMBER/TYPE OF FITTINGS, BENDS, CONNECTIONS, ADAPTERS, JUNCTIONS, CLEANOUTS, ETC. INSTALLER SHALL BE RESPONSIBLE FOR ENSURING AREA DRAIN SYSTEM IS DESIGNED AND BUILT CORRECTLY. THERE SHALL BE NO VERTICAL DEVIATIONS FROM PLAN INVERTS, GRATE ELEVATIONS, SLOPES, ETC. WITHOUT THE APPROVAL OF THE ENGINEER. 3.ALL BENDS AND FITTINGS SHOWN ARE SCHEMATIC ONLY, AND ARE NOT TO SCALE. INSTALLATION MAY REQUIRE DIFFERENT AND/OR ADDITIONAL BENDS, CLEAN-OUTS OR SIMILAR FITTINGS IN ORDER TO FUNCTION CORRECTLY. 4.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF STRUCTURES AND MAJOR JUNCTIONS. 5.AREA DRAIN GRATES SHALL BE DOMED, LIGHT-DUTY, 8" MINIMUM DIAMETER, DUCTILE IRON PER ASTM A536 GRADE 70-50-05. 6.AREA DRAIN RISERS, DROP INLETS, DRAIN BASINS, CLEAN-OUTS AND OTHER JUNCTION STRUCTURES NECESSARY FOR COMPLETION OF THIS SYSTEM CAN BE CUSTOM MANUFACTURED PVC, IF DESIRED. 7.DRAIN PIPE SHALL BE SMOOTH WALL HDPE PIPE OR EQUAL. 8.ALL PRODUCTS AND MATERIALS TO BE USED FOR AREA DRAIN SYSTEM SHALL BE SUBMITTED TO ENGINEER FOR APPROVAL PRIOR TO BIDDING. 9.ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE ELASTOMERIC SEALS (GASKETS) OR MECHANICAL JOINT WRAPS (PER ASTM F477 OR ASTM D3212). 10.ALL TRENCHING, BEDDING, BACKFILLING, AND COMPACTION REQUIREMENTS SHALL BE PER THE MANUFACTURERS RECOMMENDATIONS, OR CITY STANDARDS, WHICHEVER IS STRICTEST. 11.GRATE ELEVATIONS DEPICTED REPRESENT TOP OF FINISHED GRADE ABOVE AREA DRAINS. CONTRACTOR IS RESPONSIBLE FOR SETTING DRAIN ELEVATIONS CORRECTLY, AND FOR COMPENSATING FOR ANY DIFFERENCES IN DOME HEIGHTS, COBBLE DEPTHS, ETC. 12.CONNECTIONS TO CONCRETE STORM STRUCTURES AND SIDES OF STORM MAINS SHALL BE MADE BY CORE-DRILLING AND USING WATERTIGHT 'INSERTA TEE'®, OR APPROVED EQUAL, SERVICE CONNECTION ASSEMBLY. 13.ALL AREA DRAIN CONNECTIONS TO STORM MAINS, DOWNSPOUT LATERALS, AND OTHER PIPING RUNNING UNDER FUTURE PAVEMENT SHALL BE INSTALLED WITH MAIN LINE STORM SEWER AND STUBBED PAST THE FUTURE CURB LINE TO THE NEAREST DRAIN BASIN OR CLEAN-OUT. 14.ALL AREA DRAIN GRATES, DRAIN BASIN LIDS, CLEAN-OUT COVERS, AND SIMILAR SURFACE APPURTENANCES SHALL BE CAREFULLY COORDINATED WITH THE FINE GRADING AND LANDSCAPE INSTALLATION. 15.CONTRACTOR TO COORDINATE DEPTH AND TIMING OF DRY UTILITY AND IRRIGATION INSTALLATION TO AVOID CONFLICTS WITH AREA DRAIN SYSTEM. 16.AREA DRAIN SYSTEM SHALL BE INSPECTED AFTER FINAL LANDSCAPING TO ENSURE SYSTEM IS FREE OF DEBRIS AND DAMAGE. 17.AREA DRAIN PIPE AND DRAIN BASIN CONNECTIONS TO RCP STORM SHALL USE INSERTA TEE OR APPROVED EQUAL FOR CONNECTION. EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: EXISTING STORM SEWER EXISTING SANITARY SEWER PROPOSED STORM INLET PROPOSED SANITARY SEWER PROPERTY BOUNDARY SS W PROPOSED AREA DRAIN PIPE w/ BASIN RAIN GARDEN PROPOSED UNDERDRAIN UD INLET SCHEDULE INLET ID INLET TYPE A1 Double Combination A2 Double Combination A12 Double Combination B1 Single Area Inlet B4 Double Area Inlet C4 Double Combination C6 Single Combination C7 Single Combination D4 Double Combination AD C1-1 Double Area Inlet AD C1-4 Double Area Inlet AD C4-5 Double Area Inlet Area Drain 12" Nyloplast Drain Basin** **ALL DRAIN BASINS SHALL USE DOME GRATES UNLESS OTHERWISE NOTED THE S E R E C O R D D R A W I N G S , P R O D U C E D B Y N O R T H E R N E N G I N E E R I N G SER V I C E S , I N C . , A R E B A S E D I N W H O L E , O R I N P A R T , U P O N I N F O R M A T I O N PRO V I D E D B Y O T H E R S . N O R T H E R N E N G I N E E R I N G S E R V I C E S , I N C . A S S U M E S NO L I A B I L I T Y F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F T H I S I N F O R M A T I O N . REC O R D D R A W I N G APPENDIX E STATE PORTAL DOCUMENTS This unofficial copy was downloaded on Feb-07-2019 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Feb-07-2019 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA UD UD UD GM EM BLD G 1 CU T T I N G H O R S E D R I V E (P R I V A T E D R I V E ) 93.20 94. 9 8 PROPOSED 5' SIDEWALK CULVERT RG BASIN B5 INV.=4890.36 FG=4892.56 64. 6 3 L F 6 " P E R F . H D P E @ 0 . 4 0 % INLET B4 INV.=4890.10 FG=4894.72 STORM DRAIN B SEE SHEET ST2 92. 0 0 92.0093.00 92. 0 0 93. 5 3 95 . 1 1 95. 5 1 94.32 93 . 0 9 93.0 6 93.1 1 93.14 93 . 0 0 93.00 UD EM BLD G 1 4 YEARL I N G R O A D (PRIV A T E D R I V E ) AREA DRAIN SEE SHEET AD1 RG BASIN C4-9.1 (S) INV.=4892.16 FG=4895.08 AD TEE C4-9 (S) INV.=4891.93 FG=4896.82 95.6 5 94.68 94.6 8 95.67 94.67 95.68 95.65 94.65 PROPOSED 4' CURB CUT 95.66 28.98 LF 6" PERF. HDPE @ 0.50% UD EM FDCBLDG 15 YEARLING ROAD (PRIVATE DRIVE) 94.30 AREA DRAIN SEE SHEET AD1 93.1 7 92.16 92.1 8 93. 1 6 93.17 92.1792.18 93.16 RG TEE C4-7.1A (S) INV.=4890.48 FG=4893.11 11.56 LF 6" PERF. HDPE @ 0.50% 15.79 LF 6" PERF. HDPE @ 0.50% 12.66 LF 6" PERF. HDPE @ 0.50% RG TEE C4-7.2 (S) INV.=4890.49 FG=4892.81 AD TEE C4-7 (S) INV.=4890.26 FG=4894.29 RG TEE C4-7.1 (S) INV.=4890.43 FG=4892.31 93.18 PROPOSED 4' CURB CUT UD UD EM GM BLD G 16 MILE S H O U S E AVE N U E (PR I V A T E D R I V E ) 90.8 5 YEA R L I N G R O A D (PR I V A T E D R I V E ) PROPOSED 5' SIDEWALK CULVERT STORM DRAIN C SEE SHEET ST2 INLET C7 INV.=4888.43 FG=4891.65 18.48 LF 6" PERF. HDPE @ 0.50% RG TEE C8 INV.=4888.52 FG=4890.85 11.00 LF 6" PERF. HDPE @ 0.50%42.24 LF 6" PERF. HDPE @ 0.50% RG BASIN C9 INV.=4888.73 FG=4891.40 RG BASIN C8-1 INV.=4888.57 FG=4891.33 92. 1 8 92.3 8 90.87 91 . 8 8 91.86 90.8 6 90.85 91.87 91 . 8 6 PROPOSED 5' SIDEWALK CHASE 91. 2 5 91.37 91 . 5 1 91. 3 5 92.4 4 92 . 3 5 92.29 92.18 UD TF EM GM EM FD C TF YE A R L I N G R O A D (P R I V A T E D R I V E ) CUT T I N G HOR S E D R I V E (PR I V A T E DRI V E ) BLD G 1 0 CLU B H O U S E PROPOSED 5' SIDEWALK CHASE AD CROSS C4-1 INV.=4888.09 FG=4890.05 34.71 LF 6" PERF. HDPE @ 0.50%17.23 LF 6" PERF. HDPE @ 0.50% RG BASIN C4-1.1 INV.=4888.64 FG=4890.29 RG BASIN C4-1.1A INV.=4888.55 FG=4890.28 STORM DRAIN C SEE SHEET ST2 AREA DRAIN SEE SHEET AD2 AREA DRAIN SEE SHEET AD2 91.6 6 90.81 90. 7 8 90.05 90.0 7 90 . 0 7 90.8090.78 90 . 0 5 90.8 1 90.07 90.05 90 . 8 0 PROPOSED 4' CURB CUT 91.03 90 . 7 3 90.6990.79 90 . 7 5 90.8 4 90 . 8 0 Sheet Of 39 Sheets DR A W I N G F I L E N A M E : \ \ b r o n c o s \ e n g i n e e r s \ P r o j e c t s \ 6 8 7 - 0 0 4 \ D w g \ R e c o r d D r a w i n g s \ 6 8 7 - 0 0 4 _ R A I N G A R D E N S _ A B . d w g L A Y O U T N A M E : R G 1 D A T E : F e b 1 2 , 2 0 1 9 - 9 : 5 6 a m C A D O P E R A T O R : f r e d LI S T O F X R E F S : [ 6 8 7 - 0 0 4 _ x U T I L ] [ 6 8 7 - 0 0 4 _ x A D J ] [ 6 8 7 - 0 0 4 _ x E X S T ] [ 6 8 7 - 0 0 4 _ x G R A D ] [ 6 8 7 - 0 0 4 _ x S I T E ] [ 6 8 7 - 0 0 4 _ x T O P O ] [ N E S - x b o r d e r ] [ 6 8 7 - 0 0 4 _ K E Y M A P ] [ 6 8 7 - 0 0 4 _ 3 D _ P r o p o s e d ] [ 2 0 1 7 - 0 3 - 2 4 S t r o m A s - B u i l t ] [ 2 0 1 8 - 0 3 - 0 7 G r a d i n g A s - B u i l t ] E N G I N E E R N G I E H T R O N R N 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 ww w . n o r t h e r n e n g i n e e r i n g . c o m Ph o n e : 9 7 0 . 2 2 1 . 4 1 5 8 - F i l i n g F o u r D: \ P r o j e c t s \ 6 8 7 - 0 0 2 \ A r c h s u r v \ R e c e i v e d \ C a m p a n a \ 2 0 1 2 - 0 3 - 2 1 _ p r o j e c t - l o g o s \ B H l o g o . g i f 9.30.16 RG1 RA I N G A R D E N D E T A I L S CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R LEGEND: PROPOSED UNDERDRAIN PROPOSED STORM UD PROPOSED FINISHED GRADE SPOT ELEVATION 33.43 NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF BASINS AND FITTINGS. 4.CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD LOCATES AND POTHOLING OF SUBSURFACE UTILITIES. ENGINEER AND CITY SHALL BE NOTIFIED OF ANY POTENTIAL CONFLICTS. 5.CONTRACTOR SHALL COORDINATE ANY NECESSARY TELEPHONE, CABLE AND ELECTRIC LOWERINGS (OR RE-ROUTING) WITH THE RESPECTIVE UTILITY PROVIDERS TO FACILITATE THE INSTALLATION OF THE PROPOSED UNDERDRAINS AND RAIN GARDEN SOIL SECTIONS. 6.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 7.REFER TO RAIN GARDEN DETAILS FOR ADDITIONAL INFORMATION. 8.REFER TO LANDSCAPE PLANS FOR ADDITIONAL INFORMATION. KEYMAP NORTH ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 RAIN GARDEN A RAIN GARDEN B RAIN GARDEN ERAIN GARDEN D RAIN GARDEN C RAIN GARDEN A RAIN GARDEN B RAIN GARDEN C RAIN GARDEN D RAIN GARDEN E REFER TO THE LANDSCAPE PLANS FOR PLANTING WITHIN THE BIO-RETENTION AREA 12" (9" MIN.) BIO-RETENTION SAND MEDIA 6" PERFORATED HDPE UNDERDRAIN NOTES: 1.REFER TO THE BIORETENTION SAND MEDIA SPECIFICATIONS FOR MORE INFORMATION ON THE SOIL MIX. 2.BIORETENTION SAND MEDIA SHALL BE PROVIDED BY HAGEMAN EARTH CYCLE OR APPROVED EQUAL. 3.THE SOIL SECTION AS SHOWN ON THIS DETAIL SHALL BE PLACED IN ALL RAIN GARDEN LOCATIONS. MIN. 10" GRAVEL LAYER MEETING CDOT #4 COARSE AGGREGATE SPECIFICATION. 6" (4" MIN.) PEA GRAVEL TYPICAL RAIN GARDEN SECTION REFER TO THE LANDSCAPE PLANS FOR PLANTING WITHIN THE BIO-RETENTION AREA BIO-RETENTION SAND MEDIA 6" PERFORATED HDPE UNDERDRAIN GRAVEL LAYER PEA GRAVEL BIORETENTION SOIL LAYERING (RAIN GARDEN) CDOT CLASS B GEOTEXTILE SEPARATOR FABRIC (TYPICAL SIDES & 24" MIN. BOTTOM) CITY OF FORT COLLINS BIORETENTION SAND MEDIA SPECIFICATION PART 1 - GENERAL A.Bioretention Sand Media (BSM) shall be uniformly mixed, uncompacted, free of stones, stumps, roots, or other similar objects larger than two inches.  No other materials or substances shall be mixed or dumped within the bioretention area that may be harmful to plant growth or prove a hindrance to the facility's function and maintenance. B.BSM shall be free of plant or seed material of non-native, invasive species, or weeds. C.Fully mixed BSM shall be tested prior to installation and meet the following criteria: 1.P-Index of less than 30 2.pH of 5.5-6.5. Should pH fall outside of the acceptable range, it may be modified with lime (to raise) or iron sulfate plus sulfur (to lower). The lime or iron sulfate must be mixed uniformly into the BSM prior to use in the bioretention facility. 3.Cation Exchange Capacity (CEC) greater than 10 4.Phosphorous (Phosphate, P2O5) not to exceed 69 ppm  5.BSM that fails to meet the minimum requirements shall be replaced at the Contractor's expense. D.BSM shall be delivered fully mixed in a drum mixer.  Onsite mixing of piles will not be allowed.  Mixing of the BSM to a homogeneous consistency shall be done to the satisfaction of the Owner. PART 2 - SOIL MATERIALS A.Sand 1.BSM shall consist of 60-70% sand by volume meeting ASTM C-33. B.Shredded Paper 1.BSM shall consist of 5-10% shredded paper by volume. 2.Shredded paper shall be loosely packed, approximate bulk density of 50-100 lbs/CY. 3.Shredded paper shall consist of loose leaf paper, not shredded phone books, and shall be thoroughly and mechanically mixed to prevent clumping. C.Topsoil 1.BSM shall consist of 5-10% topsoil by volume. 2.Topsoil shall be classified as sandy loam, loamy sand, or loam per USDA textural triangle with less than 5% clay material. 3.Onsite, native material shall not be used as topsoil. 4.Textural analysis shall be performed on topsoil, preferably at its source, prior to including topsoil in the mix.  Topsoil shall be free of subsoil, debris, weeds, foreign matter, and any other material deleterious to plant health. 5.Topsoil shall have a pH range of 5.5 to 7.5 and moisture content between 25-55%.  6.Contractor shall certify that topsoil meets these specifications. D.Leaf Compost 1.BSM shall consist of 10-20% leaf compost by volume. 2.Leaf compost shall consist of Class 1 organic leaf compost consisting of aged leaf mulch resulting from biological degradation and transformation of plant-derived materials under controlled conditions designed to promote aerobic decomposition. 3.The material shall be well composted, free of viable weed seeds and contain material of a generally humus nature capable of sustaining growth of vegetation, with no materials toxic to plant growth.  4.Compost shall be provided by a local US Composting Council Seal of Testing Assurance (STA) member.  A copy of the provider's most recent independent STA test report shall be submitted to and approved by the Owner prior to delivery of BSM to the project site. 5.Compost material shall also meet the following criteria: a.100 percent of the material shall pass through a 1/2 inch screen b.PH of the material shall be between 6.0 and 8.4 c.Moisture content shall be between 35 and 50 percent d.Maturity greater than 80 percent (maturity indicator expressed as percentage of germination/vigor, 80+/80+) e.Maturity indicator expressed as Carbon to Nitrogen ration < 12 f.Maturity indicator expressed as AmmoniaN/NitrateN Ratio <4 g.Minimum organic matter shall be 40 percent dry weight basis h.Soluble salt content shall be no greater than 5500 parts per million or 0-5 mmhos/cm i.Phosphorus content shall be no greater than 325 parts per million j.Heavy metals (trace) shall not exceed 0.5 parts per million k.Chemical contaminants: meet or exceed US EPA Class A standard, 40 CFR 503.13, Tables 1 & 3 levels l.Pathogens: meet or exceed US EPA Class A standard, 40 CFR 503.32(a) levels PART 3 - EXECUTION A.General 1.Refer to project specifications for excavation requirements. B.Placement Method 1.BSM material shall be spread evenly in horizontal layers. 2.Thickness of loose material in each layer shall not exceed 9-inches. 3.Compaction of BSM material is not required. BIORETENTION SAND MEDIA SPECIFICATIONS RAIN GARDEN BASIN 12" - 30" DRAIN BASIN 12" - 30" INLINE DRAIN NON TRAFFIC INSTALLATION BACKFILL MATERIAL BELOW AND TO SIDES OF STRUCTURE SHALL BE NATIVE SOIL AND BE PLACED UNIFORMLY IN 12" LIFTS AND COMPACTED TO A MIN OF 90% REV B7001-110-111DWG NO.1 OF 1SHEET1:25SCALEDWG SIZE A 3130 VERONA AVE BUFORD, GA 30518 PHN (770) 932-2443 FAX (770) 932-2490 www.nyloplast-us.com 12 IN - 30 IN DB & ID NON TRAFFIC INSTALLATION TITLE PROJECT NO./NAME MATERIAL DATE APPD BY 9-30-99DATE CJADRAWN BYTHIS PRINT DISCLOSES SUBJECT MATTER IN WHICH NYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPT OR POSSESSION OF THIS PRINT DOES NOT CONFER, TRANSFER, OR LICENSE THE USE OF THE DESIGN OR TECHNICAL INFORMATION SHOWN HEREIN REPRODUCTION OF THIS PRINT OR ANY INFORMATION CONTAINED HEREIN, OR MANUFACTURE OF ANY ARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERS IS FORBIDDEN, EXCEPT BY SPECIFIC WRITTEN PERMISSION FROM NYLOPLAST. 9-30-99 CJA NOTE: 1.ALL DRAINS SHALL INCLUDE SUMP INSERT REV B7001-110-206DWG NO.1 OF 1SHEET1:8SCALEDWG SIZE A 3130 VERONA AVE BUFORD, GA 30518 PHN (770) 932-2443 FAX (770) 932-2490 www.nyloplast-us.com 12 IN DOME GRATE ASSEMBLY TITLE PROJECT NO./NAME MATERIAL DATE APPD BY 3-6-06DATE EBCDRAWN BYTHIS PRINT DISCLOSES SUBJECT MATTER IN WHICH NYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPT OR POSSESSION OF THIS PRINT DOES NOT CONFER, TRANSFER, OR LICENSE THE USE OF THE DESIGN OR TECHNICAL INFORMATION SHOWN HEREIN REPRODUCTION OF THIS PRINT OR ANY INFORMATION CONTAINED HEREIN, OR MANUFACTURE OF ANY ARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERS IS FORBIDDEN, EXCEPT BY SPECIFIC WRITTEN PERMISSION FROM NYLOPLAST. 3-6-06 CJA 8" DOME: PART #7001-110-197 10" DOME: PART #7001-110-201 12" DOME: PART #7001-110-206 15" DOME: PART #7001-110-211 QUALITY: MATERIAL SHALL CONFORM TO ASTM A536 GRADE 70-50-05 PAINT: CASTINGS ARE FURNISHED WITH A BLACK PAINT LOCKING DEVICE AVAILABLE UPON REQUEST SEE DRAWING NO. 7001-110-229 DUCTILE IRON D U C T I L E I RON-DO NOT P O L L U T DRAINS TO WAT E R W A Y S E NYLOPLAST 2.47 5.00 .93 TYPICAL DOME GRATE ASSEMBLY 4 1 4 1 PROPOSED OUTFALL CURB & GUTTER PROPOSED INFLOW CURB & GUTTER PROPOSED RAIN GARDEN THE S E R E C O R D D R A W I N G S , P R O D U C E D B Y N O R T H E R N E N G I N E E R I N G SER V I C E S , I N C . , A R E B A S E D I N W H O L E , O R I N P A R T , U P O N I N F O R M A T I O N PRO V I D E D B Y O T H E R S . N O R T H E R N E N G I N E E R I N G S E R V I C E S , I N C . A S S U M E S NO L I A B I L I T Y F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F T H I S I N F O R M A T I O N . REC O R D D R A W I N G SS SS SS SS SS SS SS SS SS SS SS SS SS SS 0. 4 % 0.2% BASIN B3 (FLAT TOP) INV. IN=4889.97 (SW) INV. OUT=4889.97 (NE) INV. OUT=4889.97 (SE) FG=4894.40 BASIN B2 INV. IN=4889.92 (SW) INV. IN=4889.92 (SE) INV. OUT=4889.92 (NE) FG=4894.14 STORM DRAIN B SEE SHEET ST2 VAULT 1 (SC-740 VAULTS) 12.63 LF 24" RCP @ 0.40% 89.6 4 SG 89 . 7 0 SG 93.5 6 94.1 5 94.4 6 93 . 8 8 EXISTING 10" SANITARY SEWER 110.23 LF 6" PERF. HD P E @ 0 . 2 0 % BASIN B2-1 INV. OUT=4890.14 (NW) FG=4893.59 89.4 7 SG 89 . 4 1 SG VAULT 2: (SC-310 VAULTS) 87.4 2 SG 86.6 1 SG 87.4 8 SG 91 . 0 8 90 . 1 8 91 . 0 5 AD INLET C1-4 INV. OUT=4887.97 (SE) FG=4890.91 AD CONNECTION C1-3 INV. IN=4887.93 (NW) FG=4890.87 8.10 LF 12" PVC @ 0.50% 8" P V C W A T E R STORM DRAIN C SEE SHEET ST2 0.5% 0.5% 0. 5 % 0. 5 % 90.2 1 86.5 5 SG BASIN C1-1 INV. OUT=4887.92 (SE) FG=4891.07 179.61 LF 6" PERF. HD P E @ 0 . 5 0 % BASIN C1 INV. IN=4887.02 (SW) INV. IN=4887.02 (NW) INV. OUT=4887.02 (NE) FG=4890.17 AD INLET C1-1 INV. IN=4887.09 (NW) FG=4890.03 AD CONNECTION C1-2 INV. OUT=4887.11 (SE) FG=4890.04 3.37 LF 12" PVC @ 0.50% UD UD UD TF VAULT 4: (SC-310 VAULTS) 88.06 SG 87.6 9SG 87.65 SG 88.0 2 SG 91.72 91.8 8 91.19 91.3 4 AD BASIN C4-2 INV. IN=4888.14 (NW) INV. IN=4888.14 (NE) INV. OUT=4888.14 (SE) FG=4891.13 AD TEE C4-3 INV. IN=4888.45 (NW) INV. IN=4888.74 (SW) INV. OUT=4888.45 (SE) FG=4891.57 AD CROSS C4-1 INV. IN=4888.09 (NW) INV. IN=4888.46 (NE) INV. IN=4888.46 (SW) INV. OUT=4888.09 (SE) FG=4890.05 87.94 LF 15" RCP @ 0 . 3 5 % 15.32 LF 15" RCP @ 0.35% 23.50 LF 15" RCP @ 0 . 3 5 % AREA DRAIN SEE SHEET AD2 RAIN GARDEN B SEE SHEET RG1 0.3% 0. 5 % 0. 5 % AD BASIN C4-3A INV. IN=4888.50 (NW) INV. OUT=4888.50 (SE) INV. OUT=4888.50 (NE) FG=4891.65 14.42 LF 15" RCP @ 0.35% 10.42 LF 6" PERF. HDPE @ 0.50% AD BASIN C4-2.1 INV. OUT=4888.20 (SW) FG=4891.32 SS SS SS SS SS TF CUTT I N G H O R S E D R I V E (PRIV A T E D R I V E ) VAULT 3: (SC-310 VAULTS) 86.2 8 SG 86.3 2 SG 85.75 SG 85.7 1 SG 90 . 2 2 89.3 7 89. 3 6 90.2 9 0. 5 % 0.3% 0.3% 0. 5 % BASIN D1 INV. IN=4886.20 (SW) INV. IN=4886.20 (SE) INV. OUT=4886.20 (NE) FG=4889.44 75.81 LF 18" RCP @ 0.35% CONNECTION D2 INV. IN=4886.47 (SW) INV. IN=4886.89 (NW) INV. OUT=4886.47 (NE) FG=4889.90 83.56 LF 18" RCP @ 0.35% BASIN D3 INV. IN=4886.76 (SW) INV. IN=4886.76 (NW) INV. OUT=4886.76 (NE) INV. OUT=4886.76 (SE) FG=4890.28 STORM DRAIN D SEE SHEET ST3 AREA DRAIN SEE SHEET AD1 AREA DRAIN SEE SHEET AD1 AD TEE D2 INV. IN=4886.50 (SE) FG=4889.91 26.92 LF 12" PVC @ 0.50% AD BASIN D2.1 INV. OUT=4886.63 (NW) FG=4889.78 EXISTING 12" SANITARY SEWER 8" P V C W A T E R AREA DRAIN SEE SHEET AD1 9.83 LF 6" PERF. HDPE @ 0.50% BASIN D1-1 INV. OUT=4886.25 (NW) FG=4889.35 LEGEND: PROPOSED SUBGRADE SPOT ELEVATION 33.43 PROPOSED SUBGRADE SLOPES NOTES: 2.0% EXISTING SPOT ELEVATION PROPOSED SUBDRAIN PROPOSED PVC STORM UD PROPOSED FINISHED GRADE SPOT ELEVATION 33.43 (33.43 ) SUB SG1 SU B G R A D E P L A N CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R 1.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 2.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 3.ALL SPOTS SHOWN ARE FISHED GRADE ELEVATIONS UNLESS OTHERWISE NOTED. 4.CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER AND THE CITY OF FORT COLLINS STORMWATER UTILITY A MINIMUM OF ONE WEEK IN ADVANCE SO AS TO ALLOW FOR FIELD OBSERVATION AND DOCUMENTATION OF THE FOLLOWING SYSTEM ITEMS IN THE SUBGRADE AREA: - SUBGRADE - INSTALLATION OF GEOTEXTILE FABRIC - INSTALLATION OF UNDERDRAIN - PLACEMENT AND COMPACTION OF SUB-BASE MATERIAL - PLACEMENT AND COMPACTION OF BASE MATERIAL - PLACEMENT OF SETTING BED 5.SUBGRADE AREAS ARE TO BE FIELD SURVEYED BY A LICENSED PROFESSIONAL. THE DESIGN ENGINEER MUST CONFIRM THE SUBGRADE ELEVATIONS AND DIMENSIONS PRIOR TO PLACEMENT OF GEOTEXTILE FABRIC, SUB-BASE, OR ANY OTHER MATERIAL. 6.THE CONTRACTOR SHOULD PROVIDE SLACK IN GEOTEXTILE FABRIC TO ENSURE PROPER INSTALLATION AND AGGREGATE PLACEMENT WITHOUT DAMAGE. PROVIDE SUFFICIENT SLACK SO THE FABRIC IS NOT TORN WHEN ROCK IS PLACED. IF TEARS ARE SEEN OR DISCOVERED, REPAIR THEM AS RECOMMENDED BY MANUFACTURER WITH NO LESS THAN 18 INCHES OF OVERLAP ON ALL SIDES OF THE TEAR. 7.THE CONTRACTOR SHALL, AT ALL TIMES DURING AND AFTER SYSTEM INSTALLATION, PREVENT SEDIMENT, DEBRIS, AND DIRT FROM ANY SOURCE FROM ENTERING THE VAULT SYSTEM. 8.SEE DETAIL SHEETS AND PLANS BY ADS FOR ADDITIONAL DESIGN INFORMATION. 9.CONTRACTOR SHALL COORDINATE ANY NECESSARY TELEPHONE, CABLE AND ELECTRIC LOWERINGS (OR RE-ROUTING) WITH THE RESPECTIVE UTILITY PROVIDERS TO FACILITATE THE INSTALLATION OF THE PROPOSED STORM DRAIN AND UTILITY SERVICES. 10.AREA DRAIN PIPE AND DRAIN BASIN CONNECTIONS TO RCP STORM SHALL USE INSERTA TEE OR APPROVED EQUAL FOR CONNECTION. 11.ALL STORM VAULTS ARE TO BE CONSTRUCTED AS ISOLATOR ROWS. 12.VAULT LAYOUT SHOWN IN THESE PLANS IS FOR REFERENCE ONLY. FINAL VAULT LAYOUT AND DESIGN SHALL BE PER MANUFACTURER. CURRENT DESIGN AND SPECIFICATIONS PROVIDED BY ADS (ADS PROJECT #152446) Sheet Of 39 Sheets DR A W I N G F I L E N A M E : \ \ b r o n c o s \ e n g i n e e r s \ P r o j e c t s \ 6 8 7 - 0 0 4 \ D w g \ R e c o r d D r a w i n g s \ 6 8 7 - 0 0 4 _ S U B G R A D _ A B . d w g L A Y O U T N A M E : S G 1 D A T E : F e b 1 2 , 2 0 1 9 - 1 0 : 1 2 a m C A D O P E R A T O R : f r e d LI S T O F X R E F S : [ N E S - x b o r d e r ] [ 6 8 7 - 0 0 4 _ K E Y M A P ] [ 6 8 7 - 0 0 4 _ x U T I L ] [ 6 8 7 - 0 0 4 _ x A D J ] [ 6 8 7 - 0 0 4 _ x E X S T ] [ 6 8 7 - 0 0 4 _ x S I T E ] [ 6 8 7 - 0 0 4 _ C 3 D _ S u b g r a d e ] [ 2 0 1 7 - 0 3 - 2 4 S t r o m A s - B u i l t ] E N G I N E E R N G I E H T R O N R N 30 1 N o r t h H o w e s S t r e e t , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 1 ww w . n o r t h e r n e n g i n e e r i n g . c o m Ph o n e : 9 7 0 . 2 2 1 . 4 1 5 8 - F i l i n g F o u r D: \ P r o j e c t s \ 6 8 7 - 0 0 2 \ A r c h s u r v \ R e c e i v e d \ C a m p a n a \ 2 0 1 2 - 0 3 - 2 1 _ p r o j e c t - l o g o s \ B H l o g o . g i f 9.30.16 KEYMAP NORTHVAULT AREA 2 NORTH NORTH VAULT AREA 1 VAULT AREA 3 VAULT AREA 4 VAULT AREA 1 VAULT AREA 2 VAULT AREA 3VAULT AREA 4 NORTH STORMTECH VAULT INLET/OUTLET SCHEDULE Structure ID Type Pipe Invert Weir Hight (Fom Invert) BASIN B2 30" BASIN 4889.94 -- BASIN B3 4' DIVERSION MH 4889.97 42" BASIN C4-2 30" BASIN 4888.15 -- BASIN C4-3 30" BASIN w/ WEIR 4888.5 28" BASIN D1 30" BASIN 4886.21 -- BASIN D3 30" BASIN w/ WEIR 4886.76 28" **ALL VAULT BASINS SHALL HAVE SOLID GRATE OR LID INLET SCHEDULE INLET SCHEDULE INLET ID INLET TYPE A1 Double Combination A2 Double Combination A12 Double Combination B1 Single Area Inlet B4 Double Area Inlet C4 Double Combination C6 Single Combination C7 Single Combination D4 Double Combination AD C1-1 Double Area Inlet AD C1-4 Double Area Inlet AD C4-5 Double Area Inlet Area Drain 12" Nyloplast Drain Basin** **ALL DRAIN BASINS SHALL USE DOME GRATES UNLESS OTHERWISE NOTED THE S E R E C O R D D R A W I N G S , P R O D U C E D B Y N O R T H E R N E N G I N E E R I N G SER V I C E S , I N C . , A R E B A S E D I N W H O L E , O R I N P A R T , U P O N I N F O R M A T I O N PRO V I D E D B Y O T H E R S . N O R T H E R N E N G I N E E R I N G S E R V I C E S , I N C . A S S U M E S NO L I A B I L I T Y F O R T H E A C C U R A C Y O R C O M P L E T E N E S S O F T H I S I N F O R M A T I O N . REC O R D D R A W I N G Stormwater Facility Name: Facility Location & Jurisdiction: User (Input) Watershed Characteristics User Defined User Defined User Defined User Defined Watershed Slope =0.028 ft/ft Stage [ft]Area [ft^2]Stage [ft]Discharge [cfs] Watershed Length-to-Width Ratio =1.88 L:W 0.00 0 0.00 0.03 Watershed Area =3.58 acres 0.40 770 2.93 26.00 Watershed Imperviousness =67.0%percent 0.90 1,116 3.13 26.00 Percentage Hydrologic Soil Group A =0.0%percent 1.40 1,397 Percentage Hydrologic Soil Group B =0.0%percent 1.90 1,700 Percentage Hydrologic Soil Groups C/D =100.0%percent 2.93 1,700 3.13 1,700 User Input: Detention Basin Characteristics WQCV Design Drain Time =12.00 hours After completing and printing this worksheet to a pdf, go to: https://maperture.digitaldataservices.com/gvh/?viewer=cswdif, create a new stormwater facility, and attach the pdf of this worksheet to that record. Routed Hydrograph Results Design Storm Return Period =WQCV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year Two-Hour Rainfall Depth =0.53 0.98 1.36 1.71 2.31 2.91 3.67 in Calculated Runoff Volume =0.062 0.190 0.297 0.397 0.580 0.755 0.991 acre-ft OPTIONAL Override Runoff Volume =acre-ft Inflow Hydrograph Volume =0.061 0.190 0.296 0.397 0.580 0.755 0.991 acre-ft Time to Drain 97% of Inflow Volume =1 1 1 1 1 1 1 hours Time to Drain 99% of Inflow Volume =1 1 1 1 1 1 1 hours Maximum Ponding Depth =0.17 0.52 0.79 1.04 1.48 1.87 2.44 ft Maximum Ponded Area =0.007 0.019 0.024 0.027 0.033 0.039 0.039 acres Maximum Volume Stored =0.001 0.006 0.012 0.018 0.031 0.045 0.068 acre-ft Stormwater Detention and Infiltration Design Data Sheet Bucking Horse Filing 4 - Rain Garden 1 Fort Collins, Colorado Workbook Protected Worksheet Protected SDI_Design_Data_FC_Rainfall - Rain Garden 1.xlsm, Design Data 2/12/2019, 9:24 AM Doing_Clear_Formatting =Yes CountA=1 0 1 2 3 #N/A #N/A 0 1 2 3 #N/A #N/A Check Data Set 1 Check Data Set 1 Stormwater Detention and Infiltration Design Data Sheet Area Discharge 0 5 10 15 20 25 0.1 1 10 FL O W [ c f s ] TIME [hr] 100YR IN 100YR OUT 50YR IN 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT WQCV IN WQCV OUT 0 0.5 1 1.5 2 2.5 3 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 100YR 50YR 25YR 10YR 5YR 2YR WQCV SDI_Design_Data_FC_Rainfall - Rain Garden 1.xlsm, Design Data 2/12/2019, 9:24 AM Stormwater Facility Name: Facility Location & Jurisdiction: User (Input) Watershed Characteristics User Defined User Defined User Defined User Defined Watershed Slope =0.012 ft/ft Stage [ft]Area [ft^2]Stage [ft]Discharge [cfs] Watershed Length-to-Width Ratio =1.76 L:W 0.00 0 0.00 0.01 Watershed Area =0.21 acres 0.20 68 0.76 0.25 Watershed Imperviousness =72.0%percent 0.70 227 0.96 0.36 Percentage Hydrologic Soil Group A =0.0%percent 1.20 342 1.16 0.44 Percentage Hydrologic Soil Group B =0.0%percent 1.50 406 1.36 0.50 Percentage Hydrologic Soil Groups C/D =100.0%percent 2.10 406 1.56 0.56 2.56 406 2.16 0.71 2.56 0.80 User Input: Detention Basin Characteristics WQCV Design Drain Time =12.00 hours After completing and printing this worksheet to a pdf, go to: https://maperture.digitaldataservices.com/gvh/?viewer=cswdif, create a new stormwater facility, and attach the pdf of this worksheet to that record. Routed Hydrograph Results Design Storm Return Period =WQCV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year Two-Hour Rainfall Depth =0.53 0.98 1.36 1.71 2.31 2.91 3.67 in Calculated Runoff Volume =0.004 0.012 0.018 0.024 0.035 0.046 0.060 acre-ft OPTIONAL Override Runoff Volume =acre-ft Inflow Hydrograph Volume =0.004 0.012 0.018 0.024 0.035 0.046 0.059 acre-ft Time to Drain 97% of Inflow Volume =1 1 1 1 1 1 1 hours Time to Drain 99% of Inflow Volume =1 1 1 1 1 2 2 hours Maximum Ponding Depth =0.22 0.62 0.89 1.07 1.45 1.85 2.39 ft Maximum Ponded Area =0.002 0.005 0.006 0.007 0.009 0.009 0.009 acres Maximum Volume Stored =0.000 0.001 0.003 0.004 0.007 0.011 0.016 acre-ft Workbook Protected Worksheet Protected Stormwater Detention and Infiltration Design Data Sheet Bucking Horse Filing 4 - Rain Garden 2 Fort Collins, Colorado SDI_Design_Data_FC_Rainfall - Rain Garden 2.xlsm, Design Data 2/12/2019, 9:24 AM Doing_Clear_Formatting =Yes CountA=1 0 1 2 3 #N/A #N/A 0 1 2 3 #N/A #N/A Check Data Set 1 Check Data Set 1 Area Discharge Stormwater Detention and Infiltration Design Data Sheet 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 0.1 1 10 FL O W [ c f s ] TIME [hr] 100YR IN 100YR OUT 50YR IN 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT WQCV IN WQCV OUT 0 0.5 1 1.5 2 2.5 3 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 100YR 50YR 25YR 10YR 5YR 2YR WQCV SDI_Design_Data_FC_Rainfall - Rain Garden 2.xlsm, Design Data 2/12/2019, 9:24 AM Stormwater Facility Name: Facility Location & Jurisdiction: User (Input) Watershed Characteristics User Defined User Defined User Defined User Defined Watershed Slope =0.012 ft/ft Stage [ft]Area [ft^2]Stage [ft]Discharge [cfs] Watershed Length-to-Width Ratio =3.25 L:W 0.00 0 0.00 0.01 Watershed Area =0.34 acres 0.10 107 0.75 0.50 Watershed Imperviousness =75.0%percent 0.60 385 0.95 0.72 Percentage Hydrologic Soil Group A =0.0%percent 1.15 541 1.15 0.88 Percentage Hydrologic Soil Group B =0.0%percent 1.75 541 1.75 1.12 Percentage Hydrologic Soil Groups C/D =100.0%percent 2.35 541 2.35 1.42 User Input: Detention Basin Characteristics WQCV Design Drain Time =12.00 hours After completing and printing this worksheet to a pdf, go to: https://maperture.digitaldataservices.com/gvh/?viewer=cswdif, create a new stormwater facility, and attach the pdf of this worksheet to that record. Routed Hydrograph Results Design Storm Return Period =WQCV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year Two-Hour Rainfall Depth =0.53 0.98 1.36 1.71 2.31 2.91 3.67 in Calculated Runoff Volume =0.007 0.020 0.031 0.041 0.058 0.075 0.098 acre-ft OPTIONAL Override Runoff Volume =acre-ft Inflow Hydrograph Volume =0.007 0.020 0.030 0.040 0.057 0.075 0.097 acre-ft Time to Drain 97% of Inflow Volume =1 1 1 1 1 1 1 hours Time to Drain 99% of Inflow Volume =1 1 1 1 1 2 2 hours Maximum Ponding Depth =0.17 0.49 0.69 0.86 1.14 1.48 2.00 ft Maximum Ponded Area =0.003 0.007 0.009 0.011 0.012 0.012 0.012 acres Maximum Volume Stored =0.000 0.002 0.004 0.005 0.009 0.013 0.019 acre-ft Workbook Protected Worksheet Protected Stormwater Detention and Infiltration Design Data Sheet Bucking Horse Filing 4 - Rain Garden 3 Fort Collins, Colorado SDI_Design_Data_FC_Rainfall - Rain Garden 3.xlsm, Design Data 2/12/2019, 9:25 AM Doing_Clear_Formatting =Yes CountA=1 0 1 2 3 #N/A #N/A 0 1 2 3 #N/A #N/A Check Data Set 1 Check Data Set 1 Area Discharge Stormwater Detention and Infiltration Design Data Sheet 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2 0.1 1 10 FL O W [ c f s ] TIME [hr] 100YR IN 100YR OUT 50YR IN 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT WQCV IN WQCV OUT 0 0.5 1 1.5 2 2.5 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 100YR 50YR 25YR 10YR 5YR 2YR WQCV SDI_Design_Data_FC_Rainfall - Rain Garden 3.xlsm, Design Data 2/12/2019, 9:25 AM Stormwater Facility Name: Facility Location & Jurisdiction: User (Input) Watershed Characteristics User Defined User Defined User Defined User Defined Watershed Slope =0.015 ft/ft Stage [ft]Area [ft^2]Stage [ft]Discharge [cfs] Watershed Length-to-Width Ratio =8.00 L:W 0.00 0 0.00 0.01 Watershed Area =1.41 acres 0.10 50 0.62 0.50 Watershed Imperviousness =80.0%percent 0.60 825 0.82 0.72 Percentage Hydrologic Soil Group A =0.0%percent 1.10 1,100 1.02 0.88 Percentage Hydrologic Soil Group B =0.0%percent 1.42 1,208 1.22 1.00 Percentage Hydrologic Soil Groups C/D =100.0%percent 2.02 1,208 1.42 1.12 1.62 2.71 2.02 9.09 User Input: Detention Basin Characteristics WQCV Design Drain Time =12.00 hours After completing and printing this worksheet to a pdf, go to: https://maperture.digitaldataservices.com/gvh/?viewer=cswdif, create a new stormwater facility, and attach the pdf of this worksheet to that record. Routed Hydrograph Results Design Storm Return Period =WQCV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year Two-Hour Rainfall Depth =0.53 0.98 1.36 1.71 2.31 2.91 3.67 in Calculated Runoff Volume =0.031 0.091 0.134 0.176 0.249 0.321 0.416 acre-ft OPTIONAL Override Runoff Volume =acre-ft Inflow Hydrograph Volume =0.030 0.090 0.133 0.175 0.248 0.321 0.415 acre-ft Time to Drain 97% of Inflow Volume =1 2 2 2 2 2 2 hours Time to Drain 99% of Inflow Volume =1 2 2 2 2 2 2 hours Maximum Ponding Depth =0.47 1.12 1.48 1.59 1.71 1.80 1.88 ft Maximum Ponded Area =0.014 0.025 0.028 0.028 0.028 0.028 0.028 acres Maximum Volume Stored =0.003 0.017 0.026 0.029 0.033 0.035 0.037 acre-ft Workbook Protected Worksheet Protected Stormwater Detention and Infiltration Design Data Sheet Bucking Horse Filing 4 - Rain Garden 4 Fort Collins, Colorado SDI_Design_Data_FC_Rainfall - Rain Garden 4.xlsm, Design Data 2/12/2019, 9:25 AM Doing_Clear_Formatting =Yes CountA=1 0 1 2 3 #N/A #N/A 0 1 2 3 #N/A #N/A Check Data Set 1 Check Data Set 1 Area Discharge Stormwater Detention and Infiltration Design Data Sheet 0 1 2 3 4 5 6 7 8 0.1 1 10 FL O W [ c f s ] TIME [hr] 100YR IN 100YR OUT 50YR IN 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT WQCV IN WQCV OUT 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 100YR 50YR 25YR 10YR 5YR 2YR WQCV SDI_Design_Data_FC_Rainfall - Rain Garden 4.xlsm, Design Data 2/12/2019, 9:25 AM Stormwater Facility Name: Facility Location & Jurisdiction: User (Input) Watershed Characteristics User Defined User Defined User Defined User Defined Watershed Slope =0.005 ft/ft Stage [ft]Area [ft^2]Stage [ft]Discharge [cfs] Watershed Length-to-Width Ratio =1.57 L:W 0.00 0 0.00 0.01 Watershed Area =0.30 acres 0.40 508 0.85 0.50 Watershed Imperviousness =77.0%percent 0.90 770 1.05 0.72 Percentage Hydrologic Soil Group A =0.0%percent 1.25 913 1.25 0.88 Percentage Hydrologic Soil Group B =0.0%percent 1.65 913 1.45 1.00 Percentage Hydrologic Soil Groups C/D =100.0%percent 1.65 1.12 User Input: Detention Basin Characteristics WQCV Design Drain Time =12.00 hours After completing and printing this worksheet to a pdf, go to: https://maperture.digitaldataservices.com/gvh/?viewer=cswdif, create a new stormwater facility, and attach the pdf of this worksheet to that record. Routed Hydrograph Results Design Storm Return Period =WQCV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year Two-Hour Rainfall Depth =0.53 0.98 1.36 1.71 2.31 2.91 3.67 in Calculated Runoff Volume =0.006 0.019 0.028 0.036 0.052 0.067 0.087 acre-ft OPTIONAL Override Runoff Volume =acre-ft Inflow Hydrograph Volume =0.006 0.018 0.027 0.036 0.051 0.066 0.087 acre-ft Time to Drain 97% of Inflow Volume =1 1 1 1 2 2 2 hours Time to Drain 99% of Inflow Volume =1 1 1 2 2 2 2 hours Maximum Ponding Depth =0.16 0.46 0.64 0.82 1.05 1.26 1.59 ft Maximum Ponded Area =0.005 0.012 0.015 0.017 0.019 0.021 0.021 acres Maximum Volume Stored =0.000 0.003 0.006 0.008 0.012 0.017 0.024 acre-ft Stormwater Detention and Infiltration Design Data Sheet Bucking Horse Filing 4 - Rain Garden 5 Fort Collins, Colorado Workbook Protected Worksheet Protected SDI_Design_Data_FC_Rainfall - Rain Garden 5.xlsm, Design Data 2/12/2019, 9:26 AM Doing_Clear_Formatting =Yes CountA=1 0 1 2 3 #N/A #N/A 0 1 2 3 #N/A #N/A Check Data Set 1 Check Data Set 1 Stormwater Detention and Infiltration Design Data Sheet Area Discharge 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2 0.1 1 10 FL O W [ c f s ] TIME [hr] 100YR IN 100YR OUT 50YR IN 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT WQCV IN WQCV OUT 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 100YR 50YR 25YR 10YR 5YR 2YR WQCV SDI_Design_Data_FC_Rainfall - Rain Garden 5.xlsm, Design Data 2/12/2019, 9:26 AM