HomeMy WebLinkAboutSite Certifications - 02/01/2017 Mr. Wes Lamarque City of Fort Collins Stormwater Utility 700 Wood St. Fort Collins, CO August 25, 2016 RE: Drainage Certification for Banner Health Medical Campus Dear Mr. Lamarque, This drainage certification letter is provided to verify as-constructed conditions for Banner Health Medical Campus. Northern Engineering completed survey work March 3, 2015 to verify general compliance with the Final Utility Plans for Banner Health Medical Campus, dated 8/12/16 by Northern Engineering. Included in this drainage certification submittal are the following: Attachment 1 - City of Fort Collins Drainage Certification Form. Attachment 2 - As-constructed pond volume calculations. Attachment 3 - As-constructed record drawings for Grading and Storm Drain Plan and Profile Sheets. Based on the calculations shown in Attachment 2, the as-built water quality pond volumes are in Table 1. Based on the water surface elevations and water quality volumes in Table 1, the ponds were constructed with slightly more volume. Table 1: Pond Record Volumes Pond Design Detention Volume (ac.- ft.) Design Water Surface Elev. As-Built Water Surface Elev. Design Water Quality Vol. (ac.-ft.) As-built Water Quality Vol. (ac.-ft.) Pond 1 3.62 4902.1 4901.7 0.30 0.38 Pond 2 2.24 4903.2 4902.7 0.38 0.46 ODP Pond 7.29 4887.1 4886.7 1.1 1.72 We have concluded, based on the attached information and personal site inspection, that the drainage features for the project site have been constructed in substantial compliance with the above referenced Final Utility Plans, with the following exceptions:  Item I.B.1.c: Northern Engineering did not observe construction. Northern Engineering was unable to verify the soft pan material graduation, trench width, and depth for Pond 1, Pond 2, and the ODP Pond.  Item I.B.1.c: Northern Engineering did not observe construction. Northern Engineering was unable to verify the installation of grades, bedding material, geotextile fabric, bends, and cleanouts, of the underdrains for Pond 1, Pond 2, and the ODP Pond.  Item II.A.2: The swale in the southeast corner of the parking lot was designed and approved with a longitudinal slope of 1.3%. This swale was constructed with a longitudinal grade of 1.3% to 1.5%. This swale will be replaced upon full buildout of the southwest corner of the site.  Item III.A.2: Storm Line 1 from FES 1-1 to STMH 1-2, shown on the storm drain profile sheet (Sheet C404), has been constructed with a slope below the design of 0.40% (a slope of 0.29% was constructed). Given the short length of this pipe, and that it is the last storm line segment in this system we do not feel that this should create any hydraulic capacity issues. Additionally we have re-analyzed this storm line and compared hydraulic grade line. As shown below, there is minimal change to 100-year HGL.  Item III.A.2: Storm Line 1 from STMH 1-2 to STMH 1-3, shown on the storm drain profile sheet (Sheet C404), has been constructed with a slope below the design of 0.40% (a slope of 0.34% was constructed). We have re-analyzed this storm line and compared hydraulic grade line. As shown below, there is minimal change to 100-year HGL. Based on the revised HGL, we feel this will convey the design storm hydraulic capacity.  Item III.A.2: Storm Line 1 from STMH 1-3 to STMH 1-4, shown on the storm drain profile sheet (Sheet C404), has been constructed with a slope below the design of 0.50% (a slope of 0.38% was constructed). We have re-analyzed this storm line and compared hydraulic grade line. As shown below, there is minimal change to 100-year HGL. Based on the revised HGL, we feel this will convey the design storm hydraulic capacity.  Item III.A.2: Storm Line 1-3A from Outlet Structure 1-3A.2 to Inlet 1-3A.1, shown on the storm drain profile sheet (Sheet C405), has been constructed with a slope below the design of 0.52% (a slope of 0.21% was constructed). We have re-analyzed this storm line and compared hydraulic grade line. As shown below, there is minimal change to 100-year HGL. Based on the revised HGL, we feel this will convey the design storm hydraulic capacity.  Item III.A.2: Storm Line 1-3A.2 from Inlet 1-3A.2 to STMH 1-3A.2A, shown on the storm drain profile sheet (Sheet C406), has been constructed with a slope below the design of 0.60% (a slope of 0.36% was constructed). We have re-analyzed this storm line and compared hydraulic grade line. As shown below, there is minimal change to 100-year HGL. Based on the revised HGL, we feel this will convey the design storm hydraulic capacity.  Item III.A.2: Storm Line 1-6 from STMH 1-6 to Outlet 1-6A, shown on the storm drain profile sheet (Sheet C406), has been constructed with a slope below the design of 1.31% (a slope of 0.94% was constructed). We have re-analyzed this storm line and compared hydraulic grade line. As shown below, there is minimal change to 100-year HGL. Based on the revised HGL, we feel this will convey the design storm hydraulic capacity.  Item III.A.2: Storm Line 2 from Inlet 2-1 to Inlet 2-2, shown on the storm drain profile sheet (Sheet C406), has been constructed with a slope below the design of 0.50% (a slope of 0.41% was constructed). We have re-analyzed this storm line and compared hydraulic grade line. As shown below, there is minimal change to 100-year HGL. Based on the revised HGL, we feel this will convey the design storm hydraulic capacity.  Item III.A.2: Storm Line 3 from FES 3-1 to Inlet 3-2, shown on the storm drain profile sheet (Sheet C408), has been constructed with a slope below the design of 0.50% (a slope of 0.42% was constructed). We have re-analyzed this storm line and compared hydraulic grade line. As shown below, there is minimal change to 100-year HGL. Based on the revised HGL, we feel this will convey the design storm hydraulic capacity.  Item III.A.2: Storm Line 3 from Inlet 3-2 to STMH 3-3, shown on the storm drain profile sheet (Sheet C408), has been constructed with a slope below the design of 0.50% (a slope of 0.42% was constructed). We have re-analyzed this storm line and compared hydraulic grade line. As shown below, there is minimal change to 100-year HGL. Based on the revised HGL, we feel this will convey the design storm hydraulic capacity.  Item III.A.2: Storm Line 3 from STMH 3-3 to STMH 3-4, shown on the storm drain profile sheet (Sheet C408), has been constructed with a slope below the design of 0.50% (a slope of 0.46% was constructed). We have re-analyzed this storm line and compared hydraulic grade line. As shown below, there is minimal change to 100-year HGL. Based on the revised HGL, we feel this will convey the design storm hydraulic capacity.  Item III.A.2: Storm Line 5 from FES 5 to FES 5-1, shown on the storm drain profile sheet (Sheet C410), has been constructed with a slope below the design of 0.84% (a slope of 0.79% was constructed). We have re-analyzed this storm line and compared hydraulic grade line. As shown below, there is minimal change to 100-year HGL. Based on the revised HGL, we feel this will convey the design storm hydraulic capacity.  Item III.A.2: Storm Line 4 from FES 4 to STMH 4-1, shown on the storm drain profile sheet (Sheet C411), has been constructed with a slope below the design of 0.52% (a slope of 0.39% was constructed). We have re-analyzed this storm line and compared hydraulic grade line. As shown below, there is minimal change to 100-year HGL. Based on the revised HGL, we feel this will convey the design storm hydraulic capacity.  Item III.A.2: Storm Line 4 from STMH 4-1 to STMH 4-2, shown on the storm drain profile sheet (Sheet C411), has been constructed with a slope below the design of 0.50% (a slope of 0.46% was constructed). We have re-analyzed this storm line and compared hydraulic grade line. As shown below, there is minimal change to 100-year HGL. Based on the revised HGL, we feel this will convey the design storm hydraulic capacity.  Item III.A.2: Storm Line 6 from FES 6 to Inlet 6-1, shown on the storm drain profile sheet (Sheet C412), has been constructed with a slope below the design of 0.52% (a slope of 0.37% was constructed). We have re-analyzed this storm line and compared hydraulic grade line. As shown below, there is minimal change to 100-year HGL. Based on the revised HGL, we feel this will convey the design storm hydraulic capacity.  Item III.A.2: Storm Line 6 from Inlet 6-1 to STMH 6-2, shown on the storm drain profile sheet (Sheet C412), has been constructed with a slope below the design of 0.52% (a slope of 0.47% was constructed). We have re-analyzed this storm line and compared hydraulic grade line. As shown below, there is minimal change to 100-year HGL. Based on the revised HGL, we feel this will convey the design storm hydraulic capacity.  Item III.B.2: Northern Engineering did not observe construction. Northern Engineering was unable to verify encasements and clearances between storm sewer and existing and proposed utilities.  Item III.B.3: Northern Engineering did not observe construction. Northern Engineering was unable to verify the specific joint types used in construction of the storm sewer system.  Item X.A: The drainage swale along Harmony Road was disturbed by construction activities for the development on the west side of Lady Moon Drive prior to verification by Northern Engineering. Therefore, the drainage swale along Harmony Road will not be certified by Northern Engineering.  Item X.A: An additional sidewalk was added to the north side of the building at the main entrance that was not designed by Northern Engineering. Therefore, the drainage adjacent and including this sidewalk will not be certified by Northern Engineering. The owner intends to improve the drainage around the sidewalk in the near future.  Item X.A: The interior courtyards are not part of the City of Fort Collins Overall Site Drainage Certification, and therefore will not be certified by Northern Engineering.  Item XV.A: A During Construction Inspection Checklist for Low Impact Development (LID) and other items to be verified during construction was not provided to Northern Engineering. Please feel free to contact me with any questions you may have. Thank you, NORTHERN ENGINEERING Frederick S. Wegert, PE Project Engineer Attachment 2 /15 Page 1 OVERALL SITE and DRAINAGE CERTIFICATION Commercial, Multi-Family and Subdivision Certification Form and Checklist Project Name: Date: Building Permit Numbers: (Commercial or multi-family) Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Volume 1, Section 6.11, please fill in all applicable items in this Certification Form for Commercial, Multi-Family and Overall Single Family sites. NOTE: several items must be verified during construction. A copy of the approved grading plan must be submitted with the as-built grading plan. (As-built elevations must be written in red next to the approved elevations.) x Use “Yes” for items completed as described. x Use “N/A” for items that are not applicable to the site being certified. x If any blanks are “No,” attach an explanation referencing the item number below. Attach an explanation or description of the as-built condition for any items listed or for anything not listed but shown on the approved construction plans. Provide an as-built redline or Mylar drawing with the following: I. Water Quality and Quantity Detention Basin Certification - FCSCM Vol.2, Ch.10 For multiple detention basins on a site, provide the following for each basin separately: A.Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and volume verification calculations for the water quality capture volume and the 100-year detention storage volume. 1. Detention basin topography was prepared by a professional land surveyor registered in the state of Colorado. 2. Both proposed and as-built contours are shown on the same plan sheet (dashed lines for proposed and solid lines for as-built). 3. All critical spot elevations as shown on the approved construction plans have been verified and the as-built elevations are shown on the plan sheet. 4. Stage-storage-discharge tables are provided on a separate document. 5. Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92- 602(8) is attached and has been uploaded to the Statewide Compliance Portal (tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include: a. The cover sheet from the approved drainage report b. The stamped certification page from the approved drainage report c. As-built topographic survey d. Stamped certification page from the Overall Site & Drainage Certification e. PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet ODP Pond Banner Health Medical Campus 8/11/2016 Yes Yes Yes Yes Yes Yes /15 Page 2 B.Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2% grade requirement. 1.Low Flow: Choose one of the following detention basin low flow options as applicable: a. Turf swale for low flow path in detention basin. There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade is . b. Concrete pan for low flow in detention basin. There is a concrete pan installed that meets the grades as shown on the approved construction plans. (Show as-built spot elevations.) c. Soft pan for low flow in detention basin. x Verify and document the soft pan material gradation, trench width and depth - to be verified during construction by engineer. Picture documentation is preferred or engineer’s statement of visual inspection and compliance. (Choose one below.) o There is a soft pan with an underdrain installed that meets the design on the approved construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations, bends, cleanouts, etc.) o There is soft pan installed without an underdrain but there is a type A or B soil. The soil type must be documented by supplying verification from a registered professional geotechnical engineer. NOTE: Spot elevations are to be within 0.2 ft. +/-. 2.Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown. Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re- graded. Provide documentation if a variance was granted for steeper slopes during the design process. 3.Spillway Certification: The following items must be field verified: a. The location of the spillway is indicated on the as-built plan. b. The width of the spillway is indicated on the as-built plan. c. The elevation(s) of the spillway is shown on the as-built plan. d. A concrete ribbon defines the location and grade of the spillway. e. There is downstream scour protection in the spillway as per the construction plans. Indicate type: (riprap size “D50” gradation and bedding type, geotextile, buried riprap with inches of bury, etc.). f. There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape features, rocks, etc. Yes N/A N/A No No Yes Yes Yes Yes N/A N/A Yes /15 Page 3 4.Outlet Structure Certification a. The orifice plate for the approved release rate is installed with the correct size and location of the orifice. b. The orifice plate for the water quality outlet is installed with the correct hole size, number of rows and columns of holes. c. The bottom hole on both the water quality and quantity outlets are at the bottom of the plate so no water ponds in front of the plate. d. The well screen is the correct material and is installed as shown on the construction plans. e. 100-year overflow grate elevation is . (Elev. A on detail D-46) f. The top elevation of the water quality capture volume is . (Elev. B on detail D-46) g. Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the top and bolted at the bottom. h. The bottom of the outlet box has no obstructions or misalignments that will cause it to retain runoff water and is sloped at 2% towards outlet. II. Channels/Swales - FCSCM Vol.1, Ch.7, Sect.3&4 A.Capacity: The as-built capacity of all the major channels and swales has been verified. They meet or exceed capacity requirements shown in the approved drainage study for this project. 1. All swales are located within the drainage easements as shown on the construction plans. 2. Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these criteria are not met, the certification engineer will write a justification and propose mitigation for each instance or have the issues corrected. If variances to these criteria have previously been approved and are shown on the construction plans, no justification is needed. 3. As-built spot elevations on channels/swales are shown that correspond to spot elevations shown on the approved construction plans. 4. All permanent erosion control measures are installed as shown on the approved construction plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used as part of this verification.) 5. All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the system. (Pictures at tie-in points suggested.) 6. The minimum freeboard is provided for all channels and swales as shown on the approved construction plans or as identified in the approved drainage study. (Show the freeboard provided on the cross-sections as on the construction plan set or attached as separate documentation.) 7. The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees, shrubs, sod, etc. infringe on the low flow portion of channels or swales.) Yes 4879.73 4884.14 Yes Yes Yes Yes Yes Yes N/A N/A No Yes Yes Yes N/A Yes Yes /15 Page 4 III. Storm Pipes (aka storm drains) - FCSCM Vol.1, Ch.6, Sec. 4 A.Storm Drain Pipe Capacity: The as-built capacity of all pipes installed on this project has been verified and meets or exceeds the capacity requirements shown in the approved drainage study for this project. 1. All storm drain pipe sizes and materials have been verified and are in conformance with the approved construction plans. (Indicate on the plan and profile sheets that they have been verified.) Material and size substitutions must be approved prior to installation. If a pipe size or material was changed during construction, the certification engineer must attach the approval documents or supply them with this certification. Approval documents must include a calculation documenting the capacity equivalency (equal or greater) of the substituted size. 2. The longitudinal slope of the pipe is as shown on the approved construction plans. The acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans must be justified with capacity calculations on an attached sheet. 3. The as-built invert elevations have been verified and are shown on the plan and profile sheets of the approved construction plans. B.Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the approved construction plans. 1. The minimum cover requirements for all pipes have been met as shown on the approved construction plans. These will be called out in critical locations. 2. All encasements and clearances as specified on the approved construction plans have been met. 3. Any specific joint types or construction methods specified on the approved construction plans have been met. (List on a separate sheet and attach to this certification.) IV. Concrete Pans - FCSCM Vol.1, Ch.7, Sec.4.1.3.4 A.Construction/Installation: All concrete pans have been constructed in accordance with the approved construction plans. 1. The concrete pans are the correct size/width as shown on the approved construction plans. 2. The longitudinal slopes of the pans are as shown on the approved construction plans. The certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or justification by separate document. 3. The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross- section is “V” shaped and meets the side slope shown on the detail.) 4. The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4 inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide documentation of the reinforcement used if different than shown on the details or on the approved construction plans.) 5. The spot elevations shown on the concrete pan(s) have been verified and are shown on the as- built drawings. Yes Yes No Yes Yes Yes No No N/A N/A N/A N/A N/A N/A /15 Page 5 V.Storm Drain Inlets - FCSCM Vol.1, Ch.6, Sec. 3 A.Construction/Installation: All storm drain inlets have been constructed in accordance with the approved construction plans. 1. The size and type of inlets are consistent with the inlets shown on the approved construction plan. Indicate by writing “Verified” on each inlet on the plan sheet or list on a separate document the inlet number(s), type and size (length). If the inlet installed is other than the one on the approved construction plan detail sheet, provide the name and source of the detail with justification for equal or better capacity. 2. The size of the inlet opening is consistent with the approved detail. (Check height and width.) 3. The elevation of the grate (if applicable) is at the elevation shown on the street profile or as indicated by a spot elevation on the construction plans. 4. The as-built invert elevations of all pipes entering and leaving the inlet are shown on the plan and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide justification and capacity calculations to show the capacity is not affected or propose mitigation. 5. The as-built size of the inlet box is as shown on the construction plans or an explanation or justification is attached. 6. All inlet covers are stenciled or stamped with the following designation: NO DUMPING – DRAINS TO POUDRE RIVER. VI. Culverts - FCSCM Vol.2, Ch.9 A.Construction/Installation: All culverts have been constructed and/or installed in accordance with the approved construction plans. 1. All culvert sizes have been verified as indicated on the as-built construction plans as correct. 2. The culvert material type for all culverts installed is as on the approved construction plans and is indicated on the as-built plans. 3. The as-built invert “in and out” elevations have been verified and are indicated on the as-built construction plans. 4. The culvert headwalls or wing walls have been installed as shown on the approved construction plans. Headwalls or wing walls may be needed in the as-built conditions onsite if the slopes adjacent to the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative. An alternative to consider is a turf reinforcement mat (TRM). VII. Sub-Drains A.Construction/Installation: All sub-drains shown on the construction plans have been installed in accordance with those plans. Sub-drains installed with the sanitary sewer are to be verified on the sanitary sewer plan and profile sheets of the construction plans. (NOTE: Indicate any sub-drains installed after the plans were approved on the as-built plans.) 1. The size of the sub-drains are as approved on the construction plans and are indicated on the as- built plans. 2. The type of sub-drain, in particular the perforated and non-perforated sections of the drain, are as indicated on the approved construction plans. Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes N/A N/A N/A N/A /15 Page 6 3. The cover requirements per the construction plans are provided. 4. The cleanouts have been installed at the locations shown on the construction plans and are accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations marked.) 5. The backfill materials for sub-drains are as shown on the approved construction plans. (This includes the type, depth and width.) 6. The geo-textile liner completely wraps the sub-drain and the permeable backfill material unless shown otherwise on the approved construction plans. (Sub-drain pipe wrapped in a sock filter material is accepted only if approved prior to installation.) VIII. Curb Cuts A.Construction: All curb cut openings are constructed in accordance with the approved construction plans. 1. The size (width) of the curb cut opening is as shown on the approved construction plans. 2. The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb cut. IX. Sidewalk Culverts & Chases A.Construction/Installation: All sidewalk culverts have been installed at the locations shown on the approved construction plans. 1. The size (width and length) of the culverts are as shown on the approved construction plans. 2. The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the detail shown on the approved construction plans or per the City’s detail. 3. The sidewalk culvert invert “in and out” elevations have been verified and are indicated on the as-built plans. 4. The sidewalk culvert opening is as shown on the approved construction plans or per the City’s detail. 5. There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert. X.Site Grading A.Construction: All common open spaces have been graded in accordance with the approved construction plans. 1. The grading on all common open spaces bordering private lots has been verified as correct and the as-built rear lot corner elevations have been shown on the as-built plans. N/A N/A N/A N/A N/A N/A N/A Yes Yes Yes Yes Yes Yes No N/A /15 Page 7 2. The as-built contours for “overlot grading” are shown on the as-built construction plans for all common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the situation for noncompliance and when it may be corrected. An escrow for overlot grading may be required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site Certification. It is understood that residential lots will be brought to final grade once the foundation is backfilled so they may be lower than the plan shows at this Overall Site Certification stage.) 3. All turf reinforcement mats (TRMs) have been installed as shown on the approved construction plans and the slopes are stabilized. XI. Riprap - FCSCM Vol.1, Ch.7, Sec.4.4.4.3 A.Construction: All riprap has been installed in the locations and sizes indicated on the approved construction plans. XII. Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7 A.Construction: All fabric has been installed in the locations and sizes indicated on the approved construction plans. 1. All fabric was installed per the details on the approved construction plans. XIII. Post-Construction Site Cleanup - FCSCM Vol.3, Ch.7 A.Construction: All construction debris and obstructions of any kind have been removed from drainage paths. 1. All construction debris has been removed except in staging area(s). 2. All ruts have been smoothed out in all construction areas. 3. All areas needing reseeding have been identified and future stabilization goals have been coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note the area needing stabilization in the narrative. XIV. Certification of Other Permanent BMPs - FCSCM Vol.2, Ch.8, Sec.2 & FCSCM Vol.2, Ch.12 A. The construction of channel drop structures is in accordance with the approved plan both in location, horizontal dimensions and cross-section. XV. Certification of LID and Water Quality Facilities - FCSCM Vol.3, Ch.4 A. Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and other items to be verified during construction, along with pictures and other required documentation. N/A No Yes N/A Yes N/A N/A Yes Yes Yes Yes /15 Page 1 OVERALL SITE and DRAINAGE CERTIFICATION Commercial, Multi-Family and Subdivision Certification Form and Checklist Project Name: Date: Building Permit Numbers: (Commercial or multi-family) Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Volume 1, Section 6.11, please fill in all applicable items in this Certification Form for Commercial, Multi-Family and Overall Single Family sites. NOTE: several items must be verified during construction. A copy of the approved grading plan must be submitted with the as-built grading plan. (As-built elevations must be written in red next to the approved elevations.) x Use “Yes” for items completed as described. x Use “N/A” for items that are not applicable to the site being certified. x If any blanks are “No,” attach an explanation referencing the item number below. Attach an explanation or description of the as-built condition for any items listed or for anything not listed but shown on the approved construction plans. Provide an as-built redline or Mylar drawing with the following: I. Water Quality and Quantity Detention Basin Certification - FCSCM Vol.2, Ch.10 For multiple detention basins on a site, provide the following for each basin separately: A.Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and volume verification calculations for the water quality capture volume and the 100-year detention storage volume. 1. Detention basin topography was prepared by a professional land surveyor registered in the state of Colorado. 2. Both proposed and as-built contours are shown on the same plan sheet (dashed lines for proposed and solid lines for as-built). 3. All critical spot elevations as shown on the approved construction plans have been verified and the as-built elevations are shown on the plan sheet. 4. Stage-storage-discharge tables are provided on a separate document. 5. Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92- 602(8) is attached and has been uploaded to the Statewide Compliance Portal (tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include: a. The cover sheet from the approved drainage report b. The stamped certification page from the approved drainage report c. As-built topographic survey d. Stamped certification page from the Overall Site & Drainage Certification e. PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet Pond 1 Banner Health Medical Campus 8/11/2016 Yes Yes Yes Yes Yes Yes /15 Page 2 B.Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2% grade requirement. 1.Low Flow: Choose one of the following detention basin low flow options as applicable: a. Turf swale for low flow path in detention basin. There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade is . b. Concrete pan for low flow in detention basin. There is a concrete pan installed that meets the grades as shown on the approved construction plans. (Show as-built spot elevations.) c. Soft pan for low flow in detention basin. x Verify and document the soft pan material gradation, trench width and depth - to be verified during construction by engineer. Picture documentation is preferred or engineer’s statement of visual inspection and compliance. (Choose one below.) o There is a soft pan with an underdrain installed that meets the design on the approved construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations, bends, cleanouts, etc.) o There is soft pan installed without an underdrain but there is a type A or B soil. The soil type must be documented by supplying verification from a registered professional geotechnical engineer. NOTE: Spot elevations are to be within 0.2 ft. +/-. 2.Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown. Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re- graded. Provide documentation if a variance was granted for steeper slopes during the design process. 3.Spillway Certification: The following items must be field verified: a. The location of the spillway is indicated on the as-built plan. b. The width of the spillway is indicated on the as-built plan. c. The elevation(s) of the spillway is shown on the as-built plan. d. A concrete ribbon defines the location and grade of the spillway. e. There is downstream scour protection in the spillway as per the construction plans. Indicate type: (riprap size “D50” gradation and bedding type, geotextile, buried riprap with inches of bury, etc.). f. There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape features, rocks, etc. Yes N/A N/A No No Yes N/A N/A N/A N/A N/A Yes /15 Page 3 4.Outlet Structure Certification a. The orifice plate for the approved release rate is installed with the correct size and location of the orifice. b. The orifice plate for the water quality outlet is installed with the correct hole size, number of rows and columns of holes. c. The bottom hole on both the water quality and quantity outlets are at the bottom of the plate so no water ponds in front of the plate. d. The well screen is the correct material and is installed as shown on the construction plans. e. 100-year overflow grate elevation is . (Elev. A on detail D-46) f. The top elevation of the water quality capture volume is . (Elev. B on detail D-46) g. Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the top and bolted at the bottom. h. The bottom of the outlet box has no obstructions or misalignments that will cause it to retain runoff water and is sloped at 2% towards outlet. II. Channels/Swales - FCSCM Vol.1, Ch.7, Sect.3&4 A.Capacity: The as-built capacity of all the major channels and swales has been verified. They meet or exceed capacity requirements shown in the approved drainage study for this project. 1. All swales are located within the drainage easements as shown on the construction plans. 2. Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these criteria are not met, the certification engineer will write a justification and propose mitigation for each instance or have the issues corrected. If variances to these criteria have previously been approved and are shown on the construction plans, no justification is needed. 3. As-built spot elevations on channels/swales are shown that correspond to spot elevations shown on the approved construction plans. 4. All permanent erosion control measures are installed as shown on the approved construction plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used as part of this verification.) 5. All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the system. (Pictures at tie-in points suggested.) 6. The minimum freeboard is provided for all channels and swales as shown on the approved construction plans or as identified in the approved drainage study. (Show the freeboard provided on the cross-sections as on the construction plan set or attached as separate documentation.) 7. The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees, shrubs, sod, etc. infringe on the low flow portion of channels or swales.) Yes 4895.70 4897.68 Yes Yes Yes Yes Yes Yes N/A N/A N/A N/A N/A N/A N/A N/A N/A /15 Page 1 OVERALL SITE and DRAINAGE CERTIFICATION Commercial, Multi-Family and Subdivision Certification Form and Checklist Project Name: Date: Building Permit Numbers: (Commercial or multi-family) Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Volume 1, Section 6.11, please fill in all applicable items in this Certification Form for Commercial, Multi-Family and Overall Single Family sites. NOTE: several items must be verified during construction. A copy of the approved grading plan must be submitted with the as-built grading plan. (As-built elevations must be written in red next to the approved elevations.) x Use “Yes” for items completed as described. x Use “N/A” for items that are not applicable to the site being certified. x If any blanks are “No,” attach an explanation referencing the item number below. Attach an explanation or description of the as-built condition for any items listed or for anything not listed but shown on the approved construction plans. Provide an as-built redline or Mylar drawing with the following: I. Water Quality and Quantity Detention Basin Certification - FCSCM Vol.2, Ch.10 For multiple detention basins on a site, provide the following for each basin separately: A.Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and volume verification calculations for the water quality capture volume and the 100-year detention storage volume. 1. Detention basin topography was prepared by a professional land surveyor registered in the state of Colorado. 2. Both proposed and as-built contours are shown on the same plan sheet (dashed lines for proposed and solid lines for as-built). 3. All critical spot elevations as shown on the approved construction plans have been verified and the as-built elevations are shown on the plan sheet. 4. Stage-storage-discharge tables are provided on a separate document. 5. Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92- 602(8) is attached and has been uploaded to the Statewide Compliance Portal (tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include: a. The cover sheet from the approved drainage report b. The stamped certification page from the approved drainage report c. As-built topographic survey d. Stamped certification page from the Overall Site & Drainage Certification e. PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet Pond 2 Banner Health Medical Campus 8/11/2016 Yes Yes Yes Yes Yes Yes /15 Page 2 B.Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2% grade requirement. 1.Low Flow: Choose one of the following detention basin low flow options as applicable: a. Turf swale for low flow path in detention basin. There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade is . b. Concrete pan for low flow in detention basin. There is a concrete pan installed that meets the grades as shown on the approved construction plans. (Show as-built spot elevations.) c. Soft pan for low flow in detention basin. x Verify and document the soft pan material gradation, trench width and depth - to be verified during construction by engineer. Picture documentation is preferred or engineer’s statement of visual inspection and compliance. (Choose one below.) o There is a soft pan with an underdrain installed that meets the design on the approved construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations, bends, cleanouts, etc.) o There is soft pan installed without an underdrain but there is a type A or B soil. The soil type must be documented by supplying verification from a registered professional geotechnical engineer. NOTE: Spot elevations are to be within 0.2 ft. +/-. 2.Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown. Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re- graded. Provide documentation if a variance was granted for steeper slopes during the design process. 3.Spillway Certification: The following items must be field verified: a. The location of the spillway is indicated on the as-built plan. b. The width of the spillway is indicated on the as-built plan. c. The elevation(s) of the spillway is shown on the as-built plan. d. A concrete ribbon defines the location and grade of the spillway. e. There is downstream scour protection in the spillway as per the construction plans. Indicate type: (riprap size “D50” gradation and bedding type, geotextile, buried riprap with inches of bury, etc.). f. There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape features, rocks, etc. Yes N/A N/A No No Yes N/A N/A N/A N/A N/A Yes /15 Page 3 4.Outlet Structure Certification a. The orifice plate for the approved release rate is installed with the correct size and location of the orifice. b. The orifice plate for the water quality outlet is installed with the correct hole size, number of rows and columns of holes. c. The bottom hole on both the water quality and quantity outlets are at the bottom of the plate so no water ponds in front of the plate. d. The well screen is the correct material and is installed as shown on the construction plans. e. 100-year overflow grate elevation is . (Elev. A on detail D-46) f. The top elevation of the water quality capture volume is . (Elev. B on detail D-46) g. Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the top and bolted at the bottom. h. The bottom of the outlet box has no obstructions or misalignments that will cause it to retain runoff water and is sloped at 2% towards outlet. II. Channels/Swales - FCSCM Vol.1, Ch.7, Sect.3&4 A.Capacity: The as-built capacity of all the major channels and swales has been verified. They meet or exceed capacity requirements shown in the approved drainage study for this project. 1. All swales are located within the drainage easements as shown on the construction plans. 2. Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these criteria are not met, the certification engineer will write a justification and propose mitigation for each instance or have the issues corrected. If variances to these criteria have previously been approved and are shown on the construction plans, no justification is needed. 3. As-built spot elevations on channels/swales are shown that correspond to spot elevations shown on the approved construction plans. 4. All permanent erosion control measures are installed as shown on the approved construction plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used as part of this verification.) 5. All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the system. (Pictures at tie-in points suggested.) 6. The minimum freeboard is provided for all channels and swales as shown on the approved construction plans or as identified in the approved drainage study. (Show the freeboard provided on the cross-sections as on the construction plan set or attached as separate documentation.) 7. The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees, shrubs, sod, etc. infringe on the low flow portion of channels or swales.) Yes 4897.53 4899.56 Yes Yes Yes Yes Yes Yes N/A N/A N/A N/A N/A N/A N/A N/A N/A 12/12/2014 Revision – Page 1 of 2 Construction Inspection Checklist for Bioretention Cells Item/Activity Yes No N/A Documentation/Submittal Requirements Excavation Heavy equipment did not travel over bioretention cell during excavation N/A Unable to verify. Did not observe construction activities. Bottom of cell was “ripped” after excavation N/A Unable to verify. Did not observe construction activities. Bottom of cell is flat and level Yes Pond bottoms surveyed on 3/3/15. Excavated area is protected/surrounded by sediment/runoff control BMPs during construction N/A Unable to verify. Did not observe construction activities. Inlet Inlet invert elevation is at least 3 inches above containment wall/berm N/A Unable to verify. Did not observe construction activities. Upstream catchment drains to inlet Yes Forebay Forebay is installed according to design specifications Yes Forebay has flat, concrete bottom N/A Unable to verify. Did not observe construction activities. Outlet Structure/Overflow Outlet structure/overflow elevation is confirmed Yes 7.77’ from flowline to bottom of spillway in ODP Pond. 1.98’ from flowline to overflow in Pond 1. 2.03’ from flowline to overflow in Pond 2. Impermeable Liner Impermeable liner meets design specifications N/A Unable to verify. Did not observe construction activities. Impermeable liner attached to concrete perimeter wall N/A Unable to verify. Did not observe construction activities. Impermeable liner is not exposed N/A Unable to verify. Did not observe construction activities. Underdrain System Underdrain pipe is per design specifications N/A Unable to verify. Did not observe construction activities. At least one cleanout is provided per underdrain lateral N/A Unable to verify. Did not observe construction 12/12/2014 Revision – Page 2 of 2 activities. Cleanout pipe is not perforated N/A Unable to verify. Did not observe construction activities. Cleanouts covers are installed and watertight N/A Unable to verify. Did not observe construction activities. Underdrain is NOT wrapped in geotextile fabric N/A Unable to verify. Did not observe construction activities. Underdrain orifice plate installed at outlet structure N/A Unable to verify. Did not observe construction activities. Underdrain integrity tested after backfilling using TV and/or water test N/A Unable to verify. Did not observe construction activities. Filter Media Filter media composition is per design specifications N/A Unable to verify. Did not observe construction activities. Filter media was “machine mixed” by supplier prior to delivery N/A Unable to verify. Did not observe construction activities. Filter media installed flat and level N/A Unable to verify. Did not observe construction activities. Other Structural Components Containment wall/berm is continuous and level N/A Unable to verify. Did not observe construction activities. Landscaping Final landscaping does NOT include sod Yes Final landscaping (wood/rock mulch) is flat and level N/A Unable to verify. Did not observe construction activities. Vegetation is planted according to landscape design specifications N/A Unable to verify. Did not observe construction activities. Verify that weed barrier is not installed N/A Unable to verify. Did not observe construction activities. Temporary irrigation installed N/A Unable to verify. Did not observe construction activities. Close Out Upstream catchment stabilized prior to diverting runoff into bioretention cell N/A Unable to verify. Did not observe construction activities. Project: Date: Outlet Elevation:4875.17 7.29 acre ft Grate Elevation:4883.97 1.72 acre ft Crest of Pond Elev.:4888 4886.7 Maximum Elevation Minimum Elevation sq. ft.acre ft sq. ft.acre ft 4879.5 N/A 49.3 0 0.0 0.00 0.0 0.00 4880.0 4879.5 191.1 0.5 60.1 0.00 60.1 0.00 4880.5 4880.0 262.0 0.5 113.3 0.00 173.4 0.00 4881.0 4880.5 2,957.3 0.5 804.8 0.02 978.2 0.02 4881.5 4881.0 7,075.1 0.5 2,508.1 0.06 3,486.3 0.08 4882.0 4881.5 12,580.0 0.5 4,913.8 0.11 8,400.1 0.19 4882.5 4882.0 19,702.3 0.5 8,070.6 0.19 16,470.7 0.38 4883.0 4882.5 29,629.9 0.5 12,333.0 0.28 28,803.7 0.66 4883.5 4883.0 45,655.6 0.5 18,821.4 0.43 47,625.1 1.09 4884.0 4883.5 64,082.2 0.5 27,434.5 0.63 75,059.6 1.72 4884.5 4884.0 78,210.4 0.5 35,573.2 0.82 110,632.7 2.54 4885.0 4884.5 88,795.3 0.5 41,751.4 0.96 152,384.2 3.50 4885.5 4885.0 93,847.6 0.5 45,660.7 1.05 198,044.9 4.55 4886.0 4885.5 98,471.1 0.5 48,079.7 1.10 246,124.6 5.65 4886.5 4886.0 102,884.6 0.5 50,338.9 1.16 296,463.5 6.81 4887.0 4886.5 107,310.0 0.5 52,548.6 1.21 349,012.2 8.01 4887.5 4887.0 111,747.5 0.5 54,764.4 1.26 403,776.5 9.27 4888.0 4887.5 116,198.3 0.5 56,986.5 1.31 460,763.0 10.58 Pond Outlet and Volume Data ODP Pond Stage Storage Curve Project Number:306-003 Banner Health Medical Campus Project Location:Fort Collins, Colorado Calculations By:F. Wegert 8/25/2016 Pond No.:ODP Pond Design Volume: Volume at Grate: Elev at Design Volume: Existing Pond Stage Storage Curve Contour Contour Surface Area (ft2) Depth Incremental Volume Cummalitive Volume 8/25/2016 9:55 AM D:\Projects\Presidio\306-003\Construction\Asbuilts\Pond Volumes\2015-02-06\ 306-003_AB_Pond_Stage.xlsx\Pond 3 Project: Date: Outlet Elevation:4893.76 3.62 acre ft Grate Elevation:4897.51 0.38 acre ft Crest of Pond Elev.:4903 4901.7 Maximum Elevation Minimum Elevation sq. ft.acre ft sq. ft.acre ft 4895.5 N/A 2.0 0 0.0 0.00 0.0 0.00 4896.0 4895.5 3,967.3 0.5 992.3 0.02 992.3 0.02 4896.5 4896.0 8,423.3 0.5 3,097.6 0.07 4,090.0 0.09 4897.0 4896.5 12,545.4 0.5 5,242.2 0.12 9,332.1 0.21 4897.5 4897.0 16,712.5 0.5 7,314.5 0.17 16,646.6 0.38 4898.0 4897.5 20,672.3 0.5 9,346.2 0.21 25,992.8 0.60 4898.5 4898.0 25,178.7 0.5 11,462.7 0.26 37,455.6 0.86 4899.0 4898.5 30,141.9 0.5 13,830.2 0.32 51,285.7 1.18 4899.5 4899.0 34,735.6 0.5 16,219.4 0.37 67,505.1 1.55 4900.0 4899.5 37,735.6 0.5 18,117.8 0.42 85,622.9 1.97 4900.5 4900.0 40,414.2 0.5 19,537.4 0.45 105,160.3 2.41 4901.0 4900.5 43,033.9 0.5 20,862.0 0.48 126,022.3 2.89 4901.5 4901.0 45,676.5 0.5 22,177.6 0.51 148,199.9 3.40 4902.0 4901.5 48,295.8 0.5 23,493.1 0.54 171,693.0 3.94 4902.5 4902.0 50,926.2 0.5 24,805.5 0.57 196,498.5 4.51 4903.0 4902.5 53,923.9 0.5 26,212.5 0.60 222,711.0 5.11 Volume at Grate: Project Number: Project Location: Calculations By: Pond No.: Detention Pond 1 Stage Storage Curve Contour Contour Surface Area (ft2) Depth Incremental Volume Cummalitive Volume Existing Pond Stage Storage Curve 306-003 Fort Collins, Colorado F. Wegert Detention Pond 1 Elev at Design Volume: Banner Health Medical Campus 8/25/2016 Pond Outlet and Volume Data Design Volume: 8/25/2016 9:54 AM D:\Projects\Presidio\306-003\Construction\Asbuilts\Pond Volumes\2015-02-06\ 306-003_AB_Pond_Stage.xlsx\Pond 1 Project: Date: Outlet Elevation:4895.29 2.24 acre ft Grate Elevation:4899.39 0.46 acre ft Crest of Pond Elev.:4903.5 4902.7 Maximum Elevation Minimum Elevation sq. ft.acre ft sq. ft.acre ft 4897.5 N/A 1,783.7 0 0.0 0.00 0.0 0.00 4898.0 4897.5 7,699.7 0.5 2,370.9 0.05 2,370.9 0.05 4898.5 4898.0 11,870.6 0.5 4,892.6 0.11 7,263.4 0.17 4899.0 4898.5 14,839.1 0.5 6,677.4 0.15 13,940.9 0.32 4899.5 4899.0 17,429.3 0.5 8,067.1 0.19 22,008.0 0.51 4900.0 4899.5 19,674.5 0.5 9,276.0 0.21 31,283.9 0.72 4900.5 4900.0 21,636.3 0.5 10,327.7 0.24 41,611.6 0.96 4901.0 4900.5 23,546.4 0.5 11,295.7 0.26 52,907.3 1.21 4901.5 4901.0 25,516.3 0.5 12,265.7 0.28 65,173.0 1.50 4902.0 4901.5 27,539.6 0.5 13,264.0 0.30 78,437.0 1.80 4902.5 4902.0 29,609.8 0.5 14,287.4 0.33 92,724.3 2.13 4903.0 4902.5 31,727.0 0.5 15,334.2 0.35 108,058.5 2.48 4903.5 4903.0 33,914.1 0.5 16,410.3 0.38 124,468.8 2.86 Pond Outlet and Volume Data Detention Pond 2 Stage Storage Curve Project Number:306-003 Banner Health Medical Campus Project Location:Fort Collins, Colorado Calculations By:F. Wegert 8/25/2016 Pond No.:Detention Pond 2 Design Volume: Volume at Grate: Elev at Design Volume: Existing Pond Stage Storage Curve Contour Contour Surface Area (ft2) Depth Incremental Volume Cummalitive Volume 8/25/2016 9:54 AM D:\Projects\Presidio\306-003\Construction\Asbuilts\Pond Volumes\2015-02-06\ 306-003_AB_Pond_Stage.xlsx\Pond 2 Stormwater Facility Name: Facility Location & Jurisdiction: User Input: Watershed Characteristics User Defined User Defined User Defined User DefinedWatershed Slope =0.010 ft/ft Stage [ft] Area [ft^2] Stage [ft] Discharge [cfs]Watershed Length =2130 ft 0.00 2 0.00 0.00Watershed Area = 13.88 acres 1.00 8,423 1.00 0.30Watershed Imperviousness = 65.9%percent 2.00 16,712 2.00 0.50Percentage Hydrologic Soil Group A =percent 3.00 25,179 3.00 0.60Percentage Hydrologic Soil Group B =percent 4.00 34,736 4.00 0.70Percentage Hydrologic Soil Groups C/D = 100.0%percent 5.00 40,414 5.00 0.806.00 45,677 6.00 0.80UDFCD Default 17 7.00 50,926 7.00 0.857.50 53,924 7.50 0.90 WQCV Treatment Method = 40.00 hours After completing and printing this worksheet to a pdf, go to:https://maperture.digitaldataservices.com/gvh/?viewer=cswdifcreate a new stormwater facility, and attach the pdf of this worksheet to that record. Routed Hydrograph ResultsDesign Storm Return Period =WQCV 2 Year 5 Year 10 Year 50 Year 100 YearOne-Hour Rainfall Depth =0.53 0.95 1.34 1.64 2.32 2.61 inCalculated Runoff Volume =0.298 0.702 1.118 1.461 2.318 2.719 acre-ftOPTIONAL Override Runoff Volume =acre-ftInflow Hydrograph Volume =0.297 0.701 1.118 1.461 2.318 2.718 acre-ftTime to Drain 97% of Inflow Volume =12.6 20.6 28.0 33.5 46.2 51.7 hoursTime to Drain 99% of Inflow Volume =13.7 22.1 29.9 35.8 49.1 54.7 hoursMaximum Ponding Depth =1.55 2.48 3.19 3.68 4.70 5.12 ftMaximum Ponded Area =0.30 0.48 0.62 0.73 0.89 0.94 acresMaximum Volume Stored =0.231 0.589 0.980 1.308 2.138 2.525 acre-ft Stormwater Detention and Infiltration Design Data Sheet Pond 1 Fort Collins, CO Location for 1-hr Rainfall Depths (use dropdown): Workbook Protected Worksheet Protected 306-003-SDI_Design_Data_v1.07-P1.xlsm, Design Data 8/16/2016, 2:47 PM WQCV_Trigger = 1RunOnce= 1CountA=1Draintime Coeff=1.0 0 1 2 3#N/A#N/A0 1 2 3#N/A#N/A Check Data Set 1 Check Data Set 1 Stormwater Detention and Infiltration Design Data Sheet Area Discharge 0 5 10 15 20 25 30 35 40 0.1 1 10 FL O W [ c f s ] TIME [hr] 100YR IN 100YR OUT 50YR IN 50YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT WQCV IN WQCV OUT 0 1 2 3 4 5 6 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 100YR 50YR 10YR 5YR 2YR WQCV 306-003-SDI_Design_Data_v1.07-P1.xlsm, Design Data 8/16/2016, 2:47 PM Stormwater Facility Name: Facility Location & Jurisdiction: User Input: Watershed Characteristics User Defined User Defined User Defined User DefinedWatershed Slope =0.010 ft/ft Stage [ft] Area [ft^2] Stage [ft] Discharge [cfs]Watershed Length =3695 ft 0.00 49 0.00 0.00Watershed Area = 29.69 acres 1.00 262 1.00 6.00Watershed Imperviousness = 88.9%percent 2.00 7,075 2.00 12.94Percentage Hydrologic Soil Group A =percent 3.00 19,702 3.00 18.90Percentage Hydrologic Soil Group B =percent 4.00 45,656 4.00 23.38Percentage Hydrologic Soil Groups C/D = 100.0%percent 5.00 78,210 5.00 27.146.00 93,848 6.00 30.43UDFCD Default 17 7.00 102,885 7.00 33.40 WQCV Treatment Method = 40.00 hours After completing and printing this worksheet to a pdf, go to:https://maperture.digitaldataservices.com/gvh/?viewer=cswdifcreate a new stormwater facility, and attach the pdf of this worksheet to that record. Routed Hydrograph ResultsDesign Storm Return Period =WQCV 2 Year 5 Year 10 Year 50 Year 100 YearOne-Hour Rainfall Depth =0.53 0.95 1.34 1.64 2.32 2.61 inCalculated Runoff Volume =0.971 2.083 3.033 3.809 5.656 6.492 acre-ftOPTIONAL Override Runoff Volume =acre-ftInflow Hydrograph Volume =0.970 2.082 3.032 3.808 5.655 6.492 acre-ftTime to Drain 97% of Inflow Volume =1.2 1.8 2.2 2.5 3.3 3.5 hoursTime to Drain 99% of Inflow Volume =1.3 1.9 2.4 2.7 3.4 3.7 hoursMaximum Ponding Depth =1.71 2.84 3.54 3.97 4.81 5.12 ftMaximum Ponded Area =0.12 0.41 0.77 1.03 1.64 1.83 acresMaximum Volume Stored =0.047 0.327 0.721 1.113 2.222 2.766 acre-ft Location for 1-hr Rainfall Depths (use dropdown): Workbook Protected Worksheet Protected Stormwater Detention and Infiltration Design Data Sheet ODP Pond Fort Collins, CO 306-003-SDI_Design_Data_v1.07-ODP POND.xlsm, Design Data 8/17/2016, 12:50 PM WQCV_Trigger = 1RunOnce= 1CountA=1Draintime Coeff=1.0 0 1 2 3#N/A#N/A0 1 2 3#N/A#N/A Check Data Set 1 Check Data Set 1 Area Discharge Stormwater Detention and Infiltration Design Data Sheet 0 10 20 30 40 50 60 70 80 90 0.1 1 10 FL O W [ c f s ] TIME [hr] 100YR IN 100YR OUT 50YR IN 50YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT WQCV IN WQCV OUT 0 1 2 3 4 5 6 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 100YR 50YR 10YR 5YR 2YR WQCV 306-003-SDI_Design_Data_v1.07-ODP POND.xlsm, Design Data 8/17/2016, 12:50 PM Stormwater Facility Name: Facility Location & Jurisdiction: User Input: Watershed Characteristics User Defined User Defined User Defined User DefinedWatershed Slope =0.010 ft/ft Stage [ft] Area [ft^2] Stage [ft] Discharge [cfs]Watershed Length =2221 ft 0.00 1,784 0.00 0.00Watershed Area = 13.00 acres 1.00 11,871 1.00 4.00Watershed Imperviousness = 82.8%percent 2.00 17,429 2.00 8.34Percentage Hydrologic Soil Group A =percent 3.00 21,636 3.00 8.59Percentage Hydrologic Soil Group B =percent 4.00 25,516 4.00 8.83Percentage Hydrologic Soil Groups C/D = 100.0%percent 5.00 29,610 5.00 9.066.00 33,914 6.00 9.29UDFCD Default 17 WQCV Treatment Method = 40.00 hours After completing and printing this worksheet to a pdf, go to:https://maperture.digitaldataservices.com/gvh/?viewer=cswdifcreate a new stormwater facility, and attach the pdf of this worksheet to that record. Routed Hydrograph ResultsDesign Storm Return Period =WQCV 2 Year 5 Year 10 Year 50 Year 100 YearOne-Hour Rainfall Depth =0.53 0.95 1.34 1.64 2.32 2.61 inCalculated Runoff Volume =0.375 0.844 1.254 1.589 2.396 2.764 acre-ftOPTIONAL Override Runoff Volume =acre-ftInflow Hydrograph Volume =0.375 0.843 1.253 1.588 2.395 2.764 acre-ftTime to Drain 97% of Inflow Volume =2.4 2.8 3.2 3.5 4.2 4.6 hoursTime to Drain 99% of Inflow Volume =2.8 3.4 3.5 3.8 4.5 4.9 hoursMaximum Ponding Depth =0.77 1.43 1.93 2.38 3.56 4.07 ftMaximum Ponded Area =0.22 0.33 0.39 0.44 0.55 0.59 acresMaximum Volume Stored =0.099 0.285 0.463 0.649 1.232 1.523 acre-ft Location for 1-hr Rainfall Depths (use dropdown): Workbook Protected Worksheet Protected Stormwater Detention and Infiltration Design Data Sheet Pond 2 Fort Collins, CO 306-003-SDI_Design_Data_v1.07-P2.xlsm, Design Data 8/16/2016, 3:05 PM WQCV_Trigger = 1RunOnce= 1CountA=1Draintime Coeff=1.0 0 1 2 3#N/A#N/A0 1 2 3#N/A#N/A Check Data Set 1 Check Data Set 1 Area Discharge Stormwater Detention and Infiltration Design Data Sheet 0 5 10 15 20 25 30 35 40 0.1 1 10 FL O W [ c f s ] TIME [hr] 100YR IN 100YR OUT 50YR IN 50YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT WQCV IN WQCV OUT 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 100YR 50YR 10YR 5YR 2YR WQCV 306-003-SDI_Design_Data_v1.07-P2.xlsm, Design Data 8/16/2016, 3:05 PM H2O H2O H2O WV WVWV HYD S W HYD WV WV W H2O H2O WV G G TELE T S T S F ES TELE WV WV HYD F ES F ES D D D D LOT ONE HARMONY TECHNOLOGY PARK, SECOND FILING TESTSTA HYD WV TELE TESTSTA F ES W W H2O H2O C.O. LID LID RD RDRD PROPOSED BUILDING PROPOSED HELISTOP HARMONY ROAD TIMBERWOOD DR. LA D Y M O O N D R . FFE=4910.25 POND 1 PROPOSED STORM DRAIN PROPOSED STORM DRAIN PROPOSED 68' RIGHT-OF-WAY EXISTING RIGHT-OF-WAY PROPOSED RIGHT-OF-WAY CI N Q U E F O I L L A N E PROPERTY LINE PROPOSED BUILDING FFE=4910.25 O FARM PROPOSED 82' RIGHT-OF-WAY EXISTING 60' RIGHT-OF-WAY STMH 3-3 STMH 3-4 STMH 3-8 FES 3-1 STMH 1-3A STMH 1-3A.2 STMH 1-3 STMH 1-4 STORM INLET 3-8.3 STORM INLET 3-3.3 STMH 3-3.2 STORM INLET 3-6 STORM INLET 3-7 STORM INLET 3-9 STORM INLET 3-10 STORM INLET 3-8.1 STORM INLET 3-8.2 STORM INLET 3-3.1 STORM INLET 3-3.2A STORM INLET 1-3A.1A STORM INLET 1-3A.1 OUTLET STRUCTURE 1-3A.2 STORM INLET 1-3A.2A FUTURE STORM INLET 1-3A.2B STORM INLET 1-4B STORM INLET 1-4A STORM INLET 3-2 STORM INLET 1-3B 2.1 % STORM INLET 3-5 FULL BUILD 9.8 3 6.06 9.0 2 6.64 6.8 9 13.97 4.48 6.4 8 5.71 6.34 6.4 7 6.4 8 6.49 7.15 11.59 11.32 11.07 10.69 10.33 11.47 11.20 10.77 11.16 6.23 5.82 6.95 6.8 0 5.06 5.7 7 5.60 6.00 6.25 5.92 6.48 6.91 6.49 4.73 4.99 5.8 0 3.96 5. 8 2 6.10 4.81 6.0 0 5.3 2 6.65 5.275.34 5.5 6 6.3 8 5.5 5 9.06 9.0 7 6.71 8.07 6.76 9.72 8.91 7.29 6.80 6.0 7 6.3 1 6.767.55 8.26 7.25 7.37 7.52 7.44 8.26 8.66 8.46 11.55 11 . 7 3 10.78 10.82 7.74 9.10 8.94 8.76 8.25 7.93 8.2 5 8.0 4 7.82 8.39 8.09 7.928.15 7.09 7.32 7.0 3 6.90 6.73 6.90 7.12 7.2 8 6.55 6.29 6.5 2 6.6 7 7.37 7.767.68 7.42 6.45 5.996.26 6.7 4 7.0 4 6.73 6.346.46 7.44 7.506.9 9 7.5 5 6.92 7.24 6.696.64 6.337.23 5.46 5.52 7.01 7.24 6.87 6.6 1 7.4 3 7.87 6.9 7 5.98 5.55 4.6 1 4.50 4.79 5.6 3 7.18 5.64 5.74 4.91 5.54 4.94 5.89 5.4 0 6.0 2 6.42 6.906.60 6.79 6.64 7.08 5.70 6.18 5.85 5.57 6.2 1 5.8 4 6.61 4.86 4.38 4.34 4.1 2 3.8 7 7.64 7.92 8.74 7.92 8.23 8.8 4 9.1 1 8.64 7.53 7.12 8.188.53 8.60 7.94 8.28 6.89 6.47 6.70 7.51 7.4 8 7.7 9 8.55 8.59 8.77 9.47 10.00 7.37 7.82 8.16 7.71 8.09 7.75 8.14 8.16 8.63 7.67 7.0 4 7.30 7.20 6.8 1 6.6 4 7.08 7.78 7.61 7.13 8.27 7.6 8 8.13 8.14 7.9 3 8.2 7 8.90 8.9 1 9.1 9 8.9 0 8.78 8.3 9 7.34 8.16 8.14 8.19 8.18 8.357.72 8.38 8.70 8.77 8.57 8.94 9.16 9.219.37 8.63 9.23 8.27 8.44 7.97 8.25 8.72 8.23 8.07 8.92 9.17 8.42 8.52 8.70 7.5 4 7.01 8.25 8.41 8.16 8.21 8.29 7.577.11 7.347.34 7.65 8.49 8.82 8.46 8.779.109.15 8.62 9.04 8.72 8.06 8.01 7.95 7.77 7.63 7.5 2 7.67 7.928.47 8.588.86 8.60 8.87 8.72 8.94 8.62 8.81 9.21 9.23 7.87 8.24 13.92 12 . 7 1 13 . 9 2 9.3112.06 12.11 9.5 5 8.70 8.33 8.24 8.05 7.84 7.24 7.91 7.64 7.2 4 8.809.1 2 8.839.01 9.3 2 8.949.2212.19 8.18 9.45 8.7 9 9.22 8.79 9.48 11.07 11.03 9.44 9.49 8.7 4 9.2 6 8.2 2 6. 8 5 7.3 9 6.2 3 5.3 6 3.62 3.47 2.8 6 2.6 5 2.05 1.97 3.46 3.92 3.33 2.64 1.69 1.30 5.1 0 3.8 4 4.15 6.96 6.5 4 8.3 9 8.39 9.19 9.18 8.93 8.56 8.47 10.92 9.28 10.35 7.5 0 9.98 9.25 8.62 8.10 9.36 8.07 7.9 2 7.50 7.22 8.00 7.627.266.55 7.23 4.09 10.08 9.889.8 9 9.87 9.74 9.66 9.729.71 9.92 9.56 3.77 3.37 3.28 10 . 1 4 10 . 1 1 4.18 10.08 10.22 2.679.6 5 7.78 10.10 10.1310.19 11 . 3 4 6.85 7.60 3.6 2 3.96 97.37 93.93 10.09 9.8 2 10.18 10.18 9.68 9.64 9.6 4 9.59 9.20 9.45 O FARM PROPOSED BUILDING FFE=4910.25 Date Date Date Date DateDa t e APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: City Engineer Water & Wastewater Utility Stormwater Utility Parks & Recreation Traffic Engineer Environmental Planner City of Fort Collins, Colorado UTILITY PLAN APPROVAL MATCHLINE-SEE SHEET C402 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. before you dig.Call R NORTH ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 LEGEND: NOTES: 1.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2.SPOT ELEVATIONS SHOWN ARE FLOWLINE OR EDGE OF WALK UNLESS NOTED OTHERWISE. 3.ALL DISTURBED AREAS SHALL BE REVEGETATED PER THE APPROVED LANDSCAPE PLANS. 4.ALL SOIL (NOT MULCH) IN LANDSCAPE BEDS ADJACENT TO BUILDINGS SHALL BE PLACED SUCH THAT THE TOP OF SOIL IS AT THE SAME ELEVATION AS ADJACENT SIDEWALK TO ALLOW FOR PROPER DRAINAGE. 5.THE FINISHED FLOOR ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM. {6.SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 7.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 8.THE WORK AND IMPROVEMENTS SHOWN ON THESE PLANS IS CONSIDERED PHASE 1 OF THE PROJECT ("PROPOSED BUILDING"). PRIOR TO ANY CONSTRUCTION OF ANY OTHER PHASE(S) ("FULL BUILD") A MINOR AMENDMENT SHALL BE SUBMITTED FOR SAID PHASE(S) THAT INCLUDES UTILITY PLANS (FINAL GRADING PLANS FOR SAID PHASE, EROSION CONTROL PLANS FOR SAID PHASE, AND ANY UTILITY CONNECTIONS OR INFRASTRUCTURE NEEDED FOR SAID PHASE). 9.REFER TO INLET SCHEDULE ON SHEET 705 FOR STORM SEWER INLET TYPES.} PROPOSED STORM SEWER PROPOSED STORM DRAINAGE INLET 77.71 (77.90) PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION PROPOSED GRADE 1.8% EXISTING GRADE (1.8%) PROPOSED CONTOURS 80 HP - HIGH POINT LP - LOW POINT TW - TOP OF WALL BW - BOTTOM OF WALL GRND - ELEVATION OF GROUND AT EXTERIOR WALL OR DOOR 79 GRATE - GRATE ELEVATION EXISTING STORM SEWER EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR 5015 5013 APPROXIMATE LIMITS OF CONSTRUCTION EXISTING TREES EXISTING STORM SEWER EXISTING RIGHT-OF-WAY PROPOSED RIGHT-OF-WAY PROPOSED PLD SECTION PROPOSED SAWCUT LINE PROPOSED PROPERTY LINE TS - TOP OF STAIR BS - BOTTOM OF STAIR INV - PIPE INVERT KEYMAP HARMONY ROAD BR O O K F I E L D D R I V E LE FEVER DRIVE TIMBERWOOD DRIVE LA D Y M O O N D R . CI N Q U E F O I L L A N E C401 C402 MA T C H L I N E - S E E S H E E T C 5 0 4 FORT COLLINS, COLORADO BANNER HEALTH MEDICAL CAMPUS SEPTEMBER 20, 2013 SHEET HARMONY RD. & LADY MOON DR. BOULDER ASSOCIATES ARCHITECTS 1426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 OF 60 FINAL PLAN GRADING PLAN C401 C403 TRUCK DOCK GRADING DETAIL SCALE 1"=30'NORTH 3.59 6.2 3 6.8 3 7.3 9 7.68 3.84 7.69 4.03 9.72 5.91 9.76 4.20 9.70 5.67 3.9 2 THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERING SERVICES, INC., ARE BASED IN WHOLE, OR IN PART, UPON INFORMATION PROVIDED BY OTHERS. NORTHERN ENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. RECORD DRAWING 10.01 10.11 10.13 5.87 10.02 10.05 10.08 FF = 4910.18 10.14 3.67 9.74 5.95 5.9 7 5.53 5.67 5.57 4.6 7 4.5 7 4.7 2 4.404.1 7 4.14 4.18 5.87 9.99 5.82 10.02 10.143.67 10.37 3.68 7.75 4.0 7 3.9 0 4.48 5.80 9.82 3.85 9.77 FF = 4910.18 FF = 4910.18 10.14 GRND:9.65 5.5% 0.72% (DOCK) TC:10.10 TC - TOP OF CONCRETE 6.91 RIM REV AUGUST 25 2016 WVWV S WV HYD H2O H2O H2O WV WVWV HYD S S WSO S F E S F E S F ESFES WVWVWV D D D LOT TWO HARMONY TECHNOLOGY PARK, SECOND FILING RD RD RD RD RD RD RDRD PROPOSED BUILDING LA D Y M O O N D R . CI N Q U E F O I L L A N E TIMBERWOOD DR. LE FEVER DR. FFE=4910.25 POND 2 EXISTING WOOD BARN EXISTING WOOD SHED EXISTING 93' RIGHT-OF-WAY PR O P O S E D 7 6 ' RI G H T - O F - W A Y PROPOSED 82' RIGHT-OF-WAY PROPOSED BUILDING FFE=4910.25 STMH 1-5 STMH 1-6 FES 1-7 FES 5 FES 2 FES 5-1 STMH 4-1 STORM INLET 4-1.1 STMH 4-2TEMPORARY FES 4-3 STMH 4-2.1 STORM INLET 4-2.2 STORM INLET 3-10 STORM INLET 1-5B STORM INLET 1-5A STORM INLET 6-1 FES 6 STMH 6-2 STORM INLET 6-3 GRATE = 4908.92 STORM INLET 6-4 GRATE = 4908.44 FES 4 PROPOSED STORM DRAIN PROPOSED STORM DRAIN OFFSITE STORM DRAIN PROPOSED STORM DRAIN PROPOSED STORM DRAIN FULL BUILD FULL BUILD FULL BUILD FULL BUILD FULL BUILD 8.70 8.77 9.16 9.219.37 9.23 8.27 8.44 7.24 7.2 4 8.809.1 2 8.839.01 9.3 2 8.949.2212.19 12.6212.13 10.86 8.86 7.98 8.18 9.039.429.70 8.88 8.67 9.597.928.64 8.42 7.70 8.43 9.31 9.14 11.99 7.59 7.23 6.87 8.02 7.61 9.62 8.0 9 8.3 9 8.83 9.32 8.708.27 8.048.0 2 8.719.1 6 8.8 9 9.0 1 9.3 4 9.229.5 1 8.71 8.25 8.03 8.19 8.35 8.36 8.80 8.03 0.3 7 99.99 4.98 8.30 8.868.64 7.82 8.55 9.18 7.44 7.35 7.50 7.45 5.40 5.91 6.06 5.90 5.84 5.5 0 6.12 6.33 5.93 6.24 6.54 6.62 6.82 7.27 6.70 6.93 7.587.74 7.79 8.75 8.25 7.91 8.15 8.35 7.65 7.92 7.667.30 7.27 11.23 9.50 9.19 9.68 9.64 9.14 9.34 9.21 9.1 8 9.8 1 9.55 10.46 9.23 8.36 8.35 8.10 8.26 7.045.96 5.66 10.37 10.13 8.35 8.02 7.20 9.25 9.94 9.35 2.1 2 4.7 1 6.6 2 9.5 2 9.52 10 . 3 6 8.94 8.7 2 9.6 5 10 . 1 9 9.31 8.409.78 10.29 9.3 2 11 . 0 1 11 . 4 1 6.00 3.66 2.03 14.21 14.03 8.65 8.80 10.86 9.98 9.25 8.62 8.10 9.36 9.729.71 9.92 9.76 9.68 9.74 10.17 9.74 9.57 9.7 4 9.64 9.59 9.67 9.68 9.69 9.6 9 9.76 9.8 8 9.7 3 9.9 7 10.11 9.56 10.13 10.09 9.6 7 5.4 7 5.57 3.77 9.58 9.23 10.10 10.1310.19 9.6010 . 1 9 10 . 1 8 10 . 0 8 9.8 2 10 . 2 8 10.16 10 . 1 0 9.99 9.57 11 . 1 7 12.07 99.32 99.26 98.39 95.46 98 . 5 2 9.61 Date Date Date Date DateDa t e APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: City Engineer Water & Wastewater Utility Stormwater Utility Parks & Recreation Traffic Engineer Environmental Planner City of Fort Collins, Colorado UTILITY PLAN APPROVAL NORTH ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 LEGEND: NOTES: 1.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2.SPOT ELEVATIONS SHOWN ARE FLOWLINE OR EDGE OF WALK UNLESS NOTED OTHERWISE. 3.ALL DISTURBED AREAS SHALL BE REVEGETATED PER THE APPROVED LANDSCAPE PLANS. 4.ALL SOIL (NOT MULCH) IN LANDSCAPE BEDS ADJACENT TO BUILDINGS SHALL BE PLACED SUCH THAT THE TOP OF SOIL IS AT THE SAME ELEVATION AS ADJACENT SIDEWALK TO ALLOW FOR PROPER DRAINAGE. 5.THE FINISHED FLOOR ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM. {6.SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 7.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 8.THE WORK AND IMPROVEMENTS SHOWN ON THESE PLANS IS CONSIDERED PHASE 1 OF THE PROJECT ("PROPOSED BUILDING"). PRIOR TO ANY CONSTRUCTION OF ANY OTHER PHASE(S) ("FULL BUILD") A MINOR AMENDMENT SHALL BE SUBMITTED FOR SAID PHASE(S) THAT INCLUDES UTILITY PLANS (FINAL GRADING PLANS FOR SAID PHASE, EROSION CONTROL PLANS FOR SAID PHASE, AND ANY UTILITY CONNECTIONS OR INFRASTRUCTURE NEEDED FOR SAID PHASE). 9.REFER TO INLET SCHEDULE ON SHEET 705 FOR STORM SEWER INLET TYPES.} PROPOSED STORM SEWER PROPOSED STORM DRAINAGE INLET 77.71 (77.90) PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION PROPOSED GRADE 1.8% EXISTING GRADE (1.8%) PROPOSED CONTOURS 80 HP - HIGH POINT LP - LOW POINT TW - TOP OF WALL BW - BOTTOM OF WALL GRND - ELEVATION OF GROUND AT EXTERIOR WALL OR DOOR 79 GRATE - GRATE ELEVATION EXISTING STORM SEWER EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR 5015 5013 APPROXIMATE LIMITS OF CONSTRUCTION EXISTING TREES EXISTING STORM SEWER EXISTING RIGHT-OF-WAY PROPOSED RIGHT-OF-WAY PROPOSED PLD SECTION PROPOSED SAWCUT LINE PROPOSED PROPERTY LINE TS - TOP OF STAIR BS - BOTTOM OF STAIR INV - PIPE INVERT CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. before you dig.Call R MATCHLINE-SEE SHEET C401 KEYMAP HARMONY ROAD BR O O K F I E L D D R I V E LE FEVER DRIVE TIMBERWOOD DRIVE LA D Y M O O N D R . CI N Q U E F O I L L A N E C401 C402 FORT COLLINS, COLORADO BANNER HEALTH MEDICAL CAMPUS SEPTEMBER 20, 2013 SHEET HARMONY RD. & LADY MOON DR. BOULDER ASSOCIATES ARCHITECTS 1426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 OF 60 FINAL PLAN GRADING PLAN C402 MA T C H L I N E - S E E S H E E T C 4 0 2 A C403 THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERING SERVICES, INC., ARE BASED IN WHOLE, OR IN PART, UPON INFORMATION PROVIDED BY OTHERS. NORTHERN ENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. RECORD DRAWING 10.01 9.82 9.72 9.81 10.27 9.6 9 9.73 9.7710.29 FF = 4910.18 FF = 4910.18 REV AUGUST 25, 2016 WV WVWV OWNER:CHANDLER, J THOMAS OWNER: CHANDLER, J THOMAS LE FEVER DR. LINE FES 1-1 STMH 1-2 STORM INLET 1-4B STORM INLET 1-5B FO S S I L C R E E K R E S E R V O I R I N L E T D I T C H IR R I G A T I O N D I T C H A C C E S S R O A D PROPERTY LINE PROPOSED STORM DRAIN PROPOSED STORM DRAIN PROPERTY LINE REGIONAL - OUTLET OUTLET - MH1 OUTLET - FES A A ODP POND 84.67 75.34 \A1;VARIES 10' MAINTENAN CE \A1;16' 4:1 4: 1 2.5%%% \A 1 ; 3 . 7 5 ' 4:1 (EXISTING GRADE)DR A I N A G E EA S E M E N T 4:1 \A1;16' 2.5%%% \A 1 ; V A R I E S \A 1 ; 3 . 7 5 ' 30' PLD SECTION 2.0%%%2.0%%% 10' MAINTENANCE ROAD 5.0%%%5.0%%% 48 8 8 . 2 5 SP I L L W A Y 48 8 8 . 2 5 SP I L L W A Y 48 8 9 . 2 5 TOP OF POND 48 8 9 . 2 5 TOP OF POND 60' SPILLWAY 20' TRANSITION 20' TRANSITION Date Date Date Date DateDa t e APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: City Engineer Water & Wastewater Utility Stormwater Utility Parks & Recreation Traffic Engineer Environmental Planner City of Fort Collins, Colorado UTILITY PLAN APPROVAL MA T C H L I N E - S E E S H E E T C 4 0 2 NORTH ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. before you dig.Call R KEYMAP HARMONY ROAD BR O O K F I E L D D R I V E LE FEVER DRIVE TIMBERWOOD DRIVE LA D Y M O O N D R . CI N Q U E F O I L L A N E C401 C402 LEGEND: NOTES: 1.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2.SPOT ELEVATIONS SHOWN ARE FLOWLINE OR EDGE OF WALK UNLESS NOTED OTHERWISE. 3.ALL DISTURBED AREAS SHALL BE REVEGETATED PER THE APPROVED LANDSCAPE PLANS. 4.ALL SOIL (NOT MULCH) IN LANDSCAPE BEDS ADJACENT TO BUILDINGS SHALL BE PLACED SUCH THAT THE TOP OF SOIL IS AT THE SAME ELEVATION AS ADJACENT SIDEWALK TO ALLOW FOR PROPER DRAINAGE. 5.THE FINISHED FLOOR ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM. {6.SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 7.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 8.THE WORK AND IMPROVEMENTS SHOWN ON THESE PLANS IS CONSIDERED PHASE 1 OF THE PROJECT ("PROPOSED BUILDING"). PRIOR TO ANY CONSTRUCTION OF ANY OTHER PHASE(S) ("FULL BUILD") A MINOR AMENDMENT SHALL BE SUBMITTED FOR SAID PHASE(S) THAT INCLUDES UTILITY PLANS (FINAL GRADING PLANS FOR SAID PHASE, EROSION CONTROL PLANS FOR SAID PHASE, AND ANY UTILITY CONNECTIONS OR INFRASTRUCTURE NEEDED FOR SAID PHASE). 9.REFER TO INLET SCHEDULE ON SHEET 705 FOR STORM SEWER INLET TYPES.} PROPOSED STORM SEWER PROPOSED STORM DRAINAGE INLET 77.71 (77.90) PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION PROPOSED GRADE 1.8% EXISTING GRADE (1.8%) PROPOSED CONTOURS 80 HP - HIGH POINT LP - LOW POINT TW - TOP OF WALL BW - BOTTOM OF WALL GRND - ELEVATION OF GROUND AT EXTERIOR WALL OR DOOR 79 GRATE - GRATE ELEVATION EXISTING STORM SEWER EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR 5015 5013 APPROXIMATE LIMITS OF CONSTRUCTION EXISTING TREES EXISTING STORM SEWER EXISTING RIGHT-OF-WAY PROPOSED RIGHT-OF-WAY PROPOSED PLD SECTION PROPOSED SAWCUT LINE PROPOSED PROPERTY LINE TS - TOP OF STAIR BS - BOTTOM OF STAIR INV - PIPE INVERT FORT COLLINS, COLORADO BANNER HEALTH MEDICAL CAMPUS SEPTEMBER 20, 2013 SHEET HARMONY RD. & LADY MOON DR. BOULDER ASSOCIATES ARCHITECTS 1426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 OF 60 FINAL PLAN GRADING PLAN C403 C403 SECTION A-ASPILLWAY CROSS-SECTION NOT TO SCALE THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERING SERVICES, INC., ARE BASED IN WHOLE, OR IN PART, UPON INFORMATION PROVIDED BY OTHERS. NORTHERN ENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. RECORD DRAWING REV AUGUST 25, 2016 58'48 8 8 . 5 7 48 8 8 . 5 4 48 8 8 . 9 7 48 8 8 . 9 3 4880 4885 4890 4895 4900 4905 4910 4915 4880 4885 4890 4895 4900 4905 4910 4915 9+5010+0011+0012+0013+0014+0015+0016+0017+0018+0019+0020+0021+00 FES 1-1 STA 10+00.00 N: 107283.21 E: 214546.99 53.22 LF 42" RCP @ 0.40% STMH 1-2 STA 10+53.22 N: 107317.50 E: 214506.29 378.75 LF 42" RCP @ 0.40% PROPOSED DRAINAGE EASEMENT 12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W 12" SS12" SS12" SS12" SS12" SS12" SS12" SS S F RD TF E/FO/CTVE/FO/CTVE/FO/CTVE/FO/CTVE/FO/CTVE/FO/CTVE/FO/CTV EEEEEE GGGGGGGGGGGGGGG TF T WTF IR IR G 12" SS12" SS12" SS12" SS CINQUEFOIL LANE STMH 1-5 STA 18+33.97 N: 106919.18 E: 214138.39 STMH 1-4 STA 15+21.51 N: 107231.52 E: 214129.98 STORM LINE 1-4B SEE SHEET C406 STORM LINE 1-4A SEE SHEET C406 382.84 LF 36" RCP @ 0.50% 312.46 LF 36" RCP @ 0.50% 89.55 LF 36" RCP @ 0.50% 382.84 LF 36" RCP @ 0.50% STORM LINE 1-5B SEE SHEET C407 SANITARY LINE A SEE SHEET C303 WATERMAIN LINE A SEE SHEET C307 STORM LINE 1-3B SEE SHEET C407 37 8 . 7 5 L F 4 2 " R C P @ 0 . 4 0 % STORM LINE 1-5A SEE SHEET C407 STMH 1-3 STA 14+31.97 N: 107321.04 E: 214127.56 PROPOSED DRAINAGE EASEMENT KEYMAP HARMONY ROAD BR O O K F I E L D D R I V E LE FEVER DRIVE TIMBERWOOD DRIVE LA D Y M O O N D R . CI N Q U E F O I L L A N E ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 PROPOSED RIGHT-OF-WAY EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.ALL RCP SHALL BE CLASS III UNLESS OTHERWISE NOTED. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5.ALL STORM MANHOLES LOCATED IN SIDEWALKS AND TRAILS SHALL HAVE PEDESTRIAN RATED LIDS. 6.MANHOLE DIAMETERS SHOWN ARE THE MINIMUM SIZE PER CITY STANDARD DETAIL D-3. CONTRACTOR SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). 7.REFER TO INLET SCHEDULE ON SHEET 705 FOR STORM SEWER INLET TYPES. 8.ALL ROOF DRAIN LATERALS SHALL BE HIGH DENSITY POLYETHYLENE PIPE (HDPE) OR APPROVED EQUAL. THE CONTRACTOR SHALL TERMINATE THE ROOF DRAIN LATERALS 5.0-FEET OUTSIDE OF BUILDING. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF THE ROOF DRAIN CONNECTIONS TO THE DOWNSPOUTS AT THE PROPOSED BUILDING SHALL BE COORDINATED WITH THE ARCHITECTURAL DRAWINGS. 9.REFER TO THE ARCHITECTURAL DRAWINGS FOR DETAILS REGARDING THE CONNECTIONS FROM THE DOWNSPOUT TO UNDERGROUND ROOF DRAIN PIPING. W G T E/T/C EXISTING STORM SEWER ST PROPOSED ELEC/TELE/CABLE EXISTING TELEPHONE EXISTING GAS S W PROPOSED SEWER SERVICE EXISTING SANITARY SEWER SS PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED CURB STOP & METER PIT PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT H Y D PROPOSED LOTLINE EASEMENT LINE EPROPOSED ELECTRIC WPROPOSED RESIDETIAL SERVICE PROPOSED AREA DRAIN INLET APPROXIMATE LIMITS OF CONSTRUCTION EXISTING RIGHT OF WAY PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=50' STORMDRAIN 1 Date Date Date Date Date Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: City Engineer Water & Wastewater Utility Stormwater Utility Parks & Recreation Traffic Engineer Environmental Planner City of Fort Collins, Colorado UTILITY PLAN APPROVAL CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. before you dig.Call R FORT COLLINS, COLORADO BANNER HEALTH MEDICAL CAMPUS SEPTEMBER 20, 2013 SHEET HARMONY RD. & LADY MOON DR. BOULDER ASSOCIATES ARCHITECTS 1426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 OF 60 FINAL PLAN PLAN AND PROFILE STORM DRAIN LINE 1 C404 STORM DRAIN LINE 1 SE E S H E E T MA T C H L I N E S T A 21 + 0 0 C4 0 5 SEE THIS SHEET MATCHLINE STA 12+00 SE E T H I S S H E E T MA T C H L I N E S T A 12 + 0 0 MA T C H L I N E SE E S H E E T ST A 21 + 0 0 C4 0 5 48 8 4 . 8 3 ( W ) 48 8 4 . 8 3 ( S E ) 48 9 2 . 5 8 48 8 4 . 6 7 ( N W ) THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERING SERVICES, INC., ARE BASED IN WHOLE, OR IN PART, UPON INFORMATION PROVIDED BY OTHERS. NORTHERN ENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. RECORD DRAWING 48 9 5 . 9 9 ( N W ) 48 8 6 . 1 4 ( S ) 48 8 9 . 2 4 ( N ) 48 5 6 . 1 2 ( E ) 48 9 1 . 7 2 48 9 5 . 3 3 ( W ) 48 9 5 . 4 3 ( E ) 48 8 6 . 7 3 ( S ) 48 8 6 . 4 8 ( N ) 49 0 1 . 3 8 49 0 1 . 9 5 48 9 6 . 0 0 ( W ) 48 9 6 . 0 0 ( E ) 48 9 2 . 3 0 ( S ) 48 8 8 . 2 3 ( N ) 54.6 LF 0.29% 378.9 LF 0.34% 90.3 LF 0.38% 309.2 LF 0.49% 384.0 LF 0.60% 4892.65 384.0 LF 0.60% 378.9 LF 37 8 . 9 L F 0.34% 0.3 4 % 0.29% 54.6 LF 90.3 LF 0.38% 0.68%309.2 LF REV AUGUST 25, 2016 4880 4885 4890 4895 4900 4905 4910 4915 4880 4885 4890 4895 4900 4905 4910 4915 21+0022+0023+0024+0024+50 \A 1 ; 1 8 " M I N \A1;18" MIN S WV WV WV 8" W 8" S S 12" W12" W 12" SS12" SS12" SS EE E/FO/CTVE/FO/CTVE/FO/CTV CT V CTV CT V CT V GGG G E/ C T V E/ C T V STMH 1-6 STA 22+16.82 N: 106536.47 E: 214148.71 CINQUEFOIL LANE SANITARY LINE A SEE SHEET C303 WATERMAIN LINE A SEE SHEET C307FES 1-7 STA 23+98.80 N: 106354.57 E: 214154.07 181.98 LF 24" RCP @ 0.50% STORM LINE 1-6A SEE SHEET C406 LE F E V E R D R I V E 4885 4890 4895 4900 4905 4910 4915 4920 4885 4890 4895 4900 4905 4910 4915 4920 9+5010+0011+0012+0013+0014+00 G C. O . LI D LI D E 12" W 12" W 12" W 12" W 12 " W 12 " W E E E E E E E E G G G G G G G G G W IR IR 8" S S 8" S S 12" SS STORM INLET 1-3A.1 STA 12+80.10 N: 107527.27 E: 214051.48 STMH 1-3A STA 12+10.66 N: 107531.59 E: 214120.79 69 . 4 4 L F 1 5 " R C P @ 0 . 7 5 % 210.66 LF 24" RCP @ 1.52% STORM LINE 1-3A.2 SEE SHEET C406 STMH 1-3 STA 14+31.97 N: 107321.04 E: 214127.56 CINQUEFOIL LANE 53.25 LF 12" RCP @ 0.52% OUTLET STRUCTURE 1-3A.2 STA 13+33.36 N: 107571.47 E: 214021.79 PROPOSED G C.O. LID 12 " W 12" W 12" W E E E E G G G G G W CI N Q U E F O I L L A N E STORM INLET 1-3A.1 STA 12+80.10 N: 107527.27 E: 214051.48 30.01 LF 12" RCP @ 1.00% STORM INLET 1-3A.1A STA 10+30.01 N: 107497.27 E: 214052.29 STORM LINE 1-3A.2 SEE SHEET C406 4885 4890 4895 4900 4905 4910 4915 4920 4885 4890 4895 4900 4905 4910 4915 4920 9+5010+0011+00 KEYMAP HARMONY ROAD BR O O K F I E L D D R I V E LE FEVER DRIVE TIMBERWOOD DRIVE LA D Y M O O N D R . CI N Q U E F O I L L A N E STORM DRAIN LINE 1 ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 PROPOSED RIGHT-OF-WAY EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.ALL RCP SHALL BE CLASS III UNLESS OTHERWISE NOTED. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5.ALL STORM MANHOLES LOCATED IN SIDEWALKS AND TRAILS SHALL HAVE PEDESTRIAN RATED LIDS. 6.MANHOLE DIAMETERS SHOWN ARE THE MINIMUM SIZE PER CITY STANDARD DETAIL D-3. CONTRACTOR SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). 7.REFER TO INLET SCHEDULE ON SHEET 705 FOR STORM SEWER INLET TYPES. 8.ALL ROOF DRAIN LATERALS SHALL BE HIGH DENSITY POLYETHYLENE PIPE (HDPE) OR APPROVED EQUAL. THE CONTRACTOR SHALL TERMINATE THE ROOF DRAIN LATERALS 5.0-FEET OUTSIDE OF BUILDING. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF THE ROOF DRAIN CONNECTIONS TO THE DOWNSPOUTS AT THE PROPOSED BUILDING SHALL BE COORDINATED WITH THE ARCHITECTURAL DRAWINGS. 9.REFER TO THE ARCHITECTURAL DRAWINGS FOR DETAILS REGARDING THE CONNECTIONS FROM THE DOWNSPOUT TO UNDERGROUND ROOF DRAIN PIPING. W G T E/T/C EXISTING STORM SEWER ST PROPOSED ELEC/TELE/CABLE EXISTING TELEPHONE EXISTING GAS S W PROPOSED SEWER SERVICE EXISTING SANITARY SEWER SS PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED CURB STOP & METER PIT PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT H Y D PROPOSED LOTLINE EASEMENT LINE EPROPOSED ELECTRIC WPROPOSED RESIDETIAL SERVICE PROPOSED AREA DRAIN INLET APPROXIMATE LIMITS OF CONSTRUCTION EXISTING RIGHT OF WAY PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=50' STORMDRAIN 1 Date Date Date Date Date Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: City Engineer Water & Wastewater Utility Stormwater Utility Parks & Recreation Traffic Engineer Environmental Planner City of Fort Collins, Colorado UTILITY PLAN APPROVAL CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. before you dig.Call R PLAN AND PROFILE STORM DRAIN 1, 1-3A & 1-3A.1 C405 STORM DRAIN LINE 1-3A PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=50' STORMDRAIN 1-3A STORM DRAIN LINE 1-3A.1 PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=50' SE E S H E E T MA T C H L I N E S T A 21 + 0 0 C4 0 4 MA T C H L I N E SE E S H E E T ST A C4 0 4 21 + 0 0 49 0 5 . 4 9 48 9 4 . 6 4 ( W ) 48 9 4 . 6 9 ( S ) 48 9 4 . 5 9 ( N ) 48 9 5 . 9 4 ( N W ) 48 8 6 . 1 4 ( S ) 48 8 9 . 2 4 ( N ) 48 5 6 . 1 2 ( E ) 48 9 1 . 7 2 48 9 3 . 0 7 ( W ) 48 9 3 . 1 0 ( N ) 48 9 2 . 5 1 ( S ) 49 0 1 . 7 5 48 9 3 . 8 2 ( N W ) 48 9 7 . 5 3 ( S ) 48 9 3 . 7 2 ( E ) 49 0 2 . 6 0 48 9 3 . 9 3 ( S E ) 48 9 2 . 6 0 48 9 7 . 9 0 48 9 3 . 8 2 ( N W ) 48 9 7 . 5 3 ( S ) 48 9 3 . 7 2 ( E ) 49 0 2 . 5 5 35.5 LF 52.2 LF 0.21% 69.4 LF 0.89% 211.2 LF 1.55% 4893.19 4896.5 4891.08 182.0 LF 0.45% THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERING SERVICES, INC., ARE BASED IN WHOLE, OR IN PART, UPON INFORMATION PROVIDED BY OTHERS. NORTHERN ENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. RECORD DRAWING 35.5 LF 52.2 LF 0.21% 69 . 4 L F 0.8 9 % 211.2 LF 1.55% 182.0 LF 0.54% 48 9 7 . 6 8 FORT COLLINS, COLORADO BANNER HEALTH MEDICAL CAMPUS SEPTEMBER 20, 2013 SHEET HARMONY RD. & LADY MOON DR. BOULDER ASSOCIATES ARCHITECTS 1426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 OF 60 FINAL PLAN REV AUGUST 25, 2016 8" W 8" W 8" W 8" SS 8" SS 12 " W 12 " W 12 " S S 12 " S S 12 " S S E E/ F O / C T V E/ F O / C T V E/ F O / C T V CTV CTV CTV G G G G G G E/CTV E/CTV E/CTV E/CTV S WVWVWV CI N Q U E F O I L L A N E STORM LINE 1 SEE SHEET C403 STMH 1-6 STA 10+00 N: 106536.47 E: 214148.71 OUTLET STRUCTURE 1-6A STA 10+80.40 N: 106534.25 E: 214068.34 80.40 LF 24" RCP @ 1.31% SANITARY LINE A SEE SHEET C303 WATERMAIN A SEE SHEET C307 LE FEVER DRIVE 12 " W 12 " W 12 " W 12 " W 12 " S S 12 " S S 12 " S S 12 " S S F E E E E G G G GW IR IR G CI N Q U E F O I L L A N E STORM LINE 1 SEE SHEET C404 STMH 1-4 STA 10+00.00 N: 107231.52 E: 214129.98 STORM INLET 1-4A STA 10+38.50 N: 107230.49 E: 214091.49 STORM INLET 1-4B STA 10+17.02 N: 107231.98 E: 214146.99 38.50 LF 18" RCP @ 1.00% WATERMAIN A SEE SHEET C307 SANITARY SEWER A SEE SHEET C303 4885 4890 4895 4900 4905 4910 4915 4920 4885 4890 4895 4900 4905 4910 4915 4920 9+5010+0011+0011+50 4885 4890 4895 4900 4905 4910 4915 4920 4885 4890 4895 4900 4905 4910 4915 4920 9+5010+0011+0012+0013+00 4885 4890 4895 4900 4905 4910 4915 4920 10+00 11+00 4885 4890 4895 4900 4905 4910 4915 4920 10+0011+00 12" W 12 " W 12 " W E E E E E E G G G G G G G G G G G TELE E F E S W E VA U L T EL E C VA U L T EL E C VA U L T EL E C W H2 OH2O C. O . LI D LI D E STMH 1-3A STA 10+00 N: 107531.59 E: 214120.79 STMH 1-3A.2 STA 11+42.36 N: 107673.87 E: 214116.21 142.36 LF 15" RCP @ 0.50% 36.66 LF 15" RCP @ 0.60% STORM INLET 1-3A.2A STA 11+79.01 N: 107672.89 E: 214079.56 STORM DRAIN 1-3A SEE SHEET C404 STORM DRAIN 1-3A.2B SEE THIS SHEET CINQUEFOIL LANE HA R M O N Y R O A D 4885 4890 4895 4900 4905 4910 4915 4920 4885 4890 4895 4900 4905 4910 4915 4920 9+5010+0011+00 E E E E G G G G G G G G TELE E F E S WE VA U L TELEC VA U L T EL E C VA U L T EL E C W H2O H2O LID LID E FUTURE STORM INLET 1-3A.2B STA 10+29.33 N: 107700.34 E: 214128.85 29.33 LF 15" RCP @ 0.50% STMH 1-3A.2 STA 10+00 N: 107673.87 E: 214116.21 STORM DRAIN 1-3A SEE THIS SHEET HAR M O N Y R O A D CIN Q U E F O I L L A N E KEYMAP HARMONY ROAD BR O O K F I E L D D R I V E LE FEVER DRIVE TIMBERWOOD DRIVE LA D Y M O O N D R . CI N Q U E F O I L L A N E ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 PROPOSED RIGHT-OF-WAY EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.ALL RCP SHALL BE CLASS III UNLESS OTHERWISE NOTED. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5.ALL STORM MANHOLES LOCATED IN SIDEWALKS AND TRAILS SHALL HAVE PEDESTRIAN RATED LIDS. 6.MANHOLE DIAMETERS SHOWN ARE THE MINIMUM SIZE PER CITY STANDARD DETAIL D-3. CONTRACTOR SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). 7.REFER TO INLET SCHEDULE ON SHEET 705 FOR STORM SEWER INLET TYPES. 8.ALL ROOF DRAIN LATERALS SHALL BE HIGH DENSITY POLYETHYLENE PIPE (HDPE) OR APPROVED EQUAL. THE CONTRACTOR SHALL TERMINATE THE ROOF DRAIN LATERALS 5.0-FEET OUTSIDE OF BUILDING. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF THE ROOF DRAIN CONNECTIONS TO THE DOWNSPOUTS AT THE PROPOSED BUILDING SHALL BE COORDINATED WITH THE ARCHITECTURAL DRAWINGS. 9.REFER TO THE ARCHITECTURAL DRAWINGS FOR DETAILS REGARDING THE CONNECTIONS FROM THE DOWNSPOUT TO UNDERGROUND ROOF DRAIN PIPING. W G T E/T/C EXISTING STORM SEWER ST PROPOSED ELEC/TELE/CABLE EXISTING TELEPHONE EXISTING GAS S W PROPOSED SEWER SERVICE EXISTING SANITARY SEWER SS PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED CURB STOP & METER PIT PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT H Y D PROPOSED LOTLINE EASEMENT LINE EPROPOSED ELECTRIC WPROPOSED RESIDETIAL SERVICE PROPOSED AREA DRAIN INLET APPROXIMATE LIMITS OF CONSTRUCTION EXISTING RIGHT OF WAY STORM DRAIN LINE 1-6 STORMDRAIN 1-6 STORMDRAIN 1-4A & 1-4B STORM DRAIN LINE 1-4A & 1-4B PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=50' PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=50' PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=50' Date Date Date Date Date Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: City Engineer Water & Wastewater Utility Stormwater Utility Parks & Recreation Traffic Engineer Environmental Planner City of Fort Collins, Colorado UTILITY PLAN APPROVAL CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. before you dig.Call R FORT COLLINS, COLORADO BANNER HEALTH MEDICAL CAMPUS SEPTEMBER 20, 2013 SHEET HARMONY RD. & LADY MOON DR. BOULDER ASSOCIATES ARCHITECTS 1426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 OF 60 FINAL PLAN PLAN AND PROFILE STORM DRAIN 1-3A.2, 1-4, 1-6 C406 STORM DRAIN LINE 1-3A.2FUTURE STORM DRAIN LINE 1-3A.2B PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=50' STORMDRAIN 1-3A.2 STORMDRAIN 1-3A.2B 48 9 9 . 8 7 48 9 4 . 0 3 ( W ) 48 9 4 . 0 3 ( N E ) 48 9 3 . 8 1 ( S ) 48 9 3 . 0 7 ( W ) 48 9 3 . 1 0 ( N ) 48 9 2 . 5 1 ( S ) 49 0 1 . 7 5 48 9 8 . 9 7 48 9 4 . 1 7 142.7 LF 0.52% 38.6 LF 0.36% 0.52%142.7 LF 0.36% 38.6 LF 48 9 5 . 3 8 ( W ) 48 9 5 . 4 3 ( E ) 48 8 6 . 7 3 ( S ) 48 8 6 . 4 8 ( N ) 49 0 1 . 3 8 19.0 LF 2.0% 37.2 LF 1.50% 49 0 0 . 3 9 48 9 5 . 8 1 ( W ) 49 0 0 . 6 2 48 9 5 . 9 4 ( E ) 49 0 5 . 4 9 48 9 4 . 7 4 ( W ) 48 9 4 . 6 9 ( S ) 48 9 4 . 5 9 ( N ) 81.91 LF 0.94% 48 9 5 . 4 6 ( E ) 0.94%81.91 LF INV.=4890.424892.55 4894.2 THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERING SERVICES, INC., ARE BASED IN WHOLE, OR IN PART, UPON INFORMATION PROVIDED BY OTHERS. NORTHERN ENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. RECORD DRAWING 48 9 9 . 8 7 48 9 4 . 0 3 ( W ) 48 9 4 . 0 3 ( N E ) 48 9 3 . 8 1 ( S ) 19.0 LF 2.0% 37.2 LF 1.50% REV AUGUST 25, 2016 4885 4890 4895 4900 4905 4910 4915 4920 10+00 11+00 4885 4890 4895 4900 4905 4910 4915 4920 4885 4890 4895 4900 4905 4910 4915 4920 9+50 10+00 11+00 12+00 8" W 8" W8" W G G G G G E/C T V E/C T V E/C T V E/C T V E/C T V E/C T V STORM LINE 5 SEE SHEET C410 49.98 LF 15" RCP @ 0.50% STORM INLET 2-2 STA 11+24.35 N: 106358.02 E: 213771.17 STORM INLET 2-1 STA 10+74.37 N: 106402.29 E: 213747.97 74.37 LF 1 5 " R C P @ 0 . 5 0 % FES 2 STA 10+00.00 N: 106472.87 E: 213771.41 LE F E V E R D R I V E 4885 4890 4895 4900 4905 4910 4915 4920 10+0011+00 \A1;12" MIN 12 " W 12 " W 12 " W 12 " W 12 " S S 12 " S S 12 " S S 12 " S S E/ F O / C T V E/ F O / C T V E/ F O / C T V E/ F O / C T V E/ F O / C T V G G G G STORM LINE 1 SEE SHEET C404 STORM LINE 6 SEE SHEET C412 WATERMAIN LINE A SEE SHEET C307 SANITARY LINE A SEE SHEET C303 STMH 1-5 STA 10+00 N: 106919.18 E: 214138.39 38.50 LF 18" RCP @ 1.00% STORM INLET 1-5A STA 10+38.50 N: 106918.14 E: 214099.91 17.50 LF 18" RCP @ 1.00% STORM INLET 1-5B STA 10+17.50 N: 106919.65 E: 214155.89 CI N Q U E F O I L L A N E 12 " W 12 " W 12 " W 12 " W E E E E G G G G W IR IR8" SS 8" SS 12 " S S 12 " S S STORM INLET 1-3B STA 10+67.32 N: 107341.54 E: 214063.45 67.32 LF 15" RCP @ 1.00% STORM LINE 1 SEE SHEET C404 WATERMAIN LINE A SEE SHEET C307 SANITARY LINE A SEE SHEET C303 STORM LINE 1-3A SEE SHEET C405 CI N Q U E F O I L L A N E STMH 1-3 STA 10+00.00 N: 107321.04 E: 214127.56 CI N Q U E F O I L L A N E 4885 4890 4895 4900 4905 4910 4915 4920 4885 4890 4895 4900 4905 4910 4915 4920 9+5010+0011+0011+50 \A1;18" MIN KEYMAP HARMONY ROAD BR O O K F I E L D D R I V E LE FEVER DRIVE TIMBERWOOD DRIVE LA D Y M O O N D R . CI N Q U E F O I L L A N E ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 PROPOSED RIGHT-OF-WAY EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.ALL RCP SHALL BE CLASS III UNLESS OTHERWISE NOTED. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5.ALL STORM MANHOLES LOCATED IN SIDEWALKS AND TRAILS SHALL HAVE PEDESTRIAN RATED LIDS. 6.MANHOLE DIAMETERS SHOWN ARE THE MINIMUM SIZE PER CITY STANDARD DETAIL D-3. CONTRACTOR SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). 7.REFER TO INLET SCHEDULE ON SHEET 705 FOR STORM SEWER INLET TYPES. 8.ALL ROOF DRAIN LATERALS SHALL BE HIGH DENSITY POLYETHYLENE PIPE (HDPE) OR APPROVED EQUAL. THE CONTRACTOR SHALL TERMINATE THE ROOF DRAIN LATERALS 5.0-FEET OUTSIDE OF BUILDING. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF THE ROOF DRAIN CONNECTIONS TO THE DOWNSPOUTS AT THE PROPOSED BUILDING SHALL BE COORDINATED WITH THE ARCHITECTURAL DRAWINGS. 9.REFER TO THE ARCHITECTURAL DRAWINGS FOR DETAILS REGARDING THE CONNECTIONS FROM THE DOWNSPOUT TO UNDERGROUND ROOF DRAIN PIPING. W G T E/T/C EXISTING STORM SEWER ST PROPOSED ELEC/TELE/CABLE EXISTING TELEPHONE EXISTING GAS S W PROPOSED SEWER SERVICE EXISTING SANITARY SEWER SS PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED CURB STOP & METER PIT PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT H Y D PROPOSED LOTLINE EASEMENT LINE EPROPOSED ELECTRIC WPROPOSED RESIDETIAL SERVICE PROPOSED AREA DRAIN INLET APPROXIMATE LIMITS OF CONSTRUCTION EXISTING RIGHT OF WAY PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=50' STORM DRAIN LINE 2 STORMDRAIN 2 STORM DRAIN LINE 1-5A & 1-5B PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=50' STORMDRAIN 1-5A & 1-5B Date Date Date Date Date Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: City Engineer Water & Wastewater Utility Stormwater Utility Parks & Recreation Traffic Engineer Environmental Planner City of Fort Collins, Colorado UTILITY PLAN APPROVAL CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. before you dig.Call R FORT COLLINS, COLORADO BANNER HEALTH MEDICAL CAMPUS SEPTEMBER 20, 2013 SHEET HARMONY RD. & LADY MOON DR. BOULDER ASSOCIATES ARCHITECTS 1426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 OF 60 FINAL PLAN PLAN AND PROFILE STORM DRAIN 1-3, 1-5 & 2 C407 STORM DRAIN LINE 1-3B PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=50' STORMDRAIN 1-3 49 0 1 . 9 5 48 9 6 . 0 0 ( W ) 48 9 6 . 0 0 ( E ) 48 9 2 . 3 0 ( S ) 48 8 8 . 2 3 ( N ) 48 9 5 . 9 9 ( N W ) 48 8 6 . 1 4 ( S ) 48 8 9 . 2 4 ( N ) 48 8 6 . 1 2 ( E ) 49 0 1 . 7 2 49 0 1 . 1 3 48 9 6 . 4 8 ( W ) 49 0 1 . 3 7 48 9 7 . 0 4 ( E ) 38.7 LF 2.70% 2.74% 17.5 LF 38.7 LF 2.70% 17.5 LF 2.74% 49 0 1 . 3 0 67.0 LF 1.28% 48 9 6 . 8 5 ( E ) 67.0 LF 1.28% 4895.2 4891.61 4895.0 4892.76 THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERING SERVICES, INC., ARE BASED IN WHOLE, OR IN PART, UPON INFORMATION PROVIDED BY OTHERS. NORTHERN ENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. RECORD DRAWING 49 0 6 . 5 5 49 0 1 . 1 7 ( S E ) 48 9 8 . 9 6 ( N ) 49 0 1 . 3 0 ( N ) 48 9 8 . 3 9 49 0 6 . 4 7 55.7 LF 0.41% 0.79%70.89 LF 70.89 LF 0.79% 55.7 LF 0.41% REV AUGUST 25, 2016 4885 4890 4895 4900 4905 4910 4915 4920 4885 4890 4895 4900 4905 4910 4915 4920 9+5010+0011+0012+0013+0014+0015+0016+0017+0018+0019+00 12 " W 12" W 12" W 12" W 12" W 12" W STORM LINE 3-3 SEE SHEET C409 STMH 3-4 STA 13+31.56 N: 107517.77 E: 213427.76 STMH 3-3 STA 10+76.08 N: 107517.67 E: 213683.23 STORM INLET 3-5 STA 13+72.06 N: 107477.27 E: 213427.76 9.61 LF 42" RCP @ 0.50% 40.50 LF 30" RCP @ 0.50% 18 2 . 0 0 L F 3 0 " R C P @ 0 . 6 1 % 255.47 LF 36" RCP @ 0.50% WATERMAIN A SEE SHEET C306 FES 3-1 STA 10+00.00 N: 107589.08 E: 213707.69 66.48 LF 42" RCP @ 0.50%STORM INLET 3-2 STA 10+66.48 N: 107527.27 E: 213683.23 12 " W 12 " W 12 " W STORM INLET 3-10 STA 17+60.67 N: 107088.66 E: 213427.78 STORM INLET 3-9 STA 17+44.04 N: 107105.29 E: 213427.78 STMH 3-8 STA 16+58.56 N: 107190.77 E: 213427.78 182.00 LF 30" RCP @ 0.61%96.02 LF 30" RCP @ 0.50% 16.62 LF 12" RCP @ 1.00% 85.49 LF 24" RCP @ 0.80% STORM LINE 3-8 SEE SHEET C410 STORM INLET 3-7 STA 15+62.53 N: 107286.79 E: 213427.78 FUTURE CONNECTION 3-11 PLUG AND STAKE FOR FUTURE USE STA 18+11.63 N: 107037.70 E: 213427.78 50.97 LF 12" RCP @ 1.00%8.48 LF 30" RCP @ 0.52% STORM INLET 3-6 STA 15+54.06 N: 107295.27 E: 213427.77 KEYMAP HARMONY ROAD BR O O K F I E L D D R I V E LE FEVER DRIVE TIMBERWOOD DRIVE LA D Y M O O N D R . CI N Q U E F O I L L A N E ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 PROPOSED RIGHT-OF-WAY EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.ALL RCP SHALL BE CLASS III UNLESS OTHERWISE NOTED. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5.ALL STORM MANHOLES LOCATED IN SIDEWALKS AND TRAILS SHALL HAVE PEDESTRIAN RATED LIDS. 6.MANHOLE DIAMETERS SHOWN ARE THE MINIMUM SIZE PER CITY STANDARD DETAIL D-3. CONTRACTOR SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). 7.REFER TO INLET SCHEDULE ON SHEET 705 FOR STORM SEWER INLET TYPES. 8.ALL ROOF DRAIN LATERALS SHALL BE HIGH DENSITY POLYETHYLENE PIPE (HDPE) OR APPROVED EQUAL. THE CONTRACTOR SHALL TERMINATE THE ROOF DRAIN LATERALS 5.0-FEET OUTSIDE OF BUILDING. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF THE ROOF DRAIN CONNECTIONS TO THE DOWNSPOUTS AT THE PROPOSED BUILDING SHALL BE COORDINATED WITH THE ARCHITECTURAL DRAWINGS. 9.REFER TO THE ARCHITECTURAL DRAWINGS FOR DETAILS REGARDING THE CONNECTIONS FROM THE DOWNSPOUT TO UNDERGROUND ROOF DRAIN PIPING. W G T E/T/C EXISTING STORM SEWER ST PROPOSED ELEC/TELE/CABLE EXISTING TELEPHONE EXISTING GAS S W PROPOSED SEWER SERVICE EXISTING SANITARY SEWER SS PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED CURB STOP & METER PIT PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT H Y D PROPOSED LOTLINE EASEMENT LINE EPROPOSED ELECTRIC WPROPOSED RESIDETIAL SERVICE PROPOSED AREA DRAIN INLET APPROXIMATE LIMITS OF CONSTRUCTION EXISTING RIGHT OF WAY PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=50' STORM DRAIN LINE 3 STORMDRAIN 3 LI N E MA T C H ST A 15 + 0 0 LINE MATCH STA 15+00 Date Date Date Date Date Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: City Engineer Water & Wastewater Utility Stormwater Utility Parks & Recreation Traffic Engineer Environmental Planner City of Fort Collins, Colorado UTILITY PLAN APPROVAL CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. before you dig.Call R FORT COLLINS, COLORADO BANNER HEALTH MEDICAL CAMPUS SEPTEMBER 20, 2013 SHEET HARMONY RD. & LADY MOON DR. BOULDER ASSOCIATES ARCHITECTS 1426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 OF 60 FINAL PLAN PLAN AND PROFILE STORM DRAIN LINE 3 C408 4902.2 40.0 LF 49 0 7 . 2 4 49 0 3 . 7 9 ( S ) 49 0 3 . 7 7 ( N ) 49 0 7 . 2 4 49 0 8 . 3 0 49 0 5 . 8 2 49 0 6 . 0 7 49 0 5 . 0 6 49 0 5 . 8 7 49 0 4 . 3 0 49 0 3 . 7 4 48 9 7 . 3 7 49 0 3 . 4 7 ( S ) 49 0 2 . 8 9 ( N ) 49 0 1 . 8 3 ( S ) 49 0 1 . 9 5 ( E ) 49 0 1 . 4 7 ( N ) 49 0 0 . 9 0 ( S ) 49 0 0 . 8 4 ( N ) 49 0 0 . 7 9 ( S ) 49 0 0 . 7 7 ( N ) 48 9 9 . 7 1 ( S ) 48 9 9 . 6 6 ( N ) 48 9 9 . 3 2 ( S ) 48 9 9 . 1 7 ( E ) 48 9 8 . 0 0 ( W ) 48 9 9 . 6 7 ( S ) 48 9 7 . 7 0 ( N ) 48 9 7 . 6 6 ( S ) 48 9 7 . 6 6 ( N ) 16.1 LF 1.90% 86.7 LF 96.0 LF 181.9 LF 8.1 LF 1.20% 0.59% 0.62% 0.58% 0.81% 0.46% 0.42% 0.42% 41.8 LF 256.8 LF 9.2 LF 68.4 LF THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERING SERVICES, INC., ARE BASED IN WHOLE, OR IN PART, UPON INFORMATION PROVIDED BY OTHERS. NORTHERN ENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. RECORD DRAWING 40.0 LF 1.90% 16.1 LF 86.7 LF 1.20%96.0 LF 0.59% 8.1 LF 0.62% 181.9 LF 0.58% 0.81% 41.8 LF 0.46%256.8 LF 0.42%9.2 LF 68.4 LF 0.42% 49 0 4 . 3 5 REV AUGUST 25, 2016 4890 4895 4900 4905 4910 4915 4920 4925 4890 4895 4900 4905 4910 4915 4920 4925 9+50 10+00 11+00 4890 4895 4900 4905 4910 4915 4920 4925 4890 4895 4900 4905 4910 4915 4920 4925 9+50 10+00 11+00 12+00 13+00 14+00 12" W 12" W 12" W 12" W 12" W STMH 3-3.2 STA 10+00.00 N: 107471.32 E: 213768.82 10.03 LF 12" RCP @ 1.00% STORM INLET 3-3.2A STA 10+10.03 N: 107470.61 E: 213778.82 STORM LINE 3 SEE SHEET C408 WATERMAIN A SEE SHEET C306 6"X4" REDUCER 12 " W 12 " W 12 " W 12 " W 12 " W S RD 8" S S STMH 3-3 STA 10+00.00 N: 107517.67 E: 213683.23 45.16 LF 18" RCP @ 0.50% 151.87 LF 12" HDPE @ 0.78% STMH 3-3.2 STA 11+30.77 N: 107471.32 E: 213768.82 WATERMAIN A SEE SHEET C306 85.60 LF 18" RCP @ 0.60% STORM INLET 3-3.3 STA 13+19.14 N: 107282.95 E: 213768.82 STORM INLET 3-3.1 STA 10+45.16 N: 107472.50 E: 213683.23 CONNECTION 3-3.4 8" ROOF DRAIN SEE MECHANICAL DRAWINGS FOR CONTINUATION STA 13+33.82 N: 107268.27 E: 213768.82 14.68 LF 8" HDPE @ 1.00% 46.80 LF 6" HDPE @ 4.00% 6"X4" REDUCER TO 4" ROOF DRAIN (SEE MECHANICAL DRAWINGS FOR CONTINUATION) INV. 4904.60 N: 107319.45 E: 213815.62 36.50 LF 12" HDPE @ 0.78% 12''x6'' TEE KEYMAP HARMONY ROAD BR O O K F I E L D D R I V E LE FEVER DRIVE TIMBERWOOD DRIVE LA D Y M O O N D R . CI N Q U E F O I L L A N E ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 PROPOSED RIGHT-OF-WAY EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.ALL RCP SHALL BE CLASS III UNLESS OTHERWISE NOTED. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5.ALL STORM MANHOLES LOCATED IN SIDEWALKS AND TRAILS SHALL HAVE PEDESTRIAN RATED LIDS. 6.MANHOLE DIAMETERS SHOWN ARE THE MINIMUM SIZE PER CITY STANDARD DETAIL D-3. CONTRACTOR SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). 7.REFER TO INLET SCHEDULE ON SHEET 705 FOR STORM SEWER INLET TYPES. 8.ALL ROOF DRAIN LATERALS SHALL BE HIGH DENSITY POLYETHYLENE PIPE (HDPE) OR APPROVED EQUAL. THE CONTRACTOR SHALL TERMINATE THE ROOF DRAIN LATERALS 5.0-FEET OUTSIDE OF BUILDING. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF THE ROOF DRAIN CONNECTIONS TO THE DOWNSPOUTS AT THE PROPOSED BUILDING SHALL BE COORDINATED WITH THE ARCHITECTURAL DRAWINGS. 9.REFER TO THE ARCHITECTURAL DRAWINGS FOR DETAILS REGARDING THE CONNECTIONS FROM THE DOWNSPOUT TO UNDERGROUND ROOF DRAIN PIPING. W G T E/T/C EXISTING STORM SEWER ST PROPOSED ELEC/TELE/CABLE EXISTING TELEPHONE EXISTING GAS S W PROPOSED SEWER SERVICE EXISTING SANITARY SEWER SS PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED CURB STOP & METER PIT PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT H Y D PROPOSED LOTLINE EASEMENT LINE EPROPOSED ELECTRIC WPROPOSED RESIDETIAL SERVICE PROPOSED AREA DRAIN INLET APPROXIMATE LIMITS OF CONSTRUCTION EXISTING RIGHT OF WAY STORM DRAIN LINE 3-3STORM DRAIN LINE 3-3.2A PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=50' PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=50' STORMDRAIN 3-3 STORMDRAIN 3-3.2A Date Date Date Date Date Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: City Engineer Water & Wastewater Utility Stormwater Utility Parks & Recreation Traffic Engineer Environmental Planner City of Fort Collins, Colorado UTILITY PLAN APPROVAL CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. before you dig.Call R FORT COLLINS, COLORADO BANNER HEALTH MEDICAL CAMPUS SEPTEMBER 20, 2013 SHEET HARMONY RD. & LADY MOON DR. BOULDER ASSOCIATES ARCHITECTS 1426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 OF 60 FINAL PLAN PLAN AND PROFILE STORM DRAIN LINE 3-3, 3-3.2A C409 49 0 4 . 3 0 48 9 8 . 0 0 ( W ) 48 9 9 . 6 7 ( S ) 48 9 7 . 7 0 ( N ) 49 0 4 . 8 1 49 0 0 . 3 3 ( E ) 49 0 0 . 1 9 ( N ) 49 0 6 . 0 1 49 0 1 . 1 9 ( E ) 49 0 1 . 0 1 ( S ) 49 0 0 . 8 5 ( W ) 49 0 8 . 5 2 49 0 3 . 4 6 ( N ) 14.0 LF 190.3 LF 85.9 LF 45.7 LF 1.15% 1.29% 49 0 6 . 0 1 49 0 1 . 1 9 ( E ) 49 0 1 . 0 1 ( S ) 49 0 0 . 8 5 ( W ) 49 0 5 . 5 6 49 0 1 . 5 6 ( W ) 3.75%9.9 LF 4898.5 9.9 LF 3.75% 45.7 LF 1.15% 85.9 LF 190.3 LF 1.29% 14.0 LF THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERING SERVICES, INC., ARE BASED IN WHOLE, OR IN PART, UPON INFORMATION PROVIDED BY OTHERS. NORTHERN ENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. RECORD DRAWING 0.61% REV AUGUST 25, 2016 4885 4890 4895 4900 4905 4910 4915 4920 4885 4890 4895 4900 4905 4910 4915 4920 9+50 10+00 11+00 12+00 13+00 \A1;12" MIN 4885 4890 4895 4900 4905 4910 4915 4920 4885 4890 4895 4900 4905 4910 4915 4920 9+5010+0011+0011+50 \A1;12" MIN PRIVATE DR. 12 " W 12 " W 12" W 12" W 12" W RD RD RDRD STORM INLET 3-8.1 STA 11+26.29 N: 107190.77 E: 213554.07 STORM INLET 3-8.3 STA 12+36.66 N: 107170.82 E: 213662.25 STORM INLET 3-8.2 STA 11+44.04 N: 107190.77 E: 213571.82 STMH 3-8 STA 10+00.00 N: 107190.77 E: 213427.78 126.29 LF 15" RCP @ 0.70% 17.75 LF 15" RCP @ 0.50% 92.60 LF 15 " R C P @ 0 . 5 0 % STORM LINE 3 SEE SHEET C408 14 0 . 6 7 L F 8 " H D P E @ 0 . 5 2 % 52.15 LF 6" HDPE @ 1.00% 7.74 LF 8" HDPE @ 1.00% 6"X3" TEE TO 3" ROOF DRAIN 8'X6" REDUCER (W) (SEE MECHANICAL DRAWINGS FOR CONTINUATION) INV. 4904.26 N: 107050.16 E: 213561.80 6" 90° BEND W/ 6"X3" REDUCER TO 3" ROOF DRAIN (SEE MECHANICAL DRAWINGS FOR CONTINUATION) INV. 4904.78 N: 107050.10 E: 213613.95 8''-90° BEND 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" SS 8" SS 8" SS 8" SS CO G G 8" S S E/CTV E/CTV FES 5-1 STA 10+89.70 N: 106499.86 E: 213653.64 FES 5 STA 10+00.00 N: 106500.90 E: 213743.33 89.70 LF 24" RCP @ 0.84% STORM LINE 4 SEE SHEET C411 STORM LINE 2 SEE SHEET C407 16" STEEL CASING 10' EACH SIDE OF STORM LINE KEYMAP HARMONY ROAD BR O O K F I E L D D R I V E LE FEVER DRIVE TIMBERWOOD DRIVE LA D Y M O O N D R . CI N Q U E F O I L L A N E ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 PROPOSED RIGHT-OF-WAY EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.ALL RCP SHALL BE CLASS III UNLESS OTHERWISE NOTED. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5.ALL STORM MANHOLES LOCATED IN SIDEWALKS AND TRAILS SHALL HAVE PEDESTRIAN RATED LIDS. 6.MANHOLE DIAMETERS SHOWN ARE THE MINIMUM SIZE PER CITY STANDARD DETAIL D-3. CONTRACTOR SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). 7.REFER TO INLET SCHEDULE ON SHEET 705 FOR STORM SEWER INLET TYPES. 8.ALL ROOF DRAIN LATERALS SHALL BE HIGH DENSITY POLYETHYLENE PIPE (HDPE) OR APPROVED EQUAL. THE CONTRACTOR SHALL TERMINATE THE ROOF DRAIN LATERALS 5.0-FEET OUTSIDE OF BUILDING. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF THE ROOF DRAIN CONNECTIONS TO THE DOWNSPOUTS AT THE PROPOSED BUILDING SHALL BE COORDINATED WITH THE ARCHITECTURAL DRAWINGS. 9.REFER TO THE ARCHITECTURAL DRAWINGS FOR DETAILS REGARDING THE CONNECTIONS FROM THE DOWNSPOUT TO UNDERGROUND ROOF DRAIN PIPING. W G T E/T/C EXISTING STORM SEWER ST PROPOSED ELEC/TELE/CABLE EXISTING TELEPHONE EXISTING GAS S W PROPOSED SEWER SERVICE EXISTING SANITARY SEWER SS PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED CURB STOP & METER PIT PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT H Y D PROPOSED LOTLINE EASEMENT LINE EPROPOSED ELECTRIC WPROPOSED RESIDETIAL SERVICE PROPOSED AREA DRAIN INLET APPROXIMATE LIMITS OF CONSTRUCTION EXISTING RIGHT OF WAY STORMDRAIN 3-6 STORM DRAIN LINE 3-8STORM DRAIN LINE 5 PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=50' PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=50' STORMDRAIN 5 Date Date Date Date Date Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: City Engineer Water & Wastewater Utility Stormwater Utility Parks & Recreation Traffic Engineer Environmental Planner City of Fort Collins, Colorado UTILITY PLAN APPROVAL CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. before you dig.Call R FORT COLLINS, COLORADO BANNER HEALTH MEDICAL CAMPUS SEPTEMBER 20, 2013 SHEET HARMONY RD. & LADY MOON DR. BOULDER ASSOCIATES ARCHITECTS 1426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 OF 60 FINAL PLAN PLAN AND PROFILE STORM DRAIN 3-8 & 5 C410 49 0 7 . 0 1 49 0 3 . 0 6 ( E ) 49 0 3 . 5 6 ( S ) 49 0 2 . 8 9 ( W ) 128.9 LF 0.73% 17.1 LF 1.00% 90.9 LF 0.53% 49 0 8 . 3 0 49 0 1 . 8 3 ( S ) 49 0 1 . 9 5 ( E ) 49 0 1 . 4 7 ( N ) 49 0 6 . 7 1 49 0 3 . 2 7 ( E ) 49 0 3 . 2 3 ( W ) 49 0 7 . 5 0 49 0 3 . 7 5 ( W ) 0.73%128.9 LF 1.00% 17.1 LF 0.53% 90.9 LF 4902.0 THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERING SERVICES, INC., ARE BASED IN WHOLE, OR IN PART, UPON INFORMATION PROVIDED BY OTHERS. NORTHERN ENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. RECORD DRAWING 48 9 9 . 2 6 ( W ) 48 9 9 . 9 9 ( E ) 92.5 LF 0.79% 0.79% 92.5 LF REV AUGUST 25, 2016 4885 4890 4895 4900 4905 4910 4915 4920 4885 4890 4895 4900 4905 4910 4915 4920 9+5010+0011+0012+0013+0014+00 4885 4890 4895 4900 4905 4910 4915 4920 4885 4890 4895 4900 4905 4910 4915 4920 9+5010+0011+0012+0013+00 \A1;12" MIN \A1;12" MIN 4885 4890 4895 4900 4905 4910 4915 4920 4885 4890 4895 4900 4905 4910 4915 4920 9+5010+0011+0011+50 8" W 8" W 8" W 8" W 8" W 8" W 8" SS 8" SS 8" SS 8" SS 8" SS 8" W 8" W 8" S S 8" S S STORM LINE 4-2 SEE THIS SHEET STMH 4-1 STA 10+72.90 N: 106605.91 E: 213708.43 STMH 4-2 STA 11+82.50 N: 106605.91 E: 213598.83 TEMPORARY FES 4-3 STA 12+29.22 N: 106605.91 E: 213552.11 FES 4 STA 10+00.00 N: 106546.09 E: 213750.09 46.72 LF 36" RCP @ 0.50% 72.90 LF 42" RCP @ 0.52% 109.60 LF 36" RCP @ 0.50% SANITARY LINE A1 SEE SHEET C305 STORM LINE 4-1 SEE THIS SHEET 16" STEEL CASING 10' EACH SIDE OF STORM LINE 16" STEEL CASING 10' EACH SIDE OF STORM LINE 8" W 8" W 8" W 8" W 8" S S 8" S S 8" S S 8" S S STORM INLET 4-1.1 STA 11+38.85 N: 106686.33 E: 213821.62 138.85 LF 30" RCP @ 0.50% STMH 4-1 STA 10+00.00 N: 106605.91 E: 213708.43 SANITARY LINE A1 SEE SHEET C305 8" W 8" W 8" W 8" S S 8" S S 8" W 8" W8" W8" W 12" W S S W T RD 8" S S 8" SS8" SS8" SS8" SS RD RD RD RD S RD RD STORM INLET 4-2.2 STA 13+48.58 N: 106954.50 E: 213598.83 62.38 LF 8" HDPE @ 0.61% 178.01 LF 15" RCP @ 0.52% SANITARY LINE A1 SEE SHEET C305 8"-90° BEND STMH 4-2.1 STA 10+09.45 N: 106776.49 E: 213598.83 31.59 LF 6" HDPE @ 3.83% 6" ROOF DRAIN (SEE MECHANICAL DRAWINGS FOR CONTINUATION) INV. 4905.25 N: 106959.69 E: 213567.67 41.63 LF 6" HDPE @ 2.52% 6"X4" REDUCER 4" ROOF DRAIN (SEE MECHANICAL DRAWINGS FOR CONTINUATION) INV. 4905.25 N: 106993.19 E: 213614.20 34.29 LF 6" HDPE @ 2.65% STUB AND STAKE 4-2.1A INV. 4903.97 N: 106776.49 E: 213633.12 PROPOSED BUILDING FULL BUILD FULL BUILD 6"X4" REDUCER 4" ROOF DRAIN (SEE MECHANICAL DRAWINGS FOR CONTINUATION) INV. 4905.25 N: 106995.96 E: 213651.20 8" ROOF DRAIN (SEE MECHANICAL DRAWINGS FOR CONTINUATION) INV. 4904.25 N: 106964.27 E: 213652.00 31.69 LF 6" HDPE @ 2.62% KEYMAP HARMONY ROAD BR O O K F I E L D D R I V E LE FEVER DRIVE TIMBERWOOD DRIVE LA D Y M O O N D R . CI N Q U E F O I L L A N E ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 PROPOSED RIGHT-OF-WAY EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.ALL RCP SHALL BE CLASS III UNLESS OTHERWISE NOTED. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5.ALL STORM MANHOLES LOCATED IN SIDEWALKS AND TRAILS SHALL HAVE PEDESTRIAN RATED LIDS. 6.MANHOLE DIAMETERS SHOWN ARE THE MINIMUM SIZE PER CITY STANDARD DETAIL D-3. CONTRACTOR SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). 7.REFER TO INLET SCHEDULE ON SHEET 705 FOR STORM SEWER INLET TYPES. 8.ALL ROOF DRAIN LATERALS SHALL BE HIGH DENSITY POLYETHYLENE PIPE (HDPE) OR APPROVED EQUAL. THE CONTRACTOR SHALL TERMINATE THE ROOF DRAIN LATERALS 5.0-FEET OUTSIDE OF BUILDING. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF THE ROOF DRAIN CONNECTIONS TO THE DOWNSPOUTS AT THE PROPOSED BUILDING SHALL BE COORDINATED WITH THE ARCHITECTURAL DRAWINGS. 9.REFER TO THE ARCHITECTURAL DRAWINGS FOR DETAILS REGARDING THE CONNECTIONS FROM THE DOWNSPOUT TO UNDERGROUND ROOF DRAIN PIPING. W G T E/T/C EXISTING STORM SEWER ST PROPOSED ELEC/TELE/CABLE EXISTING TELEPHONE EXISTING GAS S W PROPOSED SEWER SERVICE EXISTING SANITARY SEWER SS PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED CURB STOP & METER PIT PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT H Y D PROPOSED LOTLINE EASEMENT LINE EPROPOSED ELECTRIC WPROPOSED RESIDETIAL SERVICE PROPOSED AREA DRAIN INLET APPROXIMATE LIMITS OF CONSTRUCTION EXISTING RIGHT OF WAY PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=50' PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=50' STORMDRAIN 4 STORMDRAIN 4-1 STORMDRAIN 4-2 PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=50' Date Date Date Date Date Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: City Engineer Water & Wastewater Utility Stormwater Utility Parks & Recreation Traffic Engineer Environmental Planner City of Fort Collins, Colorado UTILITY PLAN APPROVAL CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. before you dig.Call R FORT COLLINS, COLORADO BANNER HEALTH MEDICAL CAMPUS SEPTEMBER 20, 2013 SHEET HARMONY RD. & LADY MOON DR. BOULDER ASSOCIATES ARCHITECTS 1426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 OF 60 FINAL PLAN PLAN AND PROFILE STORM DRAIN 4, 4-1 & 4-2 C411 STORM DRAIN LINE 4STORM DRAIN LINE 4-2 STORM DRAIN LINE 4-1 THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERING SERVICES, INC., ARE BASED IN WHOLE, OR IN PART, UPON INFORMATION PROVIDED BY OTHERS. NORTHERN ENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. RECORD DRAWING 49 0 5 . 0 2 49 0 0 . 1 4 ( W ) 49 0 1 . 1 7 ( N ) 49 0 0 . 1 2 ( E ) 108.1 LF 0.46% 4895.07 49 0 6 . 4 3 48 9 9 . 3 2 ( N W ) 48 9 9 . 6 2 ( W ) 48 9 9 . 5 7 ( N E ) 48 9 9 . 5 9 ( S E ) 49 0 0 . 3 7 ( E ) 69.2 LF 0.39% 50.4 LF 50.4 LF 69.2 LF 0.39% 0.46%108.1 LF 49 0 6 . 4 3 48 9 9 . 6 2 ( W ) 48 9 9 . 5 7 ( N E ) 48 9 9 . 5 9 ( S E ) 49 0 4 . 9 8 49 0 0 . 2 9 ( S W ) 49 0 5 . 0 2 49 0 0 . 1 4 ( W ) 49 0 1 . 1 7 ( N ) 49 0 0 . 1 2 ( E ) 49 0 8 . 8 3 49 0 2 . 0 8 ( N ) 49 0 2 . 8 6 ( E ) 49 0 2 . 0 6 ( S ) 49 0 8 . 3 0 49 0 3 . 3 8 ( N E ) 49 0 3 . 7 9 ( W ) 49 0 3 . 3 2 ( S ) 170.9 LF 0.70%177.9 LF 138.3 LF 0.52% 0.52% 138.3 LF 170.9 LF 177.9 LF 0.70% INV=4893.89 REV AUGUST 25, 2016 4885 4890 4895 4900 4905 4910 4915 4920 4885 4890 4895 4900 4905 4910 4915 4920 9+5010+0011+0012+0013+0014+0015+0016+0017+0017+50 8" W 8" W 8" W 8" W 8" W 8" S S 8" S S 8" S S 8" S S 8" S S 8" S S 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" SS 12" SS 12" SS 12" SS 12" SS 12" SS 12" SS 12" SS 12" SS 12" SS 12" SS 12" SS 12" SS SF RDTF E E/FO/CTV E/FO/CTV E/FO/CTV E/FO/CTV E/FO/CTV E/FO/CTV E/FO/CTV E/FO/CTV E/FO/CTV E/FO/CTV E E E E CT V CTV G G G G G G G G G G G G G G G G G G G GTF TWTF G E/ C T V E/ C T V E/ C T V E/ C T V STORM LINE 1 SEE SHEET C404 STORM LINE 1 SEE SHEET C404 STORM INLET 6-4 STA 16+90.52 N: 106992.96 E: 213788.28 STORM INLET 6-1 STA 10+46.36 N: 106626.33 E: 214072.64 (SEE NOTE 10) STMH 6-2 STA 14+05.94 N: 106985.91 E: 214072.64 FES 6 STA 10+00.00 N: 106582.73 E: 214056.90 359.58 LF 18" RCP @ 0.52% 46.36 LF 18" RCP @ 0.52% CINQUEFOIL LANE STORM LINE 1-5A SEE SHEET C405 SANITARY LINE A SEE SHEET 304 WATERMAIN LINE A SEE SHEET C307 STORM INLET 6-3 STA 15+75.22 N: 106985.91 E: 213903.37 16 9 . 2 7 L F 1 2 " S C H 4 0 P V C @ 1 . 0 0 % FULL BUILD PROPOSED BUILDING 42.14 LF 8" HDPE @ 2.11% 90° BEND 4.69 LF 8" PVC @ 5.00% 8'' ROOF DRAIN (SEE MECHANICAL DRAWINGS FOR CONTINUATION) INV = 4902.25 N: 107028.05 E: 214067.95 SEE NOTE 11 SEE NOTE 11 KEYMAP HARMONY ROAD BR O O K F I E L D D R I V E LE FEVER DRIVE TIMBERWOOD DRIVE LA D Y M O O N D R . CI N Q U E F O I L L A N E ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 PROPOSED RIGHT-OF-WAY EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.ALL RCP SHALL BE CLASS III UNLESS OTHERWISE NOTED. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5.ALL STORM MANHOLES LOCATED IN SIDEWALKS AND TRAILS SHALL HAVE PEDESTRIAN RATED LIDS. 6.MANHOLE DIAMETERS SHOWN ARE THE MINIMUM SIZE PER CITY STANDARD DETAIL D-3. CONTRACTOR SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). 7.REFER TO INLET SCHEDULE ON SHEET 705 FOR STORM SEWER INLET TYPES. 8.ALL ROOF DRAIN LATERALS SHALL BE HIGH DENSITY POLYETHYLENE PIPE (HDPE) OR APPROVED EQUAL. THE CONTRACTOR SHALL TERMINATE THE ROOF DRAIN LATERALS 5.0-FEET OUTSIDE OF BUILDING. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF THE ROOF DRAIN CONNECTIONS TO THE DOWNSPOUTS AT THE PROPOSED BUILDING SHALL BE COORDINATED WITH THE ARCHITECTURAL DRAWINGS. 9.REFER TO THE ARCHITECTURAL DRAWINGS FOR DETAILS REGARDING THE CONNECTIONS FROM THE DOWNSPOUT TO UNDERGROUND ROOF DRAIN PIPING. W G T E/T/C EXISTING STORM SEWER ST PROPOSED ELEC/TELE/CABLE EXISTING TELEPHONE EXISTING GAS S W PROPOSED SEWER SERVICE EXISTING SANITARY SEWER SS PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED CURB STOP & METER PIT PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT H Y D PROPOSED LOTLINE EASEMENT LINE EPROPOSED ELECTRIC WPROPOSED RESIDETIAL SERVICE PROPOSED AREA DRAIN INLET APPROXIMATE LIMITS OF CONSTRUCTION EXISTING RIGHT OF WAY PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=50' STORMDRAIN 6 STORM DRAIN LINE 6 Date Date Date Date Date Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: City Engineer Water & Wastewater Utility Stormwater Utility Parks & Recreation Traffic Engineer Environmental Planner City of Fort Collins, Colorado UTILITY PLAN APPROVAL CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. before you dig.Call R FORT COLLINS, COLORADO BANNER HEALTH MEDICAL CAMPUS SEPTEMBER 20, 2013 SHEET HARMONY RD. & LADY MOON DR. BOULDER ASSOCIATES ARCHITECTS 1426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 OF 60 FINAL PLAN PLAN AND PROFILE STORM DRAIN LINE 6 C412 10. CONTRACTOR SHALL PLACE STEEL PLATE ON LAST CONCRETE SECTION IN LIEU OF GRATE FOR INTERIM CONDITION. WHEN FINAL PRIVATE LOOP DRIVE IS CONSTRUCTED STEEL PLATE SHALL E BE REMOVED AND GRATE CAN BE INSTALLED. 11. CONTRACTOR SHALL ENSURE THAT PIPE JOINTS ARE NOT LOCATED UNDER PROPOSED BUILDING IF POSSIBLE. 49 0 0 . 7 0 ( W ) 49 0 0 . 8 0 ( N ) 49 0 0 . 4 0 ( S ) 49 0 3 . 5 5 THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERING SERVICES, INC., ARE BASED IN WHOLE, OR IN PART, UPON INFORMATION PROVIDED BY OTHERS. NORTHERN ENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. RECORD DRAWING 48 9 8 . 5 2 ( N ) (N ) 4 8 9 8 . 6 9 (S ) 4 8 9 8 . 6 9 49 0 9 . 0 3 49 0 8 . 4 2 49 0 4 . 1 1 49 0 2 . 4 6 ( W ) 49 0 2 . 3 9 ( E ) 115.1 LF 1.43% 171.1 LF 0.93% 0.47% 358.5 LF 45.9 LF 0.37%INV=4894.83 INV=4891.29 115.1 LF 1.43% 17 1 . 1 L F 0.9 3 % 0.47%358.5 LF 45.9 LF 0.37% REV AUGUST 25, 2016 4865 4870 4875 4880 4885 4890 4895 4900 4865 4870 4875 4880 4885 4890 4895 4900 9+5010+0011+0012+0013+00 CTV CTV CTV OUTLET - MH1 STA 10+58.37 N: 106453.08 E: 215356.97 OUTLET - FES STA 10+00.00 N: 106451.85 E: 215415.33 58.37 LF 24" RCP @ 1.00% 93.85 L F 2 4 " R C P @ 2 . 0 0 % FO S S I L C R E E K R E S E R V O I R IN L E T D I T C H REGIONAL - OUTLET STA 11+52.22 N: 106488.04 E: 215269.88 KEYMAP HARMONY ROAD BR O O K F I E L D D R I V E LE FEVER DRIVE TIMBERWOOD DRIVE LA D Y M O O N D R . CI N Q U E F O I L L A N E ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 PROPOSED RIGHT-OF-WAY EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.ALL RCP SHALL BE CLASS III UNLESS OTHERWISE NOTED. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5.ALL STORM MANHOLES LOCATED IN SIDEWALKS AND TRAILS SHALL HAVE PEDESTRIAN RATED LIDS. 6.MANHOLE DIAMETERS SHOWN ARE THE MINIMUM SIZE PER CITY STANDARD DETAIL D-3. CONTRACTOR SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). 7.REFER TO INLET SCHEDULE ON SHEET 705 FOR STORM SEWER INLET TYPES. 8.ALL ROOF DRAIN LATERALS SHALL BE HIGH DENSITY POLYETHYLENE PIPE (HDPE) OR APPROVED EQUAL. THE CONTRACTOR SHALL TERMINATE THE ROOF DRAIN LATERALS 5.0-FEET OUTSIDE OF BUILDING. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF THE ROOF DRAIN CONNECTIONS TO THE DOWNSPOUTS AT THE PROPOSED BUILDING SHALL BE COORDINATED WITH THE ARCHITECTURAL DRAWINGS. 9.REFER TO THE ARCHITECTURAL DRAWINGS FOR DETAILS REGARDING THE CONNECTIONS FROM THE DOWNSPOUT TO UNDERGROUND ROOF DRAIN PIPING. W G T E/T/C EXISTING STORM SEWER ST PROPOSED ELEC/TELE/CABLE EXISTING TELEPHONE EXISTING GAS S W PROPOSED SEWER SERVICE EXISTING SANITARY SEWER SS PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED CURB STOP & METER PIT PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT H Y D PROPOSED LOTLINE EASEMENT LINE EPROPOSED ELECTRIC WPROPOSED RESIDETIAL SERVICE PROPOSED AREA DRAIN INLET APPROXIMATE LIMITS OF CONSTRUCTION EXISTING RIGHT OF WAY Date Date Date Date Date Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: City Engineer Water & Wastewater Utility Stormwater Utility Parks & Recreation Traffic Engineer Environmental Planner City of Fort Collins, Colorado UTILITY PLAN APPROVAL CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. before you dig.Call R FORT COLLINS, COLORADO BANNER HEALTH MEDICAL CAMPUS SEPTEMBER 20, 2013 SHEET HARMONY RD. & LADY MOON DR. BOULDER ASSOCIATES ARCHITECTS 1426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 OF 60 FINAL PLAN PLAN AND PROFILE STORM DRAIN OULET C413 PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=50' OUTLET North Poudre Irrigation Company UTILITY PLAN APPROVAL APPROVED: DATE STORM DRAIN OUTLET THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERING SERVICES, INC., ARE BASED IN WHOLE, OR IN PART, UPON INFORMATION PROVIDED BY OTHERS. NORTHERN ENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. RECORD DRAWING 48 7 3 . 5 4 ( W ) 48 6 7 . 2 1 ( E ) 48 7 7 . 6 4 48 6 6 . 8 0 ( W ) 48 7 5 . 3 4 ( E ) 1.9% 94.8 LF 1.05%66.6 LF 66.6 LF 1.05% 1.9% 94.8 LF REV AUGUST 25, 2016 FORT COLLINS, COLORADO BANNER HEALTH MEDICAL CAMPUS SEPTEMBER 20, 2013 SHEET HARMONY RD. & LADY MOON DR. BOULDER ASSOCIATES ARCHITECTS 1426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 OF 60 FINAL PLAN CONSTRUCTION DETAILS C704 FLARED END SECTION TRASH RACK4 "L" 75" 84" "L" 65" 67" 108" 82.75" {LOCKING PIN} 10 8 " %%UEND VIEW %%USIDE VIEW 39.5" 62.75" "L" 30" 28" 47.5" 31" 71.25"59 . 7 5 " 52"9"512.5"15"30"15.5"36"18" \A 1 ; B 8.5"58" "B" 7.5" 5.5" 9.5" 6.5" CIRCULAR DIMENSIONS ELLIPTICAL DIMENSIONS 30" 36" 12" PIPE DIA. 15" 18" 24" 45" 38" 11" "A" 9" 12" 10" 29" 24" PIPE EQUIV. 18" 24" 23" SPAN 30"19" 14" RISE 6.5" 8" 8" "D" 6" 6 5 26.75" 21.75" 30" 25" "C" 3 3 3 5 9.5" 9" 64" 52" "W" 21" 27" 40" 28" "C" 412" "B" 417" 15" "A" 20" 9.5" "D" 8.5" 38" "W" 40" 6"132"2221"24"72" {" C " ( # B A R S ) } {" D " ( S P A C I N G ) } OTHER %%UPLAN VIEW \A1;HINGE PIN 18.5" 21.5" CIRCULAR DIMENSIONS ELLIPTICAL DIMENSIONS 60" 54" 42" 48" 60" 54" PIPE DIA. 55" 48" 43" "B" 21" 21" 76" 68" 21" "A" 24' 24" 24" PIPE EQUIV. 42" 48" 30" "L " 34" RISE 38" 53 " SPAN 60 " "D" 8" 6" 6" 10 10 9" 42" 47" 45" 50" "C" 9 14 22 90" 80" 10" 10" "W" 64" 84" 132" 70" 6 "C" 7 "B" 31.5" 36.38 "A" 35" 39" 64" "W" 70" 9.5" "D" 9"69" 71" {GENERAL NOTES: 1.ALL TRASH RACKS SHALL BE CARDER CONCRETE OR APPROVED EQUIVALENTS. 2.DIMENSIONS ABOVE LISTED IN INCHES. 3.PADLOCKS FOR LOCKING BAR WILL BE FURNISHED AND INSTALLED 4.TRASH GUARDS ARE NOT DESIGNED TO CARRY WHEEL LOADINGS AND AS SUCH ARE NOT TO BE USED AS SAFETY GRATES.} Date Date Date Date DateDa t e APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: City Engineer Water & Wastewater Utility Stormwater Utility Parks & Recreation Traffic Engineer Environmental Planner City of Fort Collins, Colorado UTILITY PLAN APPROVAL CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. before you dig.Call R CAD FILE NAME: DETAILS DRAWN BY:T. COX D46.dwg OUTLET STRUCTURE 8/15/05DATE DRAWN: CC A A B B CONTROL PLATE \A1;3'-6"\A1;Ls (MIN.)\A1;6" \A 1 ; W s \A1;6" \A1;6" \A 1 ; V A R I E S \A 1 ; V A R I E S \A1;6" \A 1 ; W s / 2 \A 1 ; W s / 2 CENTERLINE OFOUTLET PIPE SECTION C-C SECTION A-A SECTION B-B WELL SCREEN FLOW CONTROL PLATE #4@12"#4@12" #4@18" #4@12" \A1;6" Wo \A1;Wo \A1;Wo \A1;Wp (Wo+6") \A 1 ; 4 " (T Y P . ) TA B L E 1/4" (MIN.) THICK STEEL FLOW CONTROLPL A T E STAINLESS STEEL AN C H O R B O L T ( T Y P . ) (M A X . ) INTO CONCRETE SIDES STEEL CHANNEL FORMED 3/8"x1" FLAT BAR HOLDING FR A M E INTERMITTANT WELDS ON TOP AND SIDES STAINLESS STEEL ANCHOR BOLTS OR PLATEFLOW CONTROL 51"x51" GRATING (3/8" ROUND OR TWISTED CROSS BARS AT 3" O.C., WELDED TO 1"x3/8" BEARING BARS AT 2 1/2" O.C.) 3/8" ROUND OR TWISTED CROSS BA R BAR BEARING1"x3/8" PLAN 3" CLR. TO FASTEN GRATE DOWN 3/8"x6" THREADED BOLT 4.ALL TRASH RACKS SHALL BE MOUNTED USING STAINLESS STEEL HARDWARE AND PROVIDED WITH HINGED AND LOCKABLE OR BOLTABLE ACCESS PANELS. 5.TRASH RACKS SHALL BE STAINLESS STEEL, ALUMINUM, OR STEEL. STEEL TRASH RACKS SHALL BE HOT DIP GALVANIZED AND MAY BE HOT POWDER PAINTED AFTER GALVANIZING. 3 1/2" x1 1/2" KEY OUTLET PIPE 4%4% CLR. 3" BAR #4 HOOP PIPE CONCRETE METAL OR F LAP 12" #4@12" O.C. O.C. #4@12" CONCRETE SHALL BE CLASS B. MAY BE CAST-IN-PLACE OR PRECAST. GENERAL NOTES 1. 2. 3.STEPS SHALL BE PROVIDED WHEN VERTICAL DIMENSION EXCEEDS 3'-6" AND SHALL BE IN ACCORDANCE WITH AASHTO M 199. HAVE A MINIMUM 2" CLEARANCE. REINFORCING BARS SHALL BE EPOXY COATED AND DEFORMED, AND SHALL #4 DIAGONAL (TYP.) SECTION D-D HOLE (TYP.), SEE ELEV. B ELEV. A ELEV. C WQ SPILL ELEV. WATER QUALITY 100-YEAR OUTLET D D CONCRETE PAD WITH USEOF WING WALLS SECTION LINE A-A (ARROWS POINT IN DIRECTION SECTION A A OPP.OPPOSITE CLR.CLEARANCE ABBREVIATIONS MINIMUM MAXIMUM ON CENTER DIAMETER TYPICAL WIDTH OF CONCRETE OPENING WIDTH OF PLATE NUMBER AT@ # Wp Wo TYP. DIA. O.C. MAX. LEGEND WATER QUALITY (WQ) WATER QUALITYWQINVERTINV. ELEVATIONELEV. \A 1 ; 6 " \A 1 ; 6 " DOWEL WITH USE OFCONCRETE PAD LENGTH OF STRUCTURELs WIDTH OF STRUCTUREWs STEEL OR EQUAL) (NOTE 5) TRASH RACK (U.S. FILTER STAINLESS WELL SCREEN NO. 93 TRASH RACK STEEL OR EQUAL) (U.S. FILTER STAINLESS WELL SCREEN NO. 93 EQUAL) FILTER STAINLESS NO. 93 (U.S. WELL SCREEN STEEL OR DETAIL D-46 INVERT OF PLATE HOLES TO BE AT BOTTOM ROW OF LAST DATE REVISED:4/7/11 3/8"x6" THREADED BOLT TO FASTEN GRATE DOWN GRATE (TYP. OPP. SIDE) 2 1/4" FROM EDGE OF TO HOLD HINGE IN PLACE, 3/8"x6" BOLTS 12" O.C. FLOW TO COVER OPENING (FASTEN WITH 3/8"x6" 1/4" METAL PLATETREADED BOLTS) TO GRATE, WITH TO GRATE, WITH (TYP. OPP. SIDE) GRATE (TYP. OPP. SIDE) 2 1/4" FROM EDGE OF TO HOLD HINGE IN PLACE, 3/8"x6" BOLTS 12" O.C. 1/4" PLATE, WELDED 1/4" PLATE, WELDED STORMWATER CONSTRUCTION DETAILS (970) 221-6700 P.O. BOX 580, FORT COLLINS, CO. 80522 CITY OF FORT COLLINS UTILITIES * MODIFIED BY NORTHERN ENGINEERING NOT TO SCALE OUTLET STRUCTURE DETAIL5 POND 1 POND 2 ODP PONDELEV A (POND INV)4895.70 4897.53 4879.73ELEV B (WQCU ELEV)4897.68 4899.56 4884.14 ELEV C 4897.68 4899.56 4884.14 SPILL ELEVD wq (FT)1.60 2.00 2.90Ls (FT)4.00 4.00 4.00Ws (FT)4.00 4.00 4.00Wo (FT)1.00 1.00 1.00HOLE DIA (INCH)1 1 1/8 1 5/8 # ROWS 5 6 9 # COLUMNS 1 1 1 OUTLET SCHEDULE CONCRETE WING WALL (TYP.)END OF WING WALL)AND PAD (END OF PAD TO MATCH 3/8"x6" THREADED BOLT TO FASTEN GRATE DOWN TO GRATE, WITH (TYP. OPP. SIDE) 1/4" PLATE, WELDED WATER QUALITY OUTLET BOXEXPANSION JOINTMATERIAL TOP OF WINGWALL OPTIONAL MATERIAL FRONT VIEW (TYP. BOTH SIDES) RE-BARS FROM WINGWALL FOOTING CONTINUE INTO WALL 6" THICK WINGWALL AND FOOTER REINFORCED WITH NO. 4 REBAR @ 12" O.C. VERT. AND HORIZ. 6" \A 1 ; V A R I E S 6" 18" 18" CENTERED WITHIN WALL TOP VIEW \A 1 ; 1 5 " WATER QUALITY OUTLET WINGWALL DETAIL NOT TO SCALE 6 DETAILSTORMWATERCONSTRUCTION DETAILSFORT COLLINS FORT COLLINS, CO. UTILITIES CITY OF (970) 221-6700 APPROVED:DATE: DRAWN BY: CONCRETE END SECTIONS D-1501/31/01 NBJ E C B E E E E FF PLAN C B D A RISESPAN END VIEW EPLAN F SEE FIGURE 1 OF AASHTOM 206 FOR ACTUAL SIZES DSECTION F-FA RISESPAN END VIEW F 3 IN. 5 I N . 5 IN. 3 IN. F 2 FT. 5 IN. 3/4 IN. GALVANIZED ANCHOR BOLTS, NUTS AND WASHERS, MILD STEEL, ASTM A 307. ROD LUG SHALL BE COATED WITH COAL-TAR EPOXY PAINT OR APPROVED EQUAL. 3/4 IN. "CANOPY" TYPE ROD LUG, ORAPPROVED, EQUAL 2 F T . 7 I N . PIPE DIAMETER F 18 IN. - 30 IN. 36 IN. - 42 IN. 48 IN. - 60 IN. 72 IN. - 84 IN. 5 IN. 6 IN. 9 I N . CONCRETE JOINT FASTENER. LOCATION OF 1 IN. DIA. HOLES END SECTION FOR REINFORCED CONCRETE CIRCULAR PIPE END SECTION FOR REINFORCED CONCRETE ELLIPTICAL PIPE END SECTION FOR REINFORCED CONCRETE ARCH PIPE DIMENSIONS A B C D E PIPE I.D. IN. 12 15 18 24 30 36 42 48 54 60 72 5 1/2 11 1/2 12 17 18 24 28 27 36 34 1/2 23 26 26 43 53 60 61 70 65 58 75 49 47 48 54 43 37 36 28 35 40 21 72 73 74 97 96 97 97 98 100 98 96 24 29 36 48 60 71 78 84 90 96 108 IN.IN.IN.IN.IN. SECTION F-F 24 30 36 42 48 54 60 30 38 45 53 60 68 76 19 24 29 34 38 43 48 8 1/2 9 1/2 11 1/815 3/4 21 25 1/2 30 39 54 60 60 60 60 60 33 18 24 36 36 36 36 72 72 84 96 96 96 96 48 60 72 78 84 90 96 (INCHES)EQUIVALENT CIRCULAR DIAM. (IN.) NOMINAL (IN.)DIMENSIONS SPAN RISE A B C D E 24 30 36 48 54 DIAM. (IN.) CIRCULAR EQUIVALENT 42 60 72 96 96 96 96 96 (INCHES) 96 8 1/2 9 1/2 11 1/8 25 1/2 A DIMENSIONS 15 3/4 RISESPAN 30 21 NOMINAL (IN.) CB 60 60 60 60 50 60 39 36 36 36 36 46 35 33 78 90 96 84 D 60 72 48 E 29 36 43 50 58 65 72 86 18 22 27 31 36 40 44 54 31 12099396072 PLAN SECTION X-X GENERAL NOTES: 1. REVISED CDOH M-603-10 2. CONCRETE END SECTIONS ARE TO BE FURNISHED WITH TOUGE OR GROOVE AS REQUIRED. 3. INSIDE CONFIGURATION AND JOINT OF CONCRETE END SECTION AND PIPE SHALL MATCH. 4. CONCRETE PIPE JOINT FASTENERS, WHERE SHOWN ON PLANS, SHALL BE INSTALLED SO THAT A MINIMUM OF 15 LINEAR FEET OF THE OUTLET END OF THE ARE MECHANICALLY LOCKED TOGETHER. END SECTION LENGHTS, WHEN USED, WILL BE INCLUDED IN THE 15 L.F. REQUIRED. END VIEW + STANDARD CONCRETE NOTES 1.ALL CONCRETE WORK SHALL BE IN ACCORDANCE WITH THE LATEST VERSION OF ACI 318, ACI 304, AND ACI 315. ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI AT 28 DAYS WITH 4%-6% ENTRAINED AIR AND TYPE II CEMENT UNLESS NOTED OTHERWISE. REINFORCING STEEL SHALL CONFORM TO ASTM A615, GRADE 60, DEFORMED UNLESS NOTED OTHERWISE. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185 WELDED STEEL WIRE FABRIC UNLESS NOTED OTHERWISE. SPLICES SHALL BE CLASS "B". ALL HOOKS SHALL BE STANDARD UNLESS NOTED OTHERWISE. THE FOLLOWING MINIMUM CONCRETE COVER SHALL BE PROVIDED FOR REINFORCING STEEL UNLESS SHOWN OTHERWISE ON DRAWINGS: CONCRETE CAST AGAINST EARTH = 3" CONCRETE EXPOSED TO EARTH OR WEATHER: #6 AND LARGER = 2" #5 AND SMALLER AND WWF = 1 1/2" CONCRETE NOT EXPOSED TO WEATHER NOR CAST AGAINST EARTH: SLAB AND WALL = 3/4" BEAMS AND COLUMNS = 1 1/2" A 3/4" CHAMFER SHALL BE PROVIDED AT ALL EXPOSED EDGES OF CONCRETE UNLESS NOTED OTHERWISE IN ACCORDANCE WITH ACI 301 SECTION 4.2.4. HOLES TO RECEIVE EXPANSION/WEDGE ANCHORS SHALL BE 1/8" LARGER IN DIAMETER THAT THE ANCHOR BOLT, DOWEL OR ROD AND SHALL CONFORM TO MANUFACTURER'S RECOMMENDATION FOR EMBEDDMENT DEPTH OR AS SHOWN ON THE DRAWINGS. LOCATE AND AVOID CUTTING EXISTING REBAR WHEN DRILLING HOLES IN ELEVATED CONCRETE SLABS. USE AND INSTALLATION OF CONCRETE EXPANSION/WEDGE ANCHORS SHALL BE PER ICBO AND MANUFACTURER'S WRITTEN RECOMMENDED PROCEDURES. 2. 3. 5. 6. 7. 4. DETAILSTORMWATERCONSTRUCTION DETAILSFORT COLLINS FORT COLLINS, CO. UTILITIES CITY OF (970) 221-6700 APPROVED:DATE: DRAWN BY: STANDARD CONCRETE NOTES D-412/22/05 TDC CONCRETE END SECTIONS2 NOT TO SCALE STANDARD CONCRETE NOTES3 NOT TO SCALE GENERAL NOTES: 1. AREA INLETS MAY BE USED FOR DRAINAGEWAY OTHER THAN STREETS. (EXAMPLE, PARKING LOTS, MEDIANDS, SUMP BASINS) NO. 12 GRATE AND FRAME BY MaCLEAR OR APPROVED EQUAL. PLAN VIEW A A BB 35 3/4 IN. 23 3/4 IN.6 IN. 3 IN. CIR. O.F. 2 IN. CIR L.F. #4 @ 12 IN. CTRS. (TYP.) #4 @ 12 IN. CTRS. F #4 BAR CONCRETE PIPE O.D. 3 IN. CIR. CONCRETE PIPE I.D.D SECTION A-A SECTION B-B 12 IN. LAP DRAINAGE SLOPE FOR INLET AND FLOW LINE OF CONDUITPIPE AROUND #4 12 IN. MIN.INLET GRATES CTRS. (TYP.) #4 @ 12 IN. 2 IN. CIR L.F. 3 IN. CIR. O.F. 28 1/4 IN. 6 IN.16 1/4 IN. H AND FLOOR 6 IN. TYPICAL WALLS 12 IN. MAX. STEPSPACING DETAILSTORMWATERCONSTRUCTION DETAILSFORT COLLINS FORT COLLINS, CO. UTILITIES CITY OF (970) 221-6700 APPROVED:DATE: DRAWN BY:NBJ 12/8/00 D-9A AREA INLET AREA INLET1 NOT TO SCALE 4" POND UNDERDRAIN PIPE INV. 1/2" %%C HOLES FOR 3/8" %%CEXPANSION BOLTS EMBEDDED 2" INTO WALL @12" O.C. MIN. 3/ 8 " T H I C K GA L V A N I Z E D ST E E L P L A T E ORIFICE POND 1 DIA.= 3.5" POND 2 DIA.= 8.5" ODP POND DIA.= 22.0" PLATE CENTERED OVER OPENING IN WALL ORIFICE PLATE DETAIL N.T.S. 1" FROM INV. OF ORIFICE TO BOTTOM OF PLATE 18" FOR POND 1 30" FOR POND 2 30" FOR ODP POND 24" FOR POND 1 30" FOR POND 230" FOR ODP POND (SEE PLAN AND PROFILE) \A 1 ; 6 " THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERING SERVICES, INC., ARE BASED IN WHOLE, OR IN PART, UPON INFORMATION PROVIDED BY OTHERS. NORTHERN ENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. RECORD DRAWING REV AUGUST 25, 2016 FORT COLLINS, COLORADO BANNER HEALTH MEDICAL CAMPUS SEPTEMBER 20, 2013 SHEET HARMONY RD. & LADY MOON DR. BOULDER ASSOCIATES ARCHITECTS 1426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 OF 60 FINAL PLAN CONSTRUCTION DETAILS C705 Date Date Date Date DateDa t e APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: City Engineer Water & Wastewater Utility Stormwater Utility Parks & Recreation Traffic Engineer Environmental Planner City of Fort Collins, Colorado UTILITY PLAN APPROVAL CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. before you dig.Call R NOT TO SCALE SINGLE COMBINATION INLET1 IF RISER IS REQUIRED THE BASE IS POURED WITH A "SHIP-LAP" JOINT. 3'-0"2'-0" GRATING (SEE DETAIL, THIS DRAWING) %%UGRATING DETAIL 3. 2. WEIGHT: 560 LBS 1. %%UNOTES:%%U %%uISOMETRIC VIEW N.T.S. \A1;4'\A1;6" \A 1 ; 6 " \A1;2'\A 1 ; 6 " N.T.S. \A 1 ; 6 " 5' - 8 " M A X 3' - 0 " M I N M.A. STEPS @12" O.C.4 TON P52 SL (NUMBER REQ'D VARIES WITH HEIGHT) 5' - 8 " M A X 3' - 0 " M I N \A1;6" N.T.S. %%USECTION B-B \A1;3'\A1;6" 3) STEEL REINFORCEMENT: 4) CEMENT: ASTM C-150 SPECIFICATIONS 1) 4 TON P-52 SL ANCHORS (8 REQ'D) A. AASHTO HS-20-44, W/ IMPACT C. EQUIVALENT FLUID PRESSURE = 45 PCF D. 80 PSF LATERAL LIVE LOAD SURCHARGE B. SOIL WEIGHT = 120 PSF 2) CONCRETE 28 DAY COMPRESSIVE STRENGTH SHALL BE %%UDESIGN NOTES: 4500 PSI (MIN.) 1) DESIGN LOADINGS: %%ULIFTING NOTES: FRAME & GRATING NOT SHOWN 4 TON P-52 SLANCHORS FOR SETTING A. REBAR, ASTM A-615 GRADE 60, MIN. OF 2" CLR. B. MESH, ASTM A-497 GRADE 80 N.T.S. N.T.S. DESIGNED ACCORDING TO ASTM C857-87 AND ASTM C858-83 DESIGNED FOR AASHTO HS-20 LOADING EAST JORDON IRON WORKS CURB INLET 7030 (OR EQUAL) TYPE M2 GRATE AND T1 BACK COMBINATION. \A1;3' GRATING (SEE DETAIL, THIS DRAWING) PIPE(S) SIZE, SHAPE AND LOCATION VARIES AA %%USECTION A-A B B A A DIRECTION SECTION IS VIEWED) SECTION LINE A-A (ARROWS POINT IN LEGEND PIPE(S) SIZE, SHAPE AND LOCATION VARIES OPEN AREA: 260 SQ. IN. 3' - 7 " 2'-7"4"CURB ADJUSTS 6" 3 1/4" TO 9" ANCHORS DATE DRAWN:3/3/05 D43.dwg T. COXDRAWN BY: SINGLE CURB INLET CAD FILE NAME: DETAIL D-43 STORMWATER CONSTRUCTION DETAILS P.O. BOX 580, FORT COLLINS, CO. 80522 CITY OF FORT COLLINS UTILITIES NOT TO SCALE DOUBLE COMBINATION INLET2 3" 5"4-1/2" %%USUPPORT BEAM POCKET DETAIL AND ASTM C858-83. 2. DESIGNED ACCORDING TO ASTM C857-87 1. DESIGNED FOR AASHTO HS-20 LOADING. NOTES: IF RISER IS REQUIRED THE BASE IS POURED WITH A "SHIP-LAP" JOINT. 6'-1"2'-0" GRATING (SEE DETAIL, THIS DRAWING) %%UGRATING DETAIL 3. 2. WEIGHT: 1100 LBS 1. %%UNOTES:%%U %%uISOMETRIC VIEW N.T.S. \A1;7'-1"\A1;6" \A 1 ; 6 " \A1;2'\A 1 ; 6 " N.T.S. \A 1 ; 6 " 5' - 8 " M A X 3' - 0 " M I N M.A. STEPS @12" O.C. 4 TON P52 SL ANCHORS (NUMBER REQ'D VARIES WITH HEIGHT) 5' - 8 " M A X 3' - 0 " M I N \A1;6" N.T.S. %%USECTION B-B \A1;6'-1"\A1;6" POCKET FOR SUPPORT BEAM (SEE DETAIL, THIS DRAWING) 3) STEEL REINFORCEMENT: 4) CEMENT: ASTM C-150 SPECIFICATIONS 1) 4 TON P-52 SL ANCHORS (8 REQ'D) A. AASHTO HS-20-44, W/ IMPACT C. EQUIVALENT FLUID PRESSURE = 45 PCF D. 80 PSF LATERAL LIVE LOAD SURCHARGE B. SOIL WEIGHT = 120 PSF 2) CONCRETE 28 DAY COMPRESSIVE STRENGTH SHALL BE %%UDESIGN NOTES: 4500 PSI (MIN.) 1) DESIGN LOADINGS: %%ULIFTING NOTES: FRAME & GRATING NOT SHOWN 4 TON P-52 SLANCHORS FOR SETTING A. REBAR, ASTM A-615 GRADE 60, MIN. OF 2" CLR. B. MESH, ASTM A-497 GRADE 80 DATE DRAWN:3/3/05 D44.dwg T. COXDRAWN BY: CAD FILE NAME: N.T.S. N.T.S. N.T.S. 6'-8"2'-7"4" CURB ADJUSTS 6" 3 1/4" TO 9" DESIGNED ACCORDING TO ASTM C857-87 AND ASTM C858-83 DESIGNED FOR AASHTO HS-20 LOADING EAST JORDON IRON WORKS CURB INLET 7031 (OR EQUAL) TYPE M2 GRATE AND T1 BACK COMBINATION. \A1;3' GRATING (SEE DETAIL, THIS DRAWING) POCKET FOR SUPPORT BEAM (SEE DETAIL, THIS DRAWING) PIPE(S) SIZE, SHAPE ANDLOCATION VARIES AA %%USECTION A-A B B A A DIRECTION SECTION IS VIEWED) SECTION LINE A-A (ARROWS POINT IN LEGEND PIPE(S) SIZE, SHAPE ANDLOCATION VARIES 6" THICK CONCRETE WALL OPEN AREA: 520 SQ. IN. DETAIL DOUBLE CURB INLET D-44 STORMWATER CONSTRUCTION DETAILS (970) 221-6700 P.O. BOX 580, FORT COLLINS, CO. 80522 CITY OF FORT COLLINS UTILITIES STAKING NOTES: 1)CONTRACTOR SHALL HAVE ALL FOUR (4) CORNERS OF INLET BOX STAKED IN FIELD BY A QUALIFIED SURVEYOR PRIOR TO SETTING BOX. 2)CONTRACTOR SHALL ALSO HAVE A MINIMUM OF 20-FEET OF INCOMING CURB AND GUTTER IN EACH DIRECTION STAKED WITH THE INLET BOX. RUN STRING IF NECESSARY TO ENSURE PROPER CURB TRANSITION CAN BE MADE, AND THAT NO CONFLICTS ARISE. FACE CURB 2'-0" TRANSITION BACK OF CURB LIP OF GUTTER/EDGE OF ASPHALT TO BE FLUSH WITH CAST IRON FRAME LIP OF GUTTER CURB TRANSITION AT INLET N.T.S. FACE CURB 2'-0" TRANSITION BACK OF CURB LIP OF GUTTER/EDGE OF ASPHALT TO BE FLUSH WITH CAST IRON FRAME LIP OF GUTTER CURB TRANSITION AT INLET N.T.S.STAKING NOTES: 1)CONTRACTOR SHALL HAVE ALL FOUR (4) CORNERS OF INLET BOX STAKED IN FIELD BY A QUALIFIED SURVEYOR PRIOR TO SETTING BOX. 2)CONTRACTOR SHALL ALSO HAVE A MINIMUM OF 20-FEET OF INCOMING CURB AND GUTTER IN EACH DIRECTION STAKED WITH THE INLET BOX. RUN STRING IF NECESSARY TO ENSURE PROPER CURB TRANSITION CAN BE MADE, AND THAT NO CONFLICTS ARISE. SEE CHANNEL LAYOUT ON SHEET 2. 409 8" 41 3 411412 403 502504502409L= 1 5 ' H > 5' D D L=10' 413 40 3 412411 410 406 403 401 405 40 7 9"o.c.403 502503601 2" CLR. MIN. 0.5% Slope3" CLR. VARIABLE CONSTANT 5'-0" CONSTANT 32 " 8" 12" 8" 18"TO STA.PT. L=10' TYPICAL AROUND 2" All 6"o.c x 6"o.c. 16'-8" L=15 H<5' 401 403409 407 403 406405 6"o.c x 6"o.c. 11'-8" L=5' L=10'or15'~H<5' L=5'~All H 4038" 12" 6'-8" 11"o.c. 9"o.c.TYP. 6"o.c. x 6"o.c. 9"o.c. 3"clr. 3"clr.2"clr. MANHOLE CUT OFF OR BEND BARS TO CLEAR MANHOLE. 3" CLR. 601 401407 401 403 405 406 403 401 409503601409 STA.PT. 18" TO REQUIRED WHEN L=10' OR MORE. ADDITIONAL MANHOLE RING AND COVER L=10'-0" 11'-4" INLET IN 10' 3 RODS 409 503 8" INLET IN 15' 5 R O D S L=15'-0" 16'-4" * CURB AND GUTTER HERE.MEET SHAPE OF NORMAL BARRIER 409 CURB ENDS OF 8 [ BEAM FACE OF3" CLR. 3", EACH END OF FLOW DIRECTION 30"30"30"30" GUTTER TRANSITION 3'INLET PAY LENGTH3' IN 5' INLET ONE 1 " DIA. ROD TO 30"18" 601 GUTTER TRANSITION Face of Cu r b o.c.8" 36" 8" o.c. 5 " L=5'-0" 6'-4" B B AA PLACE ENTIRE ASSEMBLY BEFORE POURING 8" 3" 8" 6" 4" 8" 4" 1 " 1"LEG 3THD. (TYPE 2-SEC. IIB)CURB FACEFLUSH WITH ( ) 2: 1 3"x3"x " PLATE 2'-6"o.c. GALV. STEEL ROD 1 " DIA.. x 24" AND 1 " LOCK NUT 1 " PIPE SPACER2:1 4:1 18" LONGNO.4 BAR8 8 . 5 CURB FACEBARRIER INLET CURB AND GUTTER MOUNTABLEFOR AS CURB AND GUTTER. TRANSITION SHALL BE PAID SHALL BE CONSTRUCTED. GUTTER, 5 FT. TRANSITION MOUNTABLE CURB AND INLET IS USED WITH WHEN A TYPE R CURB FACE MOUNTABLE 5' TRANSITION AT THE SAME END OF THE INLET. AND OUTFLOW PIPE SHALL BE LOCATED MANHOLE RING & COVER, STATION POINTNOTE: INLET. ACCEPTANCE OF THE CONCRETE BEFORE SHALL BE PLUGGED WITH ROAD BASE. THE HOLE THREE INCHES BELOW ELEVATION OR A MINIMUM BE PLACED AT SUBGRADE HOLE FOR DRAINAGE SHALL A 2" DIAMETER TEMPORARY 8" WING FL. 12" o.c. 408 403 401 9" o.c. 11" o.c.11" o.c.9" o.c. 11"o.c. 9" o.c. 8" TYPICAL WALL 402 407 5 "o.c. 1 " R 2" RSLOPE=1"/FT. 7"%%P - FOR A 1'-0" PAN SLOPE 2" PER FT. 4" 6" 2'-0"4'-4" 1 "SLOPE 2% TO GUTTER,8"o.c. 501 409 5 "o.c. 2"clr.503 601 H > 3'-6" REQ'D.FOR ALLINLET STEPS 16" MAX. 401 407 2" ALL AROUND 6" o.c.6" o.c. 3" CLR.4054063'-4" 11"o.c. (DOTTED BARS ARE IN SECTION D-D) 412 403 501 408 413 3-411 413 502 409 1 2 3" CLR. 10" EMBEDMENT C C 403 CONCRETE. STATIONPOINT 21 41 12 41 ( )1 4 41 14 21 41 83 14 C C D D 3" CLR. 12 FOR LENGTH GREATER THEN 5 FT. PROVIDE ACCESS AT BOTH ENDS. 12 41 601 601 40 9 CUT REINFORCEMENT BAR ACCORDINGLY. 601 60 1 601 403 60 1 407 405 406 409 403 40 1 H<5' * * NOT TO SCALE CURB INLET TYPE R3 Banner Health Inlet Schedule Inlet ID Inlet Type 1-3A.1A 5-foot Type R 1-3A.1 5-foot Type R 1-3A.2A Double Combination 1-3A.2B Double Combination 1-3B Double Combination 1-4A Single Combination 1-4B Single Combination 1-5A Double Combination 1-5B Double Combination 2-1 5-foot Type R 2-2 5-foot Type R 3-2 Double Combination 3-3.1 Single Combination 3-3.2A Single Combination 3-3.3 Slotted Manhole Cover* 3-5 Double Combination 3-6 Double Combination 3-7 Double Combination 3-9 Double Combination 3-10 Single Combination 3-8.1 Single Combination 3-8.2 Single Combination 3-8.3 Slotted Manhole Cover* 4-1.1 Area Inlet 4-2.2 Slotted Manhole Cover* 6-1 Single Combination** 6-3 Slotted Manhole Cover* 6-4 Slotted Manhole Cover* Outlet MH1 Slotted Manhole Cover* * All slotted manhole covers shall have min. 1.1 sq.ft. open area. ** Inlet 6-1 to be partially constructed. See note on Plan and Profile sheet. THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERING SERVICES, INC., ARE BASED IN WHOLE, OR IN PART, UPON INFORMATION PROVIDED BY OTHERS. NORTHERN ENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. RECORD DRAWING VERIFIED VERIFIED VERIFIED NOT CONSTRUCTED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED NOT CONSTRUCTED NOT CONSTRUCTED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED VERIFIED PARTIALLY CONSTRUCTED VERIFIED VERIFIED VERIFIED REV AUGUST 25 2016 DRY WELL DETAIL @ AMBULANCE ENTRANCE 4" MIN ON 8" - 24" 6" MIN ON 30" 4" M I N O N 8 " - 24 " 6" M I N O N 3 0 " A \A1;A TO PREVENT BLOCKAGE OF PERFORATIONS, BASIN SHOULD BE WRAPPED IN AN ENGINEER APPROVED GEO-TEXTILE FABRIC REV B7001-110-181DWG NO.1 OF 1SHEETSCALEDWG SIZE A 3130 VERONA AVE BUFORD, GA 30518 PHN (770) 932-2443 FAX (770) 932-2490 www.nyloplast-us.com 8 IN - 30 IN PERFORATED DRAIN BASIN WITH STANDARD GRATE QUICK SPEC INSTALLATION DETAIL TITLE PROJECT NO./NAME MATERIAL DATE APPD BY 2-14-06DATE EBCDRAWN BY 2-14-06 CJA 1:40 THIS PRINT DISCLOSES SUBJECT MATTER IN WHICH NYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPT OR POSSESSION OF THIS PRINT DOES NOT CONFER, TRANSFER, OR LICENSE THE USE OF THE DESIGN OR TECHNICAL INFORMATION SHOWN HEREIN REPRODUCTION OF THIS PRINT OR ANY INFORMATION CONTAINED HEREIN, OR MANUFACTURE OF ANY ARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERS IS FORBIDDEN, EXCEPT BY SPECIFIC WRITTEN PERMISSION FROM NYLOPLAST. 6' USE CAP REDUCER AND STANDARD GRATE 1 - DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS RISERS ARE NEEDED FOR BASINS OVER 84" DUE TO SHIPPING RESTRICTIONS SEE DRAWING NO. 7001-110-065 2 - PERFORATIONS SHOULD NOT BE ON OR WITHIN 1" OF ANY EDGE OR FITTING. 3 - HOLES SHOULD BE STAGGERED EVERY OTHER ROW, AS SHOWN. 4 - GRATES SHALL MEET H-10 LOAD RATING FOR 12" - 24" PED 5 - GRATES SHALL MEET H-20 LOAD RATING FOR 30" PED & 12" - 30" STD & SOLID 6 - ALL BRONZE GRATES, DROP IN GRATES, & 8" & 10" PED/STD GRATES & SOLID COVERS ARE RATED FOR LIGHT DUTY APPLICATIONS ONLY NYLOPLAST DRAIN BASIN: 28 _ _ AG _ _X B° C 2" MIN Ø .375" MAX TOP & FRONT VIEW HOLE SIZE & LOCATION NTS ENLARGED TO SHOW DETAIL A 2 THE BACKFILL MATERIAL SHALL BE CRUSHED STONE OR OTHER GRANULAR MATERIAL MEETING THE REQUIREMENTS OF CLASS II MATERIAL AS DEFINED IN ASTM D2321. BEDDING & BACKFILL FOR SURFACE DRAINAGE INLETS SHALL BE PLACED & COMPACTED UNIFORMLY IN ACCORDANCE WITH ASTM D2321. SURROUND DRAIN BASIN WITH 3 4 " WASHED ROCK, MINIMUM 8" WIDED REVDWG NO.1 OF 1SHEET1:16SCALEDWG SIZE A 3130 VERONA AVE BUFORD, GA 30518 PHN (770) 932-2443 FAX (770) 932-2490 www.nyloplast-us.com 24 IN PERFORATED DRAIN BASIN WITH 24 IN X 12 IN CAP REDUCER & DOME GRATE TITLE PROJECT NO./NAME MATERIAL DATE APPD BY 6-2-06DATE EBCDRAWN BYTHIS PRINT DISCLOSES SUBJECT MATTER IN WHICH NYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPT OR POSSESSION OF THIS PRINT DOES NOT CONFER, TRANSFER, OR LICENSE THE USE OF THE DESIGN OR TECHNICAL INFORMATION SHOWN HEREIN REPRODUCTION OF THIS PRINT OR ANY INFORMATION CONTAINED HEREIN, OR MANUFACTURE OF ANY ARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERS IS FORBIDDEN, EXCEPT BY SPECIFIC WRITTEN PERMISSION FROM NYLOPLAST. 6-2-06 CJA 2.00" MIN Ø .375" MAX BASIN SHOULD BE PERFORATED WITH 8 HOLES PER ROW (1 EVERY 45°) HOLES SHOULD BE STAGGERED EVERY OTHER ROW, AS SHOWN FRONT VIEW HOLE SIZE & LOCATION NTS ENLARGED TO SHOW DETAIL 24" X 12" CAP REDUCER TOP VIEW STANDARD GRATE 24" DRAIN BASIN BODY WITHOUT BOTTOM CAP NOTE: ALL DRY WELL GRATES SHALL BE SURROUNDED WITH COBBLE MULCH (SEE DETAIL THIS SHEET). A B°C PART #GRATE OPTIONS 8"90°4 2808AG PEDESTRIAN/STANDARD SOLID BRONZE DOME DROP IN 10"90°4 2810AG PEDESTRIAN/STANDARD SOLID BRONZE DOME DROP IN 12"60°6 2812AG PEDESTRIAN STANDARD SOLID BRONZE DOME DROP IN 15"60°6 2815AG PEDESTRIAN STANDARD SOLID BRONZE DOME DROP IN 18"45°8 2818AG PEDESTRIAN STANDARD SOLID N/A DOME DROP IN 24"45°8 2824AG PEDESTRIAN STANDARD SOLID N/A DOME DROP IN 30"36°10 2830AG PEDESTRIAN STANDARD SOLID N/A DOME N/A A - BASIN SIZE B° - ANGLE BETWEEN MANHOLES, C - NUMBER OF HOLES D - DEPTH VARIES. 6'-0" MAX. MINIMUM DEPTH SHALL BE 2'-0" BELOW ANY ENCOUNTERED GROUNDWATER. TSALPOLYN D D D O NOT POLL TE UCT I L E IRON RAINS TO WATERWAYS U XXXXXXXXXXXX FORT COLLINS, COLORADO BANNER HEALTH MEDICAL CAMPUS SEPTEMBER 20, 2013 SHEET HARMONY RD. & LADY MOON DR. BOULDER ASSOCIATES ARCHITECTS 1426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 OF 60 FINAL PLAN CONSTRUCTION DETAILS C706 Date Date Date Date DateDa t e APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: City Engineer Water & Wastewater Utility Stormwater Utility Parks & Recreation Traffic Engineer Environmental Planner City of Fort Collins, Colorado UTILITY PLAN APPROVAL CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. before you dig.Call R FOREBAY DETAIL NOT TO SCALE SURFACE INFLOW IN F L O W \A 1 ; 1 2 " #4@18" #4@12" PROFILEPLAN 5 3 DIMENSIONS FOR SLOTTED PVC PIPE {NOTE}: "SLOTTED PVC" AND "PERFORATED PVC" SHALL MEAN THE SAME THING WHEN REFERRING TO UNDERDRAINS IN THIS PLAN SET. 120%%D 90%%D 60%%D \A 1 ; C \A 1 ; D \A 1 ; B SCREEN SLOT TABLE A B C D E F PIPE SIZE ROWS OF SLOTS MAXIMUM SLOT LENGTH MAXIMUM SLOT WIDTH APPROX. SLOT/ROW PER FOOT APPROX. SLOT SPACING MINIMUM OPEN AREA PER FOOT 6"3 (MIN.) - 6 (MAX.)2.35"0.032"14 3/4"3.15 SQ. IN. NOT TO SCALE 4" MIN ON 8" - 24" 6" MIN ON 30" 4" M I N O N 8 " - 24 " 6" M I N O N 3 0 " A \A1;A TO PREVENT BLOCKAGE OF PERFORATIONS, BASIN SHOULD BE WRAPPED IN AN ENGINEER APPROVED GEO-TEXTILE FABRIC REV B7001-110-181DWG NO.1 OF 1SHEETSCALEDWG SIZE A 3130 VERONA AVE BUFORD, GA 30518 PHN (770) 932-2443 FAX (770) 932-2490 www.nyloplast-us.com 8 IN - 30 IN PERFORATED DRAIN BASIN WITH STANDARD GRATE QUICK SPEC INSTALLATION DETAIL TITLE PROJECT NO./NAME MATERIAL DATE APPD BY 2-14-06DATE EBCDRAWN BY 2-14-06 CJA 1:40 THIS PRINT DISCLOSES SUBJECT MATTER IN WHICH NYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPT OR POSSESSION OF THIS PRINT DOES NOT CONFER, TRANSFER, OR LICENSE THE USE OF THE DESIGN OR TECHNICAL INFORMATION SHOWN HEREIN REPRODUCTION OF THIS PRINT OR ANY INFORMATION CONTAINED HEREIN, OR MANUFACTURE OF ANY ARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERS IS FORBIDDEN, EXCEPT BY SPECIFIC WRITTEN PERMISSION FROM NYLOPLAST. 5'-1/2" USE CAP REDUCER AND DOME GRATE 1 - DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS RISERS ARE NEEDED FOR BASINS OVER 84" DUE TO SHIPPING RESTRICTIONS SEE DRAWING NO. 7001-110-065 2 - PERFORATIONS SHOULD NOT BE ON OR WITHIN 1" OF ANY EDGE OR FITTING. 3 - HOLES SHOULD BE STAGGERED EVERY OTHER ROW, AS SHOWN. 4 - GRATES SHALL MEET H-10 LOAD RATING FOR 12" - 24" PED 5 - GRATES SHALL MEET H-20 LOAD RATING FOR 30" PED & 12" - 30" STD & SOLID 6 - ALL BRONZE GRATES, DROP IN GRATES, & 8" & 10" PED/STD GRATES & SOLID COVERS ARE RATED FOR LIGHT DUTY APPLICATIONS ONLY NYLOPLAST DRAIN BASIN: 28 _ _ AG _ _X B° C 2" MIN Ø .375" MAX TOP & FRONT VIEW HOLE SIZE & LOCATION NTS ENLARGED TO SHOW DETAIL A 2 THE BACKFILL MATERIAL SHALL BE CRUSHED STONE OR OTHER GRANULAR MATERIAL MEETING THE REQUIREMENTS OF CLASS II MATERIAL AS DEFINED IN ASTM D2321. BEDDING & BACKFILL FOR SURFACE DRAINAGE INLETS SHALL BE PLACED & COMPACTED UNIFORMLY IN ACCORDANCE WITH ASTM D2321. FILL DRAIN BASIN WITH 3 4 " WASHED ROCK COBBLE MULCH (3"-6" CLEAN RIVER ROCK) 18" MIN. WIDTH18" MIN.WIDTH GEO-TEXTILE FABRIC UNGER COBBLES D D - DEPTH 3'-0" REVDWG NO.1 OF 1SHEET1:16SCALEDWG SIZE A 3130 VERONA AVE BUFORD, GA 30518 PHN (770) 932-2443 FAX (770) 932-2490 www.nyloplast-us.com 24 IN PERFORATED DRAIN BASIN WITH 24 IN X 12 IN CAP REDUCER & DOME GRATE TITLE PROJECT NO./NAME MATERIAL DATE APPD BY 6-2-06DATE EBCDRAWN BYTHIS PRINT DISCLOSES SUBJECT MATTER IN WHICH NYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPT OR POSSESSION OF THIS PRINT DOES NOT CONFER, TRANSFER, OR LICENSE THE USE OF THE DESIGN OR TECHNICAL INFORMATION SHOWN HEREIN REPRODUCTION OF THIS PRINT OR ANY INFORMATION CONTAINED HEREIN, OR MANUFACTURE OF ANY ARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERS IS FORBIDDEN, EXCEPT BY SPECIFIC WRITTEN PERMISSION FROM NYLOPLAST. 6-2-06 CJA 2.00" MIN Ø .375" MAX BASIN SHOULD BE PERFORATED WITH 8 HOLES PER ROW (1 EVERY 45°) HOLES SHOULD BE STAGGERED EVERY OTHER ROW, AS SHOWN FRONT VIEW HOLE SIZE & LOCATION NTS ENLARGED TO SHOW DETAIL 24" X 12" CAP REDUCER 24" DRAIN BASIN BODY WITHOUT BOTTOM CAP NOT TO SCALE 1 DRY WELL DETAIL AT ODP POND A - DEPTH 2'-0" PROFILE PLAN EARTHERN DIKE (ODP DETENTION POND) NOT TO SCALE 2 \A 1 ; 8 ' \A1;6'\A 1 ; 9 ' \A 1 ; 5 ' 4:1 4: 1 4: 1 2.0%%% \A1;2.25' PROPOSED DRY WELL TENSAR ZMAX W-3000 OR APPROVED EQUAL \A 1 ; 8 '\A1;6'\A 1 ; 9 ' \A 1 ; 5 ' DUCT I LE IRON-DONOT POL LUT DRAINSTO WATERWAYS E NYLOPLAST TENSAR ZMAX W-3000 OR APPROVED EQUAL TO 0.5' ABOVE TOP OF EARTHEN DIKE. TENSAR ZMAX W-3000 OR APPROVED EQUAL TO 0.5' ABOVE TOP OF EARTHEN DIKE. DIRECTION OF FLOW DIRECTION OF FLOW (PLD) BIORETENTION / BIOSWALE CROSS SECTION NOT TO SCALE 4 \A 1 ; V A R I E S \A 1 ; 3 0 ' 4" UNDERDRAIN TOP VIEW 12" DOME GRATE (1299CGD) NOTE: ALL DRY WELL GRATES SHALL BE SURROUNDED WITH COBBLE MULCH (SEE DETAIL THIS SHEET). DUC T I L E IRON-DONOT PO L L U T DRAINS TO WAT E RWAYS E NYLOPLAST THESE RECORD DRAWINGS, PRODUCED BY NORTHERN ENGINEERING SERVICES, INC., ARE BASED IN WHOLE, OR IN PART, UPON INFORMATION PROVIDED BY OTHERS. NORTHERN ENGINEERING SERVICES, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION. RECORD DRAWING \A 1 ; 5 ' \A1;5' 9.4% EXISTING CONCRETE PAD DRIVEWAY 18 . 4 % 10% 5% 2% M I N . 2% MIN. 2% M I N . 5% 7.7% {LEGEND } EXISTING ELEVATION (XX.XX) PROPOSED ELEVATION XX.XX EXISTING AMBULANCE STORAGE EX. FFE = 4909.26 6% 9. 2 6% 9. 4 9. 6 9.3 0 9.4 8 9.0 8 9.29 9.1 2 9.4 8 9.4 8 9.4 8 9.26 8.50 9.6% 13% 7% 9.8 % 5.4%4:1 3% 9. 4 9. 2 9. 0 8. 8 8. 6 6 FT DRYWELL PLAN & DETAIL AT AMBULANCE ENTRANCE NOT TO SCALE REV AUGUST 25 2016