Loading...
HomeMy WebLinkAboutSite Certifications - 12/20/201712/15 Page 1 OVERALL SITE and DRAINAGE CERTIFICATION Commercial, Multi-Family and Subdivision Certification Form and Checklist Project Name: Date: Building Permit Numbers: (Commercial or multi-family) Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Volume 1, Section 6.11, please fill in all applicable items in this Certification Form for Commercial, Multi-Family and Overall Single Family sites. NOTE: several items must be verified during construction. A copy of the approved grading plan must be submitted with the as-built grading plan. (As-built elevations must be written in red next to the approved elevations.) •Use “Yes” for items completed as described. •Use “N/A” for items that are not applicable to the site being certified. •If any blanks are “No,” attach an explanation referencing the item number below. Attach an explanation or description of the as-built condition for any items listed or for anything not listed but shown on the approved construction plans. Provide an as-built redline or Mylar drawing with the following: I.Water Quality and Quantity Detention Basin Certification - FCSCM Vol.2, Ch.10 For multiple detention basins on a site, provide the following for each basin separately: A. Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and volume verification calculations for the water quality capture volume and the 100-year detention storage volume. 1. Detention basin topography was prepared by a professional land surveyor registered in the state of Colorado. 2.Both proposed and as-built contours are shown on the same plan sheet (dashed lines for proposed and solid lines for as-built). 3.All critical spot elevations as shown on the approved construction plans have been verified and the as-built elevations are shown on the plan sheet. 4.Stage-storage-discharge tables are provided on a separate document. 5.Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92- 602(8) is attached and has been uploaded to the Statewide Compliance Portal (tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include: a.The cover sheet from the approved drainage report b.The stamped certification page from the approved drainage report c.As-built topographic survey d.Stamped certification page from the Overall Site & Drainage Certification e.PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet 12/15 Page 2 B.Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2% grade requirement. 1.Low Flow: Choose one of the following detention basin low flow options as applicable: a. Turf swale for low flow path in detention basin. There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade is . b.Concrete pan for low flow in detention basin. There is a concrete pan installed that meets the grades as shown on the approved construction plans. (Show as-built spot elevations.) c.Soft pan for low flow in detention basin. •Verify and document the soft pan material gradation, trench width and depth - to be verified during construction by engineer. Picture documentation is preferred or engineer’s statement of visual inspection and compliance. (Choose one below.) o There is a soft pan with an underdrain installed that meets the design on the approved construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations, bends, cleanouts, etc.) o There is soft pan installed without an underdrain but there is a type A or B soil. The soil type must be documented by supplying verification from a registered professional geotechnical engineer. NOTE: Spot elevations are to be within 0.2 ft. +/-. 2. Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown. Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re- graded. Provide documentation if a variance was granted for steeper slopes during the design process. 3.Spillway Certification: The following items must be field verified: a.The location of the spillway is indicated on the as-built plan. b.The width of the spillway is indicated on the as-built plan. c.The elevation(s) of the spillway is shown on the as-built plan. d.A concrete ribbon defines the location and grade of the spillway. e.There is downstream scour protection in the spillway as per the construction plans. Indicate type: (riprap size “D50” gradation and bedding type, geotextile, buried riprap with inches of bury, etc.). f.There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape features, rocks, etc. 12/15 Page 3 4.Outlet Structure Certification a.The orifice plate for the approved release rate is installed with the correct size and location of the orifice. b.The orifice plate for the water quality outlet is installed with the correct hole size, number of rows and columns of holes. c.The bottom hole on both the water quality and quantity outlets are at the bottom of the plate so no water ponds in front of the plate. d.The well screen is the correct material and is installed as shown on the construction plans. e.100-year overflow grate elevation is . (Elev. A on detail D-46) f.The top elevation of the water quality capture volume is . (Elev. B on detail D-46) g.Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the top and bolted at the bottom. h.The bottom of the outlet box has no obstructions or misalignments that will cause it to retain runoff water and is sloped at 2% towards outlet. II.Channels/Swales - FCSCM Vol.1, Ch.7, Sect.3&4 A. Capacity: The as-built capacity of all the major channels and swales has been verified. They meet or exceed capacity requirements shown in the approved drainage study for this project. 1.All swales are located within the drainage easements as shown on the construction plans. 2.Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these criteria are not met, the certification engineer will write a justification and propose mitigation for each instance or have the issues corrected. If variances to these criteria have previously been approved and are shown on the construction plans, no justification is needed. 3.As-built spot elevations on channels/swales are shown that correspond to spot elevations shown on the approved construction plans. 4.All permanent erosion control measures are installed as shown on the approved construction plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used as part of this verification.) 5.All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the system. (Pictures at tie-in points suggested.) 6.The minimum freeboard is provided for all channels and swales as shown on the approved construction plans or as identified in the approved drainage study. (Show the freeboard provided on the cross-sections as on the construction plan set or attached as separate documentation.) 7.The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees, shrubs, sod, etc. infringe on the low flow portion of channels or swales.) 12/15 Page 4 III.Storm Pipes (aka storm drains) - FCSCM Vol.1, Ch.6, Sec. 4 A. Storm Drain Pipe Capacity: The as-built capacity of all pipes installed on this project has been verified and meets or exceeds the capacity requirements shown in the approved drainage study for this project. 1.All storm drain pipe sizes and materials have been verified and are in conformance with the approved construction plans. (Indicate on the plan and profile sheets that they have been verified.) Material and size substitutions must be approved prior to installation. If a pipe size or material was changed during construction, the certification engineer must attach the approval documents or supply them with this certification. Approval documents must include a calculation documenting the capacity equivalency (equal or greater) of the substituted size. 2.The longitudinal slope of the pipe is as shown on the approved construction plans. The acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans must be justified with capacity calculations on an attached sheet. 3.The as-built invert elevations have been verified and are shown on the plan and profile sheets of the approved construction plans. B.Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the approved construction plans. 1.The minimum cover requirements for all pipes have been met as shown on the approved construction plans. These will be called out in critical locations. 2.All encasements and clearances as specified on the approved construction plans have been met. 3.Any specific joint types or construction methods specified on the approved construction plans have been met. (List on a separate sheet and attach to this certification.) IV.Concrete Pans - FCSCM Vol.1, Ch.7, Sec.4.1.3.4 A. Construction/Installation: All concrete pans have been constructed in accordance with the approved construction plans. 1.The concrete pans are the correct size/width as shown on the approved construction plans. 2.The longitudinal slopes of the pans are as shown on the approved construction plans. The certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or justification by separate document. 3.The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross- section is “V” shaped and meets the side slope shown on the detail.) 4.The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4 inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide documentation of the reinforcement used if different than shown on the details or on the approved construction plans.) 5.The spot elevations shown on the concrete pan(s) have been verified and are shown on the as- built drawings. 12/15 Page 5 V. Storm Drain Inlets - FCSCM Vol.1, Ch.6, Sec. 3 A. Construction/Installation: All storm drain inlets have been constructed in accordance with the approved construction plans. 1.The size and type of inlets are consistent with the inlets shown on the approved construction plan. Indicate by writing “Verified” on each inlet on the plan sheet or list on a separate document the inlet number(s), type and size (length). If the inlet installed is other than the one on the approved construction plan detail sheet, provide the name and source of the detail with justification for equal or better capacity. 2.The size of the inlet opening is consistent with the approved detail. (Check height and width.) 3.The elevation of the grate (if applicable) is at the elevation shown on the street profile or as indicated by a spot elevation on the construction plans. 4.The as-built invert elevations of all pipes entering and leaving the inlet are shown on the plan and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide justification and capacity calculations to show the capacity is not affected or propose mitigation. 5.The as-built size of the inlet box is as shown on the construction plans or an explanation or justification is attached. 6.All inlet covers are stenciled or stamped with the following designation: NO DUMPING – DRAINS TO POUDRE RIVER. VI.Culverts - FCSCM Vol.2, Ch.9 A. Construction/Installation: All culverts have been constructed and/or installed in accordance with the approved construction plans. 1.All culvert sizes have been verified as indicated on the as-built construction plans as correct. 2.The culvert material type for all culverts installed is as on the approved construction plans and is indicated on the as-built plans. 3.The as-built invert “in and out” elevations have been verified and are indicated on the as-built construction plans. 4.The culvert headwalls or wing walls have been installed as shown on the approved construction plans. Headwalls or wing walls may be needed in the as-built conditions onsite if the slopes adjacent to the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative. An alternative to consider is a turf reinforcement mat (TRM). VII.Sub-Drains A. Construction/Installation: All sub-drains shown on the construction plans have been installed in accordance with those plans. Sub-drains installed with the sanitary sewer are to be verified on the sanitary sewer plan and profile sheets of the construction plans. (NOTE: Indicate any sub-drains installed after the plans were approved on the as-built plans.) 1.The size of the sub-drains are as approved on the construction plans and are indicated on the as- built plans. 2.The type of sub-drain, in particular the perforated and non-perforated sections of the drain, are as indicated on the approved construction plans. 12/15 Page 6 3.The cover requirements per the construction plans are provided. 4.The cleanouts have been installed at the locations shown on the construction plans and are accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations marked.) 5.The backfill materials for sub-drains are as shown on the approved construction plans. (This includes the type, depth and width.) 6.The geo-textile liner completely wraps the sub-drain and the permeable backfill material unless shown otherwise on the approved construction plans. (Sub-drain pipe wrapped in a sock filter material is accepted only if approved prior to installation.) VIII.Curb Cuts A. Construction: All curb cut openings are constructed in accordance with the approved construction plans. 1.The size (width) of the curb cut opening is as shown on the approved construction plans. 2.The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb cut. IX.Sidewalk Culverts & Chases A. Construction/Installation: All sidewalk culverts have been installed at the locations shown on the approved construction plans. 1.The size (width and length) of the culverts are as shown on the approved construction plans. 2.The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the detail shown on the approved construction plans or per the City’s detail. 3.The sidewalk culvert invert “in and out” elevations have been verified and are indicated on the as-built plans. 4.The sidewalk culvert opening is as shown on the approved construction plans or per the City’s detail. 5.There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert. X. Site Grading A. Construction: All common open spaces have been graded in accordance with the approved construction plans. 1.The grading on all common open spaces bordering private lots has been verified as correct and the as-built rear lot corner elevations have been shown on the as-built plans. 12/15 Page 7 2.The as-built contours for “overlot grading” are shown on the as-built construction plans for all common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the situation for noncompliance and when it may be corrected. An escrow for overlot grading may be required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site Certification. It is understood that residential lots will be brought to final grade once the foundation is backfilled so they may be lower than the plan shows at this Overall Site Certification stage.) 3.All turf reinforcement mats (TRMs) have been installed as shown on the approved construction plans and the slopes are stabilized. XI.Riprap - FCSCM Vol.1, Ch.7, Sec.4.4.4.3 A. Construction: All riprap has been installed in the locations and sizes indicated on the approved construction plans. XII.Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7 A. Construction: All fabric has been installed in the locations and sizes indicated on the approved construction plans. 1.All fabric was installed per the details on the approved construction plans. XIII.Post-Construction Site Cleanup - FCSCM Vol.3, Ch.7 A. Construction: All construction debris and obstructions of any kind have been removed from drainage paths. 1.All construction debris has been removed except in staging area(s). 2.All ruts have been smoothed out in all construction areas. 3.All areas needing reseeding have been identified and future stabilization goals have been coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note the area needing stabilization in the narrative. XIV.Certification of Other Permanent BMPs - FCSCM Vol.2, Ch.8, Sec.2 & FCSCM Vol.2, Ch.12 A.The construction of channel drop structures is in accordance with the approved plan both in location, horizontal dimensions and cross-section. XV.Certification of LID and Water Quality Facilities - FCSCM Vol.3, Ch.4 A.Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and other items to be verified during construction, along with pictures and other required documentation. NOTE: SURVEY DOES NOT REFLECT TRUE TOP OF POND ELEVATION. THE TOP OF POND ELEVATION HAS BEEN REVISED TO MEET PROPOSED ELEVATION OF 4962.71' 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 NOTE: SURVEY DOES NOT REFLECT TRUE TOP OF POND ELEVATION. THE TOP OF POND ELEVATION HAS BEEN REVISED TO MEET PROPOSED ELEVATION OF 4962.71' AS-BUILT BERM AT ELEVATION 4962.71 OVERFLOW SPILLWAY AT ELEVATION 4961.71 WITH WIDTH OF 160' TH I S D O C U M E N T I S A N I N S T R U M E N T O F P R O F E S S I O N A L S E R V IC E O F T H E F R E D E R I C K S O N G R O U P , L L C . T H E F R E D E R I C K S ON G R O U P S H A L L , T O T H E F U L L E S T E X T E N T P E R M I T T E D B Y LA W , B E H E L D H A R M L E S S A N D R E L E A S E D O F A N Y D A M A G E , L I AB I L I T Y , O R C O S T A L L E G E D L Y A R I S I N G O U T O F U N A U T H O R I ZE D M O D I F I C A T I O N , C H A N G E , O R R E U S E O F T H I S D O C U M E N T B Y O T H E R S . 37 1 5 S h a l l o w P o n d D r i v e Ft . C o l l i n s , C O 8 0 5 2 8 Ph o n e : ( 9 7 0 ) 2 2 6 - 0 2 6 4 la r r y c o w e n @ c o m c a s t . n e t SCALE: 1" = 30' 60'30'0 22 SEP 2016 Project No.:11-358 Date:5/27/16 Project Name:Aspen Heights Student Housing Basin I.D.:Expanded Interim Detention Basin Contour Plan Depth Volume Increment Elevation Area Interval Basin (amsl)(s.f.)(ft)(c.f.)(c.f.)(ac-ft) 4953.00 10.00 0.00 0.00 0.00 0.000 4954.00 555.15 1.00 213.22 213.22 0.005 4955.00 11400.73 1.00 4,823.88 5,037.10 0.116 4956.00 39458.69 1.00 24,023.09 29,060.19 0.667 4957.00 93816.93 1.00 64,706.27 93,766.46 2.153 4957.50 117807.93 0.50 52,792.53 146,558.99 3.365 4958.00 135782.93 0.50 63,344.56 209,903.55 4.819 4959.00 155920.73 1.00 145,735.84 355,639.39 8.164 4960.00 162934.74 1.00 159,414.88 515,054.27 11.824 4961.00 169614.08 1.00 166,263.23 681,317.49 15.641 4962.00 176903.23 1.00 173,245.88 854,563.37 19.618 WQCV WSE = 100-yr + WQCV WSE = - The required WQCV of 0.155 ac-ft is achieved at a WSE of 4955.36 - The required detention capacity to attenuate the 10-yr storm event, plus provide the WQCV (total of 0.687 ac-ft), is satisfied at a WSE of:4956.47 - The required detention capacity to attenuate the 100-yr storm event, which includes the WQCV (total of 18.48 ac-ft), is satisfied at a WSE of:4961.71 DETENTION BASIN STAGE-CAPACITY CURVE Cummulative Volume 4952.00 4953.00 4954.00 4955.00 4956.00 4957.00 4958.00 4959.00 4960.00 4961.00 4962.00 4963.00 -5.000 0.000 5.000 10.000 15.000 20.000 25.000 Co n t o u r E l e v a t i o n ( f t ) Detention Volume (ac-ft) 7047 E. Balancing Rock Rd., Scottsdale, AZ 85266 • Phone (303) 913-5382 • larrycowen@comcast.net December 12, 2017 City of Fort Collins Water Utilities Engineering 700 Wood Street Fort Collins, CO 80524 Attention: Mr. Dan Mogen, EI, CFM Development Review Engineer RE: Aspen Heights Development Site Certification Dear Mr. Mogen, Further to my submittal letter of October 24, 2017 and your subsequent email of November 7, 2017, I believe that the final documentation requirements, as set out in your email, have been addressed in the attached, updated record documents. Specifically: • The City of Fort Collins Utility Plan Approval signatures have been transferred to the as-built record drawings (for those drawings that were part of the approved set of construction drawings) and I have been stamped and signed those as record drawings, with a dated notation in the revision block that the drawings are “As-built Record Drawings”. • The drawings showing the as-built grading of the north-south drainage channel have been stamped, signed and dated, with the annotation that these are “As-built Record Drawings”. • The Overall Site and Drainage Certification document has been updated, with current stamp, signature and date. • The as-built drawings showing the as-constructed invert and rim elevations of the manholes and the final lengths and gradients of the pipe runs for both the storm drainage and sanitary sewer systems are included for your records. The additional explanatory information provided in my letter of October 24, 2017 remains applicable to this submittal, and should be considered a part of this submittal. A copy of that letter is included herewith for reference. Accordingly, I believe that all of the items associated with grading and drainage at the Aspen Heights project site have been addressed and documented, in compliance with the project requirements. Therefore, we hereby respectfully request release of the surety provided in connection with the grading and drainage improvements for the project, as well as payment of the reimbursement due to Breckenridge Group Fort Collins Colorado, LLC for costs incurred by it in connection with the installation of NECCO infrastructure within and adjacent to the project site. Yours truly, Owen Consulting Group, Inc. Larry C. Owen, P.E. Attachments cc: Mr. Jonathan Nunn, Breckenridge Group Fort Collins Colorado, LLC 7047 E. Balancing Rock Rd., Scottsdale, AZ 85266 • Phone (303) 913-5382 • larrycowen@comcast.net October 24, 2017 City of Fort Collins Water Utilities Engineering 700 Wood Street Fort Collins, CO 80524 Attention: Mr. Dan Mogen, EI, CFM Development Review Engineer RE: Aspen Heights Development Site Certification Dear Mr. Mogen, I believe that we have now addressed all the punch list items set out in your various emails regarding completion of the Site Certification for the Aspen Heights project. Following is a response to the items enumerated in your email to me dated September 1, 2017, with reference to other items of concern identified in previous communications. 1. North – South Drainage Channel • The remedial work requested to modify the concrete pan forming the channel invert downstream of the existing Conifer St. culverts and to stabilize the channel side slopes at this location, as well as downstream of the Lupine Dr. culverts has been completed, and accepted by the City. An as-built survey plot of the remedial work at the Conifer St. location has previously been submitted to the City (duplicate copy attached hereto). • Remedial work has also been completed at various locations along the edges of the trickle pan, to rectify areas that had been eroded. These areas have been filled and revegetated. • An as-built survey has now also been conducted throughout the length of the drainage channel. A plot of the as-built survey is attached for your information. 2. Private Driveways and Parking Areas • An as-built survey has been completed showing spot elevations at representative locations throughout the private driveways and parking areas of the project site. • Plots of the as-built survey are shown on four drawings, attached, corresponding approximately to each of the four development phases of the project. 3. Common Areas • The aggregate scope of the individual lot surveys, previously submitted to and accepted by the City, includes all the common areas between and around the various buildings, with the exception of the main north – south drainage channel and the area between the private sidewalk and the public sidewalk along the east perimeter of the site adjacent to Redwood St. • The north – south drainage channel has been surveyed separately and is addressed in the as-built survey plots referenced above. • The area between the sidewalks along Redwood St. has not been independently surveyed, however a visual inspection has been conducted of this area, and it has been confirmed that the finished grade of this area slopes consistently and significantly toward Mr. Dan Mogen RE: Aspen Heights – Site Certification October 24, 2017 Page 2 of 2 the street. Accordingly, it is our contention that no as-built survey is necessary to certify that positive drainage away from the buildings is achieved throughout this area. 4. Detention Basin Outlet Structure • Modifications have been made to the safety grate on the outlet structure at the southeast corner of the detention basin, to ensure the security of the grate. Hinges have been installed at the top corners of the grate to allow access into the outlet structure to conduct maintenance, but the grate is secured with bolts at it’s lower corners to prevent unauthorized access to the outlet structure. • A photo of the finished grate is attached. 5. Pool and Sport Court • Design and construction of the pool area and sport court was conducted independently of the remainder of the project site, by a firm specializing in such work. As such, no detailed as-built survey has been conducted of the pool or the pool deck area. It is our understanding, however, that you waived your initial requirement for such a survey during a field inspection with Michael Palizzi on November 30, 2016. • As-built elevations of the four corners of the sport court are included on the plot of the as-built survey of the private driveways and parking areas in Phase 1 of the project. As stated at the outset of this letter, I believe that we have now addressed all of the punch list items associated with grading and drainage at the Aspen Heights project site, and have provided appropriate documentation of compliance with the project requirements. Accordingly, we hereby respectfully request release of the surety provided in connection with the grading and drainage improvements for the project, as well as payment of the reimbursement due to Breckenridge Group Fort Collins Colorado, LLC for costs incurred by it in connection with the installation of NECCO infrastructure within and adjacent to the project site, as documented in previous separate submittals made to the City through Wes Lamarque. Yours truly, Owen Consulting Group, Inc. Larry C. Owen, P.E. Attachments cc: Mr. Jonathan Nunn, Breckenridge Group Fort Collins Colorado, LLC 7047 E. Balancing Rock Rd., Scottsdale, AZ 85266 • Phone (303) 913-5382 • larrycowen@comcast.net August 17, 2017 City of Fort Collins Water Utilities Engineering 700 Wood Street Fort Collins, CO 80524 Attention: Mr. Dan Mogen, EI, CFM Development Review Engineer RE: Aspen Heights Development Site Certification Dear Mr. Mogen, This is to confirm our telephone conversation yesterday afternoon, during which it was agreed that the required remedial activities associated with the storm drainage channel bisecting the Aspen Heights development site, from the south side of Conifer Street to the north side of the interim detention basin, have been completed to the satisfaction of the City of Fort Collins. The attached exhibit shows representative as-built elevations of the concrete drainage pan, downstream of the Conifer St. culverts, and it has been agreed that the adverse gradient indicated in the area immediately downstream of the culvert outlets is acceptable as a condition that cannot be reasonably overcome and will not result in any significant or long-term negative effect. It is my contention that all other required remedial actions, identified subsequent to our submittal of the Overall Site and Drainage Certification dated 10/31/16, have also been addressed to the satisfaction of the City, notwithstanding any deficiencies that may be identified during the warranty period. Accordingly, I hereby respectfully request, on behalf of Breckenridge Group Fort Collins Colorado, LLC., that the performance bond in the amount of $90,000.00, currently securing these drainage improvements, be reduced to the amount specified as warranty surety, and that payment be made to Breckenridge Group of the amount due as reimbursement for the NECCO improvements installed in conjunction with the Aspen Heights development ($498,643.67). Thank you for your assistance in resolving these issues. If you have any questions, please contact me immediately. Yours truly, Owen Consulting Group, Inc. Larry C. Owen, P.E. cc: Ryan Fetgatter, Jon Nunn – Breckenridge Group D FES FES FES FES MANHOLE RIM=4960.57 BTM=4948.73 30" RCP FL=4959.22 30" RCP FL=4959.24 30" RCP FL=4959.24 18" RCP FL=4960.27 MH S00°08'52"W 777.84' SLOPE = 0.75% CONCRETE CHANNEL MANHOLE RIM=4958.03 BTM=4972.90 MH NORTH 21 + 0 0 22 + 0 0 23 + 0 0 40 1-800-922-1987 KEYMAP NOT TO SCALE SA N I T A R Y S E W E R P L A N & P R O F I L E MA T C H L I N E - - 7 + 0 0 MATCHLINE -- 7+00 No . Re v i s i o n / I s s u e Da t e 12 6 9 C L E V E L A N D A V E # 4 de a n n e @ T F G c o l o r a d o . c o m (9 7 0 ) 6 6 9 - 3 7 3 7 PL A N N E R S / L A N D S C A P E A R C H I T E C T S SHEET OF PROJECT: 155-101FC DATE:DRAWN BY: OCG SCALE: By : TH I S D O C U M E N T I S A N I N S T R U M E N T O F P R O F E S S I O N A L S E R V I C E O F T H E F R E D E R I C K S O N G R O U P , L L C . T H E F R E D E R I C K S O N G R O U P S H A L L , T O T H E F U L L E S T E X T E N T P E R M I T T E D B Y L A W , B E H E L D H A R M L E S S A N D R E L E A S E D O F A N Y D A M A G E , L I A B I L I T Y , O R C O S T A L L E G E D L Y A R I S I N G O U T O F U N A U T H O R I Z E D M O D I F I C A T I O N , C H A N G E , O R R E U S E O F T H I S D O C U M E N T B Y O T H E R S . 37 1 5 S h a l l o w P o n d D r i v e Ft . C o l l i n s , C O 8 0 5 2 8 Ph o n e : ( 9 7 0 ) 2 2 6 - 0 2 6 4 la r r y c o w e n @ c o m c a s t . n e t 12 AUG 2014 70 AS P E N H E I G H T S , F O R T C O L L I N S LO V E L A N D , C O 8 0 5 3 7 1"=50' 200' GRAPHIC SCALES 25'0'50'100'50' HORIZ: 1 INCH = 50 FEET 20'2.5'0'5'10'5' VERT: 1 INCH = 5 FEET ASPEN HEIGHTS WAY (PRIVATE DRIVE) MARY JANE WAY (PRIVATE DRIVE) MARY JANE WAY (PRIVATE DRIVE) LU P I N E D R I V E MA R Y J A N E W A Y (P R I V A T E D R I V E ) ST E A M B O A T S T R E E T (P R I V A T E D R I V E ) SEWER PROFILE NOTES: 1.ALL SANITARY SEWER CONSTRUCTION SHALL CONFORM TO THE CITY OF FORT COLLINS WATER, WASTEWATER, AND STORMWATER DEVELOPMENT CONSTRUCTION STANDARDS AND DETAILS. 2.ALL SEWER SERVICES SHALL BE A MINIMUM OF 4" DIAMETER CONSTRUCTED AT A SLOPE OF 2%. 3.ALL 6" DIAMETER SEWER SERVICES SHALL BE CONSTRUCTED AT A MINIMUM SLOPE OF 1%. 4.PROVIDE 10' HORIZONTAL CLEARANCE BETWEEN WATER AND SEWER MAINS. 5.WHEN GROUNDWATER IS ENCOUNTERED CLAY CUT OFF WALLS SHALL BE INSTALLED ON THE UPSTREAM SIDE OF ALL MANHOLES, IN THE MID-SECTION OF EACH MAIN LINE RUN AT INTERVALS NOT TO EXCEED 300-FEET, OR AS REQUIRED BY THE DISTRICT. SEE DETAIL SHEET FOR CLAY CUT OFF WALL DETAIL. MA R Y J A N E W A Y RECORD DRAWING 21 + 0 0 B 19 + 0 0 16 + 0 0 17 + 0 0 41 1-800-922-1987 KEYMAP NOT TO SCALE CO P P E R M N T . L N . S A N I T A R Y S E W E R No . Re v i s i o n / I s s u e Da t e 12 6 9 C L E V E L A N D A V E # 4 de a n n e @ T F G c o l o r a d o . c o m (9 7 0 ) 6 6 9 - 3 7 3 7 PL A N N E R S / L A N D S C A P E A R C H I T E C T S SHEET OF PROJECT: 155-101FC DATE:DRAWN BY: OCG SCALE: By : TH I S D O C U M E N T I S A N I N S T R U M E N T O F P R O F E S S I O N A L S E R V I C E O F T H E F R E D E R I C K S O N G R O U P , L L C . T H E F R E D E R I C K S O N G R O U P S H A L L , T O T H E F U L L E S T E X T E N T P E R M I T T E D B Y L A W , B E H E L D H A R M L E S S A N D R E L E A S E D O F A N Y D A M A G E , L I A B I L I T Y , O R C O S T A L L E G E D L Y A R I S I N G O U T O F U N A U T H O R I Z E D M O D I F I C A T I O N , C H A N G E , O R R E U S E O F T H I S D O C U M E N T B Y O T H E R S . 37 1 5 S h a l l o w P o n d D r i v e Ft . C o l l i n s , C O 8 0 5 2 8 Ph o n e : ( 9 7 0 ) 2 2 6 - 0 2 6 4 la r r y c o w e n @ c o m c a s t . n e t 12 AUG 2014 70 AS P E N H E I G H T S , F O R T C O L L I N S LO V E L A N D , C O 8 0 5 3 7 1"=50' 200' GRAPHIC SCALES 25'0'50'100'50' HORIZ: 1 INCH = 50 FEET 20'2.5'0'5'10'5' VERT: 1 INCH = 5 FEET COPPER MOUNTAIN LANE (PRIVATE DRIVE) STEAMBOAT LANE (PRIVATE DRIVE)SOL VISTA LANE (PRIVATE DRIVE) LU P I N E D R I V E LU P I N E D R I V E LU P I N E D R I V E STEAMBOAT LANE (PRIVATE DRIVE) COPPER MOUNTAIN LANE (PRIVATE DRIVE) SEWER PROFILE NOTES: 1.ALL SANITARY SEWER CONSTRUCTION SHALL CONFORM TO THE CITY OF FORT COLLINS WATER, WASTEWATER, AND STORMWATER DEVELOPMENT CONSTRUCTION STANDARDS AND DETAILS. 2.ALL SEWER SERVICES SHALL BE A MINIMUM OF 4" DIAMETER CONSTRUCTED AT A SLOPE OF 2%. 3.ALL 6" DIAMETER SEWER SERVICES SHALL BE CONSTRUCTED AT A MINIMUM SLOPE OF 1%. 4.PROVIDE 10' HORIZONTAL CLEARANCE BETWEEN WATER AND SEWER MAINS. 5.WHEN GROUNDWATER IS ENCOUNTERED CLAY CUT OFF WALLS SHALL BE INSTALLED ON THE UPSTREAM SIDE OF ALL MANHOLES, IN THE MID-SECTION OF EACH MAIN LINE RUN AT INTERVALS NOT TO EXCEED 300-FEET, OR AS REQUIRED BY THE DISTRICT. SEE DETAIL SHEET FOR CLAY CUT OFF WALL DETAIL. SO L V I S T A L N . , S T E A M B O A T L N . & PL A N & P R O F I L E RECORD DRAWING 13 + 0 0 14 + 0 0 15 + 0 0 13 + 0 0 14 + 0 0 43 1-800-922-1987 KEYMAP NOT TO SCALE SA G R E D E C R I S T O S A N I T A R Y S E W E R No . Re v i s i o n / I s s u e Da t e 12 6 9 C L E V E L A N D A V E # 4 de a n n e @ T F G c o l o r a d o . c o m (9 7 0 ) 6 6 9 - 3 7 3 7 PL A N N E R S / L A N D S C A P E A R C H I T E C T S SHEET OF PROJECT: 155-101FC DATE:DRAWN BY: OCG SCALE: By : TH I S D O C U M E N T I S A N I N S T R U M E N T O F P R O F E S S I O N A L S E R V I C E O F T H E F R E D E R I C K S O N G R O U P , L L C . T H E F R E D E R I C K S O N G R O U P S H A L L , T O T H E F U L L E S T E X T E N T P E R M I T T E D B Y L A W , B E H E L D H A R M L E S S A N D R E L E A S E D O F A N Y D A M A G E , L I A B I L I T Y , O R C O S T A L L E G E D L Y A R I S I N G O U T O F U N A U T H O R I Z E D M O D I F I C A T I O N , C H A N G E , O R R E U S E O F T H I S D O C U M E N T B Y O T H E R S . 37 1 5 S h a l l o w P o n d D r i v e Ft . C o l l i n s , C O 8 0 5 2 8 Ph o n e : ( 9 7 0 ) 2 2 6 - 0 2 6 4 la r r y c o w e n @ c o m c a s t . n e t 12 AUG 2014 70 AS P E N H E I G H T S , F O R T C O L L I N S LO V E L A N D , C O 8 0 5 3 7 1"=50' 200' GRAPHIC SCALES 25'0'50'100'50' HORIZ: 1 INCH = 50 FEET 20'2.5'0'5'10'5' VERT: 1 INCH = 5 FEET ECHO MOUNTAIN LANE (PRIVATE DRIVE) TE N M I L E R A N G E L A N E (P R I V A T E D R I V E ) SANGRE DE CRISTO LANE (PRIVATE DRIVE) BL U E S P R U C E D R I V E BL U E S P R U C E D R I V E TE N M I L E R A N G E L A N E (P R I V A T E D R I V E ) SEWER PROFILE NOTES: 1.ALL SANITARY SEWER CONSTRUCTION SHALL CONFORM TO THE CITY OF FORT COLLINS WATER, WASTEWATER, AND STORMWATER DEVELOPMENT CONSTRUCTION STANDARDS AND DETAILS. 2.ALL SEWER SERVICES SHALL BE A MINIMUM OF 4" DIAMETER CONSTRUCTED AT A SLOPE OF 2%. 3.ALL 6" DIAMETER SEWER SERVICES SHALL BE CONSTRUCTED AT A MINIMUM SLOPE OF 1%. 4.PROVIDE 10' HORIZONTAL CLEARANCE BETWEEN WATER AND SEWER MAINS. 5.WHEN GROUNDWATER IS ENCOUNTERED CLAY CUT OFF WALLS SHALL BE INSTALLED ON THE UPSTREAM SIDE OF ALL MANHOLES, IN THE MID-SECTION OF EACH MAIN LINE RUN AT INTERVALS NOT TO EXCEED 300-FEET, OR AS REQUIRED BY THE DISTRICT. SEE DETAIL SHEET FOR CLAY CUT OFF WALL DETAIL. EC H O M N T . L N . - T E N M I L E R A N G E & PL A N & P R O F I L E RECORD DRAWING (PRIVATE DRIVE) 15 + 0 0 16 + 0 0 CO N I F E R S T R E E T LU P I N E D R . FORG E T - M E - N O T L A N E 15 + 0 0 16 + 0 0 LU P I N E D R . 45 1-800-922-1987 KEYMAP NOT TO SCALE ST O R M S E W E R P L A N / P R O F I L E - 2 200' GRAPHIC SCALE 25'0'50'100'50' HORIZ: 1 INCH = 50 FEET No . Re v i s i o n / I s s u e Da t e 12 6 9 C L E V E L A N D A V E # 4 de a n n e @ T F G c o l o r a d o . c o m (9 7 0 ) 6 6 9 - 3 7 3 7 PL A N N E R S / L A N D S C A P E A R C H I T E C T S SHEET OF PROJECT: 155-101FC DATE:DRAWN BY: OCG SCALE: By : TH I S D O C U M E N T I S A N I N S T R U M E N T O F P R O F E S S I O N A L S E R V I C E O F T H E F R E D E R I C K S O N G R O U P , L L C . T H E F R E D E R I C K S O N G R O U P S H A L L , T O T H E F U L L E S T E X T E N T P E R M I T T E D B Y L A W , B E H E L D H A R M L E S S A N D R E L E A S E D O F A N Y D A M A G E , L I A B I L I T Y , O R C O S T A L L E G E D L Y A R I S I N G O U T O F U N A U T H O R I Z E D M O D I F I C A T I O N , C H A N G E , O R R E U S E O F T H I S D O C U M E N T B Y O T H E R S . 37 1 5 S h a l l o w P o n d D r i v e Ft . C o l l i n s , C O 8 0 5 2 8 Ph o n e : ( 9 7 0 ) 2 2 6 - 0 2 6 4 la r r y c o w e n @ c o m c a s t . n e t 12 AUG 2014 70 AS P E N H E I G H T S , F O R T C O L L I N S LO V E L A N D , C O 8 0 5 3 7 1"=50'80' GRAPHIC SCALE 10'0'20'40'20' 1 INCH = 20 FEET VERT: 1 INCH = 5 FEET VERT: 1 INCH = 1 FEET ENLARGED WATER/SEWER CROSSING DETAIL NOTE: ALL JUNCTION BOXES SHALL BE PRECAST AND TO BE DESIGNED BY PRECAST ENGINEER AND APPROVED BY CIVIL ENGINEER. RECORD DRAWING