HomeMy WebLinkAboutSite Certifications - 08/07/2018 1.1 Ayres Associates ANHEUSER BUSCH CERTIFICATION OF LOT GRADING & OVERALL SITE AND DRAINAGE CERTIFICATION For Minor Amendment 150043 Tractor Trailer Paving Minor Amendment 150098 South Warehouse Addition Prepared for City of Fort Collins 700 Wood St Fort Collins, Colorado 80521 3665 JFK Parkway, Building 2, Suite 100 Fort Collins, Colorado 80525 (970) 223-5556 Ayres Project No. 32-1859.02 January 2018 1.2 Ayres Associates TABLE OF CONTENTS 1. INTRODUCTION 1.1 Purpose 1.2 General Location & Description 1.3 Construction Performed 1.4 Background 2. CERTIFICATION OF LOT GRADING - MA150043 TRACTOR TRAILER PAVING 2.1 City of Fort Collins Form 2.2 "No" Explanations 3. CERTIFICATION OF LOT GRADING - MA150098 SOUTH ADDITION 3.1 City of Fort Collins Form 3.1 "No" Explanations 4. OVERALL SITE AND DRAINAGE CERTIFICATION 4.1 City of Fort Collins Form 4.2 "No" Explanations APPENDIX – -- A. As Built Survey, November 2017 B. Ayres Associates Storm Water Drainage Design, September 2015 C. URS Grading Plans D. Ayres Associates Drainage Report, September 2015 1.3 Ayres Associates 1. INTRODUCTION 1.1 Purpose The purpose of this report is to submit to the City of Fort Collins two Certification of Lot Grading forms and one Overall Site and Drainage Certification form as part of two minor amendments connected to a plant expansion at the Fort Collins Anheuser Busch Brewery. 1.2 General Location & Description These forms have been prepared for the Fort Collins Anheuser Busch Brewery. The construction occurred in Section 33, Township 8 North, Range 68, City of Fort Collins, County of Larimer, State of Colorado. A vicinity map for the project area is included on the following page (Figure 1.1). The site is bounded by County Roads 50 & 52 (North/South) and by Interstate 25 & Burlington Northern Railroad (East/West). 1.3 Construction Performed The expansion at the Anheuser Busch Campus was driven by a need for additional trailer parking spaces, and the addition of a canning line within the brewery. One hundred twenty- seven additional parking spaces and the necessary travel lanes are being added. This added a total surface area of 238,000 square feet. Figure 1.2 shows the locations of the new parking spaces. 1.4 Ayres Associates Figure 1.1-Vicinity Map 1.5 Ayres Associates Figure 1.2-Additional Parking Spaces on AB Campus 1.6 Ayres Associates Figure 1.3-SWMM Basin Boundaries from Anheuser Busch Master Plan (May 2009) 2.1 Ayres Associates 2. CERTIFICATION OF LOT GRADING - MA150043 TRACTOR TRAILER PAVING 2.1 City of Fort Collins Form See next page. 2.2 Ayres Associates 2.2 “No” Explanations 1. Yes. A grading plan was a component of the minor amendment plan set, submitted to the City of Fort Collins, titled Anheuser-Busch Stormwater Drainage Design. The grading plan in this package comes from two different plan sets. The first was done by Ayres Associates and is specific to drainage features and water quality, while the second was done by URS and is more specific to impermeable driving surfaces and general grading. Reference Appendix A. 2. Yes. Reference Appendix A. 3. Yes. The work associated with the tractor trailer lots was done according to the approved grading plan. Reference Appendix A & C. 4. N/A. No structures were built under this minor amendment. Only tractor trailer driving surfaces were constructed. 5. N/A. No structures were built under this minor amendment. Only tractor trailer driving surfaces were constructed. 6. No. The property does not have much elevation relief. There are some areas on the tractor trailer lots and the drainage ditches that are less than 2%. The BMP features (pervious pavers & bioswale) have underdrains to ensure proper drainage. 7. N/A. There are no stormwater drainage swales immediately adjacent to the structure. 8. N/A. There are no downspouts. 9. N/A. No changes were made to the property boundaries nor where the drainage exists the property. 10. No adverse impacts will result from the drainage improvements made. All drainage as per design maintains historic drainage patterns exiting the property at the Pond 425 discharge. 11. Yes. 12. Yes. 13. Yes. 3.3 Ayres Associates 3. CERTIFICATION OF LOT GRADING - MA150098 SOUTH ADDITION 3.1 City of Fort Collins Form See next page. 3.4 Ayres Associates 3.2 “No” Explanations 1. Yes. A grading plan was a component of the minor amendment plan set, submitted to the City of Fort Collins, titled Anheuser-Busch Stormwater Drainage Design. The grading plan in this package comes from two different plan sets. The first was done by Ayres Associates and is specific to drainage features and water quality, while the second was done by URS and is more specific to impermeable driving surfaces and general grading. Reference Appendix A & C. 2. Yes. Reference Appendix A. 3. No. The work performed near the South Warehouse Addition was not done as per the approved grading plan. The area at the south end of the warehouse was graded according to a different plan and has a higher amount of impermeable asphalt. The additional impermeable surface is well within the design of the Water Quality BMPs & LIDs so this is not an environmental concern. The drainage acts in a similar way the site would have if the approved plan had been built. The area in question is within Basin 91 (as per the 2009 SWMM Anheuser Master Plan, see Figure 1.3) and maintains the historic drainage patterns. The area is also not intended to serve a specific purpose other than an open permeable surface so there are no adverse water quality impacts. The as-built survey and approved grading do not match downstream of the Pond 430 Bioswale. Construction was completed some time ago and some sedimentation has occurred. Anheuser-Busch will rectify this as part of their annual expected maintenance. Reference Appendix A & C. 4. Yes. 5. N/A. The structure is not a residence. The survey does however show that the grades are near 5% close to the building edge. 6. No. The property does not have much overall elevation relief. There are some areas in the drainage ditches that less than 2%. The BMP features (pervious pavers & bioswale) have underdrains to ensure proper drainage. 7. Yes. 8. No. Downstream culverts that are immediately downstream of the structure are shown but building downspout locations are not. There are three and they are located at the SW, SE & NE corners of the warehouse. The adjacent areas direct flow away from the structure to adjacent surfaces that drain the runoff to nearby swales. Some of the flow ultimately flows to Pond 430 while all will eventually flow to Pond 425. Only the areas that were altered are shown on the survey. 9. N/A. No changes were made to the property boundaries nor where the drainage exists the property. 10. No adverse impacts will result from the drainage improvements made. All drainage, as per design, maintains historic drainage patterns exiting the property at the Pond 425 discharge. 11. Yes. 12. Yes. 13. Yes. 4.5 Ayres Associates 4. OVERALL SITE AND DRAINAGE CERTIFICATION 4.1 City of Fort Collins Form See next page. 8/16 Page 1 OVERALL SITE and DRAINAGE CERTIFICATION Commercial, Multi-Family and Subdivision Certification Form and Checklist Project Name: Date: Building Permit Numbers: (Commercial or multi-family) Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Volume 1, Section 6.11, please fill in all applicable items in this Certification Form for Commercial, Multi-Family and Overall Single Family sites. NOTE: several items must be verified during construction. A copy of the approved grading plan must be submitted with the as-built grading plan. (As-built elevations must be written in red next to the approved elevations.) •Use “Yes” for items completed as described. •Use “N/A” for items that are not applicable to the site being certified. •If any blanks are “No,” attach an explanation referencing the item number below. Attach an explanation or description of the as-built condition for any items listed or for anything not listed but shown on the approved construction plans. Provide an as-built redline or Mylar drawing with the following: I.Water Quality and Quantity Detention Basin Certification - FCSCM Vol.2, Ch.10 For multiple detention basins on a site, provide the following for each basin separately: A. Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and volume verification calculations for the water quality capture volume and the 100-year detention storage volume. 1. Detention basin topography was prepared by a professional land surveyor registered in the state of Colorado. 2.Both proposed and as-built contours are shown on the same plan sheet (dashed lines for proposed and solid lines for as-built). 3.All critical spot elevations as shown on the approved construction plans have been verified and the as-built elevations are shown on the plan sheet. 4.Stage-storage-discharge tables are provided on a separate document. 5.Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92- 602(8) is attached and has been uploaded to the Statewide Compliance Portal (tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include: a.The cover sheet from the approved drainage report b.The stamped certification page from the approved drainage report c.As-built topographic survey d.Stamped certification page from the Overall Site & Drainage Certification e.PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet 8/16 Page 2 B.Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2% grade requirement. 1.Low Flow: Choose one of the following detention basin low flow options as applicable: a. Turf swale for low flow path in detention basin. There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade is . b.Concrete pan for low flow in detention basin. There is a concrete pan installed that meets the grades as shown on the approved construction plans. (Show as-built spot elevations.) c.Soft pan for low flow in detention basin. •Verify and document the soft pan material gradation, trench width and depth - to be verified during construction by engineer. Picture documentation is preferred or engineer’s statement of visual inspection and compliance. (Choose one below.) o There is a soft pan with an underdrain installed that meets the design on the approved construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations, bends, cleanouts, etc.) o There is soft pan installed without an underdrain but there is a type A or B soil. The soil type must be documented by supplying verification from a registered professional geotechnical engineer. NOTE: Spot elevations are to be within 0.2 ft. +/-. 2. Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown. Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re- graded. Provide documentation if a variance was granted for steeper slopes during the design process. 3.Spillway Certification: The following items must be field verified: a.The location of the spillway is indicated on the as-built plan. b.The width of the spillway is indicated on the as-built plan. c.The elevation(s) of the spillway is shown on the as-built plan. d.A concrete ribbon defines the location and grade of the spillway. e.There is downstream scour protection in the spillway as per the construction plans. Indicate type: (riprap size “D50” gradation and bedding type, geotextile, buried riprap with inches of bury, etc.). f.There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape features, rocks, etc. 8/16 Page 3 4.Outlet Structure Certification a.The orifice plate for the approved release rate is installed with the correct size and location of the orifice. b.The orifice plate for the water quality outlet is installed with the correct hole size, number of rows and columns of holes. c.The bottom hole on both the water quality and quantity outlets are at the bottom of the plate so no water ponds in front of the plate. d.The well screen is the correct material and is installed as shown on the construction plans. e.100-year overflow grate elevation is . (Elev. A on detail D-46) f.The top elevation of the water quality capture volume is . (Elev. B on detail D-46) g.Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the top and bolted at the bottom. h.The bottom of the outlet box has no obstructions or misalignments that will cause it to retain runoff water and is sloped at 2% towards outlet. II.Channels/Swales - FCSCM Vol.1, Ch.7, Sect.3&4 A. Capacity: The as-built capacity of all the major channels and swales has been verified. They meet or exceed capacity requirements shown in the approved drainage study for this project. 1.All swales are located within the drainage easements as shown on the construction plans. 2.Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these criteria are not met, the certification engineer will write a justification and propose mitigation for each instance or have the issues corrected. If variances to these criteria have previously been approved and are shown on the construction plans, no justification is needed. 3.As-built spot elevations on channels/swales are shown that correspond to spot elevations shown on the approved construction plans. 4.All permanent erosion control measures are installed as shown on the approved construction plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used as part of this verification.) 5.All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the system. (Pictures at tie-in points suggested.) 6.The minimum freeboard is provided for all channels and swales as shown on the approved construction plans or as identified in the approved drainage study. (Show the freeboard provided on the cross-sections as on the construction plan set or attached as separate documentation.) 7.The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees, shrubs, sod, etc. infringe on the low flow portion of channels or swales.) 8/16 Page 4 III.Storm Pipes (aka storm drains) - FCSCM Vol.1, Ch.6, Sec. 4 A. Storm Drain Pipe Capacity: The as-built capacity of all pipes installed on this project has been verified and meets or exceeds the capacity requirements shown in the approved drainage study for this project. 1.All storm drain pipe sizes and materials have been verified and are in conformance with the approved construction plans. (Indicate on the plan and profile sheets that they have been verified.) Material and size substitutions must be approved prior to installation. If a pipe size or material was changed during construction, the certification engineer must attach the approval documents or supply them with this certification. Approval documents must include a calculation documenting the capacity equivalency (equal or greater) of the substituted size. 2.The longitudinal slope of the pipe is as shown on the approved construction plans. The acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans must be justified with capacity calculations on an attached sheet. 3.The as-built invert elevations have been verified and are shown on the plan and profile sheets of the approved construction plans. B.Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the approved construction plans. 1.The minimum cover requirements for all pipes have been met as shown on the approved construction plans. These will be called out in critical locations. 2.All encasements and clearances as specified on the approved construction plans have been met. 3.Any specific joint types or construction methods specified on the approved construction plans have been met. (List on a separate sheet and attach to this certification.) IV.Concrete Pans - FCSCM Vol.1, Ch.7, Sec.4.1.3.4 A. Construction/Installation: All concrete pans have been constructed in accordance with the approved construction plans. 1.The concrete pans are the correct size/width as shown on the approved construction plans. 2.The longitudinal slopes of the pans are as shown on the approved construction plans. The certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or justification by separate document. 3.The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross- section is “V” shaped and meets the side slope shown on the detail.) 4.The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4 inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide documentation of the reinforcement used if different than shown on the details or on the approved construction plans.) 5.The spot elevations shown on the concrete pan(s) have been verified and are shown on the as- built drawings. 8/16 Page 5 V. Storm Drain Inlets - FCSCM Vol.1, Ch.6, Sec. 3 A. Construction/Installation: All storm drain inlets have been constructed in accordance with the approved construction plans. 1.The size and type of inlets are consistent with the inlets shown on the approved construction plan. Indicate by writing “Verified” on each inlet on the plan sheet or list on a separate document the inlet number(s), type and size (length). If the inlet installed is other than the one on the approved construction plan detail sheet, provide the name and source of the detail with justification for equal or better capacity. 2.The size of the inlet opening is consistent with the approved detail. (Check height and width.) 3.The elevation of the grate (if applicable) is at the elevation shown on the street profile or as indicated by a spot elevation on the construction plans. 4.The as-built invert elevations of all pipes entering and leaving the inlet are shown on the plan and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide justification and capacity calculations to show the capacity is not affected or propose mitigation. 5.The as-built size of the inlet box is as shown on the construction plans or an explanation or justification is attached. 6.All Type C, R, 13 and 16 inlet covers are stenciled or stamped with the following (or an equivalent) designation: NO DUMPING – DRAINS TO POUDRE RIVER. VI.Culverts - FCSCM Vol.2, Ch.9 A. Construction/Installation: All culverts have been constructed and/or installed in accordance with the approved construction plans. 1.All culvert sizes have been verified as indicated on the as-built construction plans as correct. 2.The culvert material type for all culverts installed is as on the approved construction plans and is indicated on the as-built plans. 3.The as-built invert “in and out” elevations have been verified and are indicated on the as-built construction plans. 4.The culvert headwalls or wing walls have been installed as shown on the approved construction plans. Headwalls or wing walls may be needed in the as-built conditions onsite if the slopes adjacent to the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative. An alternative to consider is a turf reinforcement mat (TRM). VII.Sub-Drains A. Construction/Installation: All sub-drains shown on the construction plans have been installed in accordance with those plans. Sub-drains installed with the sanitary sewer are to be verified on the sanitary sewer plan and profile sheets of the construction plans. (NOTE: Indicate any sub-drains installed after the plans were approved on the as-built plans.) 1.The size of the sub-drains are as approved on the construction plans and are indicated on the as- built plans. 2.The type of sub-drain, in particular the perforated and non-perforated sections of the drain, are as indicated on the approved construction plans. 8/16 Page 6 3.The cover requirements per the construction plans are provided. 4.The cleanouts have been installed at the locations shown on the construction plans and are accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations marked.) 5.The backfill materials for sub-drains are as shown on the approved construction plans. (This includes the type, depth and width.) 6.The geo-textile liner completely wraps the sub-drain and the permeable backfill material unless shown otherwise on the approved construction plans. (Sub-drain pipe wrapped in a sock filter material is accepted only if approved prior to installation.) VIII.Curb Cuts A. Construction: All curb cut openings are constructed in accordance with the approved construction plans. 1.The size (width) of the curb cut opening is as shown on the approved construction plans. 2.The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb cut. IX.Sidewalk Culverts & Chases A. Construction/Installation: All sidewalk culverts have been installed at the locations shown on the approved construction plans. 1.The size (width and length) of the culverts are as shown on the approved construction plans. 2.The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the detail shown on the approved construction plans or per the City’s detail. 3.The sidewalk culvert invert “in and out” elevations have been verified and are indicated on the as-built plans. 4.The sidewalk culvert opening is as shown on the approved construction plans or per the City’s detail. 5.There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert. X. Site Grading A. Construction: All common open spaces have been graded in accordance with the approved construction plans. 1.The grading on all common open spaces bordering private lots has been verified as correct and the as-built rear lot corner elevations have been shown on the as-built plans. 8/16 Page 7 2.The as-built contours for “overlot grading” are shown on the as-built construction plans for all common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the situation for noncompliance and when it may be corrected. An escrow for overlot grading may be required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site Certification. It is understood that residential lots will be brought to final grade once the foundation is backfilled so they may be lower than the plan shows at this Overall Site Certification stage.) 3.All turf reinforcement mats (TRMs) have been installed as shown on the approved construction plans and the slopes are stabilized. XI.Riprap - FCSCM Vol.1, Ch.7, Sec.4.4.4.3 A. Construction: All riprap has been installed in the locations and sizes indicated on the approved construction plans. XII.Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7 A. Construction: All fabric has been installed in the locations and sizes indicated on the approved construction plans. 1.All fabric was installed per the details on the approved construction plans. XIII.Post-Construction Site Cleanup - FCSCM Vol.3, Ch.7 A. Construction: All construction debris and obstructions of any kind have been removed from drainage paths. 1.All construction debris has been removed except in staging area(s). 2.All ruts have been smoothed out in all construction areas. 3.All areas needing reseeding have been identified and future stabilization goals have been coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note the area needing stabilization in the narrative. XIV.Certification of Other Permanent BMPs - FCSCM Vol.2, Ch.8, Sec.2 & FCSCM Vol.2, Ch.12 A.The construction of channel drop structures is in accordance with the approved plan both in location, horizontal dimensions and cross-section. XV.Certification of LID and Water Quality Facilities - FCSCM Vol.3, Ch.4 A.Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and other items to be verified during construction, along with pictures and other required documentation. 4.6 Ayres Associates 4.2 “No” Explanations I. Water Quality and Quantity Detention Basin Certification - FCSCM Vol.2, Ch.10 A. Volume. Reference calculations in Exhibit B; “ANHEUSER BUSCH BOTTLING LINE EXPANSION DRAINAGE REPORT, SEPTEMBER 2015” a. WQCV was added in Pond 430 b. This project was limited in scope to water quality modifications to existing structures. Overall site storage was not changed. 1. Yes. David J. Berglund with Farnsworth Group, Inc. 2. No. Only partially proposed & as built surveys are shown on the same sheets. Ayres has access to its own CAD drawings but not URS drawings so only the Ayres drainage work satisfies this question. The Ayres exhibits do however show the entire as built survey. The URS PDF drawings are included for comparison. 3. Yes. While some areas were not graded as per the approved construction plan, the areas critical to effective Stormwater drainage were done correctly and will allow water to drain as intended. 4. Yes. Reference Appendix D. 5. No. This project was done as an incremental addition to existing infrastructure. Only improvements were done to satisfy the additional impervious area and water quality requirements for the two Minor Amendments. B. No. A survey is included however which shows the site has very little elevation relief so some areas have less than 2% slope. 1a. No. The flattest as-built grade in Pond 430 is less than 2%. The bioswale daylights into one of these areas. 1b. N/A. 1c. No. The bioswale has a slope less than 2% but has an underdrain. Ayres was not involved during the construction; however, it appears from visual inspection that it was constructed as per design. 2. N/A. The side slopes of the detention basins were not part of this project and were left as is. 3. N/A. 4. Outlet Structure Certification of Pond 425 a. Yes b. Yes. c. No. This was not the intended design, however, there is a significant gap below the WQ plate which will allow water to drain. d. N/A e. N/A. This project was specific to Water Quality Improvements. f. Yes. g. The original overflow grate was left in place. It was not part of this project. h. No. The outlet structure has a gate to be closed in the event of an onsite environmental spill so can at any point be closed. II. Channels/ Swales A. Capacity: Yes, the bioswale was built as designed. 1. Yes, the bioswale is located within Pond 430 4.7 Ayres Associates 2. No. Slopes have been verified to match the design, however, the design is based on the Urban Drainage Design Procedure Form for a Grass Swale and the Longitudinal Slope available onsite is 0.0034 ft/ft. A 2% slope was not feasible. 3. Yes. Reference Appendix A. 4. Yes. Reference Appendix A. 5. Yes. 6. N/A. 7. Yes. III. Storm Pipes (aka storm drains) - N/A IV. Concrete Pans – N/A. Only concrete pans were removed in this project. V. Storm Drain Inlets - N/A VI. Culverts A. Construction/Installation – No 1. No. More culverts were installed then shown on the approved grading plans. The ones that are shown also were installed not exactly according to the plan but serve the intended purpose. All the culverts shown in the survey conform to the general idea of draining water away from the factory and roadways towards either a LID BMP or a Water Quality feature. 2. Yes. Only Corrugated Metal Pipe was called for. 3. No. Since there are additional culverts this is not possible. The survey does show that they drain in the intended downstream direction. 4. No. No culvert headwalls were designed. VII. Sub-drains. – N/A. There are no subdrains outside of the bioswale. VIII. Curb Cuts – N/A IX. Sidewalk Culverts & Chases – N/A X. Site Grading – N/A. The work was all done on Anheuser-Busch property so there is no common space. XI. Riprap – Yes. XII. Permanent Erosion Control Fabric – N/A XIII. Post-Construction Site Cleanup – Yes. XIV. Certification of Other Permanent BMPs. – N/A, there is no drop structure. XV. Certification of LID and Water Quality Facilities. - No. Ayres Associates was not involved with construction observation. The bioswale, water quality plate & permeable pavers all appear to have been constructed according to plan as best can be determined by visual inspection of the finished products. XVI. Certification and Erosion Control Measures – Yes Appendix A As Built Survey, November 2017 0.5% 0.9% AS S O C I A T E S Fo r t C o l l i n s , C O 8 0 5 2 5 (9 7 0 ) 2 2 3 - 5 5 5 6 36 6 5 J F K P a r k w a y , B u i l d i n g 2 , S u i t e 1 0 0 ONE INCH - IF NOT, SCALE ACCORDINGLY 01/02/18 GR A D I N G O F P O N D 4 3 0 AN D B I O S W A L E EX01 1 8 32-1859.02 AN H E U S E R - B U S C H AS B U I L T E X H I B I T S NOT FOR C O N S T R U C T I O N LEGEND: PROPOSED/APPROVED ASBUILT 0 50'100'25' SCALE IN FEET NOTES: 1.THE PROJECT WORK THAT WAS DONE IS SHOWN IN BLACK. ADDITIONAL TOPO SURVEY WAS DONE (SHOWN IN RED) TO ENSURE DRAINAGE CONTINUITY. 4980 4985 4990 4995 5000 5005 5010 5015 4980 4985 4990 4995 5000 5005 5010 5015 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 20+50 6 - E N D ST A 1 4 + 1 3 . 0 0 RI M 4 9 9 2 . 8 ± IN V . I N 4 9 9 2 . 3 0 ( E ) 6 - C O N N E C T I O N ST A 1 6 + 7 5 . 4 6 RI M 4 9 9 3 . 8 ± IN V . I N 4 9 9 3 . 2 2 ( E ) IN V . O U T 4 9 9 3 . 2 2 ( W ) 6 - D U A L C O 1 ST A 1 5 + 1 8 . 1 7 RI M 4 9 9 5 . 0 ± IN V . I N 4 9 9 2 . 6 7 ( E ) IN V . O U T 4 9 9 2 . 6 7 ( W ) 6 - D U A L C O 2 ST A 1 6 + 1 8 . 1 7 RI M 4 9 9 5 . 2 ± IN V . I N 4 9 9 3 . 0 2 ( E ) IN V . O U T 4 9 9 3 . 0 2 ( W ) 6 - C O 5 ST A 1 9 + 1 8 . 2 9 RI M 4 9 9 6 . 1 ± IN V . O U T 4 9 9 4 . 0 8 ( W ) 6 - D U A L C O 3 ST A 1 7 + 1 8 . 2 9 RI M 4 9 9 5 . 4 ± IN V . I N 4 9 9 3 . 3 8 ( E ) IN V . O U T 4 9 9 3 . 3 8 ( W ) 6 - D U A L C O 4 ST A 1 8 + 1 8 . 2 9 RI M 4 9 9 5 . 7 ± IN V . I N 4 9 9 3 . 7 3 ( E ) IN V . O U T 4 9 9 3 . 7 3 ( W ) ORIGINAL EXISTING GROUND PROPOSED/APPROVED GRADE ASBUILT GRADE AS S O C I A T E S Fo r t C o l l i n s , C O 8 0 5 2 5 (9 7 0 ) 2 2 3 - 5 5 5 6 36 6 5 J F K P a r k w a y , B u i l d i n g 2 , S u i t e 1 0 0 ONE INCH - IF NOT, SCALE ACCORDINGLY 01/02/18 PR O F I L E O F P O N D 4 3 0 AN D B I O S W A L E EX02 2 8 32-1859.02 AN H E U S E R - B U S C H AS B U I L T E X H I B I T S NOT FOR C O N S T R U C T I O N NOTES: 1.THE PROJECT WORK THAT WAS DONE IS SHOWN IN BLACK. ADDITIONAL TOPO SURVEY WAS DONE (SHOWN IN RED) TO ENSURE DRAINAGE CONTINUITY. INVERT ELEVATION=5009.58 INVERT ELEVATION=5010.21 1.0 % 0.8% 0.9% 0.1% 0. 3 % AS S O C I A T E S Fo r t C o l l i n s , C O 8 0 5 2 5 (9 7 0 ) 2 2 3 - 5 5 5 6 36 6 5 J F K P a r k w a y , B u i l d i n g 2 , S u i t e 1 0 0 ONE INCH - IF NOT, SCALE ACCORDINGLY 01/02/18 TR A C T O R T R A I L E R PA V I N G A R E A EX03 3 8 32-1859.02 AN H E U S E R - B U S C H AS B U I L T E X H I B I T S NOT FOR C O N S T R U C T I O N 0 50'100'25' SCALE IN FEET LEGEND: PROPOSED/APPROVED ASBUILT NOTES: 1.THE PROJECT WORK THAT WAS DONE IS SHOWN IN BLACK. ADDITIONAL TOPO SURVEY WAS DONE (SHOWN IN RED) TO ENSURE DRAINAGE CONTINUITY. 3. 3 : 1 5. 0 : 1 4.9:1 5.5:1 4.3:1 4.8 : 1 3.3:1 4.0:1 7.5 : 1 4.5:1 3. 4 : 1 5. 5 : 1 5. 0 : 1 FLARED END SECTION FLOWLINE ELEVATION=4999.94 FLARED END SECTION FLOWLINE ELEVATION=5003.19 FLARED END SECTION FLOWLINE ELEVATION=5003.33 FLARED END SECTION FLOWLINE ELEVATION=5004.29 FLARED END SECTION FLOWLINE ELEVATION=5006.22 FLARED END SECTION FLOWLINE ELEVATION=5002.40 FLARED END SECTION FLOWLINE ELEVATION=5001.12 FLARED END SECTION FLOWLINE ELEVATION=5000.45 FLARED END SECTION FLOWLINE ELEVATION=5000.50 FLARED END SECTION FLOWLINE ELEVATION=5002.65 INVERT ELEVATION=5003.12 DOWN SPOUTS 2. 6 % 1.9% 1. 8 % 0.3 % 1.7 % 0.6 % 1.0% 0.7% 0.5%0.4% 0.1% 1. 6 % 2. 0 % AS S O C I A T E S Fo r t C o l l i n s , C O 8 0 5 2 5 (9 7 0 ) 2 2 3 - 5 5 5 6 36 6 5 J F K P a r k w a y , B u i l d i n g 2 , S u i t e 1 0 0 ONE INCH - IF NOT, SCALE ACCORDINGLY 01/02/18 SO U T H W A R E H O U S E A D D I T I O N EX04 4 8 32-1859.02 AN H E U S E R - B U S C H AS B U I L T E X H I B I T S NOT FOR C O N S T R U C T I O N 0 50'100'25' SCALE IN FEET LEGEND: PROPOSED/APPROVED ASBUILT NOTES: 1.THE PROJECT WORK THAT WAS DONE IS SHOWN IN BLACK. ADDITIONAL TOPO SURVEY WAS DONE (SHOWN IN RED) TO ENSURE DRAINAGE CONTINUITY. 2 - DUAL CO 4 STA 12+44.60 N: 1470092.02 E: 3137789.46 2 - DUAL CO 2 STA 11+13.28 N: 1469968.90 E: 3137769.56 2 - DUAL CO 6 STA 13+94.26 N: 1470113.49 E: 3137930.22 2 - END 7 STA 15+10.20 N: 1470113.46 E: 3138046.16 2 - 45° BEND 5 STA 12+75.00 N: 1470113.51 E: 3137810.96 2 - 45° BEND 3 STA 12+16.51 N: 1470072.12 E: 3137769.63 2 - END 1 STA 10+00.00 N: 1469855.61 E: 3137769.49 ?? 5010 5015 5020 5025 5030 5010 5015 5020 5025 5030 9+50 10+00 11+00 12+00 13+00 14+00 15+00 15+50 2 - E N D 1 ST A 1 0 + 0 0 . 0 0 RI M 5 0 1 8 . 3 ± IN V . I N 5 0 1 7 . 9 0 ( N ) 2 - D U A L C O 4 ST A 1 2 + 4 4 . 6 0 RI M 5 0 2 2 . 8 ± IN V . I N 5 0 1 8 . 3 9 ( N E ) IN V . O U T 5 0 1 8 . 3 9 ( S W ) 2 - D U A L C O 6 ST A 1 3 + 9 4 . 2 6 RI M 5 0 2 1 . 7 ± IN V . I N 5 0 1 8 . 6 9 ( E ) IN V . O U T 5 0 1 8 . 6 9 ( W ) 2 - D U A L C O 2 ST A 1 1 + 1 3 . 2 8 RI M 5 0 2 2 . 0 ± IN V . I N 5 0 1 8 . 1 3 ( N ) IN V . O U T 5 0 1 8 . 1 3 ( S ) 2 - 4 5 ° B E N D 5 ST A 1 2 + 7 5 . 0 0 RI M 5 0 1 8 . 8 ± IN V . I N 5 0 1 8 . 4 5 ( E ) IN V . O U T 5 0 1 8 . 4 5 ( S W ) 2 - 4 5 ° B E N D 3 ST A 1 2 + 1 6 . 5 1 RI M 5 0 1 8 . 7 ± IN V . I N 5 0 1 8 . 3 3 ( N E ) IN V . O U T 5 0 1 8 . 3 3 ( S ) 2 - E N D 7 ST A 1 5 + 1 0 . 2 0 RI M 5 0 1 9 . 3 ± IN V . O U T 5 0 1 8 . 9 2 ( W ) PROPOSED PERMEABLE PAVERS (TO MATCH EXISTING GROUND) ORIGINAL EXISTING GROUND RIPRAP ASBUILT GRADE 6" DRAIN LINE - PERFORATED PVC AS S O C I A T E S Fo r t C o l l i n s , C O 8 0 5 2 5 (9 7 0 ) 2 2 3 - 5 5 5 6 36 6 5 J F K P a r k w a y , B u i l d i n g 2 , S u i t e 1 0 0 ONE INCH - IF NOT, SCALE ACCORDINGLY 01/02/18 PE R M E A B L E P A V E R S A R E A EX05 5 8 32-1859.02 AN H E U S E R - B U S C H AS B U I L T E X H I B I T S NOT FOR C O N S T R U C T I O N 0 HORIZ SCALE IN FEET 30'60' VERT 0 3'6' LEGEND: PROPOSED/APPROVED ASBUILT NOTES: 1.THE PROJECT WORK THAT WAS DONE IS SHOWN IN BLACK. ADDITIONAL TOPO SURVEY WAS DONE (SHOWN IN RED) TO ENSURE DRAINAGE CONTINUITY. FLOWLINE OF SWALE FLOWLINE OF CURB 4" PVC PIPE HEADWALL HEADWALL FLOWLINE OF SWALE FLOWLINE OF CURB TOP CENTERLINE OF 1 2" PLATE TOP CENTERLINE OF PLATE AT CENTER OF HOLES REINFORCED CONCRETE PIPE, UNABLE TO DETERMINE SIZE INVERT ELEVATION=4974.73 CHANNEL FLOWLINE ELEV 4977.01 TOP CL PLATE AT CL HOLES ELEV 4980.48 AS S O C I A T E S Fo r t C o l l i n s , C O 8 0 5 2 5 (9 7 0 ) 2 2 3 - 5 5 5 6 36 6 5 J F K P a r k w a y , B u i l d i n g 2 , S u i t e 1 0 0 ONE INCH - IF NOT, SCALE ACCORDINGLY 01/02/18 CH E C K D A M A T M O U N T A I N VI S T A D R I V E A N D P O N D 4 2 5 OU T L E T S T R U C T U R E EX06 6 8 32-1859.02 AN H E U S E R - B U S C H AS B U I L T E X H I B I T S NOT FOR C O N S T R U C T I O N 0 20'40'10' SCALE IN FEET NOTES: 1.THE PROJECT WORK THAT WAS DONE IS SHOWN IN BLACK. ADDITIONAL TOPO SURVEY WAS DONE TO ENSURE DRAINAGE CONTINUITY. AS S O C I A T E S Fo r t C o l l i n s , C O 8 0 5 2 5 (9 7 0 ) 2 2 3 - 5 5 5 6 36 6 5 J F K P a r k w a y , B u i l d i n g 2 , S u i t e 1 0 0 ONE INCH - IF NOT, SCALE ACCORDINGLY 01/02/18 SI T E P H O T O S - 1 O F 2 EX07 7 8 32-1859.02 AN H E U S E R - B U S C H AS B U I L T E X H I B I T S NOT FOR C O N S T R U C T I O N NW TRACTOR TRAILER SPOTS WEST FACE OF PLANT ASPHALT SOUTH WAREHOUSE ADDITION POND 425 WATER QUALITY PLATECR50 SEDIMENT TRAP AS S O C I A T E S Fo r t C o l l i n s , C O 8 0 5 2 5 (9 7 0 ) 2 2 3 - 5 5 5 6 36 6 5 J F K P a r k w a y , B u i l d i n g 2 , S u i t e 1 0 0 ONE INCH - IF NOT, SCALE ACCORDINGLY 01/02/18 SI T E P H O T O S - 2 O F 2 EX08 8 8 32-1859.02 AN H E U S E R - B U S C H AS B U I L T E X H I B I T S NOT FOR C O N S T R U C T I O N POND 430 BIOSWALE LOOKING WEST POND 430 FOREBAY PERMEABLE PAVERS UNDERDRAIN DISCHARGEVISITOR CENTER PERMEABLE PAVERS Appendix B Ayres Associates Storm Water Drainage Design, September 2015 16 C001 1 ANHEUSER-BUSCH STORM WATER DRAINAGE DESIGN SEPTEMBER 2015 CONTACT INFORMATION Anheuser-Busch Sean Sarmast 2351 Busch Drive Fort Collins, Colorado 80524 (970) 566-8746 BENCHMARK Ayres Associates Andrea H. Faucett, P.E. 3665 JFK Parkway, Building 2, Suite 100 Fort Collins, Colorado 80525 (970) 223-5556 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO A-B PROJECT NUMBER PS-035578, BID PACKAGE NO. 202 VICINITY MAP URS Kurt Hensic, AIA, LEED-AP 1001 Highlands Plaza Dr. West Suite 300 St. Louis, Missouri 63110 (314) 429-0100 PROJECT LOCATION Coordinate Control King Surveyors, Inc. 650 East Garden Drive Windsor, Colorado 80550 (970) 686-5011 BHA Design 1603 Oakridge Drive Fort Collins, Colorado 80525 (970) 223-7577 INDEMNIFICATION NOTES: 1.The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the Local Entity, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the Local Entity Engineer shall not relieve the engineer who prepared these plans of all responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the Local Entity, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. 2.I hereby affirm that these final construction plans were prepared under my direct supervision, in accordance with all applicable City of Ft. Collins and State of Colorado standards and statutes, respectively; and that I am fully responsible for the accuracy of all design, revisions, and record conditions that I have noted on these plans. 3.Disclaimer Statement: These Plans have been reviewed by the Local Entity for concept only. The review does not imply responsibility by the reviewing department, the Local Entity Engineer, or the Local Entity for accuracy and correctness of the calculations. Furthermore, the review does not imply that the quantities of items on the plans are the final quantities required. The review shall not be construed in any reason as acceptance of financial responsibility by the Local Entity for additional quantities of items shown that may be required during the construction phase. SHEET INDEX INDEX NO.SHEET NO.DESCRIPTION COVER AND GENERAL NOTES 1 C001 COVER SHEET 2 C002 GENERAL NOTES OVERALL SHEETS 3 C101 OVERALL SITE LOCATION MAP DEMOLITION AND EXISTING CONDITION SHEETS 4 C201 POND 430 DEMOLITION AND EXISTING CONDITION 5 C202 PERMEABLE PAVERS DEMOLITION AND EXISTING CONDITION GRADING SHEETS 6 C301 POND 430 BIO-SWALE GRADING AND EROSION CONTROL 7 C302 PERMEABLE PAVERS SITE PLAN, SECTIONS AND EROSION CONTROL DRAIN LINE PLAN AND PROFILE SHEETS 8 C401 POND 430 6" DRAIN LINE PLAN AND PROFILE 9 C402 PERMEABLE PAVERS 6" DRAIN LINE PLAN AND PROFILE DETAIL SHEETS 10 C501 GENERAL DETAILS 11 C502 GENERAL DETAILS 12 C503 GENERAL DETAILS 13 C504 EROSION CONTROL DETAILS LANDSCAPE SITE SHEETS 14 C601 PERMEABLE PAVERS SITE PLAN AND SECTIONS (BHA) 15 C602 PERMEABLE PAVERS SITE PLAN AND SECTIONS (BHA) 16 C603 TREE INVENTORY MITIGATION PLAN (BHA) 16 C002 2 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R GENERAL NOTES: 1.All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Larimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the Local Entity. 2.All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise. 3.These public improvement construction plans shall be valid for a period of three years from the date of approval by the Local Entity Engineer. Use of these plans after the expiration date will require a new review and approval process by the Local Entity prior to commencement of any work shown in these plans. 4.The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the Local Entity, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the Local Entity Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the Local Entity, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. 5.All sanitary sewer, storm sewer, and water line construction, as well as power and other current at the date of approval of the plans by the Local Entity Engineer. 6.The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The Developer shall be responsible for unknown underground utilities. 7.The Engineer shall contact the Utility Notification Center of Colorado (UNCC) at 1800-922-1987, at least 2 working days prior to beginning excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans. 8.The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any utility crossings required. 9.If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer to modify the design. Design modification(s) must be approved by the Local Entity prior to beginning construction. 10.The Developer shall coordinate and cooperate with the Local Entity, and all utility companies involved, to assure that the work is accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all parties affected by any disruption of any utility service as well as the utility companies. 11.No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider. Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a pre-construction meeting may be required prior to commencement of any work. 12.The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary sewer should be constructed prior to installation of the water lines and dry utilities. 13.The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water Utility. 14.A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or water is discharged into a storm sewer, channel, irrigation ditch or any waters of the United States. 15.The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan. 16.The Local Entity shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 17.Prior to final inspection and acceptance by the Local Entity, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. 18.The Local Entity shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the Local Entity failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development. 19.All recommendations of the final drainage and erosion control study (name of the study and date) by (Engineering Firm) shall be followed and implemented. 20.Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping. 21.The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by the Local Entity street inspector. 22.No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit is obtained, if applicable. 23.The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The Developer shall notify the Local Entity Engineering Inspector (Fort Collins - 221-6605) and the Local Entity Erosion Control Inspector (Fort Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If the Local Entity Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work in the Engineer absence. However, the Local Entity reserves the right not to accept the improvement if subsequent testing reveals an improper installation. 24.The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may use the Local Entity's default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the Local Entity Engineer approves the final report. 25.The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at all intersections, inlets, and other locations requested by the Local Entity inspector. The engineer or surveyor must certify in a letter to the Local Entity that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then resolved with the Local Entity before installation of base course or asphalt will be allowed on the streets. 26.All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the property lines and marked so as to reduce the excavation necessary for building connections. 27.Portions of Larimer County are within overlay districts. The Larimer County FloodPlain Resolution should be referred to for additional criteria for roads within these districts. 28.All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval. 29.Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree removal requiring a permit. 30.The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security. Refer to OSHA Publication 2226, Excavating and Trenching. 31.The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (Local Entity, County or State), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall be responsible for providing any and all traffic control devices as may be required by the construction activities. 32.Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact Local Entity Traffic Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor; however, if the contractor moves the traffic sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed. 33.The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development's local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the Development. 34.There shall be no site construction activities on Saturdays, unless specifically approved by the Local Entity Engineer, and no site construction activities on Sundays or holidays, unless there is prior written approval by the Local Entity. 35.The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise. 36.Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for clarification, and annotate the dimension on the as-built record drawings. 37.The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications, and a copy of any permits and extension agreements needed for the job. 38.If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the Developer shall contact the Designer and the Local Entity Engineer immediately. 39.The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the Local Entity's Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the Local Entity Engineer. 40.The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as the basis of bearings. The information shall be as follows: SEE SHEET C001 FOR PROJECT BENCH MARK 41.All stationing is based on centerline/flowline (insert proper word) of roadways unless otherwise noted. 42.Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 43.When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the Local Entity Construction Inspector before any cuts are made. Patching shall be done in accordance with the Local Entity Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the Local Entity Engineer and/or the Local Entity Inspector at the time the cuts are made. 44.Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction, or to the grades and condition as required by these plans. 45. intersections. 46.After acceptance by the Local Entity, public improvements depicted in these plans shall be guaranteed to be free from material and workmanship defects for a minimum period of two years from the date of acceptance. 47.The Local Entity shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage structures and pipes, for the following private streets: (list). 48.Approved Variances are listed as follows: Alternative Compliance Drainage Agreement with the City of Fort Collins July 2015 STANDARD EROSION AND SEDIMENT CONTROL NOTES: 1.The City Stormwater Department erosion control inspector must be notified at least 24 hours prior to any construction on this site. 2.All required BMPs shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc). All of their required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 3.Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area required for immediate construction operations, and for the shortest practical period of time. 4.All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control is installed. No soils in areas outside project street rights of way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the Stormwater Department. 5.The property must be watered and maintained at all times during construction activities so as to prevent wind-caused erosion. All land disturbing activities shall be immediately discontinued when fugitive dust impacts adjacent properties, as determined by the City Engineering Department. 6.All temporary (structural) erosion control measures must be inspected and repaired or reconstructed as necessary after each runoff event and every 14 days in order to assure continued performance of their intended function. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any drainage way. 7.No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering, and perimeter silt fencing. Any soil stockpile remaining after 30 days shall be seeded and mulched. 8.City Ordinance prohibits the tracking, dropping, or depositing of soils or any other material onto city streets by or from any vehicle. Any inadvertent deposited material shall be cleaned immediately by the contractor. 9.Additional notes can (should) be added to reflect the erosion/sediment control plan of the individual development. STORM DRAINAGE NOTES: 1.The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 2.All recommendations of the final drainage and erosion control study (name of the study and date) by (Engineering Firm) shall be followed and implemented. 3.Prior to final inspection and acceptance by The City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. PERMEABLE PAVERS LOCATION BIOSWALE LOCATION CHECK DAM LOCATION POND 425 WATER QUALITY LOCATION RICHARDS LAKE ROAD MOUNTAIN VISTA DRIVE SURVEY CONTROL POINTS POINT # 2 10 11 13 16 17 18 19 20 DESCRIPTION BM 92-10 CP BUD CP BUSCH CP BEER CP RR CP BERM CP POND CP FIELD CP OUTLET NORTHING 1468833.7800 1469971.0900 1470210.0400 1469945.3860 1466642.0250 1466271.7460 1466600.2550 1465298.4610 1463371.3190 EASTING 3138199.8270 3137867.2840 3137825.8890 3137651.3930 3135988.5020 3136143.9440 3136810.7320 3136874.9020 3136733.6890 ELEVATION 5009.600 5021.122 5025.945 5024.947 4999.188 4994.694 4990.693 4987.509 4983.504 16 C101 3 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R 0 400'800' SCALE: 1" = 400' 200' LEGEND: NOTES: FIELD SURVEY BY: EXISTING 15" RCP FL: 4990.7 (BURIED) TO REMAIN EXISTING SIGN "STORMWATER OUTFALL 003" TO REMAIN EXISTING 15" RCP w/ HEADGATE FL: 4992.0 TO REMAIN EXISTING CONCRETE WALL w/ 4x2" ORIFICES TO REMAIN EXISTING 4' CONCRETE PAN TO BE REMOVED APPROXIMATELY 780 LF EXISTING CONCRETE & ROCK RIPRAP TO REMAIN EXISTING 5' CONCRETE PAN TO REMAIN EXISTING 6' CHAIN LINK & BARBED WIRE FENCE TO REMAIN EXISTING CONCRETE & ROCK RIPRAP TO REMAIN EXISTING CONCRETE & ROCK RIPRAP TO BE REMOVED APPROXIMATELY 1270 SF EXISTING 36" CMP w/ FES FL: 4997.1 TO REMAIN SURVEY CONTROL POINTS POINT # 2 10 11 13 16 17 18 19 20 DESCRIPTION BM 92-10 CP BUD CP BUSCH CP BEER CP RR CP BERM CP POND CP FIELD CP OUTLET NORTHING 1468833.7800 1469971.0900 1470210.0400 1469945.3860 1466642.0250 1466271.7460 1466600.2550 1465298.4610 1463371.3190 EASTING 3138199.8270 3137867.2840 3137825.8890 3137651.3930 3135988.5020 3136143.9440 3136810.7320 3136874.9020 3136733.6890 ELEVATION 5009.600 5021.122 5025.945 5024.947 4999.188 4994.694 4990.693 4987.509 4983.504 16 C201 4 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R 0 50'100' SCALE: 1" = 50' 25' LEGEND: NOTES: FIELD SURVEY BY: EXISTING ADA RAMP EXISTING ADA RAMP EXISTING CURB TO REMAIN AND BE PROTECTED EXISTING WALK TO REMAIN AND BE PROTECTED EXISTING WALLS TO REMAIN AND BE PROTECTED EXISTING PARKING ISLAND TO BE REMOVED, CLEARED AND GRUBBED EXISTING PARKING ISLAND TO REMAIN AND BE PROTECTED EXISTING PARKING ISLAND TO REMAIN AND BE PROTECTED EXISTING PARKING ISLAND TO REMAIN AND BE PROTECTED EXISTING TREES TO BE PROTECTED EXISTING TREES TO BE REMOVED EXISTING TREES TO BE PROTECTED EXISTING PARKING ISLAND TO REMAIN AND BE PROTECTED EXISTING TREES TO BE PROTECTED EXISTING ASPHALT TO BE REMOVED, CLEARED AND GRUBBED APPROXIMATELY 15193 SF EXISTING 24" CMP FL: 5014.5 EXISTING 24" CMP w/ FES FL: 5012.8 EXISTING 10" CONCRETE HEADWALL EXISTING 12" CLAY PIPE FL: 5012.8 SURVEY CONTROL POINTS POINT # 2 10 11 13 16 17 18 19 20 DESCRIPTION BM 92-10 CP BUD CP BUSCH CP BEER CP RR CP BERM CP POND CP FIELD CP OUTLET NORTHING 1468833.7800 1469971.0900 1470210.0400 1469945.3860 1466642.0250 1466271.7460 1466600.2550 1465298.4610 1463371.3190 EASTING 3138199.8270 3137867.2840 3137825.8890 3137651.3930 3135988.5020 3136143.9440 3136810.7320 3136874.9020 3136733.6890 ELEVATION 5009.600 5021.122 5025.945 5024.947 4999.188 4994.694 4990.693 4987.509 4983.504 16 C202 5 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R 0 30'60' SCALE: 1" = 30' 15' LEGEND: NOTES: FIELD SURVEY BY: EXISTING 15" RCP FL: 4990.7 (BURIED) EXISTING SIGN "STORMWATER OUTFALL 003" EXISTING 15" RCP w/ HEADGATE FL: 4992.0 EXISTING CONCRETE WALL w/ 4x2" ORIFICES EXISTING CONCRETE & ROCK RIPRAP EXISTING 5' CONCRETE PAN EXISTING 6' CHAIN LINK & BARBED WIRE FENCE EXISTING CONCRETE & ROCK RIPRAP EXISTING 36" CMP w/ FES FL: 4997.1 POND 430 W W W W W W DIP-3 16 C301 6 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R 0 50'100' SCALE: 1" = 50' 25' LEGEND: NOTES: W VTC DIP-3 EXISTING 24" CMP FL: 5014.5 EXISTING 24" CMP w/ FES FL: 5012.8 EXISTING 10" CONCRETE HEADWALL EXISTING 12" CLAY PIPE FL: 5012.8 PROPOSED 2 - 5' TREE GRATE SEE SHEET C601 8' 8' 8' 9' 9' 9' 9' 9' 224'-8 1/2" 27'-2 1/2"1' 58'-8 1/2" 183'-4" 43'-3 1/2" 26'-7" 1' 29'-10" 18'-8" 5' 5' 1 (TYP) 2 3 (TYP) PROPOSED 6" ADS N-12 TO DAYLIGHT A C302 PROPOSED PERMEABLE PAVERS SEE SHEET C601 PROPOSED PERMEABLE PAVERS SEE SHEET C601 25'-10"10' 4 (TYP) 5 (TYP) VTC SF WW WW W BORGERT PAVERS - 3 1/8" THICK PERMEABLE JOINT MATERIAL (CDOT 89 AGGREGATE) OPEN GRADED BEDDING COURSE - 2" THICK (CDOT NO.8 AGGREGATE 3/8") OPEN GRADED BASE RESERVOIR - 4" THICK (CDOT NO.57 STONE 3/4") OPEN GRADED SUBBASE RESERVOIR - 12" THICK MINIMUM (CDOT NO. 2 STONE 2 1/2") 2 - UNDERDRAIN 6" ADS N-12 PERFORATED PIPE GEOTEXTILE MIRAFI RS380I SUBGRADE MINIMUM 95% STANDARD PROCTOR COMPACTION 10' 12" MIN GEOTEXTILE OVERLAP 24" EDGE RESTRAINT EXISTING CURB 16 C302 7 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R 0 30'60' SCALE: 1" = 30' 15' NOTES: STRIPING AND SIGNAGE LEGEND: 1 2 3 4 5 A C302 SECTION A-A' PERMEABLE PAVERS LEGEND: W VTC SF EXISTING 15" RCP FL: 4990.7 (BURIED) EXISTING SIGN "STORMWATER OUTFALL 003" EXISTING 15" RCP w/ HEADGATE FL: 4992.0 EXISTING CONCRETE WALL w/ 4x2" ORIFICES EXISTING 36" CMP w/ FES FL: 4997.1 4980 4985 4990 4995 5000 5005 5010 4980 4985 4990 4995 5000 5005 5010 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 20+50 EXISTING GROUND PROPOSED GRADE PROPOSED 6" THICK REINFORCE CONCRETE FLOW PAN 16 C401 8 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R 0 50'100' SCALE: 1" = 50' 25' PROFILE SCALE: 6" DRAIN LINE - SOLID & PERFORATED PVC LEGEND: NOTES: 5010 5015 5020 5025 5010 5015 5020 5025 9+50 10+00 11+00 12+00 13+00 14+00 15+00 15+50 PROPOSED PERMEABLE PAVERS (TO MATCH EXISTING GROUND) EXISTING GROUND RIPRAP 16 C402 9 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R 0 50'100' SCALE: 1" = 50' 25' PROFILE SCALE: 6" DRAIN LINE - PERFORATED PVC LEGEND: NOTES: 9' 30' 3' 15' 1' WALLS (TYP) 2' 2' A B A'B' 15' 9"2' EL: 4996.50 EL: 4993.00 EL: 4997.00 #5 BARS @ 12" O.C. EACH WAY (TYP)#5 BARS @ 12" O.C. EACH WAY (TYP) EL: 4995.00 12" SUITABLE NATIVE MATERIAL SUBGRADE, MINIMUM 95% STANDARD PROCTOR COMPACTION. SUITABLE NATIVE MATERIAL SUBGRADE, MINIMUM 95% STANDARD PROCTOR COMPACTION. 12" THICK MIN LAYER OF CDOT #4 AGGREGATE COMPACTED TO MIN. 70% RELATIVE DENSITY. 5' DRAIN. 5' CDOT NO. 4 AGGREGATE 3' 9"2' EL: 4993.00 EL: 4997.00EL: 4996.70 EL: 4995.00 PROPOSED CONCRETE FLOW PAN TO CONNECT TO EXISTING 36" CMP FES SUITABLE NATIVE MATERIAL SUBGRADE, MINIMUM 95% STANDARD PROCTOR COMPACTION. SUITABLE NATIVE MATERIAL SUBGRADE, MINIMUM 95% STANDARD PROCTOR COMPACTION. 12" THICK MIN LAYER OF CDOT #4 AGGREGATE COMPACTED TO MIN. 70% RELATIVE DENSITY. 5' DRAIN. 10' 16 C501 10 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R POND 430 BIOSWALE FOREBAY200 WATER SURFACE 5" CHANNEL 12" THICK LAYER OF BIORETENTION SAND MEDIA (SEE BIORETENTION SAND MEDIA SPECIFICATION FROM CITY OF FORT COLLINS) 6" THICK LAYER OF PEA GRAVEL DIAPHRAGM 10" THICK LAYER OF CDOT NO. 4 AGGREGATE 6- 6" PERFORATED PVC PIPE TO BE SCHEDULE 40. UNDISTURBED SOIL 2" 2" CDOT NO. 4 AGGREGATE ABOVE AND BELOW PVC PIPE NOTE: VEGETATION FOR BIOSWALE TO BE DESIGNED BY BHA PLAN VIEW SECTION A-A' SECTION B-B' BIOSWALE CROSS SECTION201 40' 43.5' 1 5 2' (TYP) 24" EDGE RESTRAINT202 FORBAY DRAIN DETAIL203 SONOVOID ROUND VOID FORM OR PVC PIPE. FORM TO PENETRATE FULL DEPTH OF CONCRETE. CDOT #4 AGGREGATE TO BE PROTECTED FROM CONCRETE DURING POUR BY POLYETHYLENE SHEETING 2" BEYOND EDGE OF AGGREGATE. #5 BAR, 2" CLEAR FROM EDGE OF FORM 24" 16" CDOT CLASS D (4500 PSI) CONCRETE MIN. 2" CLEAR TO FORMED SURFACES CHAMFER ALL EXPOSED EDGES 3/4" SAWCUT AT 12' SPACING, 4" DEPTH. #4 AT 5" OC 4- #4 LONG. AT 5" OC NOTE: MAY BE PRECAST AT CONTRACTORS OPTION, BUT MUST HAVE CLEARED FINISHED TOP SURFACE. (LIFTING EYES MUST BE ON SIDES HIDDEN FROM VIEW) APPROX. 8' CONTRACTOR TO FIELD VERIFY 1' 6" TO (TYP) *CONTRACTOR TO CENTER 4 - 4" PVC IN BOTTOM OF CONCRETE CHANNEL 4 - 4" PVC PIPES TO BE CAST IN PLACE #4 REBAR DOWELS (1 EACH SIDE) TO BE DRILLED INTO PAN TO PREVENT STRUCTURE FROM MOVING (TYP) 6" TO (TYP) #4 REBAR DOWELS (1 EACH SIDE) TO BE DRILLED INTO PAN TO PREVENT STRUCTURE FROM MOVING (TYP) 8 - 4" PVC PIPES TO BE CAST IN PLACE INVERTS OF PIPES TO MATCH BOTTOM OF FLOW CHANNEL (TYP) 5" TYP 5" TYP 16 C502 11 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R HANDICAP PARKING REQUIREMENTS202 MIN.MIN.ONE IN EVERY EIGHT ACCESSIBLE SPACES, BUT NOT LESS THAN ONE, SHALL BE VAN ACCESSIBLE. ONE SIGN PER SPACE REQUIRED REQUIRED PER SPACE ONE SIGN REQUIRED PER SPACE ONE SIGN CAR ACCESSIBLE VAN ACCESSIBLE "UNIVERSAL DESIGN" CAR & VAN ACCESSIBLE OR A "UNIVERSAL" PARKING SPACE DESIGN MAY BE USED. THIS DESIGN IS USED TO ACCOMMODATE CAR & VAN ACCESSIBLE PARKING SPACES, WHICH ELIMINATES THE NEED FOR TWO SIGN TYPES. 8' 5' 8'8' 8' 8' 11' 5' 11'11' 5' R7-8 R7-8 R7-8 PRECAST CONCRETE WHEEL STOP203 VALVE BOX w/ DRAIN ON LID (TYP) EXISTING GROUND 6" MIN WATER TIGHT SCREW CAP SEE PLANS SEE PLANS SEE PLANS UNDERDRAIN DUAL CLEANOUT204 VALVE BOX w/ DRAIN STAMPED ON LID (TYP) EXISTING GROUND 6" PVC 6" PVC UNDERDRAIN CLEANOUT205 6" PVC FOR BIOSWALE LOCATION 6" PVC FOR PERMEABLE PAVERS LOCATION 6" FOR BIOSWALE LOCATION CHECK DAM - MOUNTAIN VISTA DRIVE (COUNTY ROAD 50) 206 PLAN VIEW SECTION VIEW NOTE: CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS OF FLOW PAN. #5 BARS @ 6" O.C. EACH WAY BARS TO BE DOWELED INTO EXISTING STRUCTURE AND EPOXY IN PLACE. 6" PENETRATION MINIMUM. WATER QUALITY PLATE 1/2" BOLTS ELEV: 4980.4 ELEV: 4978.4 ELEV: 4977.4 ELEV: 4977.0 PROPOSED CONCRETE TO HAVE 3000 PSI COMPESSIVE STRENGTH MINIMUM. EXISTING STRUCTURE (SEE PHOTO) WATER QUALITY PLATE (SEE DETAIL THIS SHEET) #5 REBARS 3.4' 2" 2"4.5" 5" 4" 5" 6" (12) 1/2" HOLE CENTER HOLES IN CENTER OF PLATE * *CONTRACTOR TO VERIFY STRUCTURE WIDTH. BOTTOM OF PLATE TO SIT FLUSH WITH FLOWLINE OF EXISTING PAN AT ELEVATION 4997.0, MODIFICATION OF BOTTOM LEFT AND BOTTOM RIGHT CORNERS OF PLATE TO FIT OVER EXISTING CURB. 16 C503 12 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R POND 425 OUTLET STRUCTURE MODIFICATIONS207 WATER QUALITY PLATE208 PLAN VIEW SECTION VIEW NOTE: CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS OF EXISTING STRUCTURE BEFORE FABRICATION OF WATER QUALITY PLATE. NOTES: 1.WATER QUALITY PLATE TO BE HOT DIPPED GALVANIZED STEEL OR STAINLESS STEEL. 2.WATER QUALITY PLATE TO BE 1/2" THICK MINIMUM. 3.WATER QUALITY PLATE TO BE BOLTED TO FACE OF STRUCTURE WITH 1/2" BOLTS. 6" PENETRATION MINIMUM. MATERIAL TO MATCH WATER QUALITY PLATE. CONSTRUCTION SUBMITTALS TO BE SUBMITTED TO ANHEUSER - BUSCH PROJECT MANAGER FOR APPROVAL PRIOR TO INSTALLATION: 1.BORGET FILTRA PAVE, HERRINGS BONE PATTERN, 10,0000 PSI OR GRATER 2.CDOT NO. 8 OR 89 AGGREGATE % PASSING GRADATION FROM QUARRY. 3.CDOT NO. 57 STONE % PASSING GRADATION FROM QUARRY. 4.CDOT NO. 2 STONE % PASSING GRADATION FROM QUARRY. 5.4" ADS N-12 PERFORATED PIPE. 6.GEOTEXTILE - MIRAFI R5380I 7.6" SCHEDULE 40 PVC UNDERDRAIN 8.BIORETENTION SAND MEDIA 9.CDOT NO. 4 AGGREGATE % PASSING GRADATION FROM QUARRY. 10.VALVE BOX w/ "DRAIN" STAMPED ON LID. 11.WATER QUALITY PLATE. 12.BIOSWALE SEED MIXTURE. 13.3000 PSI COMPRESSIVE STRENGTH RECIPE 14.IRON AGE DESIGNS TREE GRATE AND EMBEDMENT FRAME. PHOTO OF EXISTING OUTLET STRUCTURE GENERAL DESCRIPTION OF PROPOSED MODIFICATIONS OF EXISTING OUTLET STRUCUTRE : THE EXISTING OUTLET STRUCTURE NEEDS TO BE 2-FEET TALLER THAN IT IS NOW SO THE PROPOSED WATER QUALITY PLATE CAN BE BOLTED TO THE OPEN FACE. VTC W SF 101 C504 DROP INLET WATTLE FILTER 16 C504 13 DIP-3 100 C504 SILT FENCE 102 C504 WATTLES 103 C504 VEHICLE TRACKING PAD 104 C504 CONCRETE WASHOUT AREA CWA EXISTING PARKING ISLAND TO REMAIN AND BE PROTECTED, TYP. EXISTING PARKING ISLAND AND CURB TO BE REMOVED, CLEARED AND GRUBBED. ADJUST EXISTING IRRIGATION SYSTEM TO IRRIGATE TREE WELLSEXISTING ADA RAMP TO REMAIN AND BE PROTECTED EXISTING CURB TO REMAIN AND BE PROTECTED EXISTING WALK TO REMAIN AND BE PROTECTED EXISTING WALLS TO REMAIN AND BE PROTECTED LIMIT OF DEMOLITION, SAW CUT EXISTING ASPHALT, CONCRETE CURBS TO REMAIN EXCEPT AS NOTED. EXISTING WALLS TO REMAIN AND BE PROTECTEDEXISTING ADA RAMP TO REMAIN AND BE PROTECTED EXISTING PARKING ISLAND TO REMAIN AND BE PROTECTED, TYP. NOTE: SEE CIVIL PLAN FOR SUB SURFACE DEMOLITION / EXCAVATION EXISTING LIGHT POLE TO REMAIN AND BE PROTECTED EXISTING GROUND MOUNTED FLOOD LIGHT TO BE RELOCATED PER OWNERS DIRECTION. (2) 6' TREE GRATE WITH 6" WIDE FLUSH CONCRETE COLLAR, TYP. (10) BOLLARD, TYP. SEE TREE MITIGATION PLAN FOR LANDSCAPE INFORMATION NEW PARKING STRIPING, TYP. MATCH EXISTING STRIPING IN COLOR AND STYLE EXISTING BACK OF CURB EXISTING FLOW LINE 2' WIDE CONCRETE BAND, PROVIDE CONTROL JOINT 12' MAX. EQ. ON CENTER, RE: CIVIL DWGS. PERMEABLE PAVERS, HERRINGBONE PATTERN, TYP. RE: CIVIL DWGS.EXISTING ADA RAMP 27'-21 2"223'-81 2"2'SOLDIER COURSE PAVER BANDS, 10" WIDE TYP. , COLOR TBD ACCESSIBLE PARKING SIGN, TYP. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS FOR CODE COMPLIANT SIGNS PRIOR TO FABRICATION AND INSTALLATION RESURFACE LIGHT POLE BASE AS NEEDED 4 C501 1 C502 10" 12'-2" 10" 13'-2" 10" 4'-3" 10" 7' 10" 12' 10" 12'-5" 10" EXISTING BACK OF CURB, TYP. EXISTING FLOW LINE, TYP. 2' CONCRETE BAND, TYP. PERIMETER SOLDIER COURSE , TYP. SOLDIER COURSE BANDING, NORTH SOUTH BANDS DOMINATE AT INTERSECTIONS AS SHOWN, TYP. PERIMETER SOLDER COURSE , TYP. MITERED JOINT AT THIS LOCATION. ALIGN PAVERS TO BE SYMMETRICAL AT JOINT MITERED JOINT AT THIS LOCATION. ALIGN PAVERS TO BE SYMMETRICAL AT JOINT MITERED JOINT AT THIS LOCATION. ALIGN PAVERS TO BE SYMMETRICAL AT JOINT 12'-41 2"10"12'10" MITERED JOINT AT THIS LOCATION. ALIGN PAVERS TO BE SYMMETRICAL AT JOINT CENTER BOLLARD ON PAVER BANDS, BOTH DIRECTIONS, TYP. 10" ADJUST PAVER PATTERN TO ACCOMMODATE EXISTING LIGHT POLE BASE MITERED JOINT AT THIS LOCATION. ALIGN PAVERS TO BE SYMMETRICAL AT JOINT 0'15'30'60' SCALE: PERMEABLE PAVERS - DEMOLITION PLAN11"=30'SCALE: PERMEABLE PAVERS - SITE PLAN21"=30' SCALE: PERMEABLE PAVERS - PLAZA DETAILED LAYOUT PLAN31"=10'SCALE: TREE GRATE - SPECIFICATION / MANUFACTURERS DETAILS4NTS 0'15'30'60' 0'5'10'20' 16 C601 14 83 4" DECORATIVE CAST ALUMINUM BOLLARD. COLOR: BRONZE BROWN 12" [+/-] 4" SCHED. 40 PIPE WELD ATTACHED TO DECORATIVE CASTING AND DRILLED TO ACCEPT #3 REBAR (REBAR BY OTHERS). 1'-6" DIA. MIN. PAVER SUFACE 10" SQ. 1/2" EXPANSION MATERIAL OPEN-GRADED BEDDING CONCRETE FOOTING WETLAND SEED MIX: APPROXIMATELY .7 AC. TRANSITION SEED MIX: APPROXIMATELY 1 AC. TREE GRATE, RE: SPECS FILL AREA BETWEEN TOP OF ROOTBALL / TOP OF SOIL AND BOTTOM OF TREE GRATE WITH 3/8" PEA GRAVEL PLACED OVER WEED BARRIER FABRIC. HOLD PEA GRAVEL DOWN A MAXIMUM OF 12" FROM BOTTOM OF TREE GRATE TRUNK FLARE (LOCATED AT TOP OF ROOTBALL) SHALL BE HELD 3" DOWN FROM TOP SURFACE OF TREE GRATE, TYP.INSTALL TREE GRATE PER MANUFACTURER'S RECOMMENDATIONS, TYP. ORDER TYPE 'E' EMBDED FRAME WITH GRATE. WELD #3 REBAR AT 18" O.C. ALL SIDES. BEND REBAR TO APPROX. ANGLE SHOWN AND CAST TREE GRATE FRAME INTO ADJACENT CONCERTE SIDEWALK PER MANUFACTURER'S RECOMMENDATIONS. FLUSH 4'-11 7/8" TREE GRATE WIDTH 5' TREE GRATE FRAME OPENING 12" OPENING FLUSH COMPACTED SUBGRADE PER GEOTECH TREE PLANTING/BACKFILL, RE: LANDSCAPE GENERAL NOTES: 1.STAKE DECIDUOUS TREES UP TO AND INCLUDING 2-1/2" CAL. DO NOT STAKE CONIFERS. 2.REMOVE STAKING AT THE END OF THE FIRST GROWING SEASON AFTER PLANTING. 3.TREE STAKES TO BE DRIVEN OUTSIDE OF ROOT BALL. 4.TREE WRAP SHALL BE INSTALLED AT TIME OF PLANTING AND BE REMOVED NO LATER THAN 12 MONTHS AFTER PLANTING. 5.TREES WHOSE NORTH ORIENTATION IS NOT CHANGED FROM THE NURSERY DO NOT NEED TO BE WRAPPED, EXCEPT TREES WITH VERY THIN BARK. 6.OVER EXCAVATE PLANTING PIT TO 2 TIMES THE DIAMETER OF THE ROOT BALL. 7.SINGLE ADVENTITIOUS ROOTS LOCATED ABOVE THE ROOT CROWN MUST BE PROPERLY EXCISED FROM THE TRUNK. CROWN TREE WRAP. APPLIED FROM TRUNK FLARE TO FIRST BRANCH. WRAP FROM BOTTOM UP WITH SUFFICIENT OVERLAP TO COVER ALL BARK. USE BIO-DEGRADABLE PLASTIC TAPE TO SECURE. NYLON STRAPS W/GROMMETS GUY WIRE - LEAVE SLACK TO ALLOW 1"-2" SWAY TREE STAKE, ADJUST SO THAT TOP IS LEVEL WITH FIRST SET OF BRANCHES SET BALL IN PIT SO THAT CROWN IS 4" ABOVE SURROUNDING EXISTING GRADE. REMOVE TOP 23 OF WIRE BASKET AND ALL TWINE - TURN BACK TOP 12 OF BURLAP 3" DEEP MULCH - TAPER TO 0" DEPTH AT CROWN FINISH GRADE SAUCER RIM -3" ABOVE FINISH GRADE FRACTURED NATIVE SOIL ZONE BACKFILL MIX PER SPECIFICATIONS SCARIFY SURFACE OF PIT UNDISTURBED SOIL ROOT BALL RESTS ON UNDISTURBED SOIL TREE STAKE PATTERN TREE STAKE SAUCER RIM TREE TRUNK SMALL TREE < 3" CAL.LARGE TREE > 3" CAL. PREV. WIND SCALE: BOLLARD1NTS BOLLARD: SAN JOSE - CAST IN - Cast components will be of 100% recycled aluminum; ASTM B261. - Castings will be squared and flat, free of burrs, slag, air pockets, blow holes, flashing, and grinding or welding on exposed surfaces. Excessive warping or shrinkage is not acceptable. - Fabricated components will be of structural aluminum, 6061 - T6. - All visible welds to be ground smooth on outside edges. - Fabrication will be true to square, or diameter and sized within 1/8". - Finish to be powder coat, standard UA color and applied per UA specifications. If alternate color or finish is required, please provide all finish information for UA approval. - Dimensions shown are nominal. - For cases of "or equal" consideration, our finished, full size product should be compared with the alternative product for general quality, surface finisih, precise pattern work, metal characteristics, and overall design aesthetics. 465 E. FIFTEENTH ST. TACOMA, WA 98421 (877) 487-0488 sales@urbanaccessories.com www.urbanaccessories.com Founded 1972 16 C602 15 SCALE: BIOSWALE21"=50' 0'25'50'100' WETLAND SEED MIX (12%) Alkali Bulrush (12%) Switchgrass (12%) Canada Wildrye (12%) Prairie Cordgrass (2%) Softstem Bulrush (6%) Nebraska Sedge (6%) Hardstem Bulrush (6%) 3-Square Bulrush (6%) Creeping Spikerush (10%) Yellow Indiangrass (2%) Baltic Rush (10%) Big Bluestem (2%) Small-winged Rush (2%) Wolly Rush RATE: 10 lbs/Acre TRANSITION MIX (5 LB WETLAND + 10 LB DRYLAND / AC) (12%) Alkali Bulrush (12%) Switchgrass (12%) Canada Wildrye (12%) Prairie Cordgrass (2%) Softstem Bulrush (6%) Nebraska Sedge (6%) Hardstem Bulrush (6%) 3-Square Bulrush (6%) Creeping Spikerush (10%) Yellow Indiangrass (2%) Baltic Rush (10%) Big Bluestem (2%) Small-winged Rush (2%) Wolly Rush RATE: 5 lbs/Acre (20%) Blue Grama (10%) Buffalograss (24%) Green Needlegrass (20%) Sideoats Grama (24%) Western Wheatgrass (2%) Sand Dropseed RATE: 10 lbs/Acre SCALE: SEED MIXES5NTS SCALE: TREE GRATE3NTS SCALE: TREE PLANTING4NTS 12" DIA. ASH TREE TO REMAIN AND BE PROTECTED, #1 12" DIA. ASH TREE TO REMAIN AND BE PROTECTED, #2 12" DIA. ASH TREE TO REMAIN AND BE PROTECTED 13" DIA. ASH TREE TO BE REMOVED AND MITIGATED, #3 13" DIA. ASH TO BE REMOVED AND MITIGATED, #4 12 1 2" DIA. ASH TREE TO REMAIN AND BE PROTECTED, #5 14" DIA. ASH TREE TO REMAIN AND BE PROTECTED, #6 13" DIA. ASH TREE TO REMAIN AND BE PROTECTED, #7 10 1 2" DIA. ASH TREE TO REMAIN AND BE PROTECTED, #8 11" DIA. ASH TREE TO REMAIN AND BE PROTECTED, #9 13" DIA. ASH TREE TO REMAIN AND BE PROTECTED, #10 4" DIA. ASH TREE TO REMAIN AND BE PROTECTED, #11 LIMIT OF DISTURBANCE, TYP. (2) GLEDITSIA TRIACANTHOS INERMIS 'SHADEMASTER' SHADEMASTER HONEYLOCUST - 3" CAL. 1 GLEDITSIA TRIACANTHOS INERMIS 'SHADEMASTER' SHADEMASTER HONEYLOCUST - 3" CAL. SCALE: TREE INVENTORY11"=30' 0'15'30'60' 16 C603 16 SCALE: MITIGATION PLAN11"=30' 0'15'30'60' 1.WITHIN THE DRIP LINE OF ANY PROTECTED EXISTING TREE THERE SHALL BE NO CUT OR FILL OVER A FOUR-INCH DEPTH UNLESS A QUALIFIED ARBORIST OR FORESTER HAS EVALUATED AND APPROVED THE DISTURBANCE. 2.ALL PROTECTED EXISTING TREES SHALL BE PRUNED TO THE CITY OF FORT COLLINS TREE MANAGEMENT STANDARDS FOR THINNING AND CLEANING. 3.PRIOR AND DURING CONSTRUCTION, BARRIERS SHALL BE ERECTED AROUND ALL PROTECTED EXISTING TREES WITH SUCH BARRIERS TO BE OF ORANGE FENCING A MINIMUM OF FOUR (4) FEET IN HEIGHT, SECURED WITH METAL T-POSTS, NO CLOSER THAN SIX (6) FEET FROM THE TRUNK OR AT THE DRIP LINE, WHICH EVER IS GREATER, THERE SHALL BE NO STORAGE OR MOVEMENT OF EQUIPMENT, MATERIAL, DEBRIS OR FILL WITHIN THE FENCED TREE PROTECTION ZONE. MODIFICATION OF PROTECTIVE FENCE LOCATIONS TO ACCOMMODATE CONSTRUCTION SHALL BE APPROVED BY THE CITY FORESTER PRIOR TO MOVING OR ERECTING A PROTECTIVE FENCE. WHERE THE DRIP LINE OF TREES TOUCH OR OVERLAP, PLACE FENCE AROUND GROUPS OF TREES. 4.DURING CONSTRUCTION THERE SHALL BE NO CLEANING OF EQUIPMENT OR MATERIALS OR THE STORAGE AND DISPOSAL OF WASTE MATERIAL SUCH AS PAINTS, OILS, SOLVENTS, ASPHALT, CONCRETE, MOTOR OIL OR ANY OTHER MATERIAL HARMFUL TO THE LIFE OF A TREE WITHIN THE DRIP LINE OF ANY PROTECTED TREE OR GROUP OF TREES. 5.NO DAMAGING ATTACHMENTS, WIRES, SIGNS OR PERMITS MAY BE FASTENED TO ANY PROTECTED TREE. TREE PROTECTION NOTES 7.CONSTRUCTION SHALL BE PERFORMED IN A MANNER TO NOT DAMAGE ANY EXISTING TREE. CLEARANCE PRUNING OF ANY TREE ON SITE SHALL ONLY BE BY A FORT COLLINS LICENSED ARBORIST FOLLOWING CITY OF FORT COLLINS TREE MANAGEMENT STANDARDS UNDER THE DIRECTION OF AN INTERNATIONAL SOCIETY OF ARBORICULTURE CERTIFIED ARBORIST. 8.EQUIPMENT ACCESS/DRIVES SHALL BE POSITIONED TO MINIMIZE TRAVEL OVER THE ROOT SYSTEM OF ANY EXISTING TREE. EQUIPMENT DRIVE LOCATIONS OVER THE ROOT SYSTEM OF ANY SIGNIFICANT TREE SHALL BE APPROVED BY THE CITY FORESTER WITH REQUIREMENTS TO PROTECT THE SOIL FROM BEING COMPACTED. 9.LARGE PROPERTY AREAS CONTAINING PROTECTED TREES AND SEPARATED FROM CONSTRUCTION OR LAND CLEARING AREAS, ROAD RIGHTS-OF-WAY AND UTILITY EASEMENTS MAY BE "RIBBONED OFF," RATHER THAN ERECTING PROTECTIVE FENCING AROUND EACH TREE AS REQUIRED IN SUBSECTION (G)(#) ABOVE. THIS MAY BE ACCOMPLISHED BY PLACING METAL T-POST STAKES A MAXIMUM OF FIFTY (50) FEET APART AND TYING RIBBON OR ROPE FROM STAKE-TO-STAKE ALONG THE OUTSIDE PERIMETERS OF SUCH AREAS BEING CLEARED. 6.THE INSTALLATION OF UTILITIES, IRRIGATION LINES OR ANY UNDERGROUND FIXTURE REQUIRING EXCAVATION DEEPER THAN SIX (6) INCHES SHALL BE ACCOMPLISHED BY BORING UNDER THE ROOT SYSTEM OF PROTECTED EXISTING TREES AT A MINIMUM DEPTH OF TWENTY-FOUR (24) INCHES. THE AUGER DISTANCE IS ESTABLISHED FROM THE FACE OF THE TREE (OUTER BARK) AND IS SCALED FROM THE TREE DIAMETER AT BREAST HEIGHT AS DESCRIBED IN THE TREE PROTECTION CHART OF THE FORT COLLINS LAND USE CODE SECTION 3.2.1. NUMBER TYPE CALIPER CONDITION MITIGATION 1 ASH 12"POOR ++1 2 ASH 12"FAIR -+1 3 ASH 13"POOR ++1 4 ASH 13"FAIR -+2 5 ASH 12 1 2"POOR ++1 6 ASH 14"POOR +1 7 ASH 13"FAIR -+1 8 ASH 10 1 2"POOR +1 9 ASH 11"POOR ++1 10 ASH 13"POOR +1 11 ASH 4"UNDERSIZE N/A TREE MITIGATION TABLE TREES 3 AND 4 ARE BEING MITIGATED AS PART OF THIS PROJECT, OTHER TREES WILL BE MITIGATED AS NEEDED Appendix C URS Grading Plans Appendix D Ayres Associates Drainage Report, September 2015 ANHEUSER BUSCH BOTTLING LINE EXPANSION DRAINAGE REPORT Prepared for City of Fort Collins 700 Wood St Fort Collins, Colorado 80521 3665 JFK Parkway, Building 2, Suite 100 Fort Collins, Colorado 80525 (970) 223-5556 Ayres Project No. 32-1859.00 September 2015 ANHEUSER BUSCH BOTTLING LINE EXPANSION DRAINAGE REPORT Prepared for City of Fort Collins 700 Wood St Fort Collins, Colorado 80521 3665 JFK Parkway, Building 2, Suite 100 Fort Collins, Colorado 80525 (970) 223-5556 Ayres Project No. 32-1859.00 September 2015 1.1 Ayres Associates TABLE OF CONTENTS 1. INTRODUCTION 1.1 Purpose 1.2 General Location & Description 1.3 Proposed Expansion 1.4 Background 2. DESIGN CRITERIA 2.1 General 2.2 Design Storm Frequencies 2.3 Drainage Basins 2.4 Hydrologic Criteria 2.5 Hydraulic Design 3. PROPOSED DRAINAGE DESIGN ELEMENTS 3.1 Low Impact Development BMP 3.1.1 Bioswale 3.1.2 Permeable Pavement 3.2 Water Quality BMP 3.2.1 Pond 425 3.2.2 Pond 430 4. MAINTENANCE STANDARD OPERATING PROCEDURES 4.1 Maintenance Routine 4.1.1 Pond 430 Bioswale 4.2 Permeable Pavement 4.3 Pond 425 Water Quality Plate & Forebay 5. CONSTRUCTION EROSION CONTROL AND ESCROW SECURITY 5.1 General Description 5.2 Stormwater Management Controls 5.3 BMP Selection 5.3.1 All Disturbed Soils 5.3.2 Vehicle Tracking of Sediment 5.3.3 Management of Contaminated Soils 5.3.4 Loading and Unloading Operations 5.3.5 Outdoor Storage Activities 5.3.6 Equipment Maintenance and Fueling 5.3.7 Significant Particulate Generating 5.3.8 Routine Maintenance Activities 5.3.9 On-site Waste Management 5.3.10 Concrete Washing 5.3.11 Dedicated Asphalt or Concrete Batch Plants 5.3.12 Non-industrial Waste Sources (worker trash and portable toilets) 5.3.13 Other Potential Spills 5.4 Vegetation & Soils 5.5 Escrow 6. CONCLUSION 1.2 Ayres Associates APPENDIX – ........................................................................................................................ -- 1. Calculation of a Peak Runoff Using Rational Method ‘UD-Rational v1.02a’ for Bioswale 2. ‘UD-BMP_v3.03’ Design Procedure Form for Bioswale Sizing 3. Anheuser Busch Site Area Values Table 4. ‘UD-Detention_v2.34’ TAB ‘WQ’ - Pond 425 WQ Plate Size Calculation 5. ‘UD-Detention_v2.34’ TAB ‘WQ’ - Pond 430 Existing Conditions WQCV 6. ‘UD-Detention_v2.34’ TAB ‘WQ’ - Pond 430 Proposed Conditions WQCV 7. Pond 425 – WQCV Stage-Storage Table 8. Construction Erosion Escrow Calculation 9. Construction Plan Set 1.3 Ayres Associates 1. INTRODUCTION 1.1 Purpose The purpose of this report is to present the drainage characteristics for the proposed expansion of the Fort Collins Anheuser Busch Brewery. It will be shown that both Low Impact Development (LIDs) Best Management Practices (BMPs) and Water Quality BMPs will be implemented. 1.2 General Location & Description This Drainage and Erosion Control report has been prepared for the Fort Collins Anheuser Busch Brewery. The proposed construction occurs in Section 33, Township 8 North, Range 68, City Of Fort Collins, County Of Larimer, State of Colorado. A vicinity map for the project area is included on the following page (Figure 1.1). The site is bounded by County Roads 50 & 52 (North/South) and by Interstate 25 & Burlington Northern Railroad (East/West). 1.3 Proposed Expansion The proposed expansion at the Anheuser Busch Campus is being driven by a need for additional trailer parking spaces, and a recent addition of a new canning line within the brewery. One hundred twenty seven additional parking spaces and the necessary travel lanes are being added. This is a total surface area of 223,000 square feet. Figure 1.2 shows the locations of the new parking spaces. 1.4 Background Much of the design and development of the Anheuser Busch (A-B) site was done prior to the City’s current standards for low impact development (LID) best management practices (BMPs) and water quality treatment (WQ). Other than water quality capture that was designed with Pond 430 there is no other water quality treatment on the site. During formal discussions with the City of Fort Collins staff it was decided that A-B can continue to release at 100-year historic release rates from their detention ponds if they add LID BMPs and water quality capture volume (WQCV). The agreed upon approach during discussions included:  Removing a concrete flow pan in Pond 430 and replacing it with a Bio Swale and pretreatment forebay.  Adding additional water quality volume in Pond 430 to account for the additional impervious area that will be draining there.  Adding enough water quality volume in Pond 425 to treat all of the impervious area that drains there plus an additional 100,000 ft2 of impervious area for future expansion. This volume is accomplished by increasing the height of the current outlet structure and adding a water quality plate.  Creating a forebay in Pond 425 by adding a concrete sill in the existing concrete swale just south of CR 50.  Adding 15,230 ft2 of porous pavement at the welcome center. 1.4 Ayres Associates Figure 1.1-Vicinity Map 1.5 Ayres Associates Figure 1.2-Additional Parking Spaces on AB Campus 1.6 Ayres Associates Figure 1.3-SWMM Basin Boundaries from Anheuser Busch Master Plan (May 2009) 2.1 Ayres Associates 2. DESIGN CRITERIA 2.1 General The procedures, criteria and standards for stormwater management in this design comply with the reference manual "City of Fort Collins Storm Drainage Design Criteria and Construction Standards" and also “Urban Storm Drainage Criteria Manual” volumes 2 and 3. 2.2 Design Storm Frequencies The proposed drainage BMPs were designed based on a design storm return period of 2- years. This provides the needed means to maintain an orderly drainage system and treat the runoff to UDFCD’s Water Quality Standards. 2.3 Drainage Basins The site is approximately 420 acres. The site has been modeled with MODSWMM, for all previous Master Plan updates. A portion of the MODSWMM basin map is shown on Figure 1.2. Basins 90 and 30, which encompass approximately 111 acres, drain to Pond 430. Pond 430 has an existing WQ outlet structure designed to include water quality capture volume (WQCV) for the area draining to it. Basins 91, 92, 93, 94, and 25, which encompass approximately 309 acres, drain to Pond 425. Pond 425 as it exists today does not have a WQCV structure. 2.4 Hydrologic Criteria Ayres used the Anheuser Busch Company Master Drainage Plan (May 2009), survey information, flown aerial topography, LIDAR and existing drainage structures to design the necessary upgrades to the existing drainage features for the project site. Only existing and established drainage ways were utilized in the design as found in the Master Plan, which were verified by multiple field visits and survey. Individual basin parameters were referenced from the Master Plan and supplemented with LIDAR and survey. Basin areas were found using the existing SWMM model boundaries from the Master Plan. Basin slopes were found using LIDAR supplemented with survey. The existing percent impervious values were found using Civil3D line work drawn on current georeferenced aerial imagery. Since a requirement for the project was to treat fifty percent of the runoff caused by the proposed expansion with a LID BMP referencing standard land use tables for percent impervious values was deemed not precise enough. The peak basin runoff flows from the additional proposed conditions were calculated using the UDFCD ‘UD-Rational v1.02a’ design spreadsheet. A NRCS Soil Type of D for the entire site was used. The required Water Quality BMP treatment volume for the entire site was calculated with these same parameters. The calculations were done with the UDFCD ‘UD-Detention_v2.34’ design spreadsheet. 3.2 Ayres Associates 2.5 Hydraulic Design Each component of drainage was looked at individually. LID BMPs (a bioswale & permeable pavement), WQ BMPs, and the required additional storage volume for the increased runoff. 3. PROPOSED DRAINAGE DESIGN ELEMENTS 3.1 Low Impact Development BMP 3.1.1 Bioswale The City requires that 50 percent of the runoff due to new impervious area be mitigated by a LID BMP. A bioswale was chosen to serve this need. The total new impervious area being constructed with this expansion on the entire A-B site is 5.1 acres. The proposed bioswale will be located in the upstream part of existing Pond 430 (located in basin 30). Basins 90 & 30 are the two basins with the highest percentage of impervious area. By placing the bioswale here it will have the greatest positive impact as it will accept the highest levels of runoff from paved areas. This location also directly accepts runoff from the tractor trailer parking area (which is the most highly trafficked parking area on the entire site.) Since the total new impervious area being added is 5.1 acres, the total area that requires treatment due to the proposed expansion is 2.55 acres. The area due to the future 100,000 sq ft is 2.3 acres. Thus the bioswale is sized to handle the required 50% of these proposed and future conditions. The bioswale is sized to handle 3.7 acres of 100 percent impervious area for a 2 year event. The peak flow rate for these parameters is 10.44 cfs. The residence time is 5.8 minutes. The calculations were done using the UDFCD ‘UD-Rational_v1.02a’ Design Spreadsheet. 3.1.2 Permeable Pavement The City’s requirements that a certain percentage of all new impervious area be constructed in the form of a LID BMP will be implemented in the public and highly visible area of the existing Anheuser Busch Welcome Center parking lot. This will be achieved with the replacement of 0.5 acre of existing asphalt with permeable paver materials. Permeable pavers allow water to infiltrate instead of collecting in the form of surface flow. This allows for a higher level of local groundwater infiltration and lessons the peak flow rates of the drainage basins they are located in. As this replaces existing 100 percent impervious area with a highly pervious surface no additional drainage features or upgrades to the current drainage system are needed in Basin 91. 3.2 Water Quality BMP 3.2.1 Pond 425 Pond 425 is located on the very south edge of the site and accepts runoff from the entire site. From a UDFCD Water Quality standpoint it collects all untreated runoff. As the City’s Water Quality standards now require that all runoff for proposed conditions be treated with a WQ BMP Pond 425 is the ideal location to do so. The proposed improvements (including the future 100,000 sq ft) result in an overall increase of percent impervious area from 21% to 23%. Using the UDFCD ‘UD-Detention_v2.34’ design spreadsheet with inputs of 419 acres with 23% catchment imperviousness the resulting required WQ capture volume is 6.74 acre-ft. This volume of water is captured in Pond 425 at an elevation of 4,980.44 feet. 4.3 Ayres Associates This is 3.44 feet above the flow line of the existing outfall structure. The existing concrete outfall structure will be increased in height to accommodate this elevation and a water quality plate will be added. Using the same UD design spreadsheet the WQ Plate was designed. Depth of the Water Quality Capture Volume (WQCV) above the lowest opening is 3 feet. There are four openings separated 4 inches vertically. Each opening has an open area of 9 square inches (2” H x 4.5” W). The peak release rate is 2.08 cfs. The time to drain the pond of its maximum WQCV is 40 hours. An additional WQ BMP that will be implemented is creating a forebay in the existing concrete flow pan south of the CR50 box culverts. This will aid in the dropping of sediment during low flow events as a form of pretreatment to Pond 425. Using the easily accessible existing concrete pan will allow for an easy maintenance routine. 3.2.2 Pond 430 The additional runoff due to the proposed expansion (including the future 100,000 sq ft) will be treated in Pond 430. Basins 90 & 30 drain to Pond 430. The additional required capture volume will be graded into the pond downstream of the proposed bioswale. The increased capture volume was found by comparing current conditions (45% Impervious) volume requirements to proposed conditions (50% Impervious) volume requirements. The volume required to capture the additional runoff is 0.2 acre-feet. No changes are being made to the existing outlet structure. 4. MAINTENANCE STANDARD OPERATING PROCEDURES 4.1 SOP Maintenance Routine Each drainage feature and BMP requires scheduled maintenance. To insure proper maintenance of the system inspections will follow a monthly routine or after each rain event. This inspection will be performed by an A-B representative and will allow for an assessment of the health of the system. SOPs will follow the BMP specific guidelines outlined in the Urban Drainage and Flood Control District (UDFCD) Urban Storm Drainage, Criteria Manual – Volume 3 – Best Management Practices. BMP maintenance guidelines are outlined in Chapter 6. Each proposed BMP has its own unique maintenance items. Important items to be checked as part of the SOP are addressed below. 4.1.1 Pond 430 Bioswale For the bioswale to maintain its function, maintenance items listed below will implemented:  Floatable debris present? o Remove and dispose in an appropriate manner  Healthy vegetation during Spring, Summer & Fall seasons? o Dead vegetation to be removed and area re-seeded  Underdrain system draining freely? o If not, cleanouts will be utilized to unclog drains  Pond outlet draining freely? o If not, obstructions will be removed  Pre-treatment forebay full of sediment? o If sediment is higher than 1 foot below lowest opening sediment will be removed and disposed of 5.4 Ayres Associates 4.2 Permeable Pavement Maintenance schedules will be followed based on the manufactures recommendations. To remove the heaviest debris it is recommended that a street sweeper equipped with a vacuum sweep the entire surface of the permeable pavers 1-2 times annually as required. After each rain event it will be verified that the underdrains are functioning properly. If an underdrain is clogged or suspected to be clogged appropriate action will be taken to unclog them. Underdrain cleanouts are part of the proposed design. 4.3 Pond 425 Water Quality Plate & Forebay The Water Quality Plate will be kept free of debris. This includes the 4 orifice openings. In the event of any separation of the WQ Plate from the face of the structure it is bolted to repairs will take place immediately. In the event that the WQ plate is overtopped and debris in front of the existing outlet gate valve will be removed. When enough sediment as accumulated to reach half the depth of the pre-treatment forebay south of CR 50 the sediment will be removed and disposed of. This depth is approximately 3 inches. 5. CONSTRUCTION EROSION CONTROL AND ESCROW 5.1 General Description Pond 430 receives water from the west side of the Anheuser-Busch property. The pond is covered in dry land vegetation with a concrete low flow channel running down the thalweg of the pond. This pan is to be removed. The bottom of the pond is vegetated at 90% vegetation density. The sloped sides of the pond are less vegetated at 85% vegetation density. Vegetation (as a surface area value) covers 95% of the pond. The last 5% are covered by the low flow channel, grouted riprap and the outlet structure. Total surface area of the pond is 2 acres. With the re-grading of the bottom of the pond, and the installation of a BMP bio-swale it is appropriate to anticipate that the entire 2 acres of the pond will be disturbed by clearing, excavating and grading. The water quality outlet for the pond has a gate valve. The intakes are four 2-inch PVC pipes penetrating the box. All 4 pipes are on the same face. These PVC inlets will be protected by a silt fence for the duration of construction activities. The pond drains to an existing vegetated channel which drains into the regional Pond 425. The outlet structure gate valve is in place to be closed in the event of a site contamination. The impacts at the Visitor Center parking lot are limited to the removal of existing asphalt which will be replaced with permeable pavement. The area being disturbed is under 0.5 acre. The existing visitor center percent impervious is 100%, as it is an asphalt parking lot. The asphalt is being replaced 1:1 with permeable pavement, the proposed condition percent impervious will be 50%. The subgrade soils will be excavated and hauled off. Due to the constraints of the immediate site all haul vehicles will remain on the existing asphalt that is not being removed. As a precaution there will be a truck wash out at the exit from the parking lot to prevent tracking out soils. The entire parking lot drains to the south so any runoff due to a rain event will be checked by a staked silt fence on the south edge of the asphalt. This will prevent any sediment from washing into the existing 5.5 Ayres Associates drainage channel on the southern edge. Straw wattles will also be staked into the thalweg of the drainage channel as a secondary line of protection. The drainage pathways, as documented by the 2009 Anheuser Busch Master Drainage Plan, will not change due to this project. All flow pathways will remain the same. All potential water born pollutants due to a spill would flow into either the existing Pond 430 or existing Pond 425. The pollutants would arrive via existing drainage channels. Once in either Pond 430 or Pond 425 the pollutants would be contained as standard practice is to close the outfall gate valves in order to limit downstream contamination and to cleanup. Both locations are easily accessed by tire or tracked equipment so cleanup methods would not be limited by accessibility. Ultimately the entire site drains into Pond 425 which drains into the Larimer Weld Canal. Water entering the site due to rainfall will have minimal impacts. The material being removed from the visitor center parking lot will be hauled off as it is excavated. Once enough material is removed the sub-grade gravel of the permeable pavement will be placed and compacted. This gravel material is not highly susceptible to erosion with low expected surface flow velocities due to rainfall. The material being removed from Pond 430 will be hauled off as it is removed. Surface velocities within Pond 430 are very slow due to a gently sloped thalweg. Any material that erodes will be trapped by the ponds outlet structure gate valve. 5.2 Stormwater Management Controls Potential pollutant sources due to the construction activities are limited to spills during re-fueling equipment and items listed in section 5.3 (5.3.1 to 5.3.13). To limit the damage of a refueling accident, refueling will take place only on existing paved roads on the Anheuser Busch facility. In the event of a spill, sorbent material designed for petroleum spills will be dispersed to absorb the pollutant. The sorbent material will be collected and disposed of in accordance to Larimer County regulations. A Storm Water Management Plan Administrator will be named by the Contractor when the construction contract is awarded. 5.3 BMP Selection 5.3.1. All Disturbed Soils All disturbed soils in Pond 430 & and the Visitor Center parking lot will we hauled off as they are removed. The gravel for the subgrade of the bioswale is a small enough volume that it can be installed as it is delivered. No stock pile will be required. The same is true for the subgrade of the bioswale. The bioswale media is a specialty material that acts as a filter and will be installed directly from the delivery containers. No stockpile will be required. 5.3.2 Vehicle Tracking of Sediment The vehicles accessing the Visitor Center parking lot will remain on the existing asphalt at all times. There is ample room for large equipment to enter, exit and to turn around on the existing asphalt that is not being removed. As a precautionary measure a vehicle track pad will be installed in the existing exit. This means that any vehicle exiting this location will travel over the track pad. In the event of a rain event during construction 5.6 Ayres Associates water will run off to the south edge of the parking lot where a staked silt fence will be installed for the entire duration of the project. For the Pond 430 location all delivery trucks will stop at the edge of the pavement on the East side of the pond. Materials will be transferred to or from the trucks at that location. A vehicle washout will be installed as a precautionary measure and for when the equipment working inside the pond is ready to come out. 5.3.3 Management of Contaminated Soils There is no history of contaminated soils on the property nor are any materials being used that would contaminate soils. If contaminated soils are encountered during construction activities they will be disposed of in accordance with all applicable City of Fort Collins and Larimer County regulations. 5.3.4 Loading and Unloading Operations Contractors and site visitors will park at one of the existing parking lots to avoid causing further disturbance to vegetated areas. 5.3.5 Outdoor Storage Activities For the visitor center parking lot the building material deliveries will be scheduled so that they can be installed as they are delivered to minimize the need for onsite storage. The major materials are pre-cast concrete edging delivered by flatbed truck, gravel which can be dumped into place from the delivery trucks and the permeable pavement bricks which will be delivered by palette and installed as delivered. For the bioswale the materials are the PVC underdrains which can be installed in one day and the bioswale media which follows the installation of the underdrains. 5.3.6. Equipment Maintenance and Fueling All equipment maintenance and fueling will take place on the existing asphalt parking lots. 5.3.7 Significant Particulate Generating The only potential source of significant particulate during the construction project is dust from dry material being excavated. If the material is found to be excessively dry it can be moistened to prevent wind born travel. No other significant particulate material is expected. 5.3.8 Routine Maintenance Activities Routine maintenance activities for the visitor center parking lot is limited to a vaccum truck cleaning the surface of the permeable pavement and snow removal during winter. This will not increase erosion in anyway. Maintenance activates in Pond 430 are limited to floatable material removal. This has been traditionally limited to personal on foot removing the limited amounts of material. Materials found have been plastic bottles, and tumble weeds. 5.3.9 On-site Waste Management Potential onsite waste generation due to construction activities is expected to be limited to materials that can be disposed of in regular waste bins. There will be a waste bin placed at both the visitor center parking lot and Pond 430. 5.7 Ayres Associates 5.3.10 Concrete Washing Minimal amounts of concrete are being used in this project so a portable or disposable concrete washout station will be used. A product like Outpak Washout is recommended or better practice. This will be located on the existing visitor center parking lot upstream of the silt fence to capture material in the event of a spill. The use of this product will prevent extra excavation and thus limit disturbing more vegetation. 5.3.11 Dedicated Asphalt or Concrete Batch Plants No asphalt or concrete will be generated or mixed onsite. 5.3.12 Non-industrial Waste Sources (worker trash and portable toilets) Portable toilets will be placed on an existing parking lot in an area that will not be disturbed. This area will be an area where the downstream flow path, in the unlikely event of a spill, will be protected by the installed sediment BMPs to contain solid materials. 5.3.13 Other Potential Spills There are no other situations or procedures expected with the potential for a spill. The only predicted materials that might need to be mitigated for are the soils that are being excavated from the pond. The rubble from the concrete pan and the asphalt rubble being removed will be hauled offsite. All the disturbance associated with Pond 430 will happen within the pond bottom and the pond outlet will be protected by a staked silt fence. 5.4 Vegetation & Soils The dominant soil type for the areas that are currently vegetated is Type D. The areas that will be disturbed have a strong history of healthy vegetation so existing soils will be used. No soil amendments outside of the proposed bioswale will be required to re- establish vegetation. Half of the disturbed area will be replaced with the installation of a vegetated bioswale. The bioswale soil layers will follow the City of Fort Collins Bioretention Sand Media Specification and will be seeded with a wetland seed mixture. The rest of the disturbed areas will be seeded with a transition seed mixture made up of wetland seed and dryland seed allowing for the natural establishment of vegetation. Seeds will be applied by hydromulching or a better practice. As is required by the Colorado Department of Public Health and Environment (CDPHE) State Stormwater Discharge Permit the vegetation disturbed by this project will need to reach 70% of its pre-construction vegetation density as listed in section 5.1 of this report. The Discharge Permit will remain in effect until the 70% density has been reached. 5.5 Escrow The total area being disturbed by the drainage and water quality enhancements is under 3 acres and the protection methods employed are staked silt fences, straw wattles, and a vehicle tracking control pad. The quantities for the construction erosion control design and estimated costs based on RSMeans 2015 cost data are included in the spread sheet. The spreadsheet is included in the Appendix. 6.8 Ayres Associates 6. CONCLUSION The Low Impact Development BMPs coupled with the Water Quality BMPs outlined in this report will exceed the current City of Fort Collins requirements for the current expansion. The BMPs make use of existing drainage features and enhance the Drainage Master Plan used by the Anheuser Busch Fort Collins Brewing Plant. The placement of the Bioswale gives the proposed vegetation the best chance of survival as it will see flows from all rain event and puts it in a flow path to treat the runoff from the most heavily trafficked area of the plant. The location of the permeable pavement not only reduces the amount of new impermeable surface area but replaces existing asphalt. The decision to install the permeable pavement in front of the Welcome Center also gives both Anheuser Busch as well as the City of Fort Collins a highly public show case of both parties’ commitment to pursue a higher level of green engineering and a commitment to the environment. It is worth noting that AB’s decision to construct the LID BMPs and WQ BMPs for an additional 100,000 square feet of 100% impervious area at this time will mean a much higher level of treatment for the entire site until future additions are constructed. With the current expansion adding only approximately 223,000 square feet the proposed drainage BMPs will be treating almost 50% over the City of Fort Collins requirement. Project Title: Catchment ID: I.Catchment Hydrologic Data Catchment ID =30 Area =3.72 Acres Percent Imperviousness =100.00 % NRCS Soil Type =D A, B, C, or D II.Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr =2 years (input return period for design storm) C1 =28.50 (input the value of C1) C2=10.00 (input the value of C2) C3=0.786 (input the value of C3) P1=0.93 inches (input one-hr precipitation--see Sheet "Design Info") III.Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C =0.89 Overide Runoff Coefficient, C =0.89 (enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 =0.90 Overide 5-yr. Runoff Coefficient, C =(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/Short Nearly Grassed Type Meadow Field Pasture/Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations:Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey-Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.90 N/A 0.00 0.00 1 0.0130 1,000 20.00 2.28 7.31 2 3 4 5 1,000 Computed Tc =7.31 Regional Tc =15.56 User-Entered Tc =5.00 IV.Peak Runoff Prediction Rainfall Intensity at Computed Tc, I =2.82 inch/hr Peak Flowrate, Qp =9.33 cfs Rainfall Intensity at Regional Tc, I =2.07 inch/hr Peak Flowrate, Qp =6.87 cfs Rainfall Intensity at User-Defined Tc, I =3.15 inch/hr Peak Flowrate, Qp =10.44 cfs Calculated values for Tc & Qp are based on overide values entered for C & C-5. (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD AB Bioswale Sizing Pond 430 Bioswale Paved Areas & UD-Rational v1.02a - AB Bioswale.xls, Tc and PeakQ 4/30/2015, 12:32 PM Sheet 1 of 1 Designer: Company: Date: Project: Location: 1.Design Discharge for 2-Year Return Period Q2 =10.50 cfs 2.Hydraulic Residence Time A) : Length of Grass Swale LS =250.0 ft B) Calculated Residence Time (based on design velocity below)THR= 5.8 minutes 3.Longitudinal Slope (vertical distance per unit horizontal) A) Available Slope (based on site constraints)Savail =0.0034 ft / ft B) Design Slope SD =0.0034 ft / ft 4.Swale Geometry A) Channel Side Slopes (Z = 4 min., horiz. distance per unit vertical)Z =5.00 ft / ft B) Bottom Width of Swale (enter 0 for triangular section)WB =40.00 ft 5.Vegetation A) Type of Planting (seed vs. sod, affects vegetal retardance factor) 6.Design Velocity (0.833 ft / s maximum for desirable 5-minute residence time)V2 =0.72 ft / s 7.Design Flow Depth (1 foot maximum)D2 =0.35 ft A) Flow Area A2 =14.6 sq ft B) Top Width of Swale W T =43.5 ft C) Froude Number (0.50 maximum)F = 0.22 D) Hydraulic Radius RH = 0.34 E) Velocity-Hydraulic Radius Product for Vegetal Retardance VR = 0.24 F) Manning's n (based on SCS vegetal retardance curve E for seeded grass)n = 0.059 G) Cumulative Height of Grade Control Structures Required HD =0.00 ft AN UNDERDRAIN IS 8.Underdrain REQUIRED IF THE (Is an underdrain necessary?)DESIGN SLOPE < 2.0% 9.Soil Preparation (Describe soil amendment) 10.Irrigation Notes: Design Procedure Form: Grass Swale (GS) Florian Fiebig Ayres Associates April 30, 2015 Anheuser Busch Canning Line Expansion - Pond 430 Bioswale Anheuser Busch Fort Collins Plant Drainage Pond 430 Choose One Temporary Permanent Choose One Grass From Seed Grass From Sod Choose One YES NO UD-BMP_v3.03 - AB BioSwale.xlsm, GS 4/30/2015, 12:41 PM ELEV AREA (sq. ft.) DEPTH (ft) AVG END INC. VOL. (cu. ft.) AVG END TOTAL VOL. (cu. ft.) AVG END TOTAL VOL. (Acre. ft.) CONIC INC. VOL. (cu. ft.) CONIC TOTAL VOL. (cu. ft.) CONIC TOTAL VOL. (Acre. ft.) 4,977.00 0 0 0 0 0 0 0 0 Outlet Structure Invert 4,977.50 0 0 0 0 0 0 0 0 4,978.00 0 0 0 0 0 0 0 0 4,978.50 0 0 0 0 0 0 0 0 4,979.00 4,913.91 0 0 0 0 0 0 0 4,979.50 49,212.58 0.5 13531.62 13531.62 0.31064325 11612.88 11612.88 0.26659504 4,980.00 118,942.19 0.5 42038.69 55570.31 1.27571878 40777.1 52389.98 1.20270845 4,980.44 6.74 Top of WQ Plate 4,980.50 323,241.96 0.5 110546.04 166116.35 7.42061433 106377.25 158767.23 3.64479408 4,981.00 577,793.32 0.5 225258.82 391375.17 8.9847376 222200.14 380967.36 8.74580716 4,981.50 667,261.41 0.5 311263.68 702638.86 16.1303687 310995.46 691962.82 15.8852805 4,982.00 712,436.52 0.5 344924.48 1047563.34 24.0487452 344862.83 1036825.66 23.802242 Pond 425 - STAGE STORAGE TABLE (WQCV) Project: Basin ID: WQCV Design Volume (Input): Catchment Imperviousness, Ia =23.0 percent Catchment Area, A =419.00 acres Diameter of holes, D =inches Depth at WQCV outlet above lowest perforation, H =3 feet Number of holes per row, N = Vertical distance between rows, h =4.00 inches Number of rows, NL =4.00 Orifice discharge coefficient, Co =0.61 Height of slot, H =2.00 inches Slope of Basin Trickle Channel, S =0.004 ft / ft Width of slot, W =4.50 inches Time to Drain the Pond =40 hours Watershed Design Information (Input):3 Percent Soil Type A =0 % Percent Soil Type B =0 % Percent Soil Type C/D =100 % Outlet Design Information (Output): Water Quality Capture Volume, WQCV =0.161 watershed inches Water Quality Capture Volume (WQCV) =5.617 acre-feet 2.00 Design Volume (WQCV / 12 * Area * 1.2) Vol =6.740 acre-feet Outlet area per row, Ao =9.33 square inches Total opening area at each row based on user-input above, Ao =9.00 square inches Total opening area at each row based on user-input above, Ao =0.063 square feet 3 Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 23 S 4977.00 4977.33 4977.67 4978.00 Flow 4977.00 0.0000 0.0000 0.0000 0.0000 0.00 4977.20 0.1368 0.0000 0.0000 0.0000 0.14 4977.40 0.1935 0.0809 0.0000 0.0000 0.27 4977.60 0.2370 0.1590 0.0000 0.0000 0.40 4977.80 0.2737 0.2097 0.1103 0.0000 0.59 4978.00 0.3060 0.2504 0.1758 0.0000 0.73 4978.20 0.3352 0.2854 0.2227 0.1368 0.98 4978.40 0.3620 0.3165 0.2614 0.1935 1.13 4978.60 0.3870 0.3448 0.2950 0.2370 1.26 4978.80 0.4105 0.3709 0.3252 0.2737 1.38 4979.00 0.4327 0.3954 0.3528 0.3060 1.49 4979.20 0.4538 0.4184 0.3784 0.3352 1.59 4979.40 0.4740 0.4402 0.4024 0.3620 1.68 4979.60 0.4933 0.4610 0.4250 0.3870 1.77 4979.80 0.5120 0.4808 0.4465 0.4105 1.85 4980.00 0.5299 0.4999 0.4670 0.4327 1.93 4980.20 0.5473 0.5183 0.4866 0.4538 2.01 4980.40 0.5641 0.5361 0.5055 0.4740 2.08 4980.60 0.5805 0.5533 0.5237 0.4933 2.15 4980.80 0.5964 0.5699 0.5413 0.5120 2.22 4981.00 0.6119 0.5861 0.5583 0.5299 2.29 4981.20 0.6270 0.6019 0.5748 0.5473 2.35 4981.40 0.6418 0.6172 0.5909 0.5641 2.41 4981.60 0.6562 0.6322 0.6065 0.5805 2.48 4981.80 0.6703 0.6469 0.6218 0.5964 2.54 4982.00 0.6841 0.6612 0.6366 0.6119 2.59 4982.20 0.6977 0.6752 0.6512 0.6270 2.65 4982.40 0.7110 0.6889 0.6654 0.6418 2.71 4982.60 0.7240 0.7024 0.6793 0.6562 2.76 4982.80 0.7368 0.7156 0.6930 0.6703 2.82 4983.00 0.7494 0.7285 0.7063 0.6841 2.87 4983.20 0.7618 0.7413 0.7195 0.6977 2.92 4983.40 0.7740 0.7538 0.7324 0.7110 2.97 4983.60 0.7860 0.7661 0.7450 0.7240 3.02 4983.80 0.7978 0.7782 0.7575 0.7368 3.07 4984.00 0.8095 0.7902 0.7698 0.7494 3.12 4984.20 0.8210 0.8019 0.7818 0.7618 3.17 4984.40 0.8323 0.8135 0.7937 0.7740 3.21 4984.60 0.8435 0.8249 0.8054 0.7860 3.26 4984.80 0.8545 0.8362 0.8170 0.7978 3.31 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Override Area Row 1 Override Area Row 2 Override Area Row 3 Override Area Row 4 Override Area Row 5 Override Area Row 6 Override Area Row 7 Override Area Row 8 Override Area Row 9 Override Area Row 10 Override Area Row 11 Override Area Row 12 Override Area Row 13 Override Area Row 14 Override Area Row 15 Override Area Row 16 Override Area Row 17 Override Area Row 18 Override Area Row 19 Override Area Row 20 Override Area Row 21 Override Area Row 22 Override Area Row 23 Override Area Row 24 Central Elevations of Rows of Holes in feet Collection Capacity for Each Row of Holes in cfs STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET Anheuser Busch Bottling Line Expansion Anheuser Busch - Entire Site WQCV UD-Detention_v2.34_A-B_Pond425 for ALL_SWMM_Basins.xls, WQCV 4/30/2015, 12:33 PM Worksheet Protected Project: Basin ID: STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET Anheuser Busch Bottling Line Expansion Anheuser Busch - Entire Site WQCV 4976.00 4977.00 4978.00 4979.00 4980.00 4981.00 4982.00 4983.00 4984.00 4985.00 4986.00 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 St a g e ( f e e t , e l e v . ) Discharge (cfs) STAGE-DISCHARGE CURVE FOR THE WQCV OUTLET STRUCTURE UD-Detention_v2.34_A-B_Pond425 for ALL_SWMM_Basins.xls, WQCV 4/30/2015, 12:33 PM Project: Basin ID: WQCV Design Volume (Input): Catchment Imperviousness, Ia =45.0 percent Catchment Area, A =111.00 acres Diameter of holes, D =inches Depth at WQCV outlet above lowest perforation, H =1 feet Number of holes per row, N = Vertical distance between rows, h =4.00 inches OR Number of rows, NL =1.00 Orifice discharge coefficient, Co =0.61 Height of slot, H =inches Slope of Basin Trickle Channel, S =0.006 ft / ft Width of slot, W =inches Time to Drain the Pond =40 hours Watershed Design Information (Input):1 Percent Soil Type A =0 % Percent Soil Type B =0 % Percent Soil Type C/D =100 % Outlet Design Information (Output): Water Quality Capture Volume, WQCV =0.252 watershed inches Water Quality Capture Volume (WQCV) =2.333 acre-feet 0.00 Design Volume (WQCV / 12 * Area * 1.2) Vol =2.799 acre-feet Outlet area per row, Ao =7.80 square inches Total opening area at each row based on user-input above, Ao =0.00 square inches Total opening area at each row based on user-input above, Ao =0.000 square feet 3 Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 23 S 0.00 Flow 4992.00 0.0000 0.00 4992.10 0.0000 0.00 4992.20 0.0000 0.00 4992.30 0.0000 0.00 4992.40 0.0000 0.00 4992.50 0.0000 0.00 4992.60 0.0000 0.00 4992.70 0.0000 0.00 4992.80 0.0000 0.00 4992.90 0.0000 0.00 4993.00 0.0000 0.00 4993.10 0.0000 0.00 4993.20 0.0000 0.00 4993.30 0.0000 0.00 4993.40 0.0000 0.00 4993.50 0.0000 0.00 4993.60 0.0000 0.00 4993.70 0.0000 0.00 4993.80 0.0000 0.00 4993.90 0.0000 0.00 4994.00 0.0000 0.00 4994.10 0.0000 0.00 4994.20 0.0000 0.00 4994.30 0.0000 0.00 4994.40 0.0000 0.00 4994.50 0.0000 0.00 4994.60 0.0000 0.00 4994.70 0.0000 0.00 4994.80 0.0000 0.00 4994.90 0.0000 0.00 4995.00 0.0000 0.00 4995.10 0.0000 0.00 4995.20 0.0000 0.00 4995.30 0.0000 0.00 4995.40 0.0000 0.00 4995.50 0.0000 0.00 4995.60 0.0000 0.00 4995.70 0.0000 0.00 4995.80 0.0000 0.00 4995.90 0.0000 0.00 4996.00 0.0000 0.00 4996.10 0.0000 0.00 4996.20 0.0000 0.00 4996.30 0.0000 0.00 Override Area Row 1 Override Area Row 2 Override Area Row 3 Override Area Row 4 Override Area Row 5 Override Area Row 6 Override Area Row 7 Override Area Row 8 Override Area Row 9 Override Area Row 10 Override Area Row 11 Override Area Row 12 Override Area Row 13 Override Area Row 14 Override Area Row 15 Override Area Row 16 Override Area Row 17 Override Area Row 18 Override Area Row 19 Override Area Row 20 Override Area Row 21 Override Area Row 22 Override Area Row 23 Override Area Row 24 Central Elevations of Rows of Holes in feet Collection Capacity for Each Row of Holes in cfs STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET Anheuser Busch Bottling Line Expansion SWMM Basins 90 & 30 Existing Conditions UD-Detention_v2.34_A-B_Pond430_Existing.xls, WQCV 4/30/2015, 12:35 PM Project: Basin ID: WQCV Design Volume (Input): Catchment Imperviousness, Ia =50.0 percent Catchment Area, A =111.00 acres Diameter of holes, D =inches Depth at WQCV outlet above lowest perforation, H =1 feet Number of holes per row, N = Vertical distance between rows, h =4.00 inches OR Number of rows, NL =1.00 Orifice discharge coefficient, Co =0.61 Height of slot, H =inches Slope of Basin Trickle Channel, S =0.006 ft / ft Width of slot, W =inches Time to Drain the Pond =40 hours Watershed Design Information (Input):1 Percent Soil Type A =0 % Percent Soil Type B =0 % Percent Soil Type C/D =100 % Outlet Design Information (Output): Water Quality Capture Volume, WQCV =0.271 watershed inches Water Quality Capture Volume (WQCV) =2.503 acre-feet 0.00 Design Volume (WQCV / 12 * Area * 1.2) Vol =3.004 acre-feet Outlet area per row, Ao =8.34 square inches Total opening area at each row based on user-input above, Ao =0.00 square inches Total opening area at each row based on user-input above, Ao =0.000 square feet 3 Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 23 S 0.00 Flow #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Override Area Row 1 Override Area Row 2 Override Area Row 3 Override Area Row 4 Override Area Row 5 Override Area Row 6 Override Area Row 7 Override Area Row 8 Override Area Row 9 Override Area Row 10 Override Area Row 11 Override Area Row 12 Override Area Row 13 Override Area Row 14 Override Area Row 15 Override Area Row 16 Override Area Row 17 Override Area Row 18 Override Area Row 19 Override Area Row 20 Override Area Row 21 Override Area Row 22 Override Area Row 23 Override Area Row 24 Central Elevations of Rows of Holes in feet Collection Capacity for Each Row of Holes in cfs STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET Anheuser Busch Bottling Line Expansion SWMM Basins 90 & 30 Proposed Conditions UD-Detention_v2.34_A-B_Pond430_Proposed.xls, WQCV 4/30/2015, 12:36 PM ELEV AREA (sq. ft.) DEPTH (ft) AVG END INC. VOL. (cu. ft.) AVG END TOTAL VOL. (cu. ft.) AVG END TOTAL VOL. (Acre. ft.) CONIC INC. VOL. (cu. ft.) CONIC TOTAL VOL. (cu. ft.) CONIC TOTAL VOL. (Acre. ft.) 4,977.00 0 0 0 0 0 0 0 0 Outlet Structure Invert 4,977.50 0 0 0 0 0 0 0 0 4,978.00 0 0 0 0 0 0 0 0 4,978.50 0 0 0 0 0 0 0 0 4,979.00 4,913.91 0 0 0 0 0 0 0 4,979.50 49,212.58 0.5 13531.62 13531.62 0.31064325 11612.88 11612.88 0.26659504 4,980.00 118,942.19 0.5 42038.69 55570.31 1.27571878 40777.1 52389.98 1.20270845 4,980.44 6.74 Top of WQ Plate 4,980.50 323,241.96 0.5 110546.04 166116.35 7.42061433 106377.25 158767.23 3.64479408 4,981.00 577,793.32 0.5 225258.82 391375.17 8.9847376 222200.14 380967.36 8.74580716 4,981.50 667,261.41 0.5 311263.68 702638.86 16.1303687 310995.46 691962.82 15.8852805 4,982.00 712,436.52 0.5 344924.48 1047563.34 24.0487452 344862.83 1036825.66 23.802242 Pond 425 - STAGE STORAGE TABLE (WQCV) Project:Disturbed Acres:3.00 EROSION CONTROL BMPs Units Estimated Quantity Unit Price Total Price L.F.470 $2.11 $991.70 10 $4.50 $45.00 1 $1,000.00 $1,000.00 Sub-Total:$2,036.70 1.5 x Sub-Total:$3,055.05 Amount of security:$3,055.05 Total Acres x Price/acre:$3,000.00 $1,000.00 Sub-Total:$3,000.00 1.5 x Sub-Total:$4,500.00 Amount to Re-seed:$4,500.00 Minimum escrow amount:$3,000.00 Erosion Control Escrow:$4,500.00 Miniumum Escrow Amount Ayres Scoped Areas for AB Expansion Unit Price of Seeding per acre: “The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid, whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three thousand dollars ($3,000) for commercial development” (add all other BMPs for the site in this list) Final Escrow Amount Wattle Erosion and Sediment Control Escrow/Security Calculation for The City of Fort Collins BMP Amount Silt Fence (SF) Vehicle Tracking Control (VTC) Reseeding Amount 9/9/2015 3:21 PM F:\32-1859.00 A-B Expansion\Report To City\Escrow & Accomp Drainage\Ayres Areas for AB Expansion Escrow.xls