HomeMy WebLinkAboutSite Certifications - 05/11/2023Page 1 OVERALL SITE and DRAINAGE CERTIFICATION Commercial, Multi-Family and Subdivision Certification Form and Checklist Project Name: Date: Building Permit Numbers: (Commercial or multi-family) Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Chapter 3, Section 3.0 to certify as- built construction to the approved drainage and grading plans, please fill in all applicable items in this Certification Form for Commercial, Multi-Family and Overall Single Family sites. NOTE: several items must be verified during construction. A copy of the approved grading plan must be submitted with the as-built grading plan. (As-built elevations must be written in red next to the approved elevations.) •Use “Yes” for items completed as described. •Use “N/A” for items that are not applicable to the site being certified. •If any blanks are “No,” attach an explanation referencing the item number below. Attach an explanation or description of the as-built condition for any items listed or for anything not listed but shown on the approved construction plans. Provide an as-built redline or Mylar drawing with the following: I.Water Quality and Quantity Detention Basin - FCSCM Ch. 6 and 7 For multiple detention basins on a site, provide the following for each basin separately: A. Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and volume verification calculations for the water quality capture volume and the 100-year detention storage volume. 1. Detention basin topography was prepared by a professional land surveyor registered in the state of Colorado. 2.Both proposed and as-built contours are shown on the same plan sheet (dashed lines for proposed and solid lines for as-built). 3.All critical spot elevations as shown on the approved construction plans have been verified and the as-built elevations are shown on the plan sheet. 4.Stage-storage-discharge tables are provided on a separate document. 5.Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92- 602(8) is attached and has been uploaded to the Statewide Compliance Portal (tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include: a.The cover sheet from the approved drainage report b.The stamped certification page from the approved drainage report c.As-built topographic survey d.Stamped certification page from the Overall Site & Drainage Certification e.PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet 11/19 Wes Lamarque 5/11/2023 Page 2 B.Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2% grade requirement. 1.Low Flow: Choose one of the following detention basin low flow options as applicable: a. Turf swale for low flow path in detention basin. There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade is . b.Concrete pan for low flow in detention basin. There is a concrete pan installed that meets the grades as shown on the approved construction plans. (Show as-built spot elevations.) c.Soft pan for low flow in detention basin. •Verify and document the soft pan material gradation, trench width and depth - to be verified during construction by engineer. Picture documentation is preferred or engineer’s statement of visual inspection and compliance. (Choose one below.) o There is a soft pan with an underdrain installed that meets the design on the approved construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations, bends, cleanouts, etc.) o There is soft pan installed without an underdrain but there is a type A or B soil. The soil type must be documented by supplying verification from a registered professional geotechnical engineer. NOTE: Spot elevations are to be within 0.2 ft. +/-. 2. Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown. Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re- graded. Provide documentation if a variance was granted for steeper slopes during the design process. 3.Spillway: The following items must be field verified: a.The location of the spillway is indicated on the as-built plan. b.The width of the spillway is indicated on the as-built plan. c.The elevation(s) of the spillway is shown on the as-built plan. d.A concrete ribbon defines the location and grade of the spillway. e.There is downstream scour protection in the spillway as per the construction plans. Indicate type: (riprap size “D50” gradation and bedding type, geotextile, buried riprap with inches of bury, etc.). f.There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape features, rocks, etc. 11/19 Page 3 4.Outlet Structure: a.The orifice plate for the approved release rate is installed with the correct size and location of the orifice. b.The orifice plate for the water quality outlet is installed with the correct hole size, number of rows and columns of holes. c.The bottom hole on both the water quality and quantity outlets are at the bottom of the plate so no water ponds in front of the plate. d.The well screen is the correct material and is installed as shown on the construction plans. e.100-year overflow grate elevation is . (Elev. A on detail D-46) f.The top elevation of the water quality capture volume is . (Elev. B on detail D-46) g.Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the top and bolted at the bottom. h.The bottom of the outlet box has no obstructions or misalignments that will cause it to retain runoff water and is sloped at 2% towards outlet. II.Channels/Swales - FCSCM Ch. 8, Sec. 2.0 and Ch. 9, Sec. 5.0 A. Capacity: The as-built capacity of all the major channels and swales has been verified. They meet or exceed capacity requirements shown in the approved drainage study for this project. 1.All swales are located within the drainage easements as shown on the construction plans. 2.Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these criteria are not met, the certification engineer will write a justification and propose mitigation for each instance or have the issues corrected. If variances to these criteria have previously been approved and are shown on the construction plans, no justification is needed. 3.As-built spot elevations on channels/swales are shown that correspond to spot elevations shown on the approved construction plans. 4.All permanent erosion control measures are installed as shown on the approved construction plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used as part of this verification.) 5.All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the system. (Pictures at tie-in points suggested.) 6.The minimum freeboard is provided for all channels and swales as shown on the approved construction plans or as identified in the approved drainage study. (Show the freeboard provided on the cross-sections as on the construction plan set or attached as separate documentation.) 7.The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees, shrubs, sod, etc. infringe on the low flow portion of channels or swales.) 11/19 Page 4 III.Storm Pipes (aka storm drains) - FCSCM Ch. 9, Sec. 4.0 A. Storm Drain Pipe Capacity: The as-built capacity of all pipes installed on this project has been verified and meets or exceeds the capacity requirements shown in the approved drainage study for this project. 1.All storm drain pipe sizes and materials have been verified and are in conformance with the approved construction plans. (Indicate on the plan and profile sheets that they have been verified.) Material and size substitutions must be approved prior to installation. If a pipe size or material was changed during construction, the certification engineer must attach the approval documents or supply them with this certification. Approval documents must include a calculation documenting the capacity equivalency (equal or greater) of the substituted size. 2.The longitudinal slope of the pipe is as shown on the approved construction plans. The acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans must be justified with capacity calculations on an attached sheet. 3.The as-built invert elevations have been verified and are shown on the plan and profile sheets of the approved construction plans. B.Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the approved construction plans and construction specifications. 1.The minimum cover requirements for all pipes have been met as shown on the approved construction plans. These will be called out in critical locations. 2.All encasements and clearances as specified on the approved construction plans have been met. 3.Any specific joint types or construction methods specified on the approved construction plans have been met. (List on a separate sheet and attach to this certification.) IV.Concrete Pans - FCSCM Ch. 8, Sec. 2.0 A. Construction/Installation: All concrete pans have been constructed in accordance with the approved construction plans. 1.The concrete pans are the correct size/width as shown on the approved construction plans. 2.The longitudinal slopes of the pans are as shown on the approved construction plans. The certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or justification by separate document. 3.The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross- section is “V” shaped and meets the side slope shown on the detail.) 4.The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4 inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide documentation of the reinforcement used if different than shown on the details or on the approved construction plans.) 5.The spot elevations shown on the concrete pan(s) have been verified and are shown on the as- built drawings. 11/19 Page 5 V. Storm Drain Inlets - FCSCM Ch. 9, Sec. 3.0 A. Construction/Installation: All storm drain inlets have been constructed in accordance with the approved construction plans and construction specifications. 1.The size and type of inlets are consistent with the inlets shown on the approved construction plan. Indicate by writing “Verified” on each inlet on the plan sheet or list on a separate document the inlet number(s), type and size (length). If the inlet installed is other than the one on the approved construction plan detail sheet, provide the name and source of the detail with justification for equal or better capacity. 2.The size of the inlet opening is consistent with the approved detail. (Check height and width.) 3.The elevation of the grate (if applicable) is at the elevation shown on the street profile or as indicated by a spot elevation on the construction plans. 4.The as-built invert elevations of all pipes entering and leaving the inlet are shown on the plan and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide justification and capacity calculations to show the capacity is not affected or propose mitigation. 5.The as-built size of the inlet box is as shown on the construction plans or an explanation or justification is attached. 6.All Type C, R, 13 and 16 inlet covers are stenciled or stamped with the following designation (or an equivalent): NO DUMPING – DRAINS TO POUDRE RIVER. VI.Culverts - FCSCM Ch. 9, Sec. 4.0 A. Construction/Installation: All culverts have been constructed and/or installed in accordance with the approved construction plans and construction specifications. 1.All culvert sizes have been verified as indicated on the as-built construction plans as correct. 2.The culvert material type for all culverts installed is as on the approved construction plans and is indicated on the as-built plans. 3.The as-built invert “in and out” elevations have been verified and are indicated on the as-built construction plans. 4.The culvert headwalls or wing walls have been installed as shown on the approved construction plans. Headwalls or wing walls may be needed in the as-built conditions onsite if the slopes adjacent to the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative. An alternative to consider is a turf reinforcement mat (TRM). VII.Sub-Drains A. Construction/Installation: All sub-drains shown on the construction plans have been installed in accordance with those plans and the construction specifications. Sub-drains installed with the sanitary sewer are to be verified on the sanitary sewer plan and profile sheets of the construction plans. (NOTE: Indicate any sub-drains installed after the plans were approved on the as-built plans.) 1.The size of the sub-drains are as approved on the construction plans and are indicated on the as- built plans. 2.The type of sub-drain, in particular the perforated and non-perforated sections of the drain, are as indicated on the approved construction plans. 11/19 Page 6 3.The cover requirements per the construction plans are provided. 4.The cleanouts have been installed at the locations shown on the construction plans and are accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations marked.) 5.The backfill materials for sub-drains are as shown on the approved construction plans. (This includes the type, depth and width.) 6.The geo-textile liner completely wraps the sub-drain and the permeable backfill material unless shown otherwise on the approved construction plans. (Sub-drain pipe wrapped in a sock filter material is accepted only if approved prior to installation.) VIII.Curb Cuts A. Construction: All curb cut openings are constructed in accordance with the approved construction plans and construction specifications. 1.The size (width) of the curb cut opening is as shown on the approved construction plans. 2.The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb cut. IX.Sidewalk Culverts & Chases A. Construction/Installation: All sidewalk culverts have been installed at the locations shown on the approved construction plans. 1.The size (width and length) of the culverts are as shown on the approved construction plans. 2.The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the detail shown on the approved construction plans or per the City’s detail. 3.The sidewalk culvert invert “in and out” elevations have been verified and are indicated on the as-built plans. 4.The sidewalk culvert opening is as shown on the approved construction plans or per the City’s detail. 5.There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert. X. Site Grading - FCSCM Ch. 8 A. Construction: All common open spaces have been graded in accordance with the approved construction plans. 1.The grading on all common open spaces bordering private lots has been verified as correct and the as-built rear lot corner elevations have been shown on the as-built plans. 11/19 Page 7 2.The as-built contours for “overlot grading” are shown on the as-built construction plans for all common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the situation for noncompliance and when it may be corrected. An escrow for overlot grading may be required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site Certification. It is understood that residential lots will be brought to final grade once the foundation is backfilled so they may be lower than the plan shows at this Overall Site Certification stage.) 3.All turf reinforcement mats (TRMs) have been installed as shown on the approved construction plans and the slopes are stabilized. XI.Permanent Erosion Control BMPs - FCSCM Ch. 9, Sec. 7.0 A. Construction: All permanent erosion control BMPs have been installed per the approved construction plans. 1.All riprap has been installed in the locations and sizes indicated on the approved construction plans. 2.All fabric has been installed in the locations and sizes indicated on the approved construction plans. a.All fabric was installed per the details on the approved construction plans. XII.Post-Construction Site Cleanup - FCSCM Ch. 3, Sec. 2.0 A. Construction: All construction debris and obstructions of any kind have been removed from drainage paths. 1.All construction debris has been removed except in staging area(s). 2.All ruts have been smoothed out in all construction areas. 3.All areas needing reseeding have been identified and future stabilization goals have been coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note the area needing stabilization in the narrative. XIII.Certification of LID and Water Quality Facilities - FCSCM Ch. 7 A.Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and other items to be verified during construction, along with pictures and other required documentation. B.Attached is verification of the rain garden and/or sand filter flat surface area(s) and ponding volume(s). This verification includes survey of critical elevations. C.Attached is verification of the underground infiltration required volume(s), weir elevations, orifices, inspection ports and filtering fabric. This verification includes survey of critical elevations. D.All visible LID design features were verified as part of the engineer's site visit. 11/19 11/19 Page 8 XIV.Certification of Other Permanent BMPs A.The construction of other permanent BMPs not specifically addressed in this certification is in accordance with the approved plan. This may include grade control structures, rundowns, bridges, stream access/improvements, etc. Please specify other permanent BMPs included on this site: XV. Certification and Erosion Control Measures - FCSCM Ch. 3 A. All temporary erosion control measures shall be removed upon stabilization. If at the time of preparing this certification there are any erosion control measures still remaining on the site, please note them in the narrative and verify that they need to remain at this time. If in doubt as to the need for any control measure, please consult with the Erosion Control Inspector at erosion@fcgov.com. XVI.Statement of Compliance - FCSCM Ch. 3 A. This certification is signed and stamped. By signing this form, the engineer(s) attests that he/she has visited and observed the site, and to the best of his/her knowledge, the as-built conditions of the drainage facilities are as described in the above form and in the enclosed as-built plans. B.Failure to properly disclose all known information could result in the rejection of this certification and prevent the release of any and all Stormwater Utility permit holds on Building Permits and/or Certificates of Occupancy within this development. XVII. Signature and Stamp by a Colorado-Registered Professional Engineer Engineer’s contact information: Name: Email: Phone: Company: Address: PE Stamp 04/03/2023 2/14/17 Page 1 CERTIFICATION OF LOT GRADING Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e) Date: Address: Lot: Block: Subdivision: Permit Application #: Larimer County Parcel #: Larimer County Reception #: (on development agreement) I, (print) , a Colorado registered professional engineer, verify that construction of all stormwater facilities and grading is complete and hereby submit this certification. Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots. 1.Certification includes attached Stormwater-approved grading plan. (NOTE: City’s Building Department does not approve grading plans). 2.Certification includes the attached as-built survey dated (must be within 60 days of the date the certification is submitted) accurately and truthfully depicting elevations for: Top of foundation/finished floor Finished grade on each side of the structure Quarter points along each lot line (not more than 50 feet apart) Break points/high points Swales Berms Retaining walls Air conditioning pads Window wells Any other appurtenance(s) within an easement 3.All elevations are within a 0.2 foot tolerance of the approved grading plan. 4.The top of foundation is at least 6 inches above the highest grade surrounding the structure. 5.There is a minimum grade of 5% away from the structure within the first 5 to 10 feet adjacent to the residence. 6.All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than 33% (3:1). 7.All flow lines of stormwater drainage swales are a minimum of 6 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Stormwater-approved grading plan. 8.All downspout locations and discharge directions are shown on the as-built survey. Runoff is directed into an appropriate drainage system or lot line swale, and it is not directed onto neighboring properties. No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes Wes Lamarque 5/11/2023 2/14/17 Page 2 9.A smooth transition with no vertical offset (step) in grade is provided at the lot line to all adjacent properties. 10.The grading of this lot does not adversely affect neighboring properties or City infrastructure. 11.Landscaping has been completed prior to survey. If not, please indicate who will be responsible for completing landscaping: 12.Final site cleanup has been completed. 13.I personally visited the site as part of the certification process, and in my professional opinion, the as-built survey is an accurate representation of the site conditions.. No Yes No Yes No Yes No Yes No Yes 14.Based on this information, I certify that (check one): □The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). □The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. Name: Email: Phone: Company: Address: NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) WaterUtilitiesEng@fcgov.com Mailing Address Fort Collins Utilities ATTN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 Questions? 970-221-6700 PE Stamp Sign and date 04/03/2023 Project Description Friction Method Manning Formula Solve For Full Flow Capacity Input Data Roughness Coefficient 0.013 Channel Slope 0.00160 ft/ft Normal Depth 1.50 ft Diameter 1.50 ft Discharge 4.20 ft³/s Results Discharge 4.20 ft³/s Normal Depth 1.50 ft Flow Area 1.77 ft² Wetted Perimeter 4.71 ft Hydraulic Radius 0.38 ft Top Width 0.00 ft Critical Depth 0.79 ft Percent Full 100.0 % Critical Slope 0.00548 ft/ft Velocity 2.38 ft/s Velocity Head 0.09 ft Specific Energy 1.59 ft Froude Number 0.00 Maximum Discharge 4.52 ft³/s Discharge Full 4.20 ft³/s Slope Full 0.00160 ft/ft Flow Type SubCritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Average End Depth Over Rise 0.00 % 18" RCP Pipe Capacity 3/27/2023 3:45:56 PM Bentley Systems, Inc. Haestad Methods Solution CenterBentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 2of1Page GVF Output Data Normal Depth Over Rise 100.00 % Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 1.50 ft Critical Depth 0.79 ft Channel Slope 0.00160 ft/ft Critical Slope 0.00548 ft/ft 18" RCP Pipe Capacity 3/27/2023 3:45:56 PM Bentley Systems, Inc. Haestad Methods Solution CenterBentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 2of2Page This pipe capacity calculation has been provided for the 18" RCP pipe within the College Ave. ROW. Per as-builts received, the as-built pipe slope was observed to be 0.16%. While this is below the minimum required slope listed in the drainage certification checklist, the pipe as constructed still has the capacity to convey 4.20 CFS. As observed from the EPA/SWMM model output (see next page, from the As-Built Design Report for the Remington Street Storm Sewer Outfall Improvement Project, prepared by Anderson Consulting Engineers on December 7, 2020), the expected flows through this pipe are 6.3, 4.6, and 2.4 CFS in the 100,10, and 2-YR storm events respectively. Thus, in the as-built condition, the 18" RCP pipe should be able to convey the full 2-YR event, 91% of the 10-YR event and 66% of the 100-YR event. It was also observed that this inlet is expected to be significantly flooded/surcharged in the 100-YR event so the slope of the newly constructed pipe should have little to no impact on the ROW stormwater system. AS-BUILT CONDITIONS WITH EXISTING FACILITIES EPA-SWMM LINK INPUT AND RESULTS Storm Sewer Link No.* Link Name Location/Description Size (ft)D/S Invert Elev. (ft) D/S Node Name U/S Invert Elev. (ft) U/S Node Name Length Slope (%) Manning's Roughness Entry Loss Coefficient Exit Loss Coefficient 100-Year Peak Q (cfs) 10-Year Peak Q (cfs) 2-Year Peak Q (cfs) 47 PRSPT_IN-1_P-1**14" H x 23" W HERCP Lateral Connection Between Prospect Inlet #1 and Prospect Inlet #2 1.17 ft H X 1.917 ft W (1.5 ft Equivalent)4987.61 PRSPT_N-3 4987.85 PRSPT_N-2 8.0 3.00% 0.013 0.500 0.100 1.9 0.9 0.5 48 PRSPT_IN-2_P-1**14" H x 23" W HERCP Lateral Connection Between Prospect Inlet #2 and Prospect Lateral 1.17 ft H X 1.917 ft W (1.5 ft Equivalent)4987.37 PRSPT_N-6 4987.41 PRSPT_N-3 49.0 0.08% 0.013 0.500 1.010 9.5 4.4 2.4 49 PRSPT_IN-3_P-1**18" PVC Lateral Connection Between Prospect Inlet #3 and Prospect Inlet #4 1.5 ft 4987.76 PRSPT_N-5 4990.24 PRSPT_N-4 20.0 12.40% 0.011 0.500 0.050 0.7 0.3 0.1 50 PRSPT_IN-4_P-1**18" RCP Lateral Connection Between Prospect Inlet #4 and Prospect Lateral 1.5 ft 4987.00 PRSPT_N-6 4987.19 PRSPT_N-5 47.0 0.40% 0.013 0.500 0.500 6.7 1.1 0.7 51 PRSPT_IN-5_P-1***Fictious 18" RCP to Limit Captured Flow Based on Inlet Capacity 1.5 ft 4987.52 PRSPT_N-9 4987.55 PRSPT_N-11 10.0 0.30% 0.013 0.500 0.025 2.1 0.5 0.3 *Link Numbers are Referenced on the Subbasin and Conveyance Element Map **These pipes were installed as part of the College Avenue/Prospect Road Improvement Project in 2017 ***Fictious pipe to limit captured flow based on inlet capacity Indicates data updated for As-built Analysis Indicates data revised for Existing Facilities Analysis Storm Sewer Link No.* Link Name Location/Description Size (ft)D/S Invert Elev. (ft) D/S Node Name U/S Invert Elev. (ft) U/S Node Name Length Slope (%) Manning's Roughness Entry Loss Coefficient Exit Loss Coefficient 100-Year Peak Q (cfs) 10-Year Peak Q (cfs) 2-Year Peak Q (cfs) 52 COLLG_IN-1_P-2**18" RCP Lateral Connection Between College Inlet #1 and Manhole West of Inlet 1.5 ft 4988.56 COLLG_N-2 4988.61 COLLG_N-1 10.0 0.50% 0.013 0.500 1.010 6.3 4.6 2.4 53 COLLG_IN-1_P-1**18" RCP Lateral Connection Between Manhole West of Inlet and Prospect Lateral 1.5 ft 4986.86 PRSPT_N-7 4987.58 COLLG_N-2 144.0 0.50% 0.013 0.200 1.010 10.7 8.7 4.6 54 COLLG_IN-2_P-3**15" Existing RCP Between College Inlet #1 and College Inlet #2 1.25 ft 4988.63 COLLG_N-2 4989.12 COLLG_N-3 88.0 0.56% 0.013 0.500 1.010 5.2 4.3 2.3 55 COLLG_IN-2_P-2**24" RCP Lateral Connection Between College Inlet #2 and Manhole North of Inlet 2.0 ft 4988.75 COLLG_N-4 4989.12 COLLG_N-3 10.0 3.70% 0.013 0.500 0.025 23.8 15.7 7.2 56 COLLG_IN-2_P-1**18" RCP Lateral Connection Between Manhole North of Inlet and Prospect Lateral 2.0 ft 4987.12 PRSPT_N-8 4987.47 PRSPT_N-4 108.0 0.32% 0.013 0.200 0.500 23.8 15.5 7.2 57 COLLG_IN-3_P-1**12" RCP Lateral Connection Between College Inlet #3 and CSU Medical Center System 1.0 ft 4992.90 CSU_MC_O-1 4993.20 COLLG_N-5 54.0 0.56% 0.013 0.500 0.025 3.8 3.8 1.3 *Link Numbers are Referenced on the Subbasin and Conveyance Element Map *These pipes were installed as part of the College Avenue/Prospect Road Improvement Project in 2017 Indicates data updated for As-built Analysis Indicates data revised for Existing Facilities Analysis Storm Sewer Link No.* Link Name Location/Description Size (ft)D/S Invert Elev. (ft) D/S Node Name U/S Invert Elev. (ft) U/S Node Name Length Slope (%) Manning's Roughness Entry Loss Coefficient Exit Loss Coefficient 100-Year Peak Q (cfs) 10-Year Peak Q (cfs) 2-Year Peak Q (cfs) 58 LAKE_IN-1_P-1**15" RCP Lateral Connection Between Lake Inlet #1 and Lake Lateral 1.25 ft 4993.20 LAKE_N-1 4994.80 LAKE_N-2 50.0 3.20% 0.013 0.500 0.500 0.9 0.9 0.6 59 LAKE_IN-2_P-1**15" RCP Lateral Connection Between Lake Inlet #2 and Lake Lateral 1.25 ft 4993.20 LAKE_N-1 4994.90 LAKE_N-3 68.0 2.50% 0.013 0.500 0.500 2.0 2.1 1.4 60 LAKE_IN-3_P-1**12" RCP Lateral Connection Between Lake Inlet #3 and Lake Lateral 1.0 ft 4993.20 LAKE_N-4 4994.20 LAKE_N-5 86.0 1.16% 0.013 0.500 0.100 3.0 3.4 2.8 61 LAKE_IN-4_P-1**15" RCP Lateral Connection Between Lake Inlet #4 and Lake Lateral 1.25 ft 4993.20 LAKE_N-4 4993.80 LAKE_N-6 79.0 0.76% 0.013 0.500 0.025 2.5 2.6 1.1 *Link Numbers are Referenced on the Subbasin and Conveyance Element Map **Existing pipes based on COFC inventory and field measurements Indicates data updated for As-built Analysis Indicates data revised for Existing Facilities Analysis LAKE INLET PIPES PROSPECT INLET PIPES COLLEGE INLET PIPES Existing College inlet lateral information - for 0.5% design slope verification where lateral is proposed to be extended to relocate manhole east with lane widening. C0.0 COVER SHEET CIVIL UTILITY PLANS FOR A PORTION OF LOTS 1, 2, 3, 4, 5 AND 6, BLOCK 1, I.C. BRADLEY'S ADDITION TO THE CITY OF FORT COLLINS; PART OF THE NORTHWEST QUARTER OF SECTION 24, T. 7 N., R. 69 W. OF THE 6TH P.M., FORT COLLINS, LARIMER COUNTY, COLORADO MARCH 2023 ALPINE BANK SUBDIVISION -01/20/2021 2ND PDP SUB MAS -02/17/2021 3RD PDP SUB MAS -04/07/2021 1ST FDP SUB MAS -05/19/2021 2ND FDP SUB MAS -07/08/2021 3RD FDP SUB MAS -08/19/2021 4TH FDP SUB MAS 1 04/01/2022 ASI #5 MAS AB 10/28/2022 AS-BUILT (WATER & SEWER)MAS - STAMP H: \ A l p i n e B a n k \ C O , F o r t C o l l i n s - X X X X X - C o l l e g e & P r o s p e c t \ C A D D \ 3 C D \ F D P \ C i v i l C o n s t u r c t i o n P l a n s \ A L B 0 0 1 _ C 0 . 0 - C o v e r . d w g - Ma t t B u n d r e n - 3/ 3 1 / 2 0 2 3 Init.#Issue / DescriptionDate THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 6162 S. Willow Drive, Suite 320 Greenwood Village, CO 80111 303.770.8884 Date: Drawn By: Project No: Checked By: CI V I L U T I L I T Y P L A N S F O R AL P I N E B A N K 16 0 8 S O U T H C O L L E G E A V E N U E S. C O L L E G E A V E . & P R O S P E C T R O A D FO R T C O L L I N S , C O L O R A D O -12/02/2020 1ST PDP SUB MAS ALB000001 MRB PJD MARCH 2023 -11/09/2021 FOR CONSTRUCTION MAS 2 09/14/2022 MONUMENT SIGN UPDATE MAS RECORD DRAWING AB 01/09/2023 AS-BUILT (WATER & SEWER)MAS AB 03/31/2023 AS-BUILT (DRAINAGE CERT)PJD NOTE: CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY MONUMENTATION. CONTRACTOR SHALL HAVE LICENSED SURVEYOR REPLACE ANY DAMAGED OR DISTURBED MONUMENTATION AT THEIR COST. SOIL PREPARATION NOTE SOIL PREPARATION SHALL BE PER RECOMMENDATIONS FROM A GEOTECHNICAL ENGINEERING REPORT PREPARED FOR THIS SITE AS FOLLOWS: GEOTECHNICAL ENGINEER: CESARE, INC. REPORT No: 20.3059 THE CONTRACTOR MUST FULLY REVIEW THESE REPORTS PRIOR TO CONSTRUCTION. INFORMATION IN THE GEOTECHNICAL REPORT SUPERSEDES ANY CONFLICTING INFORMATION CONTAINED IN THE CONSTRUCTION PLANS AND SPECIFICATIONS. REFER TO GENERAL STRUCTURAL NOTES FOR SPECIFIC SOIL PREPARATION AT SITE STRUCTURES. NOTE: CONTRACTOR MUST COORDINATE WORK WITH UTILITY COMPANY AND CITY PRIOR TO BEGINNING WORK AND IS RESPONSIBLE FOR ALL MATERIALS, LABOR, REPAIRS, ETC. TO COMPLETE WORK AND RESTORE AREA TO SAME STATE PRIOR TO STARTING WORK SURVEYOR TO OBTAIN AUTOCAD FILE FROM ENGINEER AND VERIFY ALL HORIZONTAL CONTROL DIMENSIONING PRIOR TO CONSTRUCTION STAKING. SURVEYOR MUST VERIFY ALL BENCHMARK, BASIS OF BEARING AND DATUM INFORMATION TO ENSURE IMPROVEMENTS WILL BE AT THE SAME HORIZONTAL AND VERTICAL LOCATIONS SHOWN ON THE DESIGN CONSTRUCTION DRAWINGS. PRIOR TO CONSTRUCTION STAKING ANY DISCREPANCY MUST BE REPORTED TO OWNER AND ENGINEER PRIOR TO CONTINUATION OF ANY FURTHER STAKING OR CONSTRUCTION WORK. NOTE: CONTRACTOR RESPONSIBLE FOR AS-BUILT DRAWINGS, TESTS, REPORTS AND/OR ANY OTHER CERTIFICATES OR INFORMATION AS REQUIRED FOR ACCEPTANCE OF WORK FROM CITY, UTILITY DISTRICTS OR ANY OTHER GOVERNING AGENCY. 04/03/2023 HISTORICAL BUILDING RELOCATED PROPOSED BANK EX I T O N L Y TRASH ENCLOSURE C2.0 GRADING PLAN -01/20/2021 2ND PDP SUB MAS -02/17/2021 3RD PDP SUB MAS -04/07/2021 1ST FDP SUB MAS -05/19/2021 2ND FDP SUB MAS -07/08/2021 3RD FDP SUB MAS -08/19/2021 4TH FDP SUB MAS 1 04/01/2022 ASI #5 MAS AB 10/28/2022 AS-BUILT (WATER & SEWER)MAS - STAMP H: \ A l p i n e B a n k \ C O , F o r t C o l l i n s - X X X X X - C o l l e g e & P r o s p e c t \ C A D D \ 3 C D \ F D P \ C i v i l C o n s t u r c t i o n P l a n s \ A L B 0 0 1 _ C 2 . 0 - G r a d . d w g - Ma t t B u n d r e n - 3/ 3 1 / 2 0 2 3 Init.#Issue / DescriptionDate THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 6162 S. Willow Drive, Suite 320 Greenwood Village, CO 80111 303.770.8884 Date: Drawn By: Project No: Checked By: CI V I L U T I L I T Y P L A N S F O R AL P I N E B A N K 16 0 8 S O U T H C O L L E G E A V E N U E S. C O L L E G E A V E . & P R O S P E C T R O A D FO R T C O L L I N S , C O L O R A D O -12/02/2020 1ST PDP SUB MAS ALB000001 MRB PJD MARCH 2023 -11/09/2021 FOR CONSTRUCTION MAS 2 09/14/2022 MONUMENT SIGN UPDATE MAS RECORD DRAWING AB 01/09/2023 AS-BUILT (WATER & SEWER)MAS AB 03/31/2023 AS-BUILT (DRAINAGE CERT)PJD SCALE: 1"=20' 0 10 20 SOIL PREPARATION NOTE SOIL PREPARATION SHALL BE PER RECOMMENDATIONS FROM A GEOTECHNICAL ENGINEERING REPORT PREPARED FOR THIS SITE AS FOLLOWS: GEOTECHNICAL ENGINEER: CESARE, INC. REPORT No: 20.3059 THE CONTRACTOR MUST FULLY REVIEW THESE REPORTS PRIOR TO CONSTRUCTION. INFORMATION IN THE GEOTECHNICAL REPORT SUPERSEDES ANY CONFLICTING INFORMATION CONTAINED IN THE CONSTRUCTION PLANS AND SPECIFICATIONS. REFER TO GENERAL STRUCTURAL NOTES FOR SPECIFIC SOIL PREPARATION AT SITE STRUCTURES. 04/03/2023 HISTORICAL BUILDING RELOCATED PROPOSED BANK EX I T O N L Y TRASH ENCLOSURE SCALE: 1"=20' 0 10 20 C4.0 UTILITY PLAN EM SS GM DYH GM ER EVT -01/20/2021 2ND PDP SUB MAS -02/17/2021 3RD PDP SUB MAS -04/07/2021 1ST FDP SUB MAS -05/19/2021 2ND FDP SUB MAS -07/08/2021 3RD FDP SUB MAS -08/19/2021 4TH FDP SUB MAS 1 04/01/2022 ASI #5 MAS AB 10/28/2022 AS-BUILT (WATER & SEWER)MAS - STAMP H: \ A l p i n e B a n k \ C O , F o r t C o l l i n s - X X X X X - C o l l e g e & P r o s p e c t \ C A D D \ 3 C D \ F D P \ C i v i l C o n s t u r c t i o n P l a n s \ A L B 0 0 1 _ C 4 . 0 - U t i l . d w g - Ma t t B u n d r e n - 3/ 3 1 / 2 0 2 3 Init.#Issue / DescriptionDate THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 6162 S. Willow Drive, Suite 320 Greenwood Village, CO 80111 303.770.8884 Date: Drawn By: Project No: Checked By: CI V I L U T I L I T Y P L A N S F O R AL P I N E B A N K 16 0 8 S O U T H C O L L E G E A V E N U E S. C O L L E G E A V E . & P R O S P E C T R O A D FO R T C O L L I N S , C O L O R A D O -12/02/2020 1ST PDP SUB MAS ALB000001 MRB PJD MARCH 2023 -11/09/2021 FOR CONSTRUCTION MAS 2 09/14/2022 MONUMENT SIGN UPDATE MAS RECORD DRAWING AB 01/09/2023 AS-BUILT (WATER & SEWER)MAS AB 03/31/2023 AS-BUILT (DRAINAGE CERT)PJD 04/03/2023 PR O P O S E D BA N K EXIT ONLY TRASH ENCLOSURE C5.1 STORM PLAN AND PROFILE SCALE: 1"=20' 0 10 20 -01/20/2021 2ND PDP SUB MAS -02/17/2021 3RD PDP SUB MAS -04/07/2021 1ST FDP SUB MAS -05/19/2021 2ND FDP SUB MAS -07/08/2021 3RD FDP SUB MAS -08/19/2021 4TH FDP SUB MAS 1 04/01/2022 ASI #5 MAS AB 10/28/2022 AS-BUILT (WATER & SEWER)MAS - STAMP H: \ A l p i n e B a n k \ C O , F o r t C o l l i n s - X X X X X - C o l l e g e & P r o s p e c t \ C A D D \ 3 C D \ F D P \ C i v i l C o n s t u r c t i o n P l a n s \ A L B 0 0 1 _ C 5 . 1 - S t o r m P & P . d w g - Ma t t B u n d r e n - 3/ 3 1 / 2 0 2 3 Init.#Issue / DescriptionDate THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 6162 S. Willow Drive, Suite 320 Greenwood Village, CO 80111 303.770.8884 Date: Drawn By: Project No: Checked By: CI V I L U T I L I T Y P L A N S F O R AL P I N E B A N K 16 0 8 S O U T H C O L L E G E A V E N U E S. C O L L E G E A V E . & P R O S P E C T R O A D FO R T C O L L I N S , C O L O R A D O -12/02/2020 1ST PDP SUB MAS ALB000001 MRB PJD MARCH 2023 -11/09/2021 FOR CONSTRUCTION MAS 2 09/14/2022 MONUMENT SIGN UPDATE MAS RECORD DRAWING AB 01/09/2023 AS-BUILT (WATER & SEWER)MAS AB 03/31/2023 AS-BUILT (DRAINAGE CERT)PJD PLAN: STORM SEWER LINE 1 (STA 0+00 TO STA 0+26.57) SCALE: 1"=20' PLAN: STORM SEWER LINE 2 (STA 0+00 TO STA 2+22.90) SCALE: 1"=20' PLAN: STORM SEWER LINE 1 (STA 0+00 TO STA 0+26.57) SCALE: 1"=20', HORIZONTAL: 1"=20', VERTICAL: 1"=10' PLAN: STORM SEWER LINE 2 (STA 0+00 TO STA 2+22.90) SCALE: 1"=20', HORIZONTAL: 1"=20', VERTICAL: 1"=10' SCALE: 1"=20' 0 10 20 04/03/2023 TRASH ENCLOSURE HISTORICAL BUILDING C5.2 STORM PLAN AND PROFILE SCALE: 1"=20' 0 10 20 -01/20/2021 2ND PDP SUB MAS -02/17/2021 3RD PDP SUB MAS -04/07/2021 1ST FDP SUB MAS -05/19/2021 2ND FDP SUB MAS -07/08/2021 3RD FDP SUB MAS -08/19/2021 4TH FDP SUB MAS 1 04/01/2022 ASI #5 MAS AB 10/28/2022 AS-BUILT (WATER & SEWER)MAS - STAMP H: \ A l p i n e B a n k \ C O , F o r t C o l l i n s - X X X X X - C o l l e g e & P r o s p e c t \ C A D D \ 3 C D \ F D P \ C i v i l C o n s t u r c t i o n P l a n s \ A L B 0 0 1 _ C 5 . 2 - S t o r m P & P . d w g - Ma t t B u n d r e n - 3/ 3 1 / 2 0 2 3 Init.#Issue / DescriptionDate THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 6162 S. Willow Drive, Suite 320 Greenwood Village, CO 80111 303.770.8884 Date: Drawn By: Project No: Checked By: CI V I L U T I L I T Y P L A N S F O R AL P I N E B A N K 16 0 8 S O U T H C O L L E G E A V E N U E S. C O L L E G E A V E . & P R O S P E C T R O A D FO R T C O L L I N S , C O L O R A D O -12/02/2020 1ST PDP SUB MAS ALB000001 MRB PJD MARCH 2023 -11/09/2021 FOR CONSTRUCTION MAS 2 09/14/2022 MONUMENT SIGN UPDATE MAS RECORD DRAWING AB 01/09/2023 AS-BUILT (WATER & SEWER)MAS AB 03/31/2023 AS-BUILT (DRAINAGE CERT)PJD PLAN: STORM SEWER LINE 4 (STA 0+00 TO STA 0+22.01) SCALE: 1"=20' PLAN: STORM SEWER LINE 3 (STA 0+00 TO STA 1+53.13) SCALE: 1"=20' PLAN: STORM SEWER LINE 4 (STA 0+00 TO STA 0+22.01) SCALE: 1"=20', HORIZONTAL: 1"=20', VERTICAL: 1"=10' PLAN: STORM SEWER LINE 3 (STA 0+00 TO STA 1+53.13) SCALE: 1"=20', HORIZONTAL: 1"=20', VERTICAL: 1"=10' SCALE: 1"=20' 0 10 20 04/03/2023 PROPOSED BANK C5.3 STORM PLAN CDOT ROW SCALE: 1"=20' 0 10 20 -01/20/2021 2ND PDP SUB MAS -02/17/2021 3RD PDP SUB MAS -04/07/2021 1ST FDP SUB MAS -05/19/2021 2ND FDP SUB MAS -07/08/2021 3RD FDP SUB MAS -08/19/2021 4TH FDP SUB MAS 1 04/01/2022 ASI #5 MAS AB 10/28/2022 AS-BUILT (WATER & SEWER)MAS - STAMP H: \ A l p i n e B a n k \ C O , F o r t C o l l i n s - X X X X X - C o l l e g e & P r o s p e c t \ C A D D \ 3 C D \ F D P \ C i v i l C o n s t u r c t i o n P l a n s \ A L B 0 0 1 _ C 5 . 3 - S t o r m P & P . d w g - Ma t t B u n d r e n - 3/ 3 1 / 2 0 2 3 Init.#Issue / DescriptionDate THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 6162 S. Willow Drive, Suite 320 Greenwood Village, CO 80111 303.770.8884 Date: Drawn By: Project No: Checked By: CI V I L U T I L I T Y P L A N S F O R AL P I N E B A N K 16 0 8 S O U T H C O L L E G E A V E N U E S. C O L L E G E A V E . & P R O S P E C T R O A D FO R T C O L L I N S , C O L O R A D O -12/02/2020 1ST PDP SUB MAS ALB000001 MRB PJD MARCH 2023 -11/09/2021 FOR CONSTRUCTION MAS 2 09/14/2022 MONUMENT SIGN UPDATE MAS RECORD DRAWING AB 01/09/2023 AS-BUILT (WATER & SEWER)MAS AB 03/31/2023 AS-BUILT (DRAINAGE CERT)PJD PLAN: STORM SEWER LINE 5 (STA 40+03.83 TO STA 40+16.04) SCALE: 1"=20' PLAN: STORM SEWER LINE 5 (STA 40+03.83 TO STA 40+16.04) SCALE: 1"=20', HORIZONTAL: 1"=20', VERTICAL: 1"=10' 04/03/2023 C5.5 STORM DETAILS -01/20/2021 2ND PDP SUB MAS -02/17/2021 3RD PDP SUB MAS -04/07/2021 1ST FDP SUB MAS -05/19/2021 2ND FDP SUB MAS -07/08/2021 3RD FDP SUB MAS -08/19/2021 4TH FDP SUB MAS 1 04/01/2022 ASI #5 MAS AB 10/28/2022 AS-BUILT (WATER & SEWER)MAS - STAMP H: \ A l p i n e B a n k \ C O , F o r t C o l l i n s - X X X X X - C o l l e g e & P r o s p e c t \ C A D D \ 3 C D \ F D P \ C i v i l C o n s t u r c t i o n P l a n s \ A L B 0 0 1 _ C 5 . 4 - S t o r m D e t a i l s . d w g - Ma t t B u n d r e n - 3/ 3 1 / 2 0 2 3 Init.#Issue / DescriptionDate THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 6162 S. Willow Drive, Suite 320 Greenwood Village, CO 80111 303.770.8884 Date: Drawn By: Project No: Checked By: CI V I L U T I L I T Y P L A N S F O R AL P I N E B A N K 16 0 8 S O U T H C O L L E G E A V E N U E S. C O L L E G E A V E . & P R O S P E C T R O A D FO R T C O L L I N S , C O L O R A D O -12/02/2020 1ST PDP SUB MAS ALB000001 MRB PJD MARCH 2023 -11/09/2021 FOR CONSTRUCTION MAS 2 09/14/2022 MONUMENT SIGN UPDATE MAS RECORD DRAWING AB 01/09/2023 AS-BUILT (WATER & SEWER)MAS AB 03/31/2023 AS-BUILT (DRAINAGE CERT)PJD FINISHED GRADE FINISHED FLOOR NOT TO SCALE1 BUILDING WALL STORM DRAIN CONNECTION SQUARE ARCH. DOWNSPOUT, REF. BLDG PLANS TRANSITION DOWNSPOUT FROM SQUARE TO ROUND STORM DRAIN CONNECT TO CIVIL STORM DRAIN PIPING. FIELD COORDINATE PIPING SIZE AND INVERT ELEVATION WITH CIVIL. SLOPE PIPING IN DIRECTION OF FLOW, REF. STORM DRAIN SHEETS CONCRETE SIDEWALK/LANDSCAPING PROVIDE SPLASH GUARD ON BOTTOM 2'-0" OF DOWNSPOUT, REF. BLDG PLANS BUILDING FOUNDATION 04/03/2023 HISTORICAL BUILDING RELOCATED PROPOSED BANK EX I T O N L Y TRASH ENCLOSURE C6.1 WATER PLANS SCALE: 1"=20' 0 10 20 -01/20/2021 2ND PDP SUB MAS -02/17/2021 3RD PDP SUB MAS -04/07/2021 1ST FDP SUB MAS -05/19/2021 2ND FDP SUB MAS -07/08/2021 3RD FDP SUB MAS -08/19/2021 4TH FDP SUB MAS 1 04/01/2022 ASI #5 MAS AB 10/28/2022 AS-BUILT (WATER & SEWER)MAS - STAMP H: \ A l p i n e B a n k \ C O , F o r t C o l l i n s - X X X X X - C o l l e g e & P r o s p e c t \ C A D D \ 3 C D \ F D P \ C i v i l C o n s t u r c t i o n P l a n s \ A L B 0 0 1 _ C 6 . 1 - W a t e r P l a n s . d w g - Ma t t B u n d r e n - 3/ 3 1 / 2 0 2 3 Init.#Issue / DescriptionDate THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 6162 S. Willow Drive, Suite 320 Greenwood Village, CO 80111 303.770.8884 Date: Drawn By: Project No: Checked By: CI V I L U T I L I T Y P L A N S F O R AL P I N E B A N K 16 0 8 S O U T H C O L L E G E A V E N U E S. C O L L E G E A V E . & P R O S P E C T R O A D FO R T C O L L I N S , C O L O R A D O -12/02/2020 1ST PDP SUB MAS ALB000001 MRB PJD MARCH 2023 -11/09/2021 FOR CONSTRUCTION MAS 2 09/14/2022 MONUMENT SIGN UPDATE MAS RECORD DRAWING AB 01/09/2023 AS-BUILT (WATER & SEWER)MAS AB 03/31/2023 AS-BUILT (DRAINAGE CERT)PJD 04/03/2023 HISTORICAL BUILDING RELOCATED PROPOSED BANK EX I T O N L Y TRASH ENCLOSURE C7.1 SANITARY PLANS SCALE: 1"=20' 0 10 20 -01/20/2021 2ND PDP SUB MAS -02/17/2021 3RD PDP SUB MAS -04/07/2021 1ST FDP SUB MAS -05/19/2021 2ND FDP SUB MAS -07/08/2021 3RD FDP SUB MAS -08/19/2021 4TH FDP SUB MAS 1 04/01/2022 ASI #5 MAS AB 10/28/2022 AS-BUILT (WATER & SEWER)MAS - STAMP H: \ A l p i n e B a n k \ C O , F o r t C o l l i n s - X X X X X - C o l l e g e & P r o s p e c t \ C A D D \ 3 C D \ F D P \ C i v i l C o n s t u r c t i o n P l a n s \ A L B 0 0 1 _ C 7 . 1 - S a n i t a r y P l a n s . d w g - Ma t t B u n d r e n - 3/ 3 1 / 2 0 2 3 Init.#Issue / DescriptionDate THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF GALLOWAY. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. COPYRIGHT GallowayUS.com 6162 S. Willow Drive, Suite 320 Greenwood Village, CO 80111 303.770.8884 Date: Drawn By: Project No: Checked By: CI V I L U T I L I T Y P L A N S F O R AL P I N E B A N K 16 0 8 S O U T H C O L L E G E A V E N U E S. C O L L E G E A V E . & P R O S P E C T R O A D FO R T C O L L I N S , C O L O R A D O -12/02/2020 1ST PDP SUB MAS ALB000001 MRB PJD MARCH 2023 -11/09/2021 FOR CONSTRUCTION MAS 2 09/14/2022 MONUMENT SIGN UPDATE MAS RECORD DRAWING AB 01/09/2023 AS-BUILT (WATER & SEWER)MAS AB 03/31/2023 AS-BUILT (DRAINAGE CERT)PJD 04/03/2023 HISTORICAL BUILDING RELOCATED PROPOSED BANK EX I T O N L Y TRASH ENCLOSURE 90.12 CO 90.49 CO 92.17 CS92.30 WMTR 91.59 CS 91.30 WMTR 90.02 CO 90.04 CO 91.83 WTR STUB 92.19 CS 89.97 WTR STUB 91.15 WV 91.13 WV 92.41 FL ME 92.94 TBC ME 92.96 EOC 92.93 EOC 92.89 EOC92.78 EOC 92.51 EOC 91.38 EOC 90.96 FL 90.93 FL 91.09 FL 91.77 FL 92.11 TOC 92.32 EOC 92.34 TBC 92.30 TBC 92.21 TBC 92.75 EOC 92.82 EOC 92.83 EOC 92.78 EOC 92.22 FL 92.57 EOC 91.92 FL 91.58 FL 91.64 FL 91.67 FL 91.73 FL 92.24 EOC92.26 TBC 92.19 TBC 91.41 FL XPAN 91.29 FL XPAN 91.15 FL XPAN 90.92 FL XPAN 90.92 FL XPAN 91.48 TOC 91.27 TOC 91.01 TOC 91.14 TOC 91.40 TOC 91.76 TOC 90.86 TOC91.54 EOC 91.20 EOC 91.05 FL 91.02 FL 90.94 FL 90.88 FL 90.80 FL 90.65 FL 91.27 TBC 91.30 TBC 91.35 TBC 91.06 EOC 90.58 FL 91.25 TBC 91.22 TBC90.56 FL 90.48 FL 91.32 EOC 91.30 EOC 91.21 TBC 90.55 FL 90.69 FL 91.24 CL MH RIM 91.25 CL MH RIM 90.92 FL 91.37 TBC 91.36 EOC 91.47 EOC 92.20 CL FH FLANGE 91.15 FL 91.61 TBC 91.77 TBC91.33 FL 91.82 EOC 91.81 EOC 91.94 TOC 92.03 COFC BM 92.02 TOC 91.57 FL 91.46 FL 91.54 EOC 91.48 EOC 91.36 EOC 91.69 EOC 91.80 EOC 91.73 BOW 92.39 BOW 93.11 CL TOW 93.19 CL TOW 92.56 BOW 91.73 BOW 92.98 EOC 92.57 GND 91.96 EOC 92.94 EOC 93.08 CL TOW93.08 CL TOW 92.48 BOW 92.38 BOW 91.85 TOC 91.83 TOC 91.73 EOC 91.78 EOC 91.61 EOC 91.58 EOC 91.78 EOC 92.95 EOC92.97 EOC 93.04 FF 93.04 TOC93.06 CL TOW 93.06 CL TOW 93.06 CL TOW 93.05 CL TOW 92.97 EOC 92.96 EOC 92.95 EOW 92.95 EOW 92.96 EOW 92.96 EOW 92.93 EOW 92.93 EOW92.91 EOW 92.95 EOC91.79 BOW 91.78 EOC 92.93 EOC 91.99 EOC 91.90 EOC 91.74 EOC 91.73 EOC 91.90 EOC 91.77 EOC 91.85 EOC 91.92 EOC 91.78 EOC 91.63 EOC 91.62 EOC 91.59 EOC 91.57 TBC 91.11 FL 90.92 FL 90.79 FL 90.92 FL 91.64 CL METER RIM 91.38 EOC 91.53 EOC 91.56 EOC 91.39 EOC 91.40 TBC 91.42 TBC 92.95 EOC 91.34 FL 91.17 FL 91.14 FL 90.92 FL 90.88 FL 91.10 FL 91.78 EOC 91.95 EOC 91.76 TOC 91.69 TOC 91.52 TOC 91.50 TOC 91.49 EOC 91.23 EOC 91.13 EOC 91.80 EOC 91.70 EOC 91.09 EOC 90.98 EOC 90.89 EOC 90.85 FL 90.85 FL 91.05 TBC 91.01 TBC 90.67 EOC 90.62 FL 90.68 FL 90.72 TOC 90.70 TOC 90.70 TOC 90.71 FL 90.89 TBC 91.24 TBC 90.75 FL 90.80 FL EX 91.28 TBC EX 92.06 BOW 93.04 CL TOW 93.06 CL TOW 93.05 CL TOW 92.34 BOW 91.93 BOW 92.94 EOC92.91 EOC 92.42 BOW 91.75 BOW 93.06 CL TOW 91.39 TOF 92.68 BOW 93.29 BOW 93.24 BOW 92.92 BOW 91.51 GND 91.73 TOE 91.56 TOE 91.65 TOE 91.61 GND 91.81 GND 91.94 TOE 92.02 TOE 90.82 CL SIGN FTR 90.78 CL SIGN FTR 90.19 GRATE 90.20 GRATE 90.21 GRATE 90.21 GRATE 90.36 TPAD CNR 90.27 TPAD CNR 90.25 TPAD CNR 90.33 TPAD CNR 90.71 FL 90.47 FL 90.05 FL END 89.90 EOC 89.90 EOC 89.96 EOC 89.90 EOC 89.85 EOC 89.22 CL VAULT RIM 89.76 FL END 89.44 FL 89.03 FL 88.90 FL89.02 FL89.30 FL 92.53 LP TOB 89.91 GND 89.87 GND 91.95 GND 92.11 GND 92.97 EOC 92.93 EOC 92.57 EOC 92.49 EOC 92.44 EOC 92.55 EOC 88.50 TOC 88.14 TOC 87.81 FL 87.48 FL 87.51 FL 87.55 FL 88.10 FL 88.67 FL 89.13 FL 89.81 FL 90.39 FL 90.34 FL 90.44 FL 90.62 FL 90.77 CL TOW 89.40 BOW 88.57 BOW 90.77 CL TOW 90.77 CL TOW 90.70 BOW 87.99 BOW 90.24 FL 90.15 FL 90.14 FL 90.02 FL GRATE 90.04 FL GRATE 90.39 TOC 90.70 TOC 86.13 INV 85.25 INV 85.09 INV 89.56 FL 88.61 FL 88.59 FL 88.53 FL 88.33 FL 87.90 FL 87.40 FL 87.08 FL 87.07 FL 87.29 FL 87.44 FL 88.47 TOC 88.47 TOC 87.46 TOC 87.46 TOC 87.37 FL 88.93 CL TOW 88.36 BOW 87.82 BOW 87.37 FL 87.37 FL 87.40 FL 90.21 LP TOB 87.01 FL 86.96 FL 86.96 FL 87.31 FL 87.51 FL 87.88 BOW 89.43 EOC 89.44 EOC 87.29 EOC 86.86 EOC 86.69 EOC 86.74 EOC 86.90 EOC 87.01 EOC 87.24 EOC 87.00 CL VAULT RIM 86.98 GRATE 87.01 GRATE 86.99 GRATE 86.94 GRATE 84.95 INV 87.73 CL RIM 89.06 FL 89.45 FL 89.43 FL 89.45 FL 89.77 FL 89.46 FL 89.25 FL 88.88 FL 88.76 FL 88.73 FL 88.51 FL 88.51 FL 88.94 FL 89.13 FL 89.39 FL 89.91 EOC 92.46 LP TOB 90.57 EOC 90.05 FL 91.48 EOC 91.57 CL SIGN FTR91.59 CL SIGN FTR 93.94 LP TOB 90.67 FL 90.60 FL 91.10 TOC 91.02 TOC 91.12 TOC 91.19 EOC 91.36 EOC 91.50 EOC 91.55 EOC 91.43 EOC 91.51 EOC 91.51 EOC 91.31 EOC 91.26 EOC 91.37 EOC 91.42 TOC 92.89 TOC 92.93 TOC91.37 TOC 91.28 TOC 91.20 TOC 91.34 EOC 91.27 EOC 91.20 EOC 91.14 EOC 91.05 EOC 91.11 EOC 91.31 EOC 91.34 EOC 91.25 EOC 91.08 EOC 90.92 EOC 90.71 EOC 93.01 LP TOB 90.66 CURBSTOP 90.32 FL 89.68 FL 89.53 FL 89.33 FL 89.13 FL 89.50 EOC 89.81 EOC 89.96 EOC 90.08 EOC 89.90 EOC 89.45 FL 89.75 FL 90.02 FL 90.48 FL 90.95 FL91.10 GND 92.97 EOC 90.96 FL 91.00 FL 91.07 FL 92.94 EOC 91.58 EOC 91.52 EOC 91.53 EOC 91.06 FL 91.04 FL 90.95 FL 90.57 FL 90.08 FL 89.86 FL 89.22 FL 90.15 GND90.56 EOC 90.62 EOC 90.77 EOC 90.72 EOC 90.76 EOC92.95 EOC 92.97 EOC 93.02 EOC 93.02 TOC 92.98 TOC 90.12 TOC 90.24 FL 90.24 FL 90.23 TOC 90.14 FL 90.16 FL 90.50 FL 90.61 FL 90.67 FL 91.09 TOC 90.97 TOC 90.47 FL 90.51 FL 90.45 FL 90.76 TOC 90.69 TOC 90.65 TOC 90.81 TOC 87.73 ST MH -2.95 INV N -2.45 INV W -3.05 INVS E & S 90.70 ST MH -3.65 INV N -3.85 INV S 89.84 CO 90.68 ST VAULT RIM CANT REMOVE LID 91.53 RD CO 91.45 RD CO 89.23 RD BEND POINT 91.31 RD 91.15 RD 90.02 RD 89.14 ST MH RIM 87.85 ST MH RIM 89.41 ST MH RIM 89.26 ST MH RIM 88.52 TRENCH DRAIN 88.61 TRENCH DRAIN 88.71 TOC 88.71 TOC 88.67 TOC 90.14 EOC 90.02 EOC 90.56 CO 90.95 EOC 86.78 TOP PIPE AT CONNECT 24IN 86.76 TOP PIPE AT CONNECT 24IN 90.91 CL TOP WALL 90.88 CL TOP WALL 90.91 CL TOP WALL 90.87 CL TOP WALL 92.52 EOC 92.44 EOC 88.73 TOC 88.92 TOC 89.09 TOC 88.46 TOC 87.95 TOC 88.08 TOC 88.56 TOC 88.44 TOC 88.15 TOC 87.74 TOC 88.06 TOC 88.97 TOC 91.05 TOC 87.94 TRSH ENC TOC 88.03 TRSH ENC TOC 88.23 TRSH ENC TOC 88.40 TRSH ENC TOC 88.20 FL 88.74 FL 87.63 FL 87.49 FL 87.48 FL 87.32 FL 87.04 FL 90.38 EOC 89.34 ST MH RIM 89.29 ST MH RIM 89.83 FL 87.53 EXIST ST RIM 92.19 RD 88.30 INV W 89.20 ST MH RIM 87.62 FL 87.75 FL 87.77 FL 87.44 FL 87.23 FL 87.22 EOC 86.91 EOC 86.83 EOC 86.73 EOC 86.79 EOC 86.98 EOC 87.43 EOC 88.06 EOC 89.44 EOC 90.70 TOA 89.37 TOA 88.30 TOA 87.68 TOA 87.19 TOA 86.80 TOA 86.40 TOA 86.04 TOA 85.98 TOA 85.93 FL INLET 85.96 FL INLET86.07 TOA 86.53 TOA 86.98 TOA 87.21 TOA 87.57 TOA 87.52 EX SS MH 87.47 EOA 87.50 EOA 87.42 EOA 87.05 EOA 86.87 EOA 86.40 EOA 86.61 EOA 86.95 EOA 87.53 EOA 87.94 EOA 88.53 EOA 88.98 EOA 89.40 EOA 90.23 EOA 90.64 EOA 92.63 GND 92.36 GND 92.66 GND 92.92 GND 92.77 GND 92.77 GND 92.06 GND 91.81 GND 91.86 GND 91.40 GND 91.18 GND 91.45 GND 90.95 GND 90.69 GND 90.82 GND 90.17 GND 90.02 GND 89.71 GND 89.44 GND 89.48 GND 88.79 GND 88.77 GND 88.39 GND 88.42 GND 89.29 CL RIBBON CURB 88.78 CL RIBBON CURB 91.54 CL RIBBON CURB 92.13 CL RIBBON CURB 92.87 CL RIBBON CURB 88.33 GND 87.85 FL 87.83 FL 88.28 FL 88.20 FL 88.20 FL 88.20 FL 88.19 FL 88.26 FL88.18 FL 87.99 TOC 88.19 EOC 87.88 EOC 88.02 EOC 88.09 EOC 87.81 EOC 87.54 EOC 87.55 EOC 87.73 EOC 87.51 TOC 87.49 ST MH 87.56 TOC 95.13 BCR 102.62 BCR 91.20 EOC 91.34 EOC 91.57 EOC 91.62 EOC 96.72 FF 92.97 EOC 92.87 EOC 92.71 EOC 92.94 EOC 92.86 EOC 93.00 EOC 92.92 EOC 93.04 EOC 92.94 EOC 92.79 EOC 92.74 EOC 92.52 EOC 92.23 EOC 91.87 RD -3.0 INV S 84.36 INV W 89.85 CO 84.58 INV E 91.23 INV W -2.58 89.46 FL 89.25 FL 88.88 FL 88.76 FL 88.73 FL 89.13 FL 89.39 FL 89.91 88.11 VAULT PORT RIM 89.14 ST MH RIM 87.85 ST MH RIM 87.95 VAULT PORT RIM 87.89 VAULT PORT RIM 87.79 VAULT PORT RIM 87.67 VAULT PORT RIM 87.57 VAULT PORT RIM 89.41 ST MH RIM 89.26 ST MH RIM 90.14 90.02 86.76 TOP PIPE AT CONNECT 24IN 88.73 TOC 88.92 TOC 89.09 TOC 88.46 TOC 87.95 TOC 87.94 TRSH ENC TOC 88.03 TRSH ENC TOC 88.20 FL 87.63 FL 87.49 FL 87.48 FL 87.32 FL 89.34 ST MH RIM 89.29 ST MH RIM 89.20 ST MH RIM 87.51 ST MH RIM 87.51 ST MH RIM 87.53 ST MH RIM 87.63 ST MH RIM 87.76 ST MH RIM 83.86 INV S 84.44 INV W 84.58 INV N 82.91 BOTT 82.19 BOTT 84.35 INV N 84.39 INV W 84.43 INV E84.20 INV S 84.29 INV W 84.21 INV N82.12 BOTT 82.21 BOTT 84.39 INV E 84.23 INV S 84.30 INV W 84.24 INV N 84.32 INV W 84.27 INV S 82.17 BOTT 87.62 FL 87.75 FL 87.77 FL 87.44 FL 82.20 BOTT 84.19 INV N 84.33 INV E 84.26 INV S 84.22 INV S 84.27 INV E 84.12 INV N 87.85 FL 87.83 FL 87.73 EOC 88.97 VAULT PORT RIM 89.01 VAULT PORT RIM 89.06 VAULT PORT RIM 89.13 VAULT PORT RIM 89.15 VAULT PORT RIM 89.23 VAULT PORT RIM 84.58 INV E ALPINE BANK SITE AS-BUILT LOCATED IN THE NORTHWEST QUARTER OF SECTION 24, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO 4025 Automation Way, Suite C4 Fort Collins, CO 80525 970-232-9645 www.WashburnSurveying.com Sheet 1 of 1 Project #: 2021-0076 Date: March 14, 2023 Scale: 1"=15' Drawn: CDB NOTE ELEVATIONS SHOWN HEREON ARE FROM AN AS-BUILT SURVEY OF THE SITE PERFORMED ON NOVEMBER 16TH, DECEMBER 1ST , 2022 AND JANUARY 13, 2023 Sc a l e : 1 " = 1 5 ' STORM VAULT DETAIL SCALE: 1"=5'