Loading...
HomeMy WebLinkAboutSite Certifications - 01/23/1998:;··1 -:{,1 THE SEAR-BROWN GROUP FULl.rSERVICE DESIGN PROFESSIONALS FORMERLY RBD, INC. 209 SO UTH MELDRUM FORT COL LI NS , COLORADO 80521-2603 970-482-5922 FAX: 970-482-6368 Mr. Basil Hamdan City of Fort Collins Stormwater Utility 235 Mathews Fort Collins, CO 80522 Re: Partial Drainage Certification (Completion) Wild Wood Farm, Third Filing PUD 434 -011 Dear Basil: Please find enclosed as -built drawings from The Sear-Brown Group with as -built elevations noted in red on the drawings . A survey crew from The Sear-Brown Group recently obtained these as-built elevations. The improvements most recently installed have been installed in accordance with the design intent of the construction drawings and normal construction tolerances and will function as intended. On July 25 , 1996 Jim Allen-Morley from our office submitted to you a Partial Drainage Certification for the subject property . The purpose of this certification is to wrap up the items noted in Jim's July 25 , 1996 certification to you . The following items have now been installed: 1. Line A on sheet 15 of 18. 2. Line Bon sheet 15 of 18. 3 . The detention pond concrete overflow weir outlet structure as shown on sheet 18 of 18. 4 . The asphalt surface pavement of the adjacent streets . This certification is signed and stamped and by signing this letter I attest that to the best of my knowledge the as -built conditions of the drainage facilities constructed to date are as described above and on the redlined construction drawings enclosed. Failure to properly disclose all known information could result in the rejection of this certification and prevent the release of any NEW YORK • PENNSYLVANIA COLORADO • UTAH STANDARDS IN EXCELLENCE 1 EQUAL OPPORTUNITY EMPLOYER Storm water Utility holds on Building Permits and/or Certificates of Occupancy. Thank you for your time and consideration of this submittal. Sincerely, The Sear-Brown Group 1~(ii:~r Senior Engineer 2