HomeMy WebLinkAboutSite Certifications - 10/18/2007AYRES
ASSOCIATES
Oc tober 18, 2007
Mr. Jay Barber
City of Fort Collins
Stormwater Utility
700 Wood Street
Fort Collins, Colorado 80521
Re : Drainage Certification Letter for Spring Canyon Community Park
Dear Jay,
We recently received as-built survey data for the Spring Canyon Community Park located on
Horsetooth Road in Fort Collins, from King Surveyors . The attached drawing shows the as-built
survey information which we received .
In general it appears that the park was built in conformance with the grading plan that Ayres
provided on sheets C2 .1 and C2.2 of the Utility Plans for Spring Canyon Community Park .
Observations during the site visit in combination with the attached as-built elevations verify that
the park was built in general conformance to the design .
It should be noted that the Letter of Map Revision or LOMA is currently being prepared by
Anderson Consulting Engineers and they have not completed their hydraulic modeling of the
pond at the time of this letter. There are some very minor elevation discrepancies with the
inflow and outflow weir elevations for the pond. Until Anderson completes their modeling it will
not be known whether or not these differences will affect the results of the LOMA. Anderson will
need to give their final approval for the pond design once their modeling efforts are complete.
It is my recommendation that the general grading of the park site is certified. If you have any
questions, please call.
Sincerely ,
Ayres Associates Inc
~~
Andrea H. Faucett , P.E ., CFM
Manager, Municipal Engineering Group
EPL: sp
Enclosure
Ayres Associates Inc
Engineers/Scientists/Surveyors
3665 JFK Parkway, Building 2 , Suite 200, P.O . Box 270460, Fort Collins , CO 80527
(970) 223-5556 , FAX (970) 223-5578
Printed on recycled paper
J,w BarbeJ -Spring Canyon Community park buildings
From:
To:
Date:
Craig Foreman
Jay Barber
10/12/2007 4:08:01 PM
Page 1
Subject: Spring Canyon Community park buildings
Jay: Here are the building permit numbers that need approval :
Maintenance building: 3156 S. Overland Trail -80603388
Restroom Creekside : 80602762
Restroom Ballfield: 80602757
Restroom playground: 80602749
If you need anything else, let me know.
Thanks . Craig
CC: Kathleen Benedict; Matt Day
~lLµ~2.eb
..J.:....:;..::!!.1::J.~~~•1J ~-t:+f-Ht-~-111k ~
~,) ~ l --~ /3.o'2o89b-z._ ·j
@.» llE dil ---.idz o ~
:.~ ''----f-l~~ &wQ.JSJ!t
oow S;ljl,,_f~ .uwttt,k ~&Jaop/yJ
~ar _.$1k_lfz.a~~~_:•~1 ~)fn;.Q?¼t -_
!::f.Lo ~ Qb Jb,1_ B ~ 11 ~:CE:2.~c_
.!il!!. f;IJ_s__U,g_ L-h>.t & /Jfl~J ~---
!i1 oft f idtJfeA--P { ct;-fllcuJ.. ~()jJ}_ ~~76~
S011--.. ~-+ ~,~e DRD-.~o~
~-ll{ fl 1ifJ:tl ~ id /gq -
_ ~Jg::!:!_· a3
AYRES
ASSOCIATES
Octob r 18 , 2007
Mr . Jay Barber
City of Fort Collins
Stormwater Utility
700 Wood Street
Fort Collins , Colorado 80521
Re: Drainage Certification Letter for Spring Canyon Community Park
Dear Jay,
We recently received as-built survey data for the Spring Canyon Community Park located on
Horsetooth Road in Fort Collins , from King Surveyors . The attached drawing shows the as-built
survey information which we received .
In general it appears that the park was built in conformance with the grading plan that Ayres
provided on sheets C2 .1 and C2.2 of the Utility Plans for Spring Canyon Community Park.
Observations during the site visit in combination with the attached as-built elevations verify that
the park was built in general conformance to the design .
It should be noted that the Letter of Map Revision or LOMR is currently being prepared by
Anderson Consulting Engineers and they have not completed their hydraulic modeling of the
" .. , pond at the time of this letter. There are some very minor elevation discrepancies with the
inflow and outflow weir elevations for the pond . Until Anderson completes their modeling it will
not be kn~wn whether or not these differences will affect the results of the LOMR . Anderson will
need to give their final approval for the pond design once their modeling efforts are complete.
It is my recommendation that the general grading of the park site is certified . If you have any
questions, please call.
Sincerely,
Ayres Associates Inc
4~~
Andrea H . Faucett , P.E., CFM
Manager, Municipal Engineering Group
EPL: sp
Enclosure
Ayres Associates Inc
Eng ineers/Scientis ts/Surveyors
3665 JFK Parkway , Building 2 , Suite 200 , P.O . Box 270460 , Fort Collins , CO 80527
(970) 223-5556 , FAX (970) 223-5578
Printed on recycled paper
AYRES
ASSOCIATES
Oc tob r 18, 200 7
Mr . Ja y Barber
City of Fort Collins
Stormwater Utility
700 Wood Street
Fort Collins , Colorado 80521
Re : Drainage Certification Letter for Spring Canyon Community Park
Dear Jay,
We recently received as -built survey data for the Spring Canyon Community Park located on
Horsetooth Road in Fort Collins , from King Surveyors . The attached drawing shows the as-built
survey information which we received.
In general it appears that the park was built in conformance with the grading plan that Ayres
provided on sheets C2 .1 and C2.2 of the Utility Plans for Spring Canyon Community Park .
Observations during the site visit in combination with the attached as-built elevations verify that
the park was built in general conformance to the design .
It should be noted that the Letter of Map Revision or LOMA is currently being prepared by
Anderson Consulting Engineers and they have not completed their hydraulic modeling of the
~,, • pond at the time of this letter. There are some very minor elevation discrepancies with the
inflow and outflow weir elevations for the pond . Until Anderson completes their modeling it will
not be kno,wn whether or not these differences will affect the results of the LOMA. Anderson will
need to give their final approval for the pond design once their modeling efforts are complete .
It is my recommendation that the general grading of the park site is certified. If you have any
questions, please call .
Sincerely ,
Ayres Associates Inc
.~~
Andrea H. Faucett , P.E., CFM
Manager, Municipal Engineering Group
EPL: sp
Enclosure
Ayres Associates Inc
Engin ee rs/Scienti s ts/Surveyo rs
3665 JFK Parkway , Building 2 , Su ite 200 , P.O . Box 270460 , Fort Collins , CO 80527
(970) 223-5556 , FAX (970) 223-5578
Printed on recycled paper
AYRES
ASSOCIATES
Oc tobe r 18, 2007
Mr. Jay Barber
City of Fort Collins
Stormwater Utility
700 Wood Street
Fort Collins, Colorado 80521
Re: Drainage Certification Letter for Spring Canyon Community Park
Dear Jay,
We recently received as-built survey data for the Spring Canyon Community Park located on
Horsetooth Road in Fort Collins, from King Surveyors . The attached drawing shows the as-built
survey information which we received .
In general it appears that the park was built in conformance with the grading plan that Ayres
provided on sheets C2 .1 and C2.2 of the Utility Plans for Spring Canyon Community Park.
Observations during the site visit in combination with the attached as-built elevations verify that
the park was built in general conformance to the design .
It should be noted that the Letter of Map Revision or LOMA is currently being prepared by
Anderson Consulting Engineers and they have not completed their hydraulic modeling of the
;,, •· pond at the time of this letter . There are some very minor elevation discrepancies with the
inflow and outflow weir elevations for the pond . Until Anderson completes their modeling it will
not be kno.wn whether or not these differences will affect the results of the LOMA. Anderson will
need to give their final approval for the pond design once their modeling efforts are complete.
It is my recommendation that the general grading of the park site is certified . If you have any
questions, please call.
Sincerely,
Ayres Associates Inc
4~~
Andrea H. Faucett , P.E., CFM
Manager, Municipal Engineering Group
EPL: sp
Enclosure
Ayres Associates Inc
Eng ineers/Sci entists/Surveyo rs
3665 JFK Parkway , Building 2 , Suite 200 , P.O . Box 270460 , Fort Collins , CO 80527
(970) 223-5556 , FAX (970) 223-5578
Pri nted on recycled pape r
AVRES
A.SSOCIATES
Oc tob r 18 , 200 7
Mr . Jay Barb e r
City of Fort Collins
Stormwater Utility
700 Wood Street
Fort Collins , Colorado 80521
Re : Drainage Certification Letter for Spring Canyon Community Park
Dear Jay,
We recently received as -built survey data for the Spring Canyon Community Park located on
Horsetooth Road in Fort Collins, from King Surveyors . The attached drawing shows the as-built
survey information which we received .
In general it appears that the park was built in conformance with the grading plan that Ayres
provided on sheets C2 .1 and C2 .2 of the Utility Plans for Spring Canyon Community Park .
Observations during the site visit in combination with the attached as-built elevations verify that
the park was built in general conformance to the design .
It should be noted that the Letter of Map Revision or LOMA is currently being prepared by
Anderson Consulting Engineers and they have not completed their hydraulic modeling of the
~,, • pond at the time of this letter. There are some very minor elevation discrepancies with the
inflow and outflow weir elevations for the pond . Until Anderson completes their modeling it will
not be kn~wn whether or not these differences will affect the results of the LOMA. Anderson will
need to give their final approval for the pond design once their modeling efforts are complete.
It is my recommendation that the general grading of the park site is certified . If you have any
questions, please call.
Sincerely ,
Ayres Associates Inc
/~~
Andrea H . Faucett , P .E ., CFM
Manager, Municipal Engineering Group
EPL: sp
Enclosure
Ayres Associates Inc
Engin eers/Sc ienti s ts/Su rveyors
3665 JFK Parkway , Build ing 2 , Suite 200 , P.O . Box 270460 , Fort Collins , CO 80527
(970) 223-5556 , FAX (970) 223-5578
Printed on recycled pape r
AYRES
ASSOCIATES
Oc tob r 18, 2007
Mr . Ja y Barb e r
City of Fort Collin s
Stormwater Utility
700 Wood Street
Fort Collins , Colorado 80521
Re : Drainage Certification Letter for Spring Canyon Community Park
Dear Jay,
We recently received as -built survey data for the Spring Canyon Community Park located on
Horsetooth Road in Fort Collins, from King Surveyors . The attached drawing shows the as-built
survey information which we received .
In general it appears that the park was built in conformance with the grading plan that Ayres
provided on sheets C2 .1 and C2 .2 of the Utility Plans for Spring Canyon Community Park.
Observations during the site visit in combination with the attached as-built elevations verify that
the park was built in general conformance to the design .
It should be noted that the Letter of Map Revision or LOMA is currently being prepared by
Anderson Consulting Engineers and they have not completed their hydraulic modeling of the
-,, • pond at the time of this letter . There are some very minor elevation discrepancies with the
inflow and outflow weir elevations for the pond . Until Anderson completes their modeling it will
not be kno,wn whether or not these differences will affect the results of the LOMA. Anderson will
need to give their final approval for the pond design once their modeling efforts are complete .
It is my recommendation that the general grading of the park site is certified . If you have any
questions , please call.
Sincerely ,
Ayres Associates Inc
(utdua_~
Andrea H . Faucett , P .E., CFM
Manager, Mun icipal Engineering Group
EPL : sp
Enclosure
Ayres Associates Inc
En gin eers/Sci entists/Surveyors
3665 JFK Parkway , Building 2 , Suite 200 , P.O . Box 270460 , Fort Collins , CO 80527
(970) 223-5556 , FAX (970) 223-55 78
Printed on recycled paper
AYRES
A.SSOCIATES
Oc tob r 18, 2007
Mr. Jay Barb e r
City of Fort Collin s
Stormwater Utility
700 Wood Street
Fort Collins, Colorado 80521
Re: Drainage Certification Letter for Spring Canyon Community Park
Dear Jay,
We recently received as-built survey data for the Spring Canyon Community Park located on
Horsetooth Road in Fort Collins, from King Surveyors . The attached drawing shows the as-built
survey information which we received .
In general it appears that the park was built in conformance with the grading plan that Ayres
provided on sheets C2 .1 and C2.2 of the Utility Plans for Spring Canyon Community Park .
Observations during the site visit in combination with the attached as-built elevations verify that
the park was built in general conformance to the design .
It should be noted that the Letter of Map Revision or LOMA is currently being prepared by
Anderson Consulting Engineers and they have not completed their hydraulic modeling of the
;--• pond at the time of this letter . There are some very minor elevation discrepancies with the
inflow and outflow weir elevations for the pond . Until Anderson completes their modeling it will
not be kno,wn whether or not these differences will affect the results of the LOMA. Anderson will
need to give their final approval for the pond design once their modeling efforts are complete.
It is my recommendation that the general grading of the park site is certified. If you have any
questions, please call.
Sincerely ,
Ayres Associates Inc
.~~
Andrea H. Faucett , P.E., CFM
Manager, Municipal Engineering Group
EPL: sp
Enclosure
Ayres Associates Inc
Eng in eers /Scienti sts/Surveyors
3665 JFK Parkway , Building 2 , Suite 200, P,O , Box 270460 , Fort Collins , CO 80527
(970) 223-5556 , FAX (970) 223-5578
Printed on recycled pape r
AVRES
ASSOCIATES
Oc tob e r 18, 2007
Mr. Ja y Barber
City of Fort Collins
Stormwater Utility
700 Wood Street
Fort Collins , Colorado 80521
Re: Drainage Certification Letter for Spring Canyon Community Park
Dear Jay,
We recently received as-built survey data for the Spring Canyon Community Park located on
Horsetooth Road in Fort Collins, from King Surveyors . The attached drawing shows the as-built
survey information which we received.
In general it appears that the park was built in conformance with the grading plan that Ayres
provided on sheets C2 .1 and C2.2 of the Utility Plans for Spring Canyon Community Park.
Observations during the site visit in combination with the attached as-built elevations verify that
the park was built in general conformance to the design .
It should be noted that the Letter of Map Revision or LOMA is currently being prepared by
Anderson Consulting Engineers and they have not completed their hydraulic modeling of the
~-• pond at the time of this letter. There are some very minor elevation discrepancies with the
inflow and outflow weir elevations for the pond . Until Anderson completes their modeling it will
not be kno,wn whether or not these differences will affect the results of the LOMA. Anderson will
need to give their final approval for the pond design once their modeling efforts are complete.
It is my recommendation that the general grading of the park site is certified. If you have any
questions, please call.
Sincerely ,
Ayres Associates Inc
~~
Andrea H. Faucett , P.E., CFM
Manager, Municipal Engineering Group
EPL: sp
Enclosure
Ayres Associates Inc
Eng in ee rs/Sci enti sts/Surveyors
3665 JFK Parkway , Building 2, Suite 200 , P.O . Box 270460 , Fort Collins , CO 80527
(970) 223-5556 , FAX (970) 223-5578
Printed on recycled paper
AYRES
. SSOCIATES
Oc tob e r 18, 2007
Mr. Jay Barber
City of Fort Collins
Stormwater Utility
700 Wood Street
Fort Collins , Colorado 80521
Re : Drainage Certification Letter for Spring Canyon Community Park
Dear Jay,
We recently received as-built survey data for the Spring Canyon Community Park located on
Horsetooth Road in Fort Collins, from King Surveyors. The attached drawing shows the as-built
survey information which we received.
In general it appears that the park was built in conformance with the grading plan that Ayres
provided on sheets C2 .1 and C2.2 of the Utility Plans for Spring Canyon Community Park .
Observations during the site visit in combination with the attached as-built elevations verify that
the park was built in general conformance to the design .
It should be noted that the Letter of Map Revision or LOMA is currently being prepared by
Anderson Consulting Engineers and they have not completed their hydraulic modeling of the
~-• pond at the time of this letter. There are some very minor elevation discrepancies with the
inflow and outflow weir elevations for the pond . Until Anderson completes their modeling it will
not be kn~wn whether or not these differences will affect the results of the LOMA . Anderson will
need to give their final approval for the pond design once their modeling efforts are complete .
It is my recommendation that the general grading of the park site is certified . If you have any
questions, please call.
Sincerely ,
Ayres Associates Inc
'~~
Andrea H. Faucett , P.E., CFM
Manager, Municipal Engineering Group
EPL: sp
Enclosure
Ayres Associates Inc
Eng in eers/Scie nti sts/Surveyors
3665 JFK Parkway , Building 2 , Suite 200 , P.O . Box 270460 , Fort Collins , CO 80527
(970) 223-5556, FAX (970) 223-557 8
Printed on recycled paper
AYRES
ASSOCIATES
Oc tob r 18, 200 7
Mr . Jay Barber
City of Fort Collins
Stormwater Utility
700 Wood Street
Fort Collins , Colorado 80521
Re : Drainage Certification Letter for Spring Canyon Community Park
Dear Jay,
We recently received as-built suNey data for the Spring Canyon Community Park located on
Horsetooth Road in Fort Collins , from King SuNeyors . The attached drawing shows the as-built
suNey information which we received .
In general it appears that the park was built in conformance with the grading plan that Ayres
provided on sheets C2 .1 and C2.2 of the Utility Plans for Spring Canyon Community Park.
ObseNations during the site visit in combination with the attached as -built elevations verify that
the park was built in general conformance to the design .
It should be noted that the Letter of Map Revision or LOMA is currently being prepared by
Anderson Consulting Engineers and they have not completed their hydraulic modeling of the
~ • pond at the time of this letter. There are some very minor elevation discrepancies with the
inflow and outflow weir elevations for the pond . Until Anderson completes their modeling it will
not be kno.wn whether or not these differences will affect the results of the LOMR. Anderson will
need to give their final approval for the pond design once their modeling efforts are complete .
It is my recommendation that the general grading of the park site is certified . If you have any
questions, please call.
Sincerely ,
Ayres Associates Inc
~~
Andrea H. Faucett , P.E., CFM
Manager, Municipal Engineering Gro up
EPL : sp
Enclosure
Ayres Associates Inc
Engin eers/Sci enti sts/Surveyors
3665 JFK Parkway , Building 2 , Sui te 200 , P.O . Box 270460 , Fort Colli ns , CO 80527
(970) 223-5556 , FAX (970) 223-5578
Printed on recvcled paper