Loading...
HomeMy WebLinkAboutLot Certifications - 07/22/2009" Utilities City of ,ktColli~ electric • stormwater • wastewater • water 700Wood St. PO Box 580 Fort Coll ins , CO 80522 970.221.6700 970.221.6619 fa x • 970 .224 .6003 TDD utilities @fcgo v.com • fcgov. com/utilities CERTIFICATION OF LOT GRADING Pursuant to City Code § 26-544 and City Lan d Use Code § 3.2.2 (e) Date: __ :::r.~'""-l -+-r -'~Y~+_h-,_Z_o_o_Cf __ Permit Application No . _ __,,_j ...... ~ .... .fi~t?.~~_,,_y?_'Z_}' __ _ Address: _J _o_Z_l_S~-_L_c._ ..... _.,.-+/--.A.~v_e_. ___ _ Lot: _______ Block : __ --____ _ Subdivision: fo ... arc. vo.11,y 1-\os p:-\ ... \ 2.,..,J.. F.-1.·"j Pv~ Le ..... y ('.,.,..,,.f,S -fo.-,r.,.,1 .5-\r_,_,~,,-(.. , a Colorado registered professional engineer, verify tha t the above referenced property in the City of Fo rt Collins , Colorado , has been inspected by me or an appropriate ly qualified professional und er my direct supervision , and ver ify that constr uction of a ll stormwater facilities and grading is com p lete, and that the elevations and drainage patterns shown on the attached drawing(s) which were developed from a survey performed o n (Date): A-pr;\ 2oo9 , accurately and trul y depict the e levations and drainage patterns a s they ex isted on th e date of the s urvey . Based on this information, I certify that (c heck one): □ The elevatio ns and drainage patterns of the lo t/site are i n sub sta ntial conformance with th e City approved drainage and grading plan for the property (in formation attac hed). SEE NOTE . )q The elevatio ns and drainage patterns of th e lot/site as measured are in general conformance with the City approved drainage plan with exceptions (i nformation attached). In my pro fessional j udgment the elevations and grading of the lot/s ite as constructed are functionally adeq uate and equivalent to the specifically approved drainage plan, and wi ll affect stormwater drai nage on and off the lot/site in a manner consistent with the approved drainage plan. SEE NOTE. o ~· By : --'-----'--""'"·-r--=--==-=---- (signature , P ~ 2qso f . t-\o.1N'\ • ..,V l.u.J.. Sv..:-\c.. 2 70 I Fcu-\-C0 I \;,,,_s ✓ C 0 (address of sigi,ing party) f!oS 28' NOTE: A COMPLETE certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including but not limited to drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures , drainage and grad ing features (e.g. swales , retaining walls, lot corners), written information/explanation of discrepancies , and other information necessary to confirm the above certification to: .... Stantec July 14, 2009 Mr. Jay Barber Stantec Consulting Int 2950 E Harmony Road Suite 290 Fort Collins CO 80528 Tel : (970) 482-5922 Fax: (970) 482-6368 Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80522 Re: Grading Certification for Poudre Valley Hospital 2nd Filing -PVH Lemay Campus Parking Structure Dear Mr. Barber: The purpose of this letter is to certify that the grading of Poudre Valley Hospital 2nd Filing -PVH Lemay Campus Parking Structure is in general conformance with the City approved drainage and grading plan with several minor exceptions. King Surveyors visited the site in April of 2009 to record spot elevations of the curb & gutter surrounding the new parking structure. King Surveyors also recorded rim and invert information for the trench drain surrounding the new parking structure . Stantec Consulting Ltd . reviewed the topographic information provided by King Surveyors . In general, the recorded spot elevations were within acceptable construction tolerances. However, several recorded spot elevations were outside of acceptable construction tolerances . The most significant of these areas was at the entrance to the parking structure off of Robertson Street. Elevations differed as much as 0 .37' from the approved utility plans. The contractor indicated that the grading was altered to create a smoother transition into the building. The basic drainage concept, as depicted in the approved utility plans, was slightly modified resulting in a small area of the entrance draining to the east. This flow will be collected by storm drains near the entrance to the parking structure and no adverse effect is expected . Additionally, record spot shots of the new curb & gutter along Robertson Street indicate that the grade along the curb & gutter is approximately 0.20 % in some areas. This deviates from the design drawings which require a minimum grade of 0.50 %. The deviation in grade is a direct result of existing conditions encountered along Robertson Street. City of Fort Collins inspectors were onsite during construction and accepted the minimum grade of 0.20% as it was not feasible to achieve a minimum grade of 0 .50 %. It is believed that no adverse effect will result from this modification. C:\Documents and Settings~ziliak\Desktop\2009-07-14-Grading_Cert.doc Stantec Stantec Consulting Ltd. visited the site on July 10, 2009, to inspect grading, drainage patterns and landscaping. Landscaping around the building does not appear to interfere with the proposed drainage patterns. No low spots were observed along the new curb & gutter. Additionally, no cross lot drainage to or from adjacent lots outside of drainage easements is expected . This certification is signed and stamped by a professional engineer regi stered in the State of Colorado. By signing this certification the engineer attests that to the best of his (her) knowledge the surveyed grading as shown in the enclosed certification is in compliance with the approved grading plan for this lot and subdivision as s hown on the approved utility plans. Failure to disclose all known information could result in the rejection of this certification and could cause the withholding of the certificate of occupancy for this lot until corrective action has been taken. Thank you for your time and consideration of this submittal. Sincerely Yours, Stantec Consulting Ltd. Josh Ziliak, PE Project Engineer cc: Matt Johnson, Swinerton Builders att: Grading Certification Form Record Drawing Exhibits C:\Documents and Settings\jziliak\Desktop\2009-07-14-Grading_Cert.doc