Loading...
HomeMy WebLinkAboutLot Certifications - 03/21/1995e e March 17 , 1995 Mr. Glen Schlueter Storm.water Utility City of Fort Collins P .O. Box 580 Fort Collins, CO 80522 Dear Mr. Schlueter: STEWART&\.SSOCIATES Consulting Engineers and Surveyors Please find enclosed the "As Built" survey of the grading of Envelope "Y", Amendment to The Pie1. The concrete drainage pan and the final grading have been completed. The pan and the spot elevations are shown in red on the plat. The grading was done in substantial compliance with the plan. If you have any questions regarding this project, please call. Sincerely, ~a.O~L-,_; Richard A Rutherfo:ci,-P ~E.· ~'i__'s~ ""--­ President rsc James H. Stewart and Assoc iates , Inc . 103 S. Meldrum Street P.O . Box 429 Ft. Collins , CO 80522 303/482-9331 Fax 303/482-9382