Loading...
HomeMy WebLinkAboutSite Certifications - 12/21/2001 (3)ARCHITECTURE 5285 McWhinney Blvd., Suite 190 December 14, 2001 Mr. Basil Hamdan City of Fort Collins Storm Water Utility 700 Wood Street Fort Collins, CO 80521 \1' ENGINEERING PLANNING CONSTRUCTION Re: Drainage Certification for The Residence at Fort Collins 4~~ pi,p 'I" i)R. Dear Mr. Hamdan: _r-/JH// / _#~?f/'tr' Loveland, CO 80538 970.461.2800 phone 970.461.2801 fax www.searbrown .com The purpose of this letter is to provide drainage certification for The Residence at Fort Collins. Sear Brown 's survey crew visited the site on November 16 , 2001, to measure the rims and inverts of the storm drainage manholes and inlets. Sear Brown also confirmed the installation of any curb cuts, sidewalk chases, or other storm water structures for the site. The detention pond was also surveyed for a volume calculation. This visit confirmed the elevations redlined on the attached drawings. All storm manholes and inlets are within construction tolerances. All curb cuts, sidewalk chases, and trickle pans are properly installed. The detention pond can detain 0.63 acre -feet of storm water, thereby exceeding the required detention volume of 0.52 acre-feet. The outlet structure for the pond is installed correctly, but does not have the stainless steel well screen installed. All swales meet the intent of the drainage plan and are graded correctly. It is important to note that the contractor will place $350 in escrow because the stainless steel well screen is not installed. Overall, the elevations observed for storm drainage features are within construction tolerances and all storm related structures are installed correctly. Therefore, the constructio~ of the storm drainage facilities , within the limits of this certification , meets the intent of the storm drainage design. This certification is signed and stamped. By signing this letter, I attest that to the best of my knowledge , the conditions of the site are as shown on the attached redlined photocopy. Failure to properly disclose all known information could result in the rejection of this certification and ·prevent the release of any storm water utility holds on the Building Permit or Certificates of Occupancy . L:\J obs\922-002\docs\Res idence drainage ce rt December 14 2001 .doc SEAR· BROWN Thank you for your time and consideration ofthis submittal. cc: Tony Napillilio, ADG Mike Gulley, D.A. Fritz L:Vobs\922-002 \docs\Residence drainage cert December 14 2001 .doc