HomeMy WebLinkAboutSite Certifications - 02/01/2002TST, INC.
Consulting Engineers iii 748 Whalers Way• Bu ilding D • Fort Collins, CO 80525
(970) 226-0557 • Fax (970) 226-02 04
To: Jay Barber
City of Fort Collins
Stormwater Dept.
STORMWATER
RECEIVF!D
FEBO 1 ZOO~ct No :
Project:
Date:
TRANSMITTAL
0956-000
Linden Park
2/1 /02
Re : Storm Certification
We transmit G] Herewith D Under Separate Cover Dv 1A
D Shop Drawings
[TI Copy of Letter
D Specifications D Change Order D Other
[lJ Prints D Survey D Field Order
DESCRIPTION
Storm Certification Letter
5, 6, 19-24
Remarks
Let me know if ou have an uestions.
IF ENCLOSURES RECEIVED ARE NOT AS LISTED ABOVE, KINDLY NOTIFY AT ONCE
Copies To:
Brad Lenz -Centex Homes By: Kevin Ash , PE
TST, Inc. Consulting Engineers
Mr. Jay Barber
City Of Fort Collins
Stormwater Utility Department
P.O. Box580
Fort Collins, Co 80522-0580
Re: Linden Park Phase 1 and 2
Stormwater Certification
Project No. 0956-000
Dear Mr. Barber:
February 1, 2002
Please find enclosed a partial Stormwater Drainage Certification for Phases 1 and 2 of the Linden
Park Subdivision for the as-built condition as of January 25, 2002. TST, Inc. surveyed the above
drainage facilities on October 24, 2001, January 7, 2002 and January 25, 2002, as the contractor
installed them . Included are redlined prints of the storm sewer system showing the as-built
condition. Per our conversation on January 30, 2002 , we are submitting a partial certification .
The following items have not been installed per the approved plans:
1. The storm pipe from the outlet structure of Detention Pond A to Storm Manhole #7
slopes opposite the direction of the approved plans and causes runoff to pond 0.06'
before spilling into the rest of Storm Line ST-1.
2. Storm Manhole #7 does not reach the required elevation at the rim. The specified
grate was not installed per the approved plans and does not create the emergency
overflow protection that the City wanted.
TST has made Centex Homes and the City of Fort Collins Stormwater Department aware of the
problem. Centex Homes has agreed, verbally, to have this situation corrected by the end of
February. It is my direction from Centex Homes to submit this partial certification, and then
update it once the aforementioned items have been addressed . The outlet structure, Storm
Manhole #7 and all associated structures within Detention Pond A will be subject to re
certification.
Please contact me at 226-0557 should you have any questions or require further information.
Sincerely,
TST, INC . CONSUL TING ENGINEERS
~L-Kevin Ash, P.E.
cc: Brad Lenz, Centex Homes
Enclosures
TST, INC .
Consult i ng Eng i neers
748 Wha lers Way • Bui lding D
Fort CoUins, CO 80525
(970) 226-055 7
Metro (303) 595-9103
Fax (970) 226-0204
Email info@tstinc.com
www.tstinc.com
Consulting Engineers
STORM WATER
RECE IVE ~ANSMITT AL
S
TST, INC.
7 48 Whalers Way • Building D • Fort Collins , CO 80525
(970 ) 226-0557 • Fax (970) 226-0204
APR0 4 2
To: Jay Barber ~@~---=~~5~6-~0~00c;._ _____ _
City of Fort Collins Project : Linden Park
Stormwater Date : 4/ 4/02
Re: Storm Drainage Cert .
We transmit D Herewith D Under Separate Cover Dv1A
D Shop Drawings
W Copy of Letter
0. COPIES
1
1
Remarks
D Specifications D Change Order D Other
W Prints D Survey D Field Order
nDAWINGS NO. DESCRIPTION
24 of 50 Updated Storm Cert Print
1 Storm Certification Addendum Letter
IF ENCLOSURES RECEIVED ARE NOT AS LISTED ABOVE , KINDLY NOTIFY AT ONCE
Copies To:
By: Kevin Ash , PE
TST, Inc. Consulting Engineers
Mr. Jay Barber
City Of Fort Collins
Stormwater Utility Department
P.O. Box580
Fort Collins, Co 80522-0580
Re: Linden Park Phase 1 and 2
Stormwater Certification
Project No. 0956-000
Dear Mr. Barber:
March 20, 2002
This is to update the partial Stormwater Drainage Certification for Phases 1 and 2 of the Linden
Park Subdivision dated February 1, 2002 . TST, Inc. surveyed the following drainage facilities on
March 4, 2002 . Included are redlined prints of the storm sewer system showing the updated as
built condition. The following items have now been installed per the approved plans:
1. The storm pipe from the outlet structure of Detention Pond A to Storm Manhole #7
now slopes correctly per the direction of the approved plans.
2 . Storm Manhole #7 has a rim elevation of 4935.31. The specified grate is now installed
per the approved plans and will create the emergency overflow protection that the City
wanted.
This certification does not include the irrigation conveyance through the site . A new design for the
irrigation siphon on the west side of the site, and the irrigation tie-in to the east has been
completed.
Please contact me at 226-0557 should you have any questions or require further information.
Sincerely,
TST, INC. CONSUL TING ENGINEERS
~.J-
KAS/cms
cc: Brad Lenz, Centex Homes
Enclosures
TST, INC.
Consulting Engin eer s
748 Whalers Way -Building D
Fort Collins, CO 80525
(970) 226-0557
Metro (303) 595-9103
Fax (970) 226-0204
Email info @tstinc.com
www.tstinc.com
l ·1Ht>til /A RK
1J.R-r/A .L CE-t..T ,pc.ATlut-l
z/1/n-
DRAINAGE CERTIFICATION FORM
Please fill out all applicable items in this certification form
for single family, mul.ti•-f amily and commercial properties.
Write "OK" for items checked or actual number checked in field.
Use "N/A" for items that are not applicable to the property that
is being certified.
A. Drainage facilities certification
1. Pond Certification
-volume verification
a. topographic records and volume
b. cross-sections and spot elevations
-positive fall to pan
-side slopes
-invert elevation
·-spiilway elevation
-placement and size of riprap
-side slopes
-grading
-orifice plate installation and size
-compaction of berm
-structural integrity of pond
2. Swales
-location (are they within easement)
-dimensions and cross-section verification
-longitudinal sl _opes and side slopes
,-spot elevations
_L
_x_
l
p o11 I> B X
Co"tr,-c-r"P~
-permanent erosion control measures
( drop structures, riprap, etc ... · . )
-tie-in to pipes , pans, curbs, etc.~ ..
-weir size (elevations, size, opening, etc ... )
-available freeboard
-landscaping infringement on swales
3. Pipes
4.
-size and type
-slopes (as-built and comparison to minimum
0.4% slope)
-pipe capacity calculations if slopes are
significantly altered
-invert elevations
-installa·d.on and backfill material
-cover
-encasement and clearance -from other util~ty
lines close by
-joints
Concrete Pan Channels
-size
-slope .
-super elevation
-cross-section
-thickness
-elevations
__x_
1-
_L
~P5Wfll, /Jti.T I t1 $1A'.,l
_x_
_x_
...ti6...
~
i
_:/4_
5. Inlets
-size and type
-size of op e ning (or name of standard used)
~grate elev at ion
-invert elevation
-box size
6. Cross pans
-size
-type
-grade
-elevation
-cross-sectional depth
-tie-in to curb and gutter
7. Culverts
-size
:..type
-invert elevation
-headwalls
8 • Under drains
· -size
-type
-cov er
-backfill
-ge o textiles
X
L
JL
L
L
~tl[llACJo/(
~Cf7.(l.
~l~,e_
~C.'(M
Cotl[t:A-C1t//l ..
-cleanouts
9. Curb cuts
-size
-tie in .to swale, pipe, etc ....
B. Certification of Grade Elevations Adjacent to
Drainage Facilities:
-minimum opening elevations
-top of foundation elevations
-comparison to 100 year WSEL's
(Freeboard requirements and floodplain issues).
· c. Certification of Erosion Control Measures:
1. Permanent Measures:
-Permanent ve~etation (6" bare spots and weeds
under control)
-riprap
-riprap bedding
-drop sections
-sediment basins/water quality ponds
-netting mats/blankets
-mulching
·~c.TtL
ktt.AC-rct..
l>/ii/(AC:r6t..
~M ,~e
C-orrr /lit r:r ~
~Ute~
w 17tAtr6t<.
. -
. .
, ·
•
2. Temporary Measures:
-mulching
-inlet filter installation
.-check bale dams
-seeding _and temporary vegetation
-silt fence
D. Site Cleanup After Construction
-construction clean u~
-smoothing of ruts
-reseeding
E. Statement of Compliance
CotvrlfA c.114(
~AA C..i?>~
~rJTAA C..~/.t
~t.TCP..
~~I/t o \,J~,-1 ~\VA t.y'
~ '-'-""1l.1v-r \JP
. .
~ V ;Da . i,.;frtW r:r1ot11
~ t/t1°06' ~,'l/1'il,Vt'{t ~/J
5f/lL V~Obt. l,~1J,1j~/
This certification ·is signed ·and stamped and by signing this
form the engineer (s) attest.s that to the best of his knowledge
the as-built conditions of the dr.ainage facilities are as
described in the above form and in the redlined plans enclosed.
Failure to properly disclose all known information could
result in the rejection of this .certificati~n and prevent the
release of any Stormwater Utility holds on Building Permits
and/or Certificates of Occupancy .
F . Signature and Stamp by a Colorad6,-~~~~ rofessional
Engineer. ~im~.;00 ~~ .,
~® ,-~i : • ""o U1 i-r ·····o<,c~/ ONAI f..\~_:,,,,;,-