Loading...
HomeMy WebLinkAboutSite Certifications - 03/20/2000• March 15, 2000 Mr. Jay Barber City of Fort Collins Utility Services Stormwater 700 Wood Street Fort Collins, Colorado 80522 RE : Landings Bay Drainage Certification Dear Jay: NORTHERN ENGINEERING The following letter is a partial certification of the drainage facilities as installed at andings Bay . It covers the existing detention pond volume, the overflow weir dimensions , and the new 36" storm sewer invert and locat ion . This certification is based on site v isits March 10 , 2000 by Northern Engineering Services and by a field survey by RJL Surveys in February 2000 . Attached is a plot of the proposed grading by Northern Engineering Services and the field verified storm drainage improvements located by RJL Surveys . Essentially, all of the improvements required for a partial drainage certification were installed at the time of the inspection. The 36" storm sewer with flared -end section was in place and the weir constructed alongside the ditch . The remainder of the Landings Bay site is presently being constructed and will require a future drainage certification inclusive of the entire site . The volume of the existing detention pond has been estimated and the follow ing results were obtained : Required Design Volume -53 ,017 cubic-feet at WSEL 5030 .57 Actual Volume -51 ,585 cubic-feet at WSEL 5030.43 (lowest overflow elevation) Volume at 100-year WSEL 5030 .57 -54 ,272 cubic-feet Items that will need to be completed for Landings Bay : The outlet to the existing 18" storm sewer at the north end of the pond will need to be cleaned out. The remainder of the site, aside from the detention pond , 36" storm sewer, and the weir will need to be constructed . The detention pond area will need to be landscaped. Thank you for your time and consideration . Please feel free to contact Northern Engineering Services if you have any further questions or comments concerning Landings Bay .