HomeMy WebLinkAboutSite Certifications - 05/16/2002May 16, 2002
Project No: 1552-01-96
Jay Barber
City of Ft. Collins Stormwater Utility
P .O. Box 580
Ft. Collins, Colorado 80524
Re: Hearthfire P.U.D., First Filing; Ft. Collins, Colorado
Dear Jay,
Th is letter serves as the absolute final certification for the entire Hearthfire P .U.D ., First Filing. Shear
Engineering Corporation prepared a second final certification letter dated October 9, 2001. A copy of
that letter is attached for immediate reference. Our initial certification was dated April 25, 2000. A
copy of that letter is also attached for immediate reference.
All sitework improvements have now been completed . All finished grading has now been
substantially completed in accordance with the original approved MASTER GRADING PLAN and
with the Grading Design revis ions in the area of Lots 27-33. All drainage facilities have been
installed and are functioning appropriately and generally meet the intent of the original drainage
design for Hearthfire P .U.D., First Filing in accordance with the original approved MASTER
DRAINAGE AND EROSION CONTROL PLAN and with the Grading Design revisions in the area
of Lots 27-33 .
The three remaining items requiring attention at the time of our October 12, 2001 certification are
now complete -and will be discussed in additional detail as follows :
Issue 1: Final grading on the west side of Hearthfire Way
The channel on the west s ide ofHearthfire Way has been completed and is now in conformance with
the approved MASTER GRADING PLAN and the approved MASTER DRAINAGE AND
EROSION CONTROL PLAN . Also in conformance with the Final Drainage and Erosion Control
Report for Douglas Road prepared by Shear Engineering Corporation ; Shear Project No: 1552-01-96;
Report dated September, 2000 . Page 7 of that report reads as follows :
IV. DRAINAGE FACILITY DESIGN
C. SPECIFIC DETAIL-SW ALE CAPACITIES
The swale adjacent to Hearthfire Way will be regraded to meet the capacity requirements
noted in the F inal Drainage and Erosion Control Report for Hearthfire P . U.D ., First
Filing. The design flow and capacity for this swale is summarized below. The design
flow is the l.33*Q l 00 to the upstream end of the proposed dual 36" culverts noted ab~ve.
Section
A-A
Des ign
Flow
(cfs)
83.13
Slope
(ft/ft)
0 .005
Depth
(ft .)
3.0
Manning's
(n)
0 .035
Capacity
(cfs)
228.05
4836 S. College , Su ite 12 Ft. Co llins , CO 80 525 (970) 2 26-5334 Fax (97 0) 28 2-03 11 www.shea re n g ine eri ng .c om
PAGE 2
May 16, 2002
Project No: 1552-01-96
Re: Hearthfire P.U.D., First Filing; Ft. Collins, Colorado
Issue 2: The pond overflow structure location
The previous concern was that when the pond is operational with a working water surface elevation,
overflow was not directed acceptably to the overflow structure only, and that there was a possibility
of overflow waters inundating the emergency access drive . The overflow is functioning appropriately
and generally meets the. intent of the original drainage design for Hearthfire P.U.D., First Filing. The
emergency access drive has been corrected so that the drive sits approximately 12" above the pond
overflow structure. Finished grading around the overflow structure guarantees that flows are directed
to the overflow structure only. Attached is a print of Sheet 18A of 48 delineating the current finished
condition .
Issue 3: Improvements between Lots 27-33 and the pond north of Lots 27-33
It was determined that additional subdivision improvements were required in the area of Lots 27-33
due to conditions created by certain homebuilders. A modified grading and drainage improvement
plan was prepared by Shear Engineering Corporation, constructed by Summit Excavating and As
built by King Surveyors. A copy of the approved modified plan and a copy of the record drawing
prepared by King Surveyors are attached for immediate reference.
We would respectfully request that you release all remaining building permits with this final
certification and the escrows provided.
If you have questions concerning this final drainage certification for Hearthfire P .U.D., First Filing,
please call at (970) 226-5334.
Brian W. Shear, P.E .
Shear Engineering Corporation
BWS/lm
attachments
cc : Glen Schlueter; City of Fort Collins Storm water Utility
Tom Kennedy; Hearthfire, Inc.
Bill Yunker; Clarion Mortgage Capital
Tom Dugan; PineCrest Planning and Design
Mikal Torgerson; MTA
John Walz; Builder
October 12, 2001
Project No: 1552-01-96
Jay Barber
City of Ft. Collins Stormwater Utility
P.O. Box 580
Ft. Collins, Colorado 80524
Re: Hearthfire P.U.D., First Filing; Ft. Collins, Colorado
Dear Jay ,
This letter serves as final certification for the entire Hearthfire P.U .D ., First Filing. As we
understand it, additional permits are being held by the Stormwater Utility due to the lack of a
final certification. Please note that an initial final certification was provided April 25, 2000 . That
certification identified several changes made in the field during construction and incorporated the
documentation of those changes. That certification (with attachments) is included with this final
certification for immediate reference. It is also made a part of this final certification.
Generally, a majority of all sitework improvements have been completed. All finished grading
has been substantially completed in accordance with the original approved MASTER GRADING
PLAN except as noted in following discussions. All drainage facilities have been installed and
are functioning appropriately and generally meet the intent of the original drainage design for
Hearthfire P.U.D., First Filing in accordance with the original approved MASTER DRAINAGE
AND EROSION CONTROL PLAN.
Upon release of the initial final certification dated April 25, 2000, several field reviews were
made by City of Fort Collins Stormwater Utility staff. There were two (2) major construction
items noted by that did not necessarily meet the approved Utility Plans in the opinion of the
Stormwater Utility. The first was the final grading on the west side of Hearthfire Way, the entry
drive to Hearthfire from Douglas Road. Approved final design grading accommodates the
anticipated offsite flows from the North side of Douglas Road as represented in the Final
Drainage and Erosion Control Rep(m for Hearthfire P.U.D., First Filing. This grading had not
been completed to the satisfaction of the Stormwater Utility . The second item involved the pond
overflow structure location. The overflow structure was installed at a location south of the
Equestrian I Pedestrian / Bike Trail. The plans represented the overflow box on the pond side
(north side) of the Equestrian/ Pedestrian/ Bike Trail. The overflow box elevation appeared to
be lower than the access drive elevation. Therefore, it was determined that the situation did not
necessarily meet the intent of the approved plan.
A third item has evolved since the original subdivision certification that was provided April 25,
2000. This issue involves several homes that were constructed with garden level and walkout
conditions on Lots 27-33. Although the resulting conditions due to garden level and walkout
basements are not the responsibility of the developer of Hearthfire P.U.D., First Filing, it appears
that this condition, in part, has been made a condition of this final certification. The items in this
area which are the responsibility of the developer and will be a final certification issue, are the
finished subdivision improvements between these structures and the pond area.
Each of the referenced items above will be discussed in additional detail in an effort to document
the status of each of these issues.
4 836 S. College , Suite 12 Ft . Collins , CO 80525 (97 0) 226-533 4 Fax (970) 282-0311
J4vkr/io;o Lf
t.,1{_ Zav , ?u 'l> W ,;
www.shearengineering .com
PAGE 2
October 12, 2001
Project No: 1552-01-96
Re: Hearthfire P.U.D., First Filing; Ft. Collins, Colorado
Issue 1: Final grading on the west side of Hearthfire Way
The Stormwater Utility has offered two (2) allowable scenarios regarding this issue . The first
alternative is to complete the grading to achieve conformance with the approved MASTER
GRADING PLAN and the approved MASTER DRAINAGE AND EROSION CONTROL
PLAN. The second alternative is to escrow for the amount that it would take to complete this
task. The escrow alternative has been accepted due to the timing of improvements relative to the
request for release of additional permits. Cost estimates for the performance of this work are
being pursued at this time. The applicable escrow amounts will be provided to you immediately
upon availability. Release of this escrow will be requested upon completion of the
improvements.
Issue 2: The pond overflow structure location
The pond overflow structure has been relocated to the pond side (north side) of the Equestrian /
Pedestrian / Bike Trail. Attached are the revised plan sheets representing the :reconstruction
provided. The overflow is functioning appropriately and generally meets the intent of the original
drainage design for Hearthfire P.U.D., First Filing.
Issue 3: Improvements between Lots 27-33 and the pond north of Lots 27-33
It was recently determined that additional subdivision improvements may be required in the area
of Lots 27-33. A portion of the Equestrian/ Pedestrian/ Bike Trail will be relocated to maintain
the design separation from Lot 29. The required drainage swale in this area will be
accommodated. Subdivision improvements will be completed between Lots 29 and 30 in Tract
A. Specifically, the valley pan will be installed to its correct limits and minor re-grading will be
performed from the end of the valley pan to the swale along the Equestrian / Pedestrian / Bike
Trail. The drive will be lowered to allow runoff to cross over to pond according to the approved
MASTER GRADING PLAN and the approved MASTER DRAINAGE AND EROSION
CONTROL PLAN. Additional improvements proposed in our field meeting of Wednesday ,
September 26 , 2001 with the homeowners of Lots 27-33 and homeowner association
representatives will be made only with the commitment of the individual homeowners to
participate in the cost of those improvements . At this time, the cost of these improvements will
be escrowed due to the timing of improvements relative to the request for release of additional
permits. Cost estimates for the performance of this work are being pursued at this time The
applicable escrow amounts will be provided to you immediately upon availability. Release of
this escrow will be requested upon completion of the improvements. A copy of the plan for the
proposed revised grading and additional improvements in this area, is attached for immediate
reference and review.
PAGE 3
October 12, 2001
Project No: 1552-01-96
Re: Hearthfire P.U.D., First Filing; Ft. Collins, Colorado
We would respectfully request that you release all remaining building permlts with this final
certification and the escrows provided.
If you have questions concerning this final drainage certification for Hearthfire P.U.D., First
Filing, please call at (970) 226-5334.
Sincerely,
Brian W. Shear, P.E.
Shear Engineering Corporation
BWS/mad
cc: Glen Schlueter; City of Fort Collins Stormwater Utility
Tom Kennedy; Hearthfire, Inc.
Tom Dugan; Pinecrest Planning and Design
October 9, 2001
Project No: 1552-01-96
Jay Barber
City of Ft. Collins Storm water Utility
P.O. Box 580
Ft. Collins, Colorado 80524
Re: Hearthfire P.U.D., First Filing; Ft. Collins, Colorado
Dear Jay,
This letter serves as final certification for the entire Hearthfire P.U.D., First Filing. As we
understand it, additional permits are being held by the Stormwater Utility due to the lack of a
final certification. Please note that an initial final certification was provided April 25, 2000. That
certification identified several changes made in the field during construction and incorporated the
documentation of those changes. That certification (with attachments) is included with this final
certification for immediate reference. It is also made a part of this final certification.
Generally, a majority of all sitework improvements have been completed. All finished grading
has been substantially completed in ac~ordance with the original approved MASTER GRADING
PLAN except as noted in following discussions. All drainage facilities have been installed and
are functioning appropriately and generally meet the intent of the original drainage design for
Hearthfire P.U.D., First Filing in accordance with the original approved MASTER DRAINAGE
AND EROSION CONTROL PLAN.
Upon release of the initial final certification dated April 25, 2000, several field reviews .were
made by City of Fort Collins Stormwater Utility staff. There were two (2) major construction
items noted by that did not necessarily meet the approved Utility Plans in the opinion of the
Stormwater Utility. The first was the final grading on the west side of Hearthfire Way, the entry
drive to Hearthfire from Douglas Road. Approved final design grading accommodates the
anticipated offsite flows from the North side of Douglas Road as represented in the Final
Drainage and Erosion Control Report for Hearthfire P.U.D ., First Filing. This grading had not
been completed to the satisfaction of the Stormwater Utility. The second item involved the pond
overflow structure location. The overflow structure was installed at a location south of the
Equestrian / Pedestrian / Bike Trail. The plans represented the overflow box on the pond side
(north side) of the Equestrian/ Pedestrian/ Bike Trail. The overflow box elevation appeared to
be lower than the access drive elevation. Therefore, it was determined that the situation did not
necessarily meet the intent of the approved plan.
A third item has evolved since the original subdivision certification that was provided April 25,
2000. This issue involves several homes that were constructed with garden level and walkout
conditions on Lots 27-33. Although the resulting conditions due to garden level and walkout
basements are not the responsibility of the developer ofHearthfire P.U.D., First Filing, it appears
that this condition, in part, has been made a condition of this final certification. The items in this
area which are the responsibility of the developer and will be a final certification issue, is the
finished subdivision improvements between these structures and the pond area .
Each of the referenced items above will be discussed in additional detail in an effort to document
the status of each of these issues.
4836 S. College, Suite 12 Ft . Coll ins , CO 80525 (970) 226-5334 Fax (970) 282-0311 ·www.shearengineering.com
PAGE 2
October 9, 2001
Project No: 1552-01-96
Re: Hearthfire P. U.D., First Filing; Ft. Collins, Colorado
Issue 1: Final grading on the west side of Hearthfire Way -
The Stormwater Utility has offered two (2) allowable scenarios regarding this issue. The first
alternative is to complete the grading to achieve conformance with the approved MASTER
GRADING PLAN and the approved MASTER DRAINAGE AND EROSION CONTROL
PLAN. The second alternative is to escrow for the amount that it would take to complete this
task. The escrow alternative has been accepted due to the timing of improvements relative to the
request for ·release of additional permits. Cost estimates for the performance of this work are
being pursued at this time The applicable escrow amounts will be provided to you immediately
upon availability. Release of this escrow will be requested upon completion of the
improvements.
Issue 2: The pond overflow structure location
The pond overflow strncture has been relocated to the pond side (north side) of the Equestrian/
Pedestrian / Bike Trail. Attached are the revised plan sheets representing the reconstruction
provided. The .overflow is functioning appropriately and generally meets the intent of the original
drainage design for Hearthfire P.U.D., First Filing.
Issue 3: Improvements between Lots 27-33 and the pond north of Lots 27-33
It was recently determined that additional subdivision improvements may be required in the area
of Lots 27-33. A portion of the Equestrian/ Pedestrian/ Bike Trail will be relocated to maintain
the design separation from Lot 29. The required drainage swale in this area will be
accommodated. Subdivision improvements will .be completed between Lots 29 and 30 in Tract
A. Specifically, the valley pan will be installed to its correct limits and minor re-grading will be
performed from the end of the valley pan to the swale along the Equestrian / Pedestrian / Bike
Trail. The drive will be lowered to allow runoff to cross over to pond according to the approved
MASTER GRADING PLAN and the approved MASTER DRAINAGE AND EROSION
CONTROL PLAN. Additional improvements proposed in our field meeting of Wednesday,
September 26, 2001 with the homeowners of Lots 27-33 and homeowner association
representatives will be made only with the commitment of the individual homeowners to
participate in the cost of those improvements. At this time, the cost of these improvements will
be escrowed due to the timing of improvements relative to the request for release of additional
permits. Cost estimates for the performance of this work are being pursued at this time The
applicable escrow amounts will be provided to you immediately upon availability. Release of
this escrow will be requested upon completion of the improvements. A copy of the plan for the
proposed revised grading and additional improvements in this area, is attached for immediate
reference and review. ·
.. .
PAGE 3
October 9, 2001
Project No: 1552-01-96
Re: Hearthfire P.U.D., First Filing; Ft. Collins, Colorado
. We would respectfully request that you release all remaining building permits with this final
certification and the escrows provided.
If you have questions concerning this final drainage certification for Hearthfire P.U.D., First
Filing, please call at (970) 226-5334.
Brian W. Shear, P.
Shear Engineering Corporation
BWS/mad
cc: Glen Schlueter; City of Fort Collins Stormwater Utility
Torn Kennedy; Hearthfire, Inc.
Torn Dugan; Pinecrest Planning and Design
April 25, 2000
Project No: 1552-01-96
Jay Barber
City of Ft. Collins Storm water Utility
P.O. Box 580
Ft. Collins, Colorado 80524
Re: Hearthfire P.U.D., First Filing; Ft. Collins, Colorado
Dear Jay,
This letter serves as final certification for the entire Hearthfire P.U.D., First Filing. Shear
Engineering Corporation has been involved during the entire construction process and has made
several observations during construction. Field changes that Shear Engineering Corporation has
been made aware of, have been documented by Shear Engineer.ing Corporation and will be
addressed with this certification.
Shear Engineering Corporation has also coordinated all field as-built data requirements. As
builts and elevation shots were provided by Timberline Surveying, Inc. of Littleton, Colorado.
All elevations are based on the same datum utilized with the Final Utility Plans for Hearthfire
P.U.D., First Filing which were prepared by Shear Engineering Corporation; Shear Project No.
1552 -01-96; Date of approval by the Director of Engineering; 10/03/97. Please note that the
subdivision datum does not match City of Fort Collins datum. The original survey was provided
by Merrick & Company of Denver, Colorado. The datum difference is 3.38 feet. Please refer to
attached memo prepared by Shear Engineering Corporation dated 10/12/99. This memo was
prepared for Hearthfire P.U.D., Second Filing. However, it specifically addresses the datum
issue. The following statement is in the attached memo:
• 3.38' must be added to City datum in order to match the current Hearthfire P.U.D. datum.
Therefore, 3.38' must be added to all current County Road 13 plan data, which was based on
City datum. These revisions will be made now.
All sitework improvements have been completed. All finished grading has been substantially
completed in accordance with the original approved MASTER GRADING PLAN. All drainage
facilities have been installed and are functioning appropriately and generally meet the intent of
the original drainage design for Hearthfire P.U.D., First Filing in accordance with the original
approved MASTER DRAINAGE AND EROSION CONTROL PLAN.
There are two (2) significant field changes which have been made. These changes do not affect
the intent of the original drainage design for Hearthfire P.U.D., First Filing in any way. They
simply represent facility location changes which differ than those represented on the approved
plans.
The first change is related to the Overflow system located near the intersection of Hearthfire
Way (The entrance to Hearthfire P.U.D. from Douglas Road) and Hearthfire Drive. Re
alignment of facilities were provided during construction in order to salvage existing trees. The
actual alignment of the finished system is noted on Sheet 18A of 48 which is attached for
immediate reference.
4836 S. College , Suite 12 Ft. Collins, CO 80525 (970) 226-5334 Fax (970) 282-0311 www.shearengineering.com
PAGE 2
April25,2000
Project No : 1552-01-96
Re: Hearthfire P.U.D., First Filing; Ft. Collins, Colorado
The second change is related to the overflow system from the main pond to Richards Lake . The
overflow box location was staked in the incorrect location. The location of the box resulted in the
encroachment on Lot 47 of underground pipe. The location of the overflow box was noted fairly
immediately after installation . As builts of the system were provided by Mr . Paul Meyer. Mr.
Meyer provided the construction staking for Hearth.fire P .U.D., First Filing . As-builts were
prepared in order to define the actual Lot 47 encroachments. Easements were prepared . There are
several pieces of documentation associated with this issue. These are attached for immediate
reference. Apparently, the easement was not recorded immediately . The easement has been
recently provided to the County for recording.
If you have questions concerning this drainage certification for Hearthfire P.U.D ., First Filing,
please call at (970) 226-5334 .
Brian W. Shear, P ..
Shear Engineering Corporation
BWS Imo
cc : Tom Kennedy ; Hearth.fire, Inc .
Tom Dugan ; PineCrest Planning and Design
HEARTHFIRE P.U.D., SECOND FILING
PROJECT MEMO :
To : Hearthfire P.U.D., Second Filing project team member
From : Brian W. Shear, P .E.
Date: 10/12/99
Shear Project No : 1552-02-97
Re: Project Elevation Datum
There are three (3) different elevation datums associated with Hearthfire P.U.D . These are as
follows:
• Hearthfire P.U.D. main project datum utilized by Merrick with the overall Hearthfire survey.
This is the datum that we will want to maintain . The elevation shows up on Merrick's
Hearthfire P .U.D. Preliminary Grading Plan.
• The Douglas Road datum for Douglas Road by King Surveyors based on a NGS benchmark
located on Highway 1. The elevation shows up on King Surveying disk data and hard copy
printout of Douglas Road field data.
• City datum utilized by Shear and Frederick from City of Fort Collins documented
benchmarks .
Yet a fourth datum exists relative to Hearthfire P .U.D . The Richards Lake P .U.D . by
Intermountain Engineering . Based on Paul Myer's documented level loop, Intermountain's
datum does not meet either NGS or City datum . Based on a previous level loop by Frederick
Land Surveying, the Intermountain Engineering datum is 1.525' higher than City of Fort Collins
datum . This is not necessarily consistent with the known discrepancy in datum's between the
City ofFort Collins and USGS .
Based on the complete level loop provided by Paul Meyer (November 28 , 1997), the following
has been determined . ·
• 3.38 ' must be added to City datum in order to match the current Hearthfire P .U.D . datum.
Therefore , 3 .38' must be added to all current County Road 13 plan data which was based on
City datum . These revisions will be made now.
• 3 .00' must be added to NGS datum in order to match the current Hearthfire P.U.D . datum.
Therefore , 3 .00' must be added to the Douglas Road datum . Plans for Douglas Road will not
be adjusted for the datum change. However, a strongly worded note on the cover sheet will
be required to address the datum discrepancy .
• 1.84' must be added to Intermountain Engineering datum in order to match Richards Lake
P.U.D. to the current Hearthfire P .U.D. datum . Therefore, 1.84' must be added to the
Richard's Lake P.U.D . elevations (or subtracted from the Hearthfire P.U.D. datum) in order
to coordinate Hearthfire P .U.D . with Richards Lake P .U.D .
cc : Pam Brubacher
Tom Kennedy; Hearthfire, Inc.
Bryan Short ; Frederick Land Surveying
Tom Dugan ; Pinecrest Planning and Design
4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-0311
August 20 , 1998
To : Brian and Faron, Site Foreman for Tarco
Paul Meyer
cc : Kevin Gilligan
Tom Dugan
Brian Shear
From: Mark Oberschmidt
Shear Engineering Corporation
Re: Hearthfire P.U.D., First Filing; Ft. Collins, Colorado
Onsite meeting concerning the overflow structure in the lower pond
This memo is a summary of our discussions and decisions concerning the overflow structure in
the lower pond at Hearthfire P .U.D., First Filing on Wednesday, August 18 , 1998 . The original
location of the structure was found to be in the wetlands . Therefore it was decided by the
surveyor and Tarco personnel on site to move it approximately 24' south to get it out of the
wetlands . When excavation began Whiting Petroleum gas lines were found that interfered with
construction at the new location . I met with Brian, Faron and Paul Meyer and agreed that the box
could be moved further sou~h. The proposed new location was to be at the upstream end of the
pipe which was already laid on the day of our meeting . This new location came with the
following stipulations .
I. Paul Meyer would located the northwest property corner of Lot 47 and verify that the bike
path could still be located south of the proposed box . This "warping" of the bike path was to
be fie ld designed by Tarco and Paul Meyer. Mark asked that the closest edge of the bike path
be a minimum of 5 feet from the overflow structure . It was agreed that if the end of the pipe
caused the bike path to be located on private property, i.e . Lot 47 , that additional pipe would
be laid to move the box north .
4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-03 I I
~ ()
I
1552-01-C,G.
~/4/ <qB,
LARR '1" P. kE.Td-lAl-'1
?b1
Ht~ l#/14(
' , ,,,_,._ . ........._........._ II 4-"
HEADWALi.. ~ ~ ~ ~,
INLE:TS IN ---.. -
0Rl1INAL LcX.ATI0
~z-
scALE 111 = 'So'
NOTE.S:
I. kl::.cP INVE.~TS As Ll:ST!:D IN
PLAN.j. ..SLOPES WILL VAR'f . I
0,
~::i:
_.. 181 ct, coTTONI-JOOD ( -srP. o-+41.07, 40.7 1 RT)
2d d) C.OTTONWCOD (.STA o+ 30. sr;, 4(.,,,3
1
RT)
/ /'/~ d, COTTbNWOOD . (.sTA o + 4' .zz , ,o. I ' RC)
/ -ll ± ED4E
€> / OF iR.E.I: ro OL..D L..oc..ATION:5
<t Ml-I. /f' PIPE.S
-:.._.
=~.
....... ::---.....~ ~ :~::.,
....... -.........."" :--....., --~ -' ~ .. -~-J ··c:.· ' ~---~.::::-··-. , .. ..:..: ....
NEl--l 1.0CA170N '-.___ --........: ~ 3.·.:_/":_.:.::.:,7
.STORM C.E.PWR .___.___
(sTh ct 14, )t ~T) ''\ \_ IJEW LOCA170N
50 \ HEADWALL C?
~" cb COTTON hJOOD
(STA 0-18 1 Z.5 RT)
MOY!::. FIRt=. HYDl<~NT W~T IS' 'TO 20 1 A'S
· R~Glll I R.S7 -re, c.t...EAg
T~l:.E.
\ <:.ENTEi;?. OF 2
3d' RCP PIPES
FHAS!:. -/\ (SrA 0•17, IC\5 1 RT)
l-lNE:, \
\
\
)
I
RCPTN # 2000031877 05/16/2000 14:27:00 # PAGES -5 FEE -
M RODENBERGER RECORDER, LARIMER COUNTY CO STATE DOC FEE -
STORM DRAINAGE EASEMENT
$25.00
$.00
The undersigned, HEARTHFIRE, INC., a Colorado corporation ("Granter"), being the ov.ner
Lot 47. HEARTHFIRE P.U.D. FIRST FILING, City of Fort Collins. County of Larimer, State of
Colorado (."Grantor's Property"), in consideration of Ten Dollars ($10.00) in hand paid, receipt of
which is hereby acknowledged, and other good and valuable consideration, does hereby transfer and
convey to HEARTHFIRE ASSOCIATION, INC., a Colorado nonprofit membership corporation,
a permanent easement over Granter's Property for the purposes of constructing. installing, operating
and maintaining underground storm drainage utilities over and through the Grantor's Property, said
easement being more particularly described on Exhibits A and B attached hereto and by this
reference made a part hereof.
The Grantee accepts the grant of the easement described herein and all maintenance
responsibilities therefor.
Witness my hand and seal this L day of __ d,...........,-,,_.-/ c,,...=-:-✓....,.,....c_· ___ , 2000.
GRANTOR:
ATTEST:
COUNTY OF LARIMER
)
) ss.
)
HEARTHFIRE, INC., a Colo
By:
Title:
The foregoing instrument was acknowledged before me this/ ,~ay of_:,~-c...::...Jµ...~---
2000, by William A. Yunker as Vice President and Ardith White as Secretary of Heart
Colorado corporation.
Witness my hand and seal this __ day of _______ . 2000.
LIENHOLDER:
STATE OF COLORADO )
) ss .
COUNTY OF ARAPAHOE )
MEGA BANK, now known as
COMPASS BANK_,
By :
The foregoing instrument was acknowledged before me this _j!!:_ day of l'YJ~
2000:, by Toni Serra as Senior Vice President of Mega Bank, now known as Compass~.
Witness my hand and official seal.
My commission expires:
Accepted this \ '5 day of _(_v_"'1_w_,..,.'·. ___ • 2000.
__J
GRANTEE: HEARTHFIRE ASSOCIA NC.,
a Colorado nonpro
By:
Title:
ATTEST: \ ..
ST A TE OF COLORADO )
) ss .
COUNTY OF LARIMER · )
The foregoing instrument was acknowledged before.me this 1"5 day of (Y\ °sJ
by iu. II i w'\I\ A--~Ill L as \ kc.t PRe ~ · and AecLA:t, & . Nhk as Cb~ p C!...
Hearthfire As iation, Inc .. a Colorado nonprofit membership corporation.
Witness my hand and official seal.
My commission expires: d · \ 1 · aO~
,2000,
of
EXHIBIT A
A Parcel land, being part of Lot No. 47 of Hearthfire P.U.D.,
First Filing, to the City of Fort Collins, County of Larimer,
State of Colorado, .the Plat of which was filed for record in the
Office of the Larimer County Clerk & Recorder on December 19,
1997 under Reception Nu~er 97085048. Said Parcel being more
particularly described as follows:
Beginning at the Northwesterly corner of said Lot No. 47;
Thence, S54•25'16"E, along the Northeasterly line of said Lot No.
47, a distance of 13.34 feet;
Thence, departing said Northeasterly line, S50°44'35"W, a
distance of 65.24 feet to the point of intersection with the
Southwesterly line of said Lot No. 47;
Thence, N38•57'5l"E, along said Southwesterly line of Lot No. 47,
a distance of 63.08 feet to the said point of beginning.
The above ·described Parcel containing 0.0096 acres, more or less.
• . .. .
.EXHIBIT 8
47