Loading...
HomeMy WebLinkAboutSite Certifications - 02/06/1996,-~~ Fort Collins Denver Colorado Springs P.O. Box 2127 Eighteenth Street Atrium P.O . Box 182 2290 E. Prospect 1621 18th Street, Suite 250 Colorado Springs, CO Ft . Coll ins, CO 80522 Denver , CO 80202 80901-0182 (970) 493-8747 (303) 296-0383 (719) 633-47 13 Archistruction 'M (970) 493-5869 FAX (303) 296-0382 FAX (719) 633 -9508 FAX , / ----r TRANSMITTAL LETTER c) {A_ (.9 tt , -C ,V January 25, 1996 RcJetnt' J:) 'f /,0 ....,,_ ~C/J<;_ (fr( _J070 ~ u~. --= TO: Mr. Basil Hamdan City of Fort Collins Stormwater Utility 235 Mathews Street Fort Collins, CO 80524 VIA: 0 0 0 0 Pick up Overnight a.m. Overnight p.m. UPS 0 0 X Courier US Mai l Hand Deliver JOB: Advanced Energy, 2400 Midpoint Drive, Permit No. 952386 WE TRANSMIT FOR YOUR: 0 X 0 Information Approval Signature 0 0 0 Files Correction Return FJ ' 1 COPY(IES) OF: Drainage Certification together with red-line print of Drainage and Erosion Control Plan REMARKS: Please release for Certificate of Occupancy THE NEENAN COMPANY ~ James R. Hayes Project Manager xc : file January 24, 1996 Mr . Basil Hamdan Stormwater Utility 23 5 Mathews Street li3 PARK ENGINEERING ~ CONSULTANTS Fort Collins, Colorado 80522 RE: ADVANCED ENERGY DRAINAGE CERTIFICATION Dear Basil : Enclosed is a completed Drainage Certification Form and a red-lined print of the Drainage and Erosion Control Plan for the referenced facility . We have completed an as-built survey and inspection of this project and fine that it has been completed in substantial compliance with the approved Plans prepared by us . If you have any questions, please call . cc : Jim Hayes, Neenan Company file 10734X01.doc 1240 Main Street Longmont, CO 80501 (303) 651-6626 FAX (303) 651-0331 JA N-24-96 WE~· 13:58 OAAINAGE (:.1:!,;.l:('1'1.J:o'J.CA'l'ION FORM Please fill out all applicable items in this certification form for sin,gle family, m11lti'-family and commerci.il properties. Write "OK" for items checked or actual number checked in field . Use 11 N/A" for items that are not applicable to the property that is being certified. A, Drainage facilities certification l. Pond Certification -volume verification a. topographic records and volume b. cross-sections and spot elevations -positive fall to pan -side slopes -invert elevation -spillway elevation -placement and size of riprap -side slopes -grading -oritice plate installation and size -compaction of berm -structural integrity of pond 2. Swales -location (are they within easement) -dimensions and cross-section verification -longitudinal slopes and side slopes -spot elevations Li ll (.I H 0 f( OK. OlL ~ P. 02 JAN-24-96 WED 13:58 4. -permanent erosion control measures (drop Pt~uctures, riprnp, Ate .... ) -tie-in to pipes, pan,s, curbs, etc ... . -weir 8i7.P-(Alevations, size, opening, etc ... ) av~il~bl~ frQ9bo~rd -landscaping infringement on swales -size and type -slopes (as-built and comparison to minimum 0.4%' slope} -pipe capacity calculations if slopes are significantly altered -inccallacion and backfill m~ccri~l -cover -Rn~~RAmAnt ~n~ ol .earance from other utility lines close by -joints Concrete Pan Channels -size -slope -super elevation -cross-section -thickness -elevations o.t: O'<. oK.. (){(_ c,t ii/A ot( OIL dL P. 03 JAN-24-96 WED 13:59 P. 04 5. Inlets -size and type OI.( -size of opening (or name of standard used) OK... -grate elevation Oit- -invert elevation c,l( -box size 06( -size -type -grade -e levation -cross-sectional depth -tie-in to curb and gutter 7. Culverts -size -type -invert elevation -headwalls 8. Underdrains -size lf)_4 -type '( -cover t, -backfill ,, -geotextiles I( 1AN-24-96 WED 13:59 -cleanouts 9. Curb cuts -size -tie in to swale, pipe, etc .... B. Certification of Grad~ Elevations Adjacent to Drainage Facilities: -minimum opening elevations -top of foundation elevations -compai·i.,on to 100 yeai.· WOOL'., (Freeboard requirements and floodplain issues) C. Certification of Erosion Cont~ol Measures: 1. Permanent Measures~ -Permanent vegetation (6 11 bare spots and weeds under control) ---riprap -riprap bedding -drop sections -sediment basins/water quality ponds -netting mats/blankets -mulching P. 05 ~JAN-24-96 WED 14:oo 2. Temporary Measures: -mulching -inlet filter installation -check bale dams -seeding and temporary vegetation -silt fence D. Site Cleanup After Construction -construction clean up -smoothing of ruts -reseeding E. Statement of Compliance .. , (){( OIL_ olL This certification is signed and stamped and by signing this form the engineer(s) attests that to the best of his knowledge the as-built conditions of the drainage facilities are as described in the above form and in the redlined plans enclosed. Failure to properly disclose all known information could result in the rejection of this certification and prevent the relcace of any Stormwater Vtility holds on Building Permits and/or Certificates of Occupancy. F . Signature and Stamp by a Colorado Engineer. P. 06