HomeMy WebLinkAboutLot Certifications - 10/03/2016 (3).\if•~ • ~. J ~",,, ' " "" : " ,, ' ·,:~ ,,,., "•:t '4-; • ' f • ,. !~ • -'!
-~ . CERT,IFICATION OF LOT GRADING .
, . . ; ,. . Pursuant to City Code§ 26-544 & City land Use Code§ 3.3.2 (e) , ,
,.,, ..,,,_ ~ ~ "" ~ • t , , ~ i:""µ, k' , "'*~i ;z-r • Jfit i •, ,:,: """ ., ~ , ~ , 'I' • ~
Date: September 29 , 2016
Address: 524 W . Mountain Avenue
Fort Collins , Colorado
Subdivision: City of Fort Collins
Permit Application#: _B_1_5_08_3_9_7 ________ _
Larimer County Parcel#: _9_7_11_4_-0_9_-_02_4 _______ _
~------Block : 61 Larimer County Reception#. ii!0H;085577tl N./A
'Bf.et ~, n '5Q n '1-J Of s~ c.o~ Lo, 101 (on development agreement) Nt2-f:C.
-;L.~ Ip\, frc., 1 ,-~ N-\It:; ff 1"" so Fr 1 s, 15 f1", f so f-T '1'f'o'is. CO r-.J....-,;,..J '0
/3 /-z.ol~~
I, (print) Kev in E. Forbes a Colorado registered professional engineer, verify that construction
of all stormwater facilities and grading is complete and hereby submit this certification .
Please answer the following questions by initialing the appropriate response. For each question initialed "No," attach an
explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots .
1. Certification includes attached Stormwater-approved grading plan . (NOTE: City's
Building Department does not approve grading plans).
2. Certification includes attached as-built survey dated 9/26/2016 (must be within 60
days of date of certification) accurately and truthfully depicting elevations for :
• Top of foundation/finished floor
• Finished grade on each side of the structure
• Quarter points along each lot line (not more than 50 feet apart)
• Break points/high points
• Swales
• Berms
• Retaining walls
• Air conditioning pads
• Window wells
• Any other appurtenance(s) within an easement
3. All elevations are within a 0.2 foot tolerance of the approved grading plan .
4. The top of foundation is at least 6 inches above the highest grade surrounding the
structure.
5. There is a minimum grade of 5% away from the structure within the first 5 to 10 feet
adjacent to the residence.
6. All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single
family lots when the swale is draining the runoff from only two adjoining properties)
and are not steeper than 25% (4:1).
7. All flow lines of stormwater drainage swales are a minimum of 6 inches below the
elevation of ground adjacent to the structure and will direct drainage as shown on the
Stormwater-approved grading plan .
8. All downspout locations and discharge directions are shown on the as-built survey.
Runoff is not directed toward neighboring properties.
12/15
No __ Yes ___{f-
No __ Yes K
No __ Yes _/(
No __ Yes .¥£
No __ Yes .%:f:_
No __ Yes $
No __ Yes ~
No __ Yes ~
Page 1
9. A smooth transition (no grade break) is provided to all adjacent properties.
10 . The grading of this lot does not adversely affect neighboring properties or City
infrastructure.
11. Landscaping has been completed prior to survey. If not, please indicate who will be
responsible for completing landscaping : _F_la_n_n_ery_H_o_m_e_s_L_L_C _______ _
12 . Final site cleanup has been completed .
13 . I personally visited the site as part of the certification process , and in my professional
opinion, the as-built survey is an accurate representation of the site conditions .
14. Based on this information, I certify that (check one):
No __ Yes {c_
No __ Yes ~
No _{£.._ves __
No __ Yes ~
No __ Yes --K€'
"-w/ The elevations and drainage patterns of the lot/site are in substantial conformance with the City
/ ---approved drainage and grading plan for the property (information attached).
D The elevations and drainage patterns of the lot/site as measured are in general conformance with the
City approved drainage plan with exceptions (information attached). In my professional judgment the
elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the
specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a
manner consistent with the approved drainage plan.
PE Stamp
Sign and date
Name : Kevin E. Forbes
Email : kevinforbes@frii .com
Phone : ,70-z'SZ -3,~tS
Company: Stewart & Associates Inc.
Address: 204 North Link Lane Unit A-8
Fort Collins , CO 80524
NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy
for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed
elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other
information necessary to confirm the above certification to:
Email (preferred)
WaterUtilitiesEng@fcgov .com
12/15
Mailing Address
Fort Collins Utilities
ATTN : Water Utilities Engineering
281 North College Avenue
Fort Collins, CO 80521
Questions?
970 -221-6700
City of
,r~t Colli ns
~
Page 2
l
11
"AS-BU I LT" GRADING
BEGINNING AT A POINT 50 FEET WEST OF THE SOUTHEAST
CORNER OF LOT 10, BLOCK 61 , CITY OF FORT COLLINS
THENCE NORTH 115.00 FEET, THENCE WEST 50.00 FEET,
THENCE SOUTH 115.00 FEET, THENCE SOUTH 50.00 FEET
TO THE POINT OF BEGINNING.
524 W. MOUNTAIN AVENUE, FORT COLLINS, COLORADO
(06 .90)
06 .4
SCALE: 1 " -20'
(06 .62)
07.3
(06 .95
07 .2
.,
X 08 .5 1nf
two story wood frame
house with basement
1>N
N89'4.3'26'W
tof=(07 .8)
tof=0B .3
ff=0B .7
ff=(09 .0)
50.00'
(06 .39)
06 .5
b
0
(/)
06 .7 x~------' 4 -06.2
(06 .17) (06 .73) 4
(06 .:''")
W. Mountain Avenue
(83.08) DENOTES PLAN ELEVATION PER SITE PLAN
83.08 DENOTES ASBUILT SURVEYED ELEVATION
DN -DENOTES DOWNSPOUT AND
DIRECTION OF FLOW
On September 26, 2016 a field survey
performed by me, or under my direct
supervision that measured elevations of the
existing site grading and floor elevations
and that these measurements are
accurately shown on this As-built Grading
Plan.
Prepared by Stewart & Associates, Inc.
IMPROVEMENT LOCATION CERTIFICATE
BEGINNING AT A POINT 50 FEET WEST OF THE SOUTHEAST
CORNER OF LOT 10, BLOCK 61, CllY OF FORT COLLINS
THENCE NORTH 115.00 FEET, THENCE WEST 50.00 FEET,
THENCE SOUTH 115.00 FEET, THENCE SOUTH 50.00 FEET
TO THE POINT OF BEGINNING.
524 W. MOUNTAIN AVENUE, FORT COLLINS, COLORADO
sa9•42•41 "E so .02·
SCALE: 1" -20 ' IO 5 .0'
LEGAL DESCRIPTION
BEGINNING AT A POINT ·so FEET WEST OF THE
SOUTHEAST CORNER OF LOT 10, BLOCK 61 ,
b
0
N
two story wood frame
house with basement
N89.43'26"W 50.00'
meter pit -"-•--,--
5 .0'
CITYOF FORT COLLIN S, THENCE NORTH 115.00 ------"""'·------_____;:_~
0
1/)
FEET, THENCE WEST 50.00 FEET, THENCE SOUTH w
115.00 FEET, THENCE SOUTH 50 .00 FEET TO • Mountain Avenue
THE POINT OF BEGINNING.
IMPROVEMENT LOCATION CERTIFICATE
I hereby certify that this improvement location certificate was prepared for Bill Gurski, that it is
not a land survey plat or improvement survey plat, and that it is not to be relied upon for the
establishment of fence, building or other future improvement lines.
I further certify that the improvements on the above described parcel on this date, September
26, 2016, except utility connections, are entirely within the boundaries of the parcel, except as
shown, that there are no encroachments upon the described premises by improvements on any
adjoining premises except as indi cated, and that there is no apparent evidence or sign of any
easement crossing or burdening any part of said parcel, except as noted.
37899
DATEt2½.Ll8~~?
Legal Description
from Larimer
County Clerk &
Recorder
Office Reception
#20150055770,
prepared by Stewart & Associates, Inc .