Loading...
HomeMy WebLinkAboutLot Certifications - 10/03/2016 (3).\if•~ • ~. J ~",,, ' " "" : " ,, ' ·,:~ ,,,., "•:t '4-; • ' f • ,. !~ • -'! -~ . CERT,IFICATION OF LOT GRADING . , . . ; ,. . Pursuant to City Code§ 26-544 & City land Use Code§ 3.3.2 (e) , , ,.,, ..,,,_ ~ ~ "" ~ • t , , ~ i:""µ, k' , "'*~i ;z-r • Jfit i •, ,:,: """ ., ~ , ~ , 'I' • ~ Date: September 29 , 2016 Address: 524 W . Mountain Avenue Fort Collins , Colorado Subdivision: City of Fort Collins Permit Application#: _B_1_5_08_3_9_7 ________ _ Larimer County Parcel#: _9_7_11_4_-0_9_-_02_4 _______ _ ~------Block : 61 Larimer County Reception#. ii!0H;085577tl N./A 'Bf.et ~, n '5Q n '1-J Of s~ c.o~ Lo, 101 (on development agreement) Nt2-f:C. -;L.~ Ip\, frc., 1 ,-~ N-\It:; ff 1"" so Fr 1 s, 15 f1", f so f-T '1'f'o'is. CO r-.J....-,;,..J '0 /3 /-z.ol~~ I, (print) Kev in E. Forbes a Colorado registered professional engineer, verify that construction of all stormwater facilities and grading is complete and hereby submit this certification . Please answer the following questions by initialing the appropriate response. For each question initialed "No," attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots . 1. Certification includes attached Stormwater-approved grading plan . (NOTE: City's Building Department does not approve grading plans). 2. Certification includes attached as-built survey dated 9/26/2016 (must be within 60 days of date of certification) accurately and truthfully depicting elevations for : • Top of foundation/finished floor • Finished grade on each side of the structure • Quarter points along each lot line (not more than 50 feet apart) • Break points/high points • Swales • Berms • Retaining walls • Air conditioning pads • Window wells • Any other appurtenance(s) within an easement 3. All elevations are within a 0.2 foot tolerance of the approved grading plan . 4. The top of foundation is at least 6 inches above the highest grade surrounding the structure. 5. There is a minimum grade of 5% away from the structure within the first 5 to 10 feet adjacent to the residence. 6. All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than 25% (4:1). 7. All flow lines of stormwater drainage swales are a minimum of 6 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Stormwater-approved grading plan . 8. All downspout locations and discharge directions are shown on the as-built survey. Runoff is not directed toward neighboring properties. 12/15 No __ Yes ___{f- No __ Yes K No __ Yes _/( No __ Yes .¥£ No __ Yes .%:f:_ No __ Yes $ No __ Yes ~ No __ Yes ~ Page 1 9. A smooth transition (no grade break) is provided to all adjacent properties. 10 . The grading of this lot does not adversely affect neighboring properties or City infrastructure. 11. Landscaping has been completed prior to survey. If not, please indicate who will be responsible for completing landscaping : _F_la_n_n_ery_H_o_m_e_s_L_L_C _______ _ 12 . Final site cleanup has been completed . 13 . I personally visited the site as part of the certification process , and in my professional opinion, the as-built survey is an accurate representation of the site conditions . 14. Based on this information, I certify that (check one): No __ Yes {c_ No __ Yes ~ No _{£.._ves __ No __ Yes ~ No __ Yes --K€' "-w/ The elevations and drainage patterns of the lot/site are in substantial conformance with the City / ---approved drainage and grading plan for the property (information attached). D The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. PE Stamp Sign and date Name : Kevin E. Forbes Email : kevinforbes@frii .com Phone : ,70-z'SZ -3,~tS Company: Stewart & Associates Inc. Address: 204 North Link Lane Unit A-8 Fort Collins , CO 80524 NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) WaterUtilitiesEng@fcgov .com 12/15 Mailing Address Fort Collins Utilities ATTN : Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 Questions? 970 -221-6700 City of ,r~t Colli ns ~ Page 2 l 11 "AS-BU I LT" GRADING BEGINNING AT A POINT 50 FEET WEST OF THE SOUTHEAST CORNER OF LOT 10, BLOCK 61 , CITY OF FORT COLLINS THENCE NORTH 115.00 FEET, THENCE WEST 50.00 FEET, THENCE SOUTH 115.00 FEET, THENCE SOUTH 50.00 FEET TO THE POINT OF BEGINNING. 524 W. MOUNTAIN AVENUE, FORT COLLINS, COLORADO (06 .90) 06 .4 SCALE: 1 " -20' (06 .62) 07.3 (06 .95 07 .2 ., X 08 .5 1nf two story wood frame house with basement 1>N N89'4.3'26'W tof=(07 .8) tof=0B .3 ff=0B .7 ff=(09 .0) 50.00' (06 .39) 06 .5 b 0 (/) 06 .7 x~------' 4 -06.2 (06 .17) (06 .73) 4 (06 .:''") W. Mountain Avenue (83.08) DENOTES PLAN ELEVATION PER SITE PLAN 83.08 DENOTES ASBUILT SURVEYED ELEVATION DN -DENOTES DOWNSPOUT AND DIRECTION OF FLOW On September 26, 2016 a field survey performed by me, or under my direct supervision that measured elevations of the existing site grading and floor elevations and that these measurements are accurately shown on this As-built Grading Plan. Prepared by Stewart & Associates, Inc. IMPROVEMENT LOCATION CERTIFICATE BEGINNING AT A POINT 50 FEET WEST OF THE SOUTHEAST CORNER OF LOT 10, BLOCK 61, CllY OF FORT COLLINS THENCE NORTH 115.00 FEET, THENCE WEST 50.00 FEET, THENCE SOUTH 115.00 FEET, THENCE SOUTH 50.00 FEET TO THE POINT OF BEGINNING. 524 W. MOUNTAIN AVENUE, FORT COLLINS, COLORADO sa9•42•41 "E so .02· SCALE: 1" -20 ' IO 5 .0' LEGAL DESCRIPTION BEGINNING AT A POINT ·so FEET WEST OF THE SOUTHEAST CORNER OF LOT 10, BLOCK 61 , b 0 N two story wood frame house with basement N89.43'26"W 50.00' meter pit -"-•--,-- 5 .0' CITYOF FORT COLLIN S, THENCE NORTH 115.00 ------"""'·------_____;:_~ 0 1/) FEET, THENCE WEST 50.00 FEET, THENCE SOUTH w 115.00 FEET, THENCE SOUTH 50 .00 FEET TO • Mountain Avenue THE POINT OF BEGINNING. IMPROVEMENT LOCATION CERTIFICATE I hereby certify that this improvement location certificate was prepared for Bill Gurski, that it is not a land survey plat or improvement survey plat, and that it is not to be relied upon for the establishment of fence, building or other future improvement lines. I further certify that the improvements on the above described parcel on this date, September 26, 2016, except utility connections, are entirely within the boundaries of the parcel, except as shown, that there are no encroachments upon the described premises by improvements on any adjoining premises except as indi cated, and that there is no apparent evidence or sign of any easement crossing or burdening any part of said parcel, except as noted. 37899 DATEt2½.Ll8~~? Legal Description from Larimer County Clerk & Recorder Office Reception #20150055770, prepared by Stewart & Associates, Inc .