221 E. Mountain Ave Project
June 28, 2021
BACKGROUND
This memo is to support the Certification of Lot Grading and provides detailed explanations for relevant items on
the certification. In addition, many locations on-site were redesigned by necessity or to improve upon the design
after the grading plan was approved by the City Stormwater department. The result of these changes does not
alter the general grading/drainage scheme and is in general conformance with the approved grading plan. In
most cases where items are checked “No,” the approved design plan did not meet the conditions of the item to
begin with, but they are not anticipated to negatively impact drainage conditions for neighboring properties.
Item No. 2
The as-built survey did not capture quarter points along each lot line, but it did capture several points along or
adjacent to the property lines, since the property lines generally run along or near the outside face of the new
building on all sides.
Item No. 3
Elevations are not all within 0.2 feet of tolerance from the approved grading plan. There were adjustments made
to the design and in the field that altered various site grading elements. Though these adjustments were made,
positive drainage away from the new building structure is provided and neighboring properties are not negatively
impacted.
Item No. 4
Top of foundation is not all 6” above the highest grade surrounding the structure. The structure is surrounded by
pavement that provides positive drainage away from structure.
Item No. 5
5% grade away from the structure within the first 5 to 10 feet adjacent to the building is not provided around the
entire building perimeter. The north and east sides of the building, along roadway frontages of Mountain Ave and
Mathews St respectively, are in very close proximity to the public right-of-way which serves as the ADA path for
the public. Because of this, slopes in these areas (first 5-10 feet adjacent to the building) could not be designed at
5% cross-slope and were designed to be 1%-2% cross-slope (away from the building). The structure is surrounded
by pavement that provides positive drainage away from structure.
Item No. 6
On-site slopes are not all between 2%-33%. See explanation for No. 5 above. Unpaved areas on-site that are not
within landscape planters are generally graded at slopes between 2%-33%.
2
Item No. 7
No swales are present or were included with the grading/drainage design of the site, therefore this item is not
applicable to the project.
Item No. 9
There is a vertical offset (step) in grade along the north lot line of the property (Lot 27, Block 131) to the south of
the 20’ public alley, which is south of the new building. This step is along the face of the curb and gutter of the
south edge of the alleyway, which was observed to have been constructed in general conformance with the
approved grading plan.
Item No. 10
The site grading was observed to have been constructed in general conformance with the approved grading plan.
Additional Information
A portion of curb & gutter that was replaced with this project, at the north end of Mathews St., south of the
existing curb inlet, was found to be flat according to the as-built survey. This curb & gutter was reviewed on-site
with a City of Fort Collins Engineering Department’s Right-of-Way inspector; it was found to be acceptable to the
City and passed their final inspection. The City Stormwater Department thereby accepted the curb & gutter.
FFE
FFE
FFE
FFE
FFE
FFE
FFE FFE FFE
FFE
FFE
NOTES IN BLUE ADDED BY
INTERWEST FOR CLARITY
FIRST FLOOR PLUMBING KEYNOTES:
2" RDL & 2" ODL RISE TO PATIO DRAINS ABOVE.
3" RDL RISE TO FLOOR ABOVE.
6" ODL RISE TO FLOOR ABOVE.
6" RDL FROM ABOVE, DN. ON COLUMN TO SF. UPSIZE TO 8" BEFORE
CONNECTION. 8" RDL DN. TO FLOOR BELOW.
6" ODL DN. IN CHASE, OFFSET @ 18" ABOVE GRADE.
CAP 1-1/4" CW FOR FUTURE TENANT.
CAP 2" CW FOR FUTURE TENANT.
CAP 3" V. FOR FUTURE CONNECTION.
2" CW FROM BELOW, OFFSET 2" THIS FLOOR, CONTINUE UP TO
FLOOR ABOVE.
3" RDL RISE TO FLOOR ABOVE.
4" V. RISE TO FLOOR ABOVE.
8" ODL DN. IN CHASE, OFFSET @ 18" ABOVE GRADE.
4" V. DN. TO FLOOR BELOW.
(1)2-1/2" GAS RISE TO FLOOR ABOVE FROM COMMERCIAL METER. CAP (1)1-1/2"
GAS IN VERTICAL FOR FUTURE CONNECTION FROM RESIDENTIAL SUPPORT
METER.
3/4" CW TO WH.
PLUG VALVE, FULL SIZED, ON HOUSE SIDE OF METERS.
2" GAS DN. TO FLOOR BELOW.
CAP 2" GAS FOR FUTURE KITCHEN.
3" V. DN. TO FLOOR BELOW.
3" V. RISE TO FLOOR ABOVE.
GAS PRV. 300 MBH INPUT @ S.L. 14" WC TO 10" WC OUTLET.
CONNECT 1-1/4" GAS TO UNIT WITH GAS COCK & 6" DIRT LEG.
3/4" HWC RISE TO FLOOR ABOVE.
3/4" HW RISE TO FLOOR ABOVE.
1/2" BALANCING VALVE WITH SERVICE. BALANCE TO 0.5 GPM.
BALL VALVE, FULL SIZE WITH ACCESS.
1/2" BALANCING VALVE WITH SERVICE. BALANCE TO 1.0 GPM.
2" W. RISE TO FLOOR ABOVE.
3" W. RISE TO FLOOR ABOVE.
4" W. RISE TO FLOOR ABOVE.
2" ESP DISCHARGE PIPING TURN OVER WITH 4" AS HIGH AS POSSIBLE.
ROUTE @ 1.04%.
8" RDL FROM ABOVE, DN. ON COLUMN TO SF. UPSIZE TO 10" BEFORE
CONNECTION. 10" RDL DN. TO FLOOR BELOW.
8" RDL & 8" ODL RISE TO FLOOR ABOVE.
3/4" CW FROM BELOW, TO WH.
CONNECT 3/4" CD TO UNIT. ROUTE AS HIGH AS POSSIBLE @ 1.04%.
PROVIDE CHECK VALVE AFTER UNIT AS SHOWN.
2" V. DN. TO FLOOR BELOW.
1/2" HW RISE TO FLOOR ABOVE.
2" V. RISE TO FLOOR ABOVE.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
P3.01
2
RE:MECH
GUH-0-2
RE:MECH
GUH-0-1
1"
1" G
2" G
2" G
2"
2"
2"
2"
3/4"
3/4"
3/
4
"
2"
2"
2"
2 1/2" G
2 1/2" G
2 1/2" G2 1/2" G
3/4"
1"
3/4"
2" G
2" RDL
GI-1 SEE
DETAIL
SF-1
SF-1
8"
O
D
L
1
2" ODL
6" DSN-1
2
3
4
5
6
6
6
7
9
11
8
10
8" DSN-1
12
14
33
17
18
3
4
5
6" DSN-1
4" FCO
4" GCO
(2-WAY)
SEE DETAIL
36
20
21
22
23
24
37
27
26
25
3"
2829
29
29
29
30
30
2" RD-3 &
2" OD-3
(70 SF)
MENS
115
WOMENS
114
MAINT.
OFFICE
113
TRASH
150
TENANT D
124
TENANT A
121
GARAGE
RAMP
99
SOUTH
STAIR
98
WEST
STAIR
120
TENANT C
123
GALLERIA
100
COMM'L
ELEV
01
EAST
STAIR
00
TELECOM
106
RESID'L
ELEV
02
MAIL
107
GALLERIA
101
PASSAGEWAY
110
VESTIBULE
103
VESTIBULE
102
TENANT B
122
TENANT A
121
3/4"WH-1
WH-1
WH-1
4" PUMP DISCHARGE
4"
P
U
M
P
D
I
S
C
H
A
R
G
E
31
31
10
P5.11
4" GCO
(2-WAY)
13
P5.11
GAS METER BANK BY LOCAL
GAS COMPANY. SEE P0.00
FOR GAS LOAD SCHEDULES
6" ODL
3" RDL
6" ODL
3" RDL
8" ODL
20 8
3"
8
20
8
20
3"
13
SF-2
32
8"
8"
R
D
L
3"
34
34
RE:MECH
DFC-1-1
RE:MECH
FCU-1-1
RE:MECH
FCU-1A-3
RE:MECH
FCU-1B-3
RE:MECH
FCU-1B-2
RE:MECH
FCU-1A-2
RE:MECH
FCU-1A-1
RE:MECH
FCU-1B-4
3/4" CD
3/
4
"
C
D
3/4" CD
3/
4
"
C
D
3/4" CD
1" CD
3/
4
"
C
D
1" CD
3/
4
"
C
D
35
35
35
35
35
35
35
35
RE:MECH
FCU-1B-1
(2)4" GCO
16
19
30 38
15
3/
4
"
A
A
1 1
D
D
G
G
B
B
N
N
R
R
U
U
2 2
6 6
7 7
9 9
E
E
T
T
L
L
55
P
P
44
J
J
8 8
M
M
C
C
3 3
K
K
F
F
H
H
10 10
I
I
WH-1
The Ballard Group, Inc.
Mechanical Consulting Engineers
2525 S. Wadsworth Blvd, Suite 200
Lakewood, CO 80227
(303) 988-4514
4730 S. College Ave, Suite 203
Fort Collins, CO 80525
(970) 568-8762
33
2
5
S
.
T
i
m
b
e
r
l
i
n
e
R
o
a
d
,
S
u
i
t
e
1
0
0
Fo
r
t
C
o
l
l
i
n
s
,
C
o
l
o
r
a
d
o
8
0
5
2
5
(9
7
0
)
4
9
3
-
8
7
4
7
Fa
x
:
(
9
7
0
)
4
9
3
-
5
8
6
9
®
Issued For SD:
Plot Date
Issued For DD:
Issued for Permit:
Issued For Construction:
04/05/19
05/29/19
08/16/19
08/10/18
8/15/2019 2:34:44 PM
8/
1
5
/
2
0
1
9
2
:
3
4
:
4
4
P
M
C:
\
U
s
e
r
s
\
j
b
l
a
i
r
\
D
e
s
k
t
o
p
\
L
O
C
A
L
R
E
V
I
T
\
1
7
0
6
7
-
M
o
u
n
t
a
i
n_
P
L
B
G
-
C
&
S
_
L
o
c
a
l
.
r
v
t
P1.21
FI
R
S
T
F
L
O
O
R
PL
U
M
B
I
N
G
P
L
A
N
EL
E
V
A
T
I
O
N
S
C
R
E
D
I
T
U
N
I
O
N
22
1
E
M
O
U
N
T
A
I
N
A
V
E
C
O
R
E
&
S
H
E
L
L
22
1
E
A
S
T
M
O
U
N
T
A
I
N
A
V
E
,
F
O
R
T
C
O
L
L
I
N
S
,
C
O
8
0
5
2
4
3120A
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLUMBING PLAN
FFE = 4,978'
Revision Number Revision Date
CD
N
#
3
1
2
0
A
-
0
6
7
8/
1
6
/
2
0
1
9
Storm
Filter