Loading...
HomeMy WebLinkAboutLot Certifications - 07/09/2021Wes Lamarque 7/9/2021 1218 Ash Street | Suite A Windsor, CO 80550 970.674.3300 Explanation Memo 221 E. Mountain Ave Project June 28, 2021 BACKGROUND This memo is to support the Certification of Lot Grading and provides detailed explanations for relevant items on the certification. In addition, many locations on-site were redesigned by necessity or to improve upon the design after the grading plan was approved by the City Stormwater department. The result of these changes does not alter the general grading/drainage scheme and is in general conformance with the approved grading plan. In most cases where items are checked “No,” the approved design plan did not meet the conditions of the item to begin with, but they are not anticipated to negatively impact drainage conditions for neighboring properties. Item No. 2 The as-built survey did not capture quarter points along each lot line, but it did capture several points along or adjacent to the property lines, since the property lines generally run along or near the outside face of the new building on all sides. Item No. 3 Elevations are not all within 0.2 feet of tolerance from the approved grading plan. There were adjustments made to the design and in the field that altered various site grading elements. Though these adjustments were made, positive drainage away from the new building structure is provided and neighboring properties are not negatively impacted. Item No. 4 Top of foundation is not all 6” above the highest grade surrounding the structure. The structure is surrounded by pavement that provides positive drainage away from structure. Item No. 5 5% grade away from the structure within the first 5 to 10 feet adjacent to the building is not provided around the entire building perimeter. The north and east sides of the building, along roadway frontages of Mountain Ave and Mathews St respectively, are in very close proximity to the public right-of-way which serves as the ADA path for the public. Because of this, slopes in these areas (first 5-10 feet adjacent to the building) could not be designed at 5% cross-slope and were designed to be 1%-2% cross-slope (away from the building). The structure is surrounded by pavement that provides positive drainage away from structure. Item No. 6 On-site slopes are not all between 2%-33%. See explanation for No. 5 above. Unpaved areas on-site that are not within landscape planters are generally graded at slopes between 2%-33%. 2 Item No. 7 No swales are present or were included with the grading/drainage design of the site, therefore this item is not applicable to the project. Item No. 9 There is a vertical offset (step) in grade along the north lot line of the property (Lot 27, Block 131) to the south of the 20’ public alley, which is south of the new building. This step is along the face of the curb and gutter of the south edge of the alleyway, which was observed to have been constructed in general conformance with the approved grading plan. Item No. 10 The site grading was observed to have been constructed in general conformance with the approved grading plan. Additional Information A portion of curb & gutter that was replaced with this project, at the north end of Mathews St., south of the existing curb inlet, was found to be flat according to the as-built survey. This curb & gutter was reviewed on-site with a City of Fort Collins Engineering Department’s Right-of-Way inspector; it was found to be acceptable to the City and passed their final inspection. The City Stormwater Department thereby accepted the curb & gutter. FFE FFE FFE FFE FFE FFE FFE FFE FFE FFE FFE NOTES IN BLUE ADDED BY INTERWEST FOR CLARITY FIRST FLOOR PLUMBING KEYNOTES: 2" RDL & 2" ODL RISE TO PATIO DRAINS ABOVE. 3" RDL RISE TO FLOOR ABOVE. 6" ODL RISE TO FLOOR ABOVE. 6" RDL FROM ABOVE, DN. ON COLUMN TO SF. UPSIZE TO 8" BEFORE CONNECTION. 8" RDL DN. TO FLOOR BELOW. 6" ODL DN. IN CHASE, OFFSET @ 18" ABOVE GRADE. CAP 1-1/4" CW FOR FUTURE TENANT. CAP 2" CW FOR FUTURE TENANT. CAP 3" V. FOR FUTURE CONNECTION. 2" CW FROM BELOW, OFFSET 2" THIS FLOOR, CONTINUE UP TO FLOOR ABOVE. 3" RDL RISE TO FLOOR ABOVE. 4" V. RISE TO FLOOR ABOVE. 8" ODL DN. IN CHASE, OFFSET @ 18" ABOVE GRADE. 4" V. DN. TO FLOOR BELOW. (1)2-1/2" GAS RISE TO FLOOR ABOVE FROM COMMERCIAL METER. CAP (1)1-1/2" GAS IN VERTICAL FOR FUTURE CONNECTION FROM RESIDENTIAL SUPPORT METER. 3/4" CW TO WH. PLUG VALVE, FULL SIZED, ON HOUSE SIDE OF METERS. 2" GAS DN. TO FLOOR BELOW. CAP 2" GAS FOR FUTURE KITCHEN. 3" V. DN. TO FLOOR BELOW. 3" V. RISE TO FLOOR ABOVE. GAS PRV. 300 MBH INPUT @ S.L. 14" WC TO 10" WC OUTLET. CONNECT 1-1/4" GAS TO UNIT WITH GAS COCK & 6" DIRT LEG. 3/4" HWC RISE TO FLOOR ABOVE. 3/4" HW RISE TO FLOOR ABOVE. 1/2" BALANCING VALVE WITH SERVICE. BALANCE TO 0.5 GPM. BALL VALVE, FULL SIZE WITH ACCESS. 1/2" BALANCING VALVE WITH SERVICE. BALANCE TO 1.0 GPM. 2" W. RISE TO FLOOR ABOVE. 3" W. RISE TO FLOOR ABOVE. 4" W. RISE TO FLOOR ABOVE. 2" ESP DISCHARGE PIPING TURN OVER WITH 4" AS HIGH AS POSSIBLE. ROUTE @ 1.04%. 8" RDL FROM ABOVE, DN. ON COLUMN TO SF. UPSIZE TO 10" BEFORE CONNECTION. 10" RDL DN. TO FLOOR BELOW. 8" RDL & 8" ODL RISE TO FLOOR ABOVE. 3/4" CW FROM BELOW, TO WH. CONNECT 3/4" CD TO UNIT. ROUTE AS HIGH AS POSSIBLE @ 1.04%. PROVIDE CHECK VALVE AFTER UNIT AS SHOWN. 2" V. DN. TO FLOOR BELOW. 1/2" HW RISE TO FLOOR ABOVE. 2" V. RISE TO FLOOR ABOVE. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 P3.01 2 RE:MECH GUH-0-2 RE:MECH GUH-0-1 1" 1" G 2" G 2" G 2" 2" 2" 2" 3/4" 3/4" 3/ 4 " 2" 2" 2" 2 1/2" G 2 1/2" G 2 1/2" G2 1/2" G 3/4" 1" 3/4" 2" G 2" RDL GI-1 SEE DETAIL SF-1 SF-1 8" O D L 1 2" ODL 6" DSN-1 2 3 4 5 6 6 6 7 9 11 8 10 8" DSN-1 12 14 33 17 18 3 4 5 6" DSN-1 4" FCO 4" GCO (2-WAY) SEE DETAIL 36 20 21 22 23 24 37 27 26 25 3" 2829 29 29 29 30 30 2" RD-3 & 2" OD-3 (70 SF) MENS 115 WOMENS 114 MAINT. OFFICE 113 TRASH 150 TENANT D 124 TENANT A 121 GARAGE RAMP 99 SOUTH STAIR 98 WEST STAIR 120 TENANT C 123 GALLERIA 100 COMM'L ELEV 01 EAST STAIR 00 TELECOM 106 RESID'L ELEV 02 MAIL 107 GALLERIA 101 PASSAGEWAY 110 VESTIBULE 103 VESTIBULE 102 TENANT B 122 TENANT A 121 3/4"WH-1 WH-1 WH-1 4" PUMP DISCHARGE 4" P U M P D I S C H A R G E 31 31 10 P5.11 4" GCO (2-WAY) 13 P5.11 GAS METER BANK BY LOCAL GAS COMPANY. SEE P0.00 FOR GAS LOAD SCHEDULES 6" ODL 3" RDL 6" ODL 3" RDL 8" ODL 20 8 3" 8 20 8 20 3" 13 SF-2 32 8" 8" R D L 3" 34 34 RE:MECH DFC-1-1 RE:MECH FCU-1-1 RE:MECH FCU-1A-3 RE:MECH FCU-1B-3 RE:MECH FCU-1B-2 RE:MECH FCU-1A-2 RE:MECH FCU-1A-1 RE:MECH FCU-1B-4 3/4" CD 3/ 4 " C D 3/4" CD 3/ 4 " C D 3/4" CD 1" CD 3/ 4 " C D 1" CD 3/ 4 " C D 35 35 35 35 35 35 35 35 RE:MECH FCU-1B-1 (2)4" GCO 16 19 30 38 15 3/ 4 " A A 1 1 D D G G B B N N R R U U 2 2 6 6 7 7 9 9 E E T T L L 55 P P 44 J J 8 8 M M C C 3 3 K K F F H H 10 10 I I WH-1 The Ballard Group, Inc. Mechanical Consulting Engineers 2525 S. Wadsworth Blvd, Suite 200 Lakewood, CO 80227 (303) 988-4514 4730 S. College Ave, Suite 203 Fort Collins, CO 80525 (970) 568-8762 33 2 5 S . T i m b e r l i n e R o a d , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 5 (9 7 0 ) 4 9 3 - 8 7 4 7 Fa x : ( 9 7 0 ) 4 9 3 - 5 8 6 9 ® Issued For SD: Plot Date Issued For DD: Issued for Permit: Issued For Construction: 04/05/19 05/29/19 08/16/19 08/10/18 8/15/2019 2:34:44 PM 8/ 1 5 / 2 0 1 9 2 : 3 4 : 4 4 P M C: \ U s e r s \ j b l a i r \ D e s k t o p \ L O C A L R E V I T \ 1 7 0 6 7 - M o u n t a i n_ P L B G - C & S _ L o c a l . r v t P1.21 FI R S T F L O O R PL U M B I N G P L A N EL E V A T I O N S C R E D I T U N I O N 22 1 E M O U N T A I N A V E C O R E & S H E L L 22 1 E A S T M O U N T A I N A V E , F O R T C O L L I N S , C O 8 0 5 2 4 3120A SCALE: 1/8" = 1'-0" FIRST FLOOR PLUMBING PLAN FFE = 4,978' Revision Number Revision Date CD N # 3 1 2 0 A - 0 6 7 8/ 1 6 / 2 0 1 9 Storm Filter SF-1 Grid F-9 SF-1 Grid M-10 SF-2 Grid U-3