Loading...
HomeMy WebLinkAboutLot Certifications - 02/20/2015 (37)City Of Utilities electric sionnwater. wastewater. water Fort Collins Wood St. PO Box 580 Fo0 Collins, CO 80522 970 970.221.6700 970.221.6619fax , 970.224.6003 TDD utilifies@lcgov.com . lcgov.com/ufilities CERTIFICATION OF LOT GRADING Pursuant to City Code § 26-544 and City Land Use Code § 3.2.2 (e) Date: 02/18/15 Permit Application No. B1402591 Address: 875A Baum Street Lot: M21 Block: 7 Subdivision: Old Town North Subdivision CC ft(eo,54 %A/2o 1 S I0rint) - Wyatt M. Knutson a Colorado registered professional engineer, verify that the above referenced property in the City of Fort Collins, Colorado, has been inspected by me or an appropriately qualified professional under my direct supervision, and verify that construction of all stormwater facilities and grading is complete, and that the elevations and drainage pat 1ems shown on the attached drawing(s) which were developed from a survey performed on (Date): 02/18/15 , accurately and truly depict the elevations and i drainage patterns as they existed on the date of the survey. Based on this information, I certify that (check one): ❑ The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). SEE NOTE. ® The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions, (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are specifically approved drainage plan, and will affect sto, consistent with the approved drainage plan. SEES By: 1103 Old adequate and equivalent to the off the lot/site in a manner 82009 NOTE: A COMPLETE certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, Including but not limited to drawings of the lot/site showing the approved design and as -built surveyed elevations of all structures, drainage and grading features (e.g. swales, retaining walls, lot comers), written Informationtexplanation of discrepancies, and other Information necessary to confirm the above certification to: Final Grade Assurance Observation: Per the client's request, a representative of CTL has visually observed and measured elevations of the grading aruond the home at the site referenced below. The following summarizes our observations and opinions at the time of our visit CTLITHOMPSON Client: Phase V, LLC. Site Address : 875 Baum St., Fort Collins, CO Job#: WY01035.001 Lot: M18-21 Block: 7 Date: 2/17/2015 Contact: Cleve Schenck Subdivision/filing: Old Town North Background Information: Referenced Grading Plan: Precision Drafting Dated: May 2014 Job#: 1180-01-13 STA# MEASUREMENT ELEVATION REMARKS 1 0.00 63.77 BM/Prop. Comer 2 1.70 65.47 3 1.25 65.02 4 0.20 63.97 Prop. Corner 5 1.60 65.37 6 1.61 65.31 7 2.20 65.97 Slab 8 1.70 65.47 High Point/Slab 9 1.25 65.02 10 0.40 64.17 Prop. Corner 11 1.45 65.22 Slab 12 0.801 64.57 Prop. Corner 13 2.35 66.12 Finish Floor 14 1.35 65.12 15 1.35 65.12 16 0.25 64.02 Prop..Corner 17 1.75 65.52 Slab 18 1.001 64.77 Prop. Corner 19 2.301 66.07 Finish Floor 20 1.20 64.97 21 1.25 65.02 22 0.35 64.12 Prop. Corner 23 1.85 65.62 Slab 24 1.85 65.62 Slab 25 1.25 65.02 Prop. Corner 26 2.30 66.07 Finish Floor 27 1.30 65.07 28 0.35 64.12 Prop. Comer 29 1.35 65.12 30 0.40 64.17 Prop. Comer 31 1.45 65.22 32 1.45 65.22 33 1.50 65.27 341 1.10 64.87 Prop. Comer 351 2.35 68.12 Finish Floor 36 North Summary of opinions: 9 It is our opinion that the top of foundation and grades around the home are consistent with the above referenced grading plan lor are a functionally adequate substitue. o Rejected (2nd observation required) Corrective action: Site: CTL I Thompson, hrc. 1 1103 Old Town Lane, Cheyenne, WY 82009 Page 1 of 1 AT E�ASF,M M18 6c. .3r l� M19 '6. M21 coo M22 r3.77, 14 am , M23 SITE PLAN FOR UNITS 1-4, 876 BAUM STREET LOT M18-M21, BLOCK 7, OLD TOWN NORTH FORT COLLINS, COLORADO iMA M V-20r * PHASE V, LLAC MAY. 2014