CERTIFICATION OF LOT GRADING
Date: 02/18/15
Permit Application No.
Pursuant to City Code § 26-544 and City Land Use Code § 3.2.2 (e)
B1402599
Address: 875E Baum Street
Lot: M20 Block: 7
Subdivision: Old Town North Subdivision
CO rJe&'.*d 'Aahots
I,(Print) Wyatt M. Knutson a Colorado registered professional engineer, verify that the
above referenced property in the City of Fort Collins, Colorado, has been inspected by me or an appropriately
qualified professional under my direct supervision, and verify that construction of all stormwater facilities and
grading is complete, and that the elevations and drainage patterns shown on the attached drawing(s) which were
developed f m a survey performed on (Date): 02/18/15 , accurately and truly depict the elevations and
drainage patterns as they existed on the date of the survey. Based on this information, I certify that (check one):
❑ The elevations and drainage patterns of the lot/site are insubstantial conformance with the City approved
drainage and grading plan for the property (information attached). SEE NOTE.
® The elevations and drainage patterns of the lot/site as measured are in general conformance with the City
approved drainage plan with exceptions (information attached). In my professional judgment the
elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the
specifically approved drainage plan, and will affect si
consistent with the approved drainage plan. SEE
By:
1103 Old
off the lot/site in a manner
Wyoming 82009
NOTE: A COMPLETE certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy
for the lot/site, Including but not limited to drawings of the lot/site showing the approved design and as -built surveyed
elevations of all structures, drainage and grading features (e.g. swales, retaining walls, lot comers), written
Informationlexplanation of discrepancies, and other Information necessary to confirm the above certification to:
Final Grade Assurance Observation:
Per the client's request, a representative of CTL has visually observed
and measured elevations of the grading aruond the home at the site referenced
below. The following summarizes our observafions and opinions at the time of our visit.
CTLITHOMPSON
Client:
Phase V, LLC.
Site Address :
875 Baum St., Fort Collins, CO
Job#:.
WY01035.001
Lot: M18-21
Block: 7
Date:
2/17/2015 Contact: Cleve Schenck
Subdivision/filing:
Old Town North
Background Information:
Referenced Grading Plan: Precision Drafting
Dated: May 2014 Job#: 1180-01-13
STA#
MEASUREMENT
ELEVATION
REMARKS
1
0.00
63.77
BM/Prop. Corner
2
1.70
65.47
3
1.25
65.02
4
0.20
63.97
Prop. Comer
- 5
1.60
65.37
6
1.6
65.37
7
2.20
65.97
Slab
8
1.70
65.47
High Point/Slab
9
1.25
65.02
10
0.40
64.17
Prop. Corner
11
1.45
65.22
Slab
12
0.801
64.57
Prop. Comer
13
2.351
66.12
Finish Floor,
14
1.351
65.12
15
1.351
65.12
16
0.25
64.02
Prop. Comer
17
1.75
65.52
Slab
18
1.00
64.77
Prop. Corner
19
2.30
66.07
Finish Floor
20
1.20
64.97
21
1.251
65.02
22
0.351
64.12
Prop. Comer
23
1.851
65.62
Slab
' 24
1.85
65.62
Slab
25
1.25
65.021
Prop. Comer
26
2.30
66.071
Finish Floor
27
1.30
65.07
on
A'Ir
Rd 99
1 Prnn Cnrnor
North
Summary of opinions:
X It is our opinion that the top of foundation and
grades around the home are consistent with the
above referenced grading plan or are a functionally
adequate substitue.
o Rejected (2nd observation required)
Corrective action:
Site:
my
E. ST
E�ME
2S-
N, N,
., IT
*Aq 21
X A�,
mi
elf.57
M19
M20
PIP
Id
2
s
lil.117
M22
170
M23
SITE PLAN FOR
UNITS 1-4, 675 BAUM STREET
LOT M18-M21, BLOCK 7, OLD TOWN NORTH
FORT COLLINS, COLORADO
PHASE V, UC
MAY. 2014